Parabolic solar concentrator ROI overview for electricity production that gives lowest cost per watt compared to any PV technology. The Parabolic solar concentrator works with solar water desalination and has applications in mining and water desalination or cleaning brackish water.
08448380779 Call Girls In Civil Lines Women Seeking Men
Parabolic Solar Concentrator for Mining & Water Desalination
1. Solar Hybrid Concentrator Overview
Simple ROI for Mining & Water Desalination
Contact Information:
Edward Herniak
eherniak@solartronenergy.com
www.solartronenergy.com
2. Vision: To provide a 50kW Solar Concentrator -Hybrid System
that can generate 50 kW thermal energy and is designed for
20kW electricity production for mining and water industry.
Problem: Global market is missing a versatile , cost effective
solar concentrator that would provide:
• Low cost Heat & Electricity
• Heat for Desalination, Process Heating & Enhanced Oil
Recovery
Solution: To provide a solar concentrator which can:
• 20 kW CPV Module: 42% efficiency of dense array CPV
module versus 19% PV panel
• Provide 50kW of Heat @ 73% efficiency versus 40%
3. Advantage:
• Patented Technology - Curvature of petal
• Patent Pending Technology - Celestial tracking system
Certification:
Canada – CSA International
USA – SRCC
Australia/New Zealand – Global Mark
European Union – KeyMark
Proven technology:
• License sold to Solar Systems Pty Ltd
• 45 World wide installation
4. Value Proposition
1. Most economical ( Automotive Process) &
efficient 50kW concentrator on the market
2. It is ready to produce 20kW electricity
& 30kW Heat
3. 50kW Heat production for:
• Process Heat(Pasteurisation)
• Water Desalination/Purification
• Enhanced Oil Recovery
4. Patented Technology
Partners Include:
• AzurSpace -Germany
• University of Moncton, NB
• Optical Research Lab
• ISO 9000 Manufacturer
5. Simple ROI for 1 Megawatt CPV
Parabolic Solar Concentrator
Electricity Production –20kW CPV (1 dish)
Yearly kWh – 52,800
Annual Electricity Savings - $ 5,280.00
Electricity Production –1 MegaWatt CPV (50 dish)
Yearly kWh – 2,640,000
Annual Electricity Savings - $ 264,000.00
Payback
Cost per system installed: $ 23,000.00
Project Cost: $1.1 Million
Payback: 4.16 years
Cost per watt installed: $1.07
Guaranteed: 10 years
Data:
Electricity Cost - $0.10
Average Sunlight: 8 / 330 days
Note: Chuquicamata Mine in Chile
averages 9 kWh/m2 hours of sunlight
6. Simple ROI for 24,000L Desalination Plant
SOLAR HEATING – 80 deg. C
Number of Parabolic Solar Concentrator Dishes: 12 X $ 16,500.00
Desalinator/Purifier 1 X $ 92,000.00
Total Cost $315,000.00
Water Purification Cost per Litter- $0.02
Yearly Water Production – 8,760,000L
Yearly Revenue - $ 87,600
Payback: 3.6 years
*Solar thermal power: 600kW
Water Sold @ $0.01/L profit:
Location - Jordan