SlideShare uma empresa Scribd logo
1 de 9
Baixar para ler offline
CURRICULUM VITAE
POST APPLIED FOR SENIOR LAND
SURVEYOR
PLACE ARANTHANGI
ADDRESS OF THE
CONTACT
308/45 L.N Puram, 3rd
Street.
Aranthangi – 614 616
Mobile No. 0091-
7339637780
E-MAIL : sasisubu90@yahoo.in
PERSONAL DETAILS :-
NAME : G.SUBRAMANIAN
DATE OF BIRTH : 13/04/1982
LANGUAGE KNOWN : ENGLISH, HINDI, TAMIL AND
MALAYALAM.
Passport details :
Passport No : H7968208
Place of issue : Trichy
Date of issue : 16-04-2010
Date of expiry : 15-04-2020
Emigration status : E.C.N.R
TECHNICAL QUALIFICATION : “DIPLOMA CIVIL ENGINEERING”
Year of Passing : 2003 April.
Institute : Pattukkottai Polytechnic
college.
COMPUTER QUALIFICATION : AUTO – CAD Release 2004” Computer
Aided Design of Civil Drawing “MICRO
SOFT OFFICE” – Word, Excel, Power
Point, Photo Shop.
Total Experience : 13 years (Gulf Experience of 9 years)
DETAILS OF SURVEY “G.P.S” (GLOBAL POSITION SYSTEM) EQUIPMENT USED:
Sl. No. “G.P.S.” Equipment Model Made in
1 “TRIMBLE” G.P.S. System U.S.A
DETAILS OF : TOTAL STATION” INSTRUMENT USED :
Sl. No “Total Station” Instrument Model Made in
1 “sokkia” power set 510 total station Japan
2 “Nikon” power set total station Japan
3 “ top con” total station Japan
4 “Leica TC 802” Switzerland
Survey Software programs work done:
 Downloading of Field survey details from g.p.s equipment and total station
instrument into Computer
 Import & Export in DXF and DGN formats in CAD Design
 Transforming Co-ordinates from one system to another that is conversion of
WGS84 Co-ordinates to local co – ordinates .
 Digital Terrain Modeling and Counter Maping an Design.
 Calculation of Areas & Quantities.
 Design of Multi Highway Lane and Pavement and Design of road curves,
roundabout, island and road vertical and horizontal alignment.
 Design and infrastructure works like water and sewer and storm water drainage
pipe line topological survey, counter survey and profile design of L/S & C/S and
pipe line vertical and horizontal alignment control.
DETAILS OF ABROAD AND INDIA SURVEY PROJECT WORKS
1 HIGHWAY
SURVEYOR
AECOM MIDDILE EAST
(supervision consultant) QATAR
Project Name : New Orbital Highway Project
Contractor : QDVC BINOMRAN JV
Position held : HIGHWAY SURVEYOR
Roles :
 Full Handling of Total Station,GPS and Level machines.
 Compute geodetic measurements and interpret Survey data in order to
Determine positions, shapes and elevations of topographic features.
 Establish fixed points for use in making maps.
 All setting out of with reference to approved Control Point & approved project
drawings(building, kerb stone ,sewer line, ducts, water main, telephone
line, electrical line, soak away, gully, street light and landscaping)
 Request for checking shall be submitted to the client for the item of work
planned.
 Preparation of as built drawing
 Review and comment appropriately to RFA s as received from the contractor,
when directed by the Engineer.
 Coordinate with the Contractor s Surveyors on work priorities and schedule.
 Record all measurements and calculations etc neatly and accurately in field
books as the work progress.
 Ensure that the works are being constructed to the latest construction and
shop drawings.
 Record discrepancies or technical problems to the Engineer in charge.
 Coordinate with the Contractor s Surveyors on work priorities and schedule.
Duration of work : 25 May 2014 to 20 April 2016
2 Sr.LAND SURVEYOR FCC – PETROSERVJV LIMITED QATAR
Project Name : Pedestrian Bridges:.
Bridge 6A & 4A
Contractor : Lusail City
Position held : Sr. Land Surveyor
Work done : Topography survey & preparation of earth work Qty and
