(July-2022 - Dec-2022)
PREVIOUS MEETING PENDING POINTS STATUS
JINDAL SAW LIMITED - SAMAGHOGHA
2
(July-2022 - Dec-2022)
Sr.
No.
DEPARTMENT DESCRIPTION STATUS Remarks
1
SAWH-2
(Elect. Maint.)
New DC 1500 Elmatech power
source installation & commissioning
to be done as a Master/ Slave
combination with Existing system for
increase mill speed up to 10
meters/min.
Under Process.
M/s Elmatech Germany is not confirm plan for site visit
(party not respond even though purchaser mailing to
them mean time raise service PR 1320025318 for the
same).
New Target
December-2022
2
SAWH-2
(Elect. Maint.)
ID/OD-1 (OLWS) new
machine Installation &
commissioning.
Wagon all servo motor trial done with panel. All power
source shifted on platform & its welding cable
connection work under progress. Cabinet panel Cable
laying done termination work under progress.
New Target Augest-
2022
3
SAWH 2 (Mech.
Maint)
EOT Crane Bay Platform
Installation
20% Work is completed (Run Out Area). Also Depends
On Plant Idle Time.
New Target SEP-
2022
4
SAWH 2 (Mech.
Maint)
ID/OD-1, New Welding Machine
Installation And
Commissioning.
Some Materials Are Received & Others Are Yet To
Come.
Aug’2022
5
JCO-2
Electrical
Maintenance
3MVA & 5MVA transformer
painting of JCO & IBM work to
be done.
New PR has been raised for the same & will be done
after that.
New Target
Mar-2023
6
PRODUCTION SUMMARY
July-2022 To Dec-2022
Month
CRA Welded pipe
(Mtr.)
IBM (Nos.)
SAWH 1
(Mtr.)
SAWH 2
(Mtr.)
July-2022
Aug -2022
Sep-2022
Oct -2022
Nov -2022
Dec -2022
Total
JINDAL SAW LIMITED -
SAMAGHOGHA
3
(July-2022 - Dec-2022)
QMS OBJECTIVES ACHIEVEMENT REPORT
(July-2022 - Dec-2022)
Sr.
No.
Depar
tment
Objective
Key
Performance
Indicator
July-22
Aug-
22
Sep-22 Oct-22 Nov-22 Dec-22
JCO-II
QA/QC (JCO-II)
1
JCO
(QA/QC)
Controlling field non-
conformities.
“0” field non-
conformities
Customer complaints not
more than 3 (other than
product/field non
conformity)
≤3 Customer
complaints
2
PRODUCTION (JCO-II)
3
JCO
(Production)
Pipe Production
As
per
monthly
Production
Plan
Production
Planning (MT)
Achievement
(MT)
JINDAL SAW LIMITED - SAMAGHOGHA 4
(July-2022 - Dec-2022)
QMS OBJECTIVES ACHIEVEMENT REPORT
((July-2022 - Dec-2022))
Sr.
No
Depart
ment
Objective
Key Performance
Indicator
July-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22
4
JCO-2
(Product
ion)
Control over consumption of
welding consumables during
TIG-Plasma welding process
and ID TIG welding process
(for square butt weld
groove).
As
per
updated
Norms
of
year
2022
Planning (kg)
Achievement
(kg)
5
To minimize the total weld
repair length
(Straight welding, Plate
joining and Circumferential
welding).
≤ 0.4% of total weld length
6
To minimize the rejection of
Bend
0% of Total Production
Bend
Mechanical Maintenance (JCO-II) For JCO-II Plant (Monthly Breakdown Time)
7A
JCO-2
(Mechan
ical
Mainten
ance)
JCO Press: Breakdown
time shall not exceed 90
minutes per month (30
Working Days).
Base Line: 95 minutes
(30 Working Days)-
Year 2021 target
Maximum
breakdown
time 90
minutes per
Month (30
days)
Plant running days
in a month
Actual target vs.
plant running days
(Minutes)
Breakdown Time
(Minutes)
JINDAL SAW LIMITED - SAMAGHOGHA 5
(July-2022 - Dec-2022)
QMS OBJECTIVES ACHIEVEMENT REPORT
July-2022 To Dec-2022
Sr.
No.
Depar
tment
Objective
Key Performance
Indicator
July-22
Aug-
22
Sep-22 Oct-22 Nov-22 Dec-22
7B
JCO
(Mechanica
l
Maintenanc
e)
Edge Miller: Breakdown
time shall not exceed 50
minutes per month (30
Working Days).
Base Line: 53 minutes (30
Working Days)-Year 2021
target
Edge Miller:
Maximum
breakdown
time 50
minutes per
Month (30
days).
Plant running
days in a month
Actual target vs.
plant running days
Breakdown Time
(Minutes)
7C
Welding (Tig Plasma):
Breakdown time shall not
exceed 35 minutes per
month (30 Working Days).
Base Line: 38 minutes (30
Working Days)-Year 2021
target
Maximum
breakdown
time 35
minutes per
Month (30
days).
Plant running
days in a month
Actual target vs.
plant running days
Breakdown Time
(Minutes)
7D
End Facer (1&2):
Breakdown time shall not
exceed 85 minutes per
month (30 Working Days).
Base Line: 90 minutes (30
Working Days)-Year 2021
target.
Maximum
breakdown
time 85
minutes per
Month (30
days).
Plant running
days in a month
Actual target vs.
plant running days
Breakdown Time
(Minutes)
7E
Expander (1&2):
Breakdown time shall not
exceed 61 minutes per
month (30 Working Days)
Base Line: Average
breakdown time of months
(considering 30 working
days) in which breakdown
occurred for year 2021.
Maximum
breakdown
time 61
minutes per
Month (30
days).
Plant running
days in a month
Actual target vs.
plant running days
Breakdown Time
(Minutes)
JINDAL SAW LIMITED - SAMAGHOGHA 6
(July-2022 - Dec-2022)
QMS OBJECTIVES ACHIEVEMENT REPORT
July-2022 To Dec-2022
Sr.
No.
Depart
ment
Objective Key Performance Indicator July-22
Aug-
22
Sep-22 Oct-22 Nov-22 Dec-22
8
JCO
(Mechani
cal
Maintena
nce)
2% reduce monthly consumption
of Hydraulic Oil-68 in JCO plant
as compared to previous year
KPI.
Base Line: Previous year
(2021) target 576 liters/ month.
Maximum 564 liters monthly
consumption of Hydraulic Oil-68
in JCO plant.
9A
IBM 1&2: Breakdown time
shall not exceed 155 minutes per
month (30 Working Days).
Base Line: 160 minutes (30
Working Days)-Year 2021
target.
Maximum
breakdown
time 155
minutes per
month (30
Working
Days).
Plant running days
in a month
Actual target vs.
plant running days
Breakdown Time
(Minutes)
9B
IBM Hydro Tester: Breakdown
time shall not exceed 45 minutes
per month (30 Working Days).
Base Line: 48 minutes (30
Working Days)-Year 2021
target.
Maximum
breakdown
time 45
minutes per
Month (30
days).
Plant running days
in a month
Actual target vs.
plant running days
Breakdown Time
(Minutes)
Electrical Maintenance (JCO-II) For JCO-II Plant (Monthly Breakdown Time)
10A
JCO
(Electrica
l
Maintena
nce)
JCO Press: Break down time
shall not exceed 160 minutes per
month (30 Working Days).
Base Line: 166 minutes in June-
2021 (30 Working Days).
.
Maximum
breakdown
time 160
minutes per
Month (30
days).
Plant running days in
a month
27 26 26 25 22 24
Actual target vs.
plant running days
144 139 139 133 117 128
Breakdown Time
(Minutes)
30 30 45 35 30 40
JINDAL SAW LIMITED - SAMAGHOGHA
7
(July-2022 - Dec-2022)
QMS OBJECTIVES ACHIEVEMENT REPORT
July-2022 To Dec-2022
Sr.
No
.
Depart
ment
Objective
Key Performance
Indicator
July-22 Aug-22
Sep-
22
Oct-22
Nov-
22
Dec-
22
10B
JCO
(Electrical
Maintenan
ce)
Edge Miller: Breakdown
time shall not exceed 60
minutes per month (30
Working Days).
Base Line: 62 minutes in
April-2021 (30 Working
Days).
.
Maximum
breakdown
time 60
minutes per
Month (30
days).
Plant running days
in a month
27 26 26 25 22 24
Actual target vs.
plant running days
54 52 52 50 44 48
Breakdown Time
(Minutes)
30 45 30 30 35 30
10C
Welding (Tig Plasma):
Breakdown time shall not
exceed 160 minutes per
month (30 Working Days).
Base Line: 165 minutes in
Sept-2021 (30 Working
Days).
Maximum
breakdown
time 160
minutes per
Month (30
days).
Plant running days
in a month
27 26 26 25 22 24
Actual target vs.
plant running days
144 139 139 133 117 128
Breakdown Time
(Minutes)
140 40 40 30 40 30
10D
Expander (1&2): Breakdown
time shall not exceed 85
minutes per month (30
Working Days).
Base Line: 88 minutes in
May-2021 (30 Working
Days).
Maximum
breakdown
time 85
minutes per
Month (30
days).
Plant running days
in a month
27 26 26 25 22 24
Actual target vs.
plant running days
76 74 74 71 62 68
Breakdown Time
(Minutes)
20 45 30 25 25 25
10E
Hydro Tester: Breakdown
time shall not exceed 90
minutes per month (30
Working Days).
Base Line: 93 minutes in
June-2021 (30 Working
Days).
Maximum
breakdown
time 90
minutes per
Month (30
days).
Plant running days
in a month
27 26 26 25 22 24
Actual target vs.
plant running days
81 78 78 75 66 72
Breakdown Time
(Minutes)
30 30 35 20 30 60
JINDAL SAW LIMITED - SAMAGHOGHA
8
(July-2022 - Dec-2022)
QMS OBJECTIVES ACHIEVEMENT REPORT
July-2022 To Dec-2022
Sr.
No.
Depar
tment
Objective
Key Performance
Indicator
July-22
Aug-
22
Sep-22 Oct-22 Nov-22 Dec-22
11
JCO-2
(Electrical
Maintenan
ce)
2 % reduction in
consumption of electrical
power in non production
area (Store, Admin, Plant
& office light) from
previous year (2021)
actual consumption.
Base Line: Actual power
consumption in year
2021= 183392 kWh
Maximum power consumption
in non production area 179724
KWh for the year 2022
16956 16420 14510 13817 13103 13345
= 88151 KWH
12A
IBM 1&2: Breakdown time
shall not exceed 100 minutes
per month (30 Working Days)
- Same as previous year
(2021).
Base Line: 105 minutes (30
Working Days)-Year 2020
target.
Maximum
breakdown
time 100
minutes per
Month (30
days).
Plant running
days in a month
SD SD SD 6 10 21
Actual target vs.
plant running
days
SD SD SD 20 33 70
Breakdown
Time (Minutes)
SD SD SD 0 0 0
12B
IBM End Facer: Breakdown
time shall not exceed 119
minutes per month (30
Working Days) - Same as
previous year (2021).
Base Line: 125 minutes (30
Working Days)-Year 2020
target.
Maximum
breakdown
time 119
minutes per
Month (30
days).
Plant running
days in a month
SD SD SD 6 10 21
Actual target vs.
plant running
days
SD SD SD 24 40 83
Breakdown
Time (Minutes)
SD SD SD 0 0 0
JINDAL SAW LIMITED - SAMAGHOGHA 9
(July-2022 - Dec-2022)
QMS OBJECTIVES ACHIEVEMENT REPORT
July-2022 To Dec-2022
Sr
.
N
o.
Depart
ment
Objective
Key Performance
Indicator
July-22
Aug-
22
Sep-22 Oct-22 Nov-22 Dec-22
SAWH-Unit (Spiral I & Spiral II)
QA/QC (SAWH)
13
SAWH
(QA/QC)
To ensure No
Customer Complaint
with regards to
Product Quality
Zero (0) customer
Complaints
SAWH-1
SAWH-2
14
No Non Conformity
in a month by Third
Party Inspection
Agency (TPIA)
during Final Visual
and Dimensional
Inspection stage.
No Non
Conformity by
TPIA in a Month.
SAWH-1
SAWH-2
15
X-Ray film
Consumption due to
RT and DRT shall
not exceed 1.38%
during API order
X-Ray film
consumption on
A/C of RT &
DRT= 1.38 %
maximum.
SAWH-1
SAWH-2
JINDAL SAW LIMITED - SAMAGHOGHA
10
(July-2022 - Dec-2022)
QMS OBJECTIVES ACHIEVEMENT REPORT
July-2022 To Dec-2022
Sr.
No.
Depar
tment
Objective
Key Performance
Indicator
July-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22
PRODUCTION (SAWH)
16
SAWH
(Produc
tion)
Pipe Production
As per
monthly
Production
Plan
SAWH-1
SAWH-2
17
To reduce the
milling inserts
consumption
