Case Study: Blast Furnace Gas Distribution
Dynamic Simulation models distribution of blast gas across a
steel mill and optimises modifications
Client: Multinational Steel Company
Who are we?
Process engineering consultancy
Specialising in advanced modelling techniques, to give answers that
are more accurate, reliable and robust
Expertise in HYSYS Dynamics and Dynsim
Decades of process and mechanical engineering experience
Combine cutting edge simulation with real world understanding, to
provide you with solutions that are effective and practical.
Core team of eight engineers, supported by a wide network of
associates.
Extensive simulation experience across a range of industries
Page  2
Project Background
Proposed new power plant will consume large amounts of blast gas
Best location for new blast gas connection unclear. Pipes are large >84”,
so high capital cost implications. Potential capital cost savings by using
96” against 108” pipes.
Conventional hydraulic calculations suggest that pressure drop is a
problem due to proposed location but does not take into account
fluctuations in pressure
Low pressure at inlet to power plant risks tripping adjacent power plant
as no provision to cope with low pressure.
Dynamic model expected to converge a better pressure profile and take
into account transient features that affect system pressure
Page  3
Proposed Tie Points
Page  4
Straight Length for
metering section
Location of New
Power Plant
Dynamic Simulation Scope
Blast Furnace Outlet
Blast Gas Distribution Main to Consumers
All Consumers (Stoves, Power Plants, Coke Ovens)
Flares and Pressure Control
Gas Holder
Model developed from isometrics, plant survey, trended operating data and
plant trials.
Page  5
Simulation Model – Hysys Dynamics
Page  6
Gas Holder
Flares 1 & 2
Power Plant
Blast Furnaces
& Stoves
Power Plant
Boilers
Coke Ovens New Power Plant
Rating of Models
Page  7
0
20
40
60
80
100
120
140
0
20
40
60
80
100
120
140
03-May-15 00:00:00 03-May-15 00:57:36 03-May-15 01:55:12 03-May-15 02:52:48 03-May-15 03:50:24
Flow,kNm3/hr
Pressure,mbarg
Continuous changes in system pressure observed from plant data
Dynamic fluctuations in production and consumption built into model
Equipment cycling and controller behaviour reproduced in model
Causes of pressure instability explained by modelling complex co-
incident events.
Main Modelling Observations
Large pressure fluctuations originate from a combination of rapid
changes in stoves blast gas consumption and furnace gas production
Largest fluctuation originate from older furnace as stoves consumption
erratic and furnace top cone valve oversized or poorly tuned
Gas holder level sensitive to flare flows due to its physical location on
site
Some water seals present high pressure drops suggesting partial
blockage. Gas temperature seen to fall quickly in pipes, resulting in
significant condensation of water vapour.
Page  8
Design Scenarios
Scenarios only run when model fully rated and accurately reflects plant
operation – including equipment cycling and fluctuations
Client-led scenario definition involving all team members to ensure that
scenarios are relevant and prioritised
Proposed tie-in points examined with a variety of flow conditions
reflecting current and future operating states
Looked at the impact of a sudden trip on the system and amount of
recovery time available to operator
Examined commissioning a larger inlet line to Gas Holder to dampen
fluctuations and improve trip recovery time
Page  9
Conclusion
The main purpose of the study was to examine best location for new
pipe tie ins, however, other benefits were realised when the model was
available
Concluded that the proposed tie in locations are not feasible at the
maximum design rates without making the following plant changes:
1) Gas train modifications to adjacent power plant to cope with lower
inlet pressures
2) Stabilising blast gas pressures from older furnace
3) Commissioning larger line into the gas holder to dampen pressure
spikes
Page  10
Summary
Dynamic Model demonstrated that a blast gas distribution system could
be modelled with sufficient detail to allow system characteristics to be
analysed
Static and transient characteristics that were invisible to a static
hydraulic model or through simple analysis of excel data were better
explained
Ease of running scenarios, engaged interest from relevant parties and
helped process understanding
Restarted optimisation projects previously shelved through lack of data
Avoided project failure, by identifying significant shortcomings in
proposed design
Page  11
Summary
Page  12
Consultancy.
Project Delivery.
Innovation.
Please get in touch to find out how we can help your
business today.
E: enquiries@flexprocess.co.uk W: flexprocess.co.uk
T: +44 1454 629 689

Mais conteúdo relacionado

Mais procurados

STS Product Sheet Final
STS Product Sheet FinalSTS Product Sheet Final
STS Product Sheet Final
Kevin J. Lord
 
Kealii Ribao - Lam Research MECOP Project List
Kealii Ribao - Lam Research MECOP Project ListKealii Ribao - Lam Research MECOP Project List
Kealii Ribao - Lam Research MECOP Project List
Kealii Ribao
 
