SlideShare uma empresa Scribd logo
1 de 40
INTRODUCTION TO THE
CONSTRUCTION INDUSTRY IN
BURKINA FASO

by
Abdoul-Aziz GANSONRE
CONTENT
• INTRODUCTION
• WHERE IS BURKINA FASO?

• BASIC INFORMATION
• GENERAL PRESENTATION OF THE CONSTRUCTION INDUSTRY
• PUBLIC CONSTRUCTIONS

• PRIVATE CONSTRUCTIONS
• THE ROLE OF CONSTRUCTION INDUSTRY IN BURKINA FASO
• INFRASTRUCTURES

• GENERAL CONSTRAINTS
• CONCLUSION
INTRODUCTION
• Burkina Faso is a developing country where the majority of the population

lives below the poverty. It is a landlocked country which makes it highly
dependent on its neighbors for transit and trade.

• The construction industry is very active because the country is trying to

find its way out from under-development. Plenty of Infrastructures such as
roads, dams, barrages and buildings either commercial or residential have
to be built.

• With a growth of over 7.5% per year since 2001, the Construction & Civil

Engineering sector is expanding in Burkina Faso.
WHERE IS BURKINA FASO?

• IN WEST-AFRICA
• Don’t have access to the sea because surrounded by 6 countries.
BASIC INFORMATION
• Population: 16,241,811 people
• Capital city: Ouagadougou
• Area: 274,000km²

• Cities: 45
• Main language: French
• Independence day: Aug. 5th, 1960

• Currency: 1NTD = 16 XCfa
• Economy: based on agriculture,

livestock, gold and cotton

exportations.
GENERAL PRESENTATION
OF THE CONSTRUCTION
INDUSTRY
OVERVIEW
• The major public work projects are mainly focused on the

road infrastructures required in order to open up the
country and to contribute to its economic development.

• The projects also concern the construction/rehabilitation

of dams and the reinforcement of water supply
infrastructures.

• Burkina Faso annually invests over EUR 150 million in the

Construction & Civil Engineering field.
BUDGET
The budget is first well defined by the all the contractors and owners
involved in the project.

ORGANISATION
• Project owner
• Delegated contracting owner

• Project Manager
• Builder: he is the responsible for the work on the field including the

equipment and all the materials needed for the project
PROJECT OWNER
• He is in the owner of the whole project. In

Burkina Faso, it can be an individual, an
entity or a group of investors.
• The project owner or contracting owner
“Maître d’Ouvrage” (in French) is in charge of
the management of construction investment
and the conduct of operations.
DELEGATED CONTRACTING OWNER
• He is not always present in all construction

projects, but he can be specially chosen by the
Project owner to direct operations, including the
management of the budget.
• In general, he has a great knowledge and
experience in the construction system. He is under
the order of the Project owner and is asked to
respect the deadlines for the work.
• In Burkina Faso, he is called “maître d'ouvrage
délégué”
PROJECT MANAGER
• He is often an architect or an engineer in

charge of the design, creation and
implementation of a proposed construction
or development of space .

• He can also be called Site foreman,

supervisor of works, subcontractor.

• In the local terms, he is called “Maître
d’oeuvre”
3. GENERAL CONSTRUCTION
METHODS
Artisanal construction
Industrial construction

In Burkina, the most used is Artisanal construction methods. This
has many challenges:
• Unskilled main power
• Unsophisticated building materials
• Archaic techniques
MAIN CONSTRUCTION ENTERPRISES IN BURKINA FASO
The economic pattern of the Construction & Civil Engineering sector

consists of a few local companies or subsidiaries of international
groups able to meet the requirements of the public and private
procurement offers and of several small structures.

The local companies able to execute works on the main sites are

primarily the following:

• general construction: Boutros, BTM, COGEB, Fadoul-Technibois and

Kanazoe, SABATP, ATP.

• construction of roads : COGEC, EIEF, Fadoul-Technibois, EBOMAF
• construction of buildings: Sol Confort & Décor, Echa, Ecobaa, Lafchal,

Sosaf..
EXECUTION AGENCIES
• Execution agencies are structures which make expertise in

technical and design, usually under the supervision of an
engineer.

• Execution agencies have a role in assisting, advising and

controlling public and private construction works. They can
also act as delegated contracting owners.

• In Burkina Faso, many execution agencies have the

international standards and work on all the construction
project all over the country. The most important are:
APAV, VERITAS, AGEIM, ACE.
FOREIGN ENTERPRISES
• French companies are largely represented by

Sogea Satom (Vinci), Colas, (Bouygues) and Sade
(Véolia Environnement).

• A senegale company CSE
PUBLIC CONSTRUCTIONS
1. PRESENTATION
• The public constructions in Burkina Faso are mainly funded by

the government, the non-governmental organizations,
foreign aids and privates funds of particulars.

• The public constructions are mainly composed of :
Roads

Sanitary and working buildings
 Dams
Mining infrastructures
The realization of a new international Airport before 2025.
2. STEPS
 After determining the Project owner (P.O), the Delegated

contracting owner (DCO), the project manager (PM)is
chosen by consultations or by a contest.

The PM, the engineers and architects presents to the P.O

and DCO the plans, design and estimations:
• The Basic Preliminary Design: plan, design, conception
• The Detailed Preliminary Design: it is the task where the
engineer can completely describe a product through solid
modeling and drawings.
 The PM

launches the consultation record for
construction enterprises and tender documents.

