Jazan Silos Project
Client : Main Contractor :
Prep. By
Planning Engineer / Haytham Gomaa
AGENDA
 PROJECT OVERVIEW
 PROJECT TECHNICAL DATA
 CONSTRUCTION PHOTOS
PROJECT OVERVIEW
PROJECT OVERVIEW
Party Role Organization
Client / Consultant Grain Silos and Flour Mills organization (GSFMO)
Contractor AL – Muhaidib Contracting Company
Contractual Overview
Contract Date 31-DEC-2011
Contract
Completion
28-FEB-2014
Time Extension 20 Months
Revised Completion 15-Nov.-2015
Contract Summary
Item No. Value (SR)
Original Contract Amount - 373,730,000
Approved Variation Orders 01 20,061,359
Contract amount included VO 1 393,791,359
Approved Variation order 02 17,256,761
Expected Contract Value Included VO 2 - 411,048,120
PROJECT OVERVIEW
Building Code Description Approx. Area (M2)
Process Building
W10/W20 Silo1 /Head House 1 7,584
W60/W70 Silo2/ Head House 2 7,278
PRODUCT CAPACITY = 120 ,000 TONS
Ancillary Building /Fence
A10 Admin Building 1 304
B10 Spare parts , Store 626
A20 Admin Building 2 1,148
A30 Sales Office 941
A40 Mosque 358
B50 Technical Building 1,824
B35 , B40 Toilet Building , Driver rest room 100
B70 Cafeteria 702
Fence 1730 L.M
PROJECT TECHNICAL DATA
PROJECT TECHNICAL DATA
A. Soil Works
1. Excavation works.
2. Pilling works.
B. Concrete Works
C. Steel Struc. Works
D. Project Storage Capacity
E. Process Used Systems
F. Process Conveyors
G. Ship unloaders
H. Electrical works
I. Firefighting works
J. Automation works
A. Soil Works
1. Excavation :
Soil excavated volume is 210,000
cubic meter to be considered for
both process & ancillaries areas
of works.
2. Pilling Works :
Total no. for executed piles is
1519 pile with average
approximate length 28 meter
under ground.
B. Concrete Works
Total amount of concrete
consumed to construct 2 units
of silos with all ancillary
buildings is equal to 95,000 m3.
C. Steel Structure works
Total weights for installed steel
structure works are equal to
1550 ton
D. Storage Capacity
Project storage capacity is equal to
120,000 ton of wheat .
This capacity is represented in 72 Silos
each silo can store 1,666 ton of wheat.
Wheat cycle passes on a lot of process like elevating , separation , cleaning
, weighing ... Etc.
• Elevating System (bucket elevators) : 8 bucket elevators are installed
with average height 65 m , 3 with height 30 m , 3 with height 12 m.
All with elevating speed 1000 ton/hr to elevate the wheat for
complete its cycle.
• Magnetic Drum System : The process for separation of metals from
the wheat.
• Pre-Cleaning System : The process for cleaning the wheat from the
solid particles and any defects.
• Pre-Tempering System : The process of adding water to wheat before
milling aids in producing consistent and good quality for finished
flours.
• Central Vacuum System : The process used for collect & separate dust
& small particles from wheat grains.
E. Process Used Systems
• Aspiration System : The process of collecting dust to cover all wheat
cycle from elevating and conveying process .
• Ventilation System : The system used for draw out the heat, humidity
and condensation of the wheat inside silos to save it from growing
bacteria.
• Electronic Weighs : There are 2 types of weighs are used for the
process of weigh the wheat before storage and during out-loading :
1. Electronic weighs : 2 with capacity 200 ton/hr are installed in
HH2 and 1 with capacity 1000 ton/hr is installed in HH1.
2. Out-Lead weighs : 6 weighs are installed in truck loading
buildings with average capacity 90 ton/hr.
• Pneumatic system & Compressed Air System : The process of Auto-
control of gates.
E. Process Used Systems
Conveyors that used in cycle of wheat flow
is classified to 2 types :
1. Belt-Conveyors : with total linear
meter 1065 meter & capacity 1000
ton/hr
2. Chain-Conveyors : with total linear
meter 940 meter.
F. Process Conveyors
G. SHIP UNLOADERS
2 ship unloader is
constructed on port quay
on a steel rail for flexible
movement and to increae
the served area
Each ship unloader has :
• Max unloading capacity
650 ton/hr.
• Boom length is 28.5
meter.
H. Electrical Works
Cables :
Pulled MV cables 4.30 KM.
Pulled LV cables 1308 KM.
Pulled Control cables 218 KM.
Generators :
7 Generators each one with feeding power
about 2.5 MVA to feed with total power 17.5
MVA to operate the factory in emergency status.
Synchronization panels & Switchgears :
2 Sync panels.
5 Switch-gears.
2 Ring main units.
A 3 types of fire suppression systems is installed
:
1. Fire Extinguishers : used in admin buildings.
2. FM200 : used in electrical substations.
3. Foam System : used in fuel tanks structures.
I. Firefighting Works
Automation works can be classified as :
• Cables:
Linear meter for pulled control cables reached to 218
KM.
• Temp. sensors = 216 sensor.
• Leveling sensors = 240 sensor.
• G. Sensors & devices = 3000 sensor & devise.
• Junction & sub-junction boxes = 2080 box.
• PLC & Remote I/O panels = 82 panels.
J. Automation Works
Construction Photos
Foundation - Pilling Works
Ware House B45 & Technical Building B50
Foundation – Raft Works
Finish Casting of Concrete in Silo1 Cluster B Walls
Silo 1
Ware House B45
Head House 2
Electrical Works inside Head House 2
Silo 2
Conveyors W50 & Q30
Sales Office Building A30
Cafeteria Building B70
Admin building A20
Admin building A20
Entrance Gates
www.muhaidibco.com

