SlideShare uma empresa Scribd logo
1 de 26
Plasticon Composites International Contracting B.V.
Field Fabricated Fiberglass Tanks
The ultimate solution for your storage of
chemicals
• Headquarter in NL, founded in 1952.
• Worldwide presence, production
facilities and sales all over the world.
• More than 700 employees in 16
Production Locations with approx.
80.000 m² size in 13 countries.
• Approx. 1.500.000 hours production
capacity per year.
• Capability of 200.000 h/a to do
Installation projects.
• 15 stationary and 5 onsite winding
machines.
Introduction
Characteristics of FRP
• Little to no maintenance is required
• A long product life span, up to 50 years
• High-performance insulation
• Abrasion and corrosion resistant
• Lightweight (1.8 g/cm3)
• High Chemical Resistance
• Delivery time
• GRP replaces expensive alloys like Hastelloy, Super Duplex, Ni, as well
as steel rubber lined components.
• Able to work with temperature limits of approximately – 50°C to 125°C
Fire retardance
• Fire retardant resins are tested according the ASTM E 84 (Steiner tunnel test) and
have class 1 flame rating of 25 or less.
• Normal FRP is classified as : DIN 4102 B2 and ASTM E84 class 2
• Bigger wall thickness and 9 x higher heat transfer factor means that the liquid will
not heat up as fast in a steel tank and it will take much more time that the liquid
will start to boil. Boiling liquid is a major problem during an inferno.
• Because of the thicker wall and higher safety
factor (7-10 in case of FRP and 1,5 -2 to steel)
a FRP tank will stay longer.
• The mechanical properties of steel reduces
fast above the 260 °C. ( SS -40% at 260 °C).
The tank will have a uncontrolled collapse.
What to store
Fiberglass Components are corrosion and
chemical resistant, so that you can store
different types of (aggressive) fluids such
as:
- Hydrochloric Acid
- Sulphur Acid
- Phosphoric Acid
- Acid solutions
- Other Acids
- Caustic Solutions
- Brines
- Salt solutions
- Chlorides
- Caustic Liquides
- Flue gases
- Lime slurry
- Fuels
- Fertilizers
- Starch solutions
- Vegetable oils
- Water
SERVICES
• Design
• Engineering
• Production
• Field fabrication & installation
• Installation
• Maintenance
• Repair
6
Generally
• Storage tanks
• Diameter 0 – 6 m Shop fabricated
• Diameter 6 – 21 m Produced onsite with our onsite winding
equipment.
Under certain conditions we are able
to wind up to 30 m in diameter.
• Silo’s
• Process Apparatus & Equipment
• Piping Systems / Pipelines
• Specialty products
PRODUCTS
7
Power industry
• Chimney Liner
• Ducts
• Chimneys
• Spray headers
• Tanks
• Recirculation pipes
• Process piping
• Cooling water pipes
PRODUCTS
8
Field fabrication
The field fabrication of large diameter fiberglass
components, consist of a few simple steps:
1. Design and Engineering completely executed by Plasticon’s experienced designers
2. Shipment of equipment and raw materials to site, in only a few containers
3. Quick setup of the winding and site facilities
4. Winding of the tank shells with Plasticon’s state-of-the-art proprietary winding equipment
5. Assembly and installation of the tanks by Plasticon’s experienced and trained field crew
6. Quality inspection & testing
7. Demobilization of the site facilities
Innovation
Variable mould
 Step-less variation of mould diameter
- 1 mould for 4 – 7,5 m
- 1 mould for 7 – 12,5 m
- 1 mould for 12 – 21 m
 Mould diameter can be changed within a day
 No (new) mould investment for each product
 Economical advantage for projects that require a wide
variety of (large diameter) products i.e. tanks
Production
GRP Absorber & Tanks
4.500 m3
atmospheric Tank
Carbon steel SS 304 GRP Carbon steel
Rubber lined
SS 316
Corrosion resistance Poor Adequate Excellent Inside: Excellent
Outside: Poor
Excellent
Maintenance High demand Periodic Close to nothing Lining: High
demand,
Periodic
Aging Undistinguished Good Good
No peeling
Approx. all 15
years 100%
replacement of
lining
Close to nothing
Welding points Strong corrosion
on seams
Corrosion on
seams
No corrosion Strong corrosion
on seams
Slight corrosion
on seams
Construction time 4 – 6 month 5 – 7 month 4 – 6 month 6 – 8 month 5 – 7 month
Lifetime without
serious maintenance
5 years 30 years Up to 50 years 15 years Up to 50 years
Appr. cost ratio 100 % 140 % 150 % 200 % 180 %
GRP Absorber & Tanks
