Gagan Gupta
Project Management is the dynamic process that
utilizes the appropriate resources of the organization
in a controlled and structured manner, to achieve
some clearly defined objectives identified as strategic
needs. It is always conducted within a defined set of
constraints.

1/29/2014

Gagan Gupta
Monitoring &
Control

Planning

Implementation

1/29/2014

Evaluation

Gagan Gupta
• A Project is considered as Failure……
Whenever a project
doesn’t meet to the
expectation of the
Stakeholders.

1/29/2014

Gagan Gupta
• Cost & Time Over-runs
• Quality Degradation
• Frustration & Stress: sometime resulting in people
quitting
• Low Job Satisfaction
• Low Corporate Market Value
• Low Public Opinion
• Negative Media Campaigns
• May even force the company into Closure
1/29/2014

Gagan Gupta
1/29/2014

Gagan Gupta
Also Known as “You’d like it, just a bit bigger.
No Problem.”
Oh Still a bit Bigger……. OK
Even Bigger? It wasn’t in the plan but Okay….
When Scope creeps, the end
results is always more work
than expected.

1/29/2014

Gagan Gupta
• Problems:
– The changes that were not initially planned for, are added to project.
– The Project takes longer and costs more than planned and there is no
record of WHY??

• Causes:
– Not having a method to handle or recognize changes.

• What to do:
– Document the change management process to be used and followed
by Project Team.
– Educate the project Team to recognize a change or deviation from the
Plan.
– Follow the Change Management Process.
1/29/2014

Gagan Gupta
• Problems:
– Team Members do not have the information they need when they
need it.
– Issues or changes do not get escalated.
– Project reporting is sluggish

• Causes:
– The project’s communication plan was not completed.
– The project’s communication plan doesn’t have enough details.

• What to do:
– Find out the communication requirements of all team members, and
stakeholders, then document them in a common plan, and then follow
the Plan.
1/29/2014

Gagan Gupta
• You do not have enough people, the right skill-sets, or the
team is not committed to the projects.
• Problems:
– Tasks take longer than expected
to complete.
– Deadlines and milestones get
missed.
– Project completion date comes
into jeopardy.
– You end up working double shifts to
complete all the works.

1/29/2014

Gagan Gupta
• Causes:
– There was no pre-commitment of resources to the projects.
– The Project was not supported.
– There was no analysis and documentation of all skill-set required.

• What to do:
– Get executives Sponsorship for the project.
– Document which resources and skill-sets are needed to get the job
done.
– Create a plan that gives enough time to get the job done with the
allocated resources.
– Pre-assign the required resources to the team.

1/29/2014

Gagan Gupta
• “I would like a set of stairs that leads up to a bridge.”

• Problems:
– Customer will be unhappy.
– Customer will complain and you will end up doing the what they wantat your expense.

1/29/2014

Gagan Gupta
• Causes:
– What the customer wants, was not clearly documented.
– What you believe the customer wants is different that what the
customer believes they have asked for?

• What to do:
– Find out and document exactly what the customer wants.
– Inform everybody of the project scope.
– Document Business, Functional and technical requirements.

1/29/2014

Gagan Gupta
• How do you figure out how long the project will take?

• Problems:
– An unrealistic timeline or budget will be agreed to.
– You will not be able to do all the work in the time allocated.

1/29/2014

Gagan Gupta
• Causes:
– No formal estimating method
– Estimate confidence is law.
– Volume of work not understood

• What to do:
–
–
–
–

1/29/2014

List all the work as well as possible.
Estimate each work package.
Add up all work packages.
Always give answer using a range of dates

Gagan Gupta
• Sorry about the project, I left it in my car & there was a bit of
an incidents.

• Problems:
– Unexpected events cause delays.
– Domino effect of thing going wrong.

1/29/2014

Gagan Gupta
• Causes:
–
–
–
–

No Formal Risk Management.
Just try to predict the big things that can go wrong.
It’s the sum of the all little things that make a project late.
Nothing is more stressful than trying to keep on schedule when
unexpected things keep happening.

• What to do:
–
–
–
–
–
1/29/2014

List all the work as well as possible.
Figure out what can go wrong with each piece of work.
Prioritize each risk as High/ Medium/ Low Probability or impact.
Sort the list.
Create a plan to deal with the risks at the top of list.
Gagan Gupta
• “Emergency Phone installed, Deliverable completed”

• Problems:
– Difficult to get the agreement that the product is finished.
– Customer Keep wanting more, saying you didn’t do it to their
Specification.