Mais conteúdo relacionado

Mais procurados

Cement plant lubrication
Cement plant lubricationCement plant lubrication
Cement plant lubrication
M Hussam Adeni
 
TC Inventor slideshow
TC Inventor slideshowTC Inventor slideshow
TC Inventor slideshow
Thomas Capps
 

Mais procurados (20)

Mining dumper
Mining dumperMining dumper
Mining dumper
 
BELT CONVEYORS
BELT CONVEYORSBELT CONVEYORS
BELT CONVEYORS
 
1.2.2.front end loaders
1.2.2.front end loaders1.2.2.front end loaders
1.2.2.front end loaders
 
Introduction to excavator
Introduction to excavatorIntroduction to excavator
Introduction to excavator
 
1926 concrete safety 2017
1926 concrete safety 20171926 concrete safety 2017
1926 concrete safety 2017
 
Forklift Study Guide
Forklift Study GuideForklift Study Guide
Forklift Study Guide
 
The productivity of lhd in underground coal mines
The productivity of   lhd in underground coal minesThe productivity of   lhd in underground coal mines
The productivity of lhd in underground coal mines
 
Shovel excavator
Shovel excavatorShovel excavator
Shovel excavator
 
Working of dragline
Working of draglineWorking of dragline
Working of dragline
 
Clutch
ClutchClutch
Clutch
 
Longwall mining[1]
Longwall mining[1]Longwall mining[1]
Longwall mining[1]
 
Coupling Alignment
Coupling Alignment Coupling Alignment
Coupling Alignment
 
Comparison between skip winding and high angle conveyor for vertical transport
Comparison between skip winding and high angle conveyor for vertical transportComparison between skip winding and high angle conveyor for vertical transport
Comparison between skip winding and high angle conveyor for vertical transport
 
LIQUEFIED PETROLEUM GAS INSTALLATION
LIQUEFIED PETROLEUM GAS INSTALLATIONLIQUEFIED PETROLEUM GAS INSTALLATION
LIQUEFIED PETROLEUM GAS INSTALLATION
 
Cement plant lubrication
Cement plant lubricationCement plant lubrication
Cement plant lubrication
 
fire safety
fire safetyfire safety
fire safety
 
Belt conveyor
Belt conveyorBelt conveyor
Belt conveyor
 
Exemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignmentExemplary report-rotary-kiln-alignment
Exemplary report-rotary-kiln-alignment
 
TC Inventor slideshow
TC Inventor slideshowTC Inventor slideshow
TC Inventor slideshow
 