Setting out of all structure in bridges.As – Built from daily
Activities on site. Bench mark or control points provided in
Working area.
Duration of work : 12th March 2013 to 10TH June 2013 (short time project)
TOWELL INFRASTRUCTURE PROJECTS CO L.LC OMAN
S.No Designation Period from Period TO Work Assigned
3 Sr. Land
Surveyor
2nd
December
2011
13th
June 2012
Construction of Ground level reservoirs
(GLSR) and Over head elevated service
reservoirs. (OHESRs).
 Earth work excavation, Laying,
Jointing, and Hydraulic testing of pipe
lines (DI) Ductile iron pipes, (60 KM
DI Pipe line).
 Earth work excavation, Laying,
Jointing, and Hydraulic testing of pipe
lines HDPE pipes, (166) KM HDPE
Pipe line
 Preparation of Weekly, Monthly, daily
Progress Reports.
 Surveying Work such as Auto level,
LS Marking works.
 Commissioning and maintenances of
the scheme.
 Preparation L Section.
 Preparation AS Built Drawing.
4 LAND SURVEYOR ALGHANIAM INTERNATONAL
CONTRACTING CO W.L.L (OIL &
GAS DIVISION)
KUWAIT
Project Name : New 30” crude oil transit pipe line project 120 km.
From NW to CMM.
Contractor : KOC (Kuwait Oil Company)
Sub Contractor : ABB
Position held : Land Surveyor
Work done : Responsible for overall Co-ordination and
supervision of all Survey works and projects
Involving utility construction. Then
setting out of trench alignments and levels given, (FCN)
Making Future change notification. As-Built
preparation of all responsibility
Duration of work : 10th January 2011 to 9TH Nov 2011
5 LAND SURVEYOR
SAUDI COMEDAT COMPANY
LIMITED
SAUDI ARBIA
Project Name : Al-Jalamid phosphate mine project.
Clint : Ma’den
Position held : Mine Surveyor
Work done : Topography of survey and quantity report making and
blast holes Marking and blasting design. Blast report
making Clind dealing.
Duration of work : 18.6.09 to 18.07. 2010(short time project)
6 LAND SURVEYOR
WADE ADAMS CONTRACTING Co.
LLC
DUBAI
Project 1) . Construction of Roads and Infra- structure package from “Dubai Studio
City”. Clint: Dubai Properties. Consultant : CANSULT
Project 2) . Construction of Roads and Infra- structure package from Mudon housing
Development. Client : Dubai Properties, Consultant : MANSUEL
Work done: Topography and contour surveying of project site and establishing of
control point co-ordinate and benchmark elevation and setting out of housing infra
structure area boundary and vertical & horizontal curves, vertical curves, road junctions ,
roundabout , road island and setting out and level control of electrical cable and
telephone cable.
Duration of work : 17th
July 2006 to 10th
January 2009
7 LAND SURVEYOR STRABAG OMAN LLC OMAN
Project : Construction of sewage water disposal network for
Housing area Muscat Municipality.
Work Done : Topography and contour surveying of project site and
establishing of control point co-ordinate and benchmark
elevation and Setting out of sewer man holes, from
Depth up to 8m depth. House connection chamber pipe
Line layout, excavation and formation levels.
Duration of work : Aug 2005 to April 2006
8
Junior civil
engineer
IDEAL PLANNERS &
BUILDERS
INDIA
Project : Construction of Multi storied G + 10 Buildings.
Work Done: Setting out of foundation for multi storied structural columns,
checking of alignment of structures and checking of R.C.C Concrete and steel
reinforcement and interior finishing, taking bill quantity and control of work man
power.
Duration of work : 01/05/2003 to25/05/2005
Declaration :
I hereby declared that the above mentioned details are true and correct for my best
knowledge.
Date :
Place: Aranthangi
Contact number: +91 7339637780
GOPAL

