This document provides a summary of the Master Plan Project Report for remodeling storm water drains in the Bruhath Bengaluru Mahanagara Palike (BBMP) area of Bengaluru, India. Some key details include:
- The BBMP area covers 710 square kilometers divided into core and peripheral areas. There are over 840 kilometers of storm water drains.
- The master plan project aims to minimize flooding, ensure free flow of storm water, improve environmental conditions, and protect water bodies.
- Proposals include improving drain capacity, developing water bodies as holding ponds, upgrading culverts and bridges, and carrying out other infrastructure works.
- The estimated total cost is 4,
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
1. Bruhath Bengaluru Mahanagara Palike
Presentation
on
Master Plan Project Report
for
Remodeling of Storm Water Drains
in Entire BBMP Area, Bengaluru
STUP Consultants Pvt. Ltd.
2. Salient Features
Bruhath Bengaluru Mahanagara Palike (BBMP) Area - 710 Sq.Km.
(Core Area - 225 Sq.Km.,
Peripheral Area - 485 Sq. Km.)
Total Water Shed / Catchment Area - 1016. 50 Sq.km.
Total Length of SWD in BBMP Area – 840 Km.
(Core Area – 240 Km.,
Peripheral Area - 600 Km.)
(Primary Drain Length – 415 Km. &
Secondary Drain Length – 425 Km.)
3. Master Plan Project Study Area
Core Area
East Zone
West Zone
South Zone
Bommanahalli
Yelahanka
Dasarahalli
Mahadevapura
Rajarajeshwarinagara
Study Area Map
4. Reasons for flooding
Change in land use pattern
Flow obstruction due to construction of RCC hume pipe culverts
Inappropriate design approach, construction methodology for structures
and maintenance procedures adopted in newly formed layouts
Development of land in tank bed areas and below drain HFL
Modification of original drain alignment during formation of layouts
Non existence of service roads on either side for laying service lines and
routine maintenance.
Indiscriminate dumping of debris and solid wastes into drains
Dense vegetation growth
Encroachment / Modification of original drain alignment
Lack of access for routine maintenance
Services lines laid inside and across drains
Blockage of inlet/outlet location of water bodies
Water bodies not functioning as retention basins
Sewer lines laid inside and across storm water drains
Sewage flow in storm water drains
Inadequate vent size railway culverts at 60 locations
6. DH233, Near Bagalagunte,
Site Appreciation Dasarahalli
Development of land in tank
bed areas & Below drain HFL
DH369, Near Hegganahalli -
Dasarahalli
7. Utility Cables lines laid across SWD at culvert locations is obstruction flow of water
BH579, Near MICO Factory, Hosur Road
MD 264, Near Ramamurthynagara,
Mahadevapura
BH551, Near Arkere,
Bommnahalli
8. Site Appreciation Near Hongasandra, Bommanahalli
Garbage dumped inside SWD
MD 349, Near Marathalli, ORR -
Mahadevapura
Dasarahalli Zone
9. DH332, Kalika Nagara, Dasarahalli
Inadequate Vent Size Culverts
DH 211,211A & B, Near Lageere Main
Road, Dasarahalli
10. Reasons for flooding
Lakes
Reduction in number of lakes
Blockage due to vegetation growth, dumping of debris at
inlet/outlet location of water bodies
Water bodies not functioning as retention basins
Reduction in holding capacity due to reduction in lake areas,
severe siltation and entry of sewage etc
Non existence of regulatory gate arrangement to regulate
flood discharge
Non existence of interconnectivity between water bodies due
to encroachment / modification of original alignment.
Drain diversion/bypass arrangement made to all water bodies
11. Condition of Water Bodies in BBMP Area
Chikka Beguru Kere, Bommanahalli Zone Dodda Kalsandra Kere, Bommanahalli Zone
Nelakdhirenahalli Kere, Dasarahalli Zone
Karihobanahalli Kere, Dasarahalli Zone
12. This has led to
Reduction in open spaces
Reduced time of concentration
Reduction in holding capacity of lakes.
