SlideShare uma empresa Scribd logo
1 de 7
NAME Gareth John Flanagan
AGE 46
CONTACT DETAILS 01298 402633 (home)
07778609393 (mob)
garethflanagan@aol.com (email)
QUALIFICATIONS HNC Civil/Structural Engineering
(currently working towards TMICE)
CAD EXPERIENCE Fully trained and experienced in the use of REVIT
2015, AutoCAD R2014, R2013, R2011, LT2011,
LT2010, R2010, R2008, R2005, R2002, R2000, R12,
R13, R14, & ADT3.3, Bentley Microstation V8, also
PDMS and Navisworks (viewers)
KEY SKILLS
• Self motivated and enthusiastic team player who is able to interact and
communicate effectively within a variety of environments.
• Proven willingness and ability to adapt to varied and challenging situations.
• Determination to provide the best possible solutions and service for the target
client.
• Strong organisational and planning skills including the delivery of workable
systems and the meeting of deadlines.
DATES PREVIOUS EXPERIENCE
2015 - present BWB Consulting Limited
SENIOR CIVIL/STRUCTURAL CAD DESIGNER
I have moved back within the Consulting Engineering environment to
progress my CAD, BIM and Management skills, also the move back to
living back at home was an added draw.
I am currently taking on several REVIT roles within the company with a
view to standardising the formats and production methods or drawing,
design and project management. A CAD/Revit/BIM management role in
order to develop a smooth transition from concept to construction.
The current work which I am undertaking is wide and varied and again
is anything from simple structural modifications and refurbishments to
large project such as the White Rose Centre (Cinema multiplex).
Involved with all aspects of the development of projects from initial
tender planning, including meetings, surveys, schemes etc, to the final
designs and details. Liaising with the client and his representatives,
forming solutions to immediate and unexpected problems. Co-ordination
of the in house design team, engineers and project managers in order to
achieve the project timeline.
Cont’d Page 2 – Mr G Flanagan
2012 - 2015 JACOBS ENGINEERING (on site at Shell, Bacton Gas Plant)
LEAD CIVIL/STRUCTURAL CAD DESIGNER
I am the only Senior C&S designer based on site at the Bacton
Rejuvenation Project in Norfolk. I have to date had a complete change
of location working ‘on site’ in Norfolk, further developed my Oil and
Gas experience and also refreshed a lot of my previous experience in
doing complete site surveys and investigations.
The project is a complete E.P.C project involving the redesign of the
Shell North Sea Gas processing plant, and being the only C&S designer
have been involved in all aspect of the works including foundations,
support steelwork, remedial works, modification of existing structures,
the redesign, rerouting and modification of the drainage and also
highways, aswell as working with all the other disciplines such as
Electrical, C&I, Process, Piping etc in order to co-ordinate the destruct
of the existing and construction of the new buildings, control rooms,
plant rooms, pipe supports, waste water treatment plant, desalination
plant etc whilst maintaining a working plant.
I have done every aspect of CAD work involved with the site from the
setting out and detailing of buildings and pipework, cable routing
drainage setting out, completing GA’s , detailing of steelwork and RC
work for both the new and temporary work, even providing help and
support to all other disciplines with setting out.
2011 CAPITA SYMONDS
SENIOR STRUCTURAL TECHNICIAN
The main projects I was involved with were the ongoing £1bn
Spinningfields development in Manchester City Centre, creating a new,
high quality commercial and mixed use business ‘zones’. Working and
liasing with Allied London Properties, and Manchester City Council,
aswell as planning and detailing work within the 22 acre scheme which
extends from Deansgate to the River Irwell.
I have been involved in the planning and setting out of the proposed
building zones aswell as the detailing of the buildings themselves, from
setting out, steelwork, reinforced concrete and glazing.
One of the stranger project I have worked on whilst here has been the
complete redesign of the Coronation Street set for Granada Televsion
where we designed and detailed the concrete substructure, the main
steelwork frames and gantries and the brick facades.
2009 - 2010 NORDER DESIGN LTD
SENIOR STRUCTURAL DESIGN TECHNICIAN/CAD MANAGER
& DESIGN PROJECT MANAGER
I have been involved in most of the jobs that have been in the office
being one of only three technicians. Whilst a small practice, the work
has been very diverse from Carlsberg, Black Sheep & Coors breweries
to highway/bridge works such as the A12 Witham bypass and
improvements for the A406 North Circular Road.
I have been involved in the redevelopment and expansion of several
different breweries this has been everything from the concept design and
planning meetings, client liaison, to the management and coordination
of the design team for the production of GAs and detailing of steelwork,
mainly for the process plant work but also for the storage and gas
Cont’d Page 3 – Mr G Flanagan
recovery works, and has also included the creation of fabrication
drawings for the use of the steelwork manufacturer/contractor.
The Highways and Bridges work has been again GA's and setting out
works as well as RC and steelwork detailing for bridges and safety
barrier systems.
2005 - 2009 SCOTT WILSON LTD (URS - SCOTT WILSON)
SENIOR STRUCTURAL CAD TECHNICIAN/CAD MANAGER &
TEAM LEADER
Involved with all aspects of the development of projects from initial
tender planning, including meetings, surveys, schemes etc, to the final
designs and details. Liaising with the client and his representatives,
forming solutions to immediate and unexpected problems. Co-ordination
of the in house design team, engineers and project managers in order to
achieve the project timeline. Currently involved with the design and
