SlideShare uma empresa Scribd logo
1 de 33
www.GLOBALSKILLUP.com
PMP® Certification Training!
www.GLOBALSKILLUP.com
2
CONNECT WITH US
www.GLOBALSKILLUP.com
Quality Management
Chapter 8
www.GLOBALSKILLUP.com
Chapter 8
Objectives
Understand the different Quality
Management Processes
Their Inputs, Tools and Techniques,
Outputs
This chapter entails one to
understand the various
Quality Management
aspects required to maintain
the desired customer quality.
Driving the project towards
the desired outcome while
maintaining quality is one of
the key to making the
project successful!
www.GLOBALSKILLUP.com
Project Quality Management includes processes to
ensure the project deliverables are in conformance to the
project requirements.
Ensuring the Quality and Grade of the deliverables is
understood by the team is essential and needs to be
detailed in Plan Quality Management.
Quality of the deliverables in the project is the
conformance to the Requirements, whereas the Grade of
the deliverables is the conformance to the technical
characteristics of the deliverables.
Similarly, project deliverables as per needs of the quality
conformance need to be detailed with Precision and
Accuracy.
Precision: measure of exactness. Ex: Remember a Unit
on Scale Precision.
Accuracy: measure of correctness. Ex: Remember Dart
Board Accuracy of Target.
Knowledge Area: Quality Management
www.GLOBALSKILLUP.com
There are 3 Quality Management processes, namely:
1. Plan Quality Management
Planning Project Policies, Processes, Procedures which will
enable and ensure the Project deliverables are in
compliance with the quality requirements.
2. Perform Quality Assurance
Performing Quality Audits to ensure the right set of Policies,
Processes, Procedures are used to deliver the desired
quality and grade of deliverables with defined precision and
accuracy. Quality Control Measurements can be applied to
achieve the same.
3. Control Quality
Process of managing the project quality in the defined
tolerance levels, control limits and ranges during the project
execution.
Knowledge Area: Quality Management
www.GLOBALSKILLUP.com
Some important quality terms used often in different
quality approaches.
Customer Satisfaction
Ensuring the project requirements are met and
at the same time ensuring the project outcome
is usable by the end user or the client
Prevention over Inspection
Quality should be planned always to be
proactive, the cost of prevention of defects is
much lesser than the cost of inspection.
Continuous Improvement
There are multiple Continuous Quality
Improvement initiatives possible and depends
on the project need to engage the level of
quality desired & may follow one of these
approaches:
Plan-Do-Check-Act (PDCA)
Total Quality Management (TQM)
Six Sigma
Lean Sigma
Kaizen(Kai-to alter; Zen-to make better)
Continuous Process Improvements (CPI) in any
project may be taken up with specially defined
approaches as in:
Organizational Project Management Maturity
Model (OPM3)
Capability Maturity Model Integrated (CMMI)
Management Responsibility
Achieving Quality requires Management
participation and support. Management has to
take responsibility to ensure the quality is given
due diligence without which the quality may cut
corners across the project duration due to
tradeoffs for customer & market priorities or any
other.
International Organization for Standardization
(ISO)
ISO is an International standards setting
voluntary body which develops, publishes and
administers the International Standards.
Quality Management basic approach outlined
by PMBoK® is inline with the ISO.
Knowledge Area: Quality Management
www.GLOBALSKILLUP.com
There are 3 Quality Approaches, namely:
Knowledge Area: Quality Management
• Proposed that organizations can increase their quality and reduce costs by CPI (Continuous
Process Improvements) and by thinking the entire evolution as a manufacturing system instead
of standalone unconnected pieces
W. Edwards Deming
• Proposed the application of Pareto’s(80-20) Principle to Quality
as 80% of the quality issues are due to the 20% of the causes.
• Also, developed Juran’s Trilogy:
• Quality Planning
• Quality Control
• Quality Improvement
Joseph. M. Juran
• Proposed the DiRFT (Doing it Right First Time) for the Quality Crisis
• Proposed 4 Major Principles of Quality
• Quality is Conformance to Requirements
• System of Quality is Prevention
• Performance Standard = Zero Defects
• Measurement of Quality = Price of Non-Conformance
Philip. B. Crosby
www.GLOBALSKILLUP.com
8.1 Plan Quality Management
Inputs
•Project Management Plan
•Stakeholder Register
•Risk Register
•Requirements
Documentation
•Organizational Process
Assets
Tools & Techniques
•Cost Benefit Analysis
•Cost Of Quality
•Seven Basic Quality
Tools
•Benchmarking
•Design Of Experiments
•Statistical Sampling
•Additional Quality
Planning Tools
•Meetings
Outputs
•Quality
Management Plan
•Process
Improvement
Plan
•Quality Metrics
•Quality Checklists
•Project
Documents
Updates
•Integration
•Develop Project Management Plan
•Scope
•Plan Scope Management
•Collect Requirements
•Define Scope
•Create WBS
•Time
•Plan Schedule Management
•Define Activities
•Sequence Activities
•Estimate Activity Resources
•Estimate Activity Duration
•Develop Schedule
•Cost
•Plan Cost Management
•Estimate Costs
•Determine Budget
•Quality
•Plan Quality Management
•Human Resource
•Plan HR Management
•Communications
•Plan Communications Management
•Risk
•Plan Risk Management
•Identify Risks
•Perform Qualitative Risk Analysis
•Perform Quantitative Risk Analysis
•Plan Risk Responses
•Procurement
•Plan Procurement Management
•Stakeholder
•Plan Stakeholder Management
Planning Process
It is the process to establish the Quality Management Plan based
on which the Project Quality will be planned, managed and
controlled on the relevant quality requirements and standards.
This also helps to document approaches which will guide on how to
ensure compliance to those requirements and standards.
Provides opportunity to establish mechanisms to setup process
improvements and continuous refinement procedures, define
metrics and quality checklists.
www.GLOBALSKILLUP.com
Primary benefits of meeting quality
requirements include less rework, higher
productivity, lower costs, increased
stakeholder satisfaction, and increased
profitability.
A cost-benefit analysis for each quality
activity compares the cost of the quality
step to the expected benefit.
Cost Benefit Ratio(CBR)
CBR =
𝐶𝑜𝑠𝑡
𝐵𝑒𝑛𝑒𝑓𝑖𝑡
Benefit Cost Ratio(BCR)
BCR =
𝐵𝑒𝑛𝑓𝑖𝑡
𝐶𝑜𝑠𝑡
How to use CBR & BCR ratios to pick
Projects?
Projects are compared for the better
benefit amongst a group of Projects.
The Project with highest BCR wins or
the Project with lowest CBR wins.
For any given project, always pick the
projects with benefit or at least the ones
which does not incur loss:
BCR Greater than or Equal to 1.0.
or
CBR Lower than or Equal to 1.0
Cost Benefit Analysis
www.GLOBALSKILLUP.com
Also known as 7QC Tools for 7 Quality
Control Tools.
Applied to plan Quality & solve the
Quality Improvement related issues on
the project.
1. Cause and Effect Diagrams
2. Flowcharts
3. Check Sheets
4. Pareto Diagrams
5. Histograms
6. Control Charts
7. Scatter Diagrams
1. Cause and Effect Diagrams
(Also known as Ishikawa’s Fish Bone)
The problem statement is kept at the head
of the fish and traced backwards to identify
the root cause and possible actions.
Identification of the root cause happens
based on the repeat question “why” until
the root cause of the problem is found.
2. Flowcharts (Process Maps)
Flow charts define the end to end flow of
the steps and branching possibilities that
exist for a process.
Cost estimating is obtained by using the
workflow branching logic and associated