Mais conteúdo relacionado

Mais procurados (20)

003_work profile_3
003_work profile_3003_work profile_3
003_work profile_3
 
Tanveer_Phansopkar_-__piping_Draughtsman (1)
Tanveer_Phansopkar_-__piping_Draughtsman (1)Tanveer_Phansopkar_-__piping_Draughtsman (1)
Tanveer_Phansopkar_-__piping_Draughtsman (1)
 
Mohamed ashraf land surveyor cv
Mohamed ashraf land surveyor cvMohamed ashraf land surveyor cv
Mohamed ashraf land surveyor cv
 
Resume copy jb 2015 16(1)
Resume copy jb 2015 16(1)Resume copy jb 2015 16(1)
Resume copy jb 2015 16(1)
 
Rahman cv
Rahman cvRahman cv
Rahman cv
 
Wilson_Brad_Master_01072016
Wilson_Brad_Master_01072016Wilson_Brad_Master_01072016
Wilson_Brad_Master_01072016
 
Resume_[Sr. Estimator - Sr. QS]
Resume_[Sr. Estimator - Sr. QS]Resume_[Sr. Estimator - Sr. QS]
Resume_[Sr. Estimator - Sr. QS]
 
Erwin Gultom's Cover Letter & Resume 2017
Erwin Gultom's Cover Letter & Resume 2017Erwin Gultom's Cover Letter & Resume 2017
Erwin Gultom's Cover Letter & Resume 2017
 
NIRMAL_MECH ENGINEER
NIRMAL_MECH ENGINEERNIRMAL_MECH ENGINEER
NIRMAL_MECH ENGINEER
 
CV Sriinivas 1i doc
CV Sriinivas 1i docCV Sriinivas 1i doc
CV Sriinivas 1i doc
 
shafaqat cv 1
shafaqat cv 1shafaqat cv 1
shafaqat cv 1
 
Abdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrsAbdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrs
 
Draughtsman_Sai
Draughtsman_SaiDraughtsman_Sai
Draughtsman_Sai
 
Warren Tann Resume 2016
Warren Tann Resume 2016Warren Tann Resume 2016
Warren Tann Resume 2016
 
CV_Emanuil Videnov
CV_Emanuil VidenovCV_Emanuil Videnov
CV_Emanuil Videnov
 
NOTABLE PROJECTS
NOTABLE PROJECTSNOTABLE PROJECTS
NOTABLE PROJECTS
 
Tyron Muller Curriculum Vitae
Tyron Muller Curriculum VitaeTyron Muller Curriculum Vitae
Tyron Muller Curriculum Vitae
 
CV Joseph Rey C. Marilla
CV Joseph Rey C. MarillaCV Joseph Rey C. Marilla
CV Joseph Rey C. Marilla
 
Peter Etim-CV.
Peter Etim-CV. Peter Etim-CV.
Peter Etim-CV.
 
Hashim Majeed CV 280116
Hashim Majeed CV 280116Hashim Majeed CV 280116
Hashim Majeed CV 280116
 

Destaque

Dialnet un programadecuentosmotoresparatrabajarlamotricidad-4746783
Dialnet un programadecuentosmotoresparatrabajarlamotricidad-4746783Dialnet un programadecuentosmotoresparatrabajarlamotricidad-4746783
Dialnet un programadecuentosmotoresparatrabajarlamotricidad-4746783
Katia Trujillo Goycochea
 

Destaque (15)

Bloomian Poetics in Law Schools
Bloomian Poetics in Law SchoolsBloomian Poetics in Law Schools
Bloomian Poetics in Law Schools
 
Journee portes ouvertes primaire
Journee portes ouvertes primaireJournee portes ouvertes primaire
Journee portes ouvertes primaire
 
New study: It is possible to reform France in just 100 days
New study: It is possible to reform France in just 100 daysNew study: It is possible to reform France in just 100 days
New study: It is possible to reform France in just 100 days
 
Familia araucariaceae
Familia araucariaceaeFamilia araucariaceae
Familia araucariaceae
 
C4 задание 2. Вопросы.
C4 задание 2. Вопросы.C4 задание 2. Вопросы.
C4 задание 2. Вопросы.
 
