CAREER POINT UNIVERSITY, KOTA
MAJOR ASSIGNMENT OF OPC
CASE STUDY OF TPM
PRESENTED BY :-
ASHOK KUMAR SINGH
UID – K10798
BRANCH – MECHANICAL
COURSE – B.TECH
YEAR/SEM – 3RD /6TH
SUBMITTED TO :-
MR. BHUPENDRA GAHLOT
ASSISTANT PROFESSOR
MECHANICAL DEPTT.
CONTENTS
• INTRODUCTION
• PILLARS OF TPM
• OBJECTIVES
• BENEFITS
• CASE STUDY
INTRODUCTION
• It is an innovative Japanese technique
• It is the major part of the industry to improve the
effectiveness of productivity
• It is applicable to every industry
• Careful & intentionally working by employees in the
industry
• Complete solution of all industry to increase the
productivity
PILLARS OF TPM
• Initial Flow Control Activity
• Focused improvement
• Autonomous Maintenance
• Quality Maintenance
• Planned Maintenance
• Environment, Health and Safety
• Admin TPM
• Education and Training
OBJECTIVE OF TPM
• Involve people in all level of organisation
• Achieve zero defect and zero accident
• Increase production
• Job satisfaction
BENEFITS OF TPM
• Increase OPE
• Rectify customer complaints
• Follow pollution control measures
• Share knowledge and experience
• Achieve goal by working as a team
• High confidence level among employees
CASE STUDY
[Gill Agricultural Implements Private Limited]
• It is a small scale industry
• Located in Punjab
• Main products are – multi crop thresher, tractor mounted
harvester, tractor mounted spray pump,self propelled
harvester
• We have done our case study on multi crop thresher
assembly line
• Daily production is 10 machines/day
• Work is divided for assembly of multi crop thresher on 12
stations
PROCESS FLOW DIAGRAM
SUGGESTION AND IMPLEMTATION OF TPM
• At time of Assembly of threshers there is no sequence of work and these
cause to waste of time. After gives the suggestions Assembly of threshers
working in line and this cause reduce the time of operation
• In these Industry workers has not well skilled in every work. Employee do
only one type of work in Industry. This situation create problem at time of
working. To solve this problem we create the skilled matrix generation
method to improved skill of workers in Industry
• Before implementation TPM industry used shearing machine (manually
operated), that consume lot of time and wastage of raw material. After
suggestion industry has purchased plasma cutting CNC machine that has
increase the quality and quantity of work and less man power required
• In the duration of lunch time (60 min) maintenance personnel must do
preventive maintenance of the plant
Scrap loss before TPM Scrap loss after TPM
CONCLUSION
• We see that OEE value of this Industry is 60%
approximately, this value is not good for industry and this
cause to less profit .
• We found some type of problems and weakness of workers
or industry at time of working. So we think that there is
need of TPM Implementation in this Industry and after it
we give some suggestion by the help of study TPM Pillars.
• Then we got the result, the working environment of this
industry is improved and the OEE of Industry rise to 82%
• After the result clears that by the help of TPM, industry
CASE STUDY
[M/S. SKYPET POLYMER]
• Produces plastic bottles and caps
• Production takes place in two units which are 9 km
apart
• In unit A , two injection moulding machine are present
and are used to make bottle caps.
• In unit B, three blow moulding machines are present
where assembly with the caps , packed and dispatched
are done
PROCESSES CARRIED OUT IN THE INDUSTRY
SUGGESTION AND IMPLEMENTATION OF TPM
• There is no sequence of work and these causes to Waste of
time. After gives the suggestions Assembly of machines
working in line and this cause reduce the time of operation.
• In the duration of lunch time (60 min) maintenance
personnel must do preventive maintenance of the plant.
• Before implementation of TPM there is no proper working
condition of workers. And after implementation TPM
improved the working condition of workers by gives
healthy food and purify ground water.
• At the initial phase of our study many employees consider
OEE CALCULATION BEFORE TPM OEE CALCULATION AFTER TPM
CONCLUSION
• By implementing the principles of lean manufacturing in the various processes,
standardization was achieved as well as improved productivity in a few areas.
The management was satisfied with the results the changes were able to
produce.
• The following goals were accomplished:
• The storage space in Unit A was standardized.
• The productivity in Unit B improved after changing the layout. This was in
the areas of packing and material handling.
• The inventory could be maintained better owing to a simple inventory
management system.
• The OEE value was found to be only 75% approximately, now it has improved
to 83%.
• A better quality rate has been achieved as a result of implementing TPM.