estimated monetary value for the
conformance and non-conformance work.
Seven Basic Quality Tools
www.GLOBALSKILLUP.com
Low Website Traffic
Socially networked?
Easy user navigation?
Appealing Design
& Aesthetics ?
Works on Smart devices?
Works on Tabs? Not much content?
Good Quality of Content?
Is website playful to keep user
long on website?
Is content and experience user
friendly & engaging?
Enough PR Engage?
Traditional Campaigns?
Social Campaigns?
Cause and Effect Diagram
(Ishikawa Fishbone Diagram)
www.GLOBALSKILLUP.com
Start
End
Production Setup
Production
Compliance
Kick start
Production
decision
Summation
Re-Planning
Error Type
Count
(frequency)
Weight Score
Design Error IIIII III 12 8 * 12 = 96
Development
Error
IIIII IIIII IIIII 6 15 * 6 = 90
Quality Error
IIIII IIIII IIIII
IIIII IIII
3 24 * 3 = 72
Integration
Error
III 15 3 * 15 = 45
Total Score
96+90+72+45 =
303
Are used to organize the facts in a manner that
will facilitate effective collection of useful data
about a potential quality problem.
They are useful for gathering data attributes
while performing inspections to identify
defects.
Flowcharts Check Sheets
www.GLOBALSKILLUP.com
Pareto Diagrams are visual representation of the
entire set of problems which are categorized. Out
of the 100% problems, consider to focus efforts to
fix on the 80% on the issues.
Focusing on 80% of problems with a small 20% of
root causes will yield major improvements.
Pareto Diagrams are based on the Pareto’s law,
accordingly to which a relatively small number of
causes will typically produce a majority of the
problems or the defects identified.
Based on this principle, it is observed that 80%
of the problems are due to 20% of the causes.
Analysis Deficit Design Gaps
Development
Bugs
Architectural
Flaws
Quality Gaps Integration Miss Others
Frequency 26 21 19 11 8 7 8
Cumulative 26% 47% 66% 77% 85% 92% 100%
0%
25%
50%
75%
100%
0
5
10
15
20
25
30
%ofdefects
RateofDefects
Pareto Diagram (80-20)Focus Efforts on Top
80% Topics
Pareto Diagrams
www.GLOBALSKILLUP.com
This tool illustrates the common causes
in any process with a number and
relative heights of the bar.
Histogram does not relate with the
causes based on the time phased
manner. The causes may happen over
any duration of time and is not
represented in histogram.
Is a graphical representation of any
particular nature of element with its wide
spread distribution of frequency or
occurrence intervals and having the
Central tendency.
The Histogram may be ordered or
unordered. Below representation is an
ordered histogram which represents the
central tendency and subsequent
dispersed distribution.
Integration Miss Quality Gaps
Development
Bugs
Analysis Deficit Design Gaps
Architectural
Flaws
Others
Frequency 7 8 19 26 21 11 8
0
5
10
15
20
25
30
RateofDefects
Histogram (Causes for sub standard Product Quality)
Histograms
www.GLOBALSKILLUP.com
Any deviations beyond UCL & LCL should be acted
upon to ensure the process is brought back to
stableness.
Process is considered out of control when:
A data point is beyond the Upper or Lower Control
Limit, however it is well within the Upper or Lower
Specification Limits
7 consecutive points above or below the mean of
the Chart
Control charts provide a visual representation
for review of the goal attainment performance
and the deviations of any process to the
defined path being stable or not.
Upper Control Limits and Lower Control Limits
define the process stableness. Any actual
values within the UCL & LCL provides a ready
answer that the process has been stable and
inline with the expectations.
Control Charts
0
20
40
60
80
100
120
140
160
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Actual Value
UCL Specification Limit
UCL(Upper Control Limit)
Planned Value
LCL(Lower Control Limit)
LCL Specification Limit
Customer Defined
Specifications
Process Owner
Defined Limits
3
3
www.GLOBALSKILLUP.com
Scatter Plot (Negative & Positive Co-relation)
Negative Correlation -
Data trends downward
Positive Correlation -
Data trends Upward
www.GLOBALSKILLUP.com
Scatter Diagrams (Co-relation Charts)
Negative Correlation Positive Correlation No Correlation
Scatter Diagram or Scatter Plot is a graphical representation that shows the relationship also
known as co-relation between data points of variables. This tools aids to study and identify
possible relationship between changes observed amongst variables.
We also come across basic terms here such as:
 Negative Co-relation (data points indicating the negative trend)
 Positive Co-relation (data points indicating the positive trend)
 No Co-relation (data points distributed across with no clear trend visible)
 Best Fit Line (diagonal line with data points equally distributed on both sides)
www.GLOBALSKILLUP.com
This involves comparing the planned
processes to the already existing/used
processes which have been considered best
practiced processes in any similar relevant
project within or outside the organization.
This type of benchmarking ensures that the
project processes adopt the best in line and
best in industry practices thereby naturally
increase the likely hood of becoming the
ideally run project success.
Benchmarking
www.GLOBALSKILLUP.com
Design of Experiments(DOE)
DOE is conducted to optimize the values and
parameters of any production process or product
being developed.
DOE is based on the statistical framework and
ensures to make multiple variable changes at
once to identify the best possible combinations to
achieve the desired results.
This drastically helps to conduct the experiments
keeping these conditions in mind and target the
set or defined cost parameter while achieving the
product requirements.
Example:
Imagine a jet engine, thousands of variables act
in tandem to produce the desired outcome.
Ensuring the required output is achieved at
optimal use of Jet Fuel is one of the key to high
performance engines which is a possibility of
design of experiments.
This can be soft tweaked and not hard tweaked
being considerate of costs involved in
experimentation.
Statistical sampling involves picking up a random
sample from a large population group of items
produced to ensure the Quality is being well
maintained.
Example:
A leading beverages company uses this
technique to ensure the quality of their beverages
are in line to the customer expectations.
Picking a random sample out of a large produced
numbers for a quality check from every lot
ensures the lot produced is of the desired quality.
Statistical Sampling
www.GLOBALSKILLUP.com
Two type of Sampling
Attribute Sampling
Attribute Samples (Yes/No)
(Very Good, Good, Neutral,
Bad) type of answers for a
defined sample set in question
for testing.
Variable Sampling
Variable Samples (0.1, 0.5,
0.8, 0.95, 0.24) type of
variables for a sample set
which we are testing.
www.GLOBALSKILLUP.com
Other quality planning tools are
used to define quality requirements
and to plan effective quality.
Brainstorming
Used to generate ideas in group
discussion mode.
Force Field Analysis (FFA) –
Decision Making
Forces acting for and against
Change on a Plan.
Nominal Group Technique
Allows the idea to be
brainstormed in a small group
before being reviewed by a
larger group.
Quality management and control
tools
Can be used to link and
sequence the quality activities.
Additional Quality Planning Tools
Driving & Restraining Forces in equilibrium
Equilibrium
RestrainingForcesDrivingForces
PlanorProposalorDecision
How FFA Tool is used in practice for Decisions?
1. Keep Plan or Proposal (Change) or Decision to be arrived in
Equilibrium.
2. Look at the Forces acting FOR. Identify and evaluate them.
3. Look at the Forces acting AGAINST. Identify and evaluate them.
4. Assign a rank for both sides of the Force(say 1-lower to 5- higher)