1/29/2014

Gagan Gupta
• Causes:
– The Milestones or deliverables were not measurable.
– The customer never told us How many they wanted So we just
assumed 1,

• What to do:
– Ensure Milestones or Deliverables are:
Clearly Defined
Measurable (Quantifiable)

1/29/2014

Gagan Gupta
• Of course we Can do that for you.

• Problems:
– There was little or no planning before deciding you can get the job
done.
– The task you agree to turns out to be more work than expected.
– It takes you longer and jeopardizes other deliverables.
1/29/2014

Gagan Gupta
• Causes:
– Not enough time spent planning.
– You may have been pressured into giving an answer right then and
there.
– Didn’t have a full understanding of the work involved before
committing.

• What to do:
– Take the time to fully understand the work before agreeing to it.
– Its okay to say the work is not possible or will take too long
– Only agree to work when you’re sure it can be done, this will benefit
you and your managers.

1/29/2014

Gagan Gupta
• Hurry .... We have a tight deadline. No time to plan. Just start digging.

• Problems:
– The plan is flawed from the start.
– The project gets out of control and can’t be recovered.

1/29/2014

Gagan Gupta
• Causes:
– You have to do the work and weren’t also given time for project
management.
– Perhaps you only have 10% or 20% allotment for the project
management duties.

• What to do:
– Planning a project is like setting out a roadmap. Without it you will
likely get lost.
– Controlling a project is like driving a car. You have to continuously
watch the road (the Plan) and make little adjustments.

1/29/2014

Gagan Gupta
• I think I know how this helmet goes on. I have been riding scooters for two
years now.

• Problems:
–
–
–
–
–
1/29/2014

Your project don’t finish on time.
Your project are always squeezed at the end.
Your project are stressful.
You have to deal with unrealistic expectation or customers.
You feel your projects are out of control.
Gagan Gupta
• Causes:
– People often don’t know what they don’t know.
– Their project are out of control but they don’t know WHY??
– They feel they are doing okay but could benefit from formal project
management education.

• What to do:
– Learn the methods, tools, and techniques successful Project manager
use to initiate, plan, execute and control their projects.

1/29/2014

Gagan Gupta
Presented by Gagan Gupta
1/29/2014

Gagan Gupta

Mais conteúdo relacionado

Mais procurados

File 1 removed 1 word from 5 slides 1
File 1 removed 1 word from 5 slides 1File 1 removed 1 word from 5 slides 1
File 1 removed 1 word from 5 slides 1test prod1
 
File 1 removed 5 words 1
File 1 removed 5 words 1File 1 removed 5 words 1
File 1 removed 5 words 1test prod1
 
File 1 removed 4 slides 2
File 1 removed 4 slides 2File 1 removed 4 slides 2
File 1 removed 4 slides 2test prod1
 
File 1 extra slide 1
File 1 extra slide 1File 1 extra slide 1
File 1 extra slide 1test prod1
 
File 1 extra slide 2
File 1 extra slide 2File 1 extra slide 2
File 1 extra slide 2test prod1
 
File 1 four extra slides 1
File 1 four extra slides 1File 1 four extra slides 1
File 1 four extra slides 1test prod1
 
Chapter 5,6,7 (group 1 project man)
Chapter 5,6,7 (group 1 project man)Chapter 5,6,7 (group 1 project man)
Chapter 5,6,7 (group 1 project man)Arvin Dela Cruz
 
Agile project tracking - burn up charts
Agile project tracking - burn up chartsAgile project tracking - burn up charts
Agile project tracking - burn up chartsJonny LeRoy
 
Project timeline slides v2
Project timeline slides v2Project timeline slides v2
Project timeline slides v2Eileen Feng
 
Everyone is a project manager. You can too!
Everyone is a project manager. You can too!Everyone is a project manager. You can too!
Everyone is a project manager. You can too!Linchpin
 
7 Bulletproof Strategies to Achieve Goals in Business
7 Bulletproof Strategies to Achieve Goals in Business 7 Bulletproof Strategies to Achieve Goals in Business
7 Bulletproof Strategies to Achieve Goals in Business KeepSolid
 

Mais procurados (16)

File 1 removed 1 word from 5 slides 1
File 1 removed 1 word from 5 slides 1File 1 removed 1 word from 5 slides 1
File 1 removed 1 word from 5 slides 1
 
File 1 removed 5 words 1
File 1 removed 5 words 1File 1 removed 5 words 1
File 1 removed 5 words 1
 
