SlideShare uma empresa Scribd logo
1 de 54
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
A Atividade Hidroviária no
Estado de São Paulo
Apresentação Básica
2014
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Navegável
Potencialmente
navegável
Estadual - SP
Federal / Outros
Tietê
Grande
Paranaíba
Paraná
Paranapanema
Piracicaba
Paraíba do Sul
Ribeira
Tibaji
Peixe
Ivaí
Iguaçu
Piquiri
Iguatemi
Amambaí
Ivinhem
a
Pardo
Paraná
Tietê
Verde Sucuriú
Pardo
Moji-Guaçu
Verde
Grande
Rede Hidroviária de Interesse de São Paulo
Águas Navegáveis e Potencialmente Navegáveis
Rio
Vias
Principais
Vias
Secundárias
TOTAL
Tietê 650 150 800
Paraná 1.100 500 1.600
TOTAL 1.750 650 2.400
RMSP
RMBS
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Hidrovia Tietê-Paraná
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Atividades Hidroviárias no Estado de São Paulo
Fluvial Marítima
Linhas Longitudinais
•Hidrovia Tietê-Paraná
•Hidroanel Metropolitano
•Hidrovias Litorâneas
•Cabotagem
Travessias
•Interiores
•Metropolitanas
•Litorâneas
Portos e Terminais •Terminais na HTP
•Santos
•São Sebastião
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Eclusas na Hidrovia Tietê-Paraná
BARRA BONITA - 1973
IBITINGA - 1986
BARIRI - 1968
PROMISSÃO - 1986
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Nova Avanhandava - 1991
Jupiá - 1998
Três Irmãos - 1994
Porto Primavera - 1999
Eclusas na Hidrovia Tietê-Paraná
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Canais Artificiais na Hidrovia Tietê-Paraná
Pereira Barreto
Promissão
Igaraçu do Tietê
Bariri (Margem Direita)
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Dispositivos de Segurança e Sinalização do Balizamento
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Dispositivos de Segurança e Sinalização do Balizamento
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Implantação de Rota de Navegação
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Centro de Controle Operacional – CCO
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Cartas Náuticas da Hidrovia Tietê-Paraná
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Eliminação de Gargalos
Proteção de Pilares de Pontes
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Eliminação de Gargalos
Ampliação de Vãos de Pontes e Proteção de Pilares
SP-461
SP-225
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
PONTES – AMPLIAÇÕES EM CONTRATAÇÃO
PILARES A SEREM
REFORÇADOS
SP-333 SP-425
PILARES A
SEREM
REMOVIDOS
PILARES A
SEREM
REFORÇADOS
TABULEIROS A SEREM SUBSTITUIDOS PELA
ESTRUTURA METÁLICA E NOVO VÃO DE
NAVEGAÇÃO AMPLIADO
TABULEIROS A SEREM SUBSTITUIDOS PELA
ESTRUTURA METÁLICA E NOVO VÃO DE
NAVEGAÇÃO AMPLIADO
PILARES A
SEREM
REMOVIDOS
Eliminação de Gargalos
Ampliação de Vãos de Pontes e Proteção de Pilares
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
PONTES – AMPLIAÇÕES EM CONTRATAÇÃOEliminação de Gargalos
Restrições com Desmembramento de Comboios
CANALDEPEREIRABARRETO
ECLUSADEN.AVANHANDAVA
SP595S.J.DOURADOS
SP463
SP425
JACARÉ
SP461
RIOPARANAIBA
BR153
RIO SÃO J.
R
IO
PIR
A
C
IC
AB
A
ECLUSADEPROMISSÃO
SP333
ECLUSADEIBITINGA
ECLUSADEBARIRI
SP225
AYROSAGALVÃO
SP255
ECLUSADEB.BONITA
SP191
SP147
ADMINISTRAÇÃO DO DH - ST
TRÁFEGO COM 4 CHATAS
TRÁFEGO COM RESTRIÇÃO PARA 2 CHATAS
TRÁFEGO COM RESTRIÇÃO PARA 1 CHATA
PONTEDEIGARAÇU
ECLUSA DE JUPIÁ
FRANCISCO DE SÁ
SP595
RIOPARANÁ
SP310-SP563
DOS DOURADOS
ECLUSADET.IRMÃOS
ITAIPU
GOIÁS
MINAS GERAIS
TRÁFEGO COM 6 CHATAS
LEGENDA
Situação em Janeiro 2014
SP
191
MONITORAMENTO POR CFTV
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Construção Naval - Estaleiros
Estaleiro Médio Tietê Barra Bonita - SP Estaleiro Diamante/Cosan Jaú - SP
Estaleiro Torque Pederneiras - SP Estaleiro Belconav Araçatuba - SP
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Frota das Empresas de Navegação
para Transporte de Cargas
