• Harpeth Conservancy Proposes that TDEC Facilitate a Stakeholder-led
TMDL Process
• Similar to USEPA “5R” approach
• Stretches TDEC’s scarce resources
• Allows Private Sector Expertise to be Brought to Bear
• Technical issues
• “Voluntary” process
• TMDL is a “Deal” – Allows Parties to Start Getting into “Deal Mode” Sooner
• Thinking about allocations and implementation
• Potential to Actually Achieve Restoration
Table of Contents
• Why Are We Doing a TMDL? Why are We Here?
• The Over-Riding Goal of a TMDL
• Where Are We Now?
• Elements of a TMDL
• Issues with Most TMDLs?
• Solutions? Stakeholder-led TMDL – “Privatize” the TMDL Process
• Examples & Similar Structures
• Requirements & Interim Measures
• Potential for Legislative Involvement / Encouragement
• Similarity to USEPA Region 4’s 5R Approach
• Conclusion
Why Are We Doing a TMDL? Why Are We
Here?
•River Is Impaired
• CWA §303 Requires a TMDL:
• TMDL required where Technology-based Effluent Limits (TBELS – end-of-pipe
controls) are NOT sufficient
• “Each State shall identify those waters within its boundaries for which the
effluent limitations required by section 1311(b)(1)(A) [TBELS for point sources
other than POTWs] and section 1311(b)(1)(B) [secondary treatment for pre-
existing POTWs] of this title are not stringent enough to implement any water
quality standard applicable to such waters.” 33 USC §1313 (d)(1)(A)
The Harpeth River Needs a TMDL
• The Harpeth River has been on Tennessee’s 303(d) List for excess
“nutrients” since 1996 and it has been listed as impaired by phosphorus
since 2004.
• Low DO violations
• Algae growth drives low DO
• Excess nutrients (nitrogen and/or phosphorus) can lead to harmful algal
blooms that are toxic to humans, pets, and wildlife; toxic algae can taint
drinking water and poison swimmers, and algal blooms can deplete the
water of the oxygen needed by fish and other water species.
• In 2014, TDEC began conversations with stakeholders about developing a
TMDL for the Harpeth River Watershed.
Map of Harpeth River Impairments
The Over-Riding Goal of a TMDL
•Get the River off the 303(d) List
• CWA §303(d)(1)(C): “Each State shall establish for the waters
identified in paragraph (1)(A) of this subsection, … the total maximum
daily load, …. Such load shall be established at a level necessary to
implement the applicable water quality standards with seasonal
variations and a margin of safety which takes into account any lack of
knowledge concerning the relationship between effluent limitations
and water quality.”
Where Are We Now?
• TMDL is over 3 years old and still lacks critical initial elements
• No workplan yet finalized, even though it is a critical first step in any
scientific study (M. Corn, Feb. 2018)
• 2004 – Harpeth River is first listed as impaired for phosphorus
• 2015 – (July 2015) -- TDEC announces new TMDL at same time as new water
withdrawal permit.
• 2016 – (May 2016) – TDEC holds first meeting on new TMDL
• 2018 – Meetings continue, but still no final work plan or Scientific Advisory
Panel (Technical Advisory Committee) per 2013 Draft Permit
Statutory Elements of a TMDL
• Each State shall establish TMDLs for the water quality limited segments
identified [on the State 303(d) List], and in accordance with the priority
ranking. 40 C.F.R. §130.7(c)(1).
• Waters on the 303(d) List require TMDLs when (i) technology-based effluent
limitations required by the CWA; (ii) more stringent effluent limitations required by
either State or local authority preserved by CWA Section 510, or Federal authority;
and (iii) other pollution control requirements (e.g. best management practices) are
not stringent enough to implement any water quality standards applicable to such
waters
• “water quality standards applicable to such waters” = water quality standards established under
CWA 303, including numeric criteria, narrative criteria, waterbody uses, and antidegradation
requirements
• “priority ranking” = established in accordance with the process described in the
State’s Continuing Planning Process, taking into account the severity of the pollution
and the uses to be made of such waters, and must identify waters targeted for TMDL
development in the next two years
Statutory Elements of a TMDL (cont’d)
• For pollutants other than heat, TMDLs shall be established at levels necessary
to attain and maintain the applicable narrative and numerical water quality
standards (WQS) with seasonal variations and a margin of safety which takes
into account any lack of knowledge concerning the relationship between
effluent limitations and water quality. 40 C.F.R. 130.7(c)(1).
• Determinations of TMDLs shall take into account critical conditions (e.g., 7
Q10 conditions) for stream flow, loading, and water quality parameters. Id.
• TMDLs may be established using a pollutant-by-pollutant or biomonitoring
approach. In many cases both techniques may be needed. Site-specific
information should be used wherever possible. 40 C.F.R. 130.7(c)(1)(i).
• TMDLs shall be established for all pollutants preventing or expected to
prevent attainment of water quality standards as identified [on the state’s
303(d) List]. Calculations to establish TMDLs shall be subject to public review
as defined in the State CPP. 40 C.F.R. 130.7(c)(1)(ii).
Minimum Elements of a TMDL
The EPA provides a ten-item TMDL Review Checklist of the minimum recommended
elements that should be present in a TMDL document:
• Required Elements:*
• Applicable WQS and Numeric Water Quality Target
• Loading Capacity
• Load Allocations (LAs) and Waste Load Allocations (WLAs)
• Margin of Safety
• Consideration of Seasonal Variation
• Recommended Elements:
• Identification of Waterbody, Pollutant of Concern, Pollutant Sources and Priority Ranking
• Reasonable Assurance for LAs/WLAs
• Implementation Plan – BUT must have implementation plan under 40 CFR 130.6 (b), (c) (as part of TN
State Water Quality Management Plan – Does it contain this element?)
• Monitoring Plan to Track TMDL Effectiveness
• Public Participation
* Required by 40 CFR Part 130
Issues with Most TMDLs?
• Don’t Have Necessary Elements for Success
2013 GAO STUDY:*
• “[R]epresentative sample [shows]… pollutant…[reductions], but few
impaired water bodies have fully attained water quality standards.”
• TMDLs “seldom contained all features key to attaining water quality
standards.” …. [and lack such elements as]
• identifying pollution-causing stressors
• showing how addressing them would help attain such standards
• specifying how and by whom TMDLs will be implemented
• ensuring periodic revisions as needed.
* GAO, CLEAN WATER ACT Changes Needed If Key EPA Program Is to Help Fulfill the Nation’s Water Quality Goals (Dec. 2013) (https://www.gao.gov/assets/660/659496.pdf)
Proper Allocations Between Sources Required
• “[W]here a state reduces the WLAs in a TMDL based upon anticipated
future reductions in nonpoint source loading, the state should
provide specific assurances that the reductions will in fact occur.
Absent such assurances, the state must allocate the entire load
reduction necessary to attain water quality standards to point
sources.”*