5. Finally Sum them up and make the decision based on the highest rank
side.
www.GLOBALSKILLUP.com
Quality Management Plan
Quality Management Plans define how the
Organizational Quality Policies and Project
quality objectives will be implanted and achieved.
Key Benefit of this process is to ensure to meet
project value proposition and reduce costs and
rework patterns.
Process Improvement Plans identify the activities
and process in the project management through
which the value can be enhanced.
Areas which may be considered for such:
Process Boundaries
Process Configuration
Process Metrics
Targets for Improved Performance
Process Improvement Plan
www.GLOBALSKILLUP.com
Quality Metrics
Quality Metrics are used to measure the outputs
of the processes and the outcomes of the
procedures followed.
Measuring quality with metrics provide
quantitative format to ensure suitable actions,
controls or further measures adopted or tweaked
to achieve desired state of outcome.
Usually the process are defined in a range of
tolerance and any deviations beyond the
tolerance levels are acted upon.
Quality Checklists are adopted to ensure the
frequently performed tasks and procedures are
followed in the precise same manner without
taking any deviation and introduce errors.
Checklists are often standardized and ensured
they follow the recurring protocols. In some
industries, there are pre-defined checklists which
are naturally adopted by every project performed
in similar.
Quality Checklists
www.GLOBALSKILLUP.com
8.2 Perform Quality Assurance
Inputs
• Quality Management Plan
• Process Improvement Plan
• Quality Metrics
• Quality Control
Measurements
• Project Documents
Tools & Techniques
• Quality Management And
Control Tools
• Quality Audits
• Process Analysis
Outputs
• Change Requests
• Project Management Plan
Updates
• Project Document Updates
• Organization Process Asset
Updates
•Integration
•Direct and Manage Project Work
•Scope
•Time
•Cost
•Quality
•Perform Quality Assurance
•Human Resource
•Acquire Project Team
•Develop Project Team
•Manage Project Team
•Communications
•Manage Communications
•Risk
•Procurement
•Conduct Procurements
•Stakeholder
•Manage Stakeholder Engagement
Executing Process Perform Quality Assurance to
provide the quality of the end
product is to the standards defined
and expected.
This process ensures audit of the
Quality requirements and the results
from the Quality control
measurements to ensure that the
appropriate quality standards and
operational definitions are used.
Key Benefits is it helps to ensure
the quality processes are adopted
and the end product is to the extent
of desired quality.
Quality Assurance contributes to
processes and mechanisms in
place to ensure the final output or
outcome of the end product will be a
quality product with almost certainty.
It also helps prevent the defects in
first place to ensure the end product
is of high quality.
As part of the quality assurance,
continuous process improvement
initiatives are also taken up which
naturally increase the efficiency and
effectiveness of all processes.
www.GLOBALSKILLUP.com
Quality control measurements can also compare the processes used to create the
measurements and validate to ensure their level of correctness.
Quality Control Measurements
Acknowledged. Source: http://www.belatrixsf.com
www.GLOBALSKILLUP.com
Performing Quality Assurance involves the tools and techniques
from the quality planning, quality control such as:
Affinity Diagrams - Organize Large Amounts of
disorganized data for groupings
Process Decision Program Charts (PDPC) - Breaks down
tasks into tree hierarchy and ensure the low level risks and
issues are identified.
Interrelationship Digraphs(ID) - Defines the relationships
between complex situations to solve complexities
Tree Diagrams - Breaking into granularities helps think at
finer detail.
Prioritization Matrix - Each item is given a weight to identify
and focus on the items which are more important in nature.
Activity Network Diagrams
Matrix Diagrams - Tasks are often referred with reference to
a relation to each other on parameters.
Affinity diagrams
Process decision
program charts
(PDPC)
Tree diagrams
Quality Management and Control Tools
Matrix diagrams
Interrelationship
digraphs
Prioritization Matrix
Activity network
diagrams
www.GLOBALSKILLUP.com
Quality Audit is an independent process to
ensure the quality process (which are laid in
place to ensure the quality assurance, quality
control) objectives as planned are materialized
along with any shortfalls being identified including
the conformity and compliance gaps.
Audits are also applicable not only to processes,
it may be extended to policies, procedures,
checklists so on.
Quality Audits are normally performed by an
independent Quality team & preferably not same
quality team working on project itself.
In large organizations, an independent
standalone groups exist to perform random
audits and checks which also supplement to
identify and share best practices from across the
projects, which is beneficial.
Quality Audits are constructive in nature and
should be treated for betterment of the
shortcomings than the customer finding the
shortcomings.
This is performed to identify the root cause of
issues, discover underlying cause.
Detailed study of process ensures the process
improvements are possible by looking at the
betterment of processes, eliminate the non-value
add activities and so on.
This also leads to come up with the preventive
actions and eliminate any constraint behaviors on
certain processes.
Quality Audits ProcessAnalysis
www.GLOBALSKILLUP.com
8.3 Control Quality
Inputs
•Project Management Plan
•Quality Metrics
•Quality Checklists
•Work Performance Data
•Approved Change Requests
•Deliverables
•Project Documents
•Organizational Process Assets
Tools & Techniques
•Seven Basic Quality Tools
•Statistical Sampling
•Inspection
•Approved Change Requests
Review
Outputs
•Quality Control Measurements
•Validated Changes
•Verified Deliverables
•Work Performance Information
•Change Requests
•Project Management Plan
Updates
•Project Document Updates
•Organizational Process Assets
Updates
•Integration
•Monitor and Control Project Work
•Perform Integrated Change Control
•Scope
•Validate Scope
•Control Scope
•Time
•Control Schedule
•Cost
•Control Costs
•Quality
•Control Quality
•Human Resource
•Communications
•Control Communications
•Risk
•Monitor & Control Risks
•Procurement
•Control Procurements
•Stakeholder
•Control Stakeholder Management
Monitoring & Controlling
Process
It is the process of controlling the quality of the end deliverables
across the project.
Quality planned may be monitored across monitoring and
controlling group to identify deviations from planned quality
assurance processes & control checks.
Key benefit includes the project quality is maintained to the
expected grade of quality. Eliminate and or minimize the impact
of bad processes along with validation of the project
deliverables conformance to the stakeholders or customer
requirements.
www.GLOBALSKILLUP.com
Chapter 8 - Debrief
www.GLOBALSKILLUP.com
THIS BRINGS TO “QUALITY MANAGEMENT” COMPLETION.
From what we have understood so far is:
 3 Quality Management Knowledge Area Processes
 Identified their Inputs, Tools & Techniques, Outputs
Chapter 8
www.GLOBALSKILLUP.com
PMP Group Trainings across India
Bangalore | Hyderabad | Pune | Delhi | Chennai | Mumbai | Noida | Gurgaon
Online Trainings Too
www.GLOBALSKILLUP.com
Acknowledgements & Disclaimer
PMI, PMBOK, PMP, CAPM, PgMP, PMI-
ACP, PMI-RMP, PMI-SP are registered
marks of Project Management Institute,
Inc.
All registered trademarks, symbols, names
are marks of their respective owners and
acknowledged.