EMPURRADORES BARCAÇAS
Qtde Potência
Potência
Total
Qtde Tonelagem
Tonelagem
Total
un. Hp Hp un. t t
LOUIS DREYFUS 9 920 8.280 26 1.170/1.500 35.700
TNPM 6 800/940 5.500 24 1.500/1.628 36.384
EGTM 3 800/920 2.680 29 1500/1.628 45.292
PBV 2 920 1.840 15 3.128 23.396
SARTCO 9 460/1.104 7.768 46 274/750 21.832
RAIZEN 5 210/500 1.700 22 350/460 9.020
AREALVA 24 250/600 7.400 20 650 13.000
TOTAIS 58 210/1.104 35.168 182 274/1.500 184.624
EMPRESA
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Embarcações para Transporte
Comercial de Cargas
Sartco-ADM Diamante-Cosan
Quintella EPN-Torque
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Embarcações para Transporte
Comercial de Cargas
CNA-Libra
Sartco-ADM Diamante-Cosan
EPN-Torque
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Terminais na
Hidrovia Tietê-Paraná
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Terminais na
Hidrovia Tietê-Paraná
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Terminais na
Hidrovia Tietê-Paraná
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Terminais na
Hidrovia Tietê-Paraná
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Terminais na
Hidrovia Tietê-Paraná
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Terminais na
Hidrovia Tietê-Paraná
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Terminais na
Hidrovia Tietê-Paraná
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Hidrovia Tietê-Paraná
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Transposição de Itaipu
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Transposição de Itaipu
Terminais e Rodovia de Interligação
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Hidrovia Paraná-Paraguai
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Transposição de Itaipu
Terminais e Rodovia de Interligação
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
0
1.000
2.000
3.000
4.000
5.000
6.000
7.000
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Carga(tX103)
ANO
AREIA MILHO
SOJA CANA
MADEIRA / CARVÃO FARELO DE SOJA
CELULOSE ADUBO/BAGACINHO
MANDIOCA OUTROS PRODUTOS
TRIGO PNEUS
PROJETADA
1.724
2.143 2.173
2.774
3.105
3.481
3.944
4.699
5.0264.973
5.776
6.181
5.774
6.291
6.920
Evolução das Cargas Transportadas
na Hidrovia Tietê-Paraná (mil toneladas)
TAXA MÉDIA ANUAL NOS ÚLTIMOS QUATORZE ANOS (2000-2013) = 9,7 %TAXA MÉDIA ANUAL NOS ÚLTIMOS QUATORZE ANOS (2000-2013) = 9,7 %
9,7 %
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
0
200
400
600
800
1.000
1.200
1.400
1.600
1.800
2.000
2.200
2.400
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Produção(TKUX106)
ANO
SOJA MILHO
MADEIRA / CARVÃO FARELO DE SOJA
CELULOSE AREIA
CANA ADUBO/BAGACINHO
MANDIOCA OUTROS PRODUTOS
TRIGO PNEUS
SEMENTES PROJETADA
590
743 752
858
916 894 922
1.272 1.335
1.285
1.490 1.459
1.623
2.118
2.224
Evolução das Cargas Transportadas
na Hidrovia Tietê-Paraná (milhões TKU)
TAXA MÉDIA ANUAL NOS ÚLTIMOS QUATORZE ANOS (2000-2013) = 9,6 %TAXA MÉDIA ANUAL NOS ÚLTIMOS QUATORZE ANOS (2000-2013) = 9,6 %
9,6 %
30,5 %
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
1 2 3 4 5 6 7 8 9 10 11 12
2009 12.969 67.387 261.135 261.855 276.145 234.475 216.214 146.167 85.114 68.744 40.520 27.429
2010 74.160 268.078 369.871 407.074 441.884 387.260 392.420 359.418 362.275 276.015 207.825 151.859
2011 104.817 246.148 302.149 389.725 462.389 403.171 436.444 480.646 382.714 319.831 197.000 116.690
2012 83.173 253.672 384.215 342.972 296.781 324.093 481.657 510.274 403.597 374.503 404.178 312.370
2013 191.708 296.253 309.823 429.490 497.556 451.223 456.834 531.398 529.161 518.901 463.309 325.452
0
100.000
200.000
300.000
400.000
500.000
600.000
TONELADAS
Sazonalidade das Cargas
de Longo Curso na Hidrovia Tietê-Paraná
TOTAL %
1.698.154 -
1.988.902 17
1.998.606 0
2.236.192 12
3.084.772 38
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Promef Hidrovia
