SlideShare uma empresa Scribd logo
1 de 5
Baixar para ler offline
Franklyn Lemus
Lead Piping Engineer
lemusfx@gmail.com
Resume
Page 1
SUMMARY
Over 15 years of experience in the role of Lead Piping Engineer in EPC/PMC Projects in the Oil and Gas,
Infrastructure industry. Proved experience in the coordination and revision of Design and field engineering
deliverables and activities. Man-Hours calculation & Schedule as per Project requirement. Proven efficiency
management of staff, budget, resulting in profitable projects. Strict compliance with safety regulations in the design
as part of the best engineering practices with strong support in the Department of HSE. Adept to International Codes
such as ASME, API, ASTM, NFPA, BS, NACE, AWWA, etc. Coordinator of field studies to ensure accurate design
revamps. As a group leader fully committed to ensure compliance with all aspects of safety, operability,
maintainability, codes and standards, specifications, contractual obligations and accepted within the activities of
engineers / technical practices. Relevant software expertise, including CAESAR II, Naviswork, SmartPlan Review.
Determine piping class specifications according to ASME B31.3, relevant ASME dimensional and pressure-integrity
standards, with respect to given fluid classification and base material requirements.
EXPERIENCE
2015 – Present
2004 – 2015
Lead Design Engineer - Piping, WorleyParsons – Resources & Energy (Current
Employer), Kuwait
5 BILLION USD PROJECT LOWER FARS HEAVY OIL. EPC review, Schedules and Technical
Document Register (TDR) review. Contractor deliverables reviews and approvals for the compliance
of the contract, KOC Standards and international codes. Technical Bid Evaluation and Material
requisition reviews and approvals. 3D model reviews, safety meetings and studies including HAZOP
and procedures. Interdisciplinary engineering reviews. Review and approval of 35 transmittals per
week as per project requirements.
160 MILLION USD SULAIBIYA WASTE WATER TREATMENT PLANT (SWWTP). EPC review,
Schedules and Technical Document Register (TDR) review. Contractor deliverables reviews and
approvals for the compliance of the contract, KOC Standards and international codes, Pipe Routing
validation and inter-discipline coordination, Tie-In point validation with related facilities. Site Support.
3D model reviews, safety meetings and studies including HAZOP and procedures. Interdisciplinary
engineering reviews. Review of 15 transmittal per week as per project requirements
Lead Piping Engineer, Technip, Venezuela
AGRO-INDUSTRIAL COMPLEX I BARINAS. Preparation of Basic and Detail Engineering on
Composting Systems, Steam Generation Plant, Power Plant, Diesel System, Fire System, Purification
System. Preparation of technical deliverables including, Plot Plan, Isometric, Plant layouts, hydraulic
calculation and design of fire protection systems. Rotary and Static Equipment Data Sheets reviews.
Coordination of Staff and Man-Hours for the discipline.
Franklyn Lemus
Lead Piping Engineer
lemusfx@gmail.com
Resume
Page 2
BASIC ENGINEERING SKID GAS OXYGEN PRODUCTION OF SULPHUR RECOVERY UNIT OF
IMPROVEMENT. PETROANZOATEGUI. Deliverables Review and coordination of mechanical staff.
YPERGAS YUCAL PLACER - PROJECT N2/N3. BASIC AND DETAIL Lead the team in developing
piping layouts, isometrics, Plot Plan, Sections and Details. 3D model review and coordinate the
change of scope related to technical request form the client. Manage budget of piping discipline,
Man-Hours control to adhere to the schedule established under functional, safe and efficient designs,
together with the disciplines involved (Process, Civil, Mechanical Equipment, Electrical and
Instrumentation).
ENGINEERING, PROCUREMENT AND CONSTRUCTION OF NAPHTHA HYDROTREATING
PLANT HNAY-PDVSA PARAGUANA REFINING COMPLEX (PRC). Participate in meetings of the
Coordination of Field Engineering. Review of the work of construction of piping systems. 3D model
review for the validation of field information needed for the development of the Field Design Change
Notes (FDCN), based on typical arrangements, operability and maintainability of the design of piping /
equipment. Isometrics reviews. Ensure all FDCN comply with all aspects of Safety, Operability,