 The Tender documents has 3 main kinds:
 limited consultations: a few construction enterprises

will be consulted and the choice will be made among
them.
 open tender: in the newspapers, magazines, daily revews
and on TV.
 OTC: the construction enterprises is directly chosen by
contractors without any tender.
SELECTION PROCEDURE
The choice of construction enterprises is made by the PM. The purchase
orders for the award of a public contract ranges from 2,000 to 10,000
USD.
 Quality-Cost: the choice is made for a construction of High quality no

matter the price. In this case, the budget is undeterminate.

 Lowest bidder: Best quality among the proposals of low budget. Here,

the budget is tight.

 Best cost value: the PM chooses the firm with the best ratio between

quality and cost, technical score price or price + time(ft), and other
variations
PRIVATE CONSTRUCTIONS
For private constructions the procedure is
almost the same as Public construction, but
there are some differences.
DIFFERENCES
The sector of private constructions is more focused
on residential buildings and apartments.
The project owner is often also the project manager.
He conducts by himself the work. But there is always
a builder.
The project owner does not launch a tender
document. He chooses by himself an architect or
engineer that he knows, buys the necessary
equipment and hire the workers.

DIFFERENCES
The owner makes his plans by himself or ask to

the architect or engineer to do so.

For the selection of enterprises, the owner often

chooses the lowest bidder, as the budget is often
limited.
THE ROLE OF CONSTRUCTION INDUSTRY
IN BURKINA FASO
• Construction sector is dominated by dualistic private sector of

local and foreign-owned enterprises and formal and informal
enterprises.

• The informal and small-scale enterprises ( bricklaying,

plumbing, painting) play an important role.

• 500 official artisan contractors and construction enterprises

are registered but only 20 enterprises have a solid and serious
reputation.

• Buildings construction make use of formal plans generally

prepared by the architect or civil engineer.

• There 25 independent architectural firms and about 250

qualified civil engineers.
The largest locally owned construction firm called “KANAZOE”

undertakes 25% of public works projects such as roads.

The market type in the building sector is:
• Rural traditional housing
• Improved housing
• Villa housing
• Office/commercial/apartment space
• Rural office building
The average contribution of the construction industry to the GDP is

about 12.7%
INFRASTRUCTURES
ACHIEVEMENTS

CHALLENGES

 Aircraft fleet renewed
rapidly in recent years and
aircraft size aligned to a
hub-and-spoke approach.

 Market thin and
underdeveloped.
 Very concentrated market
with very little competition.
 Safety and security remain
concerns.
 Airport facilities are in
disarray.

 Adoption of ICT promotion
policy and sectoral
 strategy.
 Liberalization and
deregulation of the sector.
 Increased GSM signal
coverage.
 Low level of market power
concentration

 Prices remain high.
 Promote competition at the
international gateways to
SAT 3/WASC

AIR TRANSPORT

ICT
ACHIEVEMENTS

POWER

RAILWAYS

CHALLENGES

 Inception of new electricity
law encouraging private
 sector participation.
 Promotion of increased
power trade and
 interconnection to WAPP.

 Limited electrification.
 Supply of power insufficient
to satisfy demand.
 Costs are among the highest
in Africa.

 Good labor productivity,
solid traffic volumes, and
 relatively competitive
average tariffs.
 Recovery of traffic after
Côte d’Ivoire crisis.
 SITARAIL is on track to
achieve its highest- ever
 traffic volume

 Financial distress of
SITARAIL.
 Rebalancing financial
structure of the railway
concession.
 Finding alternative funding
for rehabilitation backlog.
ACHIEVEMENTS

CHALLENGES

 Good international
connectivity.
 Adequate design of road
network, given the level of
 traffic.

 Ability to provision for road
maintenance.
 Limited access from rural
farms to markets.
 High transport and transit
costs due to poor logistics.
 Ability to enforce control of
axel loads particularly across
 borders.

 Progress in providing access to
improved water
 and sanitation, particularly in
urban areas.
 Successful private-public
partnership in the water
 utility.
 Water utility among the most
efficient in Africa

 Sanitation MDG is off track.
 Lack of consistent data and
standardized norms for
 monitoring progress in access.
 Improving provision in rural
areas.

ROADS

WATER AND SANITATION
INFRASTRUCTURES MAP

Source: AICD Interactive Infrastructure Atlas for Burkina Faso
(http://www.infrastructureafrica.org/aicd).
ROADS
• Burkina’s 15,202 km of classified road network length seems, in general,

adequately designed given the level of traffic and the connectivity it
provides.

Burkina Faso’s road indicators benchmarked against Africa’s low- and middle-income countries
RAIL
• Burkina Faso has a transnational railway line jointly owned by

Côte d’Ivoire.

• The rail line links the port of Abidjan to Ouagadougou and is a

key conduit for bulk freight from and into the landlocked
hinterland of Burkina Faso.

• People don’t usually travel by train. They use bus. The train is

generally for business and trade uses.
AIR TRANSPORT
• Burkina Faso is a minor player in air transportation in West

Africa.

• The country has two international airports (Ouagadougou and

Bobo Dioulasso) but strongly concentrated freight and passenger
international traffic.

• The country is on a huge project of construction of a new airport

35kms away from Ouagadougou. The work may start around
2015 for a 10-year construction process.
WATER SUPPLY AND SANITATION
• Burkina has made significant progress toward ensuring that all

of its population can access improved water.

• According to the JMP, less than 20 percent of the Burkinabè

population had access to improved sanitation in 2003.