Improving The Reliability Of Differential Pressure Level Instrumentation
Improving The Reliability Of Differential Pressure Level InstrumentationImproving The Reliability Of Differential Pressure Level Instrumentation
Improving The Reliability Of Differential Pressure Level Instrumentation
Osemhen Akhibi
 
Welck_Joshua_Resume
Welck_Joshua_ResumeWelck_Joshua_Resume
Welck_Joshua_Resume
Joshua Welck
 
Czero Engineering - Feb 2017
Czero Engineering  - Feb 2017Czero Engineering  - Feb 2017
Czero Engineering - Feb 2017
Czero
 
Brayton Energy SunShot Poster 2016-04-07
Brayton Energy SunShot Poster 2016-04-07Brayton Energy SunShot Poster 2016-04-07
Brayton Energy SunShot Poster 2016-04-07
Shaun Sullivan
 
Combined Heat and Power Engineering and Installation in the Pacific NW
Combined Heat and Power Engineering and Installation in the Pacific NWCombined Heat and Power Engineering and Installation in the Pacific NW
Combined Heat and Power Engineering and Installation in the Pacific NW
melanie_bissonnette
 
Kobe Galloway2 _10-2014
Kobe Galloway2 _10-2014Kobe Galloway2 _10-2014
Kobe Galloway2 _10-2014
Kobe Galloway
 

Mais procurados (18)

STS Product Sheet Final
STS Product Sheet FinalSTS Product Sheet Final
STS Product Sheet Final
 
How Material Science Helps Operators with End of Warranty Inspections
How Material Science Helps Operators with End of Warranty InspectionsHow Material Science Helps Operators with End of Warranty Inspections
How Material Science Helps Operators with End of Warranty Inspections
 
Ek portfolio.2
Ek portfolio.2Ek portfolio.2
Ek portfolio.2
 
Kealii Ribao - Lam Research MECOP Project List
Kealii Ribao - Lam Research MECOP Project ListKealii Ribao - Lam Research MECOP Project List
Kealii Ribao - Lam Research MECOP Project List
 
DigitalClone® Wind Turbine Validations
DigitalClone® Wind Turbine ValidationsDigitalClone® Wind Turbine Validations
DigitalClone® Wind Turbine Validations
 
Improving The Reliability Of Differential Pressure Level Instrumentation
Improving The Reliability Of Differential Pressure Level InstrumentationImproving The Reliability Of Differential Pressure Level Instrumentation
Improving The Reliability Of Differential Pressure Level Instrumentation
 
Welck_Joshua_Resume
Welck_Joshua_ResumeWelck_Joshua_Resume
Welck_Joshua_Resume
 
AdamEshkanian_EngProjects
AdamEshkanian_EngProjectsAdamEshkanian_EngProjects
AdamEshkanian_EngProjects
 
Czero Engineering - Feb 2017
Czero Engineering  - Feb 2017Czero Engineering  - Feb 2017
Czero Engineering - Feb 2017
 
Case studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industryCase studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industry
 
Brayton Energy SunShot Poster 2016-04-07
Brayton Energy SunShot Poster 2016-04-07Brayton Energy SunShot Poster 2016-04-07
Brayton Energy SunShot Poster 2016-04-07
 
Combined Heat and Power Engineering and Installation in the Pacific NW
Combined Heat and Power Engineering and Installation in the Pacific NWCombined Heat and Power Engineering and Installation in the Pacific NW
Combined Heat and Power Engineering and Installation in the Pacific NW
 
IRJET- Improvement of Coefficient of Performance of ICE Plant
IRJET- Improvement of Coefficient of Performance of ICE PlantIRJET- Improvement of Coefficient of Performance of ICE Plant
IRJET- Improvement of Coefficient of Performance of ICE Plant
 
Cliff Resume 2016
Cliff Resume 2016Cliff Resume 2016
Cliff Resume 2016
 
Kobe Galloway2 _10-2014
Kobe Galloway2 _10-2014Kobe Galloway2 _10-2014
Kobe Galloway2 _10-2014
 
ResumeATR
ResumeATRResumeATR
ResumeATR
 
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaRV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey Australia
 
Jonathan Naughton - V&V of Models for Wind Turbine and Wind Plant Aerodynamic...
Jonathan Naughton - V&V of Models for Wind Turbine and Wind Plant Aerodynamic...Jonathan Naughton - V&V of Models for Wind Turbine and Wind Plant Aerodynamic...
Jonathan Naughton - V&V of Models for Wind Turbine and Wind Plant Aerodynamic...
 

Destaque

Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
foxycrow
 

Destaque (11)

A strategy for an efficient simulation of countcorrent flows in the iron blas...
A strategy for an efficient simulation of countcorrent flows in the iron blas...A strategy for an efficient simulation of countcorrent flows in the iron blas...
A strategy for an efficient simulation of countcorrent flows in the iron blas...
 
