CAPE PENINSULA UNIVERSITY OF TECHNOLOGY
Summarised by: Lizwi Nyandu
2014
Core Notes
INTRODUCTION TO THE QUANTITY SURVEYING
PROFESSIONAL AND THE BUILDING PROCESS.
 Quantity Surveyor is a competent person in the building industry who
works with all the financial related issues during the construction/civil
works, in a nutshell Quantity Surveyors are the CA’s of Engineering.
 Quantity Surveyors performs several task throughout the stages of the
project.
FACULTY OF ENGINEERING AND THE BUILT ENVIRONMENT 2
What Services does the Quantity Surveyor provide?
 Prepare the initial budget before the fully detailed architectural
drawing is develops to check if the cost will not exceed the
budget.
 Prepare tender documents for pricing.
 Negotiation of tender sum with the “contractors”.
 Valuing the construction works that are executed on site.
 Assessing insurance claims.
FACULTY OF ENGINEERING AND THE BUILT
ENVIRONMENT 3
 Thus the QS provide various services during all the stages of
building project namely:
I. Pre-Tender
II. Tender
III. Post Tender
FACULTY OF ENGINEERING AND THE BUILT
ENVIRONMENT 4
PRE-TENDER STAGE
 The QS assists the Client to develop his wish-list into a brief.
 An Estimate sum is developed from the architectural sketched
drawings.
 Note at this stage construction drawings are not yet available
thus the will be no accuracy in costing of the Materials.
FACULTY OF ENGINEERING AND THE BUILT
ENVIRONMENT 5
TENDER STAGE
 QS prepares a BOQ from the full detailed plan and gather the
tender documentation.
 QS valuates the tender to make sure that the tenderer priced
correctly and accordingly with the work done on site and hand
over to the principal agent.
TENDER DOCUMENTATION
1. BOQ
2. Specifications
3. Tender Drawings
4. Tender Form( JBCC Principal Building Agreement Tender Form)
FACULTY OF ENGINEERING AND THE BUILT
ENVIRONMENT 6
POST TENDER STAGE
Pre- Contract
 QS valuates all the tenders which have been submitted to ensure
that all contractors have priced accordingly.
 QS formulates a tender report and submits to the principal agent
and assist the client to make a decision on which
contract/tenderer will be suitable for the project.
 Lastly the QS prepares a Contract documentation.
FACULTY OF ENGINEERING AND THE BUILT
ENVIRONMENT 7
Contract Stage
 A t this stage the QS is responsible for monthly valuations and
cost valuations and cost reporting.
 Contractor submits a claim to the QS for his work done.
 QS value the work and submits a valuation to the principal
agent.
 Principal agent issue out a certificate for the work confirming the
amount due to him.
 Contractor raises an invoice to the client based on the amount on
the certificate.
 Client pays the amount on the invoice and certificate on the
terms stated in the contract under the payment terms.
FACULTY OF ENGINEERING AND THE BUILT
ENVIRONMENT 8
Post contract
 QS formulates the final accounts for the Principal Contractor as
well as the Nominated and the selected amounts.
Finalising the Final accounts involves:
 External works are usually measured provisionally, thus at this
stage they are included in the BOQ in order to sum up the Total
Cost of the project.
 The pricing and approval of variations brought about by the site
instructions and revised drawings.
 Preliminaries Adjustments calculations.
 Issuing of the final valuation.
FACULTY OF ENGINEERING AND THE BUILT
ENVIRONMENT 9
FACULTY OF ENGINEERING AND THE BUILT
ENVIRONMENT 10
MODEL & SUPPLIMENTARY
PREAMBLES.
 The Model Preambles for trade is published and recently by the
ASAQS .
 This book covers the workmanship and materials encountered in
various Projects.
 “By its very nature, this document is a “model” document and
one is designed to act as a basis upon which to build. It is
anticipated that it will be supplemented by a “supplementary
preamble”.
FACULTY OF ENGINEERING AND THE BUILT
ENVIRONMENT 11
PRELIMINARIES
1. What are Preliminaries?
 Preliminaries out lines the conditions under which the contract
will be administered, and describes all matters which may affect
the contractor’s stuff or equipment on the site as well as
execution of the works.
Namely:
 Insurances
 Site Offices/accommodation
 Water & Electricity Supply
..
FACULTY OF ENGINEERING AND THE BUILT
ENVIRONMENT 12
STANDARD SYSTEM OF
MEASURING BUILDING WORK
 It’s a reference book which is used by the contractors & QS’s to
reach consensus on a standard.
 “Bills of Quantities” are Prepared in accordance with the rules
laid down in the “Standard System”.
 The Standard System is divided into 25 different TRADES.
FACULTY OF ENGINEERING AND THE BUILT
ENVIRONMENT 13
Composition and content
 The measured works is however arranged accordingly.
1. Works is divided into trades.
2. With a specific trade there's logical arrangements:
a. Measured by mass(kg / Tons)
b. measured by Volume (mÂł )
c. Arranged from the Cheapest to the most Expensive
FACULTY OF ENGINEERING AND THE BUILT
ENVIRONMENT 14
Net Measurements
 All the Quantities in the BOQ are Whole numbers.
 This actually means that all the numbers are rounded of to the
nearest number for example:
 12.34 » 12
 0.08 » 0
 Note that the second Quantity is rounded off into zero thus the
standard system implies another rule which is called the
Fractional Quantities.
FACULTY OF ENGINEERING AND THE BUILT
ENVIRONMENT 15
Fractional Quantities
 This occurs where the final measured quantity is very small.
 Using the Above principle will make these small quantities
disappear.
 thus in these kind of situation the quantities must be rounded
off into One decimal as far as the standard system is concerned.
 For example:
 0.28 » 0.3
FACULTY OF ENGINEERING AND THE BUILT
ENVIRONMENT 16
Provisional Quantities & Provisional Sums
 These are the Quantities that are not accurately be determined
the Tender Stage thus they are measured during the final stage
of the contract.
 Provisional sums are amounts of money that are inserted/
included in the BOQ by the QS and intended to cover for
specialist subcontractor work.
FACULTY OF ENGINEERING AND THE BUILT
ENVIRONMENT 17
Prime Cost Amounts & Contingency Sum
 P.C. Amounts are included in the BOQ inserted to establish an
allowance for the Supply only of a range quality
 Contingency Sum can be stated as the monetary amount which
covers for any unforeseen works cost.
FACULTY OF ENGINEERING AND THE BUILT
ENVIRONMENT 18
THANK YOU
GET THE
FUNDUMENTAL OF MEASURING.pptx
Email: nyandu.nyandu.lizwi@gmail.com
Facebook: Lizwi ISO 1900 Nyandu
www.cput.ac.za
FACULTY OF ENGINEERING AND THE BUILT
ENVIRONMENT 19