File 1 removed 4 slides 2
File 1 removed 4 slides 2File 1 removed 4 slides 2
File 1 removed 4 slides 2
 
File 1 extra slide 1
File 1 extra slide 1File 1 extra slide 1
File 1 extra slide 1
 
File 1 extra slide 2
File 1 extra slide 2File 1 extra slide 2
File 1 extra slide 2
 
File 1 four extra slides 1
File 1 four extra slides 1File 1 four extra slides 1
File 1 four extra slides 1
 
Effective Scrum
Effective ScrumEffective Scrum
Effective Scrum
 
Scrum Framework 2021_4
Scrum Framework 2021_4Scrum Framework 2021_4
Scrum Framework 2021_4
 
Chapter 5,6,7 (group 1 project man)
Chapter 5,6,7 (group 1 project man)Chapter 5,6,7 (group 1 project man)
Chapter 5,6,7 (group 1 project man)
 
Being prepared for the Unexpected
Being prepared for the UnexpectedBeing prepared for the Unexpected
Being prepared for the Unexpected
 
Agile project tracking - burn up charts
Agile project tracking - burn up chartsAgile project tracking - burn up charts
Agile project tracking - burn up charts
 
Time Mgmt
Time MgmtTime Mgmt
Time Mgmt
 
Project timeline slides v2
Project timeline slides v2Project timeline slides v2
Project timeline slides v2
 
Everyone is a project manager. You can too!
Everyone is a project manager. You can too!Everyone is a project manager. You can too!
Everyone is a project manager. You can too!
 
What agile is not
What agile is notWhat agile is not
What agile is not
 
7 Bulletproof Strategies to Achieve Goals in Business
7 Bulletproof Strategies to Achieve Goals in Business 7 Bulletproof Strategies to Achieve Goals in Business
7 Bulletproof Strategies to Achieve Goals in Business
 

Destaque

Investments - Project management benefits
Investments - Project management benefitsInvestments - Project management benefits
Investments - Project management benefitsDenise Fotopoulou
 
Surviving The Credit Crunch Using Benefits Management
Surviving The Credit Crunch Using Benefits ManagementSurviving The Credit Crunch Using Benefits Management
Surviving The Credit Crunch Using Benefits Managementcombera
 
Pm deep dive risk management
Pm deep dive   risk managementPm deep dive   risk management
Pm deep dive risk managementNiraj Agarwal
 
Leveraging Site Search to Optimize the User Experience
Leveraging Site Search to Optimize the User ExperienceLeveraging Site Search to Optimize the User Experience
Leveraging Site Search to Optimize the User ExperienceJohn Judge
 
Pm Risk Analysis Management
Pm Risk Analysis ManagementPm Risk Analysis Management
Pm Risk Analysis Managementjonathan077070
 
Customer Experience Management: Optimize your site to deliver a highly engagi...
Customer Experience Management: Optimize your site to deliver a highly engagi...Customer Experience Management: Optimize your site to deliver a highly engagi...
Customer Experience Management: Optimize your site to deliver a highly engagi...Janet Jaiswal
 
Qualitative vs quantitative data
Qualitative vs quantitative dataQualitative vs quantitative data
Qualitative vs quantitative dataDanule
 
Pm risks-and-constraints
Pm risks-and-constraintsPm risks-and-constraints
Pm risks-and-constraintswkkgrace
 
Amplifying Your Content with Social Media
Amplifying Your Content with Social MediaAmplifying Your Content with Social Media
Amplifying Your Content with Social MediaHubSpot
 
Leadership In Project Management
Leadership In Project ManagementLeadership In Project Management
Leadership In Project Managementguest484a666
 
Chk construction site_inspection-checklist
Chk construction site_inspection-checklistChk construction site_inspection-checklist
Chk construction site_inspection-checklistimaduddin91
 
The Project Management Process - Week 6 Leadership
The Project Management Process - Week 6   LeadershipThe Project Management Process - Week 6   Leadership
The Project Management Process - Week 6 LeadershipCraig Brown
 
Pmp exam overview
Pmp exam overviewPmp exam overview
Pmp exam overviewguokejing
 

Destaque (14)

Investments - Project management benefits
Investments - Project management benefitsInvestments - Project management benefits
Investments - Project management benefits
 
Surviving The Credit Crunch Using Benefits Management
Surviving The Credit Crunch Using Benefits ManagementSurviving The Credit Crunch Using Benefits Management
Surviving The Credit Crunch Using Benefits Management
 
Pm deep dive risk management
Pm deep dive   risk managementPm deep dive   risk management
Pm deep dive risk management
 
Leveraging Site Search to Optimize the User Experience
Leveraging Site Search to Optimize the User ExperienceLeveraging Site Search to Optimize the User Experience
Leveraging Site Search to Optimize the User Experience
 
Pm Risk Analysis Management
Pm Risk Analysis ManagementPm Risk Analysis Management
Pm Risk Analysis Management
 
Customer Experience Management: Optimize your site to deliver a highly engagi...
Customer Experience Management: Optimize your site to deliver a highly engagi...Customer Experience Management: Optimize your site to deliver a highly engagi...
Customer Experience Management: Optimize your site to deliver a highly engagi...
 
