Architectural Job Phases
ARCH-1311 Introduction to Architecture
Phase 0: Conceptual (Pre-Design)
Conceptual Design services vary depending on the complexity of a project and the
experience of the owner. Most owners need the architect’s experience and research
capabilities to determine the project’s requirements.
PROGRAMMING
Programming consists of establishing and documenting requirements for your project
including: design objectives, desired rooms or spaces, room sizes, relationships between
spaces and relationships to the site.
BUDGET ANALYSIS
The budget should estimate both hard and soft costs. Hard costs are construction related—
material, labor, and the contractor’s overhead and profit. Soft costs are non-construction
related—consultants, city and bank fees, and insurance. It is also important to assess if the
budget is adequate to complete the project.
Phase 1: Schematic Design (SD)
Schematic Design is the first phase. In this step, an architect talks with
the client to determine the project requirements and goals. The
architect usually starts with rough study sketches that illustrate the
basic concepts of the design. This most often includes spatial
relationships as well as basic scale and forms the owner might
desire. Also, initial research of jurisdictional regulations is completed
at this time. Initial cost estimations are also investigated based on total
project size and complicity.
Schematic Design often produces rough drawings of a site plan, floor
plans, some elevations, and often illustrative sketches.
Phase 2: Design Development (DD)
Design Development collects the results from the Schematic Design
phase and takes them one step further. This phase involves finalizing
the design and specifying such items as materials, window and door
locations and general structural details.
Design Development usually yields a more detailed site plan as well as
floor plans, elevations and section drawings with full dimensions.
Phase 3: Construction Documents (CD)
Once the architect and client are comfortable with the drawings produced
from the Design Development phase, they can move on to the Construction
Documents. The Construction Document phase produces drawings with
much more detail which are used for the construction of your project. These
drawings typically include specifications for construction details and
materials. Once the CDs are completed, the architects send them to
contractors for pricing or bidding as well as to the building department for
required permit approvals.
Construction Documents often include a complete set of architectural
drawings (site plan, floor plans, sections, details, etc.) that are combined
with drawings from consultants (such as structural, landscape, and electrical
drawings) that have enough detail for the contractor to build your project.
Phase 4: Construction Administration (CA)
In larger projects there can be a bid or negotiation phase as well as a
Construction Administration phase service. These typically aren’t
utilized in smaller home projects, but they are an important part of
larger residential, commercial or industrial projects.
Once you have selected a contractor and construction is under way, we
move into the fifth phase of the architectural design process –
construction administration. During this phase, we will administer the
construction process to assure conformance with design intent, visit
the site during construction, and address any field conditions as they
arise.

Mais conteúdo relacionado

Mais procurados

Resume (Jeff)
Resume (Jeff)Resume (Jeff)
Resume (Jeff)
Jeff Wang
 
ICI and ITD presentation
ICI and ITD presentationICI and ITD presentation
ICI and ITD presentation
Marco Leong
 
Engineering Drawings
Engineering DrawingsEngineering Drawings
Engineering Drawings
Joe Onn Lim
 
Assignment no.2
Assignment no.2 Assignment no.2
Assignment no.2
Est
 

Mais procurados (15)

Guc arct 702 legislations lecture 10 - contract issues for architectural fi...
Guc arct 702 legislations   lecture 10 - contract issues for architectural fi...Guc arct 702 legislations   lecture 10 - contract issues for architectural fi...
Guc arct 702 legislations lecture 10 - contract issues for architectural fi...
 
Project Files Completion
Project Files CompletionProject Files Completion
Project Files Completion
 
Do you know how a building is constructed
Do you know how a building is constructedDo you know how a building is constructed
Do you know how a building is constructed
 
Resume (Jeff)
Resume (Jeff)Resume (Jeff)
Resume (Jeff)
 
Architectural design services
Architectural design servicesArchitectural design services
Architectural design services
 
Construction terminologies
Construction terminologiesConstruction terminologies
Construction terminologies
 
ICI and ITD presentation
ICI and ITD presentationICI and ITD presentation
ICI and ITD presentation
 
Plan Review
Plan ReviewPlan Review
Plan Review
 
Application of BIM in civil industry
Application of BIM in civil industryApplication of BIM in civil industry
Application of BIM in civil industry
 
SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1
 
Documentation
Documentation Documentation
Documentation
 
Real estate investment
Real estate investmentReal estate investment
Real estate investment
 
4d bim
4d bim4d bim
4d bim
 
Engineering Drawings
Engineering DrawingsEngineering Drawings
Engineering Drawings
 
Assignment no.2
Assignment no.2 Assignment no.2
Assignment no.2
 

Semelhante a 03 Architectural Job Phases

Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
AYM1979
 
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdfCCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
ChassyTesoro1
 