Mais conteĂșdo relacionado

Mais procurados

Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of RatesRaj Shah
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantitiesAr.Vijay Kumar
 
Quantity Surveyor presentation
Quantity Surveyor presentationQuantity Surveyor presentation
Quantity Surveyor presentationcynfang Fong
 
Estimation (power point)
Estimation (power point)Estimation (power point)
Estimation (power point)Waqas Aslam
 
Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management Rajat Nainwal
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyorSyafiq Deen
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDFIDHAMUKI
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineeringKailash Chander
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008AYM1979
 
Estimation
EstimationEstimation
EstimationWaqas Aslam
 
Quantity Surveyors (Practice)
Quantity Surveyors (Practice)Quantity Surveyors (Practice)
Quantity Surveyors (Practice)Unais Mohamed Aliyar
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESPundlik Rathod
 
MODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSMODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSShourya Puri
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1Nabeel Joomun
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONAr Naveen Naveen
 

Mais procurados (20)

Types of estimates
Types of estimatesTypes of estimates
Types of estimates
 
Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of Rates
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
 
Quantity take off
Quantity take offQuantity take off
Quantity take off
 
Quantity Surveyor presentation
Quantity Surveyor presentationQuantity Surveyor presentation
Quantity Surveyor presentation
 
Estimation (power point)
Estimation (power point)Estimation (power point)
Estimation (power point)
 
Construction process
Construction processConstruction process
Construction process
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Taking off qs
Taking off qsTaking off qs
Taking off qs
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDF
 
Contracts and-tenders
Contracts and-tendersContracts and-tenders
Contracts and-tenders
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineering
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
Estimation
EstimationEstimation
Estimation
 
Quantity Surveyors (Practice)
Quantity Surveyors (Practice)Quantity Surveyors (Practice)
Quantity Surveyors (Practice)
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 
MODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSMODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODS
 
Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATION
 

Destaque

Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveyingAwanish Shukla
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing bookThomas Britto
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and materialALI HYDER GADHI
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works ALI HYDER GADHI
 
Top 10 civil quantity surveyor interview questions and answers
Top 10 civil quantity surveyor interview questions and answersTop 10 civil quantity surveyor interview questions and answers
Top 10 civil quantity surveyor interview questions and answersmarryweasley
 
Software Application in Quantity Surveying - Report
Software Application in Quantity Surveying - ReportSoftware Application in Quantity Surveying - Report
Software Application in Quantity Surveying - ReportPang Khai Shuen
 
Top 10 project quantity surveyor interview questions and answers
Top 10 project quantity surveyor interview questions and answersTop 10 project quantity surveyor interview questions and answers
Top 10 project quantity surveyor interview questions and answersmitchellparker911
 
Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014Felix Vong
 
Table of specification
Table of specificationTable of specification
Table of specificationAbigail Sapico
 
Specification writting civil construction
Specification writting civil constructionSpecification writting civil construction
Specification writting civil constructiondiasawada12345
 
Building estimation methods
Building estimation methodsBuilding estimation methods
Building estimation methodsSimarpreet Singh
 
Estimation and costing
Estimation and costingEstimation and costing
Estimation and costingGanesh Murugan
 
Building Construction
Building ConstructionBuilding Construction
Building ConstructionWilden How
 

Destaque (14)

Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveying
 
Estimating and-costing book
Estimating and-costing bookEstimating and-costing book
Estimating and-costing book
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and material
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
 
Top 10 civil quantity surveyor interview questions and answers
Top 10 civil quantity surveyor interview questions and answersTop 10 civil quantity surveyor interview questions and answers
Top 10 civil quantity surveyor interview questions and answers
 
Software Application in Quantity Surveying - Report
Software Application in Quantity Surveying - ReportSoftware Application in Quantity Surveying - Report
Software Application in Quantity Surveying - Report
 
Top 10 project quantity surveyor interview questions and answers
Top 10 project quantity surveyor interview questions and answersTop 10 project quantity surveyor interview questions and answers
Top 10 project quantity surveyor interview questions and answers
 
Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014
 
Table of specification
Table of specificationTable of specification
Table of specification
 
SPECIFICATIONS
SPECIFICATIONSSPECIFICATIONS
SPECIFICATIONS
 
Specification writting civil construction
Specification writting civil constructionSpecification writting civil construction
Specification writting civil construction
 
Building estimation methods
Building estimation methodsBuilding estimation methods
Building estimation methods
 
Estimation and costing
Estimation and costingEstimation and costing
Estimation and costing
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 

Semelhante a QUANTITY SURVEYING

Preparation of bill sandeep
Preparation of bill sandeepPreparation of bill sandeep
Preparation of bill sandeepSandeep Yadav
 
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)Sysy Jnthn
 
Building Construction 4. offer tendering - site
Building Construction 4. offer   tendering - siteBuilding Construction 4. offer   tendering - site
Building Construction 4. offer tendering - siteHamdija Velagic
 
Qs(ici&itd) (1)
Qs(ici&itd) (1)Qs(ici&itd) (1)
Qs(ici&itd) (1)Js Cheok
 
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)Jy Chong
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - siteAbdulaziz Kaya
 
Construction phases
Construction phasesConstruction phases
Construction phasesMeesum Zaidi
 
Quantycosts consultants Profile
Quantycosts consultants ProfileQuantycosts consultants Profile
Quantycosts consultants ProfileMaina Wanjama
 
PP1 Project 1 Project implementation
PP1 Project 1 Project implementationPP1 Project 1 Project implementation
PP1 Project 1 Project implementationTeo Kean Hui
 
lecture ppt for contract administration and governing
lecture ppt for contract administration and governinglecture ppt for contract administration and governing
lecture ppt for contract administration and governing2cd
 
Scope of work
Scope of workScope of work
Scope of workAshish Jain
 
Measurement 4presentation slides
Measurement 4presentation slidesMeasurement 4presentation slides
Measurement 4presentation slides마 읎환
 
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1Antonio Coladarce
 
Professional Practice II
Professional Practice IIProfessional Practice II
Professional Practice IIseenyeeyong
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2Shze Hwa Lee
 
Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)Melvin Lim
 
Lec.1 Introduction to Estimation
Lec.1   Introduction to EstimationLec.1   Introduction to Estimation
Lec.1 Introduction to EstimationMuthanna Abbu
 

Semelhante a QUANTITY SURVEYING (20)

Preparation of bill sandeep
Preparation of bill sandeepPreparation of bill sandeep
Preparation of bill sandeep
 
Qsx
QsxQsx
Qsx
 
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)
 
