1. Page 1 of 3
Islam Mohamed Said Essa
Email: islamsaid88@yahoo.com
Mob: 054 852 4877 Taif , KSA
Date of Birth: sep ,1, 1988.
Nationality: Egyptian
Military Status: Completed
Driving license: Egypt, KSA valid license
Marital Status: Single
CAREER OBJECTIVE
Professional position, where my experience and technical skills in the Electro-Mechanical construction Field
and BMS System can be used.
Summary of Qualifications
More than 6 -years of extensive work experience in electrical Installation in different projects like Hotels,
Hospitals, Colleges, and Commercial buildings.
Managerial Responsibilities:-
Coordinating Electrical milestones, time schedules with civil / Building section /clients/consultants for all
activities.
Coordinating and supervising all Electrical activities with civil / Building section /clients/consultants for
all activities.
Review all the coordinated drawing for all the services.
Prepare all the RFI (Request for Information) and other coordination documents.
Studying the contract specifications/drawings.
Monitoring the Electrical works for conformance with the provisions of the contract documents and the
procedures manual.
Reviewing Electrical shop drawings and technical submittals& Follow up the Materials take off from
contract drawings.
Issue procurement requests for material and equipment supply and to follow up its delivery to site with
related unit After Project Manager Approval.
Review daily work plan program & explain daily production sheets, related drawings & work
methodology for the staff and the Surveyors daily.
Reviewing Electrical change order proposals and preparing recommendations to Manager
Liaison with the necessary sub contractors. Follow up the manpower, Material and tools to avoid any
progress obstructions.
Study construction schedule and project budget and review them continuously to assure working within
their limits.
Prepare the project work- progress reports.
Assisting with the inspection of completed works and monitoring the start-up, testing, commissioning
and handover of the Electrical works.
Signing off on completed electrical works with completed documentation.
2. Page 2 of 3
Technical Responsibilities:-
Coordination with the Clients, Consultants, and Subcontractors for E&M work.
Reviewed MEP, Architectural, Structural Drawings and Specifications.
Site Inspection and Monitoring of E site Progress.
Coordinating the daily activities of project staff, construction trades , and taking corrective action to keep
the project on time for all the following systems.
1 - The power distribution system:-
The installations and testing of the power system from medium voltage switchgear, R.M.U,
Transformers, M.D.B, S.D.B, DB’s up to outlets.
The installation and testing of the UPS and Emergency System.
The installation and testing of the Earthing and Lightning Protection System.
The installation and testing of the Power Factor correction & Power Quality.
The installation and testing of the Smoke Extract Fans Controller.
The installation and testing of MCC for AHUs, Chilled water pumps, Fire pumps.
The installation and testing of Generators Caterpillar (2MVA) including ATS .
2-The Lighting distribution systems:-
The installation and testing of the Normal and Emergency Lighting System.
The installation and testing of the Dimming Lighting System.
3-The Fire Alarm system:-
The installation and testing of the Fire Alarm Cables, Smoke Detectors, Beam Sensor Detectors
FACP.
The installation and testing of the interface with the others systems like HVAC system, Escalators,
Elevators, Travelators, Train operation system.
4-The BMS system:-
The installation of the data cables, Field devices (Temp. Sensors, Diff. Pressure Switches, MSD’ s).
The installation of the interface with the other systems.
5-The Gas Suppression (FM 200) system:-
The installation and testing of the Fire cables, Field devices (Detectors, MCP, Flasher, Sounders and
FECP)
The installation and testing of the Interface with fire Alarm System.
6- Low Current Systems (Telephone and Data Network, CCTV, Queuing…):-
3. Page 3 of 3
WORK EXPERIENCE
February 2014 till Now
Company: SAUDI BINLADEN GROUP
Projects: MINISTRY OF INTEREIOE Correctional Facilities at Taif , KSA
Position: Electrical Engineer
April 2012 till February 2014
Company: SAUDI BINLADEN GROUP J.V. Al-Marasem International For Development
Projects: Cairo International Airport New Hotel (AIROTEL)
Position: Electrical Engineer
July 2010 till April 2012
Company: El Shrouk For Construction and Engineering Works
Projects: the Administration Building Of 6th OCT University in Cairo
Position: Site Engineer.
EDUCATION
University Degree B.Sc. Engineering
University AL-Shorouk Academy
Faculty Engineering
Major Electrical Power & Machines Engineering
Graduation Project Electrical Distribution for Helipopless Club Compound.
Grade Excellent
Graduation Year May / 2010
Graduation Degree Pass
,
LANGUAGE & COMPUTER SKILLS
Fluent in Arabic and English.
Proficient user of Microsoft Office applications: Word, Excel, & AutoCAD Program.
Ability to make plans to achieve work aims in time.
Coordinate with other activities to avoid any conflict.
Good background about Electromechanical Works.
Good background about Project Management.
Good background about electrical standers (IEC, NEC, IEEE and British standard).
References
References are available on request