Mais conteúdo relacionado

Mais procurados

Inter national standards for project management - fitsilis
Inter national standards for project management - fitsilisInter national standards for project management - fitsilis
Inter national standards for project management - fitsilis
Panos Fitsilis
 
Project management
Project managementProject management
Project management
Sameer Kumar
 
Chapter 1 An Overview Of Project Management
Chapter 1  An Overview Of Project ManagementChapter 1  An Overview Of Project Management
Chapter 1 An Overview Of Project Management
Mahesh Bendigeri
 
PMP PMBok 5th Project management processes
PMP PMBok 5th Project management processesPMP PMBok 5th Project management processes
PMP PMBok 5th Project management processes
Abdullah Ahmed, PMP, RMP
 

Mais procurados (20)

Inter national standards for project management - fitsilis
Inter national standards for project management - fitsilisInter national standards for project management - fitsilis
Inter national standards for project management - fitsilis
 
Project Management, Pmi Perspective
Project Management, Pmi PerspectiveProject Management, Pmi Perspective
Project Management, Pmi Perspective
 
Online PMP Training Material for PMP Exam - StakeholderManagement Knowledge Area
Online PMP Training Material for PMP Exam - StakeholderManagement Knowledge AreaOnline PMP Training Material for PMP Exam - StakeholderManagement Knowledge Area
Online PMP Training Material for PMP Exam - StakeholderManagement Knowledge Area
 
Project Management Process Groups And Knowledge Areas
Project Management Process Groups And Knowledge AreasProject Management Process Groups And Knowledge Areas
Project Management Process Groups And Knowledge Areas
 
Lecture 05:Advanced Project Management PM Processes and Framework
Lecture 05:Advanced Project Management   PM Processes and FrameworkLecture 05:Advanced Project Management   PM Processes and Framework
Lecture 05:Advanced Project Management PM Processes and Framework
 
PMP Exam Prep Training Materials based on PMBOK Guide 5th edition for Trainers
PMP Exam Prep Training Materials based on PMBOK Guide 5th edition for TrainersPMP Exam Prep Training Materials based on PMBOK Guide 5th edition for Trainers
PMP Exam Prep Training Materials based on PMBOK Guide 5th edition for Trainers
 
2. project scope management
2. project scope management2. project scope management
2. project scope management
 
Organizational project maturity model (opm3)
Organizational project maturity model (opm3)Organizational project maturity model (opm3)
Organizational project maturity model (opm3)
 
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre..."Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...
 
Project Management Fundamentals
Project Management FundamentalsProject Management Fundamentals
Project Management Fundamentals
 
Project Management Certification Notes
Project Management Certification NotesProject Management Certification Notes
Project Management Certification Notes
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project Management
 
2_Project Scope Management
2_Project Scope Management2_Project Scope Management
2_Project Scope Management
 
Project management
Project managementProject management
Project management
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
Chapter 1 An Overview Of Project Management
Chapter 1  An Overview Of Project ManagementChapter 1  An Overview Of Project Management
Chapter 1 An Overview Of Project Management
 
Ch1 ch2
Ch1 ch2Ch1 ch2
Ch1 ch2
 
Exec summ pmo_design_v1bwalttags_508
Exec summ pmo_design_v1bwalttags_508Exec summ pmo_design_v1bwalttags_508
Exec summ pmo_design_v1bwalttags_508
 
PMP PMBok 5th Project management processes
PMP PMBok 5th Project management processesPMP PMBok 5th Project management processes
PMP PMBok 5th Project management processes
 
Project management fundamentals
Project management fundamentals Project management fundamentals
Project management fundamentals
 

Destaque

Destaque (16)

Online PMP Training Material for PMP Exam - Communications Management Knowled...
Online PMP Training Material for PMP Exam - Communications Management Knowled...Online PMP Training Material for PMP Exam - Communications Management Knowled...
Online PMP Training Material for PMP Exam - Communications Management Knowled...
 