Mais conteúdo relacionado

Mais procurados

Autonomous maintenance ppt
Autonomous maintenance pptAutonomous maintenance ppt
Autonomous maintenance pptSuraj1911
 
TPM- total productive maintenance
TPM- total productive maintenanceTPM- total productive maintenance
TPM- total productive maintenanceASIF IQBAL
 
A Case Study on Just in Time (JIT)
A Case Study on Just in Time (JIT)A Case Study on Just in Time (JIT)
A Case Study on Just in Time (JIT)ijsrd.com
 
Lean manufacturing in automobile industry
Lean manufacturing in automobile industryLean manufacturing in automobile industry
Lean manufacturing in automobile industryMAX GALARZA HERNANDEZ
 
LEAN MANUFACTURING IN APPAREL INDUSTRY
LEAN MANUFACTURING IN APPAREL INDUSTRYLEAN MANUFACTURING IN APPAREL INDUSTRY
LEAN MANUFACTURING IN APPAREL INDUSTRYJAGADISH REDDY KP
 
Jit ppt with case study
Jit ppt with case studyJit ppt with case study
Jit ppt with case studyomkar jagtap
 
Report on JIT , for Projects and Seminars
Report on JIT , for Projects and SeminarsReport on JIT , for Projects and Seminars
Report on JIT , for Projects and Seminarsomkar jagtap
 
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Khairul Bashar
 
Tpm presentation by kaungnyunt
Tpm presentation by kaungnyuntTpm presentation by kaungnyunt
Tpm presentation by kaungnyuntKAUNG NYUNT WIN
 
Modern Terchnological Tool in aid of Lean manufacture in garment unit
Modern Terchnological Tool in aid of Lean manufacture in garment unitModern Terchnological Tool in aid of Lean manufacture in garment unit
Modern Terchnological Tool in aid of Lean manufacture in garment unitIEI GSC
 
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRYMPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRYSharif Mrh
 
Total Productivity Maintenance
Total Productivity MaintenanceTotal Productivity Maintenance
Total Productivity MaintenanceGohelYash1
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Pramod A
 
Study on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments ProductionStudy on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments ProductionMomin Uddin
 
Facility Layout and operations efficiency optimization.
Facility Layout and operations efficiency optimization.Facility Layout and operations efficiency optimization.
Facility Layout and operations efficiency optimization.ASHISH MENKUDALE
 
Application of lean manufacturing tools in garments production
Application of lean manufacturing tools in garments productionApplication of lean manufacturing tools in garments production
Application of lean manufacturing tools in garments productionRazib Mahmud
 

Mais procurados (20)

Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Autonomous maintenance ppt
Autonomous maintenance pptAutonomous maintenance ppt
Autonomous maintenance ppt
 
TPM- total productive maintenance
TPM- total productive maintenanceTPM- total productive maintenance
TPM- total productive maintenance
 
A Case Study on Just in Time (JIT)
A Case Study on Just in Time (JIT)A Case Study on Just in Time (JIT)
A Case Study on Just in Time (JIT)
 
Lean manufacturing in automobile industry
Lean manufacturing in automobile industryLean manufacturing in automobile industry
Lean manufacturing in automobile industry
 
LEAN MANUFACTURING IN APPAREL INDUSTRY
LEAN MANUFACTURING IN APPAREL INDUSTRYLEAN MANUFACTURING IN APPAREL INDUSTRY
LEAN MANUFACTURING IN APPAREL INDUSTRY
 
Jit ppt with case study
Jit ppt with case studyJit ppt with case study
Jit ppt with case study
 
Report on JIT , for Projects and Seminars
Report on JIT , for Projects and SeminarsReport on JIT , for Projects and Seminars
Report on JIT , for Projects and Seminars
 
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...
 