*Mark A. Ryan, Editor, THE CLEAN WATER ACT HANDBOOK (3rd EDITION) (American Bar Ass’n, 2011), Ch. 11 citing EPA, GUIDANCE FOR WATER QUALITY–BASED DECISIONS: THE
TMDL PROCESS, ch. 1 at 2, ch. 2 at 8, ch. 3 at 5 (Apr. 1991), available at http://water.epa.gov/lawsregs/lawsguidance/cwa/tmdl/dec1c.cfm.
Tennessee’s Record on Nutrient Pollution
Decades of Delay, Mississippi River Collaborative, November 2016:
• “Nitrogen and phosphorus pollution remain a problem in Tennessee’s waters, and it is a problem
that is getting worse.”
• “Tennessee is failing to take the necessary steps to control for nutrient pollution.”
• “…not a single permit contains a water quality based effluent limit derived from Tennessee’s
numeric nutrient translator.”
• “Tennessee’s [Nutrient Reduction] Strategy is incomplete and lacks many elements specified in
EPA’s Framework memo.”
• “Tennessee has developed just five nutrient-related TMDLs, none over the past 6 years. … Three
of the 5 TMDLs … ignor[e] any downstream reaches with wastewater treatment plant discharges.
As a result, Tennessee has never developed a wasteload allocation for these facilities.”
http://www.msrivercollab.org/wp-content/uploads/Decades-of-Delay-MRC-Nov-2016.pdf (pps. 61, 62, 64, emphasis added)
Solutions? Stakeholder-led TMDL –
“Privatize” the TMDL Process
•Utilize a Stakeholder-led TMDL process
• See https://www.epa.gov/tmdl/third-party-tmdl-development-
toolkit.
•Benefits?
•Requirements?
What is a Stakeholder-led TMDL?
• Concept promoted by USEPA
• “Denotes a TMDL in which an organization or group other than the lead
water quality agency takes responsibility for developing the TMDL
document and supporting analysis.” (Third-party TMDL)
• “A third party can be a watershed group, municipal wastewater or
stormwater discharger organization, industrial discharger entity, other unit
of government (such as a county, city, municipality, or land management
agency), or nonpoint source organization (such as a farm bureau, irrigation
and drainage district, or landowner).”
• “Other than the third party taking the lead role for developing the TMDL
document and supporting analysis, there is nothing different about a third-
party TMDL. State agencies, rather than third parties, ultimately adopt
TMDLs and submit them for approval to EPA.”
• From WEF, “Third-Party TMDL Development,” (2007), https://www.wef.org/globalassets/assets-wef/3---resources/topics/o-
z/watershed/technical-resources/toolkitwebversion.pdf and https://www.epa.gov/tmdl/resources-tmdl-stakeholders
Benefits of Stakeholder-led TMDLs
• Stretches TDEC’s scarce resources
• Allows private sector expertise to be brought to bear
• Technical issues
• “Voluntary” process
• TMDL is a “deal” – allows parties to start getting into “deal mode”
sooner
• Thinking about allocations and implementation
• Potential to Actually Achieve Restoration
Stakeholder-led TMDL Development
• Typical steps in developing a TMDL:
• State sets water quality standards, assesses water body, and determines if water
quality is impaired
• State develops total maximum daily load (TMDL) for impaired water body, taking
public comment on the draft TMDL before submitting a finalized version to EPA
• EPA reviews TMDL
• EPA rejects or approves TMDL; if rejected, EPA itself develops TMDL within 30 days
• State implements TMDL
• For point sources of pollution:
• State or EPA incorporates limits from TMDLs into discharge permits
• State monitors point sources for compliance with permits
• For nonpoint sources of pollution:
• State uses federal and nonfederal funding to help landowners and other stakeholders take
actions prescribed by TMDL
• Landowners or other stakeholders take (voluntary) action
Stakeholder-led TMDL Development (cont’d)
• While the responsibility for developing TMDLs in Tennessee ultimately
rests with the Tennessee Department of Environmental Conservation
(TDEC) and the EPA is responsible for reviewing and approving (or
rejecting and replacing) any finalized TMDL.
• The vast majority of the 70,000 approved TMDLs in the United States
only allow for substantive public participation through the notice and
comment procedure once the TMDLs are drafted.
• The Harpeth River TMDL offers a rare opportunity, as TDEC and the
EPA have engaged a group of stakeholders to collaborate on the
development of the TMDL per the USEPA-promoted stakeholder-led /
third party TMDL process.
Examples of Stakeholder-led TMDLs
• Similar Structures
• Stakeholder-led TMDLs – CASE STUDIES
• Lots of Lessons Can Be Learned from Others’ Efforts
• If Implemented Well, Could Have Better Chance of Success in Achieving Goal
of Removing River from 303(d) List
Similar Structures – Watershed Management
Structures
• At Least 3 Different Types –Government-, Citizen-Directed, Hybrid*
• Government
• Upper Occoquan Service Authority
• Citizen – Charles River Watershed Ass’n
• Hybrid
• Neuse River Compliance Association and Lower Neuse Basin Association
• Spokane River Forum
* See Schueler & Holland, eds., The Practice of Watershed Protection (2000), Article 128.
Stakeholder-led TMDLs – CASE STUDIES
Participants in the following stakeholder-led TMDLs were contacted in
preparing these recommendations (No central database, so data-gathering
& analysis more difficult.):
• Ballona Creek & LA River, California
• North Buffalo Creek, North Carolina
• Little Miami River, Ohio
• Lake Pepin, MN
Lake Pepin TMDL Organizational Structure
Stakeholder Advisory
Committee
• Help design TMDL
work plan
• Provide advice on
solutions and mouth
of watershed goals
• Coordinate
communications
MCPA
• Steering
• Support
• Leadership
• Education
• Draft TMDL Report
River Basin Teams
• Minnesota River
• Upper Mississippi River
• St. Croix River
• Lower Mississippi
• Metro Region
Public
Review
EPA Approval
Scientific Advisory Panel
• Review TMDL Documents
• Help to resolve technical issues
• Provide expert opinion on scientific questions
Requirements for Stakeholder-led TMDLs?
TDEC Must Set Outside Bounds for Privatization Process
Sierra Club v. McLerran, U.S.D.C. (W. Dist. WA, 2015)*
• River long on 303(d) list for PCBs; WA Dept’ of Ecology takes several desultory steps
toward cleanup, including organizing a group of permittees into a “Regional Task
Force”
• “… the Court sets aside the EPA’s decision and remands …. Specifically, the EPA shall
work with [WA Dep’t of] Ecology to create a definite schedule with concrete goals,
including:
• clear statements on how the Task Force will assist in creating a PCB TMDL in the Spokane River
by reducing scientific uncertainty;
• quantifiable metrics to measure progress toward that goal;
• regular checkpoints at which Ecology and the EPA will evaluate progress;
• a reasonable end date, at which time Ecology will finalize and submit the TMDL for the EPA’s
approval or disapproval; and
• firm commitments to reducing PCB production from known sources in the interim.” (Emphasis
added).
* MEMORANDUM ORDER REMANDING MATTER FOR FURTHER CONSIDERATION, Docket No. 120, Case No. 11-CV-1759-BJR; Appeal dismissed, 9th Cir, April 5, 2016.
Preparation of TMDL Does Not Excuse Violation of
WQS In the Interim
• “… TMDLs take time and resources to develop and have proven to be difficult to
