SlideShare uma empresa Scribd logo
1 de 31
Bruhath Bengaluru Mahanagara Palike



         Presentation
             on

   Master Plan Project Report
               for
Remodeling of Storm Water Drains
 in Entire BBMP Area, Bengaluru




                        STUP Consultants Pvt. Ltd.
Salient Features


   Bruhath Bengaluru Mahanagara Palike (BBMP) Area - 710 Sq.Km.

    (Core Area         - 225 Sq.Km.,
    Peripheral Area    - 485 Sq. Km.)

   Total Water Shed / Catchment Area - 1016. 50 Sq.km.

   Total Length of SWD in BBMP Area – 840 Km.

    (Core Area         – 240 Km.,
    Peripheral Area    - 600 Km.)

    (Primary Drain Length     – 415 Km. &
    Secondary Drain Length    – 425 Km.)
Master Plan Project Study Area




   Core Area
       East Zone
       West Zone
       South Zone

   Bommanahalli
   Yelahanka
   Dasarahalli
   Mahadevapura
   Rajarajeshwarinagara
                                 Study Area Map
Reasons for flooding
    Change in land use pattern
    Flow obstruction due to construction of RCC hume pipe culverts
    Inappropriate design approach, construction methodology for structures
     and maintenance procedures adopted in newly formed layouts
    Development of land in tank bed areas and below drain HFL
    Modification of original drain alignment during formation of layouts
    Non existence of service roads on either side for laying service lines and
     routine maintenance.
    Indiscriminate dumping of debris and solid wastes into drains
    Dense vegetation growth
    Encroachment / Modification of original drain alignment
    Lack of access for routine maintenance
    Services lines laid inside and across drains
    Blockage of inlet/outlet location of water bodies
    Water bodies not functioning as retention basins
    Sewer lines laid inside and across storm water drains
    Sewage flow in storm water drains
    Inadequate vent size railway culverts at 60 locations
Site Appreciation
DH233, Near Bagalagunte,
Site Appreciation                                  Dasarahalli




Development of land in tank
bed areas & Below drain HFL


                      DH369, Near Hegganahalli -
                      Dasarahalli
Utility Cables lines laid across SWD at culvert locations is obstruction flow of water

                                                       BH579, Near MICO Factory, Hosur Road




MD 264, Near Ramamurthynagara,
Mahadevapura




                                 BH551, Near Arkere,
                                 Bommnahalli
Site Appreciation                                   Near Hongasandra, Bommanahalli



Garbage dumped inside SWD




MD 349, Near Marathalli, ORR -
Mahadevapura




                                 Dasarahalli Zone
DH332, Kalika Nagara, Dasarahalli




Inadequate Vent Size Culverts




  DH 211,211A & B, Near Lageere Main
  Road, Dasarahalli
Reasons for flooding

          Lakes

       Reduction in number of lakes
       Blockage due to vegetation growth, dumping of debris at
        inlet/outlet location of water bodies
       Water bodies not functioning as retention basins
       Reduction in holding capacity due to reduction in lake areas,
        severe siltation and entry of sewage etc
       Non existence of regulatory gate arrangement to regulate
        flood discharge
       Non existence of interconnectivity between water bodies due
        to encroachment / modification of original alignment.
       Drain diversion/bypass arrangement made to all water bodies
Condition of Water Bodies in BBMP Area

Chikka Beguru Kere, Bommanahalli Zone     Dodda Kalsandra Kere, Bommanahalli Zone




                                         Nelakdhirenahalli Kere, Dasarahalli Zone
Karihobanahalli Kere, Dasarahalli Zone
This has led to
   Reduction in open spaces
   Reduced time of concentration
   Reduction in holding capacity of lakes.
   Limited land availability for construction of detention
    ponds
   Reduced space available for improving the drains
   More flooding
   Deterioration in public health & environmental
    sanitation conditions.
   Increased cost expenditure etc.
Master Plan for
Remodelling of Storm Water Drains
  in Eight Zones of BBMP Area
Project Objectives
   To minimise flood runoff.

   To ensure free flow of storm water and to minimize flooding in
    critical flood prone areas.

   To improve the health and environmental sanitation conditions in
    the surrounding vicinity of SWDs and Water bodies.

   To protect the existing waterways and water bodies from
    environmental degradation.

   To improve ground water level by holding rain water in water bodies.

   To provide alternate water source in case of emergencies by rain
    water harvesting.
Salient Details of Major & Minor
Water Shed Catchment Areas

                                                     No. of Major   No. of Minor
                                  Total Water Shed                                 Total Drain
Sl.                                                  Water Shed     Water Shed
                   Zone           Catchment Area                                     Length
No.                                                  Catchment      Catchment
                                        (Ha.)                                         (Km.)
                                                        Areas          Areas


1     East Zone                       10,937              8            134

2     West Zone                       6,366               4             87            225

3     South Zone                      5,553               4             69

4     Rajarajeshwarinagara Zone       15,365              9            118          138.15

5     Dasarahalli Zone                9,505               7             94           92.81

6     Yelahanka Zone                  14,235              9            129          104.91
7     Mahadevapura Zone               23,371             11            236          164.24

8     Bommanahalli Zone               16,317             16            300          115.15

              Total                  101,650             68           1167         840.26
Map showing Storm Water Drains in BBMP area
Summary of Project Findings
  • Drain reach is in natural condition at many places

  • Original alignment modified at certain reaches

  • Drain walls & culverts constructed by earst while CMC authorities
    are, inadequate vent way not as per standard designs and also in
    dilapidated condition in many places

  • Drain width drastically reduced at many places and buildings
    constructed butting to the drain wall

  • Due to change in land use the culverts constructed by earst while
    CMC authorities are not matching to the present field requirement.

  • Due to non existence of sewerage system, large quantity of raw
    sewage flow is observed in open drains.

  • The inlet/outlet weir of water bodies is in dilapidated condition and
    completely chocked

  • Inadequate maintenance is evident
Master Plan Proposals
Rain Gauging Station, Data Generation, Flood control & Monitoring Station
Development of Water Bodies as Holding Ponds
Typical Section of RCC Box Culvert in Place of Pipe Culvert
Typical Section of Bridge with Pile arrangement

Intl. Airport Road, Sahakaranagara




                                     Typical Section of slab culvert
Typical drain cross section
                        with RCC Retaining wall and Service Corridor




Property
Boundary                                                                              Property
                                                                                      Boundary




             Sewer Line                                              Sewer Line


                     Typical drain cross section with Earthen embankment,
 Property    stone revetment with CC lining and Service Corridor over embankment
 Boundary                                                                         Property
                                                                                  Boundary




           Sewer Line                                                      Sewer Line
Beautification along side Major Storm water Drains
                  in Core Area
Estimated Cost of SWD Master Plan Project
(As per 2010-11 Price Level)

                                          Amount
Sl .No.      Name of the Zone
                                       (Rs. In Crores)
    1       East
    2       West                               654.22
    3       South
    4       Bommanahalli                       665.14
    5       Yelahanka                          655.26
    6       Dasarahalli                        508.99
    7       Mahadevapura                       914.91
    8       Rajrarajeshwarinagara              759.73
                Total Estimated Cost         4,158.25
                                Say          4,160.00
MASTER PLAN PROJECT COST ALLOCATION
     ESTIMATED COST FOR STRUCTURAL WORKS FOR                              TOTAL ESTIMATED COST FOR STRUCTURAL & NON
     DIFFERENT ZONES OF BBMP UNDER SWD MASTER                              STRUCTURAL WORKS FOR DIFFERENT ZONES OF
      PLAN PROJECT TOTAL COST = 3,841.34 CRORES                              BBMP UNDER SWD MASTER PLAN PROJECT
                                                                                  TOTAL COST = 4,158.25 CRORES

