GE Energy
Power Conversion
We’re at work making change happen




METALS WORKSHOP
Belo Horizonte
18 April 2012
Raimundo Vasconcelos
                                                                          1
                                     GE Energy’s Power Conversion Business
                                            Metals presentation - 6/11/2012
At a glance
GE Energy, Power Conversion is an
engineering company providing customized                                               Marine
solutions and systems converting electrical
energy into productive performance

                                   Power Electronics
                                                                                     Oil & Gas
                                                     GE Energy
                                                  Power Conversion
 Power Generation

                    Power Distribution
                                                                                       Energy




                                                                                     Industry

                                                                                                          2
                                                                     GE Energy’s Power Conversion Business
                                                                            Metals presentation - 6/11/2012
We have come a long way
CGE    ALSTHOM        GEC         AEG     WESTINGHOUSE
1898     1928         1889        1883        1886                                                              1892
                                           (drive systems)



                                                                                Spin off
                                                                             from ALSTOM




                                                                                                                         GE Energy
                                                                                                                           Power
                                                                                                                         Conversion


                                                    CEGELEC          ALSTOM
              CGE
                                CEGELEC             Industrial         Power
            ALSTHOM                               Systems Group      Conversion




                                               1995


                                                                  1999


                                                                                   End 2005
           1971

                         1989




                                                                                                                    2011
                       Over 100 years of GLOBAL experience

                                                                                                                                   3
                                                                                              GE Energy’s Power Conversion Business
                                                                                                     Metals presentation - 6/11/2012
Our global footprint
    7 Converter factories

    3 Electrical machines factories

    45 Regional Business Centers                                                   Nancy, France
                                                                     UK            Established in 1898, new
    12 Engineering Centers                                                         factory in 2002 ;
                                        Rugby, United Kingdom     Kidsgrove
                                                                  Glasgow          Manuf. area: 21 000 sqm
                                        Established in 1889
                                        Manuf. area: 21 000 sqm




                                                        FRANCE
Minneapolis, USA                                                         GERMANY
                                                                                                                Yantai, China
Established in 1897                                     Massy
                                                                              Berlin                            Established in 2009
Manuf. area: 30 000 sqm
                                                                                                                Manuf. area: 16 000 sqm
                                                  USA

                                               Pittsburgh
                                                                                                               CHINA

                               BRAZIL                                                   CHINA                 Shanghai

                            Belo Horizonte                                             Conwac




                      100% of our engineering and production sites certified OHSAS 18001 & ISO 14001
                                    Total safety including our customers and suppliers
                                                                                                                                               4
                                                                                                          GE Energy’s Power Conversion Business
                                                                                                                 Metals presentation - 6/11/2012
Power Conversion Brazil
                                                 Parauapebas (Established in 2009)

230 employees / 125 engineers                                                           • Service and sales office
                                                                                        • 6 employees / 4 Engineers


                                                 Belo Horizonte (Established in 1981)
                                                                                        • HQ, Sales, Service, Engineering
                                                                                          center
                                                                                        • 158 employees / 100 Engineers
      Parauapebas
                                                 Vitória (Established in 2003)
                                                                                        • Regional Business Office
                                                                                        • 12 employees / 3 Engineers
                    Belo
                    Horizonte
                                   Vitoria       Macaé (Established in 2007)
                    Betim                                                               • Regional Business Office and
                            Ipatinga                                                      Training Center
                                        Macae
                                                                                        • 10 employees / 9 Engineers
                                       Rio de
                                       Janeiro
                                                 Rio de Janeiro (Established in 2010)
                                                                                        • Sales Office
                                                                                        • 2 employees / 2 Engineers

                                                 Betim (Established in 2005)
                                                                                        • Drives & Switchboards
                                                                                          Manufacturing
                                                                                        • 32 employees / 7 Engineers
                                                                                                                                 5
                                                                                            GE Energy’s Power Conversion Business
                                                 Ipatinga (Soon)                                   Metals presentation - 6/11/2012
Our offer in Metals
GE Power Conversion – Value Propositions
                                  Typical Scope of Supply
                     Revamping and Greenfield Turnkey Projects
                                                                                                          Assisted
                                                       3rd party                                          Operation
                                                       Equip.’s:                           Start up
                                                    Transformers,…
                                   3rd party:                             Commissioning                         Strong
                              MV/LV Cables, Field                                                               Project
                                                                 Erection
                               sensors, Erection                Supervision                                   Management
                                 Materials, …       Equipment
                                                     Delivery                  3rd party                          Strong
                                            FAT                           Auxiliaries Equip.'s                    Project
        MV / LV
                                                                            Fire Detection,                      Planning
    Power Supply &             Detail                                           CCTV,…
      Distribution             Design                                                                           Qualified
                                                          GE P&L´’s
                     Basic                                                                                     Engineering
                     Design                            Instrumentation
                                                         Equipment’s,                                             Team
            Basic
            Info’s                                           UPS                                                 Strong
 Kick off                                                                                                       Follow up
 Meeting
                                                                                                                 Project
                                 MV/LV Drives,
                              Motors & Automation
                                 Equipment’s                                   Complete Turnkey Package:
                                                                         Electrical, Automation, Instrumentation
                                                                                 and Drives Equipment’s
                                                                                                                                 7
                                                                                            GE Energy’s Power Conversion Business
                                                                                                   Metals presentation - 6/11/2012
GE Energy Metals - Market segmentation