• Increased access to improved sanitation has come

predominantly from more latrines

• Upcoming challenges include further extending the service to

rural areas and improving the technology mix in urban areas and
the construction of more dams.
GENERAL CONSTRAINTS
• Lack of qualified engineers and construction-related equipments

• High factor costs affecting the business operation
• Highly bureaucratic tender process
• Delay of payment
• Requirement of unofficial payment
• Competition with foreign-owned construction companies

• Lack of available business services provided by either

governmental or non-governmental agencies

• Very weak voluntary professional and business associations
• Inadequate accessibility to financial services
CONCLUSION
• For countries like Burkina Faso, a small landlocked and agriculture-

dependent economy, an efficient transport system, infrastructures for
water and power are critically important. The politic of the Construction
industry is widely concerned about these infrastructures.

• In addition, urban redevelopment called “OUAGA 2000” was undertaken

almost simultaneously and subsequently a construction boom for
buildings has taken place in the city.

• Burkina Faso is a fertile field for investment because the entire country is a

construction site. However, owing to the absence of any real domestic
capability, most of the larger projects are awarded to foreign-based
construction firms. Therefore, the real challenge is to be able to empower
the local enterprises so that they can benefit from these numerous
construction projects.
REFERENCES
• http://en.wikipedia.org/wiki/Engineering_design_process#Detailed_design
• http://www.izf.net/pages/burkina-faso/4673/
• http://infrastructureafrica.org/system/files/Burkina%20Faso%20ctry%20rpt%20Web.pdf
• http://www.izf.net/pages/burkina-faso/17435/
• http://www.lesite.tv/videotheque/0805.0029.00-la-voute-nubienne-comme-alternative-de-

construction-au-burkina-faso

• http://www.lavoutenubienne.org/sites/default/files/stock/documents/production_terrain/05-10-

00_rapport-evaluation_cloture-partenariat-mae_u-wyss-10-05.pdf

• http://burkinafaso.helvetas.org/fr/activites/projets_burkina_faso/construction_dinfrastructures_

durables_burkina_faso/

Mais conteúdo relacionado

Mais procurados

Construction Project management
Construction Project management Construction Project management
Construction Project management Anupama holla
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.NAVNEET KUMAR JHA
 
What is construction management & its Benefits?
What is construction management & its Benefits?What is construction management & its Benefits?
What is construction management & its Benefits?maria_singh
 
Construction management
Construction managementConstruction management
Construction managementUsama Khalid
 
5 principles of construction project management
5 principles of construction project management5 principles of construction project management
5 principles of construction project managementreachfirst01
 
Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...A Makwana
 
05 Project Monitoring & Cost Control
05 Project Monitoring & Cost Control05 Project Monitoring & Cost Control
05 Project Monitoring & Cost Controlakashpadole
 
Construction Management (1st Lecture)
Construction Management (1st Lecture) Construction Management (1st Lecture)
Construction Management (1st Lecture) Muhammad Aljalali
 
introduction to construction management
 introduction to construction management introduction to construction management
introduction to construction managementHira Atiq
 
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...Galala University
 
Arquitectura moderna II diapositiva
Arquitectura moderna II diapositivaArquitectura moderna II diapositiva
Arquitectura moderna II diapositivaErika Paz
 
Puentes Peatonales - Prefabricados
Puentes Peatonales - PrefabricadosPuentes Peatonales - Prefabricados
Puentes Peatonales - PrefabricadosMemoG
 
Los cinco maestros de la arquitectura
Los cinco maestros de la arquitecturaLos cinco maestros de la arquitectura
Los cinco maestros de la arquitecturapatypj05
 
Architectural Design Basics Syllabus 2004
Architectural Design Basics Syllabus 2004Architectural Design Basics Syllabus 2004
Architectural Design Basics Syllabus 2004Galala University
 
Sustainable architecture
Sustainable architectureSustainable architecture
Sustainable architectureTanzil Faraz
 

Mais procurados (20)

Proceso de tramitacion de planos
Proceso de tramitacion de planosProceso de tramitacion de planos
Proceso de tramitacion de planos
 
Construction Project management
Construction Project management Construction Project management
Construction Project management
 
Project management in construction.
Project management in construction.Project management in construction.
Project management in construction.
 
What is construction management & its Benefits?
What is construction management & its Benefits?What is construction management & its Benefits?
What is construction management & its Benefits?
 
Construction management
Construction managementConstruction management
Construction management
 
5 principles of construction project management
5 principles of construction project management5 principles of construction project management
5 principles of construction project management
 
Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...
 
Estimating and-costing
Estimating and-costingEstimating and-costing
Estimating and-costing
 
05 Project Monitoring & Cost Control
05 Project Monitoring & Cost Control05 Project Monitoring & Cost Control
05 Project Monitoring & Cost Control
 
Construction Management (1st Lecture)
Construction Management (1st Lecture) Construction Management (1st Lecture)
Construction Management (1st Lecture)
 
introduction to construction management
 introduction to construction management introduction to construction management
introduction to construction management
 
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...
Integrating Sustainability Strategies in Design and Practice - ادماج استراتجي...
 