Transporte de etanol
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Parâmetros de Comparação entre Modais de Transporte
Vantagens do Transporte Hidroviário
MAIOR: eficiência energética
capacidade de concentração de cargas
vida útil da infraestrutura
vida útil dos equipamentos e veículos
MENOR: consumo de combustível
emissão de poluentes (alterações climáticas e efeito estufa)
congestionamento de tráfego
custo da infraestrutura
número de acidentes
custo operacional
impacto ambiental
emissão de ruído
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Transporte Sustentável - cargas
Fonte: Ministério dos Transportes
Fonte: Ministério dos Transportes
Fonte: DOT/Maritime Administration e TCL
Fonte: PDDT Vivo
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
MODAIS HIDRO FERRO RODO
Capacidade
de Carga
1 Comboio
Duplo Tietê
(4 chatas e empurrador)
6.000 t
2,9 Comboios Hopper
(86 vagões de 70 t)
172 Carretas de 35 t
Bi-trem Graneleiras
Comprimento
Total
150 m 1,7 km
3,5 km
(26 km em movimento)
Fonte: DH, TCL
CONSUMO DE ESPAÇO: Unidades Equivalentes de Capacidade de Carga
Parâmetros de Comparação entre Modais de Transporte
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Parâmetros de Comparação entre Modais de Transporte
CUSTO DA INFRAESTRUTURA:
Fonte: Ministério dos Transportes - 1997
VIDA ÚTIL:
MODAIS HIDRO FERRO RODO
34.000 1.400.000 440.000
1 41 13
CUSTO DE MANUTENÇÃO DA VIA BAIXO ALTO ALTO
CUSTO MÉDIO DE CONSTRUÇÃO
DA VIA (US$ / km)
MODAIS HIDRO FERRO RODO
ALTA ALTA BAIXA
1 0,6 0,2
VIDA ÚTIL DOS EQUIPAMENTOS
E VEÍCULOS (ANOS)
50 30 10
VIDA ÚTIL DA VIA
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Índices de Segurança da Navegação
Acidentes na Via de 1995 a 2012
TIPO ITEM SUB-ITEM
ANO
1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
1. Envolvendo
embarcações e obras de
arte
1.1 Eclusas
Porta Montante 1 1 1 1 1
Porta Jusante 2
Amarradouro
Flutuante
1
Escada Marinheiro 1
Dentro da Eclusa 1 7 1 2 1 1 1 2 1 1 4 2 1 2 1
1.2 Estruturas Vinculadas
Muro Guia/Ala 1 1 4 3 4 1 1 2 4 2 4 8 4 3 2
Dolfins 1 2 1 1 1 1 1
1.3 Pontes
Pilares 3 1 1 2 5 1 1 1 1
Queda de Tabuleiro 1
1.4 Estruturas Auxiliares
de Navegação
Ponto de Espera
Protetores Flutuantes 1 1 1 2 4 1 2 1
2. Envolvendo Duas ou
mais embarcações
2.1 Abalroamento 1
2.2 Desgarrada e a Deriva 2 1 1 1 1
3. Com Embarcação
3.1 Encalhe 9 1 3 1 1 1
3.2 Derramamento 1
3.3 Naufrágio 2 2 1
4. Com Tripulação 4.1 Ponto de Espera Atracação 1
4.2 Outros 1
TOTAL DE ACIDENTES 6 10 7 7 22 2 4 3 5 10 8 9 12 16 6 13 5 5
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Comparação de Fretes por Modal de Transporte
FONTES RODO FERRO HIDRO
32 20 12
2,7 1,7 1,0
30 22 13
2,3 1,7 1,0
50 33 20
2,5 1,7 1,0
50 20 10
5,0 2,0 1,0
41 24 14
2,9 1,7 1,0
COMPARAÇÃO DE FRETES POR MODAL DE TRANSPORTE
(US$ / t . 1000 km)
MÉDIA
J. C. T. Riva - Consultoria - 2004
SIFRECA - ESALQ - 2005
Caramuru - Revista da Indústria - 2007
Macrologística Consultoria - 2007
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Extensão Rio Piracicaba
Barragem de Santa Maria da Serra
BARIRIBARIRI
Extensão até Ártemis – 13,5 m / 1Extensão até Ártemis – 13,5 m / 1
BARRA BONITABARRA BONITA
Extensão = 55 km
Área de Influência =
6.700 km2
Redução de Custo / t =
R$ 5,60/t
Bitola Larga
ALL (+15km)
Bitola Larga
ALL (+15km)
SANTA MARIA DA SERRASANTA MARIA DA SERRA
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Extensão até Salto
Projetos e Licenciamento Ambiental
BARRA BONITABARRA BONITA
Extensão = 200 km
Área de Influência =
14.200 km2
Redução de Custo / t =
R$ 8,00/t
(Sul de Goiás – Santos)
Extensão até Salto –
51,5 m / 5
Extensão até Salto –
51,5 m / 5
ALL Bitola
Simples
ALL Bitola
Simples ALL Bitola
Mista
ALL Bitola
Mista
ANHEMBI – 8,0 mANHEMBI – 8,0 m
CONCHAS – 5,5 mCONCHAS – 5,5 m
LARANJAL – 13,0 mLARANJAL – 13,0 m