The Furnace Design Co.
The Furnace Design Co.The Furnace Design Co.
The Furnace Design Co.
 
Design Automation of Blast Furnace
Design Automation of Blast FurnaceDesign Automation of Blast Furnace
Design Automation of Blast Furnace
 
Induction Furnace
Induction FurnaceInduction Furnace
Induction Furnace
 
panki power plant training.ppt
panki power plant training.pptpanki power plant training.ppt
panki power plant training.ppt
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal Power Plants
Thermal Power PlantsThermal Power Plants
Thermal Power Plants
 
Steam power plant
Steam power plantSteam power plant
Steam power plant
 
Boiler Presentation
Boiler PresentationBoiler Presentation
Boiler Presentation
 
Cfb boiler basic design, operation and maintenance
Cfb boiler basic design, operation and maintenanceCfb boiler basic design, operation and maintenance
Cfb boiler basic design, operation and maintenance
 
Slideshare ppt
Slideshare pptSlideshare ppt
Slideshare ppt
 

Semelhante a Case Study: Blast Furnace Gas Distribution

Kalepa Tech Engineering V09
Kalepa Tech Engineering V09Kalepa Tech Engineering V09
Kalepa Tech Engineering V09
kceridon
 
Manuscript_Guofu Chen_Designing and Achieving Geothermal Power Plants Perform...
Manuscript_Guofu Chen_Designing and Achieving Geothermal Power Plants Perform...Manuscript_Guofu Chen_Designing and Achieving Geothermal Power Plants Perform...
Manuscript_Guofu Chen_Designing and Achieving Geothermal Power Plants Perform...
Guofu Chen
 

Semelhante a Case Study: Blast Furnace Gas Distribution (20)

Case Study: Natural Gas Letdown Reliability
Case Study: Natural Gas Letdown ReliabilityCase Study: Natural Gas Letdown Reliability
Case Study: Natural Gas Letdown Reliability
 
Case Study: Resin Reactor Vent Analysis
Case Study: Resin Reactor Vent AnalysisCase Study: Resin Reactor Vent Analysis
Case Study: Resin Reactor Vent Analysis
 
Case Study: Column Relief Study
Case Study: Column Relief StudyCase Study: Column Relief Study
Case Study: Column Relief Study
 
Soot blowing and advantages
Soot blowing and advantagesSoot blowing and advantages
Soot blowing and advantages
 
Project services offering (november 2016)
Project services offering (november 2016)Project services offering (november 2016)
Project services offering (november 2016)
 
Compare cryogenic process
Compare cryogenic processCompare cryogenic process
Compare cryogenic process
 
Handbook of mechanical engineering calculations
Handbook of mechanical engineering calculationsHandbook of mechanical engineering calculations
Handbook of mechanical engineering calculations
 
Enhanced Multi – Agent Based Industrial Process Automation
Enhanced Multi – Agent Based Industrial Process AutomationEnhanced Multi – Agent Based Industrial Process Automation
Enhanced Multi – Agent Based Industrial Process Automation
 
Report on improved efficiency of gas turbine final
Report on improved efficiency of gas turbine finalReport on improved efficiency of gas turbine final
Report on improved efficiency of gas turbine final
 
Kalepa Tech Engineering V09
Kalepa Tech Engineering V09Kalepa Tech Engineering V09
Kalepa Tech Engineering V09
 
Ijmet 06 09_006
Ijmet 06 09_006Ijmet 06 09_006
Ijmet 06 09_006
 
Power supply
Power supplyPower supply
Power supply
 
Optimizing the Steam Generation Cycle and Condensate Recovery Process
Optimizing the Steam Generation Cycle and Condensate Recovery ProcessOptimizing the Steam Generation Cycle and Condensate Recovery Process
Optimizing the Steam Generation Cycle and Condensate Recovery Process
 
Optimizing the Steam Generation Cycle and Condensate Recovery Process
Optimizing the Steam Generation Cycle and Condensate Recovery ProcessOptimizing the Steam Generation Cycle and Condensate Recovery Process
Optimizing the Steam Generation Cycle and Condensate Recovery Process
 
Manuscript_Guofu Chen_Designing and Achieving Geothermal Power Plants Perform...
Manuscript_Guofu Chen_Designing and Achieving Geothermal Power Plants Perform...Manuscript_Guofu Chen_Designing and Achieving Geothermal Power Plants Perform...
Manuscript_Guofu Chen_Designing and Achieving Geothermal Power Plants Perform...
 