Minotti lisa ppp
Minotti lisa pppMinotti lisa ppp
Minotti lisa ppp
 
APRENDER A USAR WINDOWS MOVIE MAKER
APRENDER A USAR WINDOWS MOVIE MAKERAPRENDER A USAR WINDOWS MOVIE MAKER
APRENDER A USAR WINDOWS MOVIE MAKER
 
Be june2016 web full
Be june2016 web fullBe june2016 web full
Be june2016 web full
 
Scoring in Flag Football
Scoring in Flag FootballScoring in Flag Football
Scoring in Flag Football
 
Dialnet un programadecuentosmotoresparatrabajarlamotricidad-4746783
Dialnet un programadecuentosmotoresparatrabajarlamotricidad-4746783Dialnet un programadecuentosmotoresparatrabajarlamotricidad-4746783
Dialnet un programadecuentosmotoresparatrabajarlamotricidad-4746783
 
Poblacion y muestra
Poblacion y muestraPoblacion y muestra
Poblacion y muestra
 
OverDrive App on Mobile Devices
OverDrive App on Mobile DevicesOverDrive App on Mobile Devices
OverDrive App on Mobile Devices
 
Embellece sas
Embellece sasEmbellece sas
Embellece sas
 
From idea to ux roadmap - MakeIt Masterclass - Boost User Experience
From idea to ux roadmap - MakeIt Masterclass - Boost User ExperienceFrom idea to ux roadmap - MakeIt Masterclass - Boost User Experience
From idea to ux roadmap - MakeIt Masterclass - Boost User Experience
 
1 er trimestre
1 er trimestre1 er trimestre
1 er trimestre
 

Semelhante a GOPAL

new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
ali haider
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
ali haider
 
CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)
afzaal ahmad
 
CV (KYUYOUNG, HAN)(DMEC)
CV (KYUYOUNG, HAN)(DMEC)CV (KYUYOUNG, HAN)(DMEC)
CV (KYUYOUNG, HAN)(DMEC)
KYUYOUNG HAN
 

Semelhante a GOPAL (20)

Sharma cv
Sharma  cv Sharma  cv
Sharma cv
 
Land surveyor
Land surveyorLand surveyor
Land surveyor
 
GIRIRAJAN
GIRIRAJANGIRIRAJAN
GIRIRAJAN
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
 
CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)CV AFZAAL AHMAD TARAR 1980 (1)
CV AFZAAL AHMAD TARAR 1980 (1)
 
gandham2910@yahoo.co.inCIVIL Site Manager
gandham2910@yahoo.co.inCIVIL Site Managergandham2910@yahoo.co.inCIVIL Site Manager
gandham2910@yahoo.co.inCIVIL Site Manager
 
Senior Surveyor CV
Senior Surveyor CV Senior Surveyor CV
Senior Surveyor CV
 
RESUME New
RESUME NewRESUME New
RESUME New
 
updated Curriculum -osama[1]
updated Curriculum -osama[1]updated Curriculum -osama[1]
updated Curriculum -osama[1]
 
S.L Madlala May 2015
S.L Madlala May 2015S.L Madlala May 2015
S.L Madlala May 2015
 
Amjad survey inspector
Amjad survey inspectorAmjad survey inspector
Amjad survey inspector
 
Prakash cv update
Prakash cv updatePrakash cv update
Prakash cv update
 
Babar Sohail Khan (1)
Babar Sohail Khan (1)Babar Sohail Khan (1)
Babar Sohail Khan (1)
 
Resume dharmendra
Resume dharmendraResume dharmendra
Resume dharmendra
 
CV (KYUYOUNG, HAN)(DMEC)
CV (KYUYOUNG, HAN)(DMEC)CV (KYUYOUNG, HAN)(DMEC)
CV (KYUYOUNG, HAN)(DMEC)
 