0.11
insert/MT
SAWH-1
SAWH-2
18
To reduce the weld
repair length
0.005 % of
total weld
length
produced
SAWH-1
SAWH-2
19
To reduce the
consumption of
beveling inserts
0.016
insert/MT
SAWH-1
SAWH-2
JINDAL SAW LIMITED - SAMAGHOGHA
11
(July-2022 - Dec-2022)
QMS OBJECTIVES ACHIEVEMENT REPORT
July-2022 To Dec-2022
Sr.
No.
Depart
ment
Objective
Key Performance
Indicator
July-22
Aug-
22
Sep-22 Oct-22 Nov-22 Dec-22
MECH. MAINTENANCE (SAWH)
For SAWH-1 Plant (Monthly Breakdown Time)
20A
SAWH-
1
(Mech.
Mainten
ance)
Forming Mill: Breakdown
time shall not exceed 470
minutes per month (30
Working Days).
Base Line: 480 minutes (30
Working Days)-Year 2021
target
Maximum
breakdown
time 470
minutes per
Month (30
days).
Plant running
days in a month
Actual target vs.
plant running
days
Breakdown
Time (Minutes)
20B
Welding (ID/OD 1+ID/OD
2+ID/OD 3): Breakdown
time shall not exceed 265
minutes per month (30
Working Days).
Base Line: 275 minutes (30
Working Days)-Year 2021
target
Maximum
breakdown
time 265
minutes per
Month (30
days).
Plant running
days in a month
Actual target vs.
plant running
days
Breakdown
Time (Minutes)
20C
Hydro Tester: Breakdown
time shall not exceed 310
minutes per month (30
Working Days).
Base Line: 320 minutes (30
Working Days)-Year 2021
target
Maximum
breakdown
time 310
minutes per
Month (30
days)
Plant running
days in a month
Actual target vs.
plant running
days
Breakdown
Time (Minutes)
(July-2022 - Dec-2022)
JINDAL SAW LIMITED - SAMAGHOGHA 12
QMS OBJECTIVES ACHIEVEMENT REPORT
July-2022 To Dec-2022
JINDAL SAW LIMITED - SAMAGHOGHA 13
Sr.
No.
Depart
ment
Objective
Key Performance
Indicator
July-
22
Aug-
22
Sep-
22
Oct-22
Nov-
22
Dec-
22
For SAWH-2 Plant (Monthly Breakdown Time)
20
A
SAWH-
2
(Mech.
Mainte
nance)
Forming Mill: Breakdown time
shall not exceed 940 minutes per
month (30 Working Days).
Base Line: 960 minutes (30
Working Days)-Year 2021
target.
Maximum
breakdown
time 940
minutes per
Month (30
days).
Plant running days
in a month
Actual target vs.
plant running days
Breakdown Time
(Minutes)
20
B
Welding (ID/OD 2+ID/OD
3+ID/OD 4): Breakdown time
shall not exceed 700 minutes per
month (30 Working Days).
Base Line: 720 minutes (30
Working Days)-Year 2021
target
Maximum
breakdown
time 700
minutes per
Month (30
days).
Plant running days
in a month
Actual target vs.
plant running days
Breakdown Time
(Minutes)
20
C
Hydro Tester: Breakdown time
shall not exceed 570 minutes per
month (30 Working Days).
Base Line: 585 minutes (30
Working Days)-Year 2021
target.
Maximum
breakdown
time 570
minutes per
Month (30
days)
Plant running days
in a month
Actual target vs.
plant running days
Breakdown Time
(Minutes)
21
Hydraulic oil consumption is
reduced to 500 liters for year
2022 (Reduced by 20 liters)
Base line- 520 liters (Year 2021
target)
Maximum
consumption
of Hydraulic
oil 500 liters
per month
SAWH-1
SAWH-2
(July-2022 - Dec-2022)
QMS OBJECTIVES ACHIEVEMENT REPORT
July-2022 To Dec-2022
Sr.
No.
Depart
ment
Objective
Key Performance
Indicator
July-22
Aug-
22
Sep-22 Oct-22 Nov-22 Dec-22
ELECTRICAL MAINTENANCE
For SAWH-1 Plant (Monthly Breakdown Time)
22A
SAWH-1
(Elec.
Maintena
nce)
Forming Mill: Breakdown
time shall not exceed 1106
minutes per month (30
Working Days).
Base Line: 1164 minutes (30
Working Days) - Year 2021
target.
Maximum
breakdown
time
1106minut
es per
Month (30
days)
Plant running
days in a month
Actual target vs.
plant running
days
Breakdown Time
(Minutes)
22B
Welding (ID/OD 1+ID/OD
2+ID/OD 3): Breakdown
time shall not exceed 605
minutes per month (30
Working Days).
Base Line: 637 minutes (30
Working Days) - Year 2021
target.
Maximum
breakdown
time 605
minutes per
Month (30
days)
Plant running
days in a month
Actual target vs.
plant running
days
Breakdown Time
(Minutes)
For SAWH-2 Plant (Monthly Breakdown Time)
22A
SAWH-2
(Elec.
Maintena
nce)
Forming Mill: Breakdown
time shall not exceed 354
minutes per month (30
Working Days).
Base Line: Average
breakdown time of months
(considering 30 working
days) in which target not
achieved for year 2021.
Maximum
breakdown
time 354
minutes per
Month (30
days)
Plant running
days in a
month
Actual target
vs. plant
running days
Breakdown
Time (Minutes)
JINDAL SAW LIMITED - SAMAGHOGHA 14
(July-2022 - Dec-2022)
QMS OBJECTIVES ACHIEVEMENT REPORT
July-2022 To Dec-2022
Sr.
No.
Depart
ment
Objective
Key Performance
Indicator
July-22
Aug-
22
Sep-22 Oct-22 Nov-22
Dec-
22
22B
SAWH -2
(Elec.
Maintenance)
Welding (ID/OD 2+ID/OD
3+ID/OD 4): Breakdown time
shall not exceed 1129 minutes
per month (30 Working Days).
Base Line: 1188 minutes (30
Working Days) - Year 2021
target.
Maximum
breakdown time
1129 minutes
per Month (30
days)
Plant running
days in a month
Actual target vs.
plant running
days
Breakdown
Time (Minutes)
23
2% Reduction in Non
Production Area Power
Consumption (Store, Office
Building, High Mast Tower &
Street Light) from previous year
(2021) actual consumption.
Spiral-1 Plant - Base Line =
41738 kWh
Spiral-2 Plant - Base Line=
137822 kWh
Maximum
power
consumption in
non production
area for the year
2022
Spiral-1 Plant
– 40903 kWh
Spiral-2 Plant
– 135066 kWh
SAWH-1
SAWH-2
DISPATCH
24
Dispatch
Damages in Pipe and Bend on
the account of product handling. Zero (0)
25
TPI/QC complaint on the
account of pipe handling. Zero (0)
JINDAL SAW LIMITED - SAMAGHOGHA 15
(July-2022 - Dec-2022)
QMS OBJECTIVES ACHIEVEMENT REPORT
July-2022 To Dec-2022
JINDAL SAW LIMITED - SAMAGHOGHA 16
(July-2022 - Dec-2022)
Sr.
No
.
Depart
ment
Objective
Key
Performanc
e Indicator
July-22
Aug-
22
Sep-
22
Oct-22 Nov-22 Dec-22
HR (Human Recourse)
26
HR (Human
Recourse)
To impart minimum 8800 man hours
of Technical & System related
training in the current year
Minimum 8800
man hours in
year 2022
Stores
27
Stores
Conversion of material gate entry
into SAP Goods receipt
(MIGO) within 48 hours – 95.5 %
95.5 %
28
Availability of material require
planning (mini – max items) and
safety items
99.6%
Purchase (Non Raw Material)
29
Purchase
(NRM)
PROCUREMENT CYCLE
TIME: 94% of total approved line
items, having detailed information to
be converted into purchase
order/work order within 30 days -
Same as previous year (2021).
94%
30
REJECTION LEVEL/QUALITY
OF ITEMS PROCURED: Quality
of items purchased must be in line
with user requirement which is to be
reflected via rejection. Rejections
level (cumulative average) should be
as low as 2% of total items received
(monthly) - Same as previous year
(2021).
<2.0%
QMS OBJECTIVES ACHIEVEMENT REPORT
(July-2022 - Dec-2022)
JINDAL SAW LIMITED - SAMAGHOGHA 17
Sr.
No.
Depart
ment
Objective
Key
Performance
Indicator
Achievement in Q1-Q3 of FY 2022-2023
Purchase Raw Material (For Financial Year 2022-2023)
31
Purchase
(Raw
Material)
Add at least one Steel Mill for API
Grade (Non Sour/Sour) during the
assessment year
100%
32
Add at least one Coating supplier
during the assessment year
100%
Marketing (For Financial Year 2022-2023)
33
Marketing
(SAWH and
IBM)
Aiming to obtain orders from new
customers.
6
34
Aiming to achieve average customer
satisfaction index FY 2022-23
9.3
35
Aiming a total revenue generation in
FY 2022-23 in large diameter
business.
Approx. 4000
Crores
(July-2022 - Dec-2022)
QMS OBJECTIVES ACHIEVEMENT REPORT
July-2022 To Dec-2022
JINDAL SAW LIMITED - SAMAGHOGHA 18
Sr.
No.
Depart
ment
Objective
Key
Performance
Indicator
Achievement in Q1-Q2 of FY 2022-2023
Purchase Raw Material for CRA Pipe
36
Purchase
(Raw
Material-
CRA Pipes)
Add/upgrade at least one supplier for
CRA Steel
100%
Marketing _ CRA Welded pipe (For Financial Year 2022-2023)
38
Marketing
(CRA
Welded pipe)
Aiming to achieve average Customer
Satisfaction index
4.5
39
Order booking ( CRA Welded Pipes
and Seamless Pipes)
2000 Ton
Minimum
40 Developing New Customers
5 new
customers
41
EIL Enlistment For Seamless Pipes and
Tubes
100%
(July-2022 - Dec-2022)
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
19
(July-2022 - Dec-2022)
Data analysis for Dimensional, Mechanical & Chemical requirement, refer
project histogram (attached as separate file).
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
20
(July-2022 - Dec-2022)
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
21
(July-2022 - Dec-2022)
Pipe Production (As per monthly Production Plan)
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
22
Control over consumption of welding consumables
(July-2022 - Dec-2022)
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
23
Repair Analysis
(July-2022 - Dec-2022)
 JCO-II CRA Welded pipe (Production)
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
24
Defect Analysis
(July-2022 - Dec-2022)
 JCO-II CRA Welded pipe (Production)
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
25
To minimize the rejection of Bend
(July-2022 - Dec-2022)
 Induction Bend (IBM)
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
26
(July-2022 - Dec-2022)
JCO-2 CRA Welded pipe : Breakdown Analysis (Mechanical Maintenance)
JCO PRESS
WELDING (TIG PLASMA)
End Facer (1&2):
Expander (1&2):
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
27
(July-2022 - Dec-2022)
JCO-2 CRA Welded pipe : Breakdown Analysis (Mechanical Maintenance)
JCO PRESS
WELDING (TIG PLASMA)
End Facer (1&2):
Expander (1&2):
JINDAL SAW LIMITED -
SAMAGHOGHA
27
(Jan-2022 - Jun-2022)
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
28
(July-2022 - Dec-2022)
JCO-2 CRA Welded pipe :Consumption of Hydraulic Oil -68 (Mechanical Maintenance)
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
29
(July-2022 - Dec-2022)
IBM 1 & 2: BREAKDOWN ANALYSIS (Mechanical Maintenance)
IBM Hydro tester
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
30
(July-2022 - Dec-2022)
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
31
(July-2022 - Dec-2022)
IBM-1 & 2 & IBM END FACER : Breakdown Analysis (Electrical Maintenance)
JINDAL SAW LIMITED - SAMAGHOGHA
31
(Jan-2022 - Jun-2022)
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
32
(July-2022 - Dec-2022)
Major Breakdown Summary and Action Taken)
SR
NO.
DATE
B/D
(MIN)
M/C PROBLM CAUSE OF PROBLEM ACTION TAKEN
1.
15.12.2022
DD Shift
240 MIN
ID TIG-
01
ARC NOT
ON.
"showing security fault
arc cut off". power
source side all
connection tightened
work done. Then Analog
interface card, Digital
interface & memory card
removed & proper