Tpm presentation by kaungnyunt
Tpm presentation by kaungnyuntTpm presentation by kaungnyunt
Tpm presentation by kaungnyunt
 
Modern Terchnological Tool in aid of Lean manufacture in garment unit
Modern Terchnological Tool in aid of Lean manufacture in garment unitModern Terchnological Tool in aid of Lean manufacture in garment unit
Modern Terchnological Tool in aid of Lean manufacture in garment unit
 
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRYMPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
 
Total Productivity Maintenance
Total Productivity MaintenanceTotal Productivity Maintenance
Total Productivity Maintenance
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
 
Study on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments ProductionStudy on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments Production
 
Facility Layout and operations efficiency optimization.
Facility Layout and operations efficiency optimization.Facility Layout and operations efficiency optimization.
Facility Layout and operations efficiency optimization.
 
Toyota automobile
Toyota automobileToyota automobile
Toyota automobile
 
Facility layout
Facility layoutFacility layout
Facility layout
 
TPM (en)
TPM (en)TPM (en)
TPM (en)
 
Application of lean manufacturing tools in garments production
Application of lean manufacturing tools in garments productionApplication of lean manufacturing tools in garments production
Application of lean manufacturing tools in garments production
 

Destaque

Make Difficult Things Enjoyable
Make Difficult Things EnjoyableMake Difficult Things Enjoyable
Make Difficult Things EnjoyableGeorge Hutton
 
TPM PRECISION CHANGEOVERS
TPM PRECISION CHANGEOVERSTPM PRECISION CHANGEOVERS
TPM PRECISION CHANGEOVERSMax Lyons
 
Emerging technology for instruction
Emerging technology for instructionEmerging technology for instruction
Emerging technology for instructionNell Eckersley
 
Module 3 Leading T&L
Module 3 Leading T&LModule 3 Leading T&L
Module 3 Leading T&Lmrjportman
 
The Individual Chapter 11 Double Whammy Condundrum
The Individual Chapter 11 Double Whammy CondundrumThe Individual Chapter 11 Double Whammy Condundrum
The Individual Chapter 11 Double Whammy CondundrumJanine Lee
 
Cotton fibre dyeing in textile
Cotton fibre dyeing in textileCotton fibre dyeing in textile
Cotton fibre dyeing in textileSazed Salman
 
Overview of Training Within Industry (TWI) by Operational Excellence Consulting
Overview of Training Within Industry (TWI) by Operational Excellence ConsultingOverview of Training Within Industry (TWI) by Operational Excellence Consulting
Overview of Training Within Industry (TWI) by Operational Excellence ConsultingOperational Excellence Consulting
 
Continuous Improvement Project
Continuous Improvement ProjectContinuous Improvement Project
Continuous Improvement ProjectDarlene Lebaste
 

Destaque (13)

Pmo Setup Process
Pmo Setup ProcessPmo Setup Process
Pmo Setup Process
 
Make Difficult Things Enjoyable
Make Difficult Things EnjoyableMake Difficult Things Enjoyable
Make Difficult Things Enjoyable
 
TPM PRECISION CHANGEOVERS
TPM PRECISION CHANGEOVERSTPM PRECISION CHANGEOVERS
TPM PRECISION CHANGEOVERS
 
Emerging technology for instruction
Emerging technology for instructionEmerging technology for instruction
Emerging technology for instruction
 
Corporate Presentation - ITChamps
Corporate Presentation - ITChampsCorporate Presentation - ITChamps
Corporate Presentation - ITChamps
 
Module 3 Leading T&L
Module 3 Leading T&LModule 3 Leading T&L
Module 3 Leading T&L
 
Metal Alloys
Metal AlloysMetal Alloys
Metal Alloys
 
The Individual Chapter 11 Double Whammy Condundrum
The Individual Chapter 11 Double Whammy CondundrumThe Individual Chapter 11 Double Whammy Condundrum
The Individual Chapter 11 Double Whammy Condundrum
 
Cotton fibre dyeing in textile
Cotton fibre dyeing in textileCotton fibre dyeing in textile
Cotton fibre dyeing in textile
 
General safety
 General safety  General safety
General safety
 
Overview of Training Within Industry (TWI) by Operational Excellence Consulting
Overview of Training Within Industry (TWI) by Operational Excellence ConsultingOverview of Training Within Industry (TWI) by Operational Excellence Consulting
Overview of Training Within Industry (TWI) by Operational Excellence Consulting
 
Line balancing
Line balancingLine balancing
Line balancing
 
Continuous Improvement Project
Continuous Improvement ProjectContinuous Improvement Project
Continuous Improvement Project
 

Semelhante a K10798 ashok opc me 6th sem

Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptxMargi Shah
 
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh AroraTotal Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
totalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptxtotalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptxRichardMagbatoc1
 
Total Productive Maintenance_Magbatoc.pptx
Total Productive Maintenance_Magbatoc.pptxTotal Productive Maintenance_Magbatoc.pptx
Total Productive Maintenance_Magbatoc.pptxRichardMagbatoc1
 
tpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdftpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdfmihirpatel306953
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and conceptsPaul Robere
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and conceptsMarvin Norona
 
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...ADD VALUE CONSULTING Inc
 
Total productive maintance (tpm)
Total productive maintance (tpm)Total productive maintance (tpm)
Total productive maintance (tpm)Ankur Kumar
 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive MaintenanceMahendra K SHUKLA
 

Semelhante a K10798 ashok opc me 6th sem (20)

Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptx
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Tpm basic
Tpm basicTpm basic
Tpm basic
 
Tpm basic
Tpm basicTpm basic
Tpm basic
 
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh AroraTotal Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
 
totalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptxtotalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptx
 
Total Productive Maintenance_Magbatoc.pptx
Total Productive Maintenance_Magbatoc.pptxTotal Productive Maintenance_Magbatoc.pptx
Total Productive Maintenance_Magbatoc.pptx
 
Tpm+basics
Tpm+basicsTpm+basics
Tpm+basics
 
Tpm+basics
Tpm+basicsTpm+basics
Tpm+basics
 
Chapter 2. tpm
Chapter 2. tpmChapter 2. tpm
Chapter 2. tpm
 
Tpm
TpmTpm
Tpm
 
tpm presentation
tpm presentationtpm presentation
tpm presentation
 
tpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdftpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdf
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Srj tpm
Srj tpmSrj tpm
Srj tpm
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
 
Total productive maintance (tpm)
Total productive maintance (tpm)Total productive maintance (tpm)
Total productive maintance (tpm)
 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive Maintenance
 

Mais de Guddu Ali

k10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th semk10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th semGuddu Ali
 
K10870 AAFTAB ALAM RAC ME 6TH SEM
K10870 AAFTAB ALAM RAC ME 6TH SEMK10870 AAFTAB ALAM RAC ME 6TH SEM
K10870 AAFTAB ALAM RAC ME 6TH SEMGuddu Ali
 
K10870 AAFTAB ALAM RAC ME 6TH SEM
K10870 AAFTAB ALAM RAC ME 6TH SEMK10870 AAFTAB ALAM RAC ME 6TH SEM
K10870 AAFTAB ALAM RAC ME 6TH SEMGuddu Ali
 
K10870 AAFTAB ALAM CONTROL ME 6TH SEM
K10870 AAFTAB ALAM CONTROL ME 6TH SEMK10870 AAFTAB ALAM CONTROL ME 6TH SEM
K10870 AAFTAB ALAM CONTROL ME 6TH SEMGuddu Ali
 
K10870 AAFTAB ALAM IC ENGINE ME 6TH SEM
K10870 AAFTAB ALAM IC ENGINE ME 6TH SEMK10870 AAFTAB ALAM IC ENGINE ME 6TH SEM
K10870 AAFTAB ALAM IC ENGINE ME 6TH SEMGuddu Ali
 