                                                                                             Metals Processing
                            Iron / Steel Making
                                                             Hot Rolling Mills                Cold Rolling Mills                 Processing Lines




 Main projects         Automation for                  Drives & Automation for          Drives & Automation for           Drives & Automation for
                       • Blast Furnace                 • Hot Strip Mills                • Tandem Cold Mills (cont.,       • Pickling Lines
                       • El. Arc Furnace               • Plate Mills                       discont., coupled)             • Annealing Lines
                       • Secondary Metallurgy          • Bar Rod Mills                  • Reversing Cold Mills            • Cont. Coating Lines
                                                       • Tube Mills                        (4-, 6-, 20-high)              • Hot Dip Galvanising Lines
                                                                                        • Skin Pass Mills                 • Tinning Lines etc.


Applications served by •   Power Supply/Distribution               •   HV/LV-Distribution                                 •   HV/LV-Distribution
GE Energy, Power       •   SVC                                     •   MV/LV Drive Systems, Motors                        •   LV Drives Systems, Motors
Conversion, Metals
                       •   LV Drives, Motors                       •   Basic Automation (L1)                              •   Basic Automation (L1)
                       •   MV Drives, Motors                       •   Instrumentation                                    •   Instrumentation
                       •   Instrumentation                         •   Diagnosis, Condition monitoring                    •   Diagnosis
                       •   Automation (L1)                         •   Real-time Process Simulation                       •   Real-time Process Simulation
                                                                   •   Process Automation (L2)                            •   Process Automation (L2)
                                                                       (Process Models, Data Management Framework)            (Setup-calculation, Data
                                                                                                                              Management Framework)


                                                                                                                                                           8
                                                                                                                      GE Energy’s Power Conversion Business
                                                                                                                             Metals presentation - 6/11/2012
Steelmaking
Hundreds of projects provided
                 For new or existing installations

                 In all types of facilities:
                 • Ore yard and scrap yard
                 • Sintering and coke oven plant
                 • Blast furnace
                 • Oxygen steel plant
                 • Vacuum treatment
                 • Direct reduction
                 • Electric arc furnace
                 • Electrolysis
                 • Refining
                 • Continuous casting architecture

                                                                                 10
                                             GE Energy’s Power Conversion Business
                                                    Metals presentation - 6/11/2012
References
    Revamping BF # 1 – GERDAU AÇOMINAS – Ouro Branco/MG
   Revamping of Blast Furnace # 1 – GERDAU Açominas – Ouro Branco/MG – 2008/2009
        Scope of Supply:
       MV and LV electrical equipment, digital control system equipment, drives, design electrical and automation engineering,
       commissioning engineering, erection supervision, project management and planning for the Revamping of BF#1.
          Customer: GERDAU Açominas
          Production: 2,8 Millions ton per year (~ 8.000 ton per day)
          BF Capacity (Internal Volume): tbc
          9500 I/O points
          SCADA Redundant Control System

                 HMI In Touch v10.0 Wonderware
                 20 PLCs Schneider (12 Quantum & 08 Momentum).
                 Complete integration with Level 3 & PIMS

          Project Schedule: 14 months (Nov/2008 – Dez/2009)

       Project Start:   01/Dec/2008
          Blow in:
                30/March/2009 (Phase 1) - End of the main shutdown
                August/2009 (Phase 2)
                December/2009 (Phase 3)


                                                                                                                                     11
                                                                                                 GE Energy’s Power Conversion Business
                                             CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS                 Metals presentation - 6/11/2012
References
     BF #3 – Arcelor Mittal Tubarao – Vitória / Brazil
   New Blast Furnace # 3 – Arcelor Mittal Tubarao (CST) / Vitória-ES – 2005 -2007

           Scope of supply:

        Electrical installation equipment, MV and LV electrical equipment, instrumentation, digital control system equipment,
        drives, design electrical and automation engineering, commissioning engineering, erection, project management and
        planning for the New Blast Furnace #3.

           Customer: European Consortium VAI / FERROSTALL / PAUL WURTH

           Final Customer: Arcelor Mittal Tubarao (CST)

           Production: 2,8 Millions of Ton per year

           BF Capacity (Internal Volume): 3617 m3

           Bell Less Top / Cowper's: 3 / Tuyère: 34

           7.350 I/O points

           DCS Redundancy Control System:

                    DCS Yokogawa - Centum CS 3000

           Blow in: July/2007

                                                                                                                                        12
                                                                                                    GE Energy’s Power Conversion Business
                                                                                                           Metals presentation - 6/11/2012
References
    BOF #3 – Arcelor Mittal Tubarao – Vitória / Brazil
   BOF #3

          Scope of supply:

       Electrical installation equipment, MV and LV electrical equipment, instrumentation, digital control system equipment,
       drives, design electrical and automation engineering, commissioning engineering, erection, project management and
       planning for:

          Converter Tilting

       Lance Blowing System


       Oxygen    System

       Dedusting


       Material   Addition

       Transport


       Cooling &   Ancillaries

       Start   up 2007




                                                                                                                                       13
                                                                                                   GE Energy’s Power Conversion Business
                                                                                                          Metals presentation - 6/11/2012
Hot Rolling Mills
A world leader