Thesis on Labor Management Practices
Thesis on Labor Management PracticesThesis on Labor Management Practices
Thesis on Labor Management Practices
 
Arquitectura moderna II diapositiva
Arquitectura moderna II diapositivaArquitectura moderna II diapositiva
Arquitectura moderna II diapositiva
 
Puentes Peatonales - Prefabricados
Puentes Peatonales - PrefabricadosPuentes Peatonales - Prefabricados
Puentes Peatonales - Prefabricados
 
Los cinco maestros de la arquitectura
Los cinco maestros de la arquitecturaLos cinco maestros de la arquitectura
Los cinco maestros de la arquitectura
 
Construcción i
Construcción iConstrucción i
Construcción i
 
Architectural Design Basics Syllabus 2004
Architectural Design Basics Syllabus 2004Architectural Design Basics Syllabus 2004
Architectural Design Basics Syllabus 2004
 
Sustainable architecture
Sustainable architectureSustainable architecture
Sustainable architecture
 
Construction Management - New Trends
Construction Management - New TrendsConstruction Management - New Trends
Construction Management - New Trends
 

Semelhante a Introduction to burkina faso construction industry

presentation for redan in fourpoint (1)
presentation for redan in fourpoint (1)presentation for redan in fourpoint (1)
presentation for redan in fourpoint (1)tope arowolo
 
20141016 recruitment of engineers in romania
20141016 recruitment of engineers in romania20141016 recruitment of engineers in romania
20141016 recruitment of engineers in romaniaFreddy Jacobs
 
Realty education
Realty educationRealty education
Realty educationVikas Gupta
 
Plantlocationandlayoutplanning
PlantlocationandlayoutplanningPlantlocationandlayoutplanning
PlantlocationandlayoutplanningJoseph Konnully
 
Construction
ConstructionConstruction
ConstructionOat Lict
 
Build Operate Transfer and private sector led hydropower development
Build Operate Transfer and private sector led hydropower developmentBuild Operate Transfer and private sector led hydropower development
Build Operate Transfer and private sector led hydropower developmentWater, Land and Ecosystems (WLE)
 
Construction PROJECT MANAGEMENT
Construction PROJECT MANAGEMENTConstruction PROJECT MANAGEMENT
Construction PROJECT MANAGEMENTIrfan Ullah
 
SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]
SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]
SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]Tambe John Bita
 
Paper Review of Local building materials: affordable strategy for housing the...
Paper Review of Local building materials: affordable strategy for housing the...Paper Review of Local building materials: affordable strategy for housing the...
Paper Review of Local building materials: affordable strategy for housing the...Hrishikesh Satpute
 
Brandon liaw individual
Brandon liaw individualBrandon liaw individual
Brandon liaw individualbrandonliaw97
 
CSQS ch 1, 2& 3 lec. note.pdf
CSQS ch 1, 2& 3 lec. note.pdfCSQS ch 1, 2& 3 lec. note.pdf
CSQS ch 1, 2& 3 lec. note.pdfDejeneTsegaye6
 
Contract Specification and Quantity Surveying.docx
Contract Specification and Quantity Surveying.docxContract Specification and Quantity Surveying.docx
Contract Specification and Quantity Surveying.docxDejeneTsegaye6
 

Semelhante a Introduction to burkina faso construction industry (20)

Chapter 1
Chapter 1Chapter 1
Chapter 1
 
presentation for redan in fourpoint (1)
presentation for redan in fourpoint (1)presentation for redan in fourpoint (1)
presentation for redan in fourpoint (1)
 
Construction industry
Construction industryConstruction industry
Construction industry
 
20141016 recruitment of engineers in romania
20141016 recruitment of engineers in romania20141016 recruitment of engineers in romania
20141016 recruitment of engineers in romania
 
CV-rev5
CV-rev5CV-rev5
CV-rev5
 
Revitalization cdbg block grant aug2012
Revitalization cdbg block grant aug2012Revitalization cdbg block grant aug2012
Revitalization cdbg block grant aug2012
 
Construction Management Presentation
Construction Management PresentationConstruction Management Presentation
Construction Management Presentation
 
Realty education
Realty educationRealty education
Realty education
 
Plantlocationandlayoutplanning
PlantlocationandlayoutplanningPlantlocationandlayoutplanning
Plantlocationandlayoutplanning
 
Construction
ConstructionConstruction
Construction
 
Build Operate Transfer and private sector led hydropower development
Build Operate Transfer and private sector led hydropower developmentBuild Operate Transfer and private sector led hydropower development
Build Operate Transfer and private sector led hydropower development
 
Construction PROJECT MANAGEMENT
Construction PROJECT MANAGEMENTConstruction PROJECT MANAGEMENT
Construction PROJECT MANAGEMENT
 
SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]
SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]
SARF-IRF 2014 EXPOSE Chief TAMBE OK2 [Mode de compatibilité]
 
presentation mkinga july
presentation mkinga julypresentation mkinga july
presentation mkinga july
 
archamedies v3
archamedies v3archamedies v3
archamedies v3
 
Paper Review of Local building materials: affordable strategy for housing the...
Paper Review of Local building materials: affordable strategy for housing the...Paper Review of Local building materials: affordable strategy for housing the...
Paper Review of Local building materials: affordable strategy for housing the...
 