K10870 aaftab alam ic engine me 6 th sem
K10870 aaftab alam ic engine me 6 th semK10870 aaftab alam ic engine me 6 th sem
K10870 aaftab alam ic engine me 6 th semGuddu Ali
 
K10990 GUDDU ALI OPC ME 6TH SEM
K10990 GUDDU ALI OPC ME 6TH SEMK10990 GUDDU ALI OPC ME 6TH SEM
K10990 GUDDU ALI OPC ME 6TH SEMGuddu Ali
 
K10990 GUDDU ALI IC ENGINE ME 6TH SEM
K10990 GUDDU ALI IC ENGINE ME 6TH SEMK10990 GUDDU ALI IC ENGINE ME 6TH SEM
K10990 GUDDU ALI IC ENGINE ME 6TH SEMGuddu Ali
 
K10990 GUDDU ALI RAC ME 6TH SEM
K10990 GUDDU ALI RAC ME 6TH SEMK10990 GUDDU ALI RAC ME 6TH SEM
K10990 GUDDU ALI RAC ME 6TH SEMGuddu Ali
 

Mais de Guddu Ali (9)

k10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th semk10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th sem
 
K10870 AAFTAB ALAM RAC ME 6TH SEM
K10870 AAFTAB ALAM RAC ME 6TH SEMK10870 AAFTAB ALAM RAC ME 6TH SEM
K10870 AAFTAB ALAM RAC ME 6TH SEM
 
K10870 AAFTAB ALAM RAC ME 6TH SEM
K10870 AAFTAB ALAM RAC ME 6TH SEMK10870 AAFTAB ALAM RAC ME 6TH SEM
K10870 AAFTAB ALAM RAC ME 6TH SEM
 
K10870 AAFTAB ALAM CONTROL ME 6TH SEM
K10870 AAFTAB ALAM CONTROL ME 6TH SEMK10870 AAFTAB ALAM CONTROL ME 6TH SEM
K10870 AAFTAB ALAM CONTROL ME 6TH SEM
 
K10870 AAFTAB ALAM IC ENGINE ME 6TH SEM
K10870 AAFTAB ALAM IC ENGINE ME 6TH SEMK10870 AAFTAB ALAM IC ENGINE ME 6TH SEM
K10870 AAFTAB ALAM IC ENGINE ME 6TH SEM
 
K10870 aaftab alam ic engine me 6 th sem
K10870 aaftab alam ic engine me 6 th semK10870 aaftab alam ic engine me 6 th sem
K10870 aaftab alam ic engine me 6 th sem
 
K10990 GUDDU ALI OPC ME 6TH SEM
K10990 GUDDU ALI OPC ME 6TH SEMK10990 GUDDU ALI OPC ME 6TH SEM
K10990 GUDDU ALI OPC ME 6TH SEM
 
K10990 GUDDU ALI IC ENGINE ME 6TH SEM
K10990 GUDDU ALI IC ENGINE ME 6TH SEMK10990 GUDDU ALI IC ENGINE ME 6TH SEM
K10990 GUDDU ALI IC ENGINE ME 6TH SEM
 
K10990 GUDDU ALI RAC ME 6TH SEM
K10990 GUDDU ALI RAC ME 6TH SEMK10990 GUDDU ALI RAC ME 6TH SEM
K10990 GUDDU ALI RAC ME 6TH SEM
 

Último

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 

Último (20)