Qualitative vs quantitative data
Qualitative vs quantitative dataQualitative vs quantitative data
Qualitative vs quantitative data
 
Pm risks-and-constraints
Pm risks-and-constraintsPm risks-and-constraints
Pm risks-and-constraints
 
Amplifying Your Content with Social Media
Amplifying Your Content with Social MediaAmplifying Your Content with Social Media
Amplifying Your Content with Social Media
 
Leadership In Project Management
Leadership In Project ManagementLeadership In Project Management
Leadership In Project Management
 
Chk construction site_inspection-checklist
Chk construction site_inspection-checklistChk construction site_inspection-checklist
Chk construction site_inspection-checklist
 
The Project Management Process - Week 6 Leadership
The Project Management Process - Week 6   LeadershipThe Project Management Process - Week 6   Leadership
The Project Management Process - Week 6 Leadership
 
Pmp exam overview
Pmp exam overviewPmp exam overview
Pmp exam overview
 
Project Management KPIs
Project Management KPIsProject Management KPIs
Project Management KPIs
 

Semelhante a Risk Management: Evaluate Risks in your Project

File 1 four extra slides 2
File 1 four extra slides 2File 1 four extra slides 2
File 1 four extra slides 2test prod1
 
Recipe cards task 1 pro forma
Recipe cards task 1 pro formaRecipe cards task 1 pro forma
Recipe cards task 1 pro formaPJG123
 
project-management.pdf
project-management.pdfproject-management.pdf
project-management.pdfSAMPREET3
 
PM fundamentals Session 1_Final_030715_Satya g
PM fundamentals Session 1_Final_030715_Satya gPM fundamentals Session 1_Final_030715_Satya g
PM fundamentals Session 1_Final_030715_Satya gSatyanarayana Gande
 
Release planning in Scrum
Release planning in ScrumRelease planning in Scrum
Release planning in ScrumArne Åhlander
 
2. ideas and planning
2. ideas and planning2. ideas and planning
2. ideas and planningJack Hickman
 
Project Planning.ppt
Project Planning.pptProject Planning.ppt
Project Planning.pptselam49
 
ACS Presentation : How to teach your team Agile in 3 months
ACS Presentation : How to teach your team Agile in 3 monthsACS Presentation : How to teach your team Agile in 3 months
ACS Presentation : How to teach your team Agile in 3 monthsMia Horrigan
 
Rescuing and Reviving Troubled Software Projects
Rescuing and Reviving Troubled Software ProjectsRescuing and Reviving Troubled Software Projects
Rescuing and Reviving Troubled Software ProjectsBarry Curry
 
Іванна Заєць: Основи ПМа (PM’s Essentials)
 Іванна Заєць: Основи ПМа (PM’s Essentials) Іванна Заєць: Основи ПМа (PM’s Essentials)
Іванна Заєць: Основи ПМа (PM’s Essentials)Lviv Startup Club
 
Project management - a practical overview Sue Greener
Project management - a practical overview Sue GreenerProject management - a practical overview Sue Greener
Project management - a practical overview Sue GreenerSue Greener
 

Semelhante a Risk Management: Evaluate Risks in your Project (20)

File 1 copy 2
File 1 copy 2File 1 copy 2
File 1 copy 2
 
File 1 copy 1
File 1 copy 1File 1 copy 1
File 1 copy 1
 
File 1 four extra slides 2
File 1 four extra slides 2File 1 four extra slides 2
File 1 four extra slides 2
 
Recipe cards task 1 pro forma
Recipe cards task 1 pro formaRecipe cards task 1 pro forma
Recipe cards task 1 pro forma
 
project-management.pdf
project-management.pdfproject-management.pdf
project-management.pdf
 
PM fundamentals Session 1_Final_030715_Satya g
PM fundamentals Session 1_Final_030715_Satya gPM fundamentals Session 1_Final_030715_Satya g
PM fundamentals Session 1_Final_030715_Satya g
 