FIRE FIGHTING PRESENTATION
FIRE FIGHTING PRESENTATIONFIRE FIGHTING PRESENTATION
FIRE FIGHTING PRESENTATION
 

Destaque

Grelos e nabos
Grelos e nabosGrelos e nabos
Grelos e nabos
monadela
 
Food And Agriculture Organization)Power Point
Food And Agriculture Organization)Power PointFood And Agriculture Organization)Power Point
Food And Agriculture Organization)Power Point
netescrita
 
Storage of agricultural commodities
Storage of agricultural commoditiesStorage of agricultural commodities
Storage of agricultural commodities
Prathyush Raj K
 

Destaque (20)

The influence of temperature, humidity and airflow on the grain drying process
The influence of temperature, humidity and airflow on the grain drying process The influence of temperature, humidity and airflow on the grain drying process
The influence of temperature, humidity and airflow on the grain drying process
 
Grain storage in steel silos - Technology in Grain Storage Terminal
Grain storage in steel silos - Technology in Grain Storage TerminalGrain storage in steel silos - Technology in Grain Storage Terminal
Grain storage in steel silos - Technology in Grain Storage Terminal
 
Moisture control in storage
Moisture control in storageMoisture control in storage
Moisture control in storage
 
Grelos e nabos
Grelos e nabosGrelos e nabos
Grelos e nabos
 
Advantures by Mustard
Advantures by MustardAdvantures by Mustard
Advantures by Mustard
 
Desinteres por el presente
Desinteres por el presenteDesinteres por el presente
Desinteres por el presente
 
Solvita grain apresent
Solvita grain apresentSolvita grain apresent
Solvita grain apresent
 
Enterprise Architecture
Enterprise ArchitectureEnterprise Architecture
Enterprise Architecture
 
ppt project
ppt projectppt project
ppt project
 
Storage of crop grains
Storage of crop grainsStorage of crop grains
Storage of crop grains
 
Food And Agriculture Organization)Power Point
Food And Agriculture Organization)Power PointFood And Agriculture Organization)Power Point
Food And Agriculture Organization)Power Point
 
Socio-economic impact of Big Data and Smart Farming
Socio-economic impact of Big Data  and Smart FarmingSocio-economic impact of Big Data  and Smart Farming
Socio-economic impact of Big Data and Smart Farming
 
Storage of agricultural commodities
Storage of agricultural commoditiesStorage of agricultural commodities
Storage of agricultural commodities
 
Indigenous grain storage. ppt
Indigenous grain storage. pptIndigenous grain storage. ppt
Indigenous grain storage. ppt
 
Storage structre
Storage structreStorage structre
Storage structre
 
Indian Economy and Agriculture
Indian Economy and AgricultureIndian Economy and Agriculture
Indian Economy and Agriculture
 
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)
MRP II - Manufacturing Resource Planning ( Planejamento de Recursos de Produção)
 
Estrutura geológica e formas de relevo terrestre - atualizado
Estrutura geológica e formas de relevo terrestre - atualizadoEstrutura geológica e formas de relevo terrestre - atualizado
Estrutura geológica e formas de relevo terrestre - atualizado
 
Modern type storage
Modern type storageModern type storage
Modern type storage
 
Agriculture in indian economy- Vishnu pujari
Agriculture in indian economy- Vishnu pujariAgriculture in indian economy- Vishnu pujari
Agriculture in indian economy- Vishnu pujari
 

Semelhante a Microsoft PowerPoint - Jazan Grain Silos Project - Works Records - 24.03.2016

PROPOSAL OF 1x30MVA SILICON METAL FURNACE PROJECT
PROPOSAL OF 1x30MVA SILICON METAL FURNACE PROJECTPROPOSAL OF 1x30MVA SILICON METAL FURNACE PROJECT
PROPOSAL OF 1x30MVA SILICON METAL FURNACE PROJECT
Guo ke
 
Thermal Power Simulator Training
Thermal Power Simulator TrainingThermal Power Simulator Training
Thermal Power Simulator Training
Vedant Sumaria
 
INTERNSHIP REPORT ps
INTERNSHIP REPORT psINTERNSHIP REPORT ps
INTERNSHIP REPORT ps
Tarab Wasi
 

Semelhante a Microsoft PowerPoint - Jazan Grain Silos Project - Works Records - 24.03.2016 (20)

kota super thermal poer plant
kota super thermal poer plantkota super thermal poer plant
kota super thermal poer plant
 
