1. Curriculum Vital
Personal Particulars
Name : Hong Boon Pun
Residential Address: Blk 323, Tampines St 33 #05-156
Singapore 520323
Residential Telephone: (65) 6789 3279
Office Address: N/A
Email: Ferdinand.hong@gmail.com
Office Telephone: N/A H/P: (65) 9831 2011
Age / Place of Birth:
40 yrs / Malaysia
Nationality:
Malaysian (SPR)
NRIC:
S7574014Z
NRIC Colour:
Blue
Sex :
Male
Marital Status :
Married
Date Of Birth:
30th
Aug 1975
Race:
Chinese
Education Qualification
Year Qualification Attained School / Institution
2003 Bachelor in Engineering (Electrical
& Electronics Engineering) 2nd
class
honor (lower division)
Nanyang Technological University
1998 Diploma with Merit (Electrical
Engineering)
Ngee Ann Polytechnic
1995 Industrial Technical Certificate with
Merit (Electrical Engineering)
Institute of Technical Education
(Macpherson)
1992 GCE ‘O’ Level Guang Yang Secondary School
Knowledge & Skills
Computer Literacy
MS word, Excel, PowerPoint, Outlook, Project Microsoft
Visio
Technical
-Passed SCEM (Singapore Certified Energy Manager) Course.
- PLC Programming.
- Control panel wiring.
- Control Circuit and electrical troubleshooting.
-Class 3 driving license.
Management
-Project management & Supervisory skills.
-Manage Personal and Team Effectiveness.
-Lean Core Training.
-Supervise workplace safety and health practices.
-ISO/TS 16949:2009 Requirements and Process Approch
Internal Auditing.
-OHSAS 18001:1999 Internal OHSMS Auditor Training
- Emergency Response Team member.
Current Salary S$57 / hour
Expected Salary S$ 6,300 (Neg)
2. Referees
John Soh, Facilities Engineer(Yr known 11yrs)
NanYang Polytechnic. Tel: (65) 9790 5491
Manjit Sidhu, Operation Manager (Yr known 12yrs)
KMG Ultra Pure Chemical Tel: (65) 8322 6345
Employment History
Novartis Singapore Pharmaceutical Manufacturing Pte Ltd
Period Served: August 2014 – May2016
Reason for Leaving: Contract ended on 31st
May
Current Remuneration: Project Engineer (Electrical and Automation)
Engaged by Novartis through Ispahan Engineering Pte Ltd.
Involved in major capital project and base plant project on Electrical & Automation
Prepare Charter presentation for new base plant project.
Provide engineering solution, sourcing for vendors and contractors for quotation and
site show.
Work with various state holders for project User Requirements Specification and
Functional design specification.
Prepare Installation/ Operation Qualification for system qualification.
Overlook project execution and manage schedule with planner for tie in.
Prepare documentation for project completion.
Follow up with vendors and contractors on field work issue.
Chevron Oronite Pte Ltd
Period Served: December 2012 – July 2014
Reason for Leaving: Contract ended on 31st
July
Current Remuneration: Project Engineer (Electrical and Instrumentation)
Involve in major capital project on Electrical & Instrumentation.
Handle management of change (MOC) which involves Electrical & Instrumentation.
To arrange scoping meeting with project coordinator and state holders once receive
the MOC to ensure all issues are being addressed.
Contact vendors and contractors for quotation and site show.
Prepare construction drawing and loop drawing for contractors.
Overlook contractors work at field and schedule with operation for tie in and
commissioning for the MOC.
Prepare documentation upon MOC completion.
Follow up with vendor and contractor with issue on instrument or field work.
Micron Semiconductor Asia Pte Ltd
Period Served: April 2010 – December 2012
Reason for Leaving: look for better prospect
Current Remuneration: Facilities Section Manager (Electrical)
Assist Equipment Engineering Support if they have problem with electrical system in
the production line.
Coordinate in all energy conservation projects and keep track on the progress and
provide report to top management.
Keep track on daily energy consumption for all areas and report out on any high
consumption.
In charge of Facilities Monitoring Control System. Overlook the system and alias
with contractors on all projects involve PLC programming and SCADA
programming.