- The price for installed GRP products does not vary as extreme as for steel and
stainless steel. The price is usually subjected to the normal inflation only.
- Caused by the shorter construction time the EPC is saving money for overhead.
- Longer lifetime and less maintenance cost may be a sales argument towards the
end user.
References
• Alstom Power – ESKOM Kusile Power Plant (South Africa)
• 6 x duct with D=8.9m, L=250 m
REFERENCES
CS Mining / USA
– 3 x D = 7.450 mm x H = 9.000 mm
• Vinyl ester resin in structural laminate (Derakane 411-350 or a equivalent
• SIC, anti-abrasive additive
in CBL (20%)
– 4 x Settler 7.000 mm x 13.500 x H = 1.200
– 4 X Half-dome roofs for settler tanks 7.000 mm x 13.500
REFERENCES
Plasticon Composites has successfully finished all 3 contracts with CS mining, despite a demanding schedule
and navigated through diverse project impediments.
1. Leach Tanks
Three cylindrical tanks have been wound on site, assembled with prefabricated bottom panels and built up by
Plasticon in early October. All internal fixtures and apparatus were installed in a timely manner. Later, preceding
commissioning in the middle of December, the tanks were subjected to hydro-testing.
2. Settler Tanks
Simultaneously works were progressing on rectangular SX Settlers. All four tubs constructed from the very
scratch using flat FRP panels produced by a local US vendor. All tanks were equipped by Plasticon with different
accessories and applications designated for guiding and controlling the flow. Plasticon determined several
internal details to optimize working procedures. The final installation inside all four tanks proceeded parallel, and
thanks to crafty automatization of selected operations, time deadlines set at the end of october could be met.
3. Half-dome roofs for settler tanks
Recognizing Plasticon's professional conduct, CS Mining in the meantime have pondered awarding us with a
contract extension. Using capacity of Winding Machine, Plasticon was requested to wind, fabricate and install
half-dome roofs on all four rectangular tanks. After receiving additional materials and initiating contract formally,
production proceeded swiftly without major hindrances. In different configurations a complete shell has been
wound for each settler tank, to enable accurate tracing and trimming into three separate roof segments. Four
cans have been wound in total, with twelve roof modules individually tailored. The finalization on roofs has been
fulfilled one week before the deadline on December, the 5th.
The project has been completed. The site structures are already demobilized.
REFERENCES
REFERENCES
REFERENCES
References
S.E.S. in Wormer, NL
– 12 x D = 9.100 mm x H = 10.000 mm; 600 m3
– Liquid oils and Fats
– Design temp. 90 °C
– Insulated
– Heating Coils inside
– Won against SS
- Client: Daelim Industrial Co., Ltd / Sahara Petrochemical Company
- Location: Saudi Arabia
- Project: CA/EDC plant construction
- 245 KTA caustic/300 KTA EDC
- Based on Uhde technology and specs
- Scope: All Piping and fittings
Tanks and apparatus (36 items)
Design and Engineering (stress)
Installation supervision
On-site welding, lamination
Spool building
- Materials: PP/PVC/PVDF/GRP
- Budget: 10 M€
Arabian Chlor Vinyl Project
References
Solvay - IKRA Project
- Client: Technip / Rusvinyl
- Location: Nizhny Novgorod
- Project: PVC plant
(Based on Solvay technology and specs)
- Scope: All piping and fittings
All tanks and apparatus
Complete installation scope (with local partner)
Design and Engineering (stress)
Pipe supports
Spool building
- Materials: PP/PVC/PVDF/GRP
- Budget: 13 M€
References
References
• Babcock-Noell – Turow (PL)
• 3x chimney liner and ducts with
D = 5.3 m, L = appr. 700 m
Power Plant Neurath BoA 2/3
References
Clean gas duct Absorber to cooling tower
(2 lines)
- Diameter 10,0 m / Length 150m + 30m Elbow
- Turnkey incl. Engineering, Prefabrication,
Transport, Lifting, Installation, Supervision and
Quality control.
- Horizontal on site winding machine.
- Project scope M€ 20
Innovations (in progress)
Leak Monitoring System (LMS)
• In testing phase at 3 customers
• Including remote diagnostics in CCR or on computer
• Planned maintenance stop instead of unplanned
• Can replace traditional independent safety back-ups like concrete
containment and/or double wall systems
THANK YOU!
www.plasticoncomposites.com