get just right; thus, under EPA regulations, permitting authorities must adopt
interim measures to bring water bodies into compliance with water quality
standards. Id. § 1313(e)(3); 40 C.F.R. § 122.44(d); see also, e.g., 43 Fed. Reg.
60,662, 60,665 (Dec. 28, 1978) ("EPA recognizes that State development of
TMDL's and wasteload allocations for all water quality limited segments will be a
lengthy process. Water quality standards will continue to be enforced during this
process. Development of TMDL's . . . is not a necessary prerequisite to adoption
or enforcement of water quality standards . . . .").”
• “The District also alleges that the EPA was required to demonstrate … that the
phosphorus limit "would have a substantial impact on the cultural eutrophication
of the Blackstone River“…. We thus reject the notion that in order to strengthen
the District's discharge limits, the EPA must show that the new limits, in and of
themselves, will cure any water quality problems.
• Upper Blackstone Water Pollution Abatement District v. U.S. EPA, 690 F.3d 9 (1st Cir. 2012); Accord, City of Taunton Dept. of Public Works, 17 EAB __ (Env. Appeals
Board 5/3/2016); Prairie Rivers Network v. Illinois Pollution Control Board, 2016 IL App (1st) 150971 ¶¶29-33, 38 (Ill. App. Ct. 2016); Ala. Dept. of Env. Mgt. v. Ala.
Rivers Alliance, Inc. 14 So. 3d 853, 866-68 (Ala. Civ. App. 2007).
What Are We Proposing?
• Stakeholder-led TMDL
• “Steering Committee”
• Elected representatives from around the Harpeth system
• Permittees
• Environmental Interests (Harpeth Conservancy, etc.)
• Community Business Leaders
• Technical Advisory Committee
• Representatives from Steering Committee members
• Independent Stakeholders Can Participate
• Stakeholders Work Out Details, Subject to TDEC Supervision
• Schedules / Milestones / Deliverables – subject to TDEC approval
• Data Needs -- Sampling / Monitoring, etc.
• Waste- and Load-Allocations
• Implementation Plans
• Post-Effectiveness Monitoring
Steering / Executive Committee
• Need to Discuss and Settle on Composition, Charter, Reporting
Relationships, etc.
• Composition?
• Elected representatives from around the Harpeth system
• Permittees
• Environmental Interests (Harpeth Conservancy, etc.)
• Community Business Leaders
• Other Interests?
• Charter?
• Frequency of Meetings? Help Resolve Issues re Status, Progress, WLAs, LAs, etc.?
• Reporting Relationships?
• TAC reports to Steering / Executive Committee?
TDEC Says We Need a Technical Advisory
Committee
• “The Harpeth River Watershed Association (HRWA) [now, Harpeth Conservancy] developed
and on February 10, 2013 distributed to the permittees (Franklin STP TN0028827, Berry Chapel
Utility STP TN0029718, and Cartwright Creek – Grasslands STP TN0027278), EPA, USGS, the
division, and others a very comprehensive historical Harpeth River data summary, its proposed
instream monitoring program, and suggested that a Technical Advisory Committee (TAC) an
oversight organization, be assembled for assisting with the receiving stream investigations, data
application assessments, and considerations/suggestions for NPDES permit
modifications/renewals. The division concurs with HRWA, regarding the need for more
comprehensive instream data collection and the translation into viable Harpeth River upgrades.
HRWA’s documents are in the permit file and available upon request. The new permit provides
reopener provisions for modifications pursuant to the permittee’s participation in the TAC.”
TDEC, Draft of NPDES Permit No. TN0028827, April 23, 2013, Pages R-2 to R-3 (and
accompanying letter of the same date from Vojin Janjić, Manager, Permit Section, TDEC to Mr.
Mark S. Hilty, P.E., Franklin Water Management Department.) (Emphasis added). (The actual
re-opener clause is contained in Section 1.5, page 11 of the 2013 Draft Permit.)
Potential for Legislative Involvement /
Encouragement
• Legislative Involvement / Encouragement Could Facilitate the Process
• Utilize “Group of Five” Already Engaged (Sens. Dickerson, Johnson; Reps.
Clemmons, Mitchell, Whitson)
• Bring in Additional Elected Officials? Nashville Mayor Office?, Metro Council Members?,
Downstream State and Local Elected Officials?
• Oversee Process? Engage More Business / Community Leaders?
• Mandate Approach?
• Potential for Statewide Program
• Pilot Program to Begin?
Similar to USEPA Region 4’s “5R” Approach
• What is USEPA Region 4’s 5R Approach?
• What is the 5R Approach? – Alternative to / pre-TMDL
• “Process to engage local stakeholders in the watershed restoration process in advance of TMDL
development … by allowing public and private stakeholders to drive the watershed restoration
process.”
• “…stakeholders, in conjunction with their State, prepare a watershed plan that includes a broad
scope of water quality restoration activities that, when implemented, can improve water quality
…. The watershed plan should follow a continuous adaptive management approach ….”
• Six (6) year pilot program
• Why Use a 5R Process?
• Traditional TMDLs Not Working: “As of August 2011, over 44,000 TMDLs have been established
throughout the Nation. However, the National Water Quality Inventory to Congress for the 2004
Reporting Cycle reported that 44% of assessed stream miles, 64% of assessed lake acres and …
remain impaired.”
• TMDLs Not Being Implemented: “…an estimated 80% of the TMDLs established in Region 5 were
at least partially implemented; however, full implementation was uncommon….”
5R Approach (cont’d)
• Elements of a 5R Process?:
• The identification of the point and nonpoint sources
• The point source and nonpoint source water quality restoration activities that
are expected to result in water quality improvements and restoration.
• Cost estimates and funding commitments to implement the water quality
restoration activities.
• An anticipated schedule for implementing the water quality restoration
activities, including the anticipated completion date and the estimated
pollutant load reductions necessary to meet water quality standards.
• A water quality monitoring component to evaluate and track the effectiveness
of the scheduled water quality restoration activities at each 303(d) listing
cycle.
• An anticipated date for achieving water quality standards.
Why Do We Think It Might Work Here?
• Uniqueness of Harpeth River
• One of Most Heavily Recreated in State
• Contact recreation – water play, fishing, paddling
• PUBLIC HEALTH ISSUE
• REAL NEED
• Public Interest and Oversight – Already Significant Community Interest & Involvement
• Principal Issues Appear More Controllable
• Principal Sources Seem to be Point Sources
• Sewer plants
• Municipal Stormwater systems
• Not Nonpoint Sources
Conclusions
• Harpeth Conservancy Proposes a Stakeholder-led TMDL Process
• “Privatizes” Process – Engages Community
• Stretches TDEC Resources – Better Preserve & Restore TN with Less
Government Involvement, Dollars – Utilizes Community Expertise & Energy
• Addresses Issues with Many TMDLs – Has Structure to Implement, Monitor
Progress
• Similar to Approaches Used Across the Country
• More Likely to Achieve the Ultimate Goal –
• GET THE RIVER OFF THE 303(d) IMPAIRED LIST
We are the river.
United we are the solution..
34