TIÊTE – 12,0 mTIÊTE – 12,0 m
PORTO FELIZ – 13,0 mPORTO FELIZ – 13,0 m
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth levelEdgar de
Souza
Salto
Penha
Pedreira
São Miguel
Paulista
Rio Grande
da Serra
Taiaçupeba
41 km
14 km
37 km
6 km
5 km
28 km
30 km
25 km
Hidroanel: ~ 186km
Hidroanel Metropolitano de São Paulo
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Hidroanel Metropolitano de São Paulo
Rios Tietê e Pinheiros – Barragem e Eclusa do Cebolão
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
BARRA BONITABARRA BONITA
BARIRIBARIRI
IBITINGAIBITINGA
PROMISSÃOPROMISSÃO
NOVA AVANHANDAVANOVA AVANHANDAVA
TRÊS IRMÃOSTRÊS IRMÃOS
JUPIAJUPIA
ILHA SOLTEIRA
PORTO PRIMAVERAPORTO PRIMAVERA
ÁGUA VERMELHA
SÃO SIMÃO
ITAIPU
ROSANA
Controle de tráfego no
canal de Pereira Barreto
Controle de tráfego no
canal de Pereira Barreto
Cordão flutuante
de Jupia
Cordão flutuante
de Jupia
Muro-guia de
Três Irmãos
Muro-guia de
Três Irmãos
Ampliação do vão da
Ponte do Jacaré
Ampliação do vão da
Ponte do Jacaré
Ampliação do vão, proteção dos
pilares e canal de aproximação da
Ponte da SP-425
Ampliação do vão, proteção dos
pilares e canal de aproximação da
Ponte da SP-425Ampliação do vão e
proteção dos pilares da
Ponte da SP-333
Ampliação do vão e
proteção dos pilares da
Ponte da SP-333
Ampliação do vão e proteção dos
pilares da Ponte Ferroviária
Ayrosa Galvão
Ampliação do vão e proteção dos
pilares da Ponte Ferroviária
Ayrosa Galvão
Proteção dos pilares da
Ponte da SP-255
Proteção dos pilares da
Ponte da SP-255
Ampliação do vão e proteção dos
pilares da Ponte da SP-191 – Rios
Tietê e Piracicaba
Ampliação do vão e proteção dos
pilares da Ponte da SP-191 – Rios
Tietê e Piracicaba
Ampliação do vão e
proteção dos pilares da
Ponte da SP-147
Ampliação do vão e
proteção dos pilares da
Ponte da SP-147
Eliminação de Gargalos
Ampliação de Vãos de Pontes e Proteção de Pilares
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Eliminação de Gargalos
Ampliação e Retificação de Canais
BARRA BONITABARRA BONITA
BARIRIBARIRI
IBITINGAIBITINGA
PROMISSÃOPROMISSÃO
NOVA AVANHANDAVANOVA AVANHANDAVA
TRÊS IRMÃOSTRÊS IRMÃOS
JUPIAJUPIA
ILHA SOLTEIRA
PORTO PRIMAVERAPORTO PRIMAVERA
ÁGUA VERMELHA
SÃO SIMÃO
ITAIPU
ROSANA
Ampliação do Canal a
jusante da Eclusa de
Nova Avanhandava
Ampliação do Canal a
jusante da Eclusa de
Nova Avanhandava
Ampliação do Canal submerso de
aproximação da Ponte da SP-425
Ampliação do Canal submerso de
aproximação da Ponte da SP-425
Ampliação e retificação do Canal
no km 88 ao 110 do reservatório
de Barra Bonita
Ampliação e retificação do Canal
no km 88 ao 110 do reservatório
de Barra Bonita
Ampliação e retificação do Canal no
km 74 ao 89
do reservatório de Barra Bonita
Ampliação e retificação do Canal no
km 74 ao 89
do reservatório de Barra Bonita
Ampliação e retificação do Canal
no km 61 ao 74 do reservatório
de Barra Bonita
Ampliação e retificação do Canal
no km 61 ao 74 do reservatório
de Barra Bonita
Ampliação e retificação
do Canal de Igaraçu do
Tietê
Ampliação e retificação
do Canal de Igaraçu do
Tietê
Ampliação e retificação do Canal de
acesso à Eclusa de Ibitinga
Ampliação e retificação do Canal de
acesso à Eclusa de Ibitinga
Dique de ligação a jusante da
Eclusa de Promissão
Dique de ligação a jusante da
Eclusa de Promissão
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Eliminação de Gargalos
Atracadouro de espera - Eclusa de Bariri
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Duplicação de Eclusas
Projetos e Licenciamento Ambiental
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Exemplos de Usos Múltiplos das Águas
dos Reservatórios dos Rios Tietê e Paraná
Abastecimento de Água;
Geração de Energia Elétrica;
Saneamento;
Transporte Hidroviário;
Consumo Industrial;
Irrigação;
Piscicultura;
Lazer e Turismo;
Esportes e Recreação;
Controle de Enchentes.