Mais conteúdo relacionado

Mais procurados

Nilcra Zirconia ceramic for severe service pumps and valves
Nilcra Zirconia ceramic for severe service pumps and valvesNilcra Zirconia ceramic for severe service pumps and valves
Nilcra Zirconia ceramic for severe service pumps and valvesraymondmouw
 
A Systematic Approach for Repairs to Parking Structures
A Systematic Approach for Repairs to Parking StructuresA Systematic Approach for Repairs to Parking Structures
A Systematic Approach for Repairs to Parking StructuresSika Canada
 
Dn tanks prestressed_concretetank
Dn tanks prestressed_concretetankDn tanks prestressed_concretetank
Dn tanks prestressed_concretetankAdrian Frantescu
 
Chris brooks storage tanks inspection, maintenance and failure
Chris brooks   storage tanks inspection, maintenance and failureChris brooks   storage tanks inspection, maintenance and failure
Chris brooks storage tanks inspection, maintenance and failureSreekumar K S
 
Precast post tensioned tank brochure
Precast post tensioned tank brochurePrecast post tensioned tank brochure
Precast post tensioned tank brochureAdrian Frantescu
 
Vsl pt concrete_storage_structures
Vsl pt concrete_storage_structuresVsl pt concrete_storage_structures
Vsl pt concrete_storage_structuresAdrian Frantescu
 
cement-plant-operation-handbook
cement-plant-operation-handbookcement-plant-operation-handbook
cement-plant-operation-handbookVijay Kumar
 
Sewer pipes-and-fittings
Sewer pipes-and-fittingsSewer pipes-and-fittings
Sewer pipes-and-fittingsthanhuce
 
Industrial report presentation
Industrial report presentationIndustrial report presentation
Industrial report presentationMann Jais
 
Geelong galvanzing brochure_digital final
Geelong galvanzing brochure_digital finalGeelong galvanzing brochure_digital final
Geelong galvanzing brochure_digital finalAndrea Mayne
 
GRP-Glass Reinforced Plastic
GRP-Glass Reinforced PlasticGRP-Glass Reinforced Plastic
GRP-Glass Reinforced PlasticSpeed House group
 
Agricultural pipes and Fittings
Agricultural pipes and Fittings Agricultural pipes and Fittings
Agricultural pipes and Fittings truborepipesindia
 
EADIPS FGR annual journal 2010
EADIPS FGR annual journal 2010EADIPS FGR annual journal 2010
EADIPS FGR annual journal 2010AlfredBirnhuber
 

Mais procurados (20)

International paint surfaces 23
International paint surfaces 23International paint surfaces 23
International paint surfaces 23
 
Composites, The S-Pipe IDM14
Composites, The S-Pipe IDM14Composites, The S-Pipe IDM14
Composites, The S-Pipe IDM14
 