                                   701.82, 18% Core Area (W +
                                               E+ S)                                                                  Core Area (W +
      470.20, 12% 845.19, 22%                                                      508.99, 12%
                                                  Bommanahalli                                                        E+ S)
                                                                                             914.91, 22%              Bommanahalli
605.32, 16%                                       Zone               655.26, 16%
                                                                                                          759.73, 18% Zone
                                                  Yelahanka Zone
                                                                                                                      Yelahanka Zone

                                                  Dasarahalli Zone
                                                                                                                      Dasarahalli Zone

        614.45, 16%               604.36, 16%     Mahadevpura
                                                                     665.14, 16%            654.22, 16%               Mahadevpura
                                                  Zone                                                                Zone
                                                  Rajarajeshwarina                                                    Rajarajeshwarinag
                                                  gar Zone                                                            ar Zone

     ESTIMATED COST FOR NON STRUCTURAL WORKS                              ESTIMATED COST FOR DIFFERENT WORKS UNDER
      FOR DIFFERENT ZONES OF BBMP UNDER SWD                                       SWD MASTER PLAN PROJECT
               MASTER PLAN PROJECT                                               TOTAL COST = 4,158.25 CRORES
             TOTAL COST = 316.91 CRORES


                  69.73, 22%                  Core Area (W +                  266.08, 6%                              Carrying Capacity
     38.79, 12%                    57.90, 18% E+ S)                  14.49, 0%                       185.00, 5%
                                                                                       749.57, 18%                    Improvement
49.94, 16%                                      Bommanahalli                                                         Rehabilitation /
                                                Zone                                                      373.80, 9% Strengthening
                                                Yelahanka Zone                                                        Culverts / Bridges

                                                Dasarahalli Zone                                                      Allied Drain Works

                               49.86, 16%
                                                Mahadevpura                                                           Decentralized
        50.69, 16%                              Zone                               2,569.30, 62                       STP's
                                                                                        %
                                                Rajarajeshwarinag                                                     Non Structural
                                                ar Zone                                                               Works
Work Programme For Implementation of Storm Water Drain Proposals of Master Plan
 Project
Sl.              Project                Estimated         Gestation          Stage - 1         Stage - 2         Stage - 3                             Stage - 1                                                Stage - 2                                                Stage - 3
                                                                                                                                       st               nd                  rd                  st               nd                  rd                  st               nd                  rd
No.            Component                  Cost             (1 Year)          (3 Years)         (3 Years)         (3 Years)         1 Year              2 Year           3 Year              1 Year              2 Year           3 Year              1 Year              2 Year               3 Year
                                       (Rs. Crores)     %      Amount      %     Amount      %     Amount      %     Amount      %   Amount          %     Amount     %   Amount          %   Amount          %     Amount     %   Amount          %   Amount          %     Amount     %       Amount
1.0 Improvement to Carrying
    Capacity:
1.1 Desilting & deepening                      121.34 5%            6.07 50%         60.67 30%         36.40 15%         18.20 60%           36.40 20%        12.13 20%           12.13 50%           18.20 30%        10.92 20%            7.28 50%            9.10 30%         5.46 20%            3.64
1.2 Widening
    a. Earthen bund                            238.59 0%            0.00 20%         47.72 40%         95.43 40%         95.43 50%           23.86 25%        11.93 25%           11.93 50%           47.72 30%        28.63 20%           19.09 50%           47.72 30%        28.63 20%           19.09
    b. RCC independent walls                   559.62 5%           27.98 40%        223.85 30%        167.89 25%        139.90 50%          111.92 30%        67.15 20%           44.77 50%           83.94 30%        50.37 20%           33.58 50%           69.95 30%        41.97 20%           27.98

       c. RCC "U" shaped walls                 971.62 5%           48.58 40%        388.65 30%        291.49 25%        242.90 50%          194.32 30%       116.59 20%           77.73 50%          145.74 30%        87.45 20%           58.30 50%          121.45 30%        72.87 20%           48.58

    d. CRS / SSM masonry                       230.12 5%           11.51 40%         92.05 30%         69.04 25%         57.53 50%           46.02 30%        27.61 20%           18.41 50%           34.52 30%        20.71 20%           13.81 50%           28.77 30%        17.26 20%           11.51
    walls
    e. RCC box drain                           369.27 5%           18.46 40%        147.71 30%        110.78 25%         92.32 50%           73.85 30%        44.31 20%           29.54 50%           55.39 30%        33.23 20%           22.16 50%           46.16 30%        27.70 20%           18.46
1.3 Bed protection                              78.75 5%            3.94 20%         15.75 50%         39.37 25%         19.69 30%            4.72 50%         7.87 20%            3.15 30%           11.81 50%        19.69 20%            7.87 30%            5.91 50%         9.84 20%            3.94
                    Sub Total                 2569.30             116.54            976.39            810.40            665.98              491.11           287.61              197.66              397.32           250.99              162.08              329.05           203.73              133.20
2.0 Rehabilitation        and
    Strengthening:
    CRS      /    SSM     Wall                  12.90 10%           1.29 50%          6.45 30%          3.87 10%          1.29 50%            3.23 30%         1.94 20%            1.29 50%            1.94 30%         1.16 20%            0.77 50%            0.65 30%         0.39 20%            0.26
    Reconstruction
    CRS      /    SSM     Wall                   1.59
                                                        10%         0.16 50%          0.79 30%          0.48 10%          0.16 50%            0.40 30%         0.24 20%            0.16 50%            0.24 30%         0.14 20%            0.10 50%            0.08 30%         0.05 20%            0.03
    Restoration
                    Sub Total                   14.49               1.45              7.24              4.35              1.45                3.62             2.17                1.45                2.17             1.30                0.87                0.72             0.43                0.29
3.0 Culverts and Bridges:

3.1 Utility supports & bridges                   5.75 15%           0.86 50%          2.88 20%          1.15 15%          0.86 60%            1.73 25%         0.72 15%            0.43 60%            0.69 25%         0.29 15%            0.17 60%            0.52 25%         0.22 15%            0.13

3.2 Remodeling                                 244.45 15%          36.67 50%        122.22 20%         48.89 15%         36.67 60%           73.33 25%        30.56 15%           18.33 60%           29.33 25%        12.22 15%            7.33 60%           22.00 25%         9.17 15%            5.50
3.3 Rehabilitation                               7.22 15%           1.08 50%          3.61 20%          1.44 15%          1.08 60%            2.16 25%         0.90 15%            0.54 60%            0.87 25%         0.36 15%            0.22 60%            0.65 25%         0.27 15%            0.16
3.4 Railway Culverts                             8.67 15%           1.30 50%          4.33 20%          1.73 15%          1.30 60%            2.60 25%         1.08 15%            0.65 60%            1.04 25%         0.43 15%            0.26 60%            0.78 25%         0.32 15%            0.19
                       Sub Total               266.08              39.91            133.04             53.22             39.91               79.82            33.26               19.96               31.93            13.30                7.98               23.95             9.98                5.99
4.0 Allied Works:
4.1 Boundary stones                              1.16 40%           0.47 60%          0.70 0%           0.00 0%           0.00 60%            0.42 20%         0.14 20%            0.14 50%            0.00 30%         0.00 20%            0.00 50%            0.00 30%         0.00 20%            0.00
4.2 Drains in low lying areas                  224.69 15%          33.70 60%        134.81 15%         33.70 10%         22.47 60%           80.89 25%        33.70 15%           20.22 60%           20.22 25%         8.43 15%            5.06 60%           13.48 25%         5.62 15%            3.37

4.3    Service roads                           187.44   0%          0.00   20%       37.49   30%       56.23   50%       93.72   20%          7.50   30%      11.25   50%         18.74   20%         11.25   30%      16.87   50%         28.12   20%         18.74   30%      28.12   50%         46.86
4.4    Fencing                                  89.39   0%          0.00   20%       17.88   30%       26.82   50%       44.69   20%          3.58   30%       5.36   50%          8.94   20%          5.36   30%       8.04   50%         13.41   20%          8.94   30%      13.41   50%         22.35
4.5    Detention ponds                          16.43   0%          0.00   20%        3.29   50%        8.22   30%        4.93   40%          1.31   30%       0.99   30%          0.99   40%          3.29   30%       2.46   30%          2.46   40%          1.97   30%       1.48   30%          1.48
4.6    Retarding basins                          8.46   5%          0.42   40%        3.38   30%        2.54   25%        2.12   50%          1.69   30%       1.02   20%          0.68   50%          1.27   30%       0.76   20%          0.51   50%          1.06   30%       0.63   20%          0.42
4.7    Development of water                     96.40   10%         9.64   30%       28.92   40%       38.56   20%       19.28   30%          8.68   50%      14.46   20%          5.78   30%         11.57   50%      19.28   20%          7.71   30%          5.78   50%       9.64   20%          3.86
       bodies
4.8    Silt traps                               11.68   5%          0.58   50%        5.84   30%        3.50   15%        1.75   60%          3.50   20%       1.17   20%          1.17   50%          1.75   30%       1.05   20%          0.70   50%          0.88   30%       0.53   20%          0.35
4.9    Desilting ramps                           5.24   0%          0.00   20%        1.05   30%        1.57   50%        2.62   20%          0.21   30%       0.31   50%          0.52   20%          0.31   30%       0.47   50%          0.79   20%          0.52   30%       0.79   50%          1.31
4.10   Inlet / out weirs                        17.57   5%          0.88   50%        8.78   30%        5.27   15%        2.64   60%          5.27   20%       1.76   20%          1.76   50%          2.64   30%       1.58   20%          1.05   50%          1.32   30%       0.79   20%          0.53
4.11   Rain gauge stations                       0.45   40%         0.18   60%        0.27    0%        0.00    0%        0.00   60%          0.16   20%       0.05   20%          0.05   50%          0.00   30%       0.00   20%          0.00   50%          0.00   30%       0.00   20%          0.00
4.12   Shifting of sewers                       69.47   5%          3.47   50%       34.73   30%       20.84   15%       10.42   60%         20.84   20%       6.95   20%          6.95   50%         10.42   30%       6.25   20%          4.17   50%          5.21   30%       3.13   20%          2.08
4.13   Desilting equipments                     18.00   25%         4.50   50%        9.00   25%        4.50    0%        0.00   60%          5.40   20%       1.80   20%          1.80   50%          2.25   30%       1.35   20%          0.90   50%          0.00   30%       0.00   20%          0.00
4.14   Vehicles for vigilance                    3.20   10%         0.32   50%        1.60   25%        0.80   15%        0.48   60%          0.96   20%       0.32   20%          0.32   50%          0.40   30%       0.24   20%          0.16   50%          0.24   30%       0.14   20%          0.10
       squad
                           Sub Total           749.57              54.17            287.74            202.55            205.11              140.41            79.27               68.06               70.73            66.79               65.03               58.14            64.27               82.70
5.0    Sewage             Treatment
       Plants:
       Decentralized STP's                     185.00 10%          18.50 30%         55.50 40%         74.00 20%         37.00 25%           13.88 60%        33.30 15%            8.33 25%           18.50 60%        44.40 15%           11.10 25%            9.25 60%        22.20 15%            5.55
                           Sub Total           185.00              18.50             55.50             74.00             37.00               13.88            33.30                8.33               18.50            44.40               11.10                9.25            22.20                5.55
                  Total Structural =          3784.45             230.56           1459.92           1144.51            949.45              728.84           435.62              295.45              520.65           376.79              247.06              421.12           300.61              227.72
6.0    Non Structural Works:

6.1 DPR and PMC                                 38.41 100%         38.41 0%           0.00 0%           0.00 0%           0.00 0%             0.00 0%          0.00 0%             0.00 0%             0.00 0%          0.00 0%             0.00 0%             0.00 0%          0.00 0%             0.00
6.2 Rehabilitation           and                76.83 40%          30.73 60%         46.10 0%           0.00 0%           0.00 60%           27.66 20%         9.22 20%            9.22 50%            0.00 30%         0.00 20%            0.00 50%            0.00 30%         0.00 20%            0.00
    resettlement
6.3 Shifting of other services                  56.89 5%            2.84 50%         28.44 30%         17.07 15%          8.53 60%           17.07 20%         5.69 20%            5.69 50%            8.53 30%         5.12 20%            3.41 50%            4.27 30%         2.56 20%            1.71

6.4 Development of green belt                    9.60 0%            0.00 20%          1.92 30%          2.88 50%          4.80 20%            0.38 30%         0.58 50%            0.96 20%            0.58 30%         0.86 50%            1.44 20%            0.96 30%         1.44 50%            2.40

6.5 WCE + Admin.                               192.07 10%          19.21 30%         57.62 30%         57.62 30%         57.62 25%           14.41 35%        20.17 40%           23.05 25%           14.41 35%        20.17 40%           23.05 25%           14.41 35%        20.17 40%           23.05
      Total Non Structural =                   373.80              91.20            134.08             77.57             70.96               59.51            35.65               38.92               23.51            26.15               27.90               19.63            24.17               27.16
             Total of SWD =                   4158.25             321.76           1594.00           1222.08           1020.41              788.35           471.27              334.37              544.17           402.95              274.97              440.75           324.78              254.88
PROJECT PHASING AND INVESTMENT PLAN
                                                                                                                                                                                     TOTAL PROJECT INVESTMENT PLAN FOR MASTER PLAN
                                  PROJECT INVESTMENT PLAN FOR TOTAL MASTER PLAN
                                          PROJECT FOR STRUCTURAL WORKS                                                                                                                        TOTAL COST Rs. 4158.25 CRORES
                                            TOTAL COST Rs. 3784.45 CRORES
                                                                                                                                                                                  900.00
                                                                                                                                                                                                   795.72
                               800.00                                                                                                                                             800.00




                                                                                                                                                    Estimated Cost (Rs. Crores)
                                                 736.21
 Estimated Cost (Rs. Crores)




                               700.00                                                                                                                                             700.00
                                                                                                                                                                                                                                         546.22
                               600.00                                                                                                                                             600.00
                                                                            522.71                                                                                                                          472.42                                                          439.47
                               500.00                     436.77                                       419.84                                                                     500.00                                                           402.67                                   321.50
                                                                                     376.52
                               400.00                              295.49                                       297.33                                                            400.00 325.07                                334.41                          272.27                                  248.50
                                                                                              244.36
                               300.00                                                                                    221.35
                                        233.87                                                                                                                                    300.00
                               200.00                                                                                                                                             200.00
                               100.00                                                                                                                                             100.00
                                 0.00                                                                                                                                               0.00
                                         1st     2nd      3rd       4th       5th     6th      7th      8th       9th    10th
                                                                                                                                                                                            1st     2nd      3rd                4th        5th      6th               7th    8th             9th          10th
                                        Year     Year     Year     Year      Year    Year     Year     Year      Year    Year
                                                                                                                                                                                           Year     Year    Year               Year       Year     Year              Year   Year            Year          Year
                                                                             Project Year
                                                                                                                                                                                                                                           Project Year


                                   PROJECT INVESTMENT PLAN FOR TOTAL MASTER PLAN
                                        PROJECT FOR NON STRUCTURAL WORKS                                                                                                             PROJECT INVESTMENT PLAN FOR DIFFERENT WORKS
                                             TOTAL COST Rs. 373.80 CRORES                                                                                                                      FOR MASTER PLAN PROJECT
                                                                                                                                                                                             TOTAL COST Rs. 4158.25 CRORES

                               100.00


                                                                                                                                  Estimated Cost (Rs. Crores)
                                        91.20                                                                                                                                 3000.00
                                90.00                                                                                                                                                      2569.24
Estimated Cost (Rs. Crores)




