The Energy Performance “GAP” between the Design and Operation of a Building always exists! Usually the bigger gaps arise from numerous operational issues that deteriorate the performance well beyond expectations. In HIT2GAP, an effective ISO 50001 Energy Management System (EnMS) is central to the overall process.
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Closing the gap in building energy performance using ISO 50001 Energy Management System
1. Association of Energy Engineers
World Energy Engineering Congress
Atlanta, USA
September 27-29, 2017
Closing the gap for optimal building energy
performance through an
ISO 50001 Energy Management System
Presented by:
Mike Brogan, B.E., PhD (Mech Eng.), MIEI
CEO
mike.brogan@enerit.com
+1 347 230 5887 / +353 91 709818 www.enerit.com
2. QSET
software
Energy
consultants
large MNC’s
(IS 393 software)
Members
EN/ISO
50001
committees
First installs:
buildings &
industry
EN 16001
software
deployed
Enerit ISO
50001
software
launched
1995 2004 2006 2008 2010 2011 2017
Enerit
Founded
20+ years in
Management System Software
ISO 9001, ISO 14001, OHSAS 18001
Drafting of
ISO 50001:2018
Release of
ISO 50001:2011
3. The Energy Performance “GAP” between the Design
and Operation of a Building always exists!
Differences between expected and actual energy consumption arise from problems with the
design, construction, commissioning and operation of buildings.
Interventions along any of the three fundamentals life-cycle directions; design, build and operation
can reduce this GAP
4. The gap, which often exceeds 50%, can be caused by
erroneous simulations during design, poor constructions
methods and bad operational practices.
Usually the bigger gaps arise from numerous operational
issues that deteriorate the performance well beyond
expectations.
The Energy Performance “GAP” between the Design
and Operation of a Building always exists!
5. “Highly Innovative Building Control Tools
tackling the energy performance gap”
Tools include:
➢ data acquisition
➢ building simulation
➢ energy management
➢ forecasting
Project aims:
❖ To reduce the energy gap between
predicted and real building
performances, focusing on the
operation phase
❖ To propose a new paradigm for the
development of energy management
platform in buildings, integrating
existing expertise and resources
❖ To provide a smart open platform
which is marketable
➢ FDD
➢ renewable energy
➢ behavior modelling
➢ data visualization
6. Expected Results:
❖ a generic and modular platform integrating associated services based
on data collection at building level.
❖ adaptable to allow third-party suppliers to develop own modules
❖ an ‘Apps Store’ for users to get apps to operate better buildings
7. Companies working in the field of energy efficiency
Engineers: providers of BMS technology, ICT professionals,
maintenance staff
Research communities and clusters,
Other H2020 projects – e.g. BUILT2SPEC
Regional politicians & citizens’ representation bodies
Standardisation bodies and certifiers of technology
General public and the media.
Who can Benefit?
9. Enerit ISO 50001 software customised
for H2G Energy Management Module
In HIT2GAP, an effective Energy Management System
(EnMS) is central to the overall process.
The HIT2GAP platform will offer a devoted tool for Energy
Management that will be independent from the building’s
type or size, as well as from any specific technology.
Alongside energy monitoring and energy
data reporting systems, Enerit software
deals with opportunities, plans, actions,
communication and documents for ISO
50001 in a cloud-based workflow
solution.
10. Plug-in Energy Management Module
The Energy Management (EM) functionality will be available as a plug-in module
providing for the day-to-day operation of the building EnMS.
The EM module will help building owners/managers to:
Increase energy savings through better organization and teamwork
Take the risk out of the ISO 50001 certification process
Save time during certification process & maintain it in the long-term
Upgrade from spreadsheets to real workflow, maximizing time and energy
efficiency
Integrate energy monitoring systems to generate meaningful management
reports
11. The HIT2GAP EM module covers the Technical
and Management aspects of ISO 50001
The Energy Planning & Monitoring includes:
o Energy Performance management by carrying out an Energy Review
to analysis energy data and identify and monitor EnPIs.
The energy review
is visualized using
the integrated
Sankey diagrams
12. Energy Planning & Monitoring (cntd.)
Baselines are identified and EnPIs are
monitored based on consumption and activity
data
The HIT2GAP EM module covers the Technical
and Management aspects of ISO 50001 (cntd.)
13. Action Management to help make informed decisions on
Improvement Opportunities (IOs) and Action Plans to meet
Objectives & Targets (O&T).
The HIT2GAP EM module covers the Technical
and Management aspects of ISO 50001 (cntd.)
Energy Planning & Monitoring (cntd.)
14. ISO 50001 Management System
supports the management of ISO 50001 processes and information
(Document Management (Docs), Audits, Meetings (Mgt), Non-
conformities (NCs)) to achieve control and continuous improvement of the
EnMS and energy performance.
15. ISO 50001 Management System
supports the management of ISO 50001 processes and information;
Document Management (Docs), Audits, Meetings (Mgt) and Non-
conformities (NCs) to achieve control and continuous improvement of the
EnMS and energy performance.
16. Testing & Validation
The HIT2GAP platform will be tested and validated at
selected pilot buildings
The Energy Management module has already been installed
at these 3 pilot buildings
17. Pilot Projects: 1
Offices & Laboratories,
Nanogune, Spain:
− PV panels
− BMS to control lighting
and HVAC
18. Pilot Projects: 2
Challenger - Office building,
France
− PV panels & dual solar panels
− Ground source heat pump
− BMS controls lighting, HVAC,
hot & cold water & technical
alarms
19. Pilot Projects: 3
Public Office building,
Warsaw City Council,
Poland
− BMS controlled lighting
& HVAC
20. Pilot Projects: 4
Teaching and research
building, Ireland
− BMS controlling HVAC
− Lighting controls with lux
adjustment
− Uses district heating
network
21. Testing & Validation
❖ The HIT2GAP Project is ongoing and completion is September 2019.
The HIT2GAP project (Highly Innovative building control Tools Tackling the energy
performance GAP) has received funding from the European Union’s Horizon 2020
research and innovation program under grant agreement N° 680708. www.hit2gap.eu