Nilcra Zirconia ceramic for severe service pumps and valves
Nilcra Zirconia ceramic for severe service pumps and valvesNilcra Zirconia ceramic for severe service pumps and valves
Nilcra Zirconia ceramic for severe service pumps and valves
 
A Systematic Approach for Repairs to Parking Structures
A Systematic Approach for Repairs to Parking StructuresA Systematic Approach for Repairs to Parking Structures
A Systematic Approach for Repairs to Parking Structures
 
Dn tanks prestressed_concretetank
Dn tanks prestressed_concretetankDn tanks prestressed_concretetank
Dn tanks prestressed_concretetank
 
Chris brooks storage tanks inspection, maintenance and failure
Chris brooks   storage tanks inspection, maintenance and failureChris brooks   storage tanks inspection, maintenance and failure
Chris brooks storage tanks inspection, maintenance and failure
 
Precast post tensioned tank brochure
Precast post tensioned tank brochurePrecast post tensioned tank brochure
Precast post tensioned tank brochure
 
Vsl pt concrete_storage_structures
Vsl pt concrete_storage_structuresVsl pt concrete_storage_structures
Vsl pt concrete_storage_structures
 
cement-plant-operation-handbook
cement-plant-operation-handbookcement-plant-operation-handbook
cement-plant-operation-handbook
 
Thermoplastic Liners
Thermoplastic LinersThermoplastic Liners
Thermoplastic Liners
 
Sewer pipes-and-fittings
Sewer pipes-and-fittingsSewer pipes-and-fittings
Sewer pipes-and-fittings
 
Riser Design Overview
Riser Design  OverviewRiser Design  Overview
Riser Design Overview
 
Groundworks and Civil Engineering Products
Groundworks and Civil Engineering ProductsGroundworks and Civil Engineering Products
Groundworks and Civil Engineering Products
 
Industrial report presentation
Industrial report presentationIndustrial report presentation
Industrial report presentation
 
Geelong galvanzing brochure_digital final
Geelong galvanzing brochure_digital finalGeelong galvanzing brochure_digital final
Geelong galvanzing brochure_digital final
 
Kettle development and use GAA Conference 2011 - adam furphy
Kettle development and use GAA Conference 2011 - adam furphyKettle development and use GAA Conference 2011 - adam furphy
Kettle development and use GAA Conference 2011 - adam furphy
 
GRP-Glass Reinforced Plastic
GRP-Glass Reinforced PlasticGRP-Glass Reinforced Plastic
GRP-Glass Reinforced Plastic
 
SCC WITH KIM.PPTX
SCC WITH KIM.PPTXSCC WITH KIM.PPTX
SCC WITH KIM.PPTX
 
Agricultural pipes and Fittings
Agricultural pipes and Fittings Agricultural pipes and Fittings
Agricultural pipes and Fittings
 
EADIPS FGR annual journal 2010
EADIPS FGR annual journal 2010EADIPS FGR annual journal 2010
EADIPS FGR annual journal 2010
 

Destaque

Bravo páez ied
Bravo páez iedBravo páez ied
Bravo páez iedALIS234
 
Curriculum vitae- Suraj Namboodiri
Curriculum vitae- Suraj NamboodiriCurriculum vitae- Suraj Namboodiri
Curriculum vitae- Suraj NamboodiriSuraj Namboodiri
 
Proyecto de expresion oral
Proyecto de expresion oralProyecto de expresion oral
Proyecto de expresion oralDianita65
 
INTERNATIONAL BUSINESS
INTERNATIONAL BUSINESSINTERNATIONAL BUSINESS
INTERNATIONAL BUSINESSsaid masoud
 
بوربوينت أهمية القراءة
بوربوينت أهمية القراءةبوربوينت أهمية القراءة
بوربوينت أهمية القراءةmajda haiji
 
GYM LIFE AND HEALTHY FOOD.
GYM LIFE AND HEALTHY FOOD.GYM LIFE AND HEALTHY FOOD.
GYM LIFE AND HEALTHY FOOD.said masoud
 

Destaque (12)

