SlideShare uma empresa Scribd logo
1 de 1
Baixar para ler offline
The	
  Build	
  of	
  the	
  Dam	
  Door	
  System	
  
!
!
First	
  hand	
  calcula7ons	
  were	
  created.	
  	
  
My	
  role	
  in	
  the	
  calcula7ons	
  was	
  to	
  find	
  	
  
available	
  gears	
  to	
  turn	
  at	
  the	
  desired	
  speed.	
  
Using	
  solid	
  Works,	
  a	
  1:10	
  scaled	
  model	
  	
  
of	
  the	
  dam	
  was	
  created	
  to	
  be	
  built	
  	
  with	
  
Steel.	
  
A	
  true	
  challenge	
  for	
  an	
  ME,	
  electrical!	
  
We	
  used	
  a	
  DC	
  motor	
  with	
  variable	
  speeds,	
  
so	
  a	
  controller	
  from	
  Dart	
  and	
  a	
  4	
  DTP	
  switch	
  	
  
was	
  used.	
  All	
  wiring	
  was	
  done	
  in	
  team	
  with	
  the	
  	
  
help	
  of	
  other	
  students	
  in	
  electrical	
  engineering.	
  
The	
  dam	
  was	
  built	
  with	
  steel	
  components,	
  
Using	
  such	
  skills	
  as	
  milling,	
  welding,	
  drilling,	
  and	
  
Team	
  work.	
  The	
  project	
  was	
  an	
  success	
  and	
  is	
  being	
  	
  
Further	
  used	
  at	
  CSUS	
  for	
  hydraulic	
  studies,	
  	
  

Mais conteúdo relacionado

Destaque

Subh e baharan.hindi (सुब्हे बहारां)
Subh e baharan.hindi (सुब्हे बहारां)Subh e baharan.hindi (सुब्हे बहारां)
Subh e baharan.hindi (सुब्हे बहारां)Ilyas Qadri Ziaee
 
Boeing Financial analysis
Boeing Financial analysisBoeing Financial analysis
Boeing Financial analysis?? ?
 
Chris cheeseman, BT - FCCG interim report recommendations
Chris cheeseman, BT - FCCG interim report recommendationsChris cheeseman, BT - FCCG interim report recommendations
Chris cheeseman, BT - FCCG interim report recommendationstechUK
 
Introduction to SSTL
Introduction to SSTLIntroduction to SSTL
Introduction to SSTLtechUK
 
MICROBLOGS TWITTER EN LA ADMINISTRACION
MICROBLOGS TWITTER EN LA ADMINISTRACIONMICROBLOGS TWITTER EN LA ADMINISTRACION
MICROBLOGS TWITTER EN LA ADMINISTRACIONpierangelaZ
 

Destaque (11)

CV - Midhun Mohan
CV - Midhun MohanCV - Midhun Mohan
CV - Midhun Mohan
 
Subh e baharan.hindi (सुब्हे बहारां)
Subh e baharan.hindi (सुब्हे बहारां)Subh e baharan.hindi (सुब्हे बहारां)
Subh e baharan.hindi (सुब्हे बहारां)
 
Ppt
PptPpt
Ppt
 
Boeing Financial analysis
Boeing Financial analysisBoeing Financial analysis
Boeing Financial analysis
 
Lifes A Bicycle Presentation to CAPA Feb 2017
Lifes A Bicycle Presentation to CAPA Feb 2017Lifes A Bicycle Presentation to CAPA Feb 2017
Lifes A Bicycle Presentation to CAPA Feb 2017
 
Chris cheeseman, BT - FCCG interim report recommendations
Chris cheeseman, BT - FCCG interim report recommendationsChris cheeseman, BT - FCCG interim report recommendations
Chris cheeseman, BT - FCCG interim report recommendations
 
Introduction to SSTL
Introduction to SSTLIntroduction to SSTL
Introduction to SSTL
 
Vitamin Deficiency
Vitamin DeficiencyVitamin Deficiency
Vitamin Deficiency
 
World war 2 (1)
World war 2 (1)World war 2 (1)
World war 2 (1)
 
Tina Samaniego Resource Guide
Tina Samaniego Resource GuideTina Samaniego Resource Guide
Tina Samaniego Resource Guide
 
MICROBLOGS TWITTER EN LA ADMINISTRACION
MICROBLOGS TWITTER EN LA ADMINISTRACIONMICROBLOGS TWITTER EN LA ADMINISTRACION
MICROBLOGS TWITTER EN LA ADMINISTRACION
 

Semelhante a dam build

Semelhante a dam build (9)

Post Graduate Resume 2
Post Graduate Resume 2Post Graduate Resume 2
Post Graduate Resume 2
 
2012 Network design
2012 Network design2012 Network design
2012 Network design
 
HVAC design engineer
HVAC design engineerHVAC design engineer
HVAC design engineer
 
CV - AGK LinkedIn
CV - AGK LinkedInCV - AGK LinkedIn
CV - AGK LinkedIn
 
EME 185 Poster
EME 185 PosterEME 185 Poster
EME 185 Poster
 
List of Projects Completed
List of Projects CompletedList of Projects Completed
List of Projects Completed
 
EXPO Poster Eamonn Brennan
EXPO Poster Eamonn BrennanEXPO Poster Eamonn Brennan
EXPO Poster Eamonn Brennan
 
CV_VPD_mail_1
CV_VPD_mail_1CV_VPD_mail_1
CV_VPD_mail_1
 
Martin Kellinghusen Resume
Martin Kellinghusen ResumeMartin Kellinghusen Resume
Martin Kellinghusen Resume
 

dam build

  • 1. The  Build  of  the  Dam  Door  System   ! ! First  hand  calcula7ons  were  created.     My  role  in  the  calcula7ons  was  to  find     available  gears  to  turn  at  the  desired  speed.   Using  solid  Works,  a  1:10  scaled  model     of  the  dam  was  created  to  be  built    with   Steel.   A  true  challenge  for  an  ME,  electrical!   We  used  a  DC  motor  with  variable  speeds,   so  a  controller  from  Dart  and  a  4  DTP  switch     was  used.  All  wiring  was  done  in  team  with  the     help  of  other  students  in  electrical  engineering.   The  dam  was  built  with  steel  components,   Using  such  skills  as  milling,  welding,  drilling,  and   Team  work.  The  project  was  an  success  and  is  being     Further  used  at  CSUS  for  hydraulic  studies,