 Mini Mills        In solutions for hot flat product
                   mill control
 Hot Strip Mills


                   Hundreds of large projects
 Section Mills     supplied for new or existing hot
                   rolling mills of all types:
                   • Mini mills
                   • Hot strip mills
                   • Plate mills
                   • Steckel mills
                   • Section mills
                   • Bar and rod mills…


                                                                              15
                                          GE Energy’s Power Conversion Business
                                                 Metals presentation - 6/11/2012
References
             Hot Strip Mill 2250 HABAŞ A.S. - Turkey
                      Project
                      •   New Hot Strip Mill 2250


                      Final Customer
                      •   HABAŞ A.S. Aliağa / Ismir Turkey


                      Mechanical Supplier
                      •   SMS Siemag AG


                      Scope of Supply
                      •   Drives MV7000 for Roughing Mill Stand, Crop Shear, and
                          Finishing Mill Stands
                      •   Drives LV8000 for Edger and Coiler
                      •   Drives LV7000 for Screw Down, Roller Tables, etc.


                      Schedule
                      •   Order                 May 2011
                      •   Delivery              March 2013




                                                                                          16
                                                      GE Energy’s Power Conversion Business
                                                             Metals presentation - 6/11/2012
References
        Plate Mill 4300, Rourkela Steel Plant - India
                                    Project
                                    •    New 4.3 m 4 HI Single Stand Reversing Plate Mill
                                    •    Plate thickness 6 up to 50 mm
                                    •    1st phase 0,92 / 2nd phase 1,674 Mio t per year

                                    Final Customer
                                    •    SAIL, Rourkela Steel Plant, Rourkela

                                    Mechanical Supplier
                                    •   Danieli
          Example (RM Ural Steel)


                                    Scope of Supply
                                    •   Complete electrical equipment, Level 1 basic automation,
                                        incl. installation and commissioning
                                          – Switchboards, Transformers
                                          – MV Main Drive System Twin Drive, 2 Synch. Motors
                                          – (8 MW, 0-50/120 rpm, 225% OL), MV7000 Inverters
                                          – LV drives and motors (screw down, roller tables,
                                                etc.)
                                          – Cabling, Desks, I/O stations , Instrumentation
                                          – Automation Level 1 equipment

                                    Construction schedule
                                    •   Order August 2010
                                    •   Delivery January 2013 (30 months)


                                                                                                         17
                                                                     GE Energy’s Power Conversion Business
                                                                            Metals presentation - 6/11/2012
References
             Hot Strip Mill 1700, USIMINAS - Brasil
                  Project
                  •    Modernization of 1700 mm Hot Strip Mill
                  •    Strip thickness 1,8 up to 12,7 mm
                  •    3,000 Mio t per year


                  Final Customer
                  •    USIMINAS, USINAS SIDERÚRGICAS DE MINAS GERAIS S.A.,
                       Ipatinga, Minas Gerais, Brazil


                  Scope of Supply
                  •   Automation system Level 1 & 2:
                        – Hot Strip Mill
                        – Coiler


                  Reconstruction Schedule
                  •   2008
                        – Order
                  •   2010
                        – Mill shadowing Level 1 & Level 2
                        – New automation after 2 day’s mill close down


                                                                                      18
                                                  GE Energy’s Power Conversion Business
                                                         Metals presentation - 6/11/2012
Cold Rolling Mills
A world leader

             Tandem Cold Mill



                                                         In cold rolling sheet and tin mills
                      Single stand reversing Cold Mill




     Sendzimir / Cluster Mills                           Hundreds of large projects
                                                         supplied for new or existing cold
                                                         rolling mills of all types:
                                                         • Single stand mills
                                                         • Tandem cold mills (batch and continuous)
                                                         • Sendzimir / Cluster mills
                                                         • Temper mills
                                                         • Foil mills…



                                                                                                                           20
                                                                                       GE Energy’s Power Conversion Business
                                                                                              Metals presentation - 6/11/2012
References WISCO Silicon Steel CRM5 (Wuhan - China)




                           World reference:
                         1st Induction Motors
                                on Zmill


                                                                          21
                                      GE Energy’s Power Conversion Business
                                             Metals presentation - 6/11/2012
References
   BAOXIN Stainless Steel CRM2 (Ningbo - China)




                                                                            22
                                        GE Energy’s Power Conversion Business
                                               Metals presentation - 6/11/2012
References
    TISCO Stainless Steel ZRM3 (Taiyuan - China)




                                                                            23
                                        GE Energy’s Power Conversion Business
                                               Metals presentation - 6/11/2012
Advanced solutions

                          For new or existing process lines

  Bright Annealing Line
                          Many hundreds of process lines
                          projects, covering all types:
                          • Continuous galvanizing lines
                          • Integrated lines (stainless)
                          • Tinning lines
                          • Pickling lines and coupled lines/mills
                          • Annealing lines
                          • Coating lines
                          • Shearing lines and cutting lines


                                                                                          24
                                                      GE Energy’s Power Conversion Business
                                                             Metals presentation - 6/11/2012
References
             Thyssenkrupp Compass – Alabama (USA)
                  Hot Dip Galvanizing Lines 1 – 4
              •   CGL 1
                  – strip dimensions
                     – width 920 … 1870 mm
                     – thickness 0,50 … 2,50 mm
                  – Max. production speed
                     – 260 / 180 / 230 / 260 m/min
              •   CGL 2
                  – strip dimensions
                     – width 920 … 1870 mm
                     – thickness 0,50 … 2,30 mm
                  – Max. production speed
                     – 300 / 220 / 270 / 300 m/min (in CAL mode)
              •   CGL 3
                  – strip dimensions
                     – width 800 … 1670 mm
                     – thickness 0,50 … 2,50 mm
                  – Max. production speed
                     – 260 / 180 / 230 / 260 m/min
              •   CGL 4
                  – strip dimensions
                     – width 800 … 1670 mm
                     – thickness 0,30 … 2,00 mm
                  – Max. production speed
                     – 240 / 180 / 230 / 260 m/min

              •   Total production capacity
                  – 1.800.000 to/y hot dip galvanized sheet
                  – 300.000 to/y continuous annealed strip                         25
                                               GE Energy’s Power Conversion Business
                                                      Metals presentation - 6/11/2012
References
                                          Brazil: ArcelorMittal Vega
                                                        Coil data
                                                          Product                  Automotive appliances
                                                      Strip thickness                     0.5 to 2 mm
                                                        Strip width                    900 to 1875 mm
                                                     Max Coil weight                         40 tons
                                                        Line data
                                                       Line capacity                  400,000 tons/year
                                                 Max speed – Entry section                 240 m/mn
                                                Max speed – Process section                160 m/mn
                                                 Max speed – Exit section                  240 m/mn
                                                      Skin pass mill                           yes




Supply of Electrical, automation and control system (including Air knives Control),
with ~ 200 Drives.
                                                                                                                 26
                                                                             GE Energy’s Power Conversion Business
                                                                                    Metals presentation - 6/11/2012
A recognized leader
                 In power quality solutions for the
                 metals industry

                 With more than 20 years of
                 experience in compensation
                 • A very large number of SVC/D-SVC
                   installations are in operation worldwide
                 • More than 6,000 Megavars have been
                   installed



                 A wide range of performing and
                 cost-effective solutions to power
                 quality challenges
                 • Through the design and construction of
                   compensation systems
                                                                               27
                                           GE Energy’s Power Conversion Business
                                                  Metals presentation - 6/11/2012
References
Saudi Arabia: D-SVC for DC EAF
• D-SVC 22kV: +/- 61 MVAR – FC 58 MVAR
Bahrain: D-SVC for AC EAF
• D-SVC 33kV: +/- 60 MVAR – FC 60 MVAR
Latvia: D-SVC for AC EAF
• D-SVC 33kV: +/- 60 MVAR – FC 60 MVAR
Germany: SVC for AC EAF
• SVC 33 kV: 230 MVAR – FC 275 MVAR
Arcelor Laminados Zaragoza, Spain: SVC for DC EAF
• SVC 30 kV - TCR: 63 MVAR - FC: 63 MVAR


                                                                               28
                                           GE Energy’s Power Conversion Business
                                                  Metals presentation - 6/11/2012
Services
           Spare Parts & Repairs Services
           • Spare parts availability                                Our Offering
           • Obsolescence management
                                                         • Full range of lifecycle services for
           • Component repairs & rotating machine          entire offering
             refurbishment
                                                         • 45 Regional Business Centers to
           Field Services                                  support global customers
           • Installation, commissioning & start-up
           • Maintenance, technical assistance
                                                         • Experts in managing risks: from
             & expert support                              preventive maintenance to safe
                                                           modernization and upgrades
           • Training services
                                                         • Increased contractual approach to
           Revampings/Upgrades                             partner with customers
           • Life extension projects
           • Performance improvement
           • Capacity upgrades


           Long Term Service Agreement
           • From basic Time & Material to performance
             based contracts
           • Remote Monitoring & Diagnostics (VISOR)
           • Fleet Management (Marine, Offshore, Navy)


                                                                                                          29
                                                                      GE Energy’s Power Conversion Business
                                                                             Metals presentation - 6/11/2012
Thank You!

GE Energy
Power Conversion

                                                       30
                   GE Energy’s Power Conversion Business
                          Metals presentation - 6/11/2012

Mais conteúdo relacionado

Mais procurados (7)

Ibs 2011 Orlando Fl Energy Labeling 1 12 11
Ibs 2011 Orlando Fl Energy Labeling 1 12 11Ibs 2011 Orlando Fl Energy Labeling 1 12 11
Ibs 2011 Orlando Fl Energy Labeling 1 12 11
 
Presentation and outlook of the Energy Business
Presentation and outlook of the Energy BusinessPresentation and outlook of the Energy Business
Presentation and outlook of the Energy Business
 
"Issues and Challenges Sourcing Sustainable Products and Technologies" - Gary...
"Issues and Challenges Sourcing Sustainable Products and Technologies" - Gary..."Issues and Challenges Sourcing Sustainable Products and Technologies" - Gary...
"Issues and Challenges Sourcing Sustainable Products and Technologies" - Gary...
 