Limited land availability for construction of detention
ponds
Reduced space available for improving the drains
More flooding
Deterioration in public health & environmental
sanitation conditions.
Increased cost expenditure etc.
14. Project Objectives
To minimise flood runoff.
To ensure free flow of storm water and to minimize flooding in
critical flood prone areas.
To improve the health and environmental sanitation conditions in
the surrounding vicinity of SWDs and Water bodies.
To protect the existing waterways and water bodies from
environmental degradation.
To improve ground water level by holding rain water in water bodies.
To provide alternate water source in case of emergencies by rain
water harvesting.
15. Salient Details of Major & Minor
Water Shed Catchment Areas
No. of Major No. of Minor
Total Water Shed Total Drain
Sl. Water Shed Water Shed
Zone Catchment Area Length
No. Catchment Catchment
(Ha.) (Km.)
Areas Areas
1 East Zone 10,937 8 134
2 West Zone 6,366 4 87 225
3 South Zone 5,553 4 69
4 Rajarajeshwarinagara Zone 15,365 9 118 138.15
5 Dasarahalli Zone 9,505 7 94 92.81
6 Yelahanka Zone 14,235 9 129 104.91
7 Mahadevapura Zone 23,371 11 236 164.24
8 Bommanahalli Zone 16,317 16 300 115.15
Total 101,650 68 1167 840.26
17. Summary of Project Findings
• Drain reach is in natural condition at many places
• Original alignment modified at certain reaches
• Drain walls & culverts constructed by earst while CMC authorities
are, inadequate vent way not as per standard designs and also in
dilapidated condition in many places
• Drain width drastically reduced at many places and buildings
constructed butting to the drain wall
• Due to change in land use the culverts constructed by earst while
CMC authorities are not matching to the present field requirement.
• Due to non existence of sewerage system, large quantity of raw
sewage flow is observed in open drains.
• The inlet/outlet weir of water bodies is in dilapidated condition and
completely chocked
• Inadequate maintenance is evident
23. Typical Section of Bridge with Pile arrangement
Intl. Airport Road, Sahakaranagara
Typical Section of slab culvert
24. Typical drain cross section
with RCC Retaining wall and Service Corridor
Property
Boundary Property
Boundary
Sewer Line Sewer Line
Typical drain cross section with Earthen embankment,
Property stone revetment with CC lining and Service Corridor over embankment
Boundary Property
Boundary
Sewer Line Sewer Line
26. Estimated Cost of SWD Master Plan Project
(As per 2010-11 Price Level)
Amount
Sl .No. Name of the Zone
(Rs. In Crores)
1 East
2 West 654.22
3 South
4 Bommanahalli 665.14
5 Yelahanka 655.26
6 Dasarahalli 508.99
7 Mahadevapura 914.91
8 Rajrarajeshwarinagara 759.73
Total Estimated Cost 4,158.25
Say 4,160.00
27. MASTER PLAN PROJECT COST ALLOCATION
ESTIMATED COST FOR STRUCTURAL WORKS FOR TOTAL ESTIMATED COST FOR STRUCTURAL & NON
DIFFERENT ZONES OF BBMP UNDER SWD MASTER STRUCTURAL WORKS FOR DIFFERENT ZONES OF
PLAN PROJECT TOTAL COST = 3,841.34 CRORES BBMP UNDER SWD MASTER PLAN PROJECT
TOTAL COST = 4,158.25 CRORES
701.82, 18% Core Area (W +
E+ S) Core Area (W +
470.20, 12% 845.19, 22% 508.99, 12%
Bommanahalli E+ S)
914.91, 22% Bommanahalli
605.32, 16% Zone 655.26, 16%