CHAPTER-1 INTRODUCTION.pdf
CHAPTER-1 INTRODUCTION.pdfCHAPTER-1 INTRODUCTION.pdf
CHAPTER-1 INTRODUCTION.pdf
 
Brandon liaw individual
Brandon liaw individualBrandon liaw individual
Brandon liaw individual
 
CSQS ch 1, 2& 3 lec. note.pdf
CSQS ch 1, 2& 3 lec. note.pdfCSQS ch 1, 2& 3 lec. note.pdf
CSQS ch 1, 2& 3 lec. note.pdf
 
Contract Specification and Quantity Surveying.docx
Contract Specification and Quantity Surveying.docxContract Specification and Quantity Surveying.docx
Contract Specification and Quantity Surveying.docx
 

Mais de Abdoul-Aziz Gansonre

Introduction a la maquette numérique
Introduction a la maquette numériqueIntroduction a la maquette numérique
Introduction a la maquette numériqueAbdoul-Aziz Gansonre
 
A survey on modeling guidelines for quantity takeoff-oriented BIM-based design
A survey on modeling guidelines for quantity takeoff-oriented BIM-based designA survey on modeling guidelines for quantity takeoff-oriented BIM-based design
A survey on modeling guidelines for quantity takeoff-oriented BIM-based designAbdoul-Aziz Gansonre
 
Burj khalifa, the Highest building in the world
Burj khalifa, the Highest building in the worldBurj khalifa, the Highest building in the world
Burj khalifa, the Highest building in the worldAbdoul-Aziz Gansonre
 
BURKINA FASO- General presentation
BURKINA FASO- General presentationBURKINA FASO- General presentation
BURKINA FASO- General presentationAbdoul-Aziz Gansonre
 

Mais de Abdoul-Aziz Gansonre (7)

Introduction a la maquette numérique
Introduction a la maquette numériqueIntroduction a la maquette numérique
Introduction a la maquette numérique
 
Bim and building life cycle
Bim and building life cycleBim and building life cycle
Bim and building life cycle
 
A survey on modeling guidelines for quantity takeoff-oriented BIM-based design
A survey on modeling guidelines for quantity takeoff-oriented BIM-based designA survey on modeling guidelines for quantity takeoff-oriented BIM-based design
A survey on modeling guidelines for quantity takeoff-oriented BIM-based design
 
An introduction to MATLAB
An introduction to MATLABAn introduction to MATLAB
An introduction to MATLAB
 
Burj khalifa, the Highest building in the world
Burj khalifa, the Highest building in the worldBurj khalifa, the Highest building in the world
Burj khalifa, the Highest building in the world
 
Martin luther king BEST
Martin luther king BESTMartin luther king BEST
Martin luther king BEST
 
BURKINA FASO- General presentation
BURKINA FASO- General presentationBURKINA FASO- General presentation
BURKINA FASO- General presentation
 

Último

ANTI PARKISON DRUGS.pptx
ANTI         PARKISON          DRUGS.pptxANTI         PARKISON          DRUGS.pptx
ANTI PARKISON DRUGS.pptxPoojaSen20
 
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽中 央社
 
philosophy and it's principles based on the life
philosophy and it's principles based on the lifephilosophy and it's principles based on the life
philosophy and it's principles based on the lifeNitinDeodare
 
Capitol Tech Univ Doctoral Presentation -May 2024
Capitol Tech Univ Doctoral Presentation -May 2024Capitol Tech Univ Doctoral Presentation -May 2024
Capitol Tech Univ Doctoral Presentation -May 2024CapitolTechU
 
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community PartnershipsSpring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community Partnershipsexpandedwebsite
 
demyelinated disorder: multiple sclerosis.pptx
demyelinated disorder: multiple sclerosis.pptxdemyelinated disorder: multiple sclerosis.pptx
demyelinated disorder: multiple sclerosis.pptxMohamed Rizk Khodair
 
Navigating the Misinformation Minefield: The Role of Higher Education in the ...
Navigating the Misinformation Minefield: The Role of Higher Education in the ...Navigating the Misinformation Minefield: The Role of Higher Education in the ...
Navigating the Misinformation Minefield: The Role of Higher Education in the ...Mark Carrigan
 
PSYPACT- Practicing Over State Lines May 2024.pptx
PSYPACT- Practicing Over State Lines May 2024.pptxPSYPACT- Practicing Over State Lines May 2024.pptx
PSYPACT- Practicing Over State Lines May 2024.pptxMarlene Maheu
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...Nguyen Thanh Tu Collection
 
Dementia (Alzheimer & vasular dementia).
Dementia (Alzheimer & vasular dementia).Dementia (Alzheimer & vasular dementia).
Dementia (Alzheimer & vasular dementia).Mohamed Rizk Khodair
 
Incoming and Outgoing Shipments in 2 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 2 STEPS Using Odoo 17Incoming and Outgoing Shipments in 2 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 2 STEPS Using Odoo 17Celine George
 
MOOD STABLIZERS DRUGS.pptx
MOOD     STABLIZERS           DRUGS.pptxMOOD     STABLIZERS           DRUGS.pptx
MOOD STABLIZERS DRUGS.pptxPoojaSen20
 
Financial Accounting IFRS, 3rd Edition-dikompresi.pdf
Financial Accounting IFRS, 3rd Edition-dikompresi.pdfFinancial Accounting IFRS, 3rd Edition-dikompresi.pdf
Financial Accounting IFRS, 3rd Edition-dikompresi.pdfMinawBelay
 
The Ball Poem- John Berryman_20240518_001617_0000.pptx
The Ball Poem- John Berryman_20240518_001617_0000.pptxThe Ball Poem- John Berryman_20240518_001617_0000.pptx
The Ball Poem- John Berryman_20240518_001617_0000.pptxNehaChandwani11
 
Graduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptxGraduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptxneillewis46
 
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...Nguyen Thanh Tu Collection
 
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...Nguyen Thanh Tu Collection
 
II BIOSENSOR PRINCIPLE APPLICATIONS AND WORKING II
II BIOSENSOR PRINCIPLE APPLICATIONS AND WORKING IIII BIOSENSOR PRINCIPLE APPLICATIONS AND WORKING II
II BIOSENSOR PRINCIPLE APPLICATIONS AND WORKING IIagpharmacy11
 

Último (20)

ANTI PARKISON DRUGS.pptx
ANTI         PARKISON          DRUGS.pptxANTI         PARKISON          DRUGS.pptx
ANTI PARKISON DRUGS.pptx
 
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
 
philosophy and it's principles based on the life
philosophy and it's principles based on the lifephilosophy and it's principles based on the life
philosophy and it's principles based on the life
 
Capitol Tech Univ Doctoral Presentation -May 2024
Capitol Tech Univ Doctoral Presentation -May 2024Capitol Tech Univ Doctoral Presentation -May 2024
Capitol Tech Univ Doctoral Presentation -May 2024
 
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community PartnershipsSpring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
 
demyelinated disorder: multiple sclerosis.pptx
demyelinated disorder: multiple sclerosis.pptxdemyelinated disorder: multiple sclerosis.pptx
demyelinated disorder: multiple sclerosis.pptx
 
Navigating the Misinformation Minefield: The Role of Higher Education in the ...
Navigating the Misinformation Minefield: The Role of Higher Education in the ...Navigating the Misinformation Minefield: The Role of Higher Education in the ...
Navigating the Misinformation Minefield: The Role of Higher Education in the ...
 
PSYPACT- Practicing Over State Lines May 2024.pptx
PSYPACT- Practicing Over State Lines May 2024.pptxPSYPACT- Practicing Over State Lines May 2024.pptx
PSYPACT- Practicing Over State Lines May 2024.pptx
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...
 
Dementia (Alzheimer & vasular dementia).
Dementia (Alzheimer & vasular dementia).Dementia (Alzheimer & vasular dementia).
Dementia (Alzheimer & vasular dementia).
 
Incoming and Outgoing Shipments in 2 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 2 STEPS Using Odoo 17Incoming and Outgoing Shipments in 2 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 2 STEPS Using Odoo 17
 
MOOD STABLIZERS DRUGS.pptx
MOOD     STABLIZERS           DRUGS.pptxMOOD     STABLIZERS           DRUGS.pptx
MOOD STABLIZERS DRUGS.pptx
 
Financial Accounting IFRS, 3rd Edition-dikompresi.pdf
Financial Accounting IFRS, 3rd Edition-dikompresi.pdfFinancial Accounting IFRS, 3rd Edition-dikompresi.pdf
Financial Accounting IFRS, 3rd Edition-dikompresi.pdf
 
The Ball Poem- John Berryman_20240518_001617_0000.pptx
The Ball Poem- John Berryman_20240518_001617_0000.pptxThe Ball Poem- John Berryman_20240518_001617_0000.pptx
The Ball Poem- John Berryman_20240518_001617_0000.pptx
 
Graduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptxGraduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptx
 
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
 
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
 
Mattingly "AI and Prompt Design: LLMs with Text Classification and Open Source"
Mattingly "AI and Prompt Design: LLMs with Text Classification and Open Source"Mattingly "AI and Prompt Design: LLMs with Text Classification and Open Source"
Mattingly "AI and Prompt Design: LLMs with Text Classification and Open Source"
 
IPL Online Quiz by Pragya; Question Set.
IPL Online Quiz by Pragya; Question Set.IPL Online Quiz by Pragya; Question Set.
IPL Online Quiz by Pragya; Question Set.
 
II BIOSENSOR PRINCIPLE APPLICATIONS AND WORKING II
II BIOSENSOR PRINCIPLE APPLICATIONS AND WORKING IIII BIOSENSOR PRINCIPLE APPLICATIONS AND WORKING II
II BIOSENSOR PRINCIPLE APPLICATIONS AND WORKING II
 