Maintainability, codes and standards, specifications, contractual obligations and accepted practices.
Follow up field inquiry by the contractor on piping discipline. Check the impacts on cost and schedule
of implementation of field changes. Review “As Built" drawings. Ensure that the contractor has all the
technical documentation required for optimal execution of works. Ensure the full compliance with
FEED and Approved Changes in the Construction phase by the contractor.
PURCHASE AND INSTALLATION OF CENTRIFUGAL COMPRESSOR TO SUPPLY AIR TO
NITROGEN PLANT NIAY. PRC. Plot Plan Design, Review Installation details drawings. Support for
updating P&ID.
SLUDGE TREATMENT AND INJECTION OILING IN DELAYED COKING UNITS OF PARAGUANA
REFINING COMPLEX (PRC) . Field Survey for MTO estimation from tie-ins to off sites plants DCU
and the CRAY Amuay and Cardon refineries respectively. Metric calculations and MTO/BOM. Sludge
systems and service piping routing. Preparation of Tie-ins Schedule (isometric, painting and welding
specifications that apply to each tie-in, etc.) and Material Requirements for tie-ins and scope of the
work of implementing the tie-ins and all other deliverables.
VIRGIN AND CRACKED SLOP SEPARATION OF PRC. Field Survey to stablish de definite route of
lines interconnecting the CRAY, FKAY, SWAY, Flare area 5, TK-179/180 tanks of the Amuay
Refinery. Preparation of Design Criteria, Piping Materials Specifications, MTO, BOM. Piping Layouts,
Nozzles New Location in Tanks, Blanketing System Details, Plot Plan, Foam Fire System drawings.
Instrument connection details. Support development of P&ID, etc.
ADEQUACY OF THE NHT UNIT FOR CRACKED NAPHTA HANDLING. PHASE 1. PRC. Plot Plan
Design. Support for updating P&ID.
CONSTRUCTION OF RETAINING WALLS IN YARD TANKS STORAGE AREA AND LUBRICANTS
AMUAY DISTILLATION UNIT. PRC. Field Survey, Gathering existing information regarding Current
Fire Protection System, Piping Layouts, Plot Plan. Development of Design Basis and Criteria, Piping
Franklyn Lemus
Lead Piping Engineer
lemusfx@gmail.com
Resume
Page 3
Design, Specification of: Materials, Fire System, Construction. Development of MTO and RAM.
Design of unit firefighting network. Verification of tie-ins in site for existing Firefighting connections.
ENGINEERING PLANT STORAGE AND DISTRIBUTION OF PETROLEUM DERIVED FUELS,
ACAJUTLA, EL SALVADOR. PHASE I EXTENDED BASIC ENGINEERING (IBE) AND FAST
TRACK. Design piping system under ASME B31.3. Review of Tank design under API standards,
Specifications: Materials, Welding HDPE, Construction, Tie-Ins, Hydrostatic Testing. BOM, Material
requisitions, Design of Piping Layouts. P&ID Verification. Piping Team Coordination.
NEW BUILDING ROOM REFINERY AMUAY. PRC. Review of relevant documents and project
drawings of Mechanical Equipment and Fire Fighting System Coordination of mechanical staff.
CONSTRUCTION OF BUILDING FOR CHLOROPAC SYSTEM FOR MODULES A1 / A2 and B1 /
B2 EBAS-2 AMUAY. PRC. Deliverables review for the installation of an HVAC system. Coordination
of mechanical staff.
EXTENSION OF HEADQUARTERS AND PARKING NEOA AMUAY (INCLUDES OFFICES FOR
MENPET). Review of technical deliverables of Mechanical Equipment Coordinating activities of
personnel and equipment designers.
AMUAY SUPPLIES REINSTRUMENTATION. PRC. Review of technical deliverables of Mechanical
Equipment Coordinating activities of personnel and equipment designers. Review installation
drawings radar in storage tanks.
BASIC ENGINEERING DEGASSING SECTION SUAY 1/2-CRP AMUAY. Review of technical
deliverables of Mechanical Equipment Coordinating activities of personnel and equipment designers.
AMINE TREATMENT PLANT SULFUR SUAY 1/2/3”, PDVSA. PRC.
Adequacy Sour Gas Systems SUAY 1/2: Field Survey, Design Review for Piping Layouts,
Dismantling drawings, Installation Details Burner / Furnace / Boiler drawings, Instrument
Connection Details drawings, MTO, BOM, Technical Specifications. Welding and Materials
Specifications as special design conditions (NACE).
Dismantling of Equipment and Piping in SUAY 3 (Sulfreen): Field survey, Piping Dismantling
Layouts, Dismantling Procedure.
Burner X-971 Installation of Suay 3 Unit: Field survey, Design of piping layouts, Burner