759.73, 18% Zone
Yelahanka Zone
Yelahanka Zone
Dasarahalli Zone
Dasarahalli Zone
614.45, 16% 604.36, 16% Mahadevpura
665.14, 16% 654.22, 16% Mahadevpura
Zone Zone
Rajarajeshwarina Rajarajeshwarinag
gar Zone ar Zone
ESTIMATED COST FOR NON STRUCTURAL WORKS ESTIMATED COST FOR DIFFERENT WORKS UNDER
FOR DIFFERENT ZONES OF BBMP UNDER SWD SWD MASTER PLAN PROJECT
MASTER PLAN PROJECT TOTAL COST = 4,158.25 CRORES
TOTAL COST = 316.91 CRORES
69.73, 22% Core Area (W + 266.08, 6% Carrying Capacity
38.79, 12% 57.90, 18% E+ S) 14.49, 0% 185.00, 5%
749.57, 18% Improvement
49.94, 16% Bommanahalli Rehabilitation /
Zone 373.80, 9% Strengthening
Yelahanka Zone Culverts / Bridges
Dasarahalli Zone Allied Drain Works
49.86, 16%
Mahadevpura Decentralized
50.69, 16% Zone 2,569.30, 62 STP's
%
Rajarajeshwarinag Non Structural
ar Zone Works
29. PROJECT PHASING AND INVESTMENT PLAN
TOTAL PROJECT INVESTMENT PLAN FOR MASTER PLAN
PROJECT INVESTMENT PLAN FOR TOTAL MASTER PLAN
PROJECT FOR STRUCTURAL WORKS TOTAL COST Rs. 4158.25 CRORES
TOTAL COST Rs. 3784.45 CRORES
900.00
795.72
800.00 800.00
Estimated Cost (Rs. Crores)
736.21
Estimated Cost (Rs. Crores)
700.00 700.00
546.22
600.00 600.00
522.71 472.42 439.47
500.00 436.77 419.84 500.00 402.67 321.50
376.52
400.00 295.49 297.33 400.00 325.07 334.41 272.27 248.50
244.36
300.00 221.35
233.87 300.00
200.00 200.00
100.00 100.00
0.00 0.00
1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Year Year Year Year Year Year Year Year Year Year
Year Year Year Year Year Year Year Year Year Year
Project Year
Project Year
PROJECT INVESTMENT PLAN FOR TOTAL MASTER PLAN
PROJECT FOR NON STRUCTURAL WORKS PROJECT INVESTMENT PLAN FOR DIFFERENT WORKS
TOTAL COST Rs. 373.80 CRORES FOR MASTER PLAN PROJECT
TOTAL COST Rs. 4158.25 CRORES
100.00
Estimated Cost (Rs. Crores)
91.20 3000.00
90.00 2569.24
Estimated Cost (Rs. Crores)
80.00 2500.00
70.00 2000.00
59.51 749.64
60.00 1500.00
50.00 38.92
1000.00
40.00 35.65 266.08 373.80
27.90 27.16 185.00
500.00 14.49
30.00 23.51 26.15 19.63 24.17
20.00 0.00
Improvement
Non Structural
Culverts /
Decentralized
Rehabilitation /
Allied Drain
Strengthening
Bridges
10.00
Capacity
Carrying
Works
STP's
Works
0.00
1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th
Year Year Year Year Year Year Year Year Year Year
Project Year Type of Work
30. Benefits from Implementation
Provision of a properly designed drainage system for a
reasonably acceptable return period would ensure reduction in
flood incidences which in turn reduces flood damages and traffic
hold ups.
Provision and properly maintained drainage system with controls
on sewage connections and solid waste dumping will enhance
the Environmental quality in the form of reduced pollution of
water bodies and ground water.
Provision and proper maintenance of facilities like detention
ponds and retention basins will not only attenuate the peak run-
offs but also provide recharge of ground water which will improve
ground water table.
Provision and proper maintenance of localized sewage treatment
plants and using the treated sewage will reduce the stress on
fresh water sources.
Availability of treated sewage will enable more greenery and fresh
water lake developed assists reduction in climate change.