                                80.00                                                                                                                                         2500.00
                                70.00                                                                                                                                         2000.00
                                                 59.51                                                                                                                                                                                              749.64
                                60.00                                                                                                                                         1500.00
                                50.00                              38.92
                                                                                                                                                                              1000.00
                                40.00                      35.65                                                                                                                                                                   266.08                                                       373.80
                                                                                               27.90                      27.16                                                                                                                                             185.00
                                                                                                                                                                                  500.00                    14.49
                                30.00                                        23.51 26.15                19.63 24.17
                                20.00                                                                                                                                               0.00
                                                                                                                                                                                            Improvement




                                                                                                                                                                                                                                                                                                   Non Structural
                                                                                                                                                                                                                                      Culverts /




                                                                                                                                                                                                                                                                            Decentralized
                                                                                                                                                                                                            Rehabilitation /




                                                                                                                                                                                                                                                      Allied Drain
                                                                                                                                                                                                            Strengthening




                                                                                                                                                                                                                                       Bridges
                                10.00
                                                                                                                                                                                              Capacity
                                                                                                                                                                                              Carrying




                                                                                                                                                                                                                                                          Works




                                                                                                                                                                                                                                                                               STP's




                                                                                                                                                                                                                                                                                                      Works
                                 0.00
                                         1st     2nd       3rd       4th      5th      6th      7th      8th       9th    10th
                                        Year     Year      Year     Year     Year     Year     Year     Year      Year    Year
                                                                             Project Year                                                                                                                                                Type of Work
Benefits from Implementation
   Provision of a properly designed drainage system for a
    reasonably acceptable return period would ensure reduction in
    flood incidences which in turn reduces flood damages and traffic
    hold ups.

   Provision and properly maintained drainage system with controls
    on sewage connections and solid waste dumping will enhance
    the Environmental quality in the form of reduced pollution of
    water bodies and ground water.

   Provision and proper maintenance of facilities like detention
    ponds and retention basins will not only attenuate the peak run-
    offs but also provide recharge of ground water which will improve
    ground water table.

   Provision and proper maintenance of localized sewage treatment
    plants and using the treated sewage will reduce the stress on
    fresh water sources.

   Availability of treated sewage will enable more greenery and fresh
    water lake developed assists reduction in climate change.
Thank you

Mais conteúdo relacionado

Mais procurados

Chapter 9 sustainibility of water resources
Chapter 9 sustainibility of water resourcesChapter 9 sustainibility of water resources
Chapter 9 sustainibility of water resourcesMohammed Salahat
 
RAINFALL RUNOFF MODELLING USING HEC-HMS
RAINFALL RUNOFF MODELLING                USING HEC-HMSRAINFALL RUNOFF MODELLING                USING HEC-HMS
RAINFALL RUNOFF MODELLING USING HEC-HMSPushp Aggarwal
 
Sprinkler Irrigation Technology and Applications, 2011
 Sprinkler Irrigation Technology and Applications, 2011  Sprinkler Irrigation Technology and Applications, 2011
Sprinkler Irrigation Technology and Applications, 2011 Ayman Morshedy
 
Design mannual for small scale irrigation scheme book
Design mannual for small scale irrigation scheme bookDesign mannual for small scale irrigation scheme book
Design mannual for small scale irrigation scheme bookSurendra Maharjan
 
Morphometric Analysis and prioritization of watersheds of Mahanadi River Basi...
Morphometric Analysis and prioritization of watersheds of Mahanadi River Basi...Morphometric Analysis and prioritization of watersheds of Mahanadi River Basi...
Morphometric Analysis and prioritization of watersheds of Mahanadi River Basi...RINKU MEENA
 
06 115 water resources management
06 115 water resources management06 115 water resources management
06 115 water resources managementAHMED NADIM JILANI
 
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...Ekonnect Knowledge Foundation
 
Water resources development in india.
Water resources development in india.Water resources development in india.
Water resources development in india.Manish Singh
 
Desin of penstock pipe ppt
Desin of penstock pipe pptDesin of penstock pipe ppt
Desin of penstock pipe pptzafaralam7868
 
History of road in Nepal
History of road in NepalHistory of road in Nepal
History of road in Nepalpnbastola
 
Water resources in india
Water resources in indiaWater resources in india
Water resources in indiaTej Kiran
 
Integrated Urban Water Management, by Kala Vairavamoorthy
Integrated Urban Water Management, by Kala VairavamoorthyIntegrated Urban Water Management, by Kala Vairavamoorthy
Integrated Urban Water Management, by Kala VairavamoorthyGlobal Water Partnership
 
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)Vijai Krishnan V
 

Mais procurados (20)

Chapter 9 sustainibility of water resources
Chapter 9 sustainibility of water resourcesChapter 9 sustainibility of water resources
Chapter 9 sustainibility of water resources
 
RAINFALL RUNOFF MODELLING USING HEC-HMS
RAINFALL RUNOFF MODELLING                USING HEC-HMSRAINFALL RUNOFF MODELLING                USING HEC-HMS
RAINFALL RUNOFF MODELLING USING HEC-HMS
 
Sprinkler Irrigation Technology and Applications, 2011
 Sprinkler Irrigation Technology and Applications, 2011  Sprinkler Irrigation Technology and Applications, 2011
Sprinkler Irrigation Technology and Applications, 2011
 
Water conservation
Water conservationWater conservation
Water conservation
 
Design mannual for small scale irrigation scheme book
Design mannual for small scale irrigation scheme bookDesign mannual for small scale irrigation scheme book
Design mannual for small scale irrigation scheme book
 
Morphometric Analysis and prioritization of watersheds of Mahanadi River Basi...
Morphometric Analysis and prioritization of watersheds of Mahanadi River Basi...Morphometric Analysis and prioritization of watersheds of Mahanadi River Basi...
Morphometric Analysis and prioritization of watersheds of Mahanadi River Basi...
 
Hardycross method
Hardycross methodHardycross method
Hardycross method
 
RAINWATER HARVESTING
RAINWATER HARVESTINGRAINWATER HARVESTING
RAINWATER HARVESTING
 
06 115 water resources management
06 115 water resources management06 115 water resources management
06 115 water resources management
 
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
 
Water resources development in india.
Water resources development in india.Water resources development in india.
Water resources development in india.
 
Desin of penstock pipe ppt
Desin of penstock pipe pptDesin of penstock pipe ppt
Desin of penstock pipe ppt
 
History of road in Nepal
History of road in NepalHistory of road in Nepal
History of road in Nepal
 
Macchu dam
Macchu dam Macchu dam
Macchu dam
 
Tehri Dam
Tehri DamTehri Dam
Tehri Dam
 
Water resources in india
Water resources in indiaWater resources in india
Water resources in india
 
Srorm water management
Srorm water managementSrorm water management
Srorm water management
 
Integrated Urban Water Management, by Kala Vairavamoorthy
Integrated Urban Water Management, by Kala VairavamoorthyIntegrated Urban Water Management, by Kala Vairavamoorthy
Integrated Urban Water Management, by Kala Vairavamoorthy
 
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
 
Water resource engineering project list 2
Water resource engineering project list 2Water resource engineering project list 2
Water resource engineering project list 2
 

Semelhante a Master Plan Project Report on Remodeling of Storm Water Drains_BBMP

Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
Master Plan Project Report on Remodeling of Storm Water Drains_BBMPMaster Plan Project Report on Remodeling of Storm Water Drains_BBMP
Master Plan Project Report on Remodeling of Storm Water Drains_BBMPEkonnect Knowledge Foundation
 
An Effort towards Water Security:Gujarat Experience_Mahesh Singh, GoG_Indovat...
An Effort towards Water Security:Gujarat Experience_Mahesh Singh, GoG_Indovat...An Effort towards Water Security:Gujarat Experience_Mahesh Singh, GoG_Indovat...
An Effort towards Water Security:Gujarat Experience_Mahesh Singh, GoG_Indovat...India Water Portal
 
Understanding Saul Kere
Understanding Saul KereUnderstanding Saul Kere
Understanding Saul Kerebiometrust
 