Mais conteúdo relacionado

Mais procurados

NGA Report: State Practices to Protect Drinking Water While Developing Shale ...
NGA Report: State Practices to Protect Drinking Water While Developing Shale ...NGA Report: State Practices to Protect Drinking Water While Developing Shale ...
NGA Report: State Practices to Protect Drinking Water While Developing Shale ...Marcellus Drilling News
 
NOAA National Water Model, Gregory Waller
NOAA National Water Model, Gregory WallerNOAA National Water Model, Gregory Waller
NOAA National Water Model, Gregory WallerTWCA
 
U.S. Army Corps of Engineers Update, Mark Mazzanti SES
U.S. Army Corps of Engineers Update, Mark Mazzanti SESU.S. Army Corps of Engineers Update, Mark Mazzanti SES
U.S. Army Corps of Engineers Update, Mark Mazzanti SESTWCA
 
Vassar et al., EPA/USGS Aquatic Life Report
Vassar et al., EPA/USGS Aquatic Life ReportVassar et al., EPA/USGS Aquatic Life Report
Vassar et al., EPA/USGS Aquatic Life ReportTWCA
 
Regulation and Permitting of Resource Restoration Activities
Regulation and Permitting of Resource Restoration ActivitiesRegulation and Permitting of Resource Restoration Activities
Regulation and Permitting of Resource Restoration ActivitiesAndrew T. Der & Associates, LLC
 
How Changing Federal and State Water Regulations Continue to Affect Your Proj...
How Changing Federal and State Water Regulations Continue to Affect Your Proj...How Changing Federal and State Water Regulations Continue to Affect Your Proj...
How Changing Federal and State Water Regulations Continue to Affect Your Proj...Andrew T. Der & Associates, LLC
 
Transboundary Diagnostic Anaylsis: The Mediterreanean Region
Transboundary Diagnostic Anaylsis: The Mediterreanean RegionTransboundary Diagnostic Anaylsis: The Mediterreanean Region
Transboundary Diagnostic Anaylsis: The Mediterreanean RegionIwl Pcu
 
Wqm framework 1.0_e_web
Wqm framework 1.0_e_webWqm framework 1.0_e_web
Wqm framework 1.0_e_webStephen Siwila
 
French, DFC Update
French, DFC UpdateFrench, DFC Update
French, DFC UpdateTWCA
 
Balancing Nonpoint Source Water Quality Management with Wetland and Stream Pr...
Balancing Nonpoint Source Water Quality Management with Wetland and Stream Pr...Balancing Nonpoint Source Water Quality Management with Wetland and Stream Pr...
Balancing Nonpoint Source Water Quality Management with Wetland and Stream Pr...Andrew T. Der & Associates, LLC
 
Managing a Wild and Scenic River - The Wild and Scenic Rivers Act and Compreh...
Managing a Wild and Scenic River - The Wild and Scenic Rivers Act and Compreh...Managing a Wild and Scenic River - The Wild and Scenic Rivers Act and Compreh...
Managing a Wild and Scenic River - The Wild and Scenic Rivers Act and Compreh...rshimoda2014
 
The Future is Now: The Rapidly Evolving Landscape of ASR in Texas
The Future is Now: The Rapidly Evolving Landscape of ASR in TexasThe Future is Now: The Rapidly Evolving Landscape of ASR in Texas
The Future is Now: The Rapidly Evolving Landscape of ASR in TexasThe Texas Network, LLC
 
Stormwater regulations and their relationship to tmd ls
Stormwater regulations and their relationship to tmd lsStormwater regulations and their relationship to tmd ls
Stormwater regulations and their relationship to tmd lsMatthew Hahm
 
Study Results: Delineating Injection Well Buffer Zones in Brackish Aquifers
Study Results: Delineating Injection Well Buffer Zones in Brackish AquifersStudy Results: Delineating Injection Well Buffer Zones in Brackish Aquifers
Study Results: Delineating Injection Well Buffer Zones in Brackish AquifersTexas Alliance of Groundwater Districts
 

Mais procurados (20)

Environmental Compliance Overview for Architects
Environmental Compliance Overview for ArchitectsEnvironmental Compliance Overview for Architects
Environmental Compliance Overview for Architects
 
NGA Report: State Practices to Protect Drinking Water While Developing Shale ...
NGA Report: State Practices to Protect Drinking Water While Developing Shale ...NGA Report: State Practices to Protect Drinking Water While Developing Shale ...
NGA Report: State Practices to Protect Drinking Water While Developing Shale ...
 
NOAA National Water Model, Gregory Waller
NOAA National Water Model, Gregory WallerNOAA National Water Model, Gregory Waller
NOAA National Water Model, Gregory Waller
 
Water Quality and Wetlands: Historic Lessons Learned
Water Quality and Wetlands: Historic Lessons LearnedWater Quality and Wetlands: Historic Lessons Learned
Water Quality and Wetlands: Historic Lessons Learned
 
U.S. Army Corps of Engineers Update, Mark Mazzanti SES
U.S. Army Corps of Engineers Update, Mark Mazzanti SESU.S. Army Corps of Engineers Update, Mark Mazzanti SES
U.S. Army Corps of Engineers Update, Mark Mazzanti SES
 
Fort Stockton MLT_ Desired Future Conditions_Robert Bradley
Fort Stockton MLT_ Desired Future Conditions_Robert BradleyFort Stockton MLT_ Desired Future Conditions_Robert Bradley
Fort Stockton MLT_ Desired Future Conditions_Robert Bradley
 
Study Results: Brackish Groundwater Comingling
Study Results: Brackish Groundwater Comingling Study Results: Brackish Groundwater Comingling
Study Results: Brackish Groundwater Comingling
 
3. Integrated Catchment Management - Conceptual understanding
3. Integrated Catchment Management - Conceptual understanding3. Integrated Catchment Management - Conceptual understanding
3. Integrated Catchment Management - Conceptual understanding
 
Vassar et al., EPA/USGS Aquatic Life Report
Vassar et al., EPA/USGS Aquatic Life ReportVassar et al., EPA/USGS Aquatic Life Report
Vassar et al., EPA/USGS Aquatic Life Report
 
Regulation and Permitting of Resource Restoration Activities
Regulation and Permitting of Resource Restoration ActivitiesRegulation and Permitting of Resource Restoration Activities
Regulation and Permitting of Resource Restoration Activities
 
How Changing Federal and State Water Regulations Continue to Affect Your Proj...
How Changing Federal and State Water Regulations Continue to Affect Your Proj...How Changing Federal and State Water Regulations Continue to Affect Your Proj...
How Changing Federal and State Water Regulations Continue to Affect Your Proj...
 
Transboundary Diagnostic Anaylsis: The Mediterreanean Region
Transboundary Diagnostic Anaylsis: The Mediterreanean RegionTransboundary Diagnostic Anaylsis: The Mediterreanean Region
Transboundary Diagnostic Anaylsis: The Mediterreanean Region
 
Wqm framework 1.0_e_web
Wqm framework 1.0_e_webWqm framework 1.0_e_web
Wqm framework 1.0_e_web
 
French, DFC Update
French, DFC UpdateFrench, DFC Update
French, DFC Update
 
Balancing Nonpoint Source Water Quality Management with Wetland and Stream Pr...
Balancing Nonpoint Source Water Quality Management with Wetland and Stream Pr...Balancing Nonpoint Source Water Quality Management with Wetland and Stream Pr...
Balancing Nonpoint Source Water Quality Management with Wetland and Stream Pr...
 
Managing a Wild and Scenic River - The Wild and Scenic Rivers Act and Compreh...
Managing a Wild and Scenic River - The Wild and Scenic Rivers Act and Compreh...Managing a Wild and Scenic River - The Wild and Scenic Rivers Act and Compreh...
Managing a Wild and Scenic River - The Wild and Scenic Rivers Act and Compreh...
 