Building Construction 4. offer tendering - site
Building Construction 4. offer   tendering - siteBuilding Construction 4. offer   tendering - site
Building Construction 4. offer tendering - site
 
QSS
QSSQSS
QSS
 
Qs(ici&itd) (1)
Qs(ici&itd) (1)Qs(ici&itd) (1)
Qs(ici&itd) (1)
 
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - site
 
Construction phases
Construction phasesConstruction phases
Construction phases
 
MODULE 5.pptx
MODULE 5.pptxMODULE 5.pptx
MODULE 5.pptx
 
Quantycosts consultants Profile
Quantycosts consultants ProfileQuantycosts consultants Profile
Quantycosts consultants Profile
 
PP1 Project 1 Project implementation
PP1 Project 1 Project implementationPP1 Project 1 Project implementation
PP1 Project 1 Project implementation
 
lecture ppt for contract administration and governing
lecture ppt for contract administration and governinglecture ppt for contract administration and governing
lecture ppt for contract administration and governing
 
Scope of work
Scope of workScope of work
Scope of work
 
Measurement 4presentation slides
Measurement 4presentation slidesMeasurement 4presentation slides
Measurement 4presentation slides
 
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
 
Professional Practice II
Professional Practice IIProfessional Practice II
Professional Practice II
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
 
Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)
 
Lec.1 Introduction to Estimation
Lec.1   Introduction to EstimationLec.1   Introduction to Estimation
Lec.1 Introduction to Estimation
 

Último

Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Call Girls In Bangalore ☎ 7737669865 đŸ„” Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 đŸ„” Book Your One night StandCall Girls In Bangalore ☎ 7737669865 đŸ„” Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 đŸ„” Book Your One night Standamitlee9823
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Top Rated Call Girls In chittoor đŸ“± {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor đŸ“± {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor đŸ“± {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor đŸ“± {7001035870} VIP Escorts chittoordharasingh5698
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 

Último (20)

(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Call Girls In Bangalore ☎ 7737669865 đŸ„” Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 đŸ„” Book Your One night StandCall Girls In Bangalore ☎ 7737669865 đŸ„” Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 đŸ„” Book Your One night Stand
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Top Rated Call Girls In chittoor đŸ“± {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor đŸ“± {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor đŸ“± {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor đŸ“± {7001035870} VIP Escorts chittoor
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 