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LININGSEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LININGDEEPAK MALLICK
 
Designing effective Rainwater Harvesting systems_Saravanan_2013
Designing effective Rainwater Harvesting systems_Saravanan_2013Designing effective Rainwater Harvesting systems_Saravanan_2013
Designing effective Rainwater Harvesting systems_Saravanan_2013India Water Portal
 
WS-D1-CEWRE_PPT.pdf
WS-D1-CEWRE_PPT.pdfWS-D1-CEWRE_PPT.pdf
WS-D1-CEWRE_PPT.pdfssuserca460e
 
Jaipur_water supply service.pdf
Jaipur_water supply service.pdfJaipur_water supply service.pdf
Jaipur_water supply service.pdfAKASHICWORLD
 
measures to counteract urban floods
measures to counteract urban floodsmeasures to counteract urban floods
measures to counteract urban floodsdontknow288849
 
Towards A Sustainable Drainage Solution
Towards A Sustainable Drainage SolutionTowards A Sustainable Drainage Solution
Towards A Sustainable Drainage Solutionceal2005
 
Saltwater Intrusion on the Main Rivers under the Impact of Climate Change, Ng...
Saltwater Intrusion on the Main Rivers under the Impact of Climate Change, Ng...Saltwater Intrusion on the Main Rivers under the Impact of Climate Change, Ng...
Saltwater Intrusion on the Main Rivers under the Impact of Climate Change, Ng...Hanna Stahlberg
 
\\Utdc\Ut Users\Crichards\Desktop\Pro Green 2010
\\Utdc\Ut Users\Crichards\Desktop\Pro Green 2010\\Utdc\Ut Users\Crichards\Desktop\Pro Green 2010
\\Utdc\Ut Users\Crichards\Desktop\Pro Green 2010Town of Castle Rock
 

Semelhante a Master Plan Project Report on Remodeling of Storm Water Drains_BBMP (20)

Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
Master Plan Project Report on Remodeling of Storm Water Drains_BBMPMaster Plan Project Report on Remodeling of Storm Water Drains_BBMP
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
 
An Effort towards Water Security:Gujarat Experience_Mahesh Singh, GoG_Indovat...
An Effort towards Water Security:Gujarat Experience_Mahesh Singh, GoG_Indovat...An Effort towards Water Security:Gujarat Experience_Mahesh Singh, GoG_Indovat...
An Effort towards Water Security:Gujarat Experience_Mahesh Singh, GoG_Indovat...
 
Understanding Saul Kere
Understanding Saul KereUnderstanding Saul Kere
Understanding Saul Kere
 
ANP DAM PPT Dt 30-10-2022 EE.pptx
ANP DAM PPT Dt 30-10-2022 EE.pptxANP DAM PPT Dt 30-10-2022 EE.pptx
ANP DAM PPT Dt 30-10-2022 EE.pptx
 
Resource Recovery Panel
Resource Recovery PanelResource Recovery Panel
Resource Recovery Panel
 
Experience of GIZ-SLM Amhara on agricultural water management
Experience of GIZ-SLM Amhara on agricultural water managementExperience of GIZ-SLM Amhara on agricultural water management
Experience of GIZ-SLM Amhara on agricultural water management
 
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LININGSEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
 
Planning of irrigation system
Planning of irrigation systemPlanning of irrigation system
Planning of irrigation system
 
Designing effective Rainwater Harvesting systems_Saravanan_2013
Designing effective Rainwater Harvesting systems_Saravanan_2013Designing effective Rainwater Harvesting systems_Saravanan_2013
Designing effective Rainwater Harvesting systems_Saravanan_2013
 
WS-D1-CEWRE_PPT.pdf
WS-D1-CEWRE_PPT.pdfWS-D1-CEWRE_PPT.pdf
WS-D1-CEWRE_PPT.pdf
 
Jaipur_water supply service.pdf
Jaipur_water supply service.pdfJaipur_water supply service.pdf
Jaipur_water supply service.pdf
 
Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15
 
Mp ground water
Mp ground waterMp ground water
Mp ground water
 
measures to counteract urban floods
measures to counteract urban floodsmeasures to counteract urban floods
measures to counteract urban floods
 
Srisailam project final
Srisailam project finalSrisailam project final
Srisailam project final
 
Towards A Sustainable Drainage Solution
Towards A Sustainable Drainage SolutionTowards A Sustainable Drainage Solution
Towards A Sustainable Drainage Solution
 
Mahesvaran CN - UEI Day 2 - Kochi Jan18
Mahesvaran CN - UEI Day 2 - Kochi Jan18Mahesvaran CN - UEI Day 2 - Kochi Jan18
Mahesvaran CN - UEI Day 2 - Kochi Jan18
 
Saltwater Intrusion on the Main Rivers under the Impact of Climate Change, Ng...
Saltwater Intrusion on the Main Rivers under the Impact of Climate Change, Ng...Saltwater Intrusion on the Main Rivers under the Impact of Climate Change, Ng...
Saltwater Intrusion on the Main Rivers under the Impact of Climate Change, Ng...
 
\\Utdc\Ut Users\Crichards\Desktop\Pro Green 2010
\\Utdc\Ut Users\Crichards\Desktop\Pro Green 2010\\Utdc\Ut Users\Crichards\Desktop\Pro Green 2010
\\Utdc\Ut Users\Crichards\Desktop\Pro Green 2010
 
Kerala sw
Kerala swKerala sw
Kerala sw
 

Mais de Ekonnect

Lake Development Authority_CEO
Lake Development Authority_CEOLake Development Authority_CEO
Lake Development Authority_CEOEkonnect
 
Strategic Action Planning for Revival of Bangalore Lakes_KSPCB
Strategic Action Planning for Revival of Bangalore Lakes_KSPCBStrategic Action Planning for Revival of Bangalore Lakes_KSPCB
Strategic Action Planning for Revival of Bangalore Lakes_KSPCBEkonnect
 
Strategic Action Planning for Revival of Bangalore Lakes _ESG
Strategic Action Planning for Revival of Bangalore Lakes _ESGStrategic Action Planning for Revival of Bangalore Lakes _ESG
Strategic Action Planning for Revival of Bangalore Lakes _ESGEkonnect
 
Assessment Derived Conservation Strategies for Lakes in Bangalore
Assessment Derived Conservation Strategies  for Lakes in BangaloreAssessment Derived Conservation Strategies  for Lakes in Bangalore
Assessment Derived Conservation Strategies for Lakes in BangaloreEkonnect
 
Influence of Urban-Rural Gradient on Wetlands of Bangalore_CiSTUP
Influence of Urban-Rural Gradient on Wetlands of Bangalore_CiSTUPInfluence of Urban-Rural Gradient on Wetlands of Bangalore_CiSTUP
Influence of Urban-Rural Gradient on Wetlands of Bangalore_CiSTUPEkonnect
 
Action taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of LakesAction taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of LakesEkonnect
 
Development and Maintenance of Lakes_BBMP
Development and Maintenance of Lakes_BBMPDevelopment and Maintenance of Lakes_BBMP
Development and Maintenance of Lakes_BBMPEkonnect
 
Prasad Modak Presentation at First Multistakholder Workshop
Prasad Modak Presentation at First Multistakholder WorkshopPrasad Modak Presentation at First Multistakholder Workshop
Prasad Modak Presentation at First Multistakholder WorkshopEkonnect
 

Mais de Ekonnect (8)

Lake Development Authority_CEO
Lake Development Authority_CEOLake Development Authority_CEO
Lake Development Authority_CEO
 
Strategic Action Planning for Revival of Bangalore Lakes_KSPCB
Strategic Action Planning for Revival of Bangalore Lakes_KSPCBStrategic Action Planning for Revival of Bangalore Lakes_KSPCB
Strategic Action Planning for Revival of Bangalore Lakes_KSPCB
 