The Future is Now: The Rapidly Evolving Landscape of ASR in Texas
The Future is Now: The Rapidly Evolving Landscape of ASR in TexasThe Future is Now: The Rapidly Evolving Landscape of ASR in Texas
The Future is Now: The Rapidly Evolving Landscape of ASR in Texas
 
Regulatory Overview of Stormwater Management
Regulatory Overview of Stormwater ManagementRegulatory Overview of Stormwater Management
Regulatory Overview of Stormwater Management
 
Stormwater regulations and their relationship to tmd ls
Stormwater regulations and their relationship to tmd lsStormwater regulations and their relationship to tmd ls
Stormwater regulations and their relationship to tmd ls
 
Study Results: Delineating Injection Well Buffer Zones in Brackish Aquifers
Study Results: Delineating Injection Well Buffer Zones in Brackish AquifersStudy Results: Delineating Injection Well Buffer Zones in Brackish Aquifers
Study Results: Delineating Injection Well Buffer Zones in Brackish Aquifers
 

Semelhante a The Need for Stakeholder TMDL

James Solution to Pollution
James Solution to Pollution James Solution to Pollution
James Solution to Pollution Contract Cities
 
The Rivers Trust Autumn Conference: Day 2 - Session 3
The Rivers Trust Autumn Conference: Day 2 - Session 3The Rivers Trust Autumn Conference: Day 2 - Session 3
The Rivers Trust Autumn Conference: Day 2 - Session 3Westcountry Rivers Trust
 
Bioassessment Approach to MS4 Evaluation and Assessment
Bioassessment Approach to MS4 Evaluation and AssessmentBioassessment Approach to MS4 Evaluation and Assessment
Bioassessment Approach to MS4 Evaluation and AssessmentJPoore
 
Total Maximum Daily Load - Hawaii Status Report
Total Maximum Daily Load - Hawaii Status ReportTotal Maximum Daily Load - Hawaii Status Report
Total Maximum Daily Load - Hawaii Status Reportcorrin
 
Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101Greg Gearheart
 
Final CMT Implementation Services RFP
Final CMT Implementation Services RFPFinal CMT Implementation Services RFP
Final CMT Implementation Services RFPWaterQuality
 
Network and mandates of wq monitoring
Network and mandates of wq monitoringNetwork and mandates of wq monitoring
Network and mandates of wq monitoringhydrologyproject0
 
Marcia Willhite, Illinois EPA, Chloride Issue in the Chicago Area Waterway Sy...
Marcia Willhite, Illinois EPA, Chloride Issue in the Chicago Area Waterway Sy...Marcia Willhite, Illinois EPA, Chloride Issue in the Chicago Area Waterway Sy...
Marcia Willhite, Illinois EPA, Chloride Issue in the Chicago Area Waterway Sy...Kevin Perry
 
Key Clean Water Act Criteria Affecting Stormwater Management at the Site Level
Key Clean Water Act Criteria Affecting Stormwater Management at the Site LevelKey Clean Water Act Criteria Affecting Stormwater Management at the Site Level
Key Clean Water Act Criteria Affecting Stormwater Management at the Site LevelAndrew T. Der & Associates, LLC
 
central pollution control board
central pollution control boardcentral pollution control board
central pollution control boardSruthi Tangirala
 
Pollution controlboard
Pollution controlboardPollution controlboard
Pollution controlboardOnkar Chauhan
 
1 ksa%20conference%202010%20 %20 mary%20kuo[1]
1 ksa%20conference%202010%20 %20 mary%20kuo[1]1 ksa%20conference%202010%20 %20 mary%20kuo[1]
1 ksa%20conference%202010%20 %20 mary%20kuo[1]guest7dbf4
 
TGPC Joint Groundwater Monitoring and Contamination Report - Kathy McCormack
TGPC Joint Groundwater Monitoring and Contamination Report - Kathy McCormackTGPC Joint Groundwater Monitoring and Contamination Report - Kathy McCormack
TGPC Joint Groundwater Monitoring and Contamination Report - Kathy McCormackTexas Alliance of Groundwater Districts
 
Georgia Water Conservation by Alice Miller Keyes, GA EPD
Georgia Water Conservation by Alice Miller Keyes, GA EPDGeorgia Water Conservation by Alice Miller Keyes, GA EPD
Georgia Water Conservation by Alice Miller Keyes, GA EPDConfluence Conference
 
Lid tmdl badger_062613_gtg
Lid tmdl badger_062613_gtgLid tmdl badger_062613_gtg
Lid tmdl badger_062613_gtgGreg Gearheart
 
Download-manuals-surface water-manual-sw-volume1designmanualhis
 Download-manuals-surface water-manual-sw-volume1designmanualhis Download-manuals-surface water-manual-sw-volume1designmanualhis
Download-manuals-surface water-manual-sw-volume1designmanualhishydrologyproject001
 
Neuse River Basic OWLS '14 Presentation
Neuse River Basic OWLS '14 PresentationNeuse River Basic OWLS '14 Presentation
Neuse River Basic OWLS '14 PresentationU.S. Water Alliance
 

Semelhante a The Need for Stakeholder TMDL (20)

Watson
WatsonWatson
Watson
 
Watson
WatsonWatson
Watson
 
James Solution to Pollution
James Solution to Pollution James Solution to Pollution
James Solution to Pollution
 
The Rivers Trust Autumn Conference: Day 2 - Session 3
The Rivers Trust Autumn Conference: Day 2 - Session 3The Rivers Trust Autumn Conference: Day 2 - Session 3
The Rivers Trust Autumn Conference: Day 2 - Session 3
 
Bioassessment Approach to MS4 Evaluation and Assessment
Bioassessment Approach to MS4 Evaluation and AssessmentBioassessment Approach to MS4 Evaluation and Assessment
Bioassessment Approach to MS4 Evaluation and Assessment
 
Total Maximum Daily Load - Hawaii Status Report
Total Maximum Daily Load - Hawaii Status ReportTotal Maximum Daily Load - Hawaii Status Report
Total Maximum Daily Load - Hawaii Status Report
 
Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101Urban Runoff - Storm Water 101
Urban Runoff - Storm Water 101
 
Final CMT Implementation Services RFP
Final CMT Implementation Services RFPFinal CMT Implementation Services RFP
Final CMT Implementation Services RFP
 
Network and mandates of wq monitoring
Network and mandates of wq monitoringNetwork and mandates of wq monitoring
Network and mandates of wq monitoring
 
Marcia Willhite, Illinois EPA, Chloride Issue in the Chicago Area Waterway Sy...
Marcia Willhite, Illinois EPA, Chloride Issue in the Chicago Area Waterway Sy...Marcia Willhite, Illinois EPA, Chloride Issue in the Chicago Area Waterway Sy...
Marcia Willhite, Illinois EPA, Chloride Issue in the Chicago Area Waterway Sy...
 
Key Clean Water Act Criteria Affecting Stormwater Management at the Site Level
Key Clean Water Act Criteria Affecting Stormwater Management at the Site LevelKey Clean Water Act Criteria Affecting Stormwater Management at the Site Level
Key Clean Water Act Criteria Affecting Stormwater Management at the Site Level
 
central pollution control board
central pollution control boardcentral pollution control board
central pollution control board
 
Pollution controlboard
Pollution controlboardPollution controlboard
Pollution controlboard
 
1 ksa%20conference%202010%20 %20 mary%20kuo[1]
1 ksa%20conference%202010%20 %20 mary%20kuo[1]1 ksa%20conference%202010%20 %20 mary%20kuo[1]
1 ksa%20conference%202010%20 %20 mary%20kuo[1]
 
TGPC Joint Groundwater Monitoring and Contamination Report - Kathy McCormack
TGPC Joint Groundwater Monitoring and Contamination Report - Kathy McCormackTGPC Joint Groundwater Monitoring and Contamination Report - Kathy McCormack
TGPC Joint Groundwater Monitoring and Contamination Report - Kathy McCormack
 
Georgia Water Conservation by Alice Miller Keyes, GA EPD
Georgia Water Conservation by Alice Miller Keyes, GA EPDGeorgia Water Conservation by Alice Miller Keyes, GA EPD
Georgia Water Conservation by Alice Miller Keyes, GA EPD
 