Review on Boiler Control Automation for Sugar Industries
Review on Boiler Control Automation for Sugar IndustriesReview on Boiler Control Automation for Sugar Industries
Review on Boiler Control Automation for Sugar Industries
 
Dynamic future flare_design2020
Dynamic future flare_design2020Dynamic future flare_design2020
Dynamic future flare_design2020
 
Final senior design project report
Final senior design project report Final senior design project report
Final senior design project report
 
BVAA presentation 2015: The Use of CFD to assess valve performance and operat...
BVAA presentation 2015: The Use of CFD to assess valve performance and operat...BVAA presentation 2015: The Use of CFD to assess valve performance and operat...
BVAA presentation 2015: The Use of CFD to assess valve performance and operat...
 
Case study-optimization-cbm
Case study-optimization-cbmCase study-optimization-cbm
Case study-optimization-cbm
 

Último

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Último (20)

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 

Case Study: Blast Furnace Gas Distribution

  • 1. Consultancy. Project Delivery. Innovation. Case Study: Blast Furnace Gas Distribution Dynamic Simulation models distribution of blast gas across a steel mill and optimises modifications Client: Multinational Steel Company
  • 2. Who are we? Process engineering consultancy Specialising in advanced modelling techniques, to give answers that are more accurate, reliable and robust Expertise in HYSYS Dynamics and Dynsim Decades of process and mechanical engineering experience Combine cutting edge simulation with real world understanding, to provide you with solutions that are effective and practical. Core team of eight engineers, supported by a wide network of associates. Extensive simulation experience across a range of industries Page  2
  • 3. Project Background Proposed new power plant will consume large amounts of blast gas Best location for new blast gas connection unclear. Pipes are large >84”, so high capital cost implications. Potential capital cost savings by using 96” against 108” pipes. Conventional hydraulic calculations suggest that pressure drop is a problem due to proposed location but does not take into account fluctuations in pressure Low pressure at inlet to power plant risks tripping adjacent power plant as no provision to cope with low pressure. Dynamic model expected to converge a better pressure profile and take into account transient features that affect system pressure Page  3
  • 4. Proposed Tie Points Page  4 Straight Length for metering section Location of New Power Plant
  • 5. Dynamic Simulation Scope Blast Furnace Outlet Blast Gas Distribution Main to Consumers All Consumers (Stoves, Power Plants, Coke Ovens) Flares and Pressure Control Gas Holder Model developed from isometrics, plant survey, trended operating data and plant trials. Page  5
  • 6. Simulation Model – Hysys Dynamics Page  6 Gas Holder Flares 1 & 2 Power Plant Blast Furnaces & Stoves Power Plant Boilers Coke Ovens New Power Plant
  • 7. Rating of Models Page  7 0 20 40 60 80 100 120 140 0 20 40 60 80 100 120 140 03-May-15 00:00:00 03-May-15 00:57:36 03-May-15 01:55:12 03-May-15 02:52:48 03-May-15 03:50:24 Flow,kNm3/hr Pressure,mbarg Continuous changes in system pressure observed from plant data Dynamic fluctuations in production and consumption built into model Equipment cycling and controller behaviour reproduced in model Causes of pressure instability explained by modelling complex co- incident events.
  • 8. Main Modelling Observations Large pressure fluctuations originate from a combination of rapid changes in stoves blast gas consumption and furnace gas production Largest fluctuation originate from older furnace as stoves consumption erratic and furnace top cone valve oversized or poorly tuned Gas holder level sensitive to flare flows due to its physical location on site Some water seals present high pressure drops suggesting partial blockage. Gas temperature seen to fall quickly in pipes, resulting in significant condensation of water vapour. Page  8
  • 9. Design Scenarios Scenarios only run when model fully rated and accurately reflects plant operation – including equipment cycling and fluctuations Client-led scenario definition involving all team members to ensure that scenarios are relevant and prioritised Proposed tie-in points examined with a variety of flow conditions reflecting current and future operating states Looked at the impact of a sudden trip on the system and amount of recovery time available to operator Examined commissioning a larger inlet line to Gas Holder to dampen fluctuations and improve trip recovery time Page  9
  • 10. Conclusion The main purpose of the study was to examine best location for new pipe tie ins, however, other benefits were realised when the model was available Concluded that the proposed tie in locations are not feasible at the maximum design rates without making the following plant changes: 1) Gas train modifications to adjacent power plant to cope with lower inlet pressures 2) Stabilising blast gas pressures from older furnace 3) Commissioning larger line into the gas holder to dampen pressure spikes Page  10
  • 11. Summary Dynamic Model demonstrated that a blast gas distribution system could be modelled with sufficient detail to allow system characteristics to be analysed Static and transient characteristics that were invisible to a static hydraulic model or through simple analysis of excel data were better explained Ease of running scenarios, engaged interest from relevant parties and helped process understanding Restarted optimisation projects previously shelved through lack of data Avoided project failure, by identifying significant shortcomings in proposed design Page  11