1. Eastern Neighborhood TRIPS
Community Task Force meeting
EVALUATION FRAMEWORK ROADMAP & TOOLKIT
08 | 23 | 2010 | SAN FRANCISCO, CALIFORNIA
2. Agenda
• Schedule Timeline
• Proposed Evaluation Framework
Methodology
• Rights of way Toolkits
• Project Sorting
• Next Steps
2
3. DRAFT Project Development Work Flow
TRACK 1 - Network Circulation Projects EVALUATIO
EN TRIPS N
Existing Develop/ FRAMEWO
Conditions Model Model Refine MAJOR
RK
Circulation NETWORK Conceptual Environmental
Analysis Traffic (No
Alternatives
Traffic Corridor
Design Review
Project) (Project) Project PROJECT
Concepts PACKAGES
Existing
System
TRACK 2 – Neighborhood-Scale
Deficiencie Projects Fast Track
Future
s Future System Included in Improvements/
Conditions Deficiencies another Pilots
Universe of Modal / Universe plan?
Potential Analysis of Potential
Projects Projects
NEIGHBORHO Prioritized List
EN TRIPS OD SCALE of Future
Potential PROJECT Investments
Street
EN Area Plans BSP Street Projects PACKAGES (Capital and
Design
Typology List
/Other City Guidance Programming)
Project &
Plans
TRACK 3 – Area-wide Policy
Goods Movement Policy
City Policy,
Shuttle Policy Future
Planning
Parking Policy Studies
3
TDM Policy
4. DRAFT Project Development Work Flow
TRACK 1 - Network Circulation Projects EVALUATIO
EN TRIPS N
Existing Develop/ FRAMEWO
Conditions Model Model Refine MAJOR
RK
Circulation NETWORK Conceptual Environmental
Analysis Traffic (No
Alternatives
Traffic Corridor
Design Review
Project) (Project) Project PROJECT
Concepts PACKAGES
Existing
System
TRACK 2 – Neighborhood-Scale
Deficiencie Projects Fast Track
Future
s Future System Included in Improvements/
Conditions Deficiencies another Pilots
Universe of Modal / Universe plan?
Potential Analysis of Potential
Projects Projects
NEIGHBORHO Prioritized List
EN TRIPS OD SCALE of Future
Potential PROJECT Investments
Street
EN Area Plans BSP Street Projects PACKAGES (Capital and
Design
Typology List
/Other City Guidance Programming)
Project &
Plans
TRACK 3 – Area-wide Policy
Goods Movement Policy
City Policy,
Shuttle Policy Future
Planning
Parking Policy Studies
4
TDM Policy
5. Preliminary Evaluation Framework
• Mix of qualitative & quantitative criteria
– Key Goals-identifies the issue
– Evaluation Criteria-identifies the objective:
• Three Integrated Sets of Priority Settings:
1. Systemwide Network (operational, modal
capacity/priority, right of way reconfiguration,
directional changes)
2. Neighborhood/specific (cross-walks, parking,
loading, specific traffic calming)
3. Policies to aid street design/land-use
(shuttles, parking, loading & travel demand
management)
5
6. DRAFT Project Development Work Flow
TRACK 1 - Network Circulation Projects EVALUATIO
EN TRIPS N
Existing Develop/ FRAMEWO
Conditions Model Model Refine MAJOR
RK
Circulation NETWORK Conceptual Environmental
Analysis Traffic (No
Alternatives
Traffic Corridor
Design Review
Project) (Project) Project PROJECT
Concepts PACKAGES
Existing
System
TRACK 2 – Neighborhood-Scale
Deficiencie Projects Fast Track
Future
s Future System Included in Improvements/
Conditions Deficiencies another Pilots
Universe of Modal / Universe plan?
Potential Analysis of Potential
Projects Projects
NEIGHBORHO Prioritized List
EN TRIPS OD SCALE of Future
Potential PROJECT Investments
Street
EN Area Plans BSP Street Projects PACKAGES (Capital and
Design
Typology List
/Other City Guidance Programming)
Project &
Plans
TRACK 3 – Area-wide Policy
Goods Movement Policy
City Policy,
Shuttle Policy Future
Planning
Parking Policy Studies
6
TDM Policy
7. DRAFT Project Development Work Flow
TRACK 1 - Network Circulation Projects EVALUATIO
EN TRIPS N
Existing Develop/ FRAMEWO
Conditions Model Model Refine SYSTEMWID
RK
Circulation E NETWORK Conceptual Environmental
Analysis Traffic (No
Alternatives
Traffic Corridor
Design Review
Project) (Project) Project PROJECT
Concepts PACKAGES
Existing
System
TRACK 2 – Neighborhood-Scale
Deficiencie Projects Fast Track
Future
s Future System Included in Improvements/
Conditions Deficiencies another Pilots
Universe of Modal / Universe plan?
Potential Analysis of Potential
Projects Projects
NEIGHBORHO Prioritized List
EN TRIPS OD SCALE of Future
Potential PROJECT Investments
Street
EN Area Plans BSP Street Projects PACKAGES (Capital and
Design
Typology List
/Other City Guidance Programming)
Project &
Plans
TRACK 3 – Area-wide Policy
Goods Movement Policy
City Policy,
Shuttle Policy Future
Planning
Parking Policy Studies
7
TDM Policy
8. Preliminary Evaluation Framework
• Evaluate the performance of the systems
• Prioritize and rank projects/policies:
– Identify & Prioritize EN-TRIPS systems
network packages
– Complete major environmental clearance
• Identify EN-TRIPS neighborhood projects that can
be fast-tracked:
– Low-cost/Street Innovative type pilots/trials
(develop toolkit)
– Policies that can be implemented in short-term
(e.g. loading/ parking)
– Complete with minor environmental clearance
8