cleaned with electronic
component cleaner &
refitted but not solved. So
replaced the analog
interface card & trial
taken but not solved.
Then HF Box changed &
trial taken found ok.
Material Kept as spare.
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
33
(July-2022 - Dec-2022)
2% Reduction in consumption of electrical power in non production area
(Store, Admin, Plant light and office light)
JINDAL SAW LIMITED -
SAMAGHOGHA
34
(July-2022 - Dec-2022)
JINDAL SAW LIMITED -
SAMAGHOGHA
34
(Jan-2022 - Jun-2022)
DATA ANALYSIS
34
Power Consumption (Non Production Area) (JULY-2022 – DEC-2022)
34
MONTHS JUL-22 AUG-22 SEP-22 OCT-22 NOV-22 DEC-22 TOTAL
UNIT (KWH) PER MONTH 16956 16420 14510 13817 13103 13345 88151
TARGET FOR YEAR 2022 = 179724 UNIT (KWH) ACTUAL CONSUMPTION (JUL –DEC) = 88151 UNIT (KWH)
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
35
 SAWH 1&2 (QA/QC) :
Data analysis for Dimensional, Mechanical & Chemical requirement - refer project histogram
attached as separate file.
(July-2022 - Dec-2022)
 SAWH 1  SAWH 2
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
36
 SAWH 1&2 (QA/QC) :
(July-2022 - Dec-2022)
Customer complaint (July-2022 To Dec-2022)
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
37
 SAWH 1&2 (QA/QC) :
(July-2022 - Dec-2022)
No non conformity by TPIA in a month (July-2022 To Dec-2022)
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
38
 SAWH 1&2 (QA/QC)
X-Ray Film Consumption due to RT & DRT shall not exceed 1.38% for API Orders
(July-2022 - Dec-2022)
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
39
 SAWH 1&2 (QA/QC)
RAW MATERIAL YIELD (%) (July 2022 – Dec 2022)
(July-2022 - Dec-2022)
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
40
 SAWH 1&2 (QA/QC) July 2022 – Dec 2022
(July-2022 - Dec-2022)
Reason of Achieved Low Yield (SAWH-1 & 2)
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
41
 SAWH 1&2 (Production) Jan 2022 – June 2022
(July-2022 - Dec-2022)
OBJECTIVE :- 100% Pipe Production as per monthly Production Plan
SAWH 2
SAWH 1
DATAANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
42
(July-2022 - Dec-2022)
 SAWH 1&2 (Production – Forming)
OBJECTIVE :-
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
43
(July-2022 - Dec-2022)
 SAWH 1&2 (Production – Finishing)
OBJECTIVE :-
SAWH 2
SAWH 1
DATAANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
44
(July-2022 - Dec-2022)
 SAWH-1 (Production – Welding)
Repaired Weld Analysis (SAWH 1)
OBJECTIVE :-)
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
45
(July-2022 - Dec-2022)
SAWH 1&2 (Mechanical Maintenance)
BREAKDOWN ANALYSIS : FORMING SECTION
SAWH-1 SAWH-2
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
46
(July-2022 - Dec-2022)
SAWH 1&2 (Mechanical Maintenance)
ANALYSIS OF OIL CONSUMPTION (SAWH 1 & 2)
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
47
(July-2022 - Dec-2022)
SAWH 1&2 (Electrical Maintenance)
B/D ANALYSIS OF Forming Section (SAWH-1 & SAWH-2)
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
48
(July-2022 - Dec-2022)
Major Breakdown Summary and Action Taken
SR
NO.
DATE
B/D
(MIN)
M/C PROBLM CAUSE OF PROBLEM ACTION TAKEN
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
49
(July-2022 - Dec-2022)
DISPATCH
Damages in Pipe and Bend on the account of Product Handling
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
50
(July-2022 - Dec-2022)
DISPATCH -July-2022 To Dec-2022
TPI/QC Complaint on the account of pipe handling
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
51
(July-2022 - Dec-2022)
Human Resources (July-2022 To Dec-2022)
Minimum 8800 man hours of Technical & System related training in current year
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
52
(July-2022 - Dec-2022)
HR Dept. (July-2022 To Dec-2022)
Total Training (Technical & System) Performance Report
(July-2022 To Dec-2022)
S. No. Month MCS Staff Worker
Total
Participants
Total
Man
hours
Cumulative
Man hours
1
2
3
4
5
6
Total
Note :
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
53
(July-2022 - Dec-2022)
 STORE - (JULY 2022 TO DEC 2022)
Objective: Conversion of Material Gate Entry into SAP Goods Receipt
(MIGO) within 48 hours
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
54
(July-2022 - Dec-2022)
Objective: Availability of Materials requires planning (Min – Max items) and Safety items
 STORE (July-2022 To Dec-2022)
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
55
(July-2022 - Dec-2022)
 PURCHASE (NRM) (July-2022 To Dec-2022)
Objective:
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
56
(July-2022 - Dec-2022)
 MARKETING (IBM & SAWH Pipes)
 Hit Rate Analysis (Q1 ~ Q2 of FY 2022-23)
DATA ANALYSIS
JINDAL SAW LIMITED -
SAMAGHOGHA
57
(July-2022 - Dec-2022)
 MARKETING (IBM & SAWH Pipes)
Hit Rate Analysis (Q1 ~ Q2 of FY 2022-23)
DATA ANALYSIS
JINDAL SAW LIMITED - SAMAGHOGHA 58
(July-2022 - Dec-2022)
 MARKETING (IBM & SAWH Pipes)
LOSS INQUIRY ANALYSIS – EXPORTS (Q1 ~ Q2 of FY 2022-23)
DATA ANALYSIS
JINDAL SAW LIMITED - SAMAGHOGHA 59
(July-2022 - Dec-2022)
 MARKETING (IBM & SAWH Pipes)
Statistical analysis for reasons of Loss of projects
(Q1 ~ Q2 of FY 2022-23)
DATA ANALYSIS
JINDAL SAW LIMITED - SAMAGHOGHA 60
(July-2022 - Dec-2022)
 MARKETING (IBM & SAWH Pipes)
Customer Satisfaction Analysis (Q1 ~ Q2 of FY 2022-23
DATA ANALYSIS
JINDAL SAW LIMITED - SAMAGHOGHA 61
(July-2022 - Dec-2022)
 PURCHASE (IBM, CRA WELDED & SAWH Pipes)
Supplier Performance (Evaluation & Re-evaluation)
PURCHASE-RM (CS) PURCHASE-RM (CRA)
PURCHASE-NRM
CUSTOMER FEEDBACK, COMPLAINT & SATISFACTION
JINDAL SAW LIMITED -
SAMAGHOGHA
62
(July-2022 - Dec-2022)
No customer complaint received in CRA Welded pipe, SAWH & IBM
unit during (July-2022 To Dec-2022)
PRODUCTION & REJECTION REPORT
JINDAL SAW LIMITED -
SAMAGHOGHA
63
(July-2022 - Dec-2022)
 CRA Welded Pipe
Month Pipes Produced (Mtr.)
Rejection
(Full Pipe Rejection + End
Cut/Off) (Mtr.)
Remarks
July-2022
Aug -2022
Sep-2022
Oct-2022
Nov-2022
Dec-2022
Total
PRODUCTION & REJECTION REPORT
JINDAL SAW LIMITED -
SAMAGHOGHA
64
(July-2022 - Dec-2022)
 SAWH -1 (July-2022 To Dec-2022)
Month Pipes Produced (Mtr.)
Rejection
(Full Pipe Rejection + End
Cut/Off) (Mtr.)
Remarks
July-2022
Aug -2022
Sep-2022
Oct-2022
Nov-2022
Dec-2022
Total
PRODUCTION & REJECTION REPORT
JINDAL SAW LIMITED -
SAMAGHOGHA
65
(July-2022 - Dec-2022)
 SAWH-2 (July-2022 To Dec-2022)
Month Pipes Produced (Mtr.)
Rejection
(Full Pipe Rejection + End Cut/Off)
(Mtr.)
Remarks
July-2022
Aug -2022
Sep-2022
Oct-2022
Nov-2022
Dec-2022
Total
PRODUCTION & REJECTION REPORT
JINDAL SAW LIMITED -
SAMAGHOGHA
66
(July-2022 - Dec-2022)
 HOT INDUCTION BEND (IBM)
Month
Bend Produced
(Nos.)
Bend Rejected (Nos.) Remarks
July-2022
Aug -2022
Sep-2022
Oct-2022
Nov-2022
Dec-2022
Total
JINDAL SAW LIMITED -
SAMAGHOGHA
67
 STATUS OF PREVENTIVE ACTION
(July-2022 - Dec-2022)
Ref .
Potential NC
Description of
Potential non
conformance
Root cause Preventive Actions Responsibility Status
-- -- -- -- -- --
JINDAL SAW LIMITED -
SAMAGHOGHA
68
Status of Corrective & Preventive Action
(July-2022 - Dec-2022)
Ref . Non
Conformance
Department
Description of Detected /
Potential non conformance
Root cause Actions Taken Remarks
Objective was not
achieved in month
JINDAL SAW LIMITED -
SAMAGHOGHA
69
Status of Corrective & Preventive Action (Product NC)
(July-2022 - Dec-2022)
Ref . Non
Conformance
Departmen
t
Description of
Detected/Potential non
conformance
Root cause Actions Taken Remarks
JINDAL SAW LIMITED -
SAMAGHOGHA
70
Status of Corrective & Preventive Action (Internal
Audit NC -2022)
(July-2022 - Dec-2022)
Ref . Non
Conformance
Department
Description of
Detected/Potential non
conformance
Root cause Actions Taken Remarks
Risk Assessment
JINDAL SAW LIMITED -
SAMAGHOGHA
71
Information for Risk Assessment & Contingency Planning has been reviewed
in month of December 2022.
JULY‘21 TO DEC'21
List of Revised/New Procedure for Quality Management System
JINDAL SAW LIMITED -
SAMAGHOGHA
72
Sr. no. Procedure Description Document No. Version Effective Date
Jan‘22 TO June‘22
Management Of Change
JINDAL SAW LIMITED -
SAMAGHOGHA
73
MOC Description Remark
Jan‘22 TO June‘22
Status of Improvements Planned in Previous MRM
JINDAL SAW LIMITED -
SAMAGHOGHA
74
Jan‘22 TO June‘22
Sr.
No.
Department Description Status New Target Remark
1
2
3
4
SGSS
Electrical
Maintenance
EOT Cranes Anti Collision Sensor To
Be Provided.
Completed
5
Welded Pickling 20 HP 2 Nos. Hot
Blower Install For Pipe Drying Purpose
Completed
6
Seamless Section 20 HP 2 Nos. Hot
Blower Install For Pipe Drying
Purpose.
Completed
7
Seamless Hydro tester New PLC Panel
Replacement With Existing One.
Under Process
Section Head E.M MAR-23
8
Seamless Straightened New PLC
Panel Replacement With Existing One.
Under Process Section Head E.M MAR-23
Recommendation for Improvements
Sr.
No.
Department Description Action plan Responsibility Target Remark
1.
Electrical
Maintenance
(SGSS)
NEW SCREW 160 KW ELGI COMPRESSOR TO
BE DRIVEN BY AC VFD (VARIABLE
FREQUENCY DRIVE)
CAPEX APPROVED & PR
RELEASED PR NO:
2002011732.
SECTION HEAD E.M JUNE-2023
2.
WELDED & SEAMLESS MACHINE WISE RUN
TIME DATA MONITORING IN DASH BOARD
PC SYSTEM.
UNDER PROGRESS.
SECTION HEAD E.M
MAR-2023
3.
SEAMLESS FURNACE COOLING TOWER
FAN START INTERLOCKING WITH
AMBIENT TEMPERATURE.
MATERIAL ARRANGEMENT
UNDER PROGRESS. SECTION HEAD E.M
JAN-23
4.
WELDED COOLING TOWER FAN START
INTERLOCKING WITH AMBIENT
TEMPERATURE.
MATERIAL ARRANGEMENT
UNDER PROGRESS. SECTION HEAD E.M
FEB-23
SEAMLESS DEGREASING HEAT PUMP
INSTALLATION WORK INSTAED OF USING
THE IMMERSION HEATER FOR TANK
WATER IN DESIRE TEMPERATURE.
MATERIAL RECEIVED.
AFTER VENDOR REACHED
ON SITE WILL START THE
SAME.
SECTION HEAD E.M
MAY-23
5.
6
TR-4 FRONT & REAR TURNING DRIVE
INSTALLED WITH NEW ONE UPGRADED
VERSION
UNDER PROGRESS
SECTION HEAD E.M
JAN-23
7
TR-4 MAIN DRIVE INSTALLED WITH
UPGRADED VERSION
UNDER PROGRESS
SECTION HEAD E.M
JAN-23
8
REAR TURNING NEW DRIVE 1FT MOTOR
CHANGED WITH OLD ONE.
UNDER PROGRESS
SECTION HEAD E.M
JAN-23
JINDAL SAW LIMITED -
SAMAGHOGHA
75
Jan‘22 TO June‘22
JINDAL SAW LIMITED -
SAMAGHOGHA
76
Jan‘22 TO June‘22
Changes Applicable to Petroleum, Petrochemical and Natural Gas Industry
Standards
S. No Standard/
Specifications
Key Changes Remark
THANK YOU
JINDAL SAW LIMITED -
SAMAGHOGHA
77
Jan‘22 TO June‘22

Mais conteúdo relacionado

Semelhante a QMS Management Review Meeting July-2022 To Dec-2022

Team+2 energyt+storage+system final_2013 spring
Team+2 energyt+storage+system final_2013 springTeam+2 energyt+storage+system final_2013 spring
Team+2 energyt+storage+system final_2013 springJaeho Jung
 
Process dsign and facility layout
Process dsign and facility layoutProcess dsign and facility layout
Process dsign and facility layoutNsbmUcd
 
Operational Excellence Consultant
Operational Excellence ConsultantOperational Excellence Consultant
Operational Excellence Consultantbharat kumar
 
Presentasi Final FGDP Fix - Adji.pptx
Presentasi Final FGDP Fix - Adji.pptxPresentasi Final FGDP Fix - Adji.pptx
Presentasi Final FGDP Fix - Adji.pptxRyanSeptiawan1
 
Projects Review Report
Projects  Review ReportProjects  Review Report
Projects Review ReportRamuSekar4
 
AGM-PPT-2020.pdf
AGM-PPT-2020.pdfAGM-PPT-2020.pdf
AGM-PPT-2020.pdfYash255856
 
BOILER FUEL conversion.pptx
BOILER FUEL conversion.pptxBOILER FUEL conversion.pptx
BOILER FUEL conversion.pptxArunNatarajan42
 
PROJECT SUNIL KUMAR SINGH.pdf
PROJECT SUNIL KUMAR SINGH.pdfPROJECT SUNIL KUMAR SINGH.pdf
PROJECT SUNIL KUMAR SINGH.pdfSunil kumar singh
 
2022-01-13-ALALAMEEN 08-WR08.docx
2022-01-13-ALALAMEEN 08-WR08.docx2022-01-13-ALALAMEEN 08-WR08.docx
2022-01-13-ALALAMEEN 08-WR08.docxMohammedSalah424258
 
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Gensol Engineering Limited
 
Technical drawings modular cow barn design for smallholder dairy entrepreneurs
Technical drawings modular cow barn design for smallholder dairy entrepreneursTechnical drawings modular cow barn design for smallholder dairy entrepreneurs
Technical drawings modular cow barn design for smallholder dairy entrepreneursProDairy E.A. Ltd
 
Improving the Performance of Laser CNC Machine at Different Grade of Aluminiu...
Improving the Performance of Laser CNC Machine at Different Grade of Aluminiu...Improving the Performance of Laser CNC Machine at Different Grade of Aluminiu...
Improving the Performance of Laser CNC Machine at Different Grade of Aluminiu...IRJET Journal
 
Convergent Wind Mill with Velocity and Acceleration Control
Convergent Wind Mill with Velocity and Acceleration ControlConvergent Wind Mill with Velocity and Acceleration Control
Convergent Wind Mill with Velocity and Acceleration ControlIRJET Journal
 
Guidelines bond efficiency-rev-2018
Guidelines bond efficiency-rev-2018Guidelines bond efficiency-rev-2018
Guidelines bond efficiency-rev-2018AbhijeetSingh652
 
Nanotechnology for Oil Refinery
Nanotechnology for Oil RefineryNanotechnology for Oil Refinery
Nanotechnology for Oil RefineryFrans Wongkaren
 
Energy efficiency in the tennessee valley
Energy efficiency in the tennessee valleyEnergy efficiency in the tennessee valley
Energy efficiency in the tennessee valleyTNenergy
 

Semelhante a QMS Management Review Meeting July-2022 To Dec-2022 (20)

Team+2 energyt+storage+system final_2013 spring
Team+2 energyt+storage+system final_2013 springTeam+2 energyt+storage+system final_2013 spring
Team+2 energyt+storage+system final_2013 spring
 
Process dsign and facility layout
Process dsign and facility layoutProcess dsign and facility layout
Process dsign and facility layout
 
Operational Excellence Consultant
Operational Excellence ConsultantOperational Excellence Consultant
Operational Excellence Consultant
 
Presentasi Final FGDP Fix - Adji.pptx
Presentasi Final FGDP Fix - Adji.pptxPresentasi Final FGDP Fix - Adji.pptx
Presentasi Final FGDP Fix - Adji.pptx
 
Projects Review Report
Projects  Review ReportProjects  Review Report
Projects Review Report
 
Sadguruppt
SadgurupptSadguruppt
Sadguruppt
 
AGM-PPT-2020.pdf
AGM-PPT-2020.pdfAGM-PPT-2020.pdf
AGM-PPT-2020.pdf
 
ie550capp.ppt
ie550capp.pptie550capp.ppt
ie550capp.ppt
 
KEPCO's Demand Side Management Programs
KEPCO's Demand Side Management ProgramsKEPCO's Demand Side Management Programs
KEPCO's Demand Side Management Programs
 
BOILER FUEL conversion.pptx
BOILER FUEL conversion.pptxBOILER FUEL conversion.pptx
BOILER FUEL conversion.pptx
 
PROJECT SUNIL KUMAR SINGH.pdf
PROJECT SUNIL KUMAR SINGH.pdfPROJECT SUNIL KUMAR SINGH.pdf
PROJECT SUNIL KUMAR SINGH.pdf
 
2022-01-13-ALALAMEEN 08-WR08.docx
2022-01-13-ALALAMEEN 08-WR08.docx2022-01-13-ALALAMEEN 08-WR08.docx
2022-01-13-ALALAMEEN 08-WR08.docx
 
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
 
Technical drawings modular cow barn design for smallholder dairy entrepreneurs
Technical drawings modular cow barn design for smallholder dairy entrepreneursTechnical drawings modular cow barn design for smallholder dairy entrepreneurs
Technical drawings modular cow barn design for smallholder dairy entrepreneurs
 
Improving the Performance of Laser CNC Machine at Different Grade of Aluminiu...
Improving the Performance of Laser CNC Machine at Different Grade of Aluminiu...Improving the Performance of Laser CNC Machine at Different Grade of Aluminiu...
Improving the Performance of Laser CNC Machine at Different Grade of Aluminiu...
 
Convergent Wind Mill with Velocity and Acceleration Control
Convergent Wind Mill with Velocity and Acceleration ControlConvergent Wind Mill with Velocity and Acceleration Control
Convergent Wind Mill with Velocity and Acceleration Control
 
Guidelines bond efficiency-rev-2018
Guidelines bond efficiency-rev-2018Guidelines bond efficiency-rev-2018
Guidelines bond efficiency-rev-2018
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Nanotechnology for Oil Refinery
Nanotechnology for Oil RefineryNanotechnology for Oil Refinery
Nanotechnology for Oil Refinery
 
Energy efficiency in the tennessee valley
Energy efficiency in the tennessee valleyEnergy efficiency in the tennessee valley
Energy efficiency in the tennessee valley
 

Último

Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfAayushChavan5
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfneelspinoy
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一Fi L
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一diploma 1
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,Aginakm1
 
Call Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full NightCall Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书zdzoqco
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVAAnastasiya Kudinova
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricksabhishekparmar618
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...Amil baba
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Sitegalleryaagency
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRCall In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRdollysharma2066
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree ttt fff
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造kbdhl05e
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfShivakumar Viswanathan
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubaikojalkojal131
 
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts ServiceCall Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Servicejennyeacort
 

Último (20)

Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdf
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdf
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
 
Call Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full NightCall Girls Satellite 7397865700 Ridhima Hire Me Full Night
Call Girls Satellite 7397865700 Ridhima Hire Me Full Night
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricks
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Site
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
 
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRCall In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdf
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
 
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts ServiceCall Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
 