Strategic Action Planning for Revival of Bangalore Lakes _ESG
Strategic Action Planning for Revival of Bangalore Lakes _ESGStrategic Action Planning for Revival of Bangalore Lakes _ESG
Strategic Action Planning for Revival of Bangalore Lakes _ESG
 
Assessment Derived Conservation Strategies for Lakes in Bangalore
Assessment Derived Conservation Strategies  for Lakes in BangaloreAssessment Derived Conservation Strategies  for Lakes in Bangalore
Assessment Derived Conservation Strategies for Lakes in Bangalore
 
Influence of Urban-Rural Gradient on Wetlands of Bangalore_CiSTUP
Influence of Urban-Rural Gradient on Wetlands of Bangalore_CiSTUPInfluence of Urban-Rural Gradient on Wetlands of Bangalore_CiSTUP
Influence of Urban-Rural Gradient on Wetlands of Bangalore_CiSTUP
 
Action taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of LakesAction taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of Lakes
 
Development and Maintenance of Lakes_BBMP
Development and Maintenance of Lakes_BBMPDevelopment and Maintenance of Lakes_BBMP
Development and Maintenance of Lakes_BBMP
 
Prasad Modak Presentation at First Multistakholder Workshop
Prasad Modak Presentation at First Multistakholder WorkshopPrasad Modak Presentation at First Multistakholder Workshop
Prasad Modak Presentation at First Multistakholder Workshop
 

Último

"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontologyjohnbeverley2021
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Victor Rentea
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesrafiqahmad00786416
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...apidays
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKJago de Vreede
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfOrbitshub
 
JohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard37
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamUiPathCommunity
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...apidays
 

Último (20)

"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
JohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptx
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 