QUANTITY SURVEYING

  • 1. CAPE PENINSULA UNIVERSITY OF TECHNOLOGY Summarised by: Lizwi Nyandu 2014 Core Notes
  • 2. INTRODUCTION TO THE QUANTITY SURVEYING PROFESSIONAL AND THE BUILDING PROCESS.  Quantity Surveyor is a competent person in the building industry who works with all the financial related issues during the construction/civil works, in a nutshell Quantity Surveyors are the CA’s of Engineering.  Quantity Surveyors performs several task throughout the stages of the project. FACULTY OF ENGINEERING AND THE BUILT ENVIRONMENT 2
  • 3. What Services does the Quantity Surveyor provide?  Prepare the initial budget before the fully detailed architectural drawing is develops to check if the cost will not exceed the budget.  Prepare tender documents for pricing.  Negotiation of tender sum with the “contractors”.  Valuing the construction works that are executed on site.  Assessing insurance claims. FACULTY OF ENGINEERING AND THE BUILT ENVIRONMENT 3
  • 4.  Thus the QS provide various services during all the stages of building project namely: I. Pre-Tender II. Tender III. Post Tender FACULTY OF ENGINEERING AND THE BUILT ENVIRONMENT 4
  • 5. PRE-TENDER STAGE  The QS assists the Client to develop his wish-list into a brief.  An Estimate sum is developed from the architectural sketched drawings.  Note at this stage construction drawings are not yet available thus the will be no accuracy in costing of the Materials. FACULTY OF ENGINEERING AND THE BUILT ENVIRONMENT 5
  • 6. TENDER STAGE  QS prepares a BOQ from the full detailed plan and gather the tender documentation.  QS valuates the tender to make sure that the tenderer priced correctly and accordingly with the work done on site and hand over to the principal agent. TENDER DOCUMENTATION 1. BOQ 2. Specifications 3. Tender Drawings 4. Tender Form( JBCC Principal Building Agreement Tender Form) FACULTY OF ENGINEERING AND THE BUILT ENVIRONMENT 6
  • 7. POST TENDER STAGE Pre- Contract  QS valuates all the tenders which have been submitted to ensure that all contractors have priced accordingly.  QS formulates a tender report and submits to the principal agent and assist the client to make a decision on which contract/tenderer will be suitable for the project.  Lastly the QS prepares a Contract documentation. FACULTY OF ENGINEERING AND THE BUILT ENVIRONMENT 7
  • 8. Contract Stage  A t this stage the QS is responsible for monthly valuations and cost valuations and cost reporting.  Contractor submits a claim to the QS for his work done.  QS value the work and submits a valuation to the principal agent.  Principal agent issue out a certificate for the work confirming the amount due to him.  Contractor raises an invoice to the client based on the amount on the certificate.  Client pays the amount on the invoice and certificate on the terms stated in the contract under the payment terms. FACULTY OF ENGINEERING AND THE BUILT ENVIRONMENT 8
  • 9. Post contract  QS formulates the final accounts for the Principal Contractor as well as the Nominated and the selected amounts. Finalising the Final accounts involves:  External works are usually measured provisionally, thus at this stage they are included in the BOQ in order to sum up the Total Cost of the project.  The pricing and approval of variations brought about by the site instructions and revised drawings.  Preliminaries Adjustments calculations.  Issuing of the final valuation. FACULTY OF ENGINEERING AND THE BUILT ENVIRONMENT 9
  • 10. FACULTY OF ENGINEERING AND THE BUILT ENVIRONMENT 10
  • 11. MODEL & SUPPLIMENTARY PREAMBLES.  The Model Preambles for trade is published and recently by the ASAQS .  This book covers the workmanship and materials encountered in various Projects.  “By its very nature, this document is a “model” document and one is designed to act as a basis upon which to build. It is anticipated that it will be supplemented by a “supplementary preamble”. FACULTY OF ENGINEERING AND THE BUILT ENVIRONMENT 11
  • 12. PRELIMINARIES 1. What are Preliminaries?  Preliminaries out lines the conditions under which the contract will be administered, and describes all matters which may affect the contractor’s stuff or equipment on the site as well as execution of the works. Namely:  Insurances  Site Offices/accommodation  Water & Electricity Supply
.. FACULTY OF ENGINEERING AND THE BUILT ENVIRONMENT 12
  • 13. STANDARD SYSTEM OF MEASURING BUILDING WORK  It’s a reference book which is used by the contractors & QS’s to reach consensus on a standard.  “Bills of Quantities” are Prepared in accordance with the rules laid down in the “Standard System”.  The Standard System is divided into 25 different TRADES. FACULTY OF ENGINEERING AND THE BUILT ENVIRONMENT 13
  • 14. Composition and content  The measured works is however arranged accordingly. 1. Works is divided into trades. 2. With a specific trade there's logical arrangements: a. Measured by mass(kg / Tons) b. measured by Volume (mÂł ) c. Arranged from the Cheapest to the most Expensive FACULTY OF ENGINEERING AND THE BUILT ENVIRONMENT 14
  • 15. Net Measurements  All the Quantities in the BOQ are Whole numbers.  This actually means that all the numbers are rounded of to the nearest number for example:  12.34 » 12  0.08 » 0  Note that the second Quantity is rounded off into zero thus the standard system implies another rule which is called the Fractional Quantities. FACULTY OF ENGINEERING AND THE BUILT ENVIRONMENT 15
  • 16. Fractional Quantities  This occurs where the final measured quantity is very small.  Using the Above principle will make these small quantities disappear.  thus in these kind of situation the quantities must be rounded off into One decimal as far as the standard system is concerned.  For example:  0.28 » 0.3 FACULTY OF ENGINEERING AND THE BUILT ENVIRONMENT 16
  • 17. Provisional Quantities & Provisional Sums  These are the Quantities that are not accurately be determined the Tender Stage thus they are measured during the final stage of the contract.  Provisional sums are amounts of money that are inserted/ included in the BOQ by the QS and intended to cover for specialist subcontractor work. FACULTY OF ENGINEERING AND THE BUILT ENVIRONMENT 17
  • 18. Prime Cost Amounts & Contingency Sum  P.C. Amounts are included in the BOQ inserted to establish an allowance for the Supply only of a range quality  Contingency Sum can be stated as the monetary amount which covers for any unforeseen works cost. FACULTY OF ENGINEERING AND THE BUILT ENVIRONMENT 18
  • 19. THANK YOU GET THE FUNDUMENTAL OF MEASURING.pptx Email: nyandu.nyandu.lizwi@gmail.com Facebook: Lizwi ISO 1900 Nyandu www.cput.ac.za FACULTY OF ENGINEERING AND THE BUILT ENVIRONMENT 19