QMS Management Review Meeting July-2022 To Dec-2022

  • 1. QMS Management Review Meeting JINDAL SAW LIMITED - SAMAGHOGHA July-2022 To Dec-2022 JINDAL SAW LIMITED - SAMAGHOGHA 1 (July-2022 - Dec-2022)
  • 2. PREVIOUS MEETING PENDING POINTS STATUS JINDAL SAW LIMITED - SAMAGHOGHA 2 (July-2022 - Dec-2022) Sr. No. DEPARTMENT DESCRIPTION STATUS Remarks 1 SAWH-2 (Elect. Maint.) New DC 1500 Elmatech power source installation & commissioning to be done as a Master/ Slave combination with Existing system for increase mill speed up to 10 meters/min. Under Process. M/s Elmatech Germany is not confirm plan for site visit (party not respond even though purchaser mailing to them mean time raise service PR 1320025318 for the same). New Target December-2022 2 SAWH-2 (Elect. Maint.) ID/OD-1 (OLWS) new machine Installation & commissioning. Wagon all servo motor trial done with panel. All power source shifted on platform & its welding cable connection work under progress. Cabinet panel Cable laying done termination work under progress. New Target Augest- 2022 3 SAWH 2 (Mech. Maint) EOT Crane Bay Platform Installation 20% Work is completed (Run Out Area). Also Depends On Plant Idle Time. New Target SEP- 2022 4 SAWH 2 (Mech. Maint) ID/OD-1, New Welding Machine Installation And Commissioning. Some Materials Are Received & Others Are Yet To Come. Aug’2022 5 JCO-2 Electrical Maintenance 3MVA & 5MVA transformer painting of JCO & IBM work to be done. New PR has been raised for the same & will be done after that. New Target Mar-2023 6
  • 3. PRODUCTION SUMMARY July-2022 To Dec-2022 Month CRA Welded pipe (Mtr.) IBM (Nos.) SAWH 1 (Mtr.) SAWH 2 (Mtr.) July-2022 Aug -2022 Sep-2022 Oct -2022 Nov -2022 Dec -2022 Total JINDAL SAW LIMITED - SAMAGHOGHA 3 (July-2022 - Dec-2022)
  • 4. QMS OBJECTIVES ACHIEVEMENT REPORT (July-2022 - Dec-2022) Sr. No. Depar tment Objective Key Performance Indicator July-22 Aug- 22 Sep-22 Oct-22 Nov-22 Dec-22 JCO-II QA/QC (JCO-II) 1 JCO (QA/QC) Controlling field non- conformities. “0” field non- conformities Customer complaints not more than 3 (other than product/field non conformity) ≤3 Customer complaints 2 PRODUCTION (JCO-II) 3 JCO (Production) Pipe Production As per monthly Production Plan Production Planning (MT) Achievement (MT) JINDAL SAW LIMITED - SAMAGHOGHA 4 (July-2022 - Dec-2022)
  • 5. QMS OBJECTIVES ACHIEVEMENT REPORT ((July-2022 - Dec-2022)) Sr. No Depart ment Objective Key Performance Indicator July-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 4 JCO-2 (Product ion) Control over consumption of welding consumables during TIG-Plasma welding process and ID TIG welding process (for square butt weld groove). As per updated Norms of year 2022 Planning (kg) Achievement (kg) 5 To minimize the total weld repair length (Straight welding, Plate joining and Circumferential welding). ≤ 0.4% of total weld length 6 To minimize the rejection of Bend 0% of Total Production Bend Mechanical Maintenance (JCO-II) For JCO-II Plant (Monthly Breakdown Time) 7A JCO-2 (Mechan ical Mainten ance) JCO Press: Breakdown time shall not exceed 90 minutes per month (30 Working Days). Base Line: 95 minutes (30 Working Days)- Year 2021 target Maximum breakdown time 90 minutes per Month (30 days) Plant running days in a month Actual target vs. plant running days (Minutes) Breakdown Time (Minutes) JINDAL SAW LIMITED - SAMAGHOGHA 5 (July-2022 - Dec-2022)
  • 6. QMS OBJECTIVES ACHIEVEMENT REPORT July-2022 To Dec-2022 Sr. No. Depar tment Objective Key Performance Indicator July-22 Aug- 22 Sep-22 Oct-22 Nov-22 Dec-22 7B JCO (Mechanica l Maintenanc e) Edge Miller: Breakdown time shall not exceed 50 minutes per month (30 Working Days). Base Line: 53 minutes (30 Working Days)-Year 2021 target Edge Miller: Maximum breakdown time 50 minutes per Month (30 days). Plant running days in a month Actual target vs. plant running days Breakdown Time (Minutes) 7C Welding (Tig Plasma): Breakdown time shall not exceed 35 minutes per month (30 Working Days). Base Line: 38 minutes (30 Working Days)-Year 2021 target Maximum breakdown time 35 minutes per Month (30 days). Plant running days in a month Actual target vs. plant running days Breakdown Time (Minutes) 7D End Facer (1&2): Breakdown time shall not exceed 85 minutes per month (30 Working Days). Base Line: 90 minutes (30 Working Days)-Year 2021 target. Maximum breakdown time 85 minutes per Month (30 days). Plant running days in a month Actual target vs. plant running days Breakdown Time (Minutes) 7E Expander (1&2): Breakdown time shall not exceed 61 minutes per month (30 Working Days) Base Line: Average breakdown time of months (considering 30 working days) in which breakdown occurred for year 2021. Maximum breakdown time 61 minutes per Month (30 days). Plant running days in a month Actual target vs. plant running days Breakdown Time (Minutes) JINDAL SAW LIMITED - SAMAGHOGHA 6 (July-2022 - Dec-2022)
  • 7. QMS OBJECTIVES ACHIEVEMENT REPORT July-2022 To Dec-2022 Sr. No. Depart ment Objective Key Performance Indicator July-22 Aug- 22 Sep-22 Oct-22 Nov-22 Dec-22 8 JCO (Mechani cal Maintena nce) 2% reduce monthly consumption of Hydraulic Oil-68 in JCO plant as compared to previous year KPI. Base Line: Previous year (2021) target 576 liters/ month. Maximum 564 liters monthly consumption of Hydraulic Oil-68 in JCO plant. 9A IBM 1&2: Breakdown time shall not exceed 155 minutes per month (30 Working Days). Base Line: 160 minutes (30 Working Days)-Year 2021 target. Maximum breakdown time 155 minutes per month (30 Working Days). Plant running days in a month Actual target vs. plant running days Breakdown Time (Minutes) 9B IBM Hydro Tester: Breakdown time shall not exceed 45 minutes per month (30 Working Days). Base Line: 48 minutes (30 Working Days)-Year 2021 target. Maximum breakdown time 45 minutes per Month (30 days). Plant running days in a month Actual target vs. plant running days Breakdown Time (Minutes) Electrical Maintenance (JCO-II) For JCO-II Plant (Monthly Breakdown Time) 10A JCO (Electrica l Maintena nce) JCO Press: Break down time shall not exceed 160 minutes per month (30 Working Days). Base Line: 166 minutes in June- 2021 (30 Working Days). . Maximum breakdown time 160 minutes per Month (30 days). Plant running days in a month 27 26 26 25 22 24 Actual target vs. plant running days 144 139 139 133 117 128 Breakdown Time (Minutes) 30 30 45 35 30 40 JINDAL SAW LIMITED - SAMAGHOGHA 7 (July-2022 - Dec-2022)
  • 8. QMS OBJECTIVES ACHIEVEMENT REPORT July-2022 To Dec-2022 Sr. No . Depart ment Objective Key Performance Indicator July-22 Aug-22 Sep- 22 Oct-22 Nov- 22 Dec- 22 10B JCO (Electrical Maintenan ce) Edge Miller: Breakdown time shall not exceed 60 minutes per month (30 Working Days). Base Line: 62 minutes in April-2021 (30 Working Days). . Maximum breakdown time 60 minutes per Month (30 days). Plant running days in a month 27 26 26 25 22 24 Actual target vs. plant running days 54 52 52 50 44 48 Breakdown Time (Minutes) 30 45 30 30 35 30 10C Welding (Tig Plasma): Breakdown time shall not exceed 160 minutes per month (30 Working Days). Base Line: 165 minutes in Sept-2021 (30 Working Days). Maximum breakdown time 160 minutes per Month (30 days). Plant running days in a month 27 26 26 25 22 24 Actual target vs. plant running days 144 139 139 133 117 128 Breakdown Time (Minutes) 140 40 40 30 40 30 10D Expander (1&2): Breakdown time shall not exceed 85 minutes per month (30 Working Days). Base Line: 88 minutes in May-2021 (30 Working Days). Maximum breakdown time 85 minutes per Month (30 days). Plant running days in a month 27 26 26 25 22 24 Actual target vs. plant running days 76 74 74 71 62 68 Breakdown Time (Minutes) 20 45 30 25 25 25 10E Hydro Tester: Breakdown time shall not exceed 90 minutes per month (30 Working Days). Base Line: 93 minutes in June-2021 (30 Working Days). Maximum breakdown time 90 minutes per Month (30 days). Plant running days in a month 27 26 26 25 22 24 Actual target vs. plant running days 81 78 78 75 66 72 Breakdown Time (Minutes) 30 30 35 20 30 60 JINDAL SAW LIMITED - SAMAGHOGHA 8 (July-2022 - Dec-2022)
  • 9. QMS OBJECTIVES ACHIEVEMENT REPORT July-2022 To Dec-2022 Sr. No. Depar tment Objective Key Performance Indicator July-22 Aug- 22 Sep-22 Oct-22 Nov-22 Dec-22 11 JCO-2 (Electrical Maintenan ce) 2 % reduction in consumption of electrical power in non production area (Store, Admin, Plant & office light) from previous year (2021) actual consumption. Base Line: Actual power consumption in year 2021= 183392 kWh Maximum power consumption in non production area 179724 KWh for the year 2022 16956 16420 14510 13817 13103 13345 = 88151 KWH 12A IBM 1&2: Breakdown time shall not exceed 100 minutes per month (30 Working Days) - Same as previous year (2021). Base Line: 105 minutes (30 Working Days)-Year 2020 target. Maximum breakdown time 100 minutes per Month (30 days). Plant running days in a month SD SD SD 6 10 21 Actual target vs. plant running days SD SD SD 20 33 70 Breakdown Time (Minutes) SD SD SD 0 0 0 12B IBM End Facer: Breakdown time shall not exceed 119 minutes per month (30 Working Days) - Same as previous year (2021). Base Line: 125 minutes (30 Working Days)-Year 2020 target. Maximum breakdown time 119 minutes per Month (30 days). Plant running days in a month SD SD SD 6 10 21 Actual target vs. plant running days SD SD SD 24 40 83 Breakdown Time (Minutes) SD SD SD 0 0 0 JINDAL SAW LIMITED - SAMAGHOGHA 9 (July-2022 - Dec-2022)
  • 10. QMS OBJECTIVES ACHIEVEMENT REPORT July-2022 To Dec-2022 Sr . N o. Depart ment Objective Key Performance Indicator July-22 Aug- 22 Sep-22 Oct-22 Nov-22 Dec-22 SAWH-Unit (Spiral I & Spiral II) QA/QC (SAWH) 13 SAWH (QA/QC) To ensure No Customer Complaint with regards to Product Quality Zero (0) customer Complaints SAWH-1 SAWH-2 14 No Non Conformity in a month by Third Party Inspection Agency (TPIA) during Final Visual and Dimensional Inspection stage. No Non Conformity by TPIA in a Month. SAWH-1 SAWH-2 15 X-Ray film Consumption due to RT and DRT shall not exceed 1.38% during API order X-Ray film consumption on A/C of RT & DRT= 1.38 % maximum. SAWH-1 SAWH-2 JINDAL SAW LIMITED - SAMAGHOGHA 10 (July-2022 - Dec-2022)
  • 11. QMS OBJECTIVES ACHIEVEMENT REPORT July-2022 To Dec-2022 Sr. No. Depar tment Objective Key Performance Indicator July-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 PRODUCTION (SAWH) 16 SAWH (Produc tion) Pipe Production As per monthly Production Plan SAWH-1 SAWH-2 17 To reduce the milling inserts consumption 0.11 insert/MT SAWH-1 SAWH-2 18 To reduce the weld repair length 0.005 % of total weld length produced SAWH-1 SAWH-2 19 To reduce the consumption of beveling inserts 0.016 insert/MT SAWH-1 SAWH-2 JINDAL SAW LIMITED - SAMAGHOGHA 11 (July-2022 - Dec-2022)