Installation Details, Instrument Connection Details, MTO, BOM.
MONITORING OF ROTATING EQUIPMENT ONLINE PRC-Phase I. (DETAIL ENGINEERING),
PDVSA. Field Survey. Bases and Design Criteria, Verification and Updating of existing conditions
measuring process variables related to the equipment. Update MTO/BOM. Design Installing Flow
Meters Wedgemeters drawings. Site verification for instruments existing connections. Preparation of
Specifications: Materials, Paint & Coating, Insulation, Welding, Construction, Tie-Ins, Hydrostatic
Testing.
Franklyn Lemus
Lead Piping Engineer
lemusfx@gmail.com
Resume
Page 4
SEWAGE PIPE REPLACEMENT JUDIBANA SEWAGE TREATMENT PLANT AMUAY, PDVSA
PRC. Field Survey, Routing of the New buried PEAD Pipe. Development of Design Basis and Criteria,
Piping Design, Specification: Materials, Welding HDPE, Construction, Tie-Ins, Hydrostatic Testing.
Metric Computation. MTO/BOM. Design of Details Drawings, Piping Layout. Verification Field Tie-ins.
Support in developing P&ID.
NEW REFINERY CHEMICAL LABORATORY CARDÓN REFINERY. PDVSA PRC. Review
requirements PDVSA, design evaluation and proposal of recommendations applied to the documents
generated in the Basic Engineering Phase by others and developed by others, based on current
regulations. Assessment Requirements HVAC System, Fire Fighting System and Service Piping
System
NEW COOLING WATER LINE 66 (EBAS II)- AMUAY REFINERY. PDVSA PRC. Field Survey.
Development of Design Basis and Criteria, Scope of Mechanical Works, Verification and Registration
of existing conditions measuring process variables of related equipment. Preparation of Bill of
Materials, Metric Computation, MTO. Design and Piping Layout Review for 66" pipe under AWWA
specifications including: Hydrostatic, Construction Materials and Piping Class, Welding, and Tie-ins
folder.
REPLACEMENT AIR CONDITIONING SYSTEM FOR PACKING PLANT LUBRICANTS CARDÓN.
PDVSA PRC. Field survey, Design and Development of piping layout, Details drawings, Line
Diagram. Preparation of Bases and Design Criteria, Memory Calculation, Calculation of Dynamic and
Static Losses, Piping Technical Specifications, Technical Specifications 100% Team Fresh Air,
Construction Specifications, Request for exhaust fans, Unit 100% Fresh Air Data Sheet.
ADEQUACY AND CONDITIONING OF TANK YARD OF LUBRICANTS UNIT REFINERY-
DELTAVEN CARDÓN. PDVSA PRC. Field Survey, Analysis and Evaluation of Drainage System,
Drainage Piping Layouts and Pumping Station drawings.
FRESH AIR SUPPLY TO SUB-STATION 21. BLOCK 21 OF CRP AMUAY. PDVSA PRC. Field
Survey, routing Pipe, Design and Development of Piping Layouts, Details drawings, Isometrics, Line
Diagram. Preparation of Design Basis and Criteria, Memory Calculation, Calculation of Dynamic and
Static Losses, Piping Technical Specifications, Technical Specifications of blowers, Construction
Specifications, Equipment Requisition Blowers and Blower Equipment Selection.
INSTALLING NEW COMPRESSOR GAS RECYCLE OF THE CRP HDS CARDÓN. PDVSA PRC.
Preparation of Bases and Design Criteria, Standard Piping Material Specifications, Specifications of
Thermal Insulation for Pipes, documents etc. Preparation of lists, documents and drawings for the
project. Computations Piping Materials and Requisitions.
2002 - 2003 Reliability Engineer, Tecnoconsult. S. A., Venezuela
Reliability Engineering Department PRC. Development of a maintenance program based on
criticality for plant equipment manufacturing unit of High Octane. Application of FMEA to the
mechanical systems under study. Development of technical and economic information CRP
(Paraguana Refining Complex) problems. Root Cause Analysis of problems impacting CRP. FMEA
Franklyn Lemus
Lead Piping Engineer
lemusfx@gmail.com
Resume
Page 5
development to identify problems in the CRP. Root Cause Analysis to recurrent problems of CRP.
Selection tool in the CRP operational reliability. Cost-Benefit-Risk Analysis. Flexibility Analysis and
pipe supports for processing lines.
EDUCATION
MECHANICAL ENGINEER (Bachelor's degree), UNEFM, 2001
REGISTRATIONS/AFFILIATIONS
Venezuela Engineers Bureau (CIV 135428)
LANGUAGES
• English
• Spanish
COMPUTER SKILLS
• Autodesk Navisworks
• SmartPlant Review
• AutoCAD
• Bentley Microstation
• MS Office
• CAESAR II