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
 
Online PMP Training Material for PMP Exam - Risk Management Knowledge Area
Online PMP Training Material for PMP Exam - Risk Management Knowledge AreaOnline PMP Training Material for PMP Exam - Risk Management Knowledge Area
Online PMP Training Material for PMP Exam - Risk Management Knowledge Area
 
Easy 1-2-3 like Steps for PMI ACP Application Submission for Exam
Easy 1-2-3 like Steps for PMI ACP Application Submission for ExamEasy 1-2-3 like Steps for PMI ACP Application Submission for Exam
Easy 1-2-3 like Steps for PMI ACP Application Submission for Exam
 
Online PMP Training Material for PMP Exam - Procurement Management Knowledge ...
Online PMP Training Material for PMP Exam - Procurement Management Knowledge ...Online PMP Training Material for PMP Exam - Procurement Management Knowledge ...
Online PMP Training Material for PMP Exam - Procurement Management Knowledge ...
 
Online PMP Training Material for PMP Exam - Time Management Knowledge Area
Online PMP Training Material for PMP Exam - Time Management Knowledge AreaOnline PMP Training Material for PMP Exam - Time Management Knowledge Area
Online PMP Training Material for PMP Exam - Time Management Knowledge Area
 
Pmp quality chapter 8
Pmp quality chapter 8Pmp quality chapter 8
Pmp quality chapter 8
 
TIME MANAGEMENT chapter(6), PMBOK5
TIME MANAGEMENT chapter(6), PMBOK5TIME MANAGEMENT chapter(6), PMBOK5
TIME MANAGEMENT chapter(6), PMBOK5
 
1
11
1
 
Pmp6
Pmp6Pmp6
Pmp6
 
06 pmp time management exam
06 pmp time  management exam06 pmp time  management exam
06 pmp time management exam
 
2
22
2
 
Pmp5
Pmp5Pmp5
Pmp5
 
Self test engine PSP-PMI-SP
Self test engine PSP-PMI-SPSelf test engine PSP-PMI-SP
Self test engine PSP-PMI-SP
 
Free Online Agile & SCRUM Study Training Material for PMI ACP Certification P...
Free Online Agile & SCRUM Study Training Material for PMI ACP Certification P...Free Online Agile & SCRUM Study Training Material for PMI ACP Certification P...
Free Online Agile & SCRUM Study Training Material for PMI ACP Certification P...
 
Jamil faraj hassan CV
Jamil faraj hassan CVJamil faraj hassan CV
Jamil faraj hassan CV
 

Semelhante a Online PMP Training Material for PMP Exam - Quality Management Knowledge Area

projectqualitymanagement-140816235544-phpapp02.pptx
projectqualitymanagement-140816235544-phpapp02.pptxprojectqualitymanagement-140816235544-phpapp02.pptx
projectqualitymanagement-140816235544-phpapp02.pptx
HamzaKhawar4
 
2.08 quality management 1
2.08 quality management 12.08 quality management 1
2.08 quality management 1
reddvise
 
Quality management assurance
Quality management assuranceQuality management assurance
Quality management assurance
selinasimpson2701
 

Semelhante a Online PMP Training Material for PMP Exam - Quality Management Knowledge Area (20)

projectqualitymanagement-140816235544-phpapp02.pptx
projectqualitymanagement-140816235544-phpapp02.pptxprojectqualitymanagement-140816235544-phpapp02.pptx
projectqualitymanagement-140816235544-phpapp02.pptx
 
Project quality management
Project quality managementProject quality management
Project quality management
 
2.08 quality management 1
2.08 quality management 12.08 quality management 1
2.08 quality management 1
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality Management
 
Project quality management
Project quality managementProject quality management
Project quality management
 
Pmb
PmbPmb
Pmb
 
Total quality control
Total quality controlTotal quality control
Total quality control
 
Project Quality - Chapter 1.pptx
Project Quality - Chapter 1.pptxProject Quality - Chapter 1.pptx
Project Quality - Chapter 1.pptx
 
Project Quality Management powerpoint
Project Quality Management powerpointProject Quality Management powerpoint
Project Quality Management powerpoint
 
Project quality management
Project quality managementProject quality management
Project quality management
 
PMP Muzette Charles_Spring2019_Week4_Chapter8
PMP Muzette Charles_Spring2019_Week4_Chapter8PMP Muzette Charles_Spring2019_Week4_Chapter8
PMP Muzette Charles_Spring2019_Week4_Chapter8
 
PROJECT QUALITY MANAGEMENT-1.pptx
PROJECT QUALITY MANAGEMENT-1.pptxPROJECT QUALITY MANAGEMENT-1.pptx
PROJECT QUALITY MANAGEMENT-1.pptx
 
5) PQM.pptx
5) PQM.pptx5) PQM.pptx
5) PQM.pptx
 
Episode 24 : Project Quality Management
Episode 24 :  Project Quality ManagementEpisode 24 :  Project Quality Management
Episode 24 : Project Quality Management
 
Planning For Success Quality Management
Planning For Success Quality ManagementPlanning For Success Quality Management
Planning For Success Quality Management
 
PROJECT QUALITY KNOLEDGE AREA.ppt
PROJECT QUALITY KNOLEDGE    AREA.pptPROJECT QUALITY KNOLEDGE    AREA.ppt
PROJECT QUALITY KNOLEDGE AREA.ppt
 
Product quality management
Product quality managementProduct quality management
Product quality management
 
Session 12 4th edition PMP
Session  12 4th edition PMPSession  12 4th edition PMP
Session 12 4th edition PMP
 
Quality management assurance
Quality management assuranceQuality management assurance
Quality management assurance
 
Quality Management System ISO 9001 Interpretation and Internal Audit
Quality Management System ISO 9001 Interpretation and Internal AuditQuality Management System ISO 9001 Interpretation and Internal Audit
Quality Management System ISO 9001 Interpretation and Internal Audit
 

Último

Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Riyadh +966572737505 get cytotec
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
AllTops
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
Nimot Muili
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
SandaliGurusinghe2
 

Último (14)

Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docx
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
 