SCRUM methodology
SCRUM methodologySCRUM methodology
SCRUM methodology
 
Project Management for the Curious 2
Project Management for the Curious 2Project Management for the Curious 2
Project Management for the Curious 2
 
Agile framework
Agile frameworkAgile framework
Agile framework
 
The art of execution
The art of executionThe art of execution
The art of execution
 
Release planning in Scrum
Release planning in ScrumRelease planning in Scrum
Release planning in Scrum
 
2. ideas and planning
2. ideas and planning2. ideas and planning
2. ideas and planning
 
Project Planning.ppt
Project Planning.pptProject Planning.ppt
Project Planning.ppt
 
ACS Presentation : How to teach your team Agile in 3 months
ACS Presentation : How to teach your team Agile in 3 monthsACS Presentation : How to teach your team Agile in 3 months
ACS Presentation : How to teach your team Agile in 3 months
 
Teaching Scrum Fundamentals_A Quick Guide to Getting Started.pdf
Teaching Scrum Fundamentals_A Quick Guide to Getting Started.pdfTeaching Scrum Fundamentals_A Quick Guide to Getting Started.pdf
Teaching Scrum Fundamentals_A Quick Guide to Getting Started.pdf
 
Adamson "Project Management, Predictive Planning"
Adamson "Project Management, Predictive Planning"Adamson "Project Management, Predictive Planning"
Adamson "Project Management, Predictive Planning"
 
Teaching Scrum Fundamentals_A Quick Guide to Getting Started.pdf
Teaching Scrum Fundamentals_A Quick Guide to Getting Started.pdfTeaching Scrum Fundamentals_A Quick Guide to Getting Started.pdf
Teaching Scrum Fundamentals_A Quick Guide to Getting Started.pdf
 
Rescuing and Reviving Troubled Software Projects
Rescuing and Reviving Troubled Software ProjectsRescuing and Reviving Troubled Software Projects
Rescuing and Reviving Troubled Software Projects
 
Іванна Заєць: Основи ПМа (PM’s Essentials)
 Іванна Заєць: Основи ПМа (PM’s Essentials) Іванна Заєць: Основи ПМа (PM’s Essentials)
Іванна Заєць: Основи ПМа (PM’s Essentials)
 
Project management - a practical overview Sue Greener
Project management - a practical overview Sue GreenerProject management - a practical overview Sue Greener
Project management - a practical overview Sue Greener
 

Último

Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 

Último (20)

Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 

Risk Management: Evaluate Risks in your Project

  • 2. Project Management is the dynamic process that utilizes the appropriate resources of the organization in a controlled and structured manner, to achieve some clearly defined objectives identified as strategic needs. It is always conducted within a defined set of constraints. 1/29/2014 Gagan Gupta
  • 4. • A Project is considered as Failure…… Whenever a project doesn’t meet to the expectation of the Stakeholders. 1/29/2014 Gagan Gupta
  • 5. • Cost & Time Over-runs • Quality Degradation • Frustration & Stress: sometime resulting in people quitting • Low Job Satisfaction • Low Corporate Market Value • Low Public Opinion • Negative Media Campaigns • May even force the company into Closure 1/29/2014 Gagan Gupta
  • 7. Also Known as “You’d like it, just a bit bigger. No Problem.” Oh Still a bit Bigger……. OK Even Bigger? It wasn’t in the plan but Okay…. When Scope creeps, the end results is always more work than expected. 1/29/2014 Gagan Gupta
  • 8. • Problems: – The changes that were not initially planned for, are added to project. – The Project takes longer and costs more than planned and there is no record of WHY?? • Causes: – Not having a method to handle or recognize changes. • What to do: – Document the change management process to be used and followed by Project Team. – Educate the project Team to recognize a change or deviation from the Plan. – Follow the Change Management Process. 1/29/2014 Gagan Gupta
  • 9. • Problems: – Team Members do not have the information they need when they need it. – Issues or changes do not get escalated. – Project reporting is sluggish • Causes: – The project’s communication plan was not completed. – The project’s communication plan doesn’t have enough details. • What to do: – Find out the communication requirements of all team members, and stakeholders, then document them in a common plan, and then follow the Plan. 1/29/2014 Gagan Gupta
  • 10. • You do not have enough people, the right skill-sets, or the team is not committed to the projects. • Problems: – Tasks take longer than expected to complete. – Deadlines and milestones get missed. – Project completion date comes into jeopardy. – You end up working double shifts to complete all the works. 1/29/2014 Gagan Gupta
  • 11. • Causes: – There was no pre-commitment of resources to the projects. – The Project was not supported. – There was no analysis and documentation of all skill-set required. • What to do: – Get executives Sponsorship for the project. – Document which resources and skill-sets are needed to get the job done. – Create a plan that gives enough time to get the job done with the allocated resources. – Pre-assign the required resources to the team. 1/29/2014 Gagan Gupta
  • 12. • “I would like a set of stairs that leads up to a bridge.” • Problems: – Customer will be unhappy. – Customer will complain and you will end up doing the what they wantat your expense. 1/29/2014 Gagan Gupta
  • 13. • Causes: – What the customer wants, was not clearly documented. – What you believe the customer wants is different that what the customer believes they have asked for? • What to do: – Find out and document exactly what the customer wants. – Inform everybody of the project scope. – Document Business, Functional and technical requirements. 1/29/2014 Gagan Gupta
  • 14. • How do you figure out how long the project will take? • Problems: – An unrealistic timeline or budget will be agreed to. – You will not be able to do all the work in the time allocated. 1/29/2014 Gagan Gupta
  • 15. • Causes: – No formal estimating method – Estimate confidence is law. – Volume of work not understood • What to do: – – – – 1/29/2014 List all the work as well as possible. Estimate each work package. Add up all work packages. Always give answer using a range of dates Gagan Gupta
  • 16. • Sorry about the project, I left it in my car & there was a bit of an incidents. • Problems: – Unexpected events cause delays. – Domino effect of thing going wrong. 1/29/2014 Gagan Gupta
  • 17. • Causes: – – – – No Formal Risk Management. Just try to predict the big things that can go wrong. It’s the sum of the all little things that make a project late. Nothing is more stressful than trying to keep on schedule when unexpected things keep happening. • What to do: – – – – – 1/29/2014 List all the work as well as possible. Figure out what can go wrong with each piece of work. Prioritize each risk as High/ Medium/ Low Probability or impact. Sort the list. Create a plan to deal with the risks at the top of list. Gagan Gupta
  • 18. • “Emergency Phone installed, Deliverable completed” • Problems: – Difficult to get the agreement that the product is finished. – Customer Keep wanting more, saying you didn’t do it to their Specification. 1/29/2014 Gagan Gupta
  • 19. • Causes: – The Milestones or deliverables were not measurable. – The customer never told us How many they wanted So we just assumed 1, • What to do: – Ensure Milestones or Deliverables are: Clearly Defined Measurable (Quantifiable) 1/29/2014 Gagan Gupta
  • 20. • Of course we Can do that for you. • Problems: – There was little or no planning before deciding you can get the job done. – The task you agree to turns out to be more work than expected. – It takes you longer and jeopardizes other deliverables. 1/29/2014 Gagan Gupta
  • 21. • Causes: – Not enough time spent planning. – You may have been pressured into giving an answer right then and there. – Didn’t have a full understanding of the work involved before committing. • What to do: – Take the time to fully understand the work before agreeing to it. – Its okay to say the work is not possible or will take too long – Only agree to work when you’re sure it can be done, this will benefit you and your managers. 1/29/2014 Gagan Gupta
  • 22. • Hurry .... We have a tight deadline. No time to plan. Just start digging. • Problems: – The plan is flawed from the start. – The project gets out of control and can’t be recovered. 1/29/2014 Gagan Gupta
  • 23. • Causes: – You have to do the work and weren’t also given time for project management. – Perhaps you only have 10% or 20% allotment for the project management duties. • What to do: – Planning a project is like setting out a roadmap. Without it you will likely get lost. – Controlling a project is like driving a car. You have to continuously watch the road (the Plan) and make little adjustments. 1/29/2014 Gagan Gupta
  • 24. • I think I know how this helmet goes on. I have been riding scooters for two years now. • Problems: – – – – – 1/29/2014 Your project don’t finish on time. Your project are always squeezed at the end. Your project are stressful. You have to deal with unrealistic expectation or customers. You feel your projects are out of control. Gagan Gupta
  • 25. • Causes: – People often don’t know what they don’t know. – Their project are out of control but they don’t know WHY?? – They feel they are doing okay but could benefit from formal project management education. • What to do: – Learn the methods, tools, and techniques successful Project manager use to initiate, plan, execute and control their projects. 1/29/2014 Gagan Gupta
  • 26. Presented by Gagan Gupta 1/29/2014 Gagan Gupta