Lid tmdl badger_062613_gtg
Lid tmdl badger_062613_gtgLid tmdl badger_062613_gtg
Lid tmdl badger_062613_gtg
 
UNRBA OWLS '14 Presentation
UNRBA OWLS '14 PresentationUNRBA OWLS '14 Presentation
UNRBA OWLS '14 Presentation
 
Download-manuals-surface water-manual-sw-volume1designmanualhis
 Download-manuals-surface water-manual-sw-volume1designmanualhis Download-manuals-surface water-manual-sw-volume1designmanualhis
Download-manuals-surface water-manual-sw-volume1designmanualhis
 
Neuse River Basic OWLS '14 Presentation
Neuse River Basic OWLS '14 PresentationNeuse River Basic OWLS '14 Presentation
Neuse River Basic OWLS '14 Presentation
 

Último

Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Standkumarajju5765
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...rajputriyana310
 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...SUHANI PANDEY
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
 
Booking open Available Pune Call Girls Yewalewadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Yewalewadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Yewalewadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Yewalewadi 6297143586 Call Hot Indian...Call Girls in Nagpur High Profile
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...kauryashika82
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Sapana Sha
 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdfTraining Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdfBasel Ahmed
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Servicesexy call girls service in goa
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...ranjana rawat
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 

Último (20)

(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
 
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
Booking open Available Pune Call Girls Yewalewadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Yewalewadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Yewalewadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Yewalewadi 6297143586 Call Hot Indian...
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
 
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdfTraining Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
 
E Waste Management
E Waste ManagementE Waste Management
E Waste Management
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Yamuna Vihar꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 