Feed gaps and the effect of cereal grazing in a dryland farming system of the...
Feed gaps and the effect of cereal grazing in a dryland farming system of the...Feed gaps and the effect of cereal grazing in a dryland farming system of the...
Feed gaps and the effect of cereal grazing in a dryland farming system of the...
 
Grupo Visión Prospectiva México 2030, Eficiencia energetica, Dra. Cintia Angulo
Grupo Visión Prospectiva México 2030, Eficiencia energetica,  Dra. Cintia AnguloGrupo Visión Prospectiva México 2030, Eficiencia energetica,  Dra. Cintia Angulo
Grupo Visión Prospectiva México 2030, Eficiencia energetica, Dra. Cintia Angulo
 
P2 e2 samhui
P2 e2 samhuiP2 e2 samhui
P2 e2 samhui
 
Study: Organic farming outperforms conventional
Study: Organic farming outperforms conventional Study: Organic farming outperforms conventional
Study: Organic farming outperforms conventional
 

Semelhante a 3 metals workshop-raimundo_18_04_2012

Singapores Electricity Market After Market Reform
Singapores Electricity Market After Market ReformSingapores Electricity Market After Market Reform
Singapores Electricity Market After Market Reform
electricitygovernance
 
Présentation de Mirom
Présentation de MiromPrésentation de Mirom
Présentation de Mirom
Cluster TWEED
 

Semelhante a 3 metals workshop-raimundo_18_04_2012 (8)

Singapores Electricity Market After Market Reform
Singapores Electricity Market After Market ReformSingapores Electricity Market After Market Reform
Singapores Electricity Market After Market Reform
 
Usafa jan 2013
Usafa jan 2013Usafa jan 2013
Usafa jan 2013
 
Enviro power feb_2018
Enviro power feb_2018Enviro power feb_2018
Enviro power feb_2018
 
Présentation de Mirom
Présentation de MiromPrésentation de Mirom
Présentation de Mirom
 
Senoko
SenokoSenoko
Senoko
 
Resd technologies-epri
Resd technologies-epriResd technologies-epri
Resd technologies-epri
 
How Economic Value Management can be Applied to Power Plant Management
How Economic Value Management can be Applied to Power Plant ManagementHow Economic Value Management can be Applied to Power Plant Management
How Economic Value Management can be Applied to Power Plant Management
 
Enel Green Power Investor Day Rome, April 22 2009
Enel Green Power Investor Day   Rome, April 22 2009Enel Green Power Investor Day   Rome, April 22 2009
Enel Green Power Investor Day Rome, April 22 2009
 

Mais de GE_Energy

8 ind solutions - metals - abr12
8  ind solutions - metals - abr128  ind solutions - metals - abr12
8 ind solutions - metals - abr12
GE_Energy
 
7 felipe ge digital energy m&d - monitoramento metals - low-q (pt)
7  felipe  ge digital energy m&d - monitoramento metals - low-q (pt)7  felipe  ge digital energy m&d - monitoramento metals - low-q (pt)
7 felipe ge digital energy m&d - monitoramento metals - low-q (pt)
GE_Energy
 
6 de power-point_p&c_2012_final[1]
6  de power-point_p&c_2012_final[1]6  de power-point_p&c_2012_final[1]
6 de power-point_p&c_2012_final[1]
GE_Energy
 
5 salvio workshop metals11
5   salvio workshop metals115   salvio workshop metals11
5 salvio workshop metals11
GE_Energy
 
4 metals workshop igor quintao
4   metals workshop igor quintao4   metals workshop igor quintao
4 metals workshop igor quintao
GE_Energy
 
2 roberto - mining - presentation-v3
2   roberto  - mining - presentation-v32   roberto  - mining - presentation-v3
2 roberto - mining - presentation-v3
GE_Energy
 
1 aurelio power point-p&c_2012_final
1 aurelio   power point-p&c_2012_final1 aurelio   power point-p&c_2012_final
1 aurelio power point-p&c_2012_final
GE_Energy
 

Mais de GE_Energy (7)

8 ind solutions - metals - abr12
8  ind solutions - metals - abr128  ind solutions - metals - abr12
8 ind solutions - metals - abr12
 
7 felipe ge digital energy m&d - monitoramento metals - low-q (pt)
7  felipe  ge digital energy m&d - monitoramento metals - low-q (pt)7  felipe  ge digital energy m&d - monitoramento metals - low-q (pt)
7 felipe ge digital energy m&d - monitoramento metals - low-q (pt)
 
6 de power-point_p&c_2012_final[1]
6  de power-point_p&c_2012_final[1]6  de power-point_p&c_2012_final[1]
6 de power-point_p&c_2012_final[1]
 
5 salvio workshop metals11
5   salvio workshop metals115   salvio workshop metals11
5 salvio workshop metals11
 
4 metals workshop igor quintao
4   metals workshop igor quintao4   metals workshop igor quintao
4 metals workshop igor quintao
 
2 roberto - mining - presentation-v3
2   roberto  - mining - presentation-v32   roberto  - mining - presentation-v3
2 roberto - mining - presentation-v3
 
1 aurelio power point-p&c_2012_final
1 aurelio   power point-p&c_2012_final1 aurelio   power point-p&c_2012_final
1 aurelio power point-p&c_2012_final
 

