This curriculum vitae summarizes the qualifications and experience of G. Subramanian applying for a Senior Land Surveyor position. He has 13 years of total experience, including 9 years working on survey projects in Gulf countries like Qatar, Oman, Kuwait, and Saudi Arabia. His technical qualifications include a Diploma in Civil Engineering and certifications in GPS, total station, and CAD software. He has extensive experience setting out infrastructure like roads, pipelines, and buildings using surveying equipment and software.
1. CURRICULUM VITAE
POST APPLIED FOR SENIOR LAND
SURVEYOR
PLACE ARANTHANGI
ADDRESS OF THE
CONTACT
308/45 L.N Puram, 3rd
Street.
Aranthangi – 614 616
Mobile No. 0091-
7339637780
E-MAIL : sasisubu90@yahoo.in
PERSONAL DETAILS :-
NAME : G.SUBRAMANIAN
DATE OF BIRTH : 13/04/1982
LANGUAGE KNOWN : ENGLISH, HINDI, TAMIL AND
MALAYALAM.
Passport details :
Passport No : H7968208
Place of issue : Trichy
Date of issue : 16-04-2010
Date of expiry : 15-04-2020
Emigration status : E.C.N.R
TECHNICAL QUALIFICATION : “DIPLOMA CIVIL ENGINEERING”
Year of Passing : 2003 April.
Institute : Pattukkottai Polytechnic
college.
COMPUTER QUALIFICATION : AUTO – CAD Release 2004” Computer
Aided Design of Civil Drawing “MICRO
SOFT OFFICE” – Word, Excel, Power
Point, Photo Shop.
Total Experience : 13 years (Gulf Experience of 9 years)
DETAILS OF SURVEY “G.P.S” (GLOBAL POSITION SYSTEM) EQUIPMENT USED:
Sl. No. “G.P.S.” Equipment Model Made in
1 “TRIMBLE” G.P.S. System U.S.A
2. DETAILS OF : TOTAL STATION” INSTRUMENT USED :
Sl. No “Total Station” Instrument Model Made in
1 “sokkia” power set 510 total station Japan
2 “Nikon” power set total station Japan
3 “ top con” total station Japan
4 “Leica TC 802” Switzerland
Survey Software programs work done:
Downloading of Field survey details from g.p.s equipment and total station
instrument into Computer
Import & Export in DXF and DGN formats in CAD Design
Transforming Co-ordinates from one system to another that is conversion of
WGS84 Co-ordinates to local co – ordinates .
Digital Terrain Modeling and Counter Maping an Design.
Calculation of Areas & Quantities.
Design of Multi Highway Lane and Pavement and Design of road curves,
roundabout, island and road vertical and horizontal alignment.
Design and infrastructure works like water and sewer and storm water drainage
pipe line topological survey, counter survey and profile design of L/S & C/S and
pipe line vertical and horizontal alignment control.
3. DETAILS OF ABROAD AND INDIA SURVEY PROJECT WORKS
1 HIGHWAY
SURVEYOR
AECOM MIDDILE EAST
(supervision consultant) QATAR
Project Name : New Orbital Highway Project
Contractor : QDVC BINOMRAN JV
Position held : HIGHWAY SURVEYOR
Roles :
Full Handling of Total Station,GPS and Level machines.
Compute geodetic measurements and interpret Survey data in order to
Determine positions, shapes and elevations of topographic features.
Establish fixed points for use in making maps.
All setting out of with reference to approved Control Point & approved project
drawings(building, kerb stone ,sewer line, ducts, water main, telephone
line, electrical line, soak away, gully, street light and landscaping)
Request for checking shall be submitted to the client for the item of work
planned.
Preparation of as built drawing
Review and comment appropriately to RFA s as received from the contractor,
when directed by the Engineer.
Coordinate with the Contractor s Surveyors on work priorities and schedule.
Record all measurements and calculations etc neatly and accurately in field
books as the work progress.
Ensure that the works are being constructed to the latest construction and
shop drawings.
Record discrepancies or technical problems to the Engineer in charge.
Coordinate with the Contractor s Surveyors on work priorities and schedule.