From woof to wow and the cats meow bacon2
From woof to wow and the cats meow bacon2From woof to wow and the cats meow bacon2
From woof to wow and the cats meow bacon2
2013_21
 

Semelhante a 03 Architectural Job Phases (20)

7 Design Phases in Architectural Design Process
7 Design Phases in Architectural Design Process7 Design Phases in Architectural Design Process
7 Design Phases in Architectural Design Process
 
130125.PROCESS DIAGRAM
130125.PROCESS DIAGRAM130125.PROCESS DIAGRAM
130125.PROCESS DIAGRAM
 
Comprehensive Guide to SD, DD, CD in Construction Projects
Comprehensive Guide to SD, DD, CD in Construction ProjectsComprehensive Guide to SD, DD, CD in Construction Projects
Comprehensive Guide to SD, DD, CD in Construction Projects
 
PP1 Project 1 Project implementation
PP1 Project 1 Project implementationPP1 Project 1 Project implementation
PP1 Project 1 Project implementation
 
1 Introduction.pdf
1 Introduction.pdf1 Introduction.pdf
1 Introduction.pdf
 
Professional practice of architects-Role of an architect (COA)
Professional practice of architects-Role of an architect (COA)Professional practice of architects-Role of an architect (COA)
Professional practice of architects-Role of an architect (COA)
 
Design-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful OutcomesDesign-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful Outcomes
 
PPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slidePPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slide
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdfCCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
CCDC-Boise-Parking-Structure-Design-Guidelines_2016-Final-Draft-08-04-2016.pdf
 
From woof to wow and the cats meow bacon2
From woof to wow and the cats meow bacon2From woof to wow and the cats meow bacon2
From woof to wow and the cats meow bacon2
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATION
 
Programming by Eng. Iftikhar Mukhtar.pdf
Programming by Eng. Iftikhar Mukhtar.pdfProgramming by Eng. Iftikhar Mukhtar.pdf
Programming by Eng. Iftikhar Mukhtar.pdf
 
Programming in Design by Eng. Iftikhar Mukhtar.pdf
Programming in Design by Eng. Iftikhar Mukhtar.pdfProgramming in Design by Eng. Iftikhar Mukhtar.pdf
Programming in Design by Eng. Iftikhar Mukhtar.pdf
 
Construction Documents Guide: Types and Significance in 2024
Construction Documents Guide: Types and Significance in 2024Construction Documents Guide: Types and Significance in 2024
Construction Documents Guide: Types and Significance in 2024
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction Industry
 
Interior architecture ICI Project 1
Interior architecture ICI Project 1Interior architecture ICI Project 1
Interior architecture ICI Project 1
 
pre-design phase
pre-design phasepre-design phase
pre-design phase
 
glossary-of-construction-terms.pdf
glossary-of-construction-terms.pdfglossary-of-construction-terms.pdf
glossary-of-construction-terms.pdf
 
Project management
Project managementProject management
Project management
 

Mais de Douglas Vail

Mais de Douglas Vail (20)

Chapter 13: Neo-Classicism, Romanticism, and the Rococo
Chapter 13: Neo-Classicism, Romanticism, and the RococoChapter 13: Neo-Classicism, Romanticism, and the Rococo
Chapter 13: Neo-Classicism, Romanticism, and the Rococo
 
Chapter 12: Baroque Architecture
Chapter 12: Baroque ArchitectureChapter 12: Baroque Architecture
Chapter 12: Baroque Architecture
 
Chapter 15: The Twentieth Century and Modernism
Chapter 15: The Twentieth Century and ModernismChapter 15: The Twentieth Century and Modernism
Chapter 15: The Twentieth Century and Modernism
 
Chapter 11: Renaissance Architecture
Chapter 11: Renaissance ArchitectureChapter 11: Renaissance Architecture
Chapter 11: Renaissance Architecture
 
Chapter 10: Indigenous Architecture in the Americas and Africa
Chapter 10: Indigenous Architecture in the Americas and AfricaChapter 10: Indigenous Architecture in the Americas and Africa
Chapter 10: Indigenous Architecture in the Americas and Africa
 
Using the TAS 2012
Using the TAS 2012Using the TAS 2012
Using the TAS 2012
 
Chapter Nine: Gothic Architecture
Chapter Nine: Gothic ArchitectureChapter Nine: Gothic Architecture
Chapter Nine: Gothic Architecture
 
Chapter Eight: Early Medieval and Romanesque Architecture
Chapter Eight: Early Medieval and Romanesque ArchitectureChapter Eight: Early Medieval and Romanesque Architecture
Chapter Eight: Early Medieval and Romanesque Architecture
 
Chapter Seven: Islamic Architecture
Chapter Seven: Islamic ArchitectureChapter Seven: Islamic Architecture
Chapter Seven: Islamic Architecture
 