  • 12. QMS OBJECTIVES ACHIEVEMENT REPORT July-2022 To Dec-2022 Sr. No. Depart ment Objective Key Performance Indicator July-22 Aug- 22 Sep-22 Oct-22 Nov-22 Dec-22 MECH. MAINTENANCE (SAWH) For SAWH-1 Plant (Monthly Breakdown Time) 20A SAWH- 1 (Mech. Mainten ance) Forming Mill: Breakdown time shall not exceed 470 minutes per month (30 Working Days). Base Line: 480 minutes (30 Working Days)-Year 2021 target Maximum breakdown time 470 minutes per Month (30 days). Plant running days in a month Actual target vs. plant running days Breakdown Time (Minutes) 20B Welding (ID/OD 1+ID/OD 2+ID/OD 3): Breakdown time shall not exceed 265 minutes per month (30 Working Days). Base Line: 275 minutes (30 Working Days)-Year 2021 target Maximum breakdown time 265 minutes per Month (30 days). Plant running days in a month Actual target vs. plant running days Breakdown Time (Minutes) 20C Hydro Tester: Breakdown time shall not exceed 310 minutes per month (30 Working Days). Base Line: 320 minutes (30 Working Days)-Year 2021 target Maximum breakdown time 310 minutes per Month (30 days) Plant running days in a month Actual target vs. plant running days Breakdown Time (Minutes) (July-2022 - Dec-2022) JINDAL SAW LIMITED - SAMAGHOGHA 12
  • 13. QMS OBJECTIVES ACHIEVEMENT REPORT July-2022 To Dec-2022 JINDAL SAW LIMITED - SAMAGHOGHA 13 Sr. No. Depart ment Objective Key Performance Indicator July- 22 Aug- 22 Sep- 22 Oct-22 Nov- 22 Dec- 22 For SAWH-2 Plant (Monthly Breakdown Time) 20 A SAWH- 2 (Mech. Mainte nance) Forming Mill: Breakdown time shall not exceed 940 minutes per month (30 Working Days). Base Line: 960 minutes (30 Working Days)-Year 2021 target. Maximum breakdown time 940 minutes per Month (30 days). Plant running days in a month Actual target vs. plant running days Breakdown Time (Minutes) 20 B Welding (ID/OD 2+ID/OD 3+ID/OD 4): Breakdown time shall not exceed 700 minutes per month (30 Working Days). Base Line: 720 minutes (30 Working Days)-Year 2021 target Maximum breakdown time 700 minutes per Month (30 days). Plant running days in a month Actual target vs. plant running days Breakdown Time (Minutes) 20 C Hydro Tester: Breakdown time shall not exceed 570 minutes per month (30 Working Days). Base Line: 585 minutes (30 Working Days)-Year 2021 target. Maximum breakdown time 570 minutes per Month (30 days) Plant running days in a month Actual target vs. plant running days Breakdown Time (Minutes) 21 Hydraulic oil consumption is reduced to 500 liters for year 2022 (Reduced by 20 liters) Base line- 520 liters (Year 2021 target) Maximum consumption of Hydraulic oil 500 liters per month SAWH-1 SAWH-2 (July-2022 - Dec-2022)
  • 14. QMS OBJECTIVES ACHIEVEMENT REPORT July-2022 To Dec-2022 Sr. No. Depart ment Objective Key Performance Indicator July-22 Aug- 22 Sep-22 Oct-22 Nov-22 Dec-22 ELECTRICAL MAINTENANCE For SAWH-1 Plant (Monthly Breakdown Time) 22A SAWH-1 (Elec. Maintena nce) Forming Mill: Breakdown time shall not exceed 1106 minutes per month (30 Working Days). Base Line: 1164 minutes (30 Working Days) - Year 2021 target. Maximum breakdown time 1106minut es per Month (30 days) Plant running days in a month Actual target vs. plant running days Breakdown Time (Minutes) 22B Welding (ID/OD 1+ID/OD 2+ID/OD 3): Breakdown time shall not exceed 605 minutes per month (30 Working Days). Base Line: 637 minutes (30 Working Days) - Year 2021 target. Maximum breakdown time 605 minutes per Month (30 days) Plant running days in a month Actual target vs. plant running days Breakdown Time (Minutes) For SAWH-2 Plant (Monthly Breakdown Time) 22A SAWH-2 (Elec. Maintena nce) Forming Mill: Breakdown time shall not exceed 354 minutes per month (30 Working Days). Base Line: Average breakdown time of months (considering 30 working days) in which target not achieved for year 2021. Maximum breakdown time 354 minutes per Month (30 days) Plant running days in a month Actual target vs. plant running days Breakdown Time (Minutes) JINDAL SAW LIMITED - SAMAGHOGHA 14 (July-2022 - Dec-2022)
  • 15. QMS OBJECTIVES ACHIEVEMENT REPORT July-2022 To Dec-2022 Sr. No. Depart ment Objective Key Performance Indicator July-22 Aug- 22 Sep-22 Oct-22 Nov-22 Dec- 22 22B SAWH -2 (Elec. Maintenance) Welding (ID/OD 2+ID/OD 3+ID/OD 4): Breakdown time shall not exceed 1129 minutes per month (30 Working Days). Base Line: 1188 minutes (30 Working Days) - Year 2021 target. Maximum breakdown time 1129 minutes per Month (30 days) Plant running days in a month Actual target vs. plant running days Breakdown Time (Minutes) 23 2% Reduction in Non Production Area Power Consumption (Store, Office Building, High Mast Tower & Street Light) from previous year (2021) actual consumption. Spiral-1 Plant - Base Line = 41738 kWh Spiral-2 Plant - Base Line= 137822 kWh Maximum power consumption in non production area for the year 2022 Spiral-1 Plant – 40903 kWh Spiral-2 Plant – 135066 kWh SAWH-1 SAWH-2 DISPATCH 24 Dispatch Damages in Pipe and Bend on the account of product handling. Zero (0) 25 TPI/QC complaint on the account of pipe handling. Zero (0) JINDAL SAW LIMITED - SAMAGHOGHA 15 (July-2022 - Dec-2022)
  • 16. QMS OBJECTIVES ACHIEVEMENT REPORT July-2022 To Dec-2022 JINDAL SAW LIMITED - SAMAGHOGHA 16 (July-2022 - Dec-2022) Sr. No . Depart ment Objective Key Performanc e Indicator July-22 Aug- 22 Sep- 22 Oct-22 Nov-22 Dec-22 HR (Human Recourse) 26 HR (Human Recourse) To impart minimum 8800 man hours of Technical & System related training in the current year Minimum 8800 man hours in year 2022 Stores 27 Stores Conversion of material gate entry into SAP Goods receipt (MIGO) within 48 hours – 95.5 % 95.5 % 28 Availability of material require planning (mini – max items) and safety items 99.6% Purchase (Non Raw Material) 29 Purchase (NRM) PROCUREMENT CYCLE TIME: 94% of total approved line items, having detailed information to be converted into purchase order/work order within 30 days - Same as previous year (2021). 94% 30 REJECTION LEVEL/QUALITY OF ITEMS PROCURED: Quality of items purchased must be in line with user requirement which is to be reflected via rejection. Rejections level (cumulative average) should be as low as 2% of total items received (monthly) - Same as previous year (2021). <2.0%
  • 17. QMS OBJECTIVES ACHIEVEMENT REPORT (July-2022 - Dec-2022) JINDAL SAW LIMITED - SAMAGHOGHA 17 Sr. No. Depart ment Objective Key Performance Indicator Achievement in Q1-Q3 of FY 2022-2023 Purchase Raw Material (For Financial Year 2022-2023) 31 Purchase (Raw Material) Add at least one Steel Mill for API Grade (Non Sour/Sour) during the assessment year 100% 32 Add at least one Coating supplier during the assessment year 100% Marketing (For Financial Year 2022-2023) 33 Marketing (SAWH and IBM) Aiming to obtain orders from new customers. 6 34 Aiming to achieve average customer satisfaction index FY 2022-23 9.3 35 Aiming a total revenue generation in FY 2022-23 in large diameter business. Approx. 4000 Crores (July-2022 - Dec-2022)
  • 18. QMS OBJECTIVES ACHIEVEMENT REPORT July-2022 To Dec-2022 JINDAL SAW LIMITED - SAMAGHOGHA 18 Sr. No. Depart ment Objective Key Performance Indicator Achievement in Q1-Q2 of FY 2022-2023 Purchase Raw Material for CRA Pipe 36 Purchase (Raw Material- CRA Pipes) Add/upgrade at least one supplier for CRA Steel 100% Marketing _ CRA Welded pipe (For Financial Year 2022-2023) 38 Marketing (CRA Welded pipe) Aiming to achieve average Customer Satisfaction index 4.5 39 Order booking ( CRA Welded Pipes and Seamless Pipes) 2000 Ton Minimum 40 Developing New Customers 5 new customers 41 EIL Enlistment For Seamless Pipes and Tubes 100% (July-2022 - Dec-2022)
  • 19. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 19 (July-2022 - Dec-2022) Data analysis for Dimensional, Mechanical & Chemical requirement, refer project histogram (attached as separate file).
  • 20. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 20 (July-2022 - Dec-2022)
  • 21. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 21 (July-2022 - Dec-2022) Pipe Production (As per monthly Production Plan)
  • 22. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 22 Control over consumption of welding consumables (July-2022 - Dec-2022)
  • 23. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 23 Repair Analysis (July-2022 - Dec-2022)  JCO-II CRA Welded pipe (Production)
  • 24. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 24 Defect Analysis (July-2022 - Dec-2022)  JCO-II CRA Welded pipe (Production)
  • 25. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 25 To minimize the rejection of Bend (July-2022 - Dec-2022)  Induction Bend (IBM)
  • 26. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 26 (July-2022 - Dec-2022) JCO-2 CRA Welded pipe : Breakdown Analysis (Mechanical Maintenance) JCO PRESS WELDING (TIG PLASMA) End Facer (1&2): Expander (1&2):
  • 27. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 27 (July-2022 - Dec-2022) JCO-2 CRA Welded pipe : Breakdown Analysis (Mechanical Maintenance) JCO PRESS WELDING (TIG PLASMA) End Facer (1&2): Expander (1&2): JINDAL SAW LIMITED - SAMAGHOGHA 27 (Jan-2022 - Jun-2022)
  • 28. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 28 (July-2022 - Dec-2022) JCO-2 CRA Welded pipe :Consumption of Hydraulic Oil -68 (Mechanical Maintenance)
  • 29. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 29 (July-2022 - Dec-2022) IBM 1 & 2: BREAKDOWN ANALYSIS (Mechanical Maintenance) IBM Hydro tester
  • 30. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 30 (July-2022 - Dec-2022)
  • 31. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 31 (July-2022 - Dec-2022) IBM-1 & 2 & IBM END FACER : Breakdown Analysis (Electrical Maintenance) JINDAL SAW LIMITED - SAMAGHOGHA 31 (Jan-2022 - Jun-2022)
  • 32. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 32 (July-2022 - Dec-2022) Major Breakdown Summary and Action Taken) SR NO. DATE B/D (MIN) M/C PROBLM CAUSE OF PROBLEM ACTION TAKEN 1. 15.12.2022 DD Shift 240 MIN ID TIG- 01 ARC NOT ON. "showing security fault arc cut off". power source side all connection tightened work done. Then Analog interface card, Digital interface & memory card removed & proper cleaned with electronic component cleaner & refitted but not solved. So replaced the analog interface card & trial taken but not solved. Then HF Box changed & trial taken found ok. Material Kept as spare.
  • 33. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 33 (July-2022 - Dec-2022) 2% Reduction in consumption of electrical power in non production area (Store, Admin, Plant light and office light)
  • 34. JINDAL SAW LIMITED - SAMAGHOGHA 34 (July-2022 - Dec-2022) JINDAL SAW LIMITED - SAMAGHOGHA 34 (Jan-2022 - Jun-2022) DATA ANALYSIS 34 Power Consumption (Non Production Area) (JULY-2022 – DEC-2022) 34 MONTHS JUL-22 AUG-22 SEP-22 OCT-22 NOV-22 DEC-22 TOTAL UNIT (KWH) PER MONTH 16956 16420 14510 13817 13103 13345 88151 TARGET FOR YEAR 2022 = 179724 UNIT (KWH) ACTUAL CONSUMPTION (JUL –DEC) = 88151 UNIT (KWH)
  • 35. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 35  SAWH 1&2 (QA/QC) : Data analysis for Dimensional, Mechanical & Chemical requirement - refer project histogram attached as separate file. (July-2022 - Dec-2022)  SAWH 1  SAWH 2
  • 36. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 36  SAWH 1&2 (QA/QC) : (July-2022 - Dec-2022) Customer complaint (July-2022 To Dec-2022)
  • 37. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 37  SAWH 1&2 (QA/QC) : (July-2022 - Dec-2022) No non conformity by TPIA in a month (July-2022 To Dec-2022)
  • 38. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 38  SAWH 1&2 (QA/QC) X-Ray Film Consumption due to RT & DRT shall not exceed 1.38% for API Orders (July-2022 - Dec-2022)
  • 39. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 39  SAWH 1&2 (QA/QC) RAW MATERIAL YIELD (%) (July 2022 – Dec 2022) (July-2022 - Dec-2022)
  • 40. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 40  SAWH 1&2 (QA/QC) July 2022 – Dec 2022 (July-2022 - Dec-2022) Reason of Achieved Low Yield (SAWH-1 & 2)
  • 41. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 41  SAWH 1&2 (Production) Jan 2022 – June 2022 (July-2022 - Dec-2022) OBJECTIVE :- 100% Pipe Production as per monthly Production Plan SAWH 2 SAWH 1
  • 42. DATAANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 42 (July-2022 - Dec-2022)  SAWH 1&2 (Production – Forming) OBJECTIVE :-
  • 43. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 43 (July-2022 - Dec-2022)  SAWH 1&2 (Production – Finishing) OBJECTIVE :- SAWH 2 SAWH 1
  • 44. DATAANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 44 (July-2022 - Dec-2022)  SAWH-1 (Production – Welding) Repaired Weld Analysis (SAWH 1) OBJECTIVE :-)
  • 45. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 45 (July-2022 - Dec-2022) SAWH 1&2 (Mechanical Maintenance) BREAKDOWN ANALYSIS : FORMING SECTION SAWH-1 SAWH-2
  • 46. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 46 (July-2022 - Dec-2022) SAWH 1&2 (Mechanical Maintenance) ANALYSIS OF OIL CONSUMPTION (SAWH 1 & 2)
  • 47. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 47 (July-2022 - Dec-2022) SAWH 1&2 (Electrical Maintenance) B/D ANALYSIS OF Forming Section (SAWH-1 & SAWH-2)
  • 48. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 48 (July-2022 - Dec-2022) Major Breakdown Summary and Action Taken SR NO. DATE B/D (MIN) M/C PROBLM CAUSE OF PROBLEM ACTION TAKEN
  • 49. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 49 (July-2022 - Dec-2022) DISPATCH Damages in Pipe and Bend on the account of Product Handling
  • 50. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 50 (July-2022 - Dec-2022) DISPATCH -July-2022 To Dec-2022 TPI/QC Complaint on the account of pipe handling
  • 51. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 51 (July-2022 - Dec-2022) Human Resources (July-2022 To Dec-2022) Minimum 8800 man hours of Technical & System related training in current year
  • 52. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 52 (July-2022 - Dec-2022) HR Dept. (July-2022 To Dec-2022) Total Training (Technical & System) Performance Report (July-2022 To Dec-2022) S. No. Month MCS Staff Worker Total Participants Total Man hours Cumulative Man hours 1 2 3 4 5 6 Total Note :
  • 53. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 53 (July-2022 - Dec-2022)  STORE - (JULY 2022 TO DEC 2022) Objective: Conversion of Material Gate Entry into SAP Goods Receipt (MIGO) within 48 hours
  • 54. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 54 (July-2022 - Dec-2022) Objective: Availability of Materials requires planning (Min – Max items) and Safety items  STORE (July-2022 To Dec-2022)
  • 55. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 55 (July-2022 - Dec-2022)  PURCHASE (NRM) (July-2022 To Dec-2022) Objective:
  • 56. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 56 (July-2022 - Dec-2022)  MARKETING (IBM & SAWH Pipes)  Hit Rate Analysis (Q1 ~ Q2 of FY 2022-23)
  • 57. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 57 (July-2022 - Dec-2022)  MARKETING (IBM & SAWH Pipes) Hit Rate Analysis (Q1 ~ Q2 of FY 2022-23)
  • 58. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 58 (July-2022 - Dec-2022)  MARKETING (IBM & SAWH Pipes) LOSS INQUIRY ANALYSIS – EXPORTS (Q1 ~ Q2 of FY 2022-23)
  • 59. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 59 (July-2022 - Dec-2022)  MARKETING (IBM & SAWH Pipes) Statistical analysis for reasons of Loss of projects (Q1 ~ Q2 of FY 2022-23)
  • 60. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 60 (July-2022 - Dec-2022)  MARKETING (IBM & SAWH Pipes) Customer Satisfaction Analysis (Q1 ~ Q2 of FY 2022-23
  • 61. DATA ANALYSIS JINDAL SAW LIMITED - SAMAGHOGHA 61 (July-2022 - Dec-2022)  PURCHASE (IBM, CRA WELDED & SAWH Pipes) Supplier Performance (Evaluation & Re-evaluation) PURCHASE-RM (CS) PURCHASE-RM (CRA) PURCHASE-NRM
  • 62. CUSTOMER FEEDBACK, COMPLAINT & SATISFACTION JINDAL SAW LIMITED - SAMAGHOGHA 62 (July-2022 - Dec-2022) No customer complaint received in CRA Welded pipe, SAWH & IBM unit during (July-2022 To Dec-2022)
  • 63. PRODUCTION & REJECTION REPORT JINDAL SAW LIMITED - SAMAGHOGHA 63 (July-2022 - Dec-2022)  CRA Welded Pipe Month Pipes Produced (Mtr.) Rejection (Full Pipe Rejection + End Cut/Off) (Mtr.) Remarks July-2022 Aug -2022 Sep-2022 Oct-2022 Nov-2022 Dec-2022 Total
  • 64. PRODUCTION & REJECTION REPORT JINDAL SAW LIMITED - SAMAGHOGHA 64 (July-2022 - Dec-2022)  SAWH -1 (July-2022 To Dec-2022) Month Pipes Produced (Mtr.) Rejection (Full Pipe Rejection + End Cut/Off) (Mtr.) Remarks July-2022 Aug -2022 Sep-2022 Oct-2022 Nov-2022 Dec-2022 Total
  • 65. PRODUCTION & REJECTION REPORT JINDAL SAW LIMITED - SAMAGHOGHA 65 (July-2022 - Dec-2022)  SAWH-2 (July-2022 To Dec-2022) Month Pipes Produced (Mtr.) Rejection (Full Pipe Rejection + End Cut/Off) (Mtr.) Remarks July-2022 Aug -2022 Sep-2022 Oct-2022 Nov-2022 Dec-2022 Total
  • 66. PRODUCTION & REJECTION REPORT JINDAL SAW LIMITED - SAMAGHOGHA 66 (July-2022 - Dec-2022)  HOT INDUCTION BEND (IBM) Month Bend Produced (Nos.) Bend Rejected (Nos.) Remarks July-2022 Aug -2022 Sep-2022 Oct-2022 Nov-2022 Dec-2022 Total
  • 67. JINDAL SAW LIMITED - SAMAGHOGHA 67  STATUS OF PREVENTIVE ACTION (July-2022 - Dec-2022) Ref . Potential NC Description of Potential non conformance Root cause Preventive Actions Responsibility Status -- -- -- -- -- --
  • 68. JINDAL SAW LIMITED - SAMAGHOGHA 68 Status of Corrective & Preventive Action (July-2022 - Dec-2022) Ref . Non Conformance Department Description of Detected / Potential non conformance Root cause Actions Taken Remarks Objective was not achieved in month
  • 69. JINDAL SAW LIMITED - SAMAGHOGHA 69 Status of Corrective & Preventive Action (Product NC) (July-2022 - Dec-2022) Ref . Non Conformance Departmen t Description of Detected/Potential non conformance Root cause Actions Taken Remarks
  • 70. JINDAL SAW LIMITED - SAMAGHOGHA 70 Status of Corrective & Preventive Action (Internal Audit NC -2022) (July-2022 - Dec-2022) Ref . Non Conformance Department Description of Detected/Potential non conformance Root cause Actions Taken Remarks
  • 71. Risk Assessment JINDAL SAW LIMITED - SAMAGHOGHA 71 Information for Risk Assessment & Contingency Planning has been reviewed in month of December 2022. JULY‘21 TO DEC'21
  • 72. List of Revised/New Procedure for Quality Management System JINDAL SAW LIMITED - SAMAGHOGHA 72 Sr. no. Procedure Description Document No. Version Effective Date Jan‘22 TO June‘22
  • 73. Management Of Change JINDAL SAW LIMITED - SAMAGHOGHA 73 MOC Description Remark Jan‘22 TO June‘22
  • 74. Status of Improvements Planned in Previous MRM JINDAL SAW LIMITED - SAMAGHOGHA 74 Jan‘22 TO June‘22 Sr. No. Department Description Status New Target Remark 1 2 3 4 SGSS Electrical Maintenance EOT Cranes Anti Collision Sensor To Be Provided. Completed 5 Welded Pickling 20 HP 2 Nos. Hot Blower Install For Pipe Drying Purpose Completed 6 Seamless Section 20 HP 2 Nos. Hot Blower Install For Pipe Drying Purpose. Completed 7 Seamless Hydro tester New PLC Panel Replacement With Existing One. Under Process Section Head E.M MAR-23 8 Seamless Straightened New PLC Panel Replacement With Existing One. Under Process Section Head E.M MAR-23
  • 75. Recommendation for Improvements Sr. No. Department Description Action plan Responsibility Target Remark 1. Electrical Maintenance (SGSS) NEW SCREW 160 KW ELGI COMPRESSOR TO BE DRIVEN BY AC VFD (VARIABLE FREQUENCY DRIVE) CAPEX APPROVED & PR RELEASED PR NO: 2002011732. SECTION HEAD E.M JUNE-2023 2. WELDED & SEAMLESS MACHINE WISE RUN TIME DATA MONITORING IN DASH BOARD PC SYSTEM. UNDER PROGRESS. SECTION HEAD E.M MAR-2023 3. SEAMLESS FURNACE COOLING TOWER FAN START INTERLOCKING WITH AMBIENT TEMPERATURE. MATERIAL ARRANGEMENT UNDER PROGRESS. SECTION HEAD E.M JAN-23 4. WELDED COOLING TOWER FAN START INTERLOCKING WITH AMBIENT TEMPERATURE. MATERIAL ARRANGEMENT UNDER PROGRESS. SECTION HEAD E.M FEB-23 SEAMLESS DEGREASING HEAT PUMP INSTALLATION WORK INSTAED OF USING THE IMMERSION HEATER FOR TANK WATER IN DESIRE TEMPERATURE. MATERIAL RECEIVED. AFTER VENDOR REACHED ON SITE WILL START THE SAME. SECTION HEAD E.M MAY-23 5. 6 TR-4 FRONT & REAR TURNING DRIVE INSTALLED WITH NEW ONE UPGRADED VERSION UNDER PROGRESS SECTION HEAD E.M JAN-23 7 TR-4 MAIN DRIVE INSTALLED WITH UPGRADED VERSION UNDER PROGRESS SECTION HEAD E.M JAN-23 8 REAR TURNING NEW DRIVE 1FT MOTOR CHANGED WITH OLD ONE. UNDER PROGRESS SECTION HEAD E.M JAN-23 JINDAL SAW LIMITED - SAMAGHOGHA 75 Jan‘22 TO June‘22
  • 76. JINDAL SAW LIMITED - SAMAGHOGHA 76 Jan‘22 TO June‘22 Changes Applicable to Petroleum, Petrochemical and Natural Gas Industry Standards S. No Standard/ Specifications Key Changes Remark
  • 77. THANK YOU JINDAL SAW LIMITED - SAMAGHOGHA 77 Jan‘22 TO June‘22

Notas do Editor

  1. No production in SAWL unit from Sep-19 to Dec-19
  2. HR Point 1 RCA Pending