Último

Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 

Último (20)

Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 

3 metals workshop-raimundo_18_04_2012

  • 1. GE Energy Power Conversion We’re at work making change happen METALS WORKSHOP Belo Horizonte 18 April 2012 Raimundo Vasconcelos 1 GE Energy’s Power Conversion Business Metals presentation - 6/11/2012
  • 2. At a glance GE Energy, Power Conversion is an engineering company providing customized Marine solutions and systems converting electrical energy into productive performance Power Electronics Oil & Gas GE Energy Power Conversion Power Generation Power Distribution Energy Industry 2 GE Energy’s Power Conversion Business Metals presentation - 6/11/2012
  • 3. We have come a long way CGE ALSTHOM GEC AEG WESTINGHOUSE 1898 1928 1889 1883 1886 1892 (drive systems) Spin off from ALSTOM GE Energy Power Conversion CEGELEC ALSTOM CGE CEGELEC Industrial Power ALSTHOM Systems Group Conversion 1995 1999 End 2005 1971 1989 2011 Over 100 years of GLOBAL experience 3 GE Energy’s Power Conversion Business Metals presentation - 6/11/2012
  • 4. Our global footprint 7 Converter factories 3 Electrical machines factories 45 Regional Business Centers Nancy, France UK Established in 1898, new 12 Engineering Centers factory in 2002 ; Rugby, United Kingdom Kidsgrove Glasgow Manuf. area: 21 000 sqm Established in 1889 Manuf. area: 21 000 sqm FRANCE Minneapolis, USA GERMANY Yantai, China Established in 1897 Massy Berlin Established in 2009 Manuf. area: 30 000 sqm Manuf. area: 16 000 sqm USA Pittsburgh CHINA BRAZIL CHINA Shanghai Belo Horizonte Conwac 100% of our engineering and production sites certified OHSAS 18001 & ISO 14001 Total safety including our customers and suppliers 4 GE Energy’s Power Conversion Business Metals presentation - 6/11/2012
  • 5. Power Conversion Brazil Parauapebas (Established in 2009) 230 employees / 125 engineers • Service and sales office • 6 employees / 4 Engineers Belo Horizonte (Established in 1981) • HQ, Sales, Service, Engineering center • 158 employees / 100 Engineers Parauapebas Vitória (Established in 2003) • Regional Business Office • 12 employees / 3 Engineers Belo Horizonte Vitoria Macaé (Established in 2007) Betim • Regional Business Office and Ipatinga Training Center Macae • 10 employees / 9 Engineers Rio de Janeiro Rio de Janeiro (Established in 2010) • Sales Office • 2 employees / 2 Engineers Betim (Established in 2005) • Drives & Switchboards Manufacturing • 32 employees / 7 Engineers 5 GE Energy’s Power Conversion Business Ipatinga (Soon) Metals presentation - 6/11/2012
  • 6. Our offer in Metals
  • 7. GE Power Conversion – Value Propositions Typical Scope of Supply Revamping and Greenfield Turnkey Projects Assisted 3rd party Operation Equip.’s: Start up Transformers,… 3rd party: Commissioning Strong MV/LV Cables, Field Project Erection sensors, Erection Supervision Management Materials, … Equipment Delivery 3rd party Strong FAT Auxiliaries Equip.'s Project MV / LV Fire Detection, Planning Power Supply & Detail CCTV,… Distribution Design Qualified GE P&L´’s Basic Engineering Design Instrumentation Equipment’s, Team Basic Info’s UPS Strong Kick off Follow up Meeting Project MV/LV Drives, Motors & Automation Equipment’s Complete Turnkey Package: Electrical, Automation, Instrumentation and Drives Equipment’s 7 GE Energy’s Power Conversion Business Metals presentation - 6/11/2012
  • 8. GE Energy Metals - Market segmentation Metals Processing Iron / Steel Making Hot Rolling Mills Cold Rolling Mills Processing Lines Main projects Automation for Drives & Automation for Drives & Automation for Drives & Automation for • Blast Furnace • Hot Strip Mills • Tandem Cold Mills (cont., • Pickling Lines • El. Arc Furnace • Plate Mills discont., coupled) • Annealing Lines • Secondary Metallurgy • Bar Rod Mills • Reversing Cold Mills • Cont. Coating Lines • Tube Mills (4-, 6-, 20-high) • Hot Dip Galvanising Lines • Skin Pass Mills • Tinning Lines etc. Applications served by • Power Supply/Distribution • HV/LV-Distribution • HV/LV-Distribution GE Energy, Power • SVC • MV/LV Drive Systems, Motors • LV Drives Systems, Motors Conversion, Metals • LV Drives, Motors • Basic Automation (L1) • Basic Automation (L1) • MV Drives, Motors • Instrumentation • Instrumentation • Instrumentation • Diagnosis, Condition monitoring • Diagnosis • Automation (L1) • Real-time Process Simulation • Real-time Process Simulation • Process Automation (L2) • Process Automation (L2) (Process Models, Data Management Framework) (Setup-calculation, Data Management Framework) 8 GE Energy’s Power Conversion Business Metals presentation - 6/11/2012