PROPOSAL OF 1x30MVA SILICON METAL FURNACE PROJECT
PROPOSAL OF 1x30MVA SILICON METAL FURNACE PROJECTPROPOSAL OF 1x30MVA SILICON METAL FURNACE PROJECT
PROPOSAL OF 1x30MVA SILICON METAL FURNACE PROJECT
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power Station
 
ntpc khalgaon
ntpc khalgaonntpc khalgaon
ntpc khalgaon
 
SSGC Karachi Internship report
SSGC Karachi Internship report SSGC Karachi Internship report
SSGC Karachi Internship report
 
Introduction to operation and Control of Thermal Power Plant
Introduction to operation and Control of Thermal Power PlantIntroduction to operation and Control of Thermal Power Plant
Introduction to operation and Control of Thermal Power Plant
 
Ntpc unchahar
Ntpc unchaharNtpc unchahar
Ntpc unchahar
 
SSGC Karachi Internship report
SSGC Karachi Internship report SSGC Karachi Internship report
SSGC Karachi Internship report
 
PRESENTATION
PRESENTATIONPRESENTATION
PRESENTATION
 
Study of corrosion and erosion in boilers
Study of corrosion and erosion in boilersStudy of corrosion and erosion in boilers
Study of corrosion and erosion in boilers
 
A best ppt on kota super thermal power station
A best ppt on kota super thermal power stationA best ppt on kota super thermal power station
A best ppt on kota super thermal power station
 
presentation on Siemens
presentation on Siemenspresentation on Siemens
presentation on Siemens
 
NARENDRA MEENA REPORT AND PPT
NARENDRA MEENA  REPORT AND PPT NARENDRA MEENA  REPORT AND PPT
NARENDRA MEENA REPORT AND PPT
 
Thermal power plant2222222222222222
Thermal power plant2222222222222222Thermal power plant2222222222222222
Thermal power plant2222222222222222
 
Ntpc kahalgaon project by bhanu kishan
Ntpc kahalgaon project by bhanu kishanNtpc kahalgaon project by bhanu kishan
Ntpc kahalgaon project by bhanu kishan
 
Summer Training Presentation Kota Super Thermal Power Station
Summer Training Presentation Kota Super Thermal Power StationSummer Training Presentation Kota Super Thermal Power Station
Summer Training Presentation Kota Super Thermal Power Station
 
Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccpp
 
SUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTIONSUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTION
 
Thermal Power Simulator Training
Thermal Power Simulator TrainingThermal Power Simulator Training
Thermal Power Simulator Training
 