Mais conteúdo relacionado

Mais procurados

Mais procurados (18)

Resume' history
Resume' historyResume' history
Resume' history
 
JG Mech Eng CV
JG Mech Eng CVJG Mech Eng CV
JG Mech Eng CV
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineer
 
Tandur_Poornima_CV
Tandur_Poornima_CVTandur_Poornima_CV
Tandur_Poornima_CV
 
Lisa_zhang2016 piping designer -new
Lisa_zhang2016 piping designer -newLisa_zhang2016 piping designer -new
Lisa_zhang2016 piping designer -new
 
Hossein emadi CV
Hossein emadi CVHossein emadi CV
Hossein emadi CV
 
RAMESH PIPING STRESS ENGINEER
RAMESH PIPING STRESS ENGINEERRAMESH PIPING STRESS ENGINEER
RAMESH PIPING STRESS ENGINEER
 
CV for Bob Gao 022017
CV for Bob Gao 022017CV for Bob Gao 022017
CV for Bob Gao 022017
 
KUMARESH.CV
KUMARESH.CVKUMARESH.CV
KUMARESH.CV
 
Jai Prakash sharma CV
Jai Prakash sharma CVJai Prakash sharma CV
Jai Prakash sharma CV
 
RSUME-ENGLISH-DETAIL
RSUME-ENGLISH-DETAILRSUME-ENGLISH-DETAIL
RSUME-ENGLISH-DETAIL
 
Lory Francis Navor - CV
Lory Francis Navor - CVLory Francis Navor - CV
Lory Francis Navor - CV
 
Calvin Jamerson Resume 09-12-2015a
Calvin Jamerson Resume 09-12-2015aCalvin Jamerson Resume 09-12-2015a
Calvin Jamerson Resume 09-12-2015a
 
DURIO-RESUME
DURIO-RESUMEDURIO-RESUME
DURIO-RESUME
 
Senthil Nathan Senior Piping Stress Engineer
Senthil Nathan Senior Piping Stress EngineerSenthil Nathan Senior Piping Stress Engineer
Senthil Nathan Senior Piping Stress Engineer
 