Moshtak CV 2016 Pic
Moshtak CV 2016  PicMoshtak CV 2016  Pic
Moshtak CV 2016 Pic
 
Updated cv (2)
Updated cv (2)Updated cv (2)
Updated cv (2)
 
CV Shylandran-2016
CV Shylandran-2016CV Shylandran-2016
CV Shylandran-2016
 
Naresh Cherukuri_CV_May-2016
Naresh Cherukuri_CV_May-2016Naresh Cherukuri_CV_May-2016
Naresh Cherukuri_CV_May-2016
 

GOPAL

  • 1. CURRICULUM VITAE POST APPLIED FOR SENIOR LAND SURVEYOR PLACE ARANTHANGI ADDRESS OF THE CONTACT 308/45 L.N Puram, 3rd Street. Aranthangi – 614 616 Mobile No. 0091- 7339637780 E-MAIL : sasisubu90@yahoo.in PERSONAL DETAILS :- NAME : G.SUBRAMANIAN DATE OF BIRTH : 13/04/1982 LANGUAGE KNOWN : ENGLISH, HINDI, TAMIL AND MALAYALAM. Passport details : Passport No : H7968208 Place of issue : Trichy Date of issue : 16-04-2010 Date of expiry : 15-04-2020 Emigration status : E.C.N.R TECHNICAL QUALIFICATION : “DIPLOMA CIVIL ENGINEERING” Year of Passing : 2003 April. Institute : Pattukkottai Polytechnic college. COMPUTER QUALIFICATION : AUTO – CAD Release 2004” Computer Aided Design of Civil Drawing “MICRO SOFT OFFICE” – Word, Excel, Power Point, Photo Shop. Total Experience : 13 years (Gulf Experience of 9 years) DETAILS OF SURVEY “G.P.S” (GLOBAL POSITION SYSTEM) EQUIPMENT USED: Sl. No. “G.P.S.” Equipment Model Made in 1 “TRIMBLE” G.P.S. System U.S.A
  • 2. DETAILS OF : TOTAL STATION” INSTRUMENT USED : Sl. No “Total Station” Instrument Model Made in 1 “sokkia” power set 510 total station Japan 2 “Nikon” power set total station Japan 3 “ top con” total station Japan 4 “Leica TC 802” Switzerland Survey Software programs work done:  Downloading of Field survey details from g.p.s equipment and total station instrument into Computer  Import & Export in DXF and DGN formats in CAD Design  Transforming Co-ordinates from one system to another that is conversion of WGS84 Co-ordinates to local co – ordinates .  Digital Terrain Modeling and Counter Maping an Design.  Calculation of Areas & Quantities.  Design of Multi Highway Lane and Pavement and Design of road curves, roundabout, island and road vertical and horizontal alignment.  Design and infrastructure works like water and sewer and storm water drainage pipe line topological survey, counter survey and profile design of L/S & C/S and pipe line vertical and horizontal alignment control.
  • 3. DETAILS OF ABROAD AND INDIA SURVEY PROJECT WORKS 1 HIGHWAY SURVEYOR AECOM MIDDILE EAST (supervision consultant) QATAR Project Name : New Orbital Highway Project Contractor : QDVC BINOMRAN JV Position held : HIGHWAY SURVEYOR Roles :  Full Handling of Total Station,GPS and Level machines.  Compute geodetic measurements and interpret Survey data in order to Determine positions, shapes and elevations of topographic features.  Establish fixed points for use in making maps.  All setting out of with reference to approved Control Point & approved project drawings(building, kerb stone ,sewer line, ducts, water main, telephone line, electrical line, soak away, gully, street light and landscaping)  Request for checking shall be submitted to the client for the item of work planned.  Preparation of as built drawing  Review and comment appropriately to RFA s as received from the contractor, when directed by the Engineer.  Coordinate with the Contractor s Surveyors on work priorities and schedule.  Record all measurements and calculations etc neatly and accurately in field books as the work progress.  Ensure that the works are being constructed to the latest construction and shop drawings.  Record discrepancies or technical problems to the Engineer in charge.  Coordinate with the Contractor s Surveyors on work priorities and schedule. Duration of work : 25 May 2014 to 20 April 2016
  • 4. 2 Sr.LAND SURVEYOR FCC – PETROSERVJV LIMITED QATAR Project Name : Pedestrian Bridges:. Bridge 6A & 4A Contractor : Lusail City Position held : Sr. Land Surveyor Work done : Topography survey & preparation of earth work Qty and Setting out of all structure in bridges.As – Built from daily Activities on site. Bench mark or control points provided in Working area. Duration of work : 12th March 2013 to 10TH June 2013 (short time project)
  • 5. TOWELL INFRASTRUCTURE PROJECTS CO L.LC OMAN S.No Designation Period from Period TO Work Assigned 3 Sr. Land Surveyor 2nd December 2011 13th June 2012 Construction of Ground level reservoirs (GLSR) and Over head elevated service reservoirs. (OHESRs).  Earth work excavation, Laying, Jointing, and Hydraulic testing of pipe lines (DI) Ductile iron pipes, (60 KM DI Pipe line).  Earth work excavation, Laying, Jointing, and Hydraulic testing of pipe lines HDPE pipes, (166) KM HDPE Pipe line  Preparation of Weekly, Monthly, daily Progress Reports.  Surveying Work such as Auto level, LS Marking works.  Commissioning and maintenances of the scheme.  Preparation L Section.  Preparation AS Built Drawing.
  • 6. 4 LAND SURVEYOR ALGHANIAM INTERNATONAL CONTRACTING CO W.L.L (OIL & GAS DIVISION) KUWAIT Project Name : New 30” crude oil transit pipe line project 120 km. From NW to CMM. Contractor : KOC (Kuwait Oil Company) Sub Contractor : ABB Position held : Land Surveyor Work done : Responsible for overall Co-ordination and supervision of all Survey works and projects Involving utility construction. Then setting out of trench alignments and levels given, (FCN) Making Future change notification. As-Built preparation of all responsibility Duration of work : 10th January 2011 to 9TH Nov 2011 5 LAND SURVEYOR SAUDI COMEDAT COMPANY LIMITED SAUDI ARBIA Project Name : Al-Jalamid phosphate mine project. Clint : Ma’den Position held : Mine Surveyor Work done : Topography of survey and quantity report making and blast holes Marking and blasting design. Blast report making Clind dealing. Duration of work : 18.6.09 to 18.07. 2010(short time project)
  • 7. 6 LAND SURVEYOR WADE ADAMS CONTRACTING Co. LLC DUBAI Project 1) . Construction of Roads and Infra- structure package from “Dubai Studio City”. Clint: Dubai Properties. Consultant : CANSULT Project 2) . Construction of Roads and Infra- structure package from Mudon housing Development. Client : Dubai Properties, Consultant : MANSUEL Work done: Topography and contour surveying of project site and establishing of control point co-ordinate and benchmark elevation and setting out of housing infra structure area boundary and vertical & horizontal curves, vertical curves, road junctions , roundabout , road island and setting out and level control of electrical cable and telephone cable. Duration of work : 17th July 2006 to 10th January 2009 7 LAND SURVEYOR STRABAG OMAN LLC OMAN Project : Construction of sewage water disposal network for Housing area Muscat Municipality. Work Done : Topography and contour surveying of project site and establishing of control point co-ordinate and benchmark elevation and Setting out of sewer man holes, from Depth up to 8m depth. House connection chamber pipe Line layout, excavation and formation levels. Duration of work : Aug 2005 to April 2006
  • 8. 8 Junior civil engineer IDEAL PLANNERS & BUILDERS INDIA Project : Construction of Multi storied G + 10 Buildings. Work Done: Setting out of foundation for multi storied structural columns, checking of alignment of structures and checking of R.C.C Concrete and steel reinforcement and interior finishing, taking bill quantity and control of work man power. Duration of work : 01/05/2003 to25/05/2005 Declaration : I hereby declared that the above mentioned details are true and correct for my best knowledge. Date : Place: Aranthangi Contact number: +91 7339637780