3 metals workshop-raimundo_18_04_2012
1. GE Energy
Power Conversion
We’re at work making change happen
METALS WORKSHOP
Belo Horizonte
18 April 2012
Raimundo Vasconcelos
1
GE Energy’s Power Conversion Business
Metals presentation - 6/11/2012
2. At a glance
GE Energy, Power Conversion is an
engineering company providing customized Marine
solutions and systems converting electrical
energy into productive performance
Power Electronics
Oil & Gas
GE Energy
Power Conversion
Power Generation
Power Distribution
Energy
Industry
2
GE Energy’s Power Conversion Business
Metals presentation - 6/11/2012
3. We have come a long way
CGE ALSTHOM GEC AEG WESTINGHOUSE
1898 1928 1889 1883 1886 1892
(drive systems)
Spin off
from ALSTOM
GE Energy
Power
Conversion
CEGELEC ALSTOM
CGE
CEGELEC Industrial Power
ALSTHOM Systems Group Conversion
1995
1999
End 2005
1971
1989
2011
Over 100 years of GLOBAL experience
3
GE Energy’s Power Conversion Business
Metals presentation - 6/11/2012
4. Our global footprint
7 Converter factories
3 Electrical machines factories
45 Regional Business Centers Nancy, France
UK Established in 1898, new
12 Engineering Centers factory in 2002 ;
Rugby, United Kingdom Kidsgrove
Glasgow Manuf. area: 21 000 sqm
Established in 1889
Manuf. area: 21 000 sqm
FRANCE
Minneapolis, USA GERMANY
Yantai, China
Established in 1897 Massy
Berlin Established in 2009
Manuf. area: 30 000 sqm
Manuf. area: 16 000 sqm
USA
Pittsburgh
CHINA
BRAZIL CHINA Shanghai
Belo Horizonte Conwac
100% of our engineering and production sites certified OHSAS 18001 & ISO 14001
Total safety including our customers and suppliers
4
GE Energy’s Power Conversion Business
Metals presentation - 6/11/2012
5. Power Conversion Brazil
Parauapebas (Established in 2009)
230 employees / 125 engineers • Service and sales office
• 6 employees / 4 Engineers
Belo Horizonte (Established in 1981)
• HQ, Sales, Service, Engineering
center
• 158 employees / 100 Engineers
Parauapebas
Vitória (Established in 2003)
• Regional Business Office
• 12 employees / 3 Engineers
Belo
Horizonte
Vitoria Macaé (Established in 2007)
Betim • Regional Business Office and
Ipatinga Training Center
Macae
• 10 employees / 9 Engineers
Rio de
Janeiro
Rio de Janeiro (Established in 2010)
• Sales Office
• 2 employees / 2 Engineers
Betim (Established in 2005)
• Drives & Switchboards
Manufacturing
• 32 employees / 7 Engineers
5
GE Energy’s Power Conversion Business
Ipatinga (Soon) Metals presentation - 6/11/2012
10. Hundreds of projects provided
For new or existing installations
In all types of facilities:
• Ore yard and scrap yard
• Sintering and coke oven plant
• Blast furnace
• Oxygen steel plant
• Vacuum treatment
• Direct reduction
• Electric arc furnace
• Electrolysis
• Refining
• Continuous casting architecture
10
GE Energy’s Power Conversion Business
Metals presentation - 6/11/2012
11. References
Revamping BF # 1 – GERDAU AÇOMINAS – Ouro Branco/MG
Revamping of Blast Furnace # 1 – GERDAU Açominas – Ouro Branco/MG – 2008/2009
Scope of Supply:
MV and LV electrical equipment, digital control system equipment, drives, design electrical and automation engineering,
commissioning engineering, erection supervision, project management and planning for the Revamping of BF#1.
Customer: GERDAU Açominas
Production: 2,8 Millions ton per year (~ 8.000 ton per day)
BF Capacity (Internal Volume): tbc
9500 I/O points
SCADA Redundant Control System
HMI In Touch v10.0 Wonderware
20 PLCs Schneider (12 Quantum & 08 Momentum).
Complete integration with Level 3 & PIMS
Project Schedule: 14 months (Nov/2008 – Dez/2009)
Project Start: 01/Dec/2008
Blow in:
30/March/2009 (Phase 1) - End of the main shutdown
August/2009 (Phase 2)
December/2009 (Phase 3)
11
GE Energy’s Power Conversion Business
CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS Metals presentation - 6/11/2012
12. References
BF #3 – Arcelor Mittal Tubarao – Vitória / Brazil
New Blast Furnace # 3 – Arcelor Mittal Tubarao (CST) / Vitória-ES – 2005 -2007
Scope of supply:
Electrical installation equipment, MV and LV electrical equipment, instrumentation, digital control system equipment,
drives, design electrical and automation engineering, commissioning engineering, erection, project management and
planning for the New Blast Furnace #3.
Customer: European Consortium VAI / FERROSTALL / PAUL WURTH
Final Customer: Arcelor Mittal Tubarao (CST)
Production: 2,8 Millions of Ton per year
BF Capacity (Internal Volume): 3617 m3
Bell Less Top / Cowper's: 3 / Tuyère: 34
7.350 I/O points
DCS Redundancy Control System:
DCS Yokogawa - Centum CS 3000
Blow in: July/2007
12
GE Energy’s Power Conversion Business
Metals presentation - 6/11/2012
13. References
BOF #3 – Arcelor Mittal Tubarao – Vitória / Brazil
BOF #3
Scope of supply:
Electrical installation equipment, MV and LV electrical equipment, instrumentation, digital control system equipment,
drives, design electrical and automation engineering, commissioning engineering, erection, project management and
planning for:
Converter Tilting
Lance Blowing System
Oxygen System
Dedusting
Material Addition
Transport
Cooling & Ancillaries
Start up 2007
13
GE Energy’s Power Conversion Business
Metals presentation - 6/11/2012
15. A world leader
Mini Mills In solutions for hot flat product
mill control
Hot Strip Mills
Hundreds of large projects
Section Mills supplied for new or existing hot
rolling mills of all types:
• Mini mills
• Hot strip mills
• Plate mills
• Steckel mills
• Section mills
• Bar and rod mills…
15
GE Energy’s Power Conversion Business
Metals presentation - 6/11/2012
16. References
Hot Strip Mill 2250 HABAŞ A.S. - Turkey
Project
• New Hot Strip Mill 2250
Final Customer
• HABAŞ A.S. Aliağa / Ismir Turkey
Mechanical Supplier
• SMS Siemag AG
Scope of Supply
• Drives MV7000 for Roughing Mill Stand, Crop Shear, and
Finishing Mill Stands
• Drives LV8000 for Edger and Coiler
• Drives LV7000 for Screw Down, Roller Tables, etc.
Schedule
• Order May 2011
• Delivery March 2013
16
GE Energy’s Power Conversion Business
Metals presentation - 6/11/2012
17. References
Plate Mill 4300, Rourkela Steel Plant - India
Project
• New 4.3 m 4 HI Single Stand Reversing Plate Mill
• Plate thickness 6 up to 50 mm
• 1st phase 0,92 / 2nd phase 1,674 Mio t per year
Final Customer
• SAIL, Rourkela Steel Plant, Rourkela
Mechanical Supplier
• Danieli
Example (RM Ural Steel)
Scope of Supply
• Complete electrical equipment, Level 1 basic automation,
incl. installation and commissioning
– Switchboards, Transformers
– MV Main Drive System Twin Drive, 2 Synch. Motors
– (8 MW, 0-50/120 rpm, 225% OL), MV7000 Inverters
– LV drives and motors (screw down, roller tables,
etc.)
– Cabling, Desks, I/O stations , Instrumentation
– Automation Level 1 equipment
Construction schedule
• Order August 2010
• Delivery January 2013 (30 months)
17
GE Energy’s Power Conversion Business
Metals presentation - 6/11/2012
18. References
Hot Strip Mill 1700, USIMINAS - Brasil
Project
• Modernization of 1700 mm Hot Strip Mill
• Strip thickness 1,8 up to 12,7 mm
• 3,000 Mio t per year
Final Customer
• USIMINAS, USINAS SIDERÚRGICAS DE MINAS GERAIS S.A.,
Ipatinga, Minas Gerais, Brazil
Scope of Supply
• Automation system Level 1 & 2:
– Hot Strip Mill
– Coiler
Reconstruction Schedule
• 2008
– Order
• 2010
– Mill shadowing Level 1 & Level 2
– New automation after 2 day’s mill close down
18
GE Energy’s Power Conversion Business
Metals presentation - 6/11/2012
20. A world leader
Tandem Cold Mill
In cold rolling sheet and tin mills
Single stand reversing Cold Mill
Sendzimir / Cluster Mills Hundreds of large projects
supplied for new or existing cold
rolling mills of all types:
• Single stand mills
• Tandem cold mills (batch and continuous)
• Sendzimir / Cluster mills
• Temper mills
• Foil mills…
20
GE Energy’s Power Conversion Business
Metals presentation - 6/11/2012
21. References WISCO Silicon Steel CRM5 (Wuhan - China)
World reference:
1st Induction Motors
on Zmill
21
GE Energy’s Power Conversion Business
Metals presentation - 6/11/2012
22. References
BAOXIN Stainless Steel CRM2 (Ningbo - China)
22
GE Energy’s Power Conversion Business
Metals presentation - 6/11/2012
23. References
TISCO Stainless Steel ZRM3 (Taiyuan - China)
23
GE Energy’s Power Conversion Business
Metals presentation - 6/11/2012
24. Advanced solutions
For new or existing process lines
Bright Annealing Line
Many hundreds of process lines
projects, covering all types:
• Continuous galvanizing lines
• Integrated lines (stainless)
• Tinning lines
• Pickling lines and coupled lines/mills
• Annealing lines
• Coating lines
• Shearing lines and cutting lines
24
GE Energy’s Power Conversion Business
Metals presentation - 6/11/2012
25. References
Thyssenkrupp Compass – Alabama (USA)
Hot Dip Galvanizing Lines 1 – 4
• CGL 1
– strip dimensions
– width 920 … 1870 mm
– thickness 0,50 … 2,50 mm
– Max. production speed
– 260 / 180 / 230 / 260 m/min
• CGL 2
– strip dimensions
– width 920 … 1870 mm
– thickness 0,50 … 2,30 mm
– Max. production speed
– 300 / 220 / 270 / 300 m/min (in CAL mode)
• CGL 3
– strip dimensions
– width 800 … 1670 mm
– thickness 0,50 … 2,50 mm
– Max. production speed
– 260 / 180 / 230 / 260 m/min
• CGL 4
– strip dimensions
– width 800 … 1670 mm
– thickness 0,30 … 2,00 mm
– Max. production speed
– 240 / 180 / 230 / 260 m/min
• Total production capacity
– 1.800.000 to/y hot dip galvanized sheet
– 300.000 to/y continuous annealed strip 25
GE Energy’s Power Conversion Business
Metals presentation - 6/11/2012
26. References
Brazil: ArcelorMittal Vega
Coil data
Product Automotive appliances
Strip thickness 0.5 to 2 mm
Strip width 900 to 1875 mm
Max Coil weight 40 tons
Line data
Line capacity 400,000 tons/year
Max speed – Entry section 240 m/mn
Max speed – Process section 160 m/mn
Max speed – Exit section 240 m/mn
Skin pass mill yes
Supply of Electrical, automation and control system (including Air knives Control),
with ~ 200 Drives.
26
GE Energy’s Power Conversion Business
Metals presentation - 6/11/2012
27. A recognized leader
In power quality solutions for the
metals industry
With more than 20 years of
experience in compensation
• A very large number of SVC/D-SVC
installations are in operation worldwide
• More than 6,000 Megavars have been
installed
A wide range of performing and
cost-effective solutions to power
quality challenges
• Through the design and construction of
compensation systems
27
GE Energy’s Power Conversion Business
Metals presentation - 6/11/2012
28. References
Saudi Arabia: D-SVC for DC EAF
• D-SVC 22kV: +/- 61 MVAR – FC 58 MVAR
Bahrain: D-SVC for AC EAF
• D-SVC 33kV: +/- 60 MVAR – FC 60 MVAR
Latvia: D-SVC for AC EAF
• D-SVC 33kV: +/- 60 MVAR – FC 60 MVAR
Germany: SVC for AC EAF
• SVC 33 kV: 230 MVAR – FC 275 MVAR
Arcelor Laminados Zaragoza, Spain: SVC for DC EAF
• SVC 30 kV - TCR: 63 MVAR - FC: 63 MVAR
28
GE Energy’s Power Conversion Business
Metals presentation - 6/11/2012
29. Services
Spare Parts & Repairs Services
• Spare parts availability Our Offering
• Obsolescence management
• Full range of lifecycle services for
• Component repairs & rotating machine entire offering
refurbishment
• 45 Regional Business Centers to
Field Services support global customers
• Installation, commissioning & start-up
• Maintenance, technical assistance
• Experts in managing risks: from
& expert support preventive maintenance to safe
modernization and upgrades
• Training services
• Increased contractual approach to
Revampings/Upgrades partner with customers
• Life extension projects
• Performance improvement
• Capacity upgrades
Long Term Service Agreement
• From basic Time & Material to performance
based contracts
• Remote Monitoring & Diagnostics (VISOR)
• Fleet Management (Marine, Offshore, Navy)
29
GE Energy’s Power Conversion Business
Metals presentation - 6/11/2012
30. Thank You!