Diluição de Efluentes;
Construção Naval;
Mineração;













Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Exemplos de Usos Múltiplos das Águas
dos Reservatórios dos Rios Tietê e Paraná
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Exemplos de Usos Múltiplos das Águas
dos Reservatórios dos Rios Tietê e Paraná
Click to edit Master title style
• Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Av. do Estado, 777 - 1º andar
São Paulo - SP - Brasil
C.E.P.: 01107-908
Tel.: (11) 3312-4500
Fax: (11) 3312-4510
e-mail: dh@transportes.sp.gov.br
Site: www.transportes.sp.gov.br

Mais conteúdo relacionado

Destaque

Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellGood Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Saba Software
 

Destaque (20)

Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy Presentation
 
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellGood Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
 

A Atividade Hidroviária no Estado de São Paulo

  • 1. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level A Atividade Hidroviária no Estado de São Paulo Apresentação Básica 2014
  • 2. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Navegável Potencialmente navegável Estadual - SP Federal / Outros Tietê Grande Paranaíba Paraná Paranapanema Piracicaba Paraíba do Sul Ribeira Tibaji Peixe Ivaí Iguaçu Piquiri Iguatemi Amambaí Ivinhem a Pardo Paraná Tietê Verde Sucuriú Pardo Moji-Guaçu Verde Grande Rede Hidroviária de Interesse de São Paulo Águas Navegáveis e Potencialmente Navegáveis Rio Vias Principais Vias Secundárias TOTAL Tietê 650 150 800 Paraná 1.100 500 1.600 TOTAL 1.750 650 2.400 RMSP RMBS
  • 3. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Hidrovia Tietê-Paraná
  • 4. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Atividades Hidroviárias no Estado de São Paulo Fluvial Marítima Linhas Longitudinais •Hidrovia Tietê-Paraná •Hidroanel Metropolitano •Hidrovias Litorâneas •Cabotagem Travessias •Interiores •Metropolitanas •Litorâneas Portos e Terminais •Terminais na HTP •Santos •São Sebastião
  • 5. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Eclusas na Hidrovia Tietê-Paraná BARRA BONITA - 1973 IBITINGA - 1986 BARIRI - 1968 PROMISSÃO - 1986
  • 6. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Nova Avanhandava - 1991 Jupiá - 1998 Três Irmãos - 1994 Porto Primavera - 1999 Eclusas na Hidrovia Tietê-Paraná
  • 7. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Canais Artificiais na Hidrovia Tietê-Paraná Pereira Barreto Promissão Igaraçu do Tietê Bariri (Margem Direita)
  • 8. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Dispositivos de Segurança e Sinalização do Balizamento
  • 9. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Dispositivos de Segurança e Sinalização do Balizamento
  • 10. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Implantação de Rota de Navegação
  • 11. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Centro de Controle Operacional – CCO
  • 12. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Cartas Náuticas da Hidrovia Tietê-Paraná
  • 13. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Eliminação de Gargalos Proteção de Pilares de Pontes
  • 14. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Eliminação de Gargalos Ampliação de Vãos de Pontes e Proteção de Pilares SP-461 SP-225
  • 15. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level PONTES – AMPLIAÇÕES EM CONTRATAÇÃO PILARES A SEREM REFORÇADOS SP-333 SP-425 PILARES A SEREM REMOVIDOS PILARES A SEREM REFORÇADOS TABULEIROS A SEREM SUBSTITUIDOS PELA ESTRUTURA METÁLICA E NOVO VÃO DE NAVEGAÇÃO AMPLIADO TABULEIROS A SEREM SUBSTITUIDOS PELA ESTRUTURA METÁLICA E NOVO VÃO DE NAVEGAÇÃO AMPLIADO PILARES A SEREM REMOVIDOS Eliminação de Gargalos Ampliação de Vãos de Pontes e Proteção de Pilares
  • 16. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level PONTES – AMPLIAÇÕES EM CONTRATAÇÃOEliminação de Gargalos Restrições com Desmembramento de Comboios CANALDEPEREIRABARRETO ECLUSADEN.AVANHANDAVA SP595S.J.DOURADOS SP463 SP425 JACARÉ SP461 RIOPARANAIBA BR153 RIO SÃO J. R IO PIR A C IC AB A ECLUSADEPROMISSÃO SP333 ECLUSADEIBITINGA ECLUSADEBARIRI SP225 AYROSAGALVÃO SP255 ECLUSADEB.BONITA SP191 SP147 ADMINISTRAÇÃO DO DH - ST TRÁFEGO COM 4 CHATAS TRÁFEGO COM RESTRIÇÃO PARA 2 CHATAS TRÁFEGO COM RESTRIÇÃO PARA 1 CHATA PONTEDEIGARAÇU ECLUSA DE JUPIÁ FRANCISCO DE SÁ SP595 RIOPARANÁ SP310-SP563 DOS DOURADOS ECLUSADET.IRMÃOS ITAIPU GOIÁS MINAS GERAIS TRÁFEGO COM 6 CHATAS LEGENDA Situação em Janeiro 2014 SP 191 MONITORAMENTO POR CFTV