detailing of project such as Liverpool’s’ John Lennon Airport, not only
involved with the master planning but also designing the new terminals
as well. Also involved in the current design ideas for the proposed new
Manchester University and South Cheshire College with state of the art
buildings for lecture theatres, cinema and general purpose university
buildings. Complete ‘space engineering’ in both modern and traditional
materials. Also currently involved with a very similar project for the
Nelson and Colne College in the Burnley area of North Manchester with
the design and development of new purpose built study units and the
rationalisation of the existing campus.
2004 - 2005 MARTIN STOCKLEY ASSOCIATES – CONSULTING ENGINEERS
SENIOR STRUCTURAL CAD TECHNICIAN/CAD SYSTEMS
MANAGER
Learned a completely new CAD package in Bentley Microstation V8 as
well as involved with the CAD and IT support. Development of projects
from initial tender planning, including meetings, surveys, schemes etc,
to the final designs and details.
Currently involved with the design and detailing of The Woodroyd
Centre, a purpose built community hospital and recreation centre in
Bradford by Bauman Lyons, also involved with the massive
redevelopment co-ordination and master planning for the Ancoats area
of Manchester now designated New Islington in association with Urban
Splash, Grants, Alsops and the English Partnerships. Involved with the
rather interesting development of the Castlefield Quay, an area to the
bottom end of Deansgate in Central Manchester where a sympathetic
development is currently under discussion due to the site being the
location of the original Roman Fort of Mamucium and the extent of the
archaeology. Involved with several urban redevelopment projects in and
around Manchester as well as both Sheffield and Leeds in Yorkshire.
Cont’d Page 4 – Mr G Flanagan
2001 – 2004 BURO HAPPOLD – CONSULTING ENGINEERS
SENIOR STRUCTURAL CAD DESIGN TECHNICIAN/CAD
SYSTEMS MANAGER ESAT LEAD TECHNICIAN
(ENGINEERING SYSTEMS AND TECHNOLOGIES)
Have been involved with the development of both office systems and
the development of in house design specific software and utilities.
Involved with all aspects of the development of projects from initial
tender planning, including meetings, surveys, schemes etc. to the final
designs and details.
Have been involved with the design and detailing of project such as The
Free Trade Hall in Manchester, hotel developments for The Raddisson
Group and Mal Maison as well as work on the regeneration of central
Manchester with new apartment complexes and shopping areas as well
as the preservation of listed buildings in and around Manchester such as
the Manchester Cathedral Visitors Centre, Leftbank Spinningfields and
the regeneration of several mills in and around the Ancoats area
including the grade 2 listed Royal Mills. Projects also run further afield
with the GSP link bridge in Edinburgh, the Sheffield Heart of the City
Project which while being several projects in one was also an interesting
study in master planning. I have also been involved with various PFI
jobs up and down the country as well as numerous universities such as
MMU, University of Central England, Nottingham University and York
University bio-sciences.
2000 G.C MCDONALD & PARTNERS
SENIOR STRUCTURAL CAD DESIGN TECHNICIAN/CAD
SYSTEMS MANAGER
Development of projects from initial tender planning, including
meetings, surveys, schemes etc. to the final designs and details.
Involved with the design and detailing of project for The David Lloyd
Leisure Group with their new Racquet and Sports Clubs up and down
the country as well as work on the urban regeneration and preservation
or the listed buildings in and around Ancoats. Involved with the
redevelopment of the Collegiate Campus for Sheffield University. Also
involved with many other varied projects from house extensions,
underpinning, foundation design and detailing for house builders, to
new office developments and mill refurbishment’s.
1999 WHITBY BIRD & PARTNERS
SENIOR STRUCTURAL CAD DESIGN TECHNICIAN
Being one of only a small number of staff allows me to be involved
with all aspects of the development of projects from initial tender
planning, including meetings, surveys, schemes etc., to the final designs
and details as well as the eventual hand over.
I am currently involved with the design and detailing of project for The
RSPB, Hodder Associates and Urban Splash which are proposed timber
hides for the disabled, an exhibition /visitors centre for The National
Wild Flower Society and the redevelopment of an industrial box factory
into exclusive city centre residential apartments respectively.
As the requirements of each client at the tender stages are different it
has been necessary not only to help the client with his design outlook
but also be able to work in 3D as well as 2D
Cont’d Page 5 – Mr G Flanagan
1998 – 1999 DOROTHEA GROUP LTD
DESIGN TEAM/DRAWING OFFICE MANAGER & SENIOR
STRUCTURAL ENGINEER
As the Design Office Manager I am involved in the training of junior
technicians, the co-ordination of draughtsmen and engineers and
liaisons with site and major clients.
As the senior structural engineer I have sole responsibility for the
production and checking of all calculations and drawings. I regularly
attend both site and contracts meeting and report to the MD as to the
status, programme and costing of the various projects.
Working on a wide variety of Structural and Architectural
Iron/Aluminium projects such as the major redevelopment of The Royal
Arsenal in Woolwich, Palace Extensions for The Sultan of Brunei to
canopies, entrance features, emergency escape stairs and cast metal
railings as well as the standard range of street furniture products.
1997 – 1998 THE RODDERICK O'CONNOR PARTNERSHIP (ROCP)
SENIOR CIVIL / STRUCTURAL TECHNICIAN & CAD SYSTEMS
MANAGER
Working on a wide variety of both Civil and Structural projects,
including major redevelopment of The Old Parsonage/Archwright