Introduction to burkina faso construction industry

  • 1. INTRODUCTION TO THE CONSTRUCTION INDUSTRY IN BURKINA FASO by Abdoul-Aziz GANSONRE
  • 2. CONTENT • INTRODUCTION • WHERE IS BURKINA FASO? • BASIC INFORMATION • GENERAL PRESENTATION OF THE CONSTRUCTION INDUSTRY • PUBLIC CONSTRUCTIONS • PRIVATE CONSTRUCTIONS • THE ROLE OF CONSTRUCTION INDUSTRY IN BURKINA FASO • INFRASTRUCTURES • GENERAL CONSTRAINTS • CONCLUSION
  • 3. INTRODUCTION • Burkina Faso is a developing country where the majority of the population lives below the poverty. It is a landlocked country which makes it highly dependent on its neighbors for transit and trade. • The construction industry is very active because the country is trying to find its way out from under-development. Plenty of Infrastructures such as roads, dams, barrages and buildings either commercial or residential have to be built. • With a growth of over 7.5% per year since 2001, the Construction & Civil Engineering sector is expanding in Burkina Faso.
  • 4. WHERE IS BURKINA FASO? • IN WEST-AFRICA • Don’t have access to the sea because surrounded by 6 countries.
  • 5. BASIC INFORMATION • Population: 16,241,811 people • Capital city: Ouagadougou • Area: 274,000km² • Cities: 45 • Main language: French • Independence day: Aug. 5th, 1960 • Currency: 1NTD = 16 XCfa • Economy: based on agriculture, livestock, gold and cotton exportations.
  • 6. GENERAL PRESENTATION OF THE CONSTRUCTION INDUSTRY
  • 7. OVERVIEW • The major public work projects are mainly focused on the road infrastructures required in order to open up the country and to contribute to its economic development. • The projects also concern the construction/rehabilitation of dams and the reinforcement of water supply infrastructures. • Burkina Faso annually invests over EUR 150 million in the Construction & Civil Engineering field.
  • 8. BUDGET The budget is first well defined by the all the contractors and owners involved in the project. ORGANISATION • Project owner • Delegated contracting owner • Project Manager • Builder: he is the responsible for the work on the field including the equipment and all the materials needed for the project
  • 9. PROJECT OWNER • He is in the owner of the whole project. In Burkina Faso, it can be an individual, an entity or a group of investors. • The project owner or contracting owner “Maître d’Ouvrage” (in French) is in charge of the management of construction investment and the conduct of operations.
  • 10. DELEGATED CONTRACTING OWNER • He is not always present in all construction projects, but he can be specially chosen by the Project owner to direct operations, including the management of the budget. • In general, he has a great knowledge and experience in the construction system. He is under the order of the Project owner and is asked to respect the deadlines for the work. • In Burkina Faso, he is called “maître d'ouvrage délégué”
  • 11. PROJECT MANAGER • He is often an architect or an engineer in charge of the design, creation and implementation of a proposed construction or development of space . • He can also be called Site foreman, supervisor of works, subcontractor. • In the local terms, he is called “Maître d’oeuvre”
  • 12. 3. GENERAL CONSTRUCTION METHODS Artisanal construction Industrial construction In Burkina, the most used is Artisanal construction methods. This has many challenges: • Unskilled main power • Unsophisticated building materials • Archaic techniques
  • 13. MAIN CONSTRUCTION ENTERPRISES IN BURKINA FASO The economic pattern of the Construction & Civil Engineering sector consists of a few local companies or subsidiaries of international groups able to meet the requirements of the public and private procurement offers and of several small structures. The local companies able to execute works on the main sites are primarily the following: • general construction: Boutros, BTM, COGEB, Fadoul-Technibois and Kanazoe, SABATP, ATP. • construction of roads : COGEC, EIEF, Fadoul-Technibois, EBOMAF • construction of buildings: Sol Confort & Décor, Echa, Ecobaa, Lafchal, Sosaf..
  • 14. EXECUTION AGENCIES • Execution agencies are structures which make expertise in technical and design, usually under the supervision of an engineer. • Execution agencies have a role in assisting, advising and controlling public and private construction works. They can also act as delegated contracting owners. • In Burkina Faso, many execution agencies have the international standards and work on all the construction project all over the country. The most important are: APAV, VERITAS, AGEIM, ACE.
  • 15. FOREIGN ENTERPRISES • French companies are largely represented by Sogea Satom (Vinci), Colas, (Bouygues) and Sade (Véolia Environnement). • A senegale company CSE
  • 17. 1. PRESENTATION • The public constructions in Burkina Faso are mainly funded by the government, the non-governmental organizations, foreign aids and privates funds of particulars. • The public constructions are mainly composed of : Roads Sanitary and working buildings  Dams Mining infrastructures The realization of a new international Airport before 2025.
  • 18. 2. STEPS  After determining the Project owner (P.O), the Delegated contracting owner (DCO), the project manager (PM)is chosen by consultations or by a contest. The PM, the engineers and architects presents to the P.O and DCO the plans, design and estimations: • The Basic Preliminary Design: plan, design, conception • The Detailed Preliminary Design: it is the task where the engineer can completely describe a product through solid modeling and drawings.
  • 19.  The PM launches the consultation record for construction enterprises and tender documents.  The Tender documents has 3 main kinds:  limited consultations: a few construction enterprises will be consulted and the choice will be made among them.  open tender: in the newspapers, magazines, daily revews and on TV.  OTC: the construction enterprises is directly chosen by contractors without any tender.
  • 20. SELECTION PROCEDURE The choice of construction enterprises is made by the PM. The purchase orders for the award of a public contract ranges from 2,000 to 10,000 USD.  Quality-Cost: the choice is made for a construction of High quality no matter the price. In this case, the budget is undeterminate.  Lowest bidder: Best quality among the proposals of low budget. Here, the budget is tight.  Best cost value: the PM chooses the firm with the best ratio between quality and cost, technical score price or price + time(ft), and other variations
  • 22. For private constructions the procedure is almost the same as Public construction, but there are some differences.
  • 23. DIFFERENCES The sector of private constructions is more focused on residential buildings and apartments. The project owner is often also the project manager. He conducts by himself the work. But there is always a builder. The project owner does not launch a tender document. He chooses by himself an architect or engineer that he knows, buys the necessary equipment and hire the workers. 