Chapter Four: The Traditional Architecture of China and Japan
Chapter Four: The Traditional Architecture of China and JapanChapter Four: The Traditional Architecture of China and Japan
Chapter Four: The Traditional Architecture of China and Japan
 
Chapter Six: Early Christian and Byzantine Architecture
Chapter Six: Early Christian and Byzantine ArchitectureChapter Six: Early Christian and Byzantine Architecture
Chapter Six: Early Christian and Byzantine Architecture
 
Chapter Three: The Architecture of Ancient India and Southeast Asia
Chapter Three: The Architecture of Ancient India and Southeast AsiaChapter Three: The Architecture of Ancient India and Southeast Asia
Chapter Three: The Architecture of Ancient India and Southeast Asia
 
Chapter Five: The Roman World
Chapter Five: The Roman WorldChapter Five: The Roman World
Chapter Five: The Roman World
 
Chapter One: The Beginnings of Architecture
Chapter One: The Beginnings of ArchitectureChapter One: The Beginnings of Architecture
Chapter One: The Beginnings of Architecture
 
Chapter 05 Wood Light Frame Construction
Chapter 05 Wood Light Frame ConstructionChapter 05 Wood Light Frame Construction
Chapter 05 Wood Light Frame Construction
 
Chapter 12 Light Gauge Steel Frame Construction
Chapter 12 Light Gauge Steel Frame ConstructionChapter 12 Light Gauge Steel Frame Construction
Chapter 12 Light Gauge Steel Frame Construction
 
Chapter 11 Steel Frame Construction
Chapter 11 Steel Frame ConstructionChapter 11 Steel Frame Construction
Chapter 11 Steel Frame Construction
 
Chapter 13 Concrete Construction
Chapter 13 Concrete ConstructionChapter 13 Concrete Construction
Chapter 13 Concrete Construction
 
Chapter 01 Making Buildings
Chapter 01 Making BuildingsChapter 01 Making Buildings
Chapter 01 Making Buildings
 
01 Chicago School
01 Chicago School01 Chicago School
01 Chicago School
 

Último

Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 

Último (20)

PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 

03 Architectural Job Phases

  • 1. Architectural Job Phases ARCH-1311 Introduction to Architecture
  • 2. Phase 0: Conceptual (Pre-Design) Conceptual Design services vary depending on the complexity of a project and the experience of the owner. Most owners need the architect’s experience and research capabilities to determine the project’s requirements. PROGRAMMING Programming consists of establishing and documenting requirements for your project including: design objectives, desired rooms or spaces, room sizes, relationships between spaces and relationships to the site. BUDGET ANALYSIS The budget should estimate both hard and soft costs. Hard costs are construction related— material, labor, and the contractor’s overhead and profit. Soft costs are non-construction related—consultants, city and bank fees, and insurance. It is also important to assess if the budget is adequate to complete the project.
  • 3.
  • 4.
  • 5. Phase 1: Schematic Design (SD) Schematic Design is the first phase. In this step, an architect talks with the client to determine the project requirements and goals. The architect usually starts with rough study sketches that illustrate the basic concepts of the design. This most often includes spatial relationships as well as basic scale and forms the owner might desire. Also, initial research of jurisdictional regulations is completed at this time. Initial cost estimations are also investigated based on total project size and complicity. Schematic Design often produces rough drawings of a site plan, floor plans, some elevations, and often illustrative sketches.
  • 6.
  • 7.
  • 8.
  • 9. Phase 2: Design Development (DD) Design Development collects the results from the Schematic Design phase and takes them one step further. This phase involves finalizing the design and specifying such items as materials, window and door locations and general structural details. Design Development usually yields a more detailed site plan as well as floor plans, elevations and section drawings with full dimensions.
  • 10.
  • 11.
  • 12. Phase 3: Construction Documents (CD) Once the architect and client are comfortable with the drawings produced from the Design Development phase, they can move on to the Construction Documents. The Construction Document phase produces drawings with much more detail which are used for the construction of your project. These drawings typically include specifications for construction details and materials. Once the CDs are completed, the architects send them to contractors for pricing or bidding as well as to the building department for required permit approvals. Construction Documents often include a complete set of architectural drawings (site plan, floor plans, sections, details, etc.) that are combined with drawings from consultants (such as structural, landscape, and electrical drawings) that have enough detail for the contractor to build your project.
  • 13.
  • 14.
  • 15. Phase 4: Construction Administration (CA) In larger projects there can be a bid or negotiation phase as well as a Construction Administration phase service. These typically aren’t utilized in smaller home projects, but they are an important part of larger residential, commercial or industrial projects. Once you have selected a contractor and construction is under way, we move into the fifth phase of the architectural design process – construction administration. During this phase, we will administer the construction process to assure conformance with design intent, visit the site during construction, and address any field conditions as they arise.