House for Chestertons, Lord St in Liverpool for Barlows and numerous
development sites for Orange/Hutchinson Communications. Highway
design for the proposed redevelopment of the A74 into the M74 at
Todhills. I am involved with highway design and the structural steel and
r.c design and detailing for all sizes of projects from small underpinning
work to major new build and redevelopment projects. I conduct
investigative surveys and compile reports and recommendations I am
also in charge of the maintenance and running of the network systems.
1996 – 1997 SHAW WHITMORE FYFFE PARTNERSHIP
SENIOR CIVIL / STRUCTURAL TECHNICIAN & ASSISTANT
CAD SYSTEMNS MANAGER
Working on a wide variety of both Civil and Structural projects,
including major developments of the old Cheadle Royal site and
Birmingham Great Park for AMEC Involved in both highway design
and structural steel and r.c design and detailing for all sizes of projects
for Aldi, Gala Leisure, Heery International and Pillar Properties Ltd. I
am also involved with the maintenance and running of the network
systems.
1995 – 1996 JMP CONSULTANTS LTD
SENIOR CIVIL / STRUCTURAL TECHNICIAN
Working with Autocad R12 in all aspects of Highway and Civil
Engineering. Involved in highway design, urban relief and feasibility
studies, though mainly involved with the preparation, detailing and
checking of GA and RC work for concrete bridges, abutments and
retaining walls.
Cont’d Page 6 – Mr G Flanagan
1994 - 1995 HAREMEAD LIMITED/TANSHIRE HOLDINGS LTD
SENIOR STRUCTURAL CAD DRAUGHTSMAN
Working on major pharmaceutical projects for companies such as
Zeneca, Scherer, Fisons and others; involved with the detailing and
checking of reinforced concrete and steelwork.
Smaller projects include detailing work for refurbishment to existing
laboratories such as UMIST; work involved all main structural materials
ie. steelwork, concrete, masonry & timber.
All projects conform to ISO & BS Standards and all draughting is
executed on Autocad Release 12.
1992 – 1994 THOMAS STOREY (ENGINEERS) LIMITED
SENIOR STRUCTURAL DRAUGHTSMAN
Involved in the preparation detailing and checking of all aspects of the
construction, launching, erection and dismantling of temporary bridging
systems. This includes propping, jacking and various support schemes
for existing structures. All drawings are produced on one of the CAD
systems - CADplus, MultiCAD or MLD2.
1991 - 1992 THE DEW GROUP
SENIOR DESIGN DRAUGHTSMAN
Working on the Building Division with responsibilities for the design
and draughting of tender drawings for Design and Build contracts. Full
detail drawings were produced including foundation designs for a
variety of contracts including industrial, commercial and retail
buildings.
Also experienced in site work, checking construction and finishes.
1990 - 1991 BRIAN MOORHEAD AND PARTNERS
CAD DRAUGHTSMAN
Worked on several projects including Trinity Hospice on the Fylde
Coast, a Renault Dealership Building on Salford Quays and St James
House in Manchester.
All of the work was produced on the Autocad System and including RC
details, structural steelwork arrangements and details and general
building arrangements and details.
1989 - 1990 DGP
CIVIL TECHNICIAN
Worked on a variety of projects for NWW and BNF plc. Projects
include RC details of water retaining structures for Sweetloves STW
and Swinton STW, redesign of DI and fibreglass pipework for High
lane Reservoir in Marple. This involved re-aligning the existing
highway. Production of GAs and details in both steel and concrete for
the EPMF and Encapsulating Plant facilities at the BNF site at
Sellafield.
Cont’d Page 7 – Mr G Flanagan
1987 - 1989 MARSLAND AND CHARGE
CIVIL/STRUCTURAL TECHNICIAN
As sole draughtsman, responsibilities included simple design work,
assisting with site investigations and production of drawings for various
types of schemes including the refurbishment in timber of a 14th
Century church in Chadkirk, Romiley, the re-design of a timber floor
for Hazel Grove Civil Hall. Housing Association work and student
accommodation buildings in Whitworth Park for Manchester
University.
1986 - 1987 ALLOTT AND LOMAX
CIVIL/STRUCTURAL DRAUGHTSMAN
Employed in the Power and Industrial Section with responsibilities for
the production of GAs and RC detail drawings on coal fire power
station projects at Kilroot, Northern Ireland and in Dekelia, Cyprus.
1985 - 1986 MARSTON AND GRUNDY
TRAINEE DRAUGHTSMAN
Working mainly on small structural projects such as pub refurbishment
for Robinson Brewery, extensions to bus depots for Greater Manchester
Passenger Transport Executive. Involved in site survey work,
production of GAs, building details, RC details, drainage layouts and
steelwork arrangements.
Hobbies and Interests
I am a ex-member of the JJB Leyland Brass Band who are still in the top ten Brass Bands in
England along with the likes of Brighouse & Rasterick , Fairey Engineering, Black Dyke
Mills etc and are invited to take part in the British Open Championship as well as The All
England Masters contest in Cambridge. I get invited on a regular basis to play with the Foden
Richarson Brass Band who are at present the number one band in the world rankings
however I am now mainly involved with brass bands at a more grass roots levels, preferring
now to helping my home town band.
I played golf at Stockport Golf Club where I was the first junior member in 1981until
recently when I moved to a more local course at the Buxton and High Peak Golf Club,
Buxton.
I am an Assistant Club Instructor for the British Sub-Aqua Club where I teach the art of
Scuba Diving. I am also a PADI Master Scuba Diver and Divemaster
I have recently become a member of the Nautical Archaeological Society involved in the
search, survey and possible recovery of artefacts and vessels as well as being a member of
the Historic Diving Society.
I have also recently become a member of the Marine Conservation Society involved with the
surveying of marine life of the world and its habitat and behaviour.

Mais conteúdo relacionado

Mais procurados

A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCVAhmed Mishrif
 
Mohamed Nabil Omar - CV
Mohamed Nabil Omar - CVMohamed Nabil Omar - CV
Mohamed Nabil Omar - CVMohamed Omer
 
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011Hans Goetze
 
Rolando alvarez cv for site architect 2
Rolando alvarez cv for site architect  2Rolando alvarez cv for site architect  2
Rolando alvarez cv for site architect 2Rolando Alvarez
 
FR Curriculum Vitae
FR Curriculum VitaeFR Curriculum Vitae
FR Curriculum VitaeFrank Rooney
 
Ganesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande
 
Engineering rana - cv - 2018
Engineering   rana - cv - 2018Engineering   rana - cv - 2018
Engineering rana - cv - 2018RanaMoustafa3
 
Key experience Feb 2016
Key experience Feb 2016Key experience Feb 2016
Key experience Feb 2016Kim Barry
 
CV Details 2016
CV Details 2016CV Details 2016
CV Details 2016Liam Henry
 
Yehia CV+Portfolio 2017 Final
Yehia CV+Portfolio 2017 FinalYehia CV+Portfolio 2017 Final
Yehia CV+Portfolio 2017 FinalAhmed Yehia
 
CV Details 2016
CV Details 2016CV Details 2016
CV Details 2016Liam Henry
 
Nicholas Sheldrake_Oct2016_Arcadis CV
Nicholas Sheldrake_Oct2016_Arcadis CVNicholas Sheldrake_Oct2016_Arcadis CV
Nicholas Sheldrake_Oct2016_Arcadis CVNicholas Sheldrake
 
Mai gabica cv 2020
Mai gabica cv 2020Mai gabica cv 2020
Mai gabica cv 2020maigabica
 
BMA COMPANY PROFILE 2014
BMA COMPANY PROFILE 2014BMA COMPANY PROFILE 2014
BMA COMPANY PROFILE 2014Sally Atalah
 
HANI ISMAIL HARZALLAH - Latest
HANI ISMAIL HARZALLAH - LatestHANI ISMAIL HARZALLAH - Latest
HANI ISMAIL HARZALLAH - LatestHani Herzallah
 
Curent Resume - Lucian Gunter IV
Curent Resume - Lucian Gunter IVCurent Resume - Lucian Gunter IV
Curent Resume - Lucian Gunter IVLucian Gunter IV
 
Adrians Job ApplicationRecent 2015
Adrians Job ApplicationRecent 2015Adrians Job ApplicationRecent 2015
Adrians Job ApplicationRecent 2015Adrian Taylor
 

Mais procurados (20)

A_Rashad_new_updateCV
A_Rashad_new_updateCVA_Rashad_new_updateCV
A_Rashad_new_updateCV
 
CV OG Jan 2016
CV OG Jan 2016CV OG Jan 2016
CV OG Jan 2016
 
Mohamed Nabil Omar - CV
Mohamed Nabil Omar - CVMohamed Nabil Omar - CV
Mohamed Nabil Omar - CV
 
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011
 
Rolando alvarez cv for site architect 2
Rolando alvarez cv for site architect  2Rolando alvarez cv for site architect  2
Rolando alvarez cv for site architect 2
 
FR Curriculum Vitae
FR Curriculum VitaeFR Curriculum Vitae
FR Curriculum Vitae
 
Ganesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts Administrator
 
Mohamed Hassan CV ..
Mohamed Hassan CV ..Mohamed Hassan CV ..
Mohamed Hassan CV ..
 
Engineering rana - cv - 2018
Engineering   rana - cv - 2018Engineering   rana - cv - 2018
Engineering rana - cv - 2018
 
Key experience Feb 2016
Key experience Feb 2016Key experience Feb 2016
Key experience Feb 2016
 
CV Details 2016
CV Details 2016CV Details 2016
CV Details 2016
 
Yehia CV+Portfolio 2017 Final
Yehia CV+Portfolio 2017 FinalYehia CV+Portfolio 2017 Final
Yehia CV+Portfolio 2017 Final
 
CV Details 2016
CV Details 2016CV Details 2016
CV Details 2016
 
Nicholas Sheldrake_Oct2016_Arcadis CV
Nicholas Sheldrake_Oct2016_Arcadis CVNicholas Sheldrake_Oct2016_Arcadis CV
Nicholas Sheldrake_Oct2016_Arcadis CV
 
CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16
CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16
CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16
 
Mai gabica cv 2020
Mai gabica cv 2020Mai gabica cv 2020
Mai gabica cv 2020
 
BMA COMPANY PROFILE 2014
BMA COMPANY PROFILE 2014BMA COMPANY PROFILE 2014
BMA COMPANY PROFILE 2014
 
HANI ISMAIL HARZALLAH - Latest
HANI ISMAIL HARZALLAH - LatestHANI ISMAIL HARZALLAH - Latest
HANI ISMAIL HARZALLAH - Latest
 
Curent Resume - Lucian Gunter IV
Curent Resume - Lucian Gunter IVCurent Resume - Lucian Gunter IV
Curent Resume - Lucian Gunter IV
 
Adrians Job ApplicationRecent 2015
Adrians Job ApplicationRecent 2015Adrians Job ApplicationRecent 2015
Adrians Job ApplicationRecent 2015
 

Destaque

Elite Eyeglass + Samples
Elite Eyeglass + SamplesElite Eyeglass + Samples
Elite Eyeglass + SamplesElite Eyeglass
 
La Evolucion de los Sistemas Operativos
La Evolucion de los Sistemas OperativosLa Evolucion de los Sistemas Operativos
La Evolucion de los Sistemas Operativosmarcoorteflo
 
Modelling Increase in Low Pay 18th May 2016
Modelling Increase in Low Pay 18th May 2016Modelling Increase in Low Pay 18th May 2016
Modelling Increase in Low Pay 18th May 2016NevinInstitute
 