Cv mr. orhan degermenci (lead pipeline engineer)
Cv   mr. orhan degermenci (lead pipeline engineer)Cv   mr. orhan degermenci (lead pipeline engineer)
Cv mr. orhan degermenci (lead pipeline engineer)
 
KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2KPH- 4-2-15 resume-v2
KPH- 4-2-15 resume-v2
 
Resume Ramagost k 8 2016
Resume Ramagost k 8 2016Resume Ramagost k 8 2016
Resume Ramagost k 8 2016
 

Semelhante a Resume Frank Lemus Jan 2017

Semelhante a Resume Frank Lemus Jan 2017 (20)

Engineering
EngineeringEngineering
Engineering
 
Engineering
EngineeringEngineering
Engineering
 
CV-NKN-09.05.16
CV-NKN-09.05.16CV-NKN-09.05.16
CV-NKN-09.05.16
 
Curriculum caab ver english
Curriculum caab ver englishCurriculum caab ver english
Curriculum caab ver english
 
TARIQUE ALSTOM
TARIQUE ALSTOMTARIQUE ALSTOM
TARIQUE ALSTOM
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
abhinav rawat resume
abhinav rawat resumeabhinav rawat resume
abhinav rawat resume
 
Saurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CV
 
ptsresume[1]
ptsresume[1]ptsresume[1]
ptsresume[1]
 
Nirmal_Resume
Nirmal_ResumeNirmal_Resume
Nirmal_Resume
 
03 Mohamed_fathi
03 Mohamed_fathi03 Mohamed_fathi
03 Mohamed_fathi
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
JBP_Resume
JBP_ResumeJBP_Resume
JBP_Resume
 
SUMER_MECH_Er
SUMER_MECH_ErSUMER_MECH_Er
SUMER_MECH_Er
 
MY CV AB - Lng-2014
MY  CV AB - Lng-2014MY  CV AB - Lng-2014
MY CV AB - Lng-2014
 
mechanical cv
mechanical cvmechanical cv
mechanical cv
 
Steve Chu resume
Steve Chu resumeSteve Chu resume
Steve Chu resume
 
Suman Professional
Suman ProfessionalSuman Professional
Suman Professional
 
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
2.-Introduction-to-Process-Plant-Layout-and-Piping-Design.pptx
 

Resume Frank Lemus Jan 2017

  • 1. Franklyn Lemus Lead Piping Engineer lemusfx@gmail.com Resume Page 1 SUMMARY Over 15 years of experience in the role of Lead Piping Engineer in EPC/PMC Projects in the Oil and Gas, Infrastructure industry. Proved experience in the coordination and revision of Design and field engineering deliverables and activities. Man-Hours calculation & Schedule as per Project requirement. Proven efficiency management of staff, budget, resulting in profitable projects. Strict compliance with safety regulations in the design as part of the best engineering practices with strong support in the Department of HSE. Adept to International Codes such as ASME, API, ASTM, NFPA, BS, NACE, AWWA, etc. Coordinator of field studies to ensure accurate design revamps. As a group leader fully committed to ensure compliance with all aspects of safety, operability, maintainability, codes and standards, specifications, contractual obligations and accepted within the activities of engineers / technical practices. Relevant software expertise, including CAESAR II, Naviswork, SmartPlan Review. Determine piping class specifications according to ASME B31.3, relevant ASME dimensional and pressure-integrity standards, with respect to given fluid classification and base material requirements. EXPERIENCE 2015 – Present 2004 – 2015 Lead Design Engineer - Piping, WorleyParsons – Resources & Energy (Current Employer), Kuwait 5 BILLION USD PROJECT LOWER FARS HEAVY OIL. EPC review, Schedules and Technical Document Register (TDR) review. Contractor deliverables reviews and approvals for the compliance of the contract, KOC Standards and international codes. Technical Bid Evaluation and Material requisition reviews and approvals. 3D model reviews, safety meetings and studies including HAZOP and procedures. Interdisciplinary engineering reviews. Review and approval of 35 transmittals per week as per project requirements. 160 MILLION USD SULAIBIYA WASTE WATER TREATMENT PLANT (SWWTP). EPC review, Schedules and Technical Document Register (TDR) review. Contractor deliverables reviews and approvals for the compliance of the contract, KOC Standards and international codes, Pipe Routing validation and inter-discipline coordination, Tie-In point validation with related facilities. Site Support. 3D model reviews, safety meetings and studies including HAZOP and procedures. Interdisciplinary engineering reviews. Review of 15 transmittal per week as per project requirements Lead Piping Engineer, Technip, Venezuela AGRO-INDUSTRIAL COMPLEX I BARINAS. Preparation of Basic and Detail Engineering on Composting Systems, Steam Generation Plant, Power Plant, Diesel System, Fire System, Purification System. Preparation of technical deliverables including, Plot Plan, Isometric, Plant layouts, hydraulic calculation and design of fire protection systems. Rotary and Static Equipment Data Sheets reviews. Coordination of Staff and Man-Hours for the discipline.
  • 2. Franklyn Lemus Lead Piping Engineer lemusfx@gmail.com Resume Page 2 BASIC ENGINEERING SKID GAS OXYGEN PRODUCTION OF SULPHUR RECOVERY UNIT OF IMPROVEMENT. PETROANZOATEGUI. Deliverables Review and coordination of mechanical staff. YPERGAS YUCAL PLACER - PROJECT N2/N3. BASIC AND DETAIL Lead the team in developing piping layouts, isometrics, Plot Plan, Sections and Details. 3D model review and coordinate the change of scope related to technical request form the client. Manage budget of piping discipline, Man-Hours control to adhere to the schedule established under functional, safe and efficient designs, together with the disciplines involved (Process, Civil, Mechanical Equipment, Electrical and Instrumentation). ENGINEERING, PROCUREMENT AND CONSTRUCTION OF NAPHTHA HYDROTREATING PLANT HNAY-PDVSA PARAGUANA REFINING COMPLEX (PRC). Participate in meetings of the Coordination of Field Engineering. Review of the work of construction of piping systems. 