  • 17. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Construção Naval - Estaleiros Estaleiro Médio Tietê Barra Bonita - SP Estaleiro Diamante/Cosan Jaú - SP Estaleiro Torque Pederneiras - SP Estaleiro Belconav Araçatuba - SP
  • 18. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Frota das Empresas de Navegação para Transporte de Cargas EMPURRADORES BARCAÇAS Qtde Potência Potência Total Qtde Tonelagem Tonelagem Total un. Hp Hp un. t t LOUIS DREYFUS 9 920 8.280 26 1.170/1.500 35.700 TNPM 6 800/940 5.500 24 1.500/1.628 36.384 EGTM 3 800/920 2.680 29 1500/1.628 45.292 PBV 2 920 1.840 15 3.128 23.396 SARTCO 9 460/1.104 7.768 46 274/750 21.832 RAIZEN 5 210/500 1.700 22 350/460 9.020 AREALVA 24 250/600 7.400 20 650 13.000 TOTAIS 58 210/1.104 35.168 182 274/1.500 184.624 EMPRESA
  • 19. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Embarcações para Transporte Comercial de Cargas Sartco-ADM Diamante-Cosan Quintella EPN-Torque
  • 20. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Embarcações para Transporte Comercial de Cargas CNA-Libra Sartco-ADM Diamante-Cosan EPN-Torque
  • 21. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Terminais na Hidrovia Tietê-Paraná
  • 22. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Terminais na Hidrovia Tietê-Paraná
  • 23. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Terminais na Hidrovia Tietê-Paraná
  • 24. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Terminais na Hidrovia Tietê-Paraná
  • 25. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Terminais na Hidrovia Tietê-Paraná
  • 26. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Terminais na Hidrovia Tietê-Paraná
  • 27. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Terminais na Hidrovia Tietê-Paraná
  • 28. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Hidrovia Tietê-Paraná
  • 29. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Transposição de Itaipu
  • 30. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Transposição de Itaipu Terminais e Rodovia de Interligação
  • 31. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Hidrovia Paraná-Paraguai
  • 32. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Transposição de Itaipu Terminais e Rodovia de Interligação
  • 33. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level 0 1.000 2.000 3.000 4.000 5.000 6.000 7.000 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 Carga(tX103) ANO AREIA MILHO SOJA CANA MADEIRA / CARVÃO FARELO DE SOJA CELULOSE ADUBO/BAGACINHO MANDIOCA OUTROS PRODUTOS TRIGO PNEUS PROJETADA 1.724 2.143 2.173 2.774 3.105 3.481 3.944 4.699 5.0264.973 5.776 6.181 5.774 6.291 6.920 Evolução das Cargas Transportadas na Hidrovia Tietê-Paraná (mil toneladas) TAXA MÉDIA ANUAL NOS ÚLTIMOS QUATORZE ANOS (2000-2013) = 9,7 %TAXA MÉDIA ANUAL NOS ÚLTIMOS QUATORZE ANOS (2000-2013) = 9,7 % 9,7 %
  • 34. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level 0 200 400 600 800 1.000 1.200 1.400 1.600 1.800 2.000 2.200 2.400 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 Produção(TKUX106) ANO SOJA MILHO MADEIRA / CARVÃO FARELO DE SOJA CELULOSE AREIA CANA ADUBO/BAGACINHO MANDIOCA OUTROS PRODUTOS TRIGO PNEUS SEMENTES PROJETADA 590 743 752 858 916 894 922 1.272 1.335 1.285 1.490 1.459 1.623 2.118 2.224 Evolução das Cargas Transportadas na Hidrovia Tietê-Paraná (milhões TKU) TAXA MÉDIA ANUAL NOS ÚLTIMOS QUATORZE ANOS (2000-2013) = 9,6 %TAXA MÉDIA ANUAL NOS ÚLTIMOS QUATORZE ANOS (2000-2013) = 9,6 % 9,6 % 30,5 %
  • 35. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level 1 2 3 4 5 6 7 8 9 10 11 12 2009 12.969 67.387 261.135 261.855 276.145 234.475 216.214 146.167 85.114 68.744 40.520 27.429 2010 74.160 268.078 369.871 407.074 441.884 387.260 392.420 359.418 362.275 276.015 207.825 151.859 2011 104.817 246.148 302.149 389.725 462.389 403.171 436.444 480.646 382.714 319.831 197.000 116.690 2012 83.173 253.672 384.215 342.972 296.781 324.093 481.657 510.274 403.597 374.503 404.178 312.370 2013 191.708 296.253 309.823 429.490 497.556 451.223 456.834 531.398 529.161 518.901 463.309 325.452 0 100.000 200.000 300.000 400.000 500.000 600.000 TONELADAS Sazonalidade das Cargas de Longo Curso na Hidrovia Tietê-Paraná TOTAL % 1.698.154 - 1.988.902 17 1.998.606 0 2.236.192 12 3.084.772 38