  • 10. Hundreds of projects provided For new or existing installations In all types of facilities: • Ore yard and scrap yard • Sintering and coke oven plant • Blast furnace • Oxygen steel plant • Vacuum treatment • Direct reduction • Electric arc furnace • Electrolysis • Refining • Continuous casting architecture 10 GE Energy’s Power Conversion Business Metals presentation - 6/11/2012
  • 11. References Revamping BF # 1 – GERDAU AÇOMINAS – Ouro Branco/MG  Revamping of Blast Furnace # 1 – GERDAU Açominas – Ouro Branco/MG – 2008/2009  Scope of Supply: MV and LV electrical equipment, digital control system equipment, drives, design electrical and automation engineering, commissioning engineering, erection supervision, project management and planning for the Revamping of BF#1.  Customer: GERDAU Açominas  Production: 2,8 Millions ton per year (~ 8.000 ton per day)  BF Capacity (Internal Volume): tbc  9500 I/O points  SCADA Redundant Control System  HMI In Touch v10.0 Wonderware  20 PLCs Schneider (12 Quantum & 08 Momentum).  Complete integration with Level 3 & PIMS  Project Schedule: 14 months (Nov/2008 – Dez/2009) Project Start: 01/Dec/2008  Blow in:  30/March/2009 (Phase 1) - End of the main shutdown  August/2009 (Phase 2)  December/2009 (Phase 3) 11 GE Energy’s Power Conversion Business CUSTOMISED TECHNOLOGY FOR CUSTOMER SUCCESS Metals presentation - 6/11/2012
  • 12. References BF #3 – Arcelor Mittal Tubarao – Vitória / Brazil  New Blast Furnace # 3 – Arcelor Mittal Tubarao (CST) / Vitória-ES – 2005 -2007  Scope of supply: Electrical installation equipment, MV and LV electrical equipment, instrumentation, digital control system equipment, drives, design electrical and automation engineering, commissioning engineering, erection, project management and planning for the New Blast Furnace #3.  Customer: European Consortium VAI / FERROSTALL / PAUL WURTH  Final Customer: Arcelor Mittal Tubarao (CST)  Production: 2,8 Millions of Ton per year  BF Capacity (Internal Volume): 3617 m3  Bell Less Top / Cowper's: 3 / Tuyère: 34  7.350 I/O points  DCS Redundancy Control System:  DCS Yokogawa - Centum CS 3000  Blow in: July/2007 12 GE Energy’s Power Conversion Business Metals presentation - 6/11/2012
  • 13. References BOF #3 – Arcelor Mittal Tubarao – Vitória / Brazil  BOF #3  Scope of supply: Electrical installation equipment, MV and LV electrical equipment, instrumentation, digital control system equipment, drives, design electrical and automation engineering, commissioning engineering, erection, project management and planning for:  Converter Tilting Lance Blowing System Oxygen System Dedusting Material Addition Transport Cooling & Ancillaries Start up 2007 13 GE Energy’s Power Conversion Business Metals presentation - 6/11/2012
  • 15. A world leader Mini Mills In solutions for hot flat product mill control Hot Strip Mills Hundreds of large projects Section Mills supplied for new or existing hot rolling mills of all types: • Mini mills • Hot strip mills • Plate mills • Steckel mills • Section mills • Bar and rod mills… 15 GE Energy’s Power Conversion Business Metals presentation - 6/11/2012
  • 16. References Hot Strip Mill 2250 HABAŞ A.S. - Turkey Project • New Hot Strip Mill 2250 Final Customer • HABAŞ A.S. Aliağa / Ismir Turkey Mechanical Supplier • SMS Siemag AG Scope of Supply • Drives MV7000 for Roughing Mill Stand, Crop Shear, and Finishing Mill Stands • Drives LV8000 for Edger and Coiler • Drives LV7000 for Screw Down, Roller Tables, etc. Schedule • Order May 2011 • Delivery March 2013 16 GE Energy’s Power Conversion Business Metals presentation - 6/11/2012
  • 17. References Plate Mill 4300, Rourkela Steel Plant - India Project • New 4.3 m 4 HI Single Stand Reversing Plate Mill • Plate thickness 6 up to 50 mm • 1st phase 0,92 / 2nd phase 1,674 Mio t per year Final Customer • SAIL, Rourkela Steel Plant, Rourkela Mechanical Supplier • Danieli Example (RM Ural Steel) Scope of Supply • Complete electrical equipment, Level 1 basic automation, incl. installation and commissioning – Switchboards, Transformers – MV Main Drive System Twin Drive, 2 Synch. Motors – (8 MW, 0-50/120 rpm, 225% OL), MV7000 Inverters – LV drives and motors (screw down, roller tables, etc.) – Cabling, Desks, I/O stations , Instrumentation – Automation Level 1 equipment Construction schedule • Order August 2010 • Delivery January 2013 (30 months) 17 GE Energy’s Power Conversion Business Metals presentation - 6/11/2012
  • 18. References Hot Strip Mill 1700, USIMINAS - Brasil Project • Modernization of 1700 mm Hot Strip Mill • Strip thickness 1,8 up to 12,7 mm • 3,000 Mio t per year Final Customer • USIMINAS, USINAS SIDERÚRGICAS DE MINAS GERAIS S.A., Ipatinga, Minas Gerais, Brazil Scope of Supply • Automation system Level 1 & 2: – Hot Strip Mill – Coiler Reconstruction Schedule • 2008 – Order • 2010 – Mill shadowing Level 1 & Level 2 – New automation after 2 day’s mill close down 18 GE Energy’s Power Conversion Business Metals presentation - 6/11/2012