Online PMP Training Material for PMP Exam - Quality Management Knowledge Area

  • 4. www.GLOBALSKILLUP.com Chapter 8 Objectives Understand the different Quality Management Processes Their Inputs, Tools and Techniques, Outputs This chapter entails one to understand the various Quality Management aspects required to maintain the desired customer quality. Driving the project towards the desired outcome while maintaining quality is one of the key to making the project successful!
  • 5. www.GLOBALSKILLUP.com Project Quality Management includes processes to ensure the project deliverables are in conformance to the project requirements. Ensuring the Quality and Grade of the deliverables is understood by the team is essential and needs to be detailed in Plan Quality Management. Quality of the deliverables in the project is the conformance to the Requirements, whereas the Grade of the deliverables is the conformance to the technical characteristics of the deliverables. Similarly, project deliverables as per needs of the quality conformance need to be detailed with Precision and Accuracy. Precision: measure of exactness. Ex: Remember a Unit on Scale Precision. Accuracy: measure of correctness. Ex: Remember Dart Board Accuracy of Target. Knowledge Area: Quality Management
  • 6. www.GLOBALSKILLUP.com There are 3 Quality Management processes, namely: 1. Plan Quality Management Planning Project Policies, Processes, Procedures which will enable and ensure the Project deliverables are in compliance with the quality requirements. 2. Perform Quality Assurance Performing Quality Audits to ensure the right set of Policies, Processes, Procedures are used to deliver the desired quality and grade of deliverables with defined precision and accuracy. Quality Control Measurements can be applied to achieve the same. 3. Control Quality Process of managing the project quality in the defined tolerance levels, control limits and ranges during the project execution. Knowledge Area: Quality Management
  • 7. www.GLOBALSKILLUP.com Some important quality terms used often in different quality approaches. Customer Satisfaction Ensuring the project requirements are met and at the same time ensuring the project outcome is usable by the end user or the client Prevention over Inspection Quality should be planned always to be proactive, the cost of prevention of defects is much lesser than the cost of inspection. Continuous Improvement There are multiple Continuous Quality Improvement initiatives possible and depends on the project need to engage the level of quality desired & may follow one of these approaches: Plan-Do-Check-Act (PDCA) Total Quality Management (TQM) Six Sigma Lean Sigma Kaizen(Kai-to alter; Zen-to make better) Continuous Process Improvements (CPI) in any project may be taken up with specially defined approaches as in: Organizational Project Management Maturity Model (OPM3) Capability Maturity Model Integrated (CMMI) Management Responsibility Achieving Quality requires Management participation and support. Management has to take responsibility to ensure the quality is given due diligence without which the quality may cut corners across the project duration due to tradeoffs for customer & market priorities or any other. International Organization for Standardization (ISO) ISO is an International standards setting voluntary body which develops, publishes and administers the International Standards. Quality Management basic approach outlined by PMBoK® is inline with the ISO. Knowledge Area: Quality Management
  • 8. www.GLOBALSKILLUP.com There are 3 Quality Approaches, namely: Knowledge Area: Quality Management • Proposed that organizations can increase their quality and reduce costs by CPI (Continuous Process Improvements) and by thinking the entire evolution as a manufacturing system instead of standalone unconnected pieces W. Edwards Deming • Proposed the application of Pareto’s(80-20) Principle to Quality as 80% of the quality issues are due to the 20% of the causes. • Also, developed Juran’s Trilogy: • Quality Planning • Quality Control • Quality Improvement Joseph. M. Juran • Proposed the DiRFT (Doing it Right First Time) for the Quality Crisis • Proposed 4 Major Principles of Quality • Quality is Conformance to Requirements • System of Quality is Prevention • Performance Standard = Zero Defects • Measurement of Quality = Price of Non-Conformance Philip. B. Crosby
  • 9. www.GLOBALSKILLUP.com 8.1 Plan Quality Management Inputs •Project Management Plan •Stakeholder Register •Risk Register •Requirements Documentation •Organizational Process Assets Tools & Techniques •Cost Benefit Analysis •Cost Of Quality •Seven Basic Quality Tools •Benchmarking •Design Of Experiments •Statistical Sampling •Additional Quality Planning Tools •Meetings Outputs •Quality Management Plan •Process Improvement Plan •Quality Metrics •Quality Checklists •Project Documents Updates •Integration •Develop Project Management Plan •Scope •Plan Scope Management •Collect Requirements •Define Scope •Create WBS •Time •Plan Schedule Management •Define Activities •Sequence Activities •Estimate Activity Resources •Estimate Activity Duration •Develop Schedule •Cost •Plan Cost Management •Estimate Costs •Determine Budget •Quality •Plan Quality Management •Human Resource •Plan HR Management •Communications •Plan Communications Management •Risk •Plan Risk Management •Identify Risks •Perform Qualitative Risk Analysis •Perform Quantitative Risk Analysis •Plan Risk Responses •Procurement •Plan Procurement Management •Stakeholder •Plan Stakeholder Management Planning Process It is the process to establish the Quality Management Plan based on which the Project Quality will be planned, managed and controlled on the relevant quality requirements and standards. This also helps to document approaches which will guide on how to ensure compliance to those requirements and standards. Provides opportunity to establish mechanisms to setup process improvements and continuous refinement procedures, define metrics and quality checklists.
  • 10. www.GLOBALSKILLUP.com Primary benefits of meeting quality requirements include less rework, higher productivity, lower costs, increased stakeholder satisfaction, and increased profitability. A cost-benefit analysis for each quality activity compares the cost of the quality step to the expected benefit. Cost Benefit Ratio(CBR) CBR = 𝐶𝑜𝑠𝑡 𝐵𝑒𝑛𝑒𝑓𝑖𝑡 Benefit Cost Ratio(BCR) BCR = 𝐵𝑒𝑛𝑓𝑖𝑡 𝐶𝑜𝑠𝑡 How to use CBR & BCR ratios to pick Projects? Projects are compared for the better benefit amongst a group of Projects. The Project with highest BCR wins or the Project with lowest CBR wins. For any given project, always pick the projects with benefit or at least the ones which does not incur loss: BCR Greater than or Equal to 1.0. or CBR Lower than or Equal to 1.0 Cost Benefit Analysis
  • 11. www.GLOBALSKILLUP.com Also known as 7QC Tools for 7 Quality Control Tools. Applied to plan Quality & solve the Quality Improvement related issues on the project. 1. Cause and Effect Diagrams 2. Flowcharts 3. Check Sheets 4. Pareto Diagrams 5. Histograms 6. Control Charts 7. Scatter Diagrams 1. Cause and Effect Diagrams (Also known as Ishikawa’s Fish Bone) The problem statement is kept at the head of the fish and traced backwards to identify the root cause and possible actions. Identification of the root cause happens based on the repeat question “why” until the root cause of the problem is found. 2. Flowcharts (Process Maps) Flow charts define the end to end flow of the steps and branching possibilities that exist for a process. Cost estimating is obtained by using the workflow branching logic and associated estimated monetary value for the conformance and non-conformance work. Seven Basic Quality Tools