INTERNSHIP REPORT ps
INTERNSHIP REPORT psINTERNSHIP REPORT ps
INTERNSHIP REPORT ps
 

Microsoft PowerPoint - Jazan Grain Silos Project - Works Records - 24.03.2016

  • 1. Jazan Silos Project Client : Main Contractor : Prep. By Planning Engineer / Haytham Gomaa
  • 2.
  • 3.
  • 4.
  • 5. AGENDA  PROJECT OVERVIEW  PROJECT TECHNICAL DATA  CONSTRUCTION PHOTOS
  • 7. PROJECT OVERVIEW Party Role Organization Client / Consultant Grain Silos and Flour Mills organization (GSFMO) Contractor AL – Muhaidib Contracting Company Contractual Overview Contract Date 31-DEC-2011 Contract Completion 28-FEB-2014 Time Extension 20 Months Revised Completion 15-Nov.-2015 Contract Summary Item No. Value (SR) Original Contract Amount - 373,730,000 Approved Variation Orders 01 20,061,359 Contract amount included VO 1 393,791,359 Approved Variation order 02 17,256,761 Expected Contract Value Included VO 2 - 411,048,120
  • 8. PROJECT OVERVIEW Building Code Description Approx. Area (M2) Process Building W10/W20 Silo1 /Head House 1 7,584 W60/W70 Silo2/ Head House 2 7,278 PRODUCT CAPACITY = 120 ,000 TONS Ancillary Building /Fence A10 Admin Building 1 304 B10 Spare parts , Store 626 A20 Admin Building 2 1,148 A30 Sales Office 941 A40 Mosque 358 B50 Technical Building 1,824 B35 , B40 Toilet Building , Driver rest room 100 B70 Cafeteria 702 Fence 1730 L.M
  • 10. PROJECT TECHNICAL DATA A. Soil Works 1. Excavation works. 2. Pilling works. B. Concrete Works C. Steel Struc. Works D. Project Storage Capacity E. Process Used Systems F. Process Conveyors G. Ship unloaders H. Electrical works I. Firefighting works J. Automation works
  • 11. A. Soil Works 1. Excavation : Soil excavated volume is 210,000 cubic meter to be considered for both process & ancillaries areas of works. 2. Pilling Works : Total no. for executed piles is 1519 pile with average approximate length 28 meter under ground.
  • 12. B. Concrete Works Total amount of concrete consumed to construct 2 units of silos with all ancillary buildings is equal to 95,000 m3.
  • 13. C. Steel Structure works Total weights for installed steel structure works are equal to 1550 ton
  • 14. D. Storage Capacity Project storage capacity is equal to 120,000 ton of wheat . This capacity is represented in 72 Silos each silo can store 1,666 ton of wheat.
  • 15. Wheat cycle passes on a lot of process like elevating , separation , cleaning , weighing ... Etc. • Elevating System (bucket elevators) : 8 bucket elevators are installed with average height 65 m , 3 with height 30 m , 3 with height 12 m. All with elevating speed 1000 ton/hr to elevate the wheat for complete its cycle. • Magnetic Drum System : The process for separation of metals from the wheat. • Pre-Cleaning System : The process for cleaning the wheat from the solid particles and any defects. • Pre-Tempering System : The process of adding water to wheat before milling aids in producing consistent and good quality for finished flours. • Central Vacuum System : The process used for collect & separate dust & small particles from wheat grains. E. Process Used Systems
  • 16. • Aspiration System : The process of collecting dust to cover all wheat cycle from elevating and conveying process . • Ventilation System : The system used for draw out the heat, humidity and condensation of the wheat inside silos to save it from growing bacteria. • Electronic Weighs : There are 2 types of weighs are used for the process of weigh the wheat before storage and during out-loading : 1. Electronic weighs : 2 with capacity 200 ton/hr are installed in HH2 and 1 with capacity 1000 ton/hr is installed in HH1. 2. Out-Lead weighs : 6 weighs are installed in truck loading buildings with average capacity 90 ton/hr. • Pneumatic system & Compressed Air System : The process of Auto- control of gates. E. Process Used Systems
  • 17. Conveyors that used in cycle of wheat flow is classified to 2 types : 1. Belt-Conveyors : with total linear meter 1065 meter & capacity 1000 ton/hr 2. Chain-Conveyors : with total linear meter 940 meter. F. Process Conveyors
  • 18. G. SHIP UNLOADERS 2 ship unloader is constructed on port quay on a steel rail for flexible movement and to increae the served area Each ship unloader has : • Max unloading capacity 650 ton/hr. • Boom length is 28.5 meter.
  • 19. H. Electrical Works Cables : Pulled MV cables 4.30 KM. Pulled LV cables 1308 KM. Pulled Control cables 218 KM. Generators : 7 Generators each one with feeding power about 2.5 MVA to feed with total power 17.5 MVA to operate the factory in emergency status. Synchronization panels & Switchgears : 2 Sync panels. 5 Switch-gears. 2 Ring main units.
  • 20. A 3 types of fire suppression systems is installed : 1. Fire Extinguishers : used in admin buildings. 2. FM200 : used in electrical substations. 3. Foam System : used in fuel tanks structures. I. Firefighting Works
  • 21. Automation works can be classified as : • Cables: Linear meter for pulled control cables reached to 218 KM. • Temp. sensors = 216 sensor. • Leveling sensors = 240 sensor. • G. Sensors & devices = 3000 sensor & devise. • Junction & sub-junction boxes = 2080 box. • PLC & Remote I/O panels = 82 panels. J. Automation Works
  • 24. Ware House B45 & Technical Building B50
  • 26. Finish Casting of Concrete in Silo1 Cluster B Walls
  • 28.
  • 31. Electrical Works inside Head House 2