SlideShare uma empresa Scribd logo
1 de 3
Donnie J. Belloit
Chief Estimator / Purchaser
E-Mail: dbelloit@att.net
Phone: 904-860-7903
 Years in discipline: 25 (WPC Industrial Contractors LLC)
Mr. Belloit has 25 years of estimating experience in the Water and Wastewater Plant construction
industryto drawfromfor hisestimatesfor bidsandproposals. Hereviewsproposalspecifications,project
plan drawings, attends pre-bid meetings, etc. to determine scope of work and required contents of
estimates, provides complete detailed estimates on complex projects, prepares the required
documentation using a variety of bid forms, creates bids for any of the following types of estimates: hard
bid, negotiated,unit price,lumpsum, design-build,communicatesandworkswithdesignteams to develop
projectdocumentsandcosts at variousdesignstages,andattends designmeetings,adviseclients of design
decisions which affect cost and offer creative alternatives as well as practical cost-savings suggestions.
Mr. Belloit is experienced in all phases of construction and has special training in mechanical piping,
pumping systems, and chemical piping applications.
He also has expertise in development of estimation methodologies, identification of major cost
components, performing bid evaluations, cost factor analysis, risk analysis, change order analysis and
price/budget negotiations. In addition he has previously performed as purchasing manager performing
buyout of major equipment, and functioned as liaison between the engineer and general contractor
regarding the approval and delivery of required approved shop drawings for multi-million dollar Water
and Wastewater projects.
HasworkedwithWinEst estimatingsoftwarefor20plusyearsformulating estimatesforprojectbidsand
would be able to adapt to other type estimating programs.
Recent Experience
Jacksonville Beach Wastewater Treatment Plant Improvements, Jacksonville Beach, Florida, $20,000,000 +
Project consisted of (4) new sequential batch reactors (SBR) Waste Treatment Process facilities, new influent bar screen
structure, renovation of on-site lift station 14, new SBR blower building/maintenance office, modification to existing belt press
facility, conversion of part of effluent tanks into new high level disinfection chlorine contact tanks, new on-site reuse system,
new digester blower equipment, sludge pumps, yard pump station, sludge transfer pumps, new process yard piping between
various structures, new state-of-the-art electrical control system, new drying bed facility, phase demolition of the old plant
facilities, and maintaining existing waste treatment to capacity during construction of new facilities. Completion: January 2014
City of LaBelle Membrane Water Treatment Facility, LaBelle, Florida, $8,500,000 +
Project consisted of furnishing all labor, equipment and materials for the construction of the water treatment facility
consisting of, but not limited to, the following: 1.5 MGD membrane water treatment system in building, chlorine contact
chamber, finished water storage tank, concentrate storage tank, degasifier system, chlorination system and building, high
service pumps, transfer pumps, chemical feed systems, chemical building, concentrate pumps, plant piping, sewer pump
station, septic system, stormwater management system, and paving of roads and parking; Approximately 11,250 linear feet
(IF) 16-inch PVC raw water main and all necessary appurtenances; Approximately 3,100 IF of 12-inch PVC distribution water
main and all necessary appurtenances; Modifications to existing piping and controls at existing City of LaBelle Water
Treatment Facility site; All associated related fencing, site grading, electrical work, instrumentation work, restoration work,
necessary permits, testing, painting, disposal of demolished or removed items and materials, cleanup work, temporary
utilities, and other miscellaneous items of work as shown on the Drawings, specified, or otherwise required for a complete and
operable water treatment facility. Completion: September 2014
Oldsmar Alternative Water Supply Project, Oldsmar, Florida, $9,000,000 +
One new brackish water Reverse Osmosis Water Treatment Plant (ROWTP) with a production capacity of 3.2 MGD, consisting
of a new administration building including, control room, laboratory, offices, and associated appurtenances connected to a
process area consisting of high bay structure containing process equipment and associated appurtenances that support the
facility. Installation of water treatment process equipment, transfer pumps, bio-trickling filter odor control towers, process
waste holding pump station, bulk chemical storage tanks, and chemical day tanks. A 1 MG pre-stressed concrete ground