Duration of work : 25 May 2014 to 20 April 2016
4. 2 Sr.LAND SURVEYOR FCC – PETROSERVJV LIMITED QATAR
Project Name : Pedestrian Bridges:.
Bridge 6A & 4A
Contractor : Lusail City
Position held : Sr. Land Surveyor
Work done : Topography survey & preparation of earth work Qty and
Setting out of all structure in bridges.As – Built from daily
Activities on site. Bench mark or control points provided in
Working area.
Duration of work : 12th March 2013 to 10TH June 2013 (short time project)
5. TOWELL INFRASTRUCTURE PROJECTS CO L.LC OMAN
S.No Designation Period from Period TO Work Assigned
3 Sr. Land
Surveyor
2nd
December
2011
13th
June 2012
Construction of Ground level reservoirs
(GLSR) and Over head elevated service
reservoirs. (OHESRs).
Earth work excavation, Laying,
Jointing, and Hydraulic testing of pipe
lines (DI) Ductile iron pipes, (60 KM
DI Pipe line).
Earth work excavation, Laying,
Jointing, and Hydraulic testing of pipe
lines HDPE pipes, (166) KM HDPE
Pipe line
Preparation of Weekly, Monthly, daily
Progress Reports.
Surveying Work such as Auto level,
LS Marking works.
Commissioning and maintenances of
the scheme.
Preparation L Section.
Preparation AS Built Drawing.
6. 4 LAND SURVEYOR ALGHANIAM INTERNATONAL
CONTRACTING CO W.L.L (OIL &
GAS DIVISION)
KUWAIT
Project Name : New 30” crude oil transit pipe line project 120 km.
From NW to CMM.
Contractor : KOC (Kuwait Oil Company)
Sub Contractor : ABB
Position held : Land Surveyor
Work done : Responsible for overall Co-ordination and
supervision of all Survey works and projects
Involving utility construction. Then
setting out of trench alignments and levels given, (FCN)
Making Future change notification. As-Built
preparation of all responsibility
Duration of work : 10th January 2011 to 9TH Nov 2011
5 LAND SURVEYOR
SAUDI COMEDAT COMPANY
LIMITED
SAUDI ARBIA
Project Name : Al-Jalamid phosphate mine project.
Clint : Ma’den
Position held : Mine Surveyor
Work done : Topography of survey and quantity report making and
blast holes Marking and blasting design. Blast report
making Clind dealing.
Duration of work : 18.6.09 to 18.07. 2010(short time project)
7. 6 LAND SURVEYOR
WADE ADAMS CONTRACTING Co.
LLC
DUBAI
Project 1) . Construction of Roads and Infra- structure package from “Dubai Studio
City”. Clint: Dubai Properties. Consultant : CANSULT
Project 2) . Construction of Roads and Infra- structure package from Mudon housing
Development. Client : Dubai Properties, Consultant : MANSUEL
Work done: Topography and contour surveying of project site and establishing of
control point co-ordinate and benchmark elevation and setting out of housing infra
structure area boundary and vertical & horizontal curves, vertical curves, road junctions ,
roundabout , road island and setting out and level control of electrical cable and
telephone cable.
Duration of work : 17th
July 2006 to 10th
January 2009
7 LAND SURVEYOR STRABAG OMAN LLC OMAN
Project : Construction of sewage water disposal network for
Housing area Muscat Municipality.
Work Done : Topography and contour surveying of project site and
establishing of control point co-ordinate and benchmark
elevation and Setting out of sewer man holes, from
Depth up to 8m depth. House connection chamber pipe
Line layout, excavation and formation levels.
Duration of work : Aug 2005 to April 2006
8. 8
Junior civil
engineer
IDEAL PLANNERS &
BUILDERS
INDIA
Project : Construction of Multi storied G + 10 Buildings.
Work Done: Setting out of foundation for multi storied structural columns,
checking of alignment of structures and checking of R.C.C Concrete and steel
reinforcement and interior finishing, taking bill quantity and control of work man
power.
Duration of work : 01/05/2003 to25/05/2005
Declaration :
I hereby declared that the above mentioned details are true and correct for my best
knowledge.
Date :
Place: Aranthangi
Contact number: +91 7339637780