Bravo páez ied
Bravo páez iedBravo páez ied
Bravo páez ied
 
Brett Anderson Resume4
Brett Anderson Resume4Brett Anderson Resume4
Brett Anderson Resume4
 
As.. as
As.. asAs.. as
As.. as
 
Curriculum vitae- Suraj Namboodiri
Curriculum vitae- Suraj NamboodiriCurriculum vitae- Suraj Namboodiri
Curriculum vitae- Suraj Namboodiri
 
SAMAKH
SAMAKHSAMAKH
SAMAKH
 
Coneguem el riu ripoll
Coneguem el riu ripollConeguem el riu ripoll
Coneguem el riu ripoll
 
Eco-Mind Meeting Book - What's next r3.5
Eco-Mind Meeting Book - What's next r3.5 Eco-Mind Meeting Book - What's next r3.5
Eco-Mind Meeting Book - What's next r3.5
 
Proyecto de expresion oral
Proyecto de expresion oralProyecto de expresion oral
Proyecto de expresion oral
 
Trabajo práctico n° 5
Trabajo práctico n° 5Trabajo práctico n° 5
Trabajo práctico n° 5
 
INTERNATIONAL BUSINESS
INTERNATIONAL BUSINESSINTERNATIONAL BUSINESS
INTERNATIONAL BUSINESS
 
بوربوينت أهمية القراءة
بوربوينت أهمية القراءةبوربوينت أهمية القراءة
بوربوينت أهمية القراءة
 
GYM LIFE AND HEALTHY FOOD.
GYM LIFE AND HEALTHY FOOD.GYM LIFE AND HEALTHY FOOD.
GYM LIFE AND HEALTHY FOOD.
 

Semelhante a Presentation FFFT

FPI-Corporate Brochure for information about
FPI-Corporate Brochure for information aboutFPI-Corporate Brochure for information about
FPI-Corporate Brochure for information aboutAbdulbaset14
 
corrocoat newsletter web
corrocoat newsletter webcorrocoat newsletter web
corrocoat newsletter webbus dev
 
pressure vessel details for design and it components
pressure vessel details for design and it componentspressure vessel details for design and it components
pressure vessel details for design and it componentsdhaneshmech1
 
CH3080_pressure_vessels.ppt
CH3080_pressure_vessels.pptCH3080_pressure_vessels.ppt
CH3080_pressure_vessels.pptYahiya Ahmed
 
Projects Oil and Gas Brochure
Projects Oil and Gas BrochureProjects Oil and Gas Brochure
Projects Oil and Gas BrochureZhen Min Cheong
 
Prozinco introduction english me v8_o
Prozinco introduction english me v8_oProzinco introduction english me v8_o
Prozinco introduction english me v8_oProzinco
 
Metalog Presentation 2015
Metalog Presentation 2015Metalog Presentation 2015
Metalog Presentation 2015Jaideep Paul
 
Industeel cryogenic steel-grades-low-temperatures
Industeel cryogenic steel-grades-low-temperaturesIndusteel cryogenic steel-grades-low-temperatures
Industeel cryogenic steel-grades-low-temperaturesFrederic Bouvart
 
autoclaved aerated concrete
autoclaved aerated concreteautoclaved aerated concrete
autoclaved aerated concreteSIVA Aruna
 
Anders Brødsjø - Airborne
Anders Brødsjø - AirborneAnders Brødsjø - Airborne
Anders Brødsjø - AirborneThemadagen
 
2015 Foundations for larger and deeper Offshore Wind
2015 Foundations for larger and deeper Offshore Wind 2015 Foundations for larger and deeper Offshore Wind
2015 Foundations for larger and deeper Offshore Wind MEC Intelligence
 
A comprehensive approach to tank design and tank equipment selection
A comprehensive approach to tank design and tank equipment selectionA comprehensive approach to tank design and tank equipment selection
A comprehensive approach to tank design and tank equipment selectionMohieddin Hadidi
 