The Need for Stakeholder TMDL

  • 2. Harpeth Conservancy’s Innovative Suggestions to Help TDEC and Restore the River • Harpeth Conservancy Proposes that TDEC Facilitate a Stakeholder-led TMDL Process • Similar to USEPA “5R” approach • Stretches TDEC’s scarce resources • Allows Private Sector Expertise to be Brought to Bear • Technical issues • “Voluntary” process • TMDL is a “Deal” – Allows Parties to Start Getting into “Deal Mode” Sooner • Thinking about allocations and implementation • Potential to Actually Achieve Restoration
  • 3. Table of Contents • Why Are We Doing a TMDL? Why are We Here? • The Over-Riding Goal of a TMDL • Where Are We Now? • Elements of a TMDL • Issues with Most TMDLs? • Solutions? Stakeholder-led TMDL – “Privatize” the TMDL Process • Examples & Similar Structures • Requirements & Interim Measures • Potential for Legislative Involvement / Encouragement • Similarity to USEPA Region 4’s 5R Approach • Conclusion
  • 4. Why Are We Doing a TMDL? Why Are We Here? •River Is Impaired • CWA §303 Requires a TMDL: • TMDL required where Technology-based Effluent Limits (TBELS – end-of-pipe controls) are NOT sufficient • “Each State shall identify those waters within its boundaries for which the effluent limitations required by section 1311(b)(1)(A) [TBELS for point sources other than POTWs] and section 1311(b)(1)(B) [secondary treatment for pre- existing POTWs] of this title are not stringent enough to implement any water quality standard applicable to such waters.” 33 USC §1313 (d)(1)(A)
  • 5. The Harpeth River Needs a TMDL • The Harpeth River has been on Tennessee’s 303(d) List for excess “nutrients” since 1996 and it has been listed as impaired by phosphorus since 2004. • Low DO violations • Algae growth drives low DO • Excess nutrients (nitrogen and/or phosphorus) can lead to harmful algal blooms that are toxic to humans, pets, and wildlife; toxic algae can taint drinking water and poison swimmers, and algal blooms can deplete the water of the oxygen needed by fish and other water species. • In 2014, TDEC began conversations with stakeholders about developing a TMDL for the Harpeth River Watershed.
  • 6. Map of Harpeth River Impairments
  • 7. The Over-Riding Goal of a TMDL •Get the River off the 303(d) List • CWA §303(d)(1)(C): “Each State shall establish for the waters identified in paragraph (1)(A) of this subsection, … the total maximum daily load, …. Such load shall be established at a level necessary to implement the applicable water quality standards with seasonal variations and a margin of safety which takes into account any lack of knowledge concerning the relationship between effluent limitations and water quality.”
  • 8. Where Are We Now? • TMDL is over 3 years old and still lacks critical initial elements • No workplan yet finalized, even though it is a critical first step in any scientific study (M. Corn, Feb. 2018) • 2004 – Harpeth River is first listed as impaired for phosphorus • 2015 – (July 2015) -- TDEC announces new TMDL at same time as new water withdrawal permit. • 2016 – (May 2016) – TDEC holds first meeting on new TMDL • 2018 – Meetings continue, but still no final work plan or Scientific Advisory Panel (Technical Advisory Committee) per 2013 Draft Permit
  • 9. Statutory Elements of a TMDL • Each State shall establish TMDLs for the water quality limited segments identified [on the State 303(d) List], and in accordance with the priority ranking. 40 C.F.R. §130.7(c)(1). • Waters on the 303(d) List require TMDLs when (i) technology-based effluent limitations required by the CWA; (ii) more stringent effluent limitations required by either State or local authority preserved by CWA Section 510, or Federal authority; and (iii) other pollution control requirements (e.g. best management practices) are not stringent enough to implement any water quality standards applicable to such waters • “water quality standards applicable to such waters” = water quality standards established under CWA 303, including numeric criteria, narrative criteria, waterbody uses, and antidegradation requirements • “priority ranking” = established in accordance with the process described in the State’s Continuing Planning Process, taking into account the severity of the pollution and the uses to be made of such waters, and must identify waters targeted for TMDL development in the next two years
  • 10. Statutory Elements of a TMDL (cont’d) • For pollutants other than heat, TMDLs shall be established at levels necessary to attain and maintain the applicable narrative and numerical water quality standards (WQS) with seasonal variations and a margin of safety which takes into account any lack of knowledge concerning the relationship between effluent limitations and water quality. 40 C.F.R. 130.7(c)(1). • Determinations of TMDLs shall take into account critical conditions (e.g., 7 Q10 conditions) for stream flow, loading, and water quality parameters. Id. • TMDLs may be established using a pollutant-by-pollutant or biomonitoring approach. In many cases both techniques may be needed. Site-specific information should be used wherever possible. 40 C.F.R. 130.7(c)(1)(i). • TMDLs shall be established for all pollutants preventing or expected to prevent attainment of water quality standards as identified [on the state’s 303(d) List]. Calculations to establish TMDLs shall be subject to public review as defined in the State CPP. 40 C.F.R. 130.7(c)(1)(ii).
  • 11. Minimum Elements of a TMDL The EPA provides a ten-item TMDL Review Checklist of the minimum recommended elements that should be present in a TMDL document: • Required Elements:* • Applicable WQS and Numeric Water Quality Target • Loading Capacity • Load Allocations (LAs) and Waste Load Allocations (WLAs) • Margin of Safety • Consideration of Seasonal Variation • Recommended Elements: • Identification of Waterbody, Pollutant of Concern, Pollutant Sources and Priority Ranking • Reasonable Assurance for LAs/WLAs • Implementation Plan – BUT must have implementation plan under 40 CFR 130.6 (b), (c) (as part of TN State Water Quality Management Plan – Does it contain this element?) • Monitoring Plan to Track TMDL Effectiveness • Public Participation * Required by 40 CFR Part 130
  • 12. Issues with Most TMDLs? • Don’t Have Necessary Elements for Success 2013 GAO STUDY:* • “[R]epresentative sample [shows]… pollutant…[reductions], but few impaired water bodies have fully attained water quality standards.” • TMDLs “seldom contained all features key to attaining water quality standards.” …. [and lack such elements as] • identifying pollution-causing stressors • showing how addressing them would help attain such standards • specifying how and by whom TMDLs will be implemented • ensuring periodic revisions as needed. * GAO, CLEAN WATER ACT Changes Needed If Key EPA Program Is to Help Fulfill the Nation’s Water Quality Goals (Dec. 2013) (https://www.gao.gov/assets/660/659496.pdf)
  • 13. Proper Allocations Between Sources Required • “[W]here a state reduces the WLAs in a TMDL based upon anticipated future reductions in nonpoint source loading, the state should provide specific assurances that the reductions will in fact occur. Absent such assurances, the state must allocate the entire load reduction necessary to attain water quality standards to point sources.”* *Mark A. Ryan, Editor, THE CLEAN WATER ACT HANDBOOK (3rd EDITION) (American Bar Ass’n, 2011), Ch. 11 citing EPA, GUIDANCE FOR WATER QUALITY–BASED DECISIONS: THE TMDL PROCESS, ch. 1 at 2, ch. 2 at 8, ch. 3 at 5 (Apr. 1991), available at http://water.epa.gov/lawsregs/lawsguidance/cwa/tmdl/dec1c.cfm.
  • 14. Tennessee’s Record on Nutrient Pollution Decades of Delay, Mississippi River Collaborative, November 2016: • “Nitrogen and phosphorus pollution remain a problem in Tennessee’s waters, and it is a problem that is getting worse.” • “Tennessee is failing to take the necessary steps to control for nutrient pollution.” • “…not a single permit contains a water quality based effluent limit derived from Tennessee’s numeric nutrient translator.” • “Tennessee’s [Nutrient Reduction] Strategy is incomplete and lacks many elements specified in EPA’s Framework memo.” • “Tennessee has developed just five nutrient-related TMDLs, none over the past 6 years. … Three of the 5 TMDLs … ignor[e] any downstream reaches with wastewater treatment plant discharges. As a result, Tennessee has never developed a wasteload allocation for these facilities.” http://www.msrivercollab.org/wp-content/uploads/Decades-of-Delay-MRC-Nov-2016.pdf (pps. 61, 62, 64, emphasis added)
  • 15. Solutions? Stakeholder-led TMDL – “Privatize” the TMDL Process •Utilize a Stakeholder-led TMDL process • See https://www.epa.gov/tmdl/third-party-tmdl-development- toolkit. •Benefits? •Requirements?
  • 16. What is a Stakeholder-led TMDL? • Concept promoted by USEPA • “Denotes a TMDL in which an organization or group other than the lead water quality agency takes responsibility for developing the TMDL document and supporting analysis.” (Third-party TMDL) • “A third party can be a watershed group, municipal wastewater or stormwater discharger organization, industrial discharger entity, other unit of government (such as a county, city, municipality, or land management agency), or nonpoint source organization (such as a farm bureau, irrigation and drainage district, or landowner).” • “Other than the third party taking the lead role for developing the TMDL document and supporting analysis, there is nothing different about a third- party TMDL. State agencies, rather than third parties, ultimately adopt TMDLs and submit them for approval to EPA.” • From WEF, “Third-Party TMDL Development,” (2007), https://www.wef.org/globalassets/assets-wef/3---resources/topics/o- z/watershed/technical-resources/toolkitwebversion.pdf and https://www.epa.gov/tmdl/resources-tmdl-stakeholders
  • 17. Benefits of Stakeholder-led TMDLs • Stretches TDEC’s scarce resources • Allows private sector expertise to be brought to bear • Technical issues • “Voluntary” process • TMDL is a “deal” – allows parties to start getting into “deal mode” sooner • Thinking about allocations and implementation • Potential to Actually Achieve Restoration
  • 18. Stakeholder-led TMDL Development • Typical steps in developing a TMDL: • State sets water quality standards, assesses water body, and determines if water quality is impaired • State develops total maximum daily load (TMDL) for impaired water body, taking public comment on the draft TMDL before submitting a finalized version to EPA • EPA reviews TMDL • EPA rejects or approves TMDL; if rejected, EPA itself develops TMDL within 30 days • State implements TMDL • For point sources of pollution: • State or EPA incorporates limits from TMDLs into discharge permits • State monitors point sources for compliance with permits • For nonpoint sources of pollution: • State uses federal and nonfederal funding to help landowners and other stakeholders take actions prescribed by TMDL • Landowners or other stakeholders take (voluntary) action