  • 20. A world leader Tandem Cold Mill In cold rolling sheet and tin mills Single stand reversing Cold Mill Sendzimir / Cluster Mills Hundreds of large projects supplied for new or existing cold rolling mills of all types: • Single stand mills • Tandem cold mills (batch and continuous) • Sendzimir / Cluster mills • Temper mills • Foil mills… 20 GE Energy’s Power Conversion Business Metals presentation - 6/11/2012
  • 21. References WISCO Silicon Steel CRM5 (Wuhan - China) World reference: 1st Induction Motors on Zmill 21 GE Energy’s Power Conversion Business Metals presentation - 6/11/2012
  • 22. References BAOXIN Stainless Steel CRM2 (Ningbo - China) 22 GE Energy’s Power Conversion Business Metals presentation - 6/11/2012
  • 23. References TISCO Stainless Steel ZRM3 (Taiyuan - China) 23 GE Energy’s Power Conversion Business Metals presentation - 6/11/2012
  • 24. Advanced solutions For new or existing process lines Bright Annealing Line Many hundreds of process lines projects, covering all types: • Continuous galvanizing lines • Integrated lines (stainless) • Tinning lines • Pickling lines and coupled lines/mills • Annealing lines • Coating lines • Shearing lines and cutting lines 24 GE Energy’s Power Conversion Business Metals presentation - 6/11/2012
  • 25. References Thyssenkrupp Compass – Alabama (USA) Hot Dip Galvanizing Lines 1 – 4 • CGL 1 – strip dimensions – width 920 … 1870 mm – thickness 0,50 … 2,50 mm – Max. production speed – 260 / 180 / 230 / 260 m/min • CGL 2 – strip dimensions – width 920 … 1870 mm – thickness 0,50 … 2,30 mm – Max. production speed – 300 / 220 / 270 / 300 m/min (in CAL mode) • CGL 3 – strip dimensions – width 800 … 1670 mm – thickness 0,50 … 2,50 mm – Max. production speed – 260 / 180 / 230 / 260 m/min • CGL 4 – strip dimensions – width 800 … 1670 mm – thickness 0,30 … 2,00 mm – Max. production speed – 240 / 180 / 230 / 260 m/min • Total production capacity – 1.800.000 to/y hot dip galvanized sheet – 300.000 to/y continuous annealed strip 25 GE Energy’s Power Conversion Business Metals presentation - 6/11/2012
  • 26. References Brazil: ArcelorMittal Vega Coil data Product Automotive appliances Strip thickness 0.5 to 2 mm Strip width 900 to 1875 mm Max Coil weight 40 tons Line data Line capacity 400,000 tons/year Max speed – Entry section 240 m/mn Max speed – Process section 160 m/mn Max speed – Exit section 240 m/mn Skin pass mill yes Supply of Electrical, automation and control system (including Air knives Control), with ~ 200 Drives. 26 GE Energy’s Power Conversion Business Metals presentation - 6/11/2012
  • 27. A recognized leader In power quality solutions for the metals industry With more than 20 years of experience in compensation • A very large number of SVC/D-SVC installations are in operation worldwide • More than 6,000 Megavars have been installed A wide range of performing and cost-effective solutions to power quality challenges • Through the design and construction of compensation systems 27 GE Energy’s Power Conversion Business Metals presentation - 6/11/2012
  • 28. References Saudi Arabia: D-SVC for DC EAF • D-SVC 22kV: +/- 61 MVAR – FC 58 MVAR Bahrain: D-SVC for AC EAF • D-SVC 33kV: +/- 60 MVAR – FC 60 MVAR Latvia: D-SVC for AC EAF • D-SVC 33kV: +/- 60 MVAR – FC 60 MVAR Germany: SVC for AC EAF • SVC 33 kV: 230 MVAR – FC 275 MVAR Arcelor Laminados Zaragoza, Spain: SVC for DC EAF • SVC 30 kV - TCR: 63 MVAR - FC: 63 MVAR 28 GE Energy’s Power Conversion Business Metals presentation - 6/11/2012
  • 29. Services Spare Parts & Repairs Services • Spare parts availability Our Offering • Obsolescence management • Full range of lifecycle services for • Component repairs & rotating machine entire offering refurbishment • 45 Regional Business Centers to Field Services support global customers • Installation, commissioning & start-up • Maintenance, technical assistance • Experts in managing risks: from & expert support preventive maintenance to safe modernization and upgrades • Training services • Increased contractual approach to Revampings/Upgrades partner with customers • Life extension projects • Performance improvement • Capacity upgrades Long Term Service Agreement • From basic Time & Material to performance based contracts • Remote Monitoring & Diagnostics (VISOR) • Fleet Management (Marine, Offshore, Navy) 29 GE Energy’s Power Conversion Business Metals presentation - 6/11/2012
  • 30. Thank You! GE Energy Power Conversion 30 GE Energy’s Power Conversion Business Metals presentation - 6/11/2012