3. Troubleshoot facility systems with instrumentation and control issue.
Ensure all electrical PM are done accordingly to schedule.
Prepare Monthly reporting on facilities systems consumption, Interruption to
Production, energy consumption against production moves, SPC report on facilities
critical parameters and safety.
In charge of all new software deployment to facility department.
Assist in preparation for ISO/TS 16949, audit.
Coordinate and planning with production on tools electrical hook up in the line.
Numonyx Pte Ltd
Period Served: April 2008 – March 2010
Reason for Leaving: Company acquired by Micron Technology
Current Remuneration: Facilities Section Head (Electrical)
Assist Equipment Engineering Support if they have problem with electrical system in
the Production line.
Coordinate in all energy conservation projects and keep track on the progress and
provide report to top management.
Keep track on daily energy consumption for all areas and report out on any high
consumption.
In charge of Facilities Monitoring Control System. Overlook the system and alias
with contractors on all projects involve PLC programming and SCADA
programming.
Troubleshoot facility systems with instrumentation and control issue.
Ensure all electrical PM are done accordingly to schedule.
Prepare Monthly reporting on facilities systems consumption, Interruption to
Production, energy consumption against production moves, SPC report on facilities
critical parameters and safety.
In charge of all new software deployment to facility department.
Assist in preparation for ISO/TS 16949 audit.
Coordinate and planning with production on tools electrical hook up in the line.
STMicroelectronics Pte Ltd
Period Served: September 2005 – March 2008
Reason for Leaving: Company spin off and merge with Intel Flash Memory Group to
form Numonyx Pte Ltd
Current Remuneration: Facilities Engineer (Electrical and Process Control)
4. In charge of Facilities Monitoring Control System. Overlook the system and alias
with contractors on all projects involve PLC programming and SCADA
programming
Troubleshoot facility systems with instrumentation and control issue.
Prepare Monthly reporting on facilities systems consumption, Interruption to
Production, energy consumption against production moves, SPC report on facilities
critical parameters and safety.
In charge of all new software deployment to facility department.
Assist in preparation for ISO 9000 audit.
Ensure all electrical PM are done accordingly to schedule.
Coordinate and planning with production on tools electrical hook up in the line.
A-Control Pte Ltd
Period Served: June 2003 – September 2005
Reason for Leaving: to look for Electrical related job and for better prospect.
Current Remuneration: Engineer
PLC programming and Control panel design.
Testing and commissioning of facilities system such as compressor, portable water
system, Power Monitoring system.
Oversea testing and commissioning such as:
Portable water system for oil platform at South China Sea.
Portable water system for oil platform at Korea
Air Compressor system for oil platform at China.
Design and set up Power monitoring system for STMicroelectronics fab and 66kV
sub-station located at Serangoon North.
Oversee & Supervise subcontractors doing work accordingly.
Schneider Electric Singapore Pte Ltd
Period Served: January 2002 – June 2002
Reason for Leaving: End of Industrial Attachment
Involved in company newest range of Air Circuit Breaker (Masterpact) product
launch.
Developed simulation circuit for MicroLogic demonstration use in the product
launch.
Built a demonstration unit on company new DC power supply for sales personnel.
Built 2 Electronic soft starter demonstration units for product launching to supplier
Asahi Techno Vision (S) Pte Ltd
Period Served: June 1998 – June 2000
Reason for Leaving: Further study at Nanyang Technological University
Current Remuneration: Assistant Foreman
5. Lead a team of technicians handling production line maintenances and
troubleshooting.
Handling production line modification in both software and hardware.
Coordinate with production engineers and contractors in modification project.
Troubleshoot faulty equipment (Programmable Logic Controller).
Provide monthly troubleshooting summary for Management meeting between
Production, Mechanical and Electrical Department.
WV Electrical Engineering
Period Served: August 1995 – June 1996
Reason for Leaving: Further study at Ngee Ann Polytechnic
Current Remuneration: Electrical Draft Person
Make amendment for project electrical layout
Onsite inspection and meeting with contractors for building electrical layout