  • 24. DIFFERENCES The owner makes his plans by himself or ask to the architect or engineer to do so. For the selection of enterprises, the owner often chooses the lowest bidder, as the budget is often limited.
  • 25. THE ROLE OF CONSTRUCTION INDUSTRY IN BURKINA FASO
  • 26. • Construction sector is dominated by dualistic private sector of local and foreign-owned enterprises and formal and informal enterprises. • The informal and small-scale enterprises ( bricklaying, plumbing, painting) play an important role. • 500 official artisan contractors and construction enterprises are registered but only 20 enterprises have a solid and serious reputation. • Buildings construction make use of formal plans generally prepared by the architect or civil engineer. • There 25 independent architectural firms and about 250 qualified civil engineers.
  • 27. The largest locally owned construction firm called “KANAZOE” undertakes 25% of public works projects such as roads. The market type in the building sector is: • Rural traditional housing • Improved housing • Villa housing • Office/commercial/apartment space • Rural office building The average contribution of the construction industry to the GDP is about 12.7%
  • 29. ACHIEVEMENTS CHALLENGES  Aircraft fleet renewed rapidly in recent years and aircraft size aligned to a hub-and-spoke approach.  Market thin and underdeveloped.  Very concentrated market with very little competition.  Safety and security remain concerns.  Airport facilities are in disarray.  Adoption of ICT promotion policy and sectoral  strategy.  Liberalization and deregulation of the sector.  Increased GSM signal coverage.  Low level of market power concentration  Prices remain high.  Promote competition at the international gateways to SAT 3/WASC AIR TRANSPORT ICT
  • 30. ACHIEVEMENTS POWER RAILWAYS CHALLENGES  Inception of new electricity law encouraging private  sector participation.  Promotion of increased power trade and  interconnection to WAPP.  Limited electrification.  Supply of power insufficient to satisfy demand.  Costs are among the highest in Africa.  Good labor productivity, solid traffic volumes, and  relatively competitive average tariffs.  Recovery of traffic after Côte d’Ivoire crisis.  SITARAIL is on track to achieve its highest- ever  traffic volume  Financial distress of SITARAIL.  Rebalancing financial structure of the railway concession.  Finding alternative funding for rehabilitation backlog.
  • 31. ACHIEVEMENTS CHALLENGES  Good international connectivity.  Adequate design of road network, given the level of  traffic.  Ability to provision for road maintenance.  Limited access from rural farms to markets.  High transport and transit costs due to poor logistics.  Ability to enforce control of axel loads particularly across  borders.  Progress in providing access to improved water  and sanitation, particularly in urban areas.  Successful private-public partnership in the water  utility.  Water utility among the most efficient in Africa  Sanitation MDG is off track.  Lack of consistent data and standardized norms for  monitoring progress in access.  Improving provision in rural areas. ROADS WATER AND SANITATION
  • 32. INFRASTRUCTURES MAP Source: AICD Interactive Infrastructure Atlas for Burkina Faso (http://www.infrastructureafrica.org/aicd).
  • 33. ROADS • Burkina’s 15,202 km of classified road network length seems, in general, adequately designed given the level of traffic and the connectivity it provides. Burkina Faso’s road indicators benchmarked against Africa’s low- and middle-income countries
  • 34. RAIL • Burkina Faso has a transnational railway line jointly owned by Côte d’Ivoire. • The rail line links the port of Abidjan to Ouagadougou and is a key conduit for bulk freight from and into the landlocked hinterland of Burkina Faso. • People don’t usually travel by train. They use bus. The train is generally for business and trade uses.
  • 35. AIR TRANSPORT • Burkina Faso is a minor player in air transportation in West Africa. • The country has two international airports (Ouagadougou and Bobo Dioulasso) but strongly concentrated freight and passenger international traffic. • The country is on a huge project of construction of a new airport 35kms away from Ouagadougou. The work may start around 2015 for a 10-year construction process.
  • 36. WATER SUPPLY AND SANITATION • Burkina has made significant progress toward ensuring that all of its population can access improved water. • According to the JMP, less than 20 percent of the Burkinabè population had access to improved sanitation in 2003. • Increased access to improved sanitation has come predominantly from more latrines • Upcoming challenges include further extending the service to rural areas and improving the technology mix in urban areas and the construction of more dams.
  • 38. • Lack of qualified engineers and construction-related equipments • High factor costs affecting the business operation • Highly bureaucratic tender process • Delay of payment • Requirement of unofficial payment • Competition with foreign-owned construction companies • Lack of available business services provided by either governmental or non-governmental agencies • Very weak voluntary professional and business associations • Inadequate accessibility to financial services
  • 39. CONCLUSION • For countries like Burkina Faso, a small landlocked and agriculture- dependent economy, an efficient transport system, infrastructures for water and power are critically important. The politic of the Construction industry is widely concerned about these infrastructures. • In addition, urban redevelopment called “OUAGA 2000” was undertaken almost simultaneously and subsequently a construction boom for buildings has taken place in the city. • Burkina Faso is a fertile field for investment because the entire country is a construction site. However, owing to the absence of any real domestic capability, most of the larger projects are awarded to foreign-based construction firms. Therefore, the real challenge is to be able to empower the local enterprises so that they can benefit from these numerous construction projects.
  • 40. REFERENCES • http://en.wikipedia.org/wiki/Engineering_design_process#Detailed_design • http://www.izf.net/pages/burkina-faso/4673/ • http://infrastructureafrica.org/system/files/Burkina%20Faso%20ctry%20rpt%20Web.pdf • http://www.izf.net/pages/burkina-faso/17435/ • http://www.lesite.tv/videotheque/0805.0029.00-la-voute-nubienne-comme-alternative-de- construction-au-burkina-faso • http://www.lavoutenubienne.org/sites/default/files/stock/documents/production_terrain/05-10- 00_rapport-evaluation_cloture-partenariat-mae_u-wyss-10-05.pdf • http://burkinafaso.helvetas.org/fr/activites/projets_burkina_faso/construction_dinfrastructures_ durables_burkina_faso/