Laudano, marisa electricity
Laudano, marisa   electricityLaudano, marisa   electricity
Laudano, marisa electricitylaudanom1
 
Chickens-Article for vegans and vegetarians. Message for the people
Chickens-Article for vegans and vegetarians. Message for the people Chickens-Article for vegans and vegetarians. Message for the people
Chickens-Article for vegans and vegetarians. Message for the people holly hudson
 
Федеральная программа «Ты – предприниматель» (Самарская область). Модуль-6....
Федеральная программа «Ты – предприниматель» (Самарская область). Модуль-6....Федеральная программа «Ты – предприниматель» (Самарская область). Модуль-6....
Федеральная программа «Ты – предприниматель» (Самарская область). Модуль-6....Gedocorp | Гедокорп
 
Kuliah 1 konsep jaringan
Kuliah 1 konsep jaringanKuliah 1 konsep jaringan
Kuliah 1 konsep jaringanjanuari massudi
 
о музее будь готов 2012
о музее будь готов 2012о музее будь готов 2012
о музее будь готов 2012Vlad Safianov
 
Презентація_ТВБВ_10002-07
Презентація_ТВБВ_10002-07Презентація_ТВБВ_10002-07
Презентація_ТВБВ_10002-07Arsen Bielik
 
команда, путешествия
команда, путешествиякоманда, путешествия
команда, путешествияVlad Safianov
 

Destaque (20)

Club de lecteurs
Club de lecteursClub de lecteurs
Club de lecteurs
 
TOTETECA final
TOTETECA finalTOTETECA final
TOTETECA final
 
Elite Eyeglass + Samples
Elite Eyeglass + SamplesElite Eyeglass + Samples
Elite Eyeglass + Samples
 
La Evolucion de los Sistemas Operativos
La Evolucion de los Sistemas OperativosLa Evolucion de los Sistemas Operativos
La Evolucion de los Sistemas Operativos
 
Yo soy uniatlantico
Yo soy uniatlanticoYo soy uniatlantico
Yo soy uniatlantico
 
Modelling Increase in Low Pay 18th May 2016
Modelling Increase in Low Pay 18th May 2016Modelling Increase in Low Pay 18th May 2016
Modelling Increase in Low Pay 18th May 2016
 
Laudano, marisa electricity
Laudano, marisa   electricityLaudano, marisa   electricity
Laudano, marisa electricity
 
Chickens-Article for vegans and vegetarians. Message for the people
Chickens-Article for vegans and vegetarians. Message for the people Chickens-Article for vegans and vegetarians. Message for the people
Chickens-Article for vegans and vegetarians. Message for the people
 
Calcular sueldo
Calcular sueldoCalcular sueldo
Calcular sueldo
 
Федеральная программа «Ты – предприниматель» (Самарская область). Модуль-6....
Федеральная программа «Ты – предприниматель» (Самарская область). Модуль-6....Федеральная программа «Ты – предприниматель» (Самарская область). Модуль-6....
Федеральная программа «Ты – предприниматель» (Самарская область). Модуль-6....
 
Heru ppt
Heru pptHeru ppt
Heru ppt
 
576-1284-1-SM
576-1284-1-SM576-1284-1-SM
576-1284-1-SM
 
CV
CVCV
CV
 
0 a+18_cv_francais(1)
 0 a+18_cv_francais(1) 0 a+18_cv_francais(1)
0 a+18_cv_francais(1)
 
Kuliah 1 konsep jaringan
Kuliah 1 konsep jaringanKuliah 1 konsep jaringan
Kuliah 1 konsep jaringan
 
о музее будь готов 2012
о музее будь готов 2012о музее будь готов 2012
о музее будь готов 2012
 
Uji kolmogorov 2
Uji kolmogorov 2Uji kolmogorov 2
Uji kolmogorov 2
 
FIESTAS INFANTILES Y EMPRESARIALES BTL
FIESTAS INFANTILES Y EMPRESARIALES BTLFIESTAS INFANTILES Y EMPRESARIALES BTL
FIESTAS INFANTILES Y EMPRESARIALES BTL
 
Презентація_ТВБВ_10002-07
Презентація_ТВБВ_10002-07Презентація_ТВБВ_10002-07
Презентація_ТВБВ_10002-07
 
команда, путешествия
команда, путешествиякоманда, путешествия
команда, путешествия
 

Semelhante a CV_GFlanagan current 2016

Semelhante a CV_GFlanagan current 2016 (20)

Adrian Johnson CV
Adrian Johnson CVAdrian Johnson CV
Adrian Johnson CV
 
JAB CV current
JAB CV currentJAB CV current
JAB CV current
 
Stelian Dragomir-CV
Stelian Dragomir-CVStelian Dragomir-CV
Stelian Dragomir-CV
 
Fabio Chinato CV
Fabio Chinato CVFabio Chinato CV
Fabio Chinato CV
 
Richard Batts CV 2017
Richard Batts CV 2017Richard Batts CV 2017
Richard Batts CV 2017
 
Tom Barnes CV
Tom Barnes CVTom Barnes CV
Tom Barnes CV
 
Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2
 
CV-Lynsey Dyer
CV-Lynsey DyerCV-Lynsey Dyer
CV-Lynsey Dyer
 
CHRIS-NEALE-CV-16R1
CHRIS-NEALE-CV-16R1CHRIS-NEALE-CV-16R1
CHRIS-NEALE-CV-16R1
 
IAN REID CV- Project Management
IAN REID CV- Project ManagementIAN REID CV- Project Management
IAN REID CV- Project Management
 
Manal ibrahim.cv 17.docx
Manal ibrahim.cv 17.docxManal ibrahim.cv 17.docx
Manal ibrahim.cv 17.docx
 
Zvezdan Kostic Resume Word
Zvezdan Kostic Resume WordZvezdan Kostic Resume Word
Zvezdan Kostic Resume Word
 
Dan Wraggett Resume 3.0
Dan Wraggett Resume 3.0Dan Wraggett Resume 3.0
Dan Wraggett Resume 3.0
 
Amcb Selected Cv
Amcb Selected CvAmcb Selected Cv
Amcb Selected Cv
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
CV
CVCV
CV
 
Steve Miller CV 2017
Steve Miller CV 2017Steve Miller CV 2017
Steve Miller CV 2017
 
Hafiz's CV
Hafiz's CVHafiz's CV
Hafiz's CV
 
HAFIZ'S Cv
HAFIZ'S Cv HAFIZ'S Cv
HAFIZ'S Cv
 
CVnz - Andrew Nash
CVnz - Andrew NashCVnz - Andrew Nash
CVnz - Andrew Nash
 

CV_GFlanagan current 2016

  • 1. NAME Gareth John Flanagan AGE 46 CONTACT DETAILS 01298 402633 (home) 07778609393 (mob) garethflanagan@aol.com (email) QUALIFICATIONS HNC Civil/Structural Engineering (currently working towards TMICE) CAD EXPERIENCE Fully trained and experienced in the use of REVIT 2015, AutoCAD R2014, R2013, R2011, LT2011, LT2010, R2010, R2008, R2005, R2002, R2000, R12, R13, R14, & ADT3.3, Bentley Microstation V8, also PDMS and Navisworks (viewers) KEY SKILLS • Self motivated and enthusiastic team player who is able to interact and communicate effectively within a variety of environments. • Proven willingness and ability to adapt to varied and challenging situations. • Determination to provide the best possible solutions and service for the target client. • Strong organisational and planning skills including the delivery of workable systems and the meeting of deadlines. DATES PREVIOUS EXPERIENCE 2015 - present BWB Consulting Limited SENIOR CIVIL/STRUCTURAL CAD DESIGNER I have moved back within the Consulting Engineering environment to progress my CAD, BIM and Management skills, also the move back to living back at home was an added draw. I am currently taking on several REVIT roles within the company with a view to standardising the formats and production methods or drawing, design and project management. A CAD/Revit/BIM management role in order to develop a smooth transition from concept to construction. The current work which I am undertaking is wide and varied and again is anything from simple structural modifications and refurbishments to large project such as the White Rose Centre (Cinema multiplex). Involved with all aspects of the development of projects from initial tender planning, including meetings, surveys, schemes etc, to the final designs and details. Liaising with the client and his representatives, forming solutions to immediate and unexpected problems. Co-ordination of the in house design team, engineers and project managers in order to achieve the project timeline.
  • 2. Cont’d Page 2 – Mr G Flanagan 2012 - 2015 JACOBS ENGINEERING (on site at Shell, Bacton Gas Plant) LEAD CIVIL/STRUCTURAL CAD DESIGNER I am the only Senior C&S designer based on site at the Bacton Rejuvenation Project in Norfolk. I have to date had a complete change of location working ‘on site’ in Norfolk, further developed my Oil and Gas experience and also refreshed a lot of my previous experience in doing complete site surveys and investigations. The project is a complete E.P.C project involving the redesign of the Shell North Sea Gas processing plant, and being the only C&S designer have been involved in all aspect of the works including foundations, support steelwork, remedial works, modification of existing structures, the redesign, rerouting and modification of the drainage and also highways, aswell as working with all the other disciplines such as Electrical, C&I, Process, Piping etc in order to co-ordinate the destruct of the existing and construction of the new buildings, control rooms, plant rooms, pipe supports, waste water treatment plant, desalination plant etc whilst maintaining a working plant. I have done every aspect of CAD work involved with the site from the setting out and detailing of buildings and pipework, cable routing drainage setting out, completing GA’s , detailing of steelwork and RC work for both the new and temporary work, even providing help and support to all other disciplines with setting out. 2011 CAPITA SYMONDS SENIOR STRUCTURAL TECHNICIAN The main projects I was involved with were the ongoing £1bn Spinningfields development in Manchester City Centre, creating a new, high quality commercial and mixed use business ‘zones’. Working and liasing with Allied London Properties, and Manchester City Council, aswell as planning and detailing work within the 22 acre scheme which extends from Deansgate to the River Irwell. I have been involved in the planning and setting out of the proposed building zones aswell as the detailing of the buildings themselves, from setting out, steelwork, reinforced concrete and glazing. One of the stranger project I have worked on whilst here has been the complete redesign of the Coronation Street set for Granada Televsion where we designed and detailed the concrete substructure, the main steelwork frames and gantries and the brick facades. 2009 - 2010 NORDER DESIGN LTD SENIOR STRUCTURAL DESIGN TECHNICIAN/CAD MANAGER & DESIGN PROJECT MANAGER I have been involved in most of the jobs that have been in the office being one of only three technicians. Whilst a small practice, the work has been very diverse from Carlsberg, Black Sheep & Coors breweries to highway/bridge works such as the A12 Witham bypass and improvements for the A406 North Circular Road. I have been involved in the redevelopment and expansion of several different breweries this has been everything from the concept design and planning meetings, client liaison, to the management and coordination of the design team for the production of GAs and detailing of steelwork, mainly for the process plant work but also for the storage and gas