Master Plan Project Report on Remodeling of Storm Water Drains_BBMP

  • 1. Bruhath Bengaluru Mahanagara Palike Presentation on Master Plan Project Report for Remodeling of Storm Water Drains in Entire BBMP Area, Bengaluru STUP Consultants Pvt. Ltd.
  • 2. Salient Features  Bruhath Bengaluru Mahanagara Palike (BBMP) Area - 710 Sq.Km. (Core Area - 225 Sq.Km., Peripheral Area - 485 Sq. Km.)  Total Water Shed / Catchment Area - 1016. 50 Sq.km.  Total Length of SWD in BBMP Area – 840 Km. (Core Area – 240 Km., Peripheral Area - 600 Km.) (Primary Drain Length – 415 Km. & Secondary Drain Length – 425 Km.)
  • 3. Master Plan Project Study Area  Core Area  East Zone  West Zone  South Zone  Bommanahalli  Yelahanka  Dasarahalli  Mahadevapura  Rajarajeshwarinagara Study Area Map
  • 4. Reasons for flooding  Change in land use pattern  Flow obstruction due to construction of RCC hume pipe culverts  Inappropriate design approach, construction methodology for structures and maintenance procedures adopted in newly formed layouts  Development of land in tank bed areas and below drain HFL  Modification of original drain alignment during formation of layouts  Non existence of service roads on either side for laying service lines and routine maintenance.  Indiscriminate dumping of debris and solid wastes into drains  Dense vegetation growth  Encroachment / Modification of original drain alignment  Lack of access for routine maintenance  Services lines laid inside and across drains  Blockage of inlet/outlet location of water bodies  Water bodies not functioning as retention basins  Sewer lines laid inside and across storm water drains  Sewage flow in storm water drains  Inadequate vent size railway culverts at 60 locations
  • 6. DH233, Near Bagalagunte, Site Appreciation Dasarahalli Development of land in tank bed areas & Below drain HFL DH369, Near Hegganahalli - Dasarahalli
  • 7. Utility Cables lines laid across SWD at culvert locations is obstruction flow of water BH579, Near MICO Factory, Hosur Road MD 264, Near Ramamurthynagara, Mahadevapura BH551, Near Arkere, Bommnahalli
  • 8. Site Appreciation Near Hongasandra, Bommanahalli Garbage dumped inside SWD MD 349, Near Marathalli, ORR - Mahadevapura Dasarahalli Zone
  • 9. DH332, Kalika Nagara, Dasarahalli Inadequate Vent Size Culverts DH 211,211A & B, Near Lageere Main Road, Dasarahalli
  • 10. Reasons for flooding  Lakes  Reduction in number of lakes  Blockage due to vegetation growth, dumping of debris at inlet/outlet location of water bodies  Water bodies not functioning as retention basins  Reduction in holding capacity due to reduction in lake areas, severe siltation and entry of sewage etc  Non existence of regulatory gate arrangement to regulate flood discharge  Non existence of interconnectivity between water bodies due to encroachment / modification of original alignment.  Drain diversion/bypass arrangement made to all water bodies
  • 11. Condition of Water Bodies in BBMP Area Chikka Beguru Kere, Bommanahalli Zone Dodda Kalsandra Kere, Bommanahalli Zone Nelakdhirenahalli Kere, Dasarahalli Zone Karihobanahalli Kere, Dasarahalli Zone
  • 12. This has led to  Reduction in open spaces  Reduced time of concentration  Reduction in holding capacity of lakes.  Limited land availability for construction of detention ponds  Reduced space available for improving the drains  More flooding  Deterioration in public health & environmental sanitation conditions.  Increased cost expenditure etc.
  • 13. Master Plan for Remodelling of Storm Water Drains in Eight Zones of BBMP Area
  • 14. Project Objectives  To minimise flood runoff.  To ensure free flow of storm water and to minimize flooding in critical flood prone areas.  To improve the health and environmental sanitation conditions in the surrounding vicinity of SWDs and Water bodies.  To protect the existing waterways and water bodies from environmental degradation.  To improve ground water level by holding rain water in water bodies.  To provide alternate water source in case of emergencies by rain water harvesting.
  • 15. Salient Details of Major & Minor Water Shed Catchment Areas No. of Major No. of Minor Total Water Shed Total Drain Sl. Water Shed Water Shed Zone Catchment Area Length No. Catchment Catchment (Ha.) (Km.) Areas Areas 1 East Zone 10,937 8 134 2 West Zone 6,366 4 87 225 3 South Zone 5,553 4 69 4 Rajarajeshwarinagara Zone 15,365 9 118 138.15 5 Dasarahalli Zone 9,505 7 94 92.81 6 Yelahanka Zone 14,235 9 129 104.91 7 Mahadevapura Zone 23,371 11 236 164.24 8 Bommanahalli Zone 16,317 16 300 115.15 Total 101,650 68 1167 840.26
  • 16. Map showing Storm Water Drains in BBMP area
  • 17. Summary of Project Findings • Drain reach is in natural condition at many places • Original alignment modified at certain reaches • Drain walls & culverts constructed by earst while CMC authorities are, inadequate vent way not as per standard designs and also in dilapidated condition in many places • Drain width drastically reduced at many places and buildings constructed butting to the drain wall • Due to change in land use the culverts constructed by earst while CMC authorities are not matching to the present field requirement. • Due to non existence of sewerage system, large quantity of raw sewage flow is observed in open drains. • The inlet/outlet weir of water bodies is in dilapidated condition and completely chocked • Inadequate maintenance is evident
  • 19.
  • 20. Rain Gauging Station, Data Generation, Flood control & Monitoring Station
  • 21. Development of Water Bodies as Holding Ponds
  • 22. Typical Section of RCC Box Culvert in Place of Pipe Culvert
  • 23. Typical Section of Bridge with Pile arrangement Intl. Airport Road, Sahakaranagara Typical Section of slab culvert
  • 24. Typical drain cross section with RCC Retaining wall and Service Corridor Property Boundary Property Boundary Sewer Line Sewer Line Typical drain cross section with Earthen embankment, Property stone revetment with CC lining and Service Corridor over embankment Boundary Property Boundary Sewer Line Sewer Line
  • 25. Beautification along side Major Storm water Drains in Core Area
  • 26. Estimated Cost of SWD Master Plan Project (As per 2010-11 Price Level) Amount Sl .No. Name of the Zone (Rs. In Crores) 1 East 2 West 654.22 3 South 4 Bommanahalli 665.14 5 Yelahanka 655.26 6 Dasarahalli 508.99 7 Mahadevapura 914.91 8 Rajrarajeshwarinagara 759.73 Total Estimated Cost 4,158.25 Say 4,160.00
  • 27. MASTER PLAN PROJECT COST ALLOCATION ESTIMATED COST FOR STRUCTURAL WORKS FOR TOTAL ESTIMATED COST FOR STRUCTURAL & NON DIFFERENT ZONES OF BBMP UNDER SWD MASTER STRUCTURAL WORKS FOR DIFFERENT ZONES OF PLAN PROJECT TOTAL COST = 3,841.34 CRORES BBMP UNDER SWD MASTER PLAN PROJECT TOTAL COST = 4,158.25 CRORES 701.82, 18% Core Area (W + E+ S) Core Area (W + 470.20, 12% 845.19, 22% 508.99, 12% Bommanahalli E+ S) 914.91, 22% Bommanahalli 605.32, 16% Zone 655.26, 16% 759.73, 18% Zone Yelahanka Zone Yelahanka Zone Dasarahalli Zone Dasarahalli Zone 614.45, 16% 604.36, 16% Mahadevpura 665.14, 16% 654.22, 16% Mahadevpura Zone Zone Rajarajeshwarina Rajarajeshwarinag gar Zone ar Zone ESTIMATED COST FOR NON STRUCTURAL WORKS ESTIMATED COST FOR DIFFERENT WORKS UNDER FOR DIFFERENT ZONES OF BBMP UNDER SWD SWD MASTER PLAN PROJECT MASTER PLAN PROJECT TOTAL COST = 4,158.25 CRORES TOTAL COST = 316.91 CRORES 69.73, 22% Core Area (W + 266.08, 6% Carrying Capacity 38.79, 12% 57.90, 18% E+ S) 14.49, 0% 185.00, 5% 749.57, 18% Improvement 49.94, 16% Bommanahalli Rehabilitation / Zone 373.80, 9% Strengthening Yelahanka Zone Culverts / Bridges Dasarahalli Zone Allied Drain Works 49.86, 16% Mahadevpura Decentralized 50.69, 16% Zone 2,569.30, 62 STP's % Rajarajeshwarinag Non Structural ar Zone Works