Pt slab design philosophy with slides and pictures showing benefit
Pt slab design philosophy  with slides and pictures showing benefitPt slab design philosophy  with slides and pictures showing benefit
Pt slab design philosophy with slides and pictures showing benefitPerwez Ahmad
 

Semelhante a Presentation FFFT (20)

FPI-Corporate Brochure for information about
FPI-Corporate Brochure for information aboutFPI-Corporate Brochure for information about
FPI-Corporate Brochure for information about
 
Linex presentationeng
Linex presentationengLinex presentationeng
Linex presentationeng
 
corrocoat newsletter web
corrocoat newsletter webcorrocoat newsletter web
corrocoat newsletter web
 
Projects MeerkatII Copy
Projects MeerkatII CopyProjects MeerkatII Copy
Projects MeerkatII Copy
 
pressure vessel details for design and it components
pressure vessel details for design and it componentspressure vessel details for design and it components
pressure vessel details for design and it components
 
CH3080_pressure_vessels.ppt
CH3080_pressure_vessels.pptCH3080_pressure_vessels.ppt
CH3080_pressure_vessels.ppt
 
Custom Metal Fabricated Industrial Ducts
Custom Metal Fabricated Industrial DuctsCustom Metal Fabricated Industrial Ducts
Custom Metal Fabricated Industrial Ducts
 
Projects Oil and Gas Brochure
Projects Oil and Gas BrochureProjects Oil and Gas Brochure
Projects Oil and Gas Brochure
 
Prozinco introduction english me v8_o
Prozinco introduction english me v8_oProzinco introduction english me v8_o
Prozinco introduction english me v8_o
 
Copper Mould
Copper MouldCopper Mould
Copper Mould
 
Metalog Presentation 2015
Metalog Presentation 2015Metalog Presentation 2015
Metalog Presentation 2015
 
Industeel cryogenic steel-grades-low-temperatures
Industeel cryogenic steel-grades-low-temperaturesIndusteel cryogenic steel-grades-low-temperatures
Industeel cryogenic steel-grades-low-temperatures
 
autoclaved aerated concrete
autoclaved aerated concreteautoclaved aerated concrete
autoclaved aerated concrete
 
Amipox
AmipoxAmipox
Amipox
 
Amipox
AmipoxAmipox
Amipox
 
Anders Brødsjø - Airborne
Anders Brødsjø - AirborneAnders Brødsjø - Airborne
Anders Brødsjø - Airborne
 
Gregory severyn michael cordell
Gregory severyn   michael cordellGregory severyn   michael cordell
Gregory severyn michael cordell
 
2015 Foundations for larger and deeper Offshore Wind
2015 Foundations for larger and deeper Offshore Wind 2015 Foundations for larger and deeper Offshore Wind
2015 Foundations for larger and deeper Offshore Wind
 
A comprehensive approach to tank design and tank equipment selection
A comprehensive approach to tank design and tank equipment selectionA comprehensive approach to tank design and tank equipment selection
A comprehensive approach to tank design and tank equipment selection
 
Pt slab design philosophy with slides and pictures showing benefit
Pt slab design philosophy  with slides and pictures showing benefitPt slab design philosophy  with slides and pictures showing benefit
Pt slab design philosophy with slides and pictures showing benefit
 