  • 12. www.GLOBALSKILLUP.com Low Website Traffic Socially networked? Easy user navigation? Appealing Design & Aesthetics ? Works on Smart devices? Works on Tabs? Not much content? Good Quality of Content? Is website playful to keep user long on website? Is content and experience user friendly & engaging? Enough PR Engage? Traditional Campaigns? Social Campaigns? Cause and Effect Diagram (Ishikawa Fishbone Diagram)
  • 13. www.GLOBALSKILLUP.com Start End Production Setup Production Compliance Kick start Production decision Summation Re-Planning Error Type Count (frequency) Weight Score Design Error IIIII III 12 8 * 12 = 96 Development Error IIIII IIIII IIIII 6 15 * 6 = 90 Quality Error IIIII IIIII IIIII IIIII IIII 3 24 * 3 = 72 Integration Error III 15 3 * 15 = 45 Total Score 96+90+72+45 = 303 Are used to organize the facts in a manner that will facilitate effective collection of useful data about a potential quality problem. They are useful for gathering data attributes while performing inspections to identify defects. Flowcharts Check Sheets
  • 14. www.GLOBALSKILLUP.com Pareto Diagrams are visual representation of the entire set of problems which are categorized. Out of the 100% problems, consider to focus efforts to fix on the 80% on the issues. Focusing on 80% of problems with a small 20% of root causes will yield major improvements. Pareto Diagrams are based on the Pareto’s law, accordingly to which a relatively small number of causes will typically produce a majority of the problems or the defects identified. Based on this principle, it is observed that 80% of the problems are due to 20% of the causes. Analysis Deficit Design Gaps Development Bugs Architectural Flaws Quality Gaps Integration Miss Others Frequency 26 21 19 11 8 7 8 Cumulative 26% 47% 66% 77% 85% 92% 100% 0% 25% 50% 75% 100% 0 5 10 15 20 25 30 %ofdefects RateofDefects Pareto Diagram (80-20)Focus Efforts on Top 80% Topics Pareto Diagrams
  • 15. www.GLOBALSKILLUP.com This tool illustrates the common causes in any process with a number and relative heights of the bar. Histogram does not relate with the causes based on the time phased manner. The causes may happen over any duration of time and is not represented in histogram. Is a graphical representation of any particular nature of element with its wide spread distribution of frequency or occurrence intervals and having the Central tendency. The Histogram may be ordered or unordered. Below representation is an ordered histogram which represents the central tendency and subsequent dispersed distribution. Integration Miss Quality Gaps Development Bugs Analysis Deficit Design Gaps Architectural Flaws Others Frequency 7 8 19 26 21 11 8 0 5 10 15 20 25 30 RateofDefects Histogram (Causes for sub standard Product Quality) Histograms
  • 16. www.GLOBALSKILLUP.com Any deviations beyond UCL & LCL should be acted upon to ensure the process is brought back to stableness. Process is considered out of control when: A data point is beyond the Upper or Lower Control Limit, however it is well within the Upper or Lower Specification Limits 7 consecutive points above or below the mean of the Chart Control charts provide a visual representation for review of the goal attainment performance and the deviations of any process to the defined path being stable or not. Upper Control Limits and Lower Control Limits define the process stableness. Any actual values within the UCL & LCL provides a ready answer that the process has been stable and inline with the expectations. Control Charts 0 20 40 60 80 100 120 140 160 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Actual Value UCL Specification Limit UCL(Upper Control Limit) Planned Value LCL(Lower Control Limit) LCL Specification Limit Customer Defined Specifications Process Owner Defined Limits 3 3
  • 17. www.GLOBALSKILLUP.com Scatter Plot (Negative & Positive Co-relation) Negative Correlation - Data trends downward Positive Correlation - Data trends Upward
  • 18. www.GLOBALSKILLUP.com Scatter Diagrams (Co-relation Charts) Negative Correlation Positive Correlation No Correlation Scatter Diagram or Scatter Plot is a graphical representation that shows the relationship also known as co-relation between data points of variables. This tools aids to study and identify possible relationship between changes observed amongst variables. We also come across basic terms here such as:  Negative Co-relation (data points indicating the negative trend)  Positive Co-relation (data points indicating the positive trend)  No Co-relation (data points distributed across with no clear trend visible)  Best Fit Line (diagonal line with data points equally distributed on both sides)
  • 19. www.GLOBALSKILLUP.com This involves comparing the planned processes to the already existing/used processes which have been considered best practiced processes in any similar relevant project within or outside the organization. This type of benchmarking ensures that the project processes adopt the best in line and best in industry practices thereby naturally increase the likely hood of becoming the ideally run project success. Benchmarking
  • 20. www.GLOBALSKILLUP.com Design of Experiments(DOE) DOE is conducted to optimize the values and parameters of any production process or product being developed. DOE is based on the statistical framework and ensures to make multiple variable changes at once to identify the best possible combinations to achieve the desired results. This drastically helps to conduct the experiments keeping these conditions in mind and target the set or defined cost parameter while achieving the product requirements. Example: Imagine a jet engine, thousands of variables act in tandem to produce the desired outcome. Ensuring the required output is achieved at optimal use of Jet Fuel is one of the key to high performance engines which is a possibility of design of experiments. This can be soft tweaked and not hard tweaked being considerate of costs involved in experimentation. Statistical sampling involves picking up a random sample from a large population group of items produced to ensure the Quality is being well maintained. Example: A leading beverages company uses this technique to ensure the quality of their beverages are in line to the customer expectations. Picking a random sample out of a large produced numbers for a quality check from every lot ensures the lot produced is of the desired quality. Statistical Sampling
  • 21. www.GLOBALSKILLUP.com Two type of Sampling Attribute Sampling Attribute Samples (Yes/No) (Very Good, Good, Neutral, Bad) type of answers for a defined sample set in question for testing. Variable Sampling Variable Samples (0.1, 0.5, 0.8, 0.95, 0.24) type of variables for a sample set which we are testing.
  • 22. www.GLOBALSKILLUP.com Other quality planning tools are used to define quality requirements and to plan effective quality. Brainstorming Used to generate ideas in group discussion mode. Force Field Analysis (FFA) – Decision Making Forces acting for and against Change on a Plan. Nominal Group Technique Allows the idea to be brainstormed in a small group before being reviewed by a larger group. Quality management and control tools Can be used to link and sequence the quality activities. Additional Quality Planning Tools Driving & Restraining Forces in equilibrium Equilibrium RestrainingForcesDrivingForces PlanorProposalorDecision How FFA Tool is used in practice for Decisions? 1. Keep Plan or Proposal (Change) or Decision to be arrived in Equilibrium. 2. Look at the Forces acting FOR. Identify and evaluate them. 3. Look at the Forces acting AGAINST. Identify and evaluate them. 4. Assign a rank for both sides of the Force(say 1-lower to 5- higher) 5. Finally Sum them up and make the decision based on the highest rank side.