3D model review for the validation of field information needed for the development of the Field Design Change Notes (FDCN), based on typical arrangements, operability and maintainability of the design of piping / equipment. Isometrics reviews. Ensure all FDCN comply with all aspects of Safety, Operability, Maintainability, codes and standards, specifications, contractual obligations and accepted practices. Follow up field inquiry by the contractor on piping discipline. Check the impacts on cost and schedule of implementation of field changes. Review “As Built" drawings. Ensure that the contractor has all the technical documentation required for optimal execution of works. Ensure the full compliance with FEED and Approved Changes in the Construction phase by the contractor. PURCHASE AND INSTALLATION OF CENTRIFUGAL COMPRESSOR TO SUPPLY AIR TO NITROGEN PLANT NIAY. PRC. Plot Plan Design, Review Installation details drawings. Support for updating P&ID. SLUDGE TREATMENT AND INJECTION OILING IN DELAYED COKING UNITS OF PARAGUANA REFINING COMPLEX (PRC) . Field Survey for MTO estimation from tie-ins to off sites plants DCU and the CRAY Amuay and Cardon refineries respectively. Metric calculations and MTO/BOM. Sludge systems and service piping routing. Preparation of Tie-ins Schedule (isometric, painting and welding specifications that apply to each tie-in, etc.) and Material Requirements for tie-ins and scope of the work of implementing the tie-ins and all other deliverables. VIRGIN AND CRACKED SLOP SEPARATION OF PRC. Field Survey to stablish de definite route of lines interconnecting the CRAY, FKAY, SWAY, Flare area 5, TK-179/180 tanks of the Amuay Refinery. Preparation of Design Criteria, Piping Materials Specifications, MTO, BOM. Piping Layouts, Nozzles New Location in Tanks, Blanketing System Details, Plot Plan, Foam Fire System drawings. Instrument connection details. Support development of P&ID, etc. ADEQUACY OF THE NHT UNIT FOR CRACKED NAPHTA HANDLING. PHASE 1. PRC. Plot Plan Design. Support for updating P&ID. CONSTRUCTION OF RETAINING WALLS IN YARD TANKS STORAGE AREA AND LUBRICANTS AMUAY DISTILLATION UNIT. PRC. Field Survey, Gathering existing information regarding Current Fire Protection System, Piping Layouts, Plot Plan. Development of Design Basis and Criteria, Piping
  • 3. Franklyn Lemus Lead Piping Engineer lemusfx@gmail.com Resume Page 3 Design, Specification of: Materials, Fire System, Construction. Development of MTO and RAM. Design of unit firefighting network. Verification of tie-ins in site for existing Firefighting connections. ENGINEERING PLANT STORAGE AND DISTRIBUTION OF PETROLEUM DERIVED FUELS, ACAJUTLA, EL SALVADOR. PHASE I EXTENDED BASIC ENGINEERING (IBE) AND FAST TRACK. Design piping system under ASME B31.3. Review of Tank design under API standards, Specifications: Materials, Welding HDPE, Construction, Tie-Ins, Hydrostatic Testing. BOM, Material requisitions, Design of Piping Layouts. P&ID Verification. Piping Team Coordination. NEW BUILDING ROOM REFINERY AMUAY. PRC. Review of relevant documents and project drawings of Mechanical Equipment and Fire Fighting System Coordination of mechanical staff. CONSTRUCTION OF BUILDING FOR CHLOROPAC SYSTEM FOR MODULES A1 / A2 and B1 / B2 EBAS-2 AMUAY. PRC. Deliverables review for the installation of an HVAC system. Coordination of mechanical staff. EXTENSION OF HEADQUARTERS AND PARKING NEOA AMUAY (INCLUDES OFFICES FOR MENPET). Review of technical deliverables of Mechanical Equipment Coordinating activities of personnel and equipment designers. AMUAY SUPPLIES REINSTRUMENTATION. PRC. Review of technical deliverables of Mechanical Equipment Coordinating activities of personnel and equipment designers. Review installation drawings radar in storage tanks. BASIC ENGINEERING DEGASSING SECTION SUAY 1/2-CRP AMUAY. Review of technical deliverables of Mechanical Equipment Coordinating activities of personnel and equipment designers. AMINE TREATMENT PLANT SULFUR SUAY 1/2/3”, PDVSA. PRC. Adequacy Sour Gas Systems SUAY 1/2: Field Survey, Design Review for Piping Layouts, Dismantling drawings, Installation Details Burner / Furnace / Boiler drawings, Instrument Connection Details drawings, MTO, BOM, Technical Specifications. Welding and Materials Specifications as special design conditions (NACE). Dismantling of Equipment and Piping in SUAY 3 (Sulfreen): Field survey, Piping Dismantling Layouts, Dismantling Procedure. Burner X-971 Installation of Suay 3 Unit: Field survey, Design of piping layouts, Burner Installation Details, Instrument Connection Details, MTO, BOM. MONITORING OF ROTATING EQUIPMENT ONLINE PRC-Phase I. (DETAIL ENGINEERING), PDVSA. Field Survey. Bases and Design Criteria, Verification and Updating of existing conditions measuring process variables related to the equipment. Update MTO/BOM. Design Installing Flow Meters Wedgemeters drawings. Site verification for instruments existing connections. Preparation of Specifications: Materials, Paint & Coating, Insulation, Welding, Construction, Tie-Ins, Hydrostatic Testing.