  • 36. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Promef Hidrovia Transporte de etanol
  • 37. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Parâmetros de Comparação entre Modais de Transporte Vantagens do Transporte Hidroviário MAIOR: eficiência energética capacidade de concentração de cargas vida útil da infraestrutura vida útil dos equipamentos e veículos MENOR: consumo de combustível emissão de poluentes (alterações climáticas e efeito estufa) congestionamento de tráfego custo da infraestrutura número de acidentes custo operacional impacto ambiental emissão de ruído
  • 38. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Transporte Sustentável - cargas Fonte: Ministério dos Transportes Fonte: Ministério dos Transportes Fonte: DOT/Maritime Administration e TCL Fonte: PDDT Vivo
  • 39. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level MODAIS HIDRO FERRO RODO Capacidade de Carga 1 Comboio Duplo Tietê (4 chatas e empurrador) 6.000 t 2,9 Comboios Hopper (86 vagões de 70 t) 172 Carretas de 35 t Bi-trem Graneleiras Comprimento Total 150 m 1,7 km 3,5 km (26 km em movimento) Fonte: DH, TCL CONSUMO DE ESPAÇO: Unidades Equivalentes de Capacidade de Carga Parâmetros de Comparação entre Modais de Transporte
  • 40. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Parâmetros de Comparação entre Modais de Transporte CUSTO DA INFRAESTRUTURA: Fonte: Ministério dos Transportes - 1997 VIDA ÚTIL: MODAIS HIDRO FERRO RODO 34.000 1.400.000 440.000 1 41 13 CUSTO DE MANUTENÇÃO DA VIA BAIXO ALTO ALTO CUSTO MÉDIO DE CONSTRUÇÃO DA VIA (US$ / km) MODAIS HIDRO FERRO RODO ALTA ALTA BAIXA 1 0,6 0,2 VIDA ÚTIL DOS EQUIPAMENTOS E VEÍCULOS (ANOS) 50 30 10 VIDA ÚTIL DA VIA
  • 41. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Índices de Segurança da Navegação Acidentes na Via de 1995 a 2012 TIPO ITEM SUB-ITEM ANO 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 1. Envolvendo embarcações e obras de arte 1.1 Eclusas Porta Montante 1 1 1 1 1 Porta Jusante 2 Amarradouro Flutuante 1 Escada Marinheiro 1 Dentro da Eclusa 1 7 1 2 1 1 1 2 1 1 4 2 1 2 1 1.2 Estruturas Vinculadas Muro Guia/Ala 1 1 4 3 4 1 1 2 4 2 4 8 4 3 2 Dolfins 1 2 1 1 1 1 1 1.3 Pontes Pilares 3 1 1 2 5 1 1 1 1 Queda de Tabuleiro 1 1.4 Estruturas Auxiliares de Navegação Ponto de Espera Protetores Flutuantes 1 1 1 2 4 1 2 1 2. Envolvendo Duas ou mais embarcações 2.1 Abalroamento 1 2.2 Desgarrada e a Deriva 2 1 1 1 1 3. Com Embarcação 3.1 Encalhe 9 1 3 1 1 1 3.2 Derramamento 1 3.3 Naufrágio 2 2 1 4. Com Tripulação 4.1 Ponto de Espera Atracação 1 4.2 Outros 1 TOTAL DE ACIDENTES 6 10 7 7 22 2 4 3 5 10 8 9 12 16 6 13 5 5
  • 42. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Comparação de Fretes por Modal de Transporte FONTES RODO FERRO HIDRO 32 20 12 2,7 1,7 1,0 30 22 13 2,3 1,7 1,0 50 33 20 2,5 1,7 1,0 50 20 10 5,0 2,0 1,0 41 24 14 2,9 1,7 1,0 COMPARAÇÃO DE FRETES POR MODAL DE TRANSPORTE (US$ / t . 1000 km) MÉDIA J. C. T. Riva - Consultoria - 2004 SIFRECA - ESALQ - 2005 Caramuru - Revista da Indústria - 2007 Macrologística Consultoria - 2007
  • 43. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Extensão Rio Piracicaba Barragem de Santa Maria da Serra BARIRIBARIRI Extensão até Ártemis – 13,5 m / 1Extensão até Ártemis – 13,5 m / 1 BARRA BONITABARRA BONITA Extensão = 55 km Área de Influência = 6.700 km2 Redução de Custo / t = R$ 5,60/t Bitola Larga ALL (+15km) Bitola Larga ALL (+15km) SANTA MARIA DA SERRASANTA MARIA DA SERRA
  • 44. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Extensão até Salto Projetos e Licenciamento Ambiental BARRA BONITABARRA BONITA Extensão = 200 km Área de Influência = 14.200 km2 Redução de Custo / t = R$ 8,00/t (Sul de Goiás – Santos) Extensão até Salto – 51,5 m / 5 Extensão até Salto – 51,5 m / 5 ALL Bitola Simples ALL Bitola Simples ALL Bitola Mista ALL Bitola Mista ANHEMBI – 8,0 mANHEMBI – 8,0 m CONCHAS – 5,5 mCONCHAS – 5,5 m LARANJAL – 13,0 mLARANJAL – 13,0 m TIÊTE – 12,0 mTIÊTE – 12,0 m PORTO FELIZ – 13,0 mPORTO FELIZ – 13,0 m
  • 45. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth levelEdgar de Souza Salto Penha Pedreira São Miguel Paulista Rio Grande da Serra Taiaçupeba 41 km 14 km 37 km 6 km 5 km 28 km 30 km 25 km Hidroanel: ~ 186km Hidroanel Metropolitano de São Paulo