  • 3. Cont’d Page 3 – Mr G Flanagan recovery works, and has also included the creation of fabrication drawings for the use of the steelwork manufacturer/contractor. The Highways and Bridges work has been again GA's and setting out works as well as RC and steelwork detailing for bridges and safety barrier systems. 2005 - 2009 SCOTT WILSON LTD (URS - SCOTT WILSON) SENIOR STRUCTURAL CAD TECHNICIAN/CAD MANAGER & TEAM LEADER Involved with all aspects of the development of projects from initial tender planning, including meetings, surveys, schemes etc, to the final designs and details. Liaising with the client and his representatives, forming solutions to immediate and unexpected problems. Co-ordination of the in house design team, engineers and project managers in order to achieve the project timeline. Currently involved with the design and detailing of project such as Liverpool’s’ John Lennon Airport, not only involved with the master planning but also designing the new terminals as well. Also involved in the current design ideas for the proposed new Manchester University and South Cheshire College with state of the art buildings for lecture theatres, cinema and general purpose university buildings. Complete ‘space engineering’ in both modern and traditional materials. Also currently involved with a very similar project for the Nelson and Colne College in the Burnley area of North Manchester with the design and development of new purpose built study units and the rationalisation of the existing campus. 2004 - 2005 MARTIN STOCKLEY ASSOCIATES – CONSULTING ENGINEERS SENIOR STRUCTURAL CAD TECHNICIAN/CAD SYSTEMS MANAGER Learned a completely new CAD package in Bentley Microstation V8 as well as involved with the CAD and IT support. Development of projects from initial tender planning, including meetings, surveys, schemes etc, to the final designs and details. Currently involved with the design and detailing of The Woodroyd Centre, a purpose built community hospital and recreation centre in Bradford by Bauman Lyons, also involved with the massive redevelopment co-ordination and master planning for the Ancoats area of Manchester now designated New Islington in association with Urban Splash, Grants, Alsops and the English Partnerships. Involved with the rather interesting development of the Castlefield Quay, an area to the bottom end of Deansgate in Central Manchester where a sympathetic development is currently under discussion due to the site being the location of the original Roman Fort of Mamucium and the extent of the archaeology. Involved with several urban redevelopment projects in and around Manchester as well as both Sheffield and Leeds in Yorkshire.
  • 4. Cont’d Page 4 – Mr G Flanagan 2001 – 2004 BURO HAPPOLD – CONSULTING ENGINEERS SENIOR STRUCTURAL CAD DESIGN TECHNICIAN/CAD SYSTEMS MANAGER ESAT LEAD TECHNICIAN (ENGINEERING SYSTEMS AND TECHNOLOGIES) Have been involved with the development of both office systems and the development of in house design specific software and utilities. Involved with all aspects of the development of projects from initial tender planning, including meetings, surveys, schemes etc. to the final designs and details. Have been involved with the design and detailing of project such as The Free Trade Hall in Manchester, hotel developments for The Raddisson Group and Mal Maison as well as work on the regeneration of central Manchester with new apartment complexes and shopping areas as well as the preservation of listed buildings in and around Manchester such as the Manchester Cathedral Visitors Centre, Leftbank Spinningfields and the regeneration of several mills in and around the Ancoats area including the grade 2 listed Royal Mills. Projects also run further afield with the GSP link bridge in Edinburgh, the Sheffield Heart of the City Project which while being several projects in one was also an interesting study in master planning. I have also been involved with various PFI jobs up and down the country as well as numerous universities such as MMU, University of Central England, Nottingham University and York University bio-sciences. 2000 G.C MCDONALD & PARTNERS SENIOR STRUCTURAL CAD DESIGN TECHNICIAN/CAD SYSTEMS MANAGER Development of projects from initial tender planning, including meetings, surveys, schemes etc. to the final designs and details. Involved with the design and detailing of project for The David Lloyd Leisure Group with their new Racquet and Sports Clubs up and down the country as well as work on the urban regeneration and preservation or the listed buildings in and around Ancoats. Involved with the redevelopment of the Collegiate Campus for Sheffield University. Also involved with many other varied projects from house extensions, underpinning, foundation design and detailing for house builders, to new office developments and mill refurbishment’s. 1999 WHITBY BIRD & PARTNERS SENIOR STRUCTURAL CAD DESIGN TECHNICIAN Being one of only a small number of staff allows me to be involved with all aspects of the development of projects from initial tender planning, including meetings, surveys, schemes etc., to the final designs and details as well as the eventual hand over. I am currently involved with the design and detailing of project for The RSPB, Hodder Associates and Urban Splash which are proposed timber hides for the disabled, an exhibition /visitors centre for The National Wild Flower Society and the redevelopment of an industrial box factory into exclusive city centre residential apartments respectively. As the requirements of each client at the tender stages are different it has been necessary not only to help the client with his design outlook but also be able to work in 3D as well as 2D
  • 5. Cont’d Page 5 – Mr G Flanagan 1998 – 1999 DOROTHEA GROUP LTD DESIGN TEAM/DRAWING OFFICE MANAGER & SENIOR STRUCTURAL ENGINEER As the Design Office Manager I am involved in the training of junior technicians, the co-ordination of draughtsmen and engineers and liaisons with site and major clients. As the senior structural engineer I have sole responsibility for the production and checking of all calculations and drawings. I regularly attend both site and contracts meeting and report to the MD as to the status, programme and costing of the various projects. Working on a wide variety of Structural and Architectural Iron/Aluminium projects such as the major redevelopment of The Royal Arsenal in Woolwich, Palace Extensions for The Sultan of Brunei to canopies, entrance features, emergency escape stairs and cast metal railings as well as the standard range of street furniture products. 