  • 4. Franklyn Lemus Lead Piping Engineer lemusfx@gmail.com Resume Page 4 SEWAGE PIPE REPLACEMENT JUDIBANA SEWAGE TREATMENT PLANT AMUAY, PDVSA PRC. Field Survey, Routing of the New buried PEAD Pipe. Development of Design Basis and Criteria, Piping Design, Specification: Materials, Welding HDPE, Construction, Tie-Ins, Hydrostatic Testing. Metric Computation. MTO/BOM. Design of Details Drawings, Piping Layout. Verification Field Tie-ins. Support in developing P&ID. NEW REFINERY CHEMICAL LABORATORY CARDÓN REFINERY. PDVSA PRC. Review requirements PDVSA, design evaluation and proposal of recommendations applied to the documents generated in the Basic Engineering Phase by others and developed by others, based on current regulations. Assessment Requirements HVAC System, Fire Fighting System and Service Piping System NEW COOLING WATER LINE 66 (EBAS II)- AMUAY REFINERY. PDVSA PRC. Field Survey. Development of Design Basis and Criteria, Scope of Mechanical Works, Verification and Registration of existing conditions measuring process variables of related equipment. Preparation of Bill of Materials, Metric Computation, MTO. Design and Piping Layout Review for 66" pipe under AWWA specifications including: Hydrostatic, Construction Materials and Piping Class, Welding, and Tie-ins folder. REPLACEMENT AIR CONDITIONING SYSTEM FOR PACKING PLANT LUBRICANTS CARDÓN. PDVSA PRC. Field survey, Design and Development of piping layout, Details drawings, Line Diagram. Preparation of Bases and Design Criteria, Memory Calculation, Calculation of Dynamic and Static Losses, Piping Technical Specifications, Technical Specifications 100% Team Fresh Air, Construction Specifications, Request for exhaust fans, Unit 100% Fresh Air Data Sheet. ADEQUACY AND CONDITIONING OF TANK YARD OF LUBRICANTS UNIT REFINERY- DELTAVEN CARDÓN. PDVSA PRC. Field Survey, Analysis and Evaluation of Drainage System, Drainage Piping Layouts and Pumping Station drawings. FRESH AIR SUPPLY TO SUB-STATION 21. BLOCK 21 OF CRP AMUAY. PDVSA PRC. Field Survey, routing Pipe, Design and Development of Piping Layouts, Details drawings, Isometrics, Line Diagram. Preparation of Design Basis and Criteria, Memory Calculation, Calculation of Dynamic and Static Losses, Piping Technical Specifications, Technical Specifications of blowers, Construction Specifications, Equipment Requisition Blowers and Blower Equipment Selection. INSTALLING NEW COMPRESSOR GAS RECYCLE OF THE CRP HDS CARDÓN. PDVSA PRC. Preparation of Bases and Design Criteria, Standard Piping Material Specifications, Specifications of Thermal Insulation for Pipes, documents etc. Preparation of lists, documents and drawings for the project. Computations Piping Materials and Requisitions. 2002 - 2003 Reliability Engineer, Tecnoconsult. S. A., Venezuela Reliability Engineering Department PRC. Development of a maintenance program based on criticality for plant equipment manufacturing unit of High Octane. Application of FMEA to the mechanical systems under study. Development of technical and economic information CRP (Paraguana Refining Complex) problems. Root Cause Analysis of problems impacting CRP. FMEA
  • 5. Franklyn Lemus Lead Piping Engineer lemusfx@gmail.com Resume Page 5 development to identify problems in the CRP. Root Cause Analysis to recurrent problems of CRP. Selection tool in the CRP operational reliability. Cost-Benefit-Risk Analysis. Flexibility Analysis and pipe supports for processing lines. EDUCATION MECHANICAL ENGINEER (Bachelor's degree), UNEFM, 2001 REGISTRATIONS/AFFILIATIONS Venezuela Engineers Bureau (CIV 135428) LANGUAGES • English • Spanish COMPUTER SKILLS • Autodesk Navisworks • SmartPlant Review • AutoCAD • Bentley Microstation • MS Office • CAESAR II