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 

K10798 ashok opc me 6th sem

  • 1. CAREER POINT UNIVERSITY, KOTA MAJOR ASSIGNMENT OF OPC CASE STUDY OF TPM PRESENTED BY :- ASHOK KUMAR SINGH UID – K10798 BRANCH – MECHANICAL COURSE – B.TECH YEAR/SEM – 3RD /6TH SUBMITTED TO :- MR. BHUPENDRA GAHLOT ASSISTANT PROFESSOR MECHANICAL DEPTT.
  • 2. CONTENTS • INTRODUCTION • PILLARS OF TPM • OBJECTIVES • BENEFITS • CASE STUDY
  • 3. INTRODUCTION • It is an innovative Japanese technique • It is the major part of the industry to improve the effectiveness of productivity • It is applicable to every industry • Careful & intentionally working by employees in the industry • Complete solution of all industry to increase the productivity
  • 4. PILLARS OF TPM • Initial Flow Control Activity • Focused improvement • Autonomous Maintenance • Quality Maintenance • Planned Maintenance • Environment, Health and Safety • Admin TPM • Education and Training
  • 5. OBJECTIVE OF TPM • Involve people in all level of organisation • Achieve zero defect and zero accident • Increase production • Job satisfaction
  • 6. BENEFITS OF TPM • Increase OPE • Rectify customer complaints • Follow pollution control measures • Share knowledge and experience • Achieve goal by working as a team • High confidence level among employees
  • 7. CASE STUDY [Gill Agricultural Implements Private Limited] • It is a small scale industry • Located in Punjab • Main products are – multi crop thresher, tractor mounted harvester, tractor mounted spray pump,self propelled harvester • We have done our case study on multi crop thresher assembly line • Daily production is 10 machines/day • Work is divided for assembly of multi crop thresher on 12 stations
  • 9. SUGGESTION AND IMPLEMTATION OF TPM • At time of Assembly of threshers there is no sequence of work and these cause to waste of time. After gives the suggestions Assembly of threshers working in line and this cause reduce the time of operation • In these Industry workers has not well skilled in every work. Employee do only one type of work in Industry. This situation create problem at time of working. To solve this problem we create the skilled matrix generation method to improved skill of workers in Industry • Before implementation TPM industry used shearing machine (manually operated), that consume lot of time and wastage of raw material. After suggestion industry has purchased plasma cutting CNC machine that has increase the quality and quantity of work and less man power required • In the duration of lunch time (60 min) maintenance personnel must do preventive maintenance of the plant
  • 10.
  • 11.
  • 12. Scrap loss before TPM Scrap loss after TPM
  • 13. CONCLUSION • We see that OEE value of this Industry is 60% approximately, this value is not good for industry and this cause to less profit . • We found some type of problems and weakness of workers or industry at time of working. So we think that there is need of TPM Implementation in this Industry and after it we give some suggestion by the help of study TPM Pillars. • Then we got the result, the working environment of this industry is improved and the OEE of Industry rise to 82% • After the result clears that by the help of TPM, industry
  • 14. CASE STUDY [M/S. SKYPET POLYMER] • Produces plastic bottles and caps • Production takes place in two units which are 9 km apart • In unit A , two injection moulding machine are present and are used to make bottle caps. • In unit B, three blow moulding machines are present where assembly with the caps , packed and dispatched are done
  • 15. PROCESSES CARRIED OUT IN THE INDUSTRY
  • 16. SUGGESTION AND IMPLEMENTATION OF TPM • There is no sequence of work and these causes to Waste of time. After gives the suggestions Assembly of machines working in line and this cause reduce the time of operation. • In the duration of lunch time (60 min) maintenance personnel must do preventive maintenance of the plant. • Before implementation of TPM there is no proper working condition of workers. And after implementation TPM improved the working condition of workers by gives healthy food and purify ground water. • At the initial phase of our study many employees consider
  • 17. OEE CALCULATION BEFORE TPM OEE CALCULATION AFTER TPM
  • 18.
  • 19. CONCLUSION • By implementing the principles of lean manufacturing in the various processes, standardization was achieved as well as improved productivity in a few areas. The management was satisfied with the results the changes were able to produce. • The following goals were accomplished: • The storage space in Unit A was standardized. • The productivity in Unit B improved after changing the layout. This was in the areas of packing and material handling. • The inventory could be maintained better owing to a simple inventory management system. • The OEE value was found to be only 75% approximately, now it has improved to 83%. • A better quality rate has been achieved as a result of implementing TPM.