  • 46. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Hidroanel Metropolitano de São Paulo Rios Tietê e Pinheiros – Barragem e Eclusa do Cebolão
  • 47. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level BARRA BONITABARRA BONITA BARIRIBARIRI IBITINGAIBITINGA PROMISSÃOPROMISSÃO NOVA AVANHANDAVANOVA AVANHANDAVA TRÊS IRMÃOSTRÊS IRMÃOS JUPIAJUPIA ILHA SOLTEIRA PORTO PRIMAVERAPORTO PRIMAVERA ÁGUA VERMELHA SÃO SIMÃO ITAIPU ROSANA Controle de tráfego no canal de Pereira Barreto Controle de tráfego no canal de Pereira Barreto Cordão flutuante de Jupia Cordão flutuante de Jupia Muro-guia de Três Irmãos Muro-guia de Três Irmãos Ampliação do vão da Ponte do Jacaré Ampliação do vão da Ponte do Jacaré Ampliação do vão, proteção dos pilares e canal de aproximação da Ponte da SP-425 Ampliação do vão, proteção dos pilares e canal de aproximação da Ponte da SP-425Ampliação do vão e proteção dos pilares da Ponte da SP-333 Ampliação do vão e proteção dos pilares da Ponte da SP-333 Ampliação do vão e proteção dos pilares da Ponte Ferroviária Ayrosa Galvão Ampliação do vão e proteção dos pilares da Ponte Ferroviária Ayrosa Galvão Proteção dos pilares da Ponte da SP-255 Proteção dos pilares da Ponte da SP-255 Ampliação do vão e proteção dos pilares da Ponte da SP-191 – Rios Tietê e Piracicaba Ampliação do vão e proteção dos pilares da Ponte da SP-191 – Rios Tietê e Piracicaba Ampliação do vão e proteção dos pilares da Ponte da SP-147 Ampliação do vão e proteção dos pilares da Ponte da SP-147 Eliminação de Gargalos Ampliação de Vãos de Pontes e Proteção de Pilares
  • 48. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Eliminação de Gargalos Ampliação e Retificação de Canais BARRA BONITABARRA BONITA BARIRIBARIRI IBITINGAIBITINGA PROMISSÃOPROMISSÃO NOVA AVANHANDAVANOVA AVANHANDAVA TRÊS IRMÃOSTRÊS IRMÃOS JUPIAJUPIA ILHA SOLTEIRA PORTO PRIMAVERAPORTO PRIMAVERA ÁGUA VERMELHA SÃO SIMÃO ITAIPU ROSANA Ampliação do Canal a jusante da Eclusa de Nova Avanhandava Ampliação do Canal a jusante da Eclusa de Nova Avanhandava Ampliação do Canal submerso de aproximação da Ponte da SP-425 Ampliação do Canal submerso de aproximação da Ponte da SP-425 Ampliação e retificação do Canal no km 88 ao 110 do reservatório de Barra Bonita Ampliação e retificação do Canal no km 88 ao 110 do reservatório de Barra Bonita Ampliação e retificação do Canal no km 74 ao 89 do reservatório de Barra Bonita Ampliação e retificação do Canal no km 74 ao 89 do reservatório de Barra Bonita Ampliação e retificação do Canal no km 61 ao 74 do reservatório de Barra Bonita Ampliação e retificação do Canal no km 61 ao 74 do reservatório de Barra Bonita Ampliação e retificação do Canal de Igaraçu do Tietê Ampliação e retificação do Canal de Igaraçu do Tietê Ampliação e retificação do Canal de acesso à Eclusa de Ibitinga Ampliação e retificação do Canal de acesso à Eclusa de Ibitinga Dique de ligação a jusante da Eclusa de Promissão Dique de ligação a jusante da Eclusa de Promissão
  • 49. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Eliminação de Gargalos Atracadouro de espera - Eclusa de Bariri
  • 50. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Duplicação de Eclusas Projetos e Licenciamento Ambiental
  • 51. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Exemplos de Usos Múltiplos das Águas dos Reservatórios dos Rios Tietê e Paraná Abastecimento de Água; Geração de Energia Elétrica; Saneamento; Transporte Hidroviário; Consumo Industrial; Irrigação; Piscicultura; Lazer e Turismo; Esportes e Recreação; Controle de Enchentes. Diluição de Efluentes; Construção Naval; Mineração;             
  • 52. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Exemplos de Usos Múltiplos das Águas dos Reservatórios dos Rios Tietê e Paraná
  • 53. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Exemplos de Usos Múltiplos das Águas dos Reservatórios dos Rios Tietê e Paraná
  • 54. Click to edit Master title style • Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Av. do Estado, 777 - 1º andar São Paulo - SP - Brasil C.E.P.: 01107-908 Tel.: (11) 3312-4500 Fax: (11) 3312-4510 e-mail: dh@transportes.sp.gov.br Site: www.transportes.sp.gov.br

Notas do Editor

  1. Jumirim é o ponto mais próximo da Ferrovia do Rio Tietê