  • 28. Work Programme For Implementation of Storm Water Drain Proposals of Master Plan Project Sl. Project Estimated Gestation Stage - 1 Stage - 2 Stage - 3 Stage - 1 Stage - 2 Stage - 3 st nd rd st nd rd st nd rd No. Component Cost (1 Year) (3 Years) (3 Years) (3 Years) 1 Year 2 Year 3 Year 1 Year 2 Year 3 Year 1 Year 2 Year 3 Year (Rs. Crores) % Amount % Amount % Amount % Amount % Amount % Amount % Amount % Amount % Amount % Amount % Amount % Amount % Amount 1.0 Improvement to Carrying Capacity: 1.1 Desilting & deepening 121.34 5% 6.07 50% 60.67 30% 36.40 15% 18.20 60% 36.40 20% 12.13 20% 12.13 50% 18.20 30% 10.92 20% 7.28 50% 9.10 30% 5.46 20% 3.64 1.2 Widening a. Earthen bund 238.59 0% 0.00 20% 47.72 40% 95.43 40% 95.43 50% 23.86 25% 11.93 25% 11.93 50% 47.72 30% 28.63 20% 19.09 50% 47.72 30% 28.63 20% 19.09 b. RCC independent walls 559.62 5% 27.98 40% 223.85 30% 167.89 25% 139.90 50% 111.92 30% 67.15 20% 44.77 50% 83.94 30% 50.37 20% 33.58 50% 69.95 30% 41.97 20% 27.98 c. RCC "U" shaped walls 971.62 5% 48.58 40% 388.65 30% 291.49 25% 242.90 50% 194.32 30% 116.59 20% 77.73 50% 145.74 30% 87.45 20% 58.30 50% 121.45 30% 72.87 20% 48.58 d. CRS / SSM masonry 230.12 5% 11.51 40% 92.05 30% 69.04 25% 57.53 50% 46.02 30% 27.61 20% 18.41 50% 34.52 30% 20.71 20% 13.81 50% 28.77 30% 17.26 20% 11.51 walls e. RCC box drain 369.27 5% 18.46 40% 147.71 30% 110.78 25% 92.32 50% 73.85 30% 44.31 20% 29.54 50% 55.39 30% 33.23 20% 22.16 50% 46.16 30% 27.70 20% 18.46 1.3 Bed protection 78.75 5% 3.94 20% 15.75 50% 39.37 25% 19.69 30% 4.72 50% 7.87 20% 3.15 30% 11.81 50% 19.69 20% 7.87 30% 5.91 50% 9.84 20% 3.94 Sub Total 2569.30 116.54 976.39 810.40 665.98 491.11 287.61 197.66 397.32 250.99 162.08 329.05 203.73 133.20 2.0 Rehabilitation and Strengthening: CRS / SSM Wall 12.90 10% 1.29 50% 6.45 30% 3.87 10% 1.29 50% 3.23 30% 1.94 20% 1.29 50% 1.94 30% 1.16 20% 0.77 50% 0.65 30% 0.39 20% 0.26 Reconstruction CRS / SSM Wall 1.59 10% 0.16 50% 0.79 30% 0.48 10% 0.16 50% 0.40 30% 0.24 20% 0.16 50% 0.24 30% 0.14 20% 0.10 50% 0.08 30% 0.05 20% 0.03 Restoration Sub Total 14.49 1.45 7.24 4.35 1.45 3.62 2.17 1.45 2.17 1.30 0.87 0.72 0.43 0.29 3.0 Culverts and Bridges: 3.1 Utility supports & bridges 5.75 15% 0.86 50% 2.88 20% 1.15 15% 0.86 60% 1.73 25% 0.72 15% 0.43 60% 0.69 25% 0.29 15% 0.17 60% 0.52 25% 0.22 15% 0.13 3.2 Remodeling 244.45 15% 36.67 50% 122.22 20% 48.89 15% 36.67 60% 73.33 25% 30.56 15% 18.33 60% 29.33 25% 12.22 15% 7.33 60% 22.00 25% 9.17 15% 5.50 3.3 Rehabilitation 7.22 15% 1.08 50% 3.61 20% 1.44 15% 1.08 60% 2.16 25% 0.90 15% 0.54 60% 0.87 25% 0.36 15% 0.22 60% 0.65 25% 0.27 15% 0.16 3.4 Railway Culverts 8.67 15% 1.30 50% 4.33 20% 1.73 15% 1.30 60% 2.60 25% 1.08 15% 0.65 60% 1.04 25% 0.43 15% 0.26 60% 0.78 25% 0.32 15% 0.19 Sub Total 266.08 39.91 133.04 53.22 39.91 79.82 33.26 19.96 31.93 13.30 7.98 23.95 9.98 5.99 4.0 Allied Works: 4.1 Boundary stones 1.16 40% 0.47 60% 0.70 0% 0.00 0% 0.00 60% 0.42 20% 0.14 20% 0.14 50% 0.00 30% 0.00 20% 0.00 50% 0.00 30% 0.00 20% 0.00 4.2 Drains in low lying areas 224.69 15% 33.70 60% 134.81 15% 33.70 10% 22.47 60% 80.89 25% 33.70 15% 20.22 60% 20.22 25% 8.43 15% 5.06 60% 13.48 25% 5.62 15% 3.37 4.3 Service roads 187.44 0% 0.00 20% 37.49 30% 56.23 50% 93.72 20% 7.50 30% 11.25 50% 18.74 20% 11.25 30% 16.87 50% 28.12 20% 18.74 30% 28.12 50% 46.86 4.4 Fencing 89.39 0% 0.00 20% 17.88 30% 26.82 50% 44.69 20% 3.58 30% 5.36 50% 8.94 20% 5.36 30% 8.04 50% 13.41 20% 8.94 30% 13.41 50% 22.35 4.5 Detention ponds 16.43 0% 0.00 20% 3.29 50% 8.22 30% 4.93 40% 1.31 30% 0.99 30% 0.99 40% 3.29 30% 2.46 30% 2.46 40% 1.97 30% 1.48 30% 1.48 4.6 Retarding basins 8.46 5% 0.42 40% 3.38 30% 2.54 25% 2.12 50% 1.69 30% 1.02 20% 0.68 50% 1.27 30% 0.76 20% 0.51 50% 1.06 30% 0.63 20% 0.42 4.7 Development of water 96.40 10% 9.64 30% 28.92 40% 38.56 20% 19.28 30% 8.68 50% 14.46 20% 5.78 30% 11.57 50% 19.28 20% 7.71 30% 5.78 50% 9.64 20% 3.86 bodies 4.8 Silt traps 11.68 5% 0.58 50% 5.84 30% 3.50 15% 1.75 60% 3.50 20% 1.17 20% 1.17 50% 1.75 30% 1.05 20% 0.70 50% 0.88 30% 0.53 20% 0.35 4.9 Desilting ramps 5.24 0% 0.00 20% 1.05 30% 1.57 50% 2.62 20% 0.21 30% 0.31 50% 0.52 20% 0.31 30% 0.47 50% 0.79 20% 0.52 30% 0.79 50% 1.31 4.10 Inlet / out weirs 17.57 5% 0.88 50% 8.78 30% 5.27 15% 2.64 60% 5.27 20% 1.76 20% 1.76 50% 2.64 30% 1.58 20% 1.05 50% 1.32 30% 0.79 20% 0.53 4.11 Rain gauge stations 0.45 40% 0.18 60% 0.27 0% 0.00 0% 0.00 60% 0.16 20% 0.05 20% 0.05 50% 0.00 30% 0.00 20% 0.00 50% 0.00 30% 0.00 20% 0.00 4.12 Shifting of sewers 69.47 5% 3.47 50% 34.73 30% 20.84 15% 10.42 60% 20.84 20% 6.95 20% 6.95 50% 10.42 30% 6.25 20% 4.17 50% 5.21 30% 3.13 20% 2.08 4.13 Desilting equipments 18.00 25% 4.50 50% 9.00 25% 4.50 0% 0.00 60% 5.40 20% 1.80 20% 1.80 50% 2.25 30% 1.35 20% 0.90 50% 0.00 30% 0.00 20% 0.00 4.14 Vehicles for vigilance 3.20 10% 0.32 50% 1.60 25% 0.80 15% 0.48 60% 0.96 20% 0.32 20% 0.32 50% 0.40 30% 0.24 20% 0.16 50% 0.24 30% 0.14 20% 0.10 squad Sub Total 749.57 54.17 287.74 202.55 205.11 140.41 79.27 68.06 70.73 66.79 65.03 58.14 64.27 82.70 5.0 Sewage Treatment Plants: Decentralized STP's 185.00 10% 18.50 30% 55.50 40% 74.00 20% 37.00 25% 13.88 60% 33.30 15% 8.33 25% 18.50 60% 44.40 15% 11.10 25% 9.25 60% 22.20 15% 5.55 Sub Total 185.00 18.50 55.50 74.00 37.00 13.88 33.30 8.33 18.50 44.40 11.10 9.25 22.20 5.55 Total Structural = 3784.45 230.56 1459.92 1144.51 949.45 728.84 435.62 295.45 520.65 376.79 247.06 421.12 300.61 227.72 6.0 Non Structural Works: 6.1 DPR and PMC 38.41 100% 38.41 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 0% 0.00 6.2 Rehabilitation and 76.83 40% 30.73 60% 46.10 0% 0.00 0% 0.00 60% 27.66 20% 9.22 20% 9.22 50% 0.00 30% 0.00 20% 0.00 50% 0.00 30% 0.00 20% 0.00 resettlement 6.3 Shifting of other services 56.89 5% 2.84 50% 28.44 30% 17.07 15% 8.53 60% 17.07 20% 5.69 20% 5.69 50% 8.53 30% 5.12 20% 3.41 50% 4.27 30% 2.56 20% 1.71 6.4 Development of green belt 9.60 0% 0.00 20% 1.92 30% 2.88 50% 4.80 20% 0.38 30% 0.58 50% 0.96 20% 0.58 30% 0.86 50% 1.44 20% 0.96 30% 1.44 50% 2.40 6.5 WCE + Admin. 192.07 10% 19.21 30% 57.62 30% 57.62 30% 57.62 25% 14.41 35% 20.17 40% 23.05 25% 14.41 35% 20.17 40% 23.05 25% 14.41 35% 20.17 40% 23.05 Total Non Structural = 373.80 91.20 134.08 77.57 70.96 59.51 35.65 38.92 23.51 26.15 27.90 19.63 24.17 27.16 Total of SWD = 4158.25 321.76 1594.00 1222.08 1020.41 788.35 471.27 334.37 544.17 402.95 274.97 440.75 324.78 254.88
  • 29. PROJECT PHASING AND INVESTMENT PLAN TOTAL PROJECT INVESTMENT PLAN FOR MASTER PLAN PROJECT INVESTMENT PLAN FOR TOTAL MASTER PLAN PROJECT FOR STRUCTURAL WORKS TOTAL COST Rs. 4158.25 CRORES TOTAL COST Rs. 3784.45 CRORES 900.00 795.72 800.00 800.00 Estimated Cost (Rs. Crores) 736.21 Estimated Cost (Rs. Crores) 700.00 700.00 546.22 600.00 600.00 522.71 472.42 439.47 500.00 436.77 419.84 500.00 402.67 321.50 376.52 400.00 295.49 297.33 400.00 325.07 334.41 272.27 248.50 244.36 300.00 221.35 233.87 300.00 200.00 200.00 100.00 100.00 0.00 0.00 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th Year Year Year Year Year Year Year Year Year Year Year Year Year Year Year Year Year Year Year Year Project Year Project Year PROJECT INVESTMENT PLAN FOR TOTAL MASTER PLAN PROJECT FOR NON STRUCTURAL WORKS PROJECT INVESTMENT PLAN FOR DIFFERENT WORKS TOTAL COST Rs. 373.80 CRORES FOR MASTER PLAN PROJECT TOTAL COST Rs. 4158.25 CRORES 100.00 Estimated Cost (Rs. Crores) 91.20 3000.00 90.00 2569.24 Estimated Cost (Rs. Crores) 80.00 2500.00 70.00 2000.00 59.51 749.64 60.00 1500.00 50.00 38.92 1000.00 40.00 35.65 266.08 373.80 27.90 27.16 185.00 500.00 14.49 30.00 23.51 26.15 19.63 24.17 20.00 0.00 Improvement Non Structural Culverts / Decentralized Rehabilitation / Allied Drain Strengthening Bridges 10.00 Capacity Carrying Works STP's Works 0.00 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th Year Year Year Year Year Year Year Year Year Year Project Year Type of Work
  • 30. Benefits from Implementation  Provision of a properly designed drainage system for a reasonably acceptable return period would ensure reduction in flood incidences which in turn reduces flood damages and traffic hold ups.  Provision and properly maintained drainage system with controls on sewage connections and solid waste dumping will enhance the Environmental quality in the form of reduced pollution of water bodies and ground water.  Provision and proper maintenance of facilities like detention ponds and retention basins will not only attenuate the peak run- offs but also provide recharge of ground water which will improve ground water table.  Provision and proper maintenance of localized sewage treatment plants and using the treated sewage will reduce the stress on fresh water sources.  Availability of treated sewage will enable more greenery and fresh water lake developed assists reduction in climate change.