Presentation FFFT

  • 1. Plasticon Composites International Contracting B.V. Field Fabricated Fiberglass Tanks The ultimate solution for your storage of chemicals
  • 2. • Headquarter in NL, founded in 1952. • Worldwide presence, production facilities and sales all over the world. • More than 700 employees in 16 Production Locations with approx. 80.000 m² size in 13 countries. • Approx. 1.500.000 hours production capacity per year. • Capability of 200.000 h/a to do Installation projects. • 15 stationary and 5 onsite winding machines. Introduction
  • 3. Characteristics of FRP • Little to no maintenance is required • A long product life span, up to 50 years • High-performance insulation • Abrasion and corrosion resistant • Lightweight (1.8 g/cm3) • High Chemical Resistance • Delivery time • GRP replaces expensive alloys like Hastelloy, Super Duplex, Ni, as well as steel rubber lined components. • Able to work with temperature limits of approximately – 50°C to 125°C
  • 4. Fire retardance • Fire retardant resins are tested according the ASTM E 84 (Steiner tunnel test) and have class 1 flame rating of 25 or less. • Normal FRP is classified as : DIN 4102 B2 and ASTM E84 class 2 • Bigger wall thickness and 9 x higher heat transfer factor means that the liquid will not heat up as fast in a steel tank and it will take much more time that the liquid will start to boil. Boiling liquid is a major problem during an inferno. • Because of the thicker wall and higher safety factor (7-10 in case of FRP and 1,5 -2 to steel) a FRP tank will stay longer. • The mechanical properties of steel reduces fast above the 260 °C. ( SS -40% at 260 °C). The tank will have a uncontrolled collapse.
  • 5. What to store Fiberglass Components are corrosion and chemical resistant, so that you can store different types of (aggressive) fluids such as: - Hydrochloric Acid - Sulphur Acid - Phosphoric Acid - Acid solutions - Other Acids - Caustic Solutions - Brines - Salt solutions - Chlorides - Caustic Liquides - Flue gases - Lime slurry - Fuels - Fertilizers - Starch solutions - Vegetable oils - Water
  • 6. SERVICES • Design • Engineering • Production • Field fabrication & installation • Installation • Maintenance • Repair 6
  • 7. Generally • Storage tanks • Diameter 0 – 6 m Shop fabricated • Diameter 6 – 21 m Produced onsite with our onsite winding equipment. Under certain conditions we are able to wind up to 30 m in diameter. • Silo’s • Process Apparatus & Equipment • Piping Systems / Pipelines • Specialty products PRODUCTS 7
  • 8. Power industry • Chimney Liner • Ducts • Chimneys • Spray headers • Tanks • Recirculation pipes • Process piping • Cooling water pipes PRODUCTS 8
  • 9. Field fabrication The field fabrication of large diameter fiberglass components, consist of a few simple steps: 1. Design and Engineering completely executed by Plasticon’s experienced designers 2. Shipment of equipment and raw materials to site, in only a few containers 3. Quick setup of the winding and site facilities 4. Winding of the tank shells with Plasticon’s state-of-the-art proprietary winding equipment 5. Assembly and installation of the tanks by Plasticon’s experienced and trained field crew 6. Quality inspection & testing 7. Demobilization of the site facilities
  • 10. Innovation Variable mould  Step-less variation of mould diameter - 1 mould for 4 – 7,5 m - 1 mould for 7 – 12,5 m - 1 mould for 12 – 21 m  Mould diameter can be changed within a day  No (new) mould investment for each product  Economical advantage for projects that require a wide variety of (large diameter) products i.e. tanks
  • 12. GRP Absorber & Tanks 4.500 m3 atmospheric Tank Carbon steel SS 304 GRP Carbon steel Rubber lined SS 316 Corrosion resistance Poor Adequate Excellent Inside: Excellent Outside: Poor Excellent Maintenance High demand Periodic Close to nothing Lining: High demand, Periodic Aging Undistinguished Good Good No peeling Approx. all 15 years 100% replacement of lining Close to nothing Welding points Strong corrosion on seams Corrosion on seams No corrosion Strong corrosion on seams Slight corrosion on seams Construction time 4 – 6 month 5 – 7 month 4 – 6 month 6 – 8 month 5 – 7 month Lifetime without serious maintenance 5 years 30 years Up to 50 years 15 years Up to 50 years Appr. cost ratio 100 % 140 % 150 % 200 % 180 %