1997 – 1998 THE RODDERICK O'CONNOR PARTNERSHIP (ROCP) SENIOR CIVIL / STRUCTURAL TECHNICIAN & CAD SYSTEMS MANAGER Working on a wide variety of both Civil and Structural projects, including major redevelopment of The Old Parsonage/Archwright House for Chestertons, Lord St in Liverpool for Barlows and numerous development sites for Orange/Hutchinson Communications. Highway design for the proposed redevelopment of the A74 into the M74 at Todhills. I am involved with highway design and the structural steel and r.c design and detailing for all sizes of projects from small underpinning work to major new build and redevelopment projects. I conduct investigative surveys and compile reports and recommendations I am also in charge of the maintenance and running of the network systems. 1996 – 1997 SHAW WHITMORE FYFFE PARTNERSHIP SENIOR CIVIL / STRUCTURAL TECHNICIAN & ASSISTANT CAD SYSTEMNS MANAGER Working on a wide variety of both Civil and Structural projects, including major developments of the old Cheadle Royal site and Birmingham Great Park for AMEC Involved in both highway design and structural steel and r.c design and detailing for all sizes of projects for Aldi, Gala Leisure, Heery International and Pillar Properties Ltd. I am also involved with the maintenance and running of the network systems. 1995 – 1996 JMP CONSULTANTS LTD SENIOR CIVIL / STRUCTURAL TECHNICIAN Working with Autocad R12 in all aspects of Highway and Civil Engineering. Involved in highway design, urban relief and feasibility studies, though mainly involved with the preparation, detailing and checking of GA and RC work for concrete bridges, abutments and retaining walls.
  • 6. Cont’d Page 6 – Mr G Flanagan 1994 - 1995 HAREMEAD LIMITED/TANSHIRE HOLDINGS LTD SENIOR STRUCTURAL CAD DRAUGHTSMAN Working on major pharmaceutical projects for companies such as Zeneca, Scherer, Fisons and others; involved with the detailing and checking of reinforced concrete and steelwork. Smaller projects include detailing work for refurbishment to existing laboratories such as UMIST; work involved all main structural materials ie. steelwork, concrete, masonry & timber. All projects conform to ISO & BS Standards and all draughting is executed on Autocad Release 12. 1992 – 1994 THOMAS STOREY (ENGINEERS) LIMITED SENIOR STRUCTURAL DRAUGHTSMAN Involved in the preparation detailing and checking of all aspects of the construction, launching, erection and dismantling of temporary bridging systems. This includes propping, jacking and various support schemes for existing structures. All drawings are produced on one of the CAD systems - CADplus, MultiCAD or MLD2. 1991 - 1992 THE DEW GROUP SENIOR DESIGN DRAUGHTSMAN Working on the Building Division with responsibilities for the design and draughting of tender drawings for Design and Build contracts. Full detail drawings were produced including foundation designs for a variety of contracts including industrial, commercial and retail buildings. Also experienced in site work, checking construction and finishes. 1990 - 1991 BRIAN MOORHEAD AND PARTNERS CAD DRAUGHTSMAN Worked on several projects including Trinity Hospice on the Fylde Coast, a Renault Dealership Building on Salford Quays and St James House in Manchester. All of the work was produced on the Autocad System and including RC details, structural steelwork arrangements and details and general building arrangements and details. 1989 - 1990 DGP CIVIL TECHNICIAN Worked on a variety of projects for NWW and BNF plc. Projects include RC details of water retaining structures for Sweetloves STW and Swinton STW, redesign of DI and fibreglass pipework for High lane Reservoir in Marple. This involved re-aligning the existing highway. Production of GAs and details in both steel and concrete for the EPMF and Encapsulating Plant facilities at the BNF site at Sellafield.
  • 7. Cont’d Page 7 – Mr G Flanagan 1987 - 1989 MARSLAND AND CHARGE CIVIL/STRUCTURAL TECHNICIAN As sole draughtsman, responsibilities included simple design work, assisting with site investigations and production of drawings for various types of schemes including the refurbishment in timber of a 14th Century church in Chadkirk, Romiley, the re-design of a timber floor for Hazel Grove Civil Hall. Housing Association work and student accommodation buildings in Whitworth Park for Manchester University. 1986 - 1987 ALLOTT AND LOMAX CIVIL/STRUCTURAL DRAUGHTSMAN Employed in the Power and Industrial Section with responsibilities for the production of GAs and RC detail drawings on coal fire power station projects at Kilroot, Northern Ireland and in Dekelia, Cyprus. 1985 - 1986 MARSTON AND GRUNDY TRAINEE DRAUGHTSMAN Working mainly on small structural projects such as pub refurbishment for Robinson Brewery, extensions to bus depots for Greater Manchester Passenger Transport Executive. Involved in site survey work, production of GAs, building details, RC details, drainage layouts and steelwork arrangements. Hobbies and Interests I am a ex-member of the JJB Leyland Brass Band who are still in the top ten Brass Bands in England along with the likes of Brighouse & Rasterick , Fairey Engineering, Black Dyke Mills etc and are invited to take part in the British Open Championship as well as The All England Masters contest in Cambridge. I get invited on a regular basis to play with the Foden Richarson Brass Band who are at present the number one band in the world rankings however I am now mainly involved with brass bands at a more grass roots levels, preferring now to helping my home town band. I played golf at Stockport Golf Club where I was the first junior member in 1981until recently when I moved to a more local course at the Buxton and High Peak Golf Club, Buxton. I am an Assistant Club Instructor for the British Sub-Aqua Club where I teach the art of Scuba Diving. I am also a PADI Master Scuba Diver and Divemaster I have recently become a member of the Nautical Archaeological Society involved in the search, survey and possible recovery of artefacts and vessels as well as being a member of the Historic Diving Society. I have also recently become a member of the Marine Conservation Society involved with the surveying of marine life of the world and its habitat and behaviour.