  • 23. www.GLOBALSKILLUP.com Quality Management Plan Quality Management Plans define how the Organizational Quality Policies and Project quality objectives will be implanted and achieved. Key Benefit of this process is to ensure to meet project value proposition and reduce costs and rework patterns. Process Improvement Plans identify the activities and process in the project management through which the value can be enhanced. Areas which may be considered for such: Process Boundaries Process Configuration Process Metrics Targets for Improved Performance Process Improvement Plan
  • 24. www.GLOBALSKILLUP.com Quality Metrics Quality Metrics are used to measure the outputs of the processes and the outcomes of the procedures followed. Measuring quality with metrics provide quantitative format to ensure suitable actions, controls or further measures adopted or tweaked to achieve desired state of outcome. Usually the process are defined in a range of tolerance and any deviations beyond the tolerance levels are acted upon. Quality Checklists are adopted to ensure the frequently performed tasks and procedures are followed in the precise same manner without taking any deviation and introduce errors. Checklists are often standardized and ensured they follow the recurring protocols. In some industries, there are pre-defined checklists which are naturally adopted by every project performed in similar. Quality Checklists
  • 25. www.GLOBALSKILLUP.com 8.2 Perform Quality Assurance Inputs • Quality Management Plan • Process Improvement Plan • Quality Metrics • Quality Control Measurements • Project Documents Tools & Techniques • Quality Management And Control Tools • Quality Audits • Process Analysis Outputs • Change Requests • Project Management Plan Updates • Project Document Updates • Organization Process Asset Updates •Integration •Direct and Manage Project Work •Scope •Time •Cost •Quality •Perform Quality Assurance •Human Resource •Acquire Project Team •Develop Project Team •Manage Project Team •Communications •Manage Communications •Risk •Procurement •Conduct Procurements •Stakeholder •Manage Stakeholder Engagement Executing Process Perform Quality Assurance to provide the quality of the end product is to the standards defined and expected. This process ensures audit of the Quality requirements and the results from the Quality control measurements to ensure that the appropriate quality standards and operational definitions are used. Key Benefits is it helps to ensure the quality processes are adopted and the end product is to the extent of desired quality. Quality Assurance contributes to processes and mechanisms in place to ensure the final output or outcome of the end product will be a quality product with almost certainty. It also helps prevent the defects in first place to ensure the end product is of high quality. As part of the quality assurance, continuous process improvement initiatives are also taken up which naturally increase the efficiency and effectiveness of all processes.
  • 26. www.GLOBALSKILLUP.com Quality control measurements can also compare the processes used to create the measurements and validate to ensure their level of correctness. Quality Control Measurements Acknowledged. Source: http://www.belatrixsf.com
  • 27. www.GLOBALSKILLUP.com Performing Quality Assurance involves the tools and techniques from the quality planning, quality control such as: Affinity Diagrams - Organize Large Amounts of disorganized data for groupings Process Decision Program Charts (PDPC) - Breaks down tasks into tree hierarchy and ensure the low level risks and issues are identified. Interrelationship Digraphs(ID) - Defines the relationships between complex situations to solve complexities Tree Diagrams - Breaking into granularities helps think at finer detail. Prioritization Matrix - Each item is given a weight to identify and focus on the items which are more important in nature. Activity Network Diagrams Matrix Diagrams - Tasks are often referred with reference to a relation to each other on parameters. Affinity diagrams Process decision program charts (PDPC) Tree diagrams Quality Management and Control Tools Matrix diagrams Interrelationship digraphs Prioritization Matrix Activity network diagrams
  • 28. www.GLOBALSKILLUP.com Quality Audit is an independent process to ensure the quality process (which are laid in place to ensure the quality assurance, quality control) objectives as planned are materialized along with any shortfalls being identified including the conformity and compliance gaps. Audits are also applicable not only to processes, it may be extended to policies, procedures, checklists so on. Quality Audits are normally performed by an independent Quality team & preferably not same quality team working on project itself. In large organizations, an independent standalone groups exist to perform random audits and checks which also supplement to identify and share best practices from across the projects, which is beneficial. Quality Audits are constructive in nature and should be treated for betterment of the shortcomings than the customer finding the shortcomings. This is performed to identify the root cause of issues, discover underlying cause. Detailed study of process ensures the process improvements are possible by looking at the betterment of processes, eliminate the non-value add activities and so on. This also leads to come up with the preventive actions and eliminate any constraint behaviors on certain processes. Quality Audits ProcessAnalysis
  • 29. www.GLOBALSKILLUP.com 8.3 Control Quality Inputs •Project Management Plan •Quality Metrics •Quality Checklists •Work Performance Data •Approved Change Requests •Deliverables •Project Documents •Organizational Process Assets Tools & Techniques •Seven Basic Quality Tools •Statistical Sampling •Inspection •Approved Change Requests Review Outputs •Quality Control Measurements •Validated Changes •Verified Deliverables •Work Performance Information •Change Requests •Project Management Plan Updates •Project Document Updates •Organizational Process Assets Updates •Integration •Monitor and Control Project Work •Perform Integrated Change Control •Scope •Validate Scope •Control Scope •Time •Control Schedule •Cost •Control Costs •Quality •Control Quality •Human Resource •Communications •Control Communications •Risk •Monitor & Control Risks •Procurement •Control Procurements •Stakeholder •Control Stakeholder Management Monitoring & Controlling Process It is the process of controlling the quality of the end deliverables across the project. Quality planned may be monitored across monitoring and controlling group to identify deviations from planned quality assurance processes & control checks. Key benefit includes the project quality is maintained to the expected grade of quality. Eliminate and or minimize the impact of bad processes along with validation of the project deliverables conformance to the stakeholders or customer requirements.
  • 31. www.GLOBALSKILLUP.com THIS BRINGS TO “QUALITY MANAGEMENT” COMPLETION. From what we have understood so far is:  3 Quality Management Knowledge Area Processes  Identified their Inputs, Tools & Techniques, Outputs Chapter 8
  • 32. www.GLOBALSKILLUP.com PMP Group Trainings across India Bangalore | Hyderabad | Pune | Delhi | Chennai | Mumbai | Noida | Gurgaon Online Trainings Too
  • 33. www.GLOBALSKILLUP.com Acknowledgements & Disclaimer PMI, PMBOK, PMP, CAPM, PgMP, PMI- ACP, PMI-RMP, PMI-SP are registered marks of Project Management Institute, Inc. All registered trademarks, symbols, names are marks of their respective owners and acknowledged.

Notas do Editor

  1. Image Source: Wiki on Seven Planning and Management Tools