  • 13. GRP Absorber & Tanks - The price for installed GRP products does not vary as extreme as for steel and stainless steel. The price is usually subjected to the normal inflation only. - Caused by the shorter construction time the EPC is saving money for overhead. - Longer lifetime and less maintenance cost may be a sales argument towards the end user.
  • 14. References • Alstom Power – ESKOM Kusile Power Plant (South Africa) • 6 x duct with D=8.9m, L=250 m
  • 15. REFERENCES CS Mining / USA – 3 x D = 7.450 mm x H = 9.000 mm • Vinyl ester resin in structural laminate (Derakane 411-350 or a equivalent • SIC, anti-abrasive additive in CBL (20%) – 4 x Settler 7.000 mm x 13.500 x H = 1.200 – 4 X Half-dome roofs for settler tanks 7.000 mm x 13.500
  • 16. REFERENCES Plasticon Composites has successfully finished all 3 contracts with CS mining, despite a demanding schedule and navigated through diverse project impediments. 1. Leach Tanks Three cylindrical tanks have been wound on site, assembled with prefabricated bottom panels and built up by Plasticon in early October. All internal fixtures and apparatus were installed in a timely manner. Later, preceding commissioning in the middle of December, the tanks were subjected to hydro-testing. 2. Settler Tanks Simultaneously works were progressing on rectangular SX Settlers. All four tubs constructed from the very scratch using flat FRP panels produced by a local US vendor. All tanks were equipped by Plasticon with different accessories and applications designated for guiding and controlling the flow. Plasticon determined several internal details to optimize working procedures. The final installation inside all four tanks proceeded parallel, and thanks to crafty automatization of selected operations, time deadlines set at the end of october could be met. 3. Half-dome roofs for settler tanks Recognizing Plasticon's professional conduct, CS Mining in the meantime have pondered awarding us with a contract extension. Using capacity of Winding Machine, Plasticon was requested to wind, fabricate and install half-dome roofs on all four rectangular tanks. After receiving additional materials and initiating contract formally, production proceeded swiftly without major hindrances. In different configurations a complete shell has been wound for each settler tank, to enable accurate tracing and trimming into three separate roof segments. Four cans have been wound in total, with twelve roof modules individually tailored. The finalization on roofs has been fulfilled one week before the deadline on December, the 5th. The project has been completed. The site structures are already demobilized.
  • 20. References S.E.S. in Wormer, NL – 12 x D = 9.100 mm x H = 10.000 mm; 600 m3 – Liquid oils and Fats – Design temp. 90 °C – Insulated – Heating Coils inside – Won against SS
  • 21. - Client: Daelim Industrial Co., Ltd / Sahara Petrochemical Company - Location: Saudi Arabia - Project: CA/EDC plant construction - 245 KTA caustic/300 KTA EDC - Based on Uhde technology and specs - Scope: All Piping and fittings Tanks and apparatus (36 items) Design and Engineering (stress) Installation supervision On-site welding, lamination Spool building - Materials: PP/PVC/PVDF/GRP - Budget: 10 M€ Arabian Chlor Vinyl Project References
  • 22. Solvay - IKRA Project - Client: Technip / Rusvinyl - Location: Nizhny Novgorod - Project: PVC plant (Based on Solvay technology and specs) - Scope: All piping and fittings All tanks and apparatus Complete installation scope (with local partner) Design and Engineering (stress) Pipe supports Spool building - Materials: PP/PVC/PVDF/GRP - Budget: 13 M€ References
  • 23. References • Babcock-Noell – Turow (PL) • 3x chimney liner and ducts with D = 5.3 m, L = appr. 700 m
  • 24. Power Plant Neurath BoA 2/3 References Clean gas duct Absorber to cooling tower (2 lines) - Diameter 10,0 m / Length 150m + 30m Elbow - Turnkey incl. Engineering, Prefabrication, Transport, Lifting, Installation, Supervision and Quality control. - Horizontal on site winding machine. - Project scope M€ 20
  • 25. Innovations (in progress) Leak Monitoring System (LMS) • In testing phase at 3 customers • Including remote diagnostics in CCR or on computer • Planned maintenance stop instead of unplanned • Can replace traditional independent safety back-ups like concrete containment and/or double wall systems