  • 19. Stakeholder-led TMDL Development (cont’d) • While the responsibility for developing TMDLs in Tennessee ultimately rests with the Tennessee Department of Environmental Conservation (TDEC) and the EPA is responsible for reviewing and approving (or rejecting and replacing) any finalized TMDL. • The vast majority of the 70,000 approved TMDLs in the United States only allow for substantive public participation through the notice and comment procedure once the TMDLs are drafted. • The Harpeth River TMDL offers a rare opportunity, as TDEC and the EPA have engaged a group of stakeholders to collaborate on the development of the TMDL per the USEPA-promoted stakeholder-led / third party TMDL process.
  • 20. Examples of Stakeholder-led TMDLs • Similar Structures • Stakeholder-led TMDLs – CASE STUDIES • Lots of Lessons Can Be Learned from Others’ Efforts • If Implemented Well, Could Have Better Chance of Success in Achieving Goal of Removing River from 303(d) List
  • 21. Similar Structures – Watershed Management Structures • At Least 3 Different Types –Government-, Citizen-Directed, Hybrid* • Government • Upper Occoquan Service Authority • Citizen – Charles River Watershed Ass’n • Hybrid • Neuse River Compliance Association and Lower Neuse Basin Association • Spokane River Forum * See Schueler & Holland, eds., The Practice of Watershed Protection (2000), Article 128.
  • 22. Stakeholder-led TMDLs – CASE STUDIES Participants in the following stakeholder-led TMDLs were contacted in preparing these recommendations (No central database, so data-gathering & analysis more difficult.): • Ballona Creek & LA River, California • North Buffalo Creek, North Carolina • Little Miami River, Ohio • Lake Pepin, MN
  • 23. Lake Pepin TMDL Organizational Structure Stakeholder Advisory Committee • Help design TMDL work plan • Provide advice on solutions and mouth of watershed goals • Coordinate communications MCPA • Steering • Support • Leadership • Education • Draft TMDL Report River Basin Teams • Minnesota River • Upper Mississippi River • St. Croix River • Lower Mississippi • Metro Region Public Review EPA Approval Scientific Advisory Panel • Review TMDL Documents • Help to resolve technical issues • Provide expert opinion on scientific questions
  • 24. Requirements for Stakeholder-led TMDLs? TDEC Must Set Outside Bounds for Privatization Process Sierra Club v. McLerran, U.S.D.C. (W. Dist. WA, 2015)* • River long on 303(d) list for PCBs; WA Dept’ of Ecology takes several desultory steps toward cleanup, including organizing a group of permittees into a “Regional Task Force” • “… the Court sets aside the EPA’s decision and remands …. Specifically, the EPA shall work with [WA Dep’t of] Ecology to create a definite schedule with concrete goals, including: • clear statements on how the Task Force will assist in creating a PCB TMDL in the Spokane River by reducing scientific uncertainty; • quantifiable metrics to measure progress toward that goal; • regular checkpoints at which Ecology and the EPA will evaluate progress; • a reasonable end date, at which time Ecology will finalize and submit the TMDL for the EPA’s approval or disapproval; and • firm commitments to reducing PCB production from known sources in the interim.” (Emphasis added). * MEMORANDUM ORDER REMANDING MATTER FOR FURTHER CONSIDERATION, Docket No. 120, Case No. 11-CV-1759-BJR; Appeal dismissed, 9th Cir, April 5, 2016.
  • 25. Preparation of TMDL Does Not Excuse Violation of WQS In the Interim • “… TMDLs take time and resources to develop and have proven to be difficult to get just right; thus, under EPA regulations, permitting authorities must adopt interim measures to bring water bodies into compliance with water quality standards. Id. § 1313(e)(3); 40 C.F.R. § 122.44(d); see also, e.g., 43 Fed. Reg. 60,662, 60,665 (Dec. 28, 1978) ("EPA recognizes that State development of TMDL's and wasteload allocations for all water quality limited segments will be a lengthy process. Water quality standards will continue to be enforced during this process. Development of TMDL's . . . is not a necessary prerequisite to adoption or enforcement of water quality standards . . . .").” • “The District also alleges that the EPA was required to demonstrate … that the phosphorus limit "would have a substantial impact on the cultural eutrophication of the Blackstone River“…. We thus reject the notion that in order to strengthen the District's discharge limits, the EPA must show that the new limits, in and of themselves, will cure any water quality problems. • Upper Blackstone Water Pollution Abatement District v. U.S. EPA, 690 F.3d 9 (1st Cir. 2012); Accord, City of Taunton Dept. of Public Works, 17 EAB __ (Env. Appeals Board 5/3/2016); Prairie Rivers Network v. Illinois Pollution Control Board, 2016 IL App (1st) 150971 ¶¶29-33, 38 (Ill. App. Ct. 2016); Ala. Dept. of Env. Mgt. v. Ala. Rivers Alliance, Inc. 14 So. 3d 853, 866-68 (Ala. Civ. App. 2007).
  • 26. What Are We Proposing? • Stakeholder-led TMDL • “Steering Committee” • Elected representatives from around the Harpeth system • Permittees • Environmental Interests (Harpeth Conservancy, etc.) • Community Business Leaders • Technical Advisory Committee • Representatives from Steering Committee members • Independent Stakeholders Can Participate • Stakeholders Work Out Details, Subject to TDEC Supervision • Schedules / Milestones / Deliverables – subject to TDEC approval • Data Needs -- Sampling / Monitoring, etc. • Waste- and Load-Allocations • Implementation Plans • Post-Effectiveness Monitoring
  • 27. Steering / Executive Committee • Need to Discuss and Settle on Composition, Charter, Reporting Relationships, etc. • Composition? • Elected representatives from around the Harpeth system • Permittees • Environmental Interests (Harpeth Conservancy, etc.) • Community Business Leaders • Other Interests? • Charter? • Frequency of Meetings? Help Resolve Issues re Status, Progress, WLAs, LAs, etc.? • Reporting Relationships? • TAC reports to Steering / Executive Committee?
  • 28. TDEC Says We Need a Technical Advisory Committee • “The Harpeth River Watershed Association (HRWA) [now, Harpeth Conservancy] developed and on February 10, 2013 distributed to the permittees (Franklin STP TN0028827, Berry Chapel Utility STP TN0029718, and Cartwright Creek – Grasslands STP TN0027278), EPA, USGS, the division, and others a very comprehensive historical Harpeth River data summary, its proposed instream monitoring program, and suggested that a Technical Advisory Committee (TAC) an oversight organization, be assembled for assisting with the receiving stream investigations, data application assessments, and considerations/suggestions for NPDES permit modifications/renewals. The division concurs with HRWA, regarding the need for more comprehensive instream data collection and the translation into viable Harpeth River upgrades. HRWA’s documents are in the permit file and available upon request. The new permit provides reopener provisions for modifications pursuant to the permittee’s participation in the TAC.” TDEC, Draft of NPDES Permit No. TN0028827, April 23, 2013, Pages R-2 to R-3 (and accompanying letter of the same date from Vojin Janjić, Manager, Permit Section, TDEC to Mr. Mark S. Hilty, P.E., Franklin Water Management Department.) (Emphasis added). (The actual re-opener clause is contained in Section 1.5, page 11 of the 2013 Draft Permit.)
  • 29. Potential for Legislative Involvement / Encouragement • Legislative Involvement / Encouragement Could Facilitate the Process • Utilize “Group of Five” Already Engaged (Sens. Dickerson, Johnson; Reps. Clemmons, Mitchell, Whitson) • Bring in Additional Elected Officials? Nashville Mayor Office?, Metro Council Members?, Downstream State and Local Elected Officials? • Oversee Process? Engage More Business / Community Leaders? • Mandate Approach? • Potential for Statewide Program • Pilot Program to Begin?
  • 30. Similar to USEPA Region 4’s “5R” Approach • What is USEPA Region 4’s 5R Approach? • What is the 5R Approach? – Alternative to / pre-TMDL • “Process to engage local stakeholders in the watershed restoration process in advance of TMDL development … by allowing public and private stakeholders to drive the watershed restoration process.” • “…stakeholders, in conjunction with their State, prepare a watershed plan that includes a broad scope of water quality restoration activities that, when implemented, can improve water quality …. The watershed plan should follow a continuous adaptive management approach ….” • Six (6) year pilot program • Why Use a 5R Process? • Traditional TMDLs Not Working: “As of August 2011, over 44,000 TMDLs have been established throughout the Nation. However, the National Water Quality Inventory to Congress for the 2004 Reporting Cycle reported that 44% of assessed stream miles, 64% of assessed lake acres and … remain impaired.” • TMDLs Not Being Implemented: “…an estimated 80% of the TMDLs established in Region 5 were at least partially implemented; however, full implementation was uncommon….”
  • 31. 5R Approach (cont’d) • Elements of a 5R Process?: • The identification of the point and nonpoint sources • The point source and nonpoint source water quality restoration activities that are expected to result in water quality improvements and restoration. • Cost estimates and funding commitments to implement the water quality restoration activities. • An anticipated schedule for implementing the water quality restoration activities, including the anticipated completion date and the estimated pollutant load reductions necessary to meet water quality standards. • A water quality monitoring component to evaluate and track the effectiveness of the scheduled water quality restoration activities at each 303(d) listing cycle. • An anticipated date for achieving water quality standards.
  • 32. Why Do We Think It Might Work Here? • Uniqueness of Harpeth River • One of Most Heavily Recreated in State • Contact recreation – water play, fishing, paddling • PUBLIC HEALTH ISSUE • REAL NEED • Public Interest and Oversight – Already Significant Community Interest & Involvement • Principal Issues Appear More Controllable • Principal Sources Seem to be Point Sources • Sewer plants • Municipal Stormwater systems • Not Nonpoint Sources
  • 33. Conclusions • Harpeth Conservancy Proposes a Stakeholder-led TMDL Process • “Privatizes” Process – Engages Community • Stretches TDEC Resources – Better Preserve & Restore TN with Less Government Involvement, Dollars – Utilizes Community Expertise & Energy • Addresses Issues with Many TMDLs – Has Structure to Implement, Monitor Progress • Similar to Approaches Used Across the Country • More Likely to Achieve the Ultimate Goal – • GET THE RIVER OFF THE 303(d) IMPAIRED LIST
  • 34. We are the river. United we are the solution.. 34