storage tank, associated piping and valves in the building and in the yard, electrical systems (i.e., motor control equipment,
variable frequency drives, building and site lighting, emergency generator and fuel tank, wire/conduit, etc. Instrumentation
(i.e., field devices, PLCs, panels, computers, integration, etc.), Site work, Equipment/systems for 11 raw water production
wells, submersible well pumps, valves, piping, concrete vaults, flow meters, electrical, emergency generators, instrumentation,
various ancillary items. Equipment/systems for 1 deep injection well (DIW) and 2 monitor wells related to Byproduct
disposal, including piping, valves, flow meter, electrical, instrumentation, submersible pumps for the monitor wells, various
ancillary items, and site work. Completion: October 2012
Buckman Water Reclamation Facility, Phase 1 & 2, $16,000,000 +
Project for JEA (Hai Vu, P.E.) including: Replacement of primary clarifier effluent weir, addition of side stream pump station
and effluent piping. Modifications to the aeration basins to include new effluent gates, floating mixers, four new air valves and
actuators, baffle walls, overflow weir structure, enlarged sluice gates, scum collection and pump station, four recycle pumps
and piping and associated structural, mechanical, electrical and instrumentation and control work. New RAS flow meter with
vault, demolition and replacement of four secondary clarifier mechanisms, replacement of two clarifier dewatering pump
valves. Addition of HVAC to Chem Scan Building, ventilation of the new Secondary Building, rehabilitation of the old Secondary
Clarifier Control Building to include new MCC, HVAC, lights, stairs and all associated appurtenances. Construction of a new grit
removal basin, consisting of 3 flow channels. Conversion of the existing pre-aeration basin into a 3 channel grit removal basin.
Influent flow distribution and effluent flow control. Installation of grit handling equipment. Improvements to the installation of
a grit drainage pad and pump station. Decommissioning of existing grit removal facilities. Electrical, instrumentation and
controls. Conversion of the existing pre-aeration basin into a 3 channel grit removal basin. Blower improvements including
removal and salvage of existing blower, installation of three new turbo blowers, installation of new stainless steel discharge
piping, valves and appurtenances. All electrical and instrumentation. Completion: November 2014
James Anderson Reverse Osmosis WTP, City of Port St. Lucie, Florida. $ 47,000,000 +
Project consisting of all labor, materials and equipment to construct an operation/laboratory, emergency power and
membrane filtration building with new treatment equipment and chemical feed systems and 22 MGD of water treatment plant
capacity including RO treatment skids, including skid assemblies, piping, vessels, membranes, and instrumentation; blend and
feed water micron filter systems, high pressure feed pumps, transfer pumps including piping, high service pumps including
piping, chemical feed systems including pumps, piping and tanks, 4 mg potable water ground storage tanks including site
work, piping and coatings; electrical including wiring, conduit, field panels, transformer, transfer switches, generators and
motor control centers; instrumentation including programming, panels, instruments and telemetry; ductile yard piping; post
treatment modifications including: 6.0 mgd Degasifier, 18 scfm blowers, 36,000 scfm scrubber systems and ducting; well
houses including site work, pumps, piping, electrical and instrumentation; 30” transmission main. Completion: June 2009
Atlantic Beach Florida Wastewater Treatment Plant TMDL Compliance Improvements, Atlantic Beach, Florida,
$5,000,000 +
The project work that was performed included construction of improvements to the City’s Wastewater Treatment Plant #1
(WWTP #1), located at 1100 Sandpiper Lane, Atlantic Beach, FL 32233 and Phase-out of Atlantic Beach Wastewater Plant #2
(WWTP #2), located at 739 Renault Dr., Jacksonville, FL. WWTP #1 is an existing 3.0 MGD Domestic Wastewater Treatment
Plant that was upgraded to provide 4-stage biological nitrogen removal and re-rating to 3.5 MGD capacity. WWTP #2 is an
existing 1.9 MGD Sequencing Batch Reactor plant which was de-commissioned. The work generally consisted of furnishing all
labor, materials and equipment necessary to final construction. Completion: December 2012
Blacksford Water Reclamation Facility Phase II, $12,000,000 +
Project for JEA (Hai Vu, P.E.) including: Expansion/rehabilitation of the existing WTP and construction of a new SBR treatment
facility, sludge handling, chemical feed systems, blowers, odor control system, reuse pump station, UV facility, reuse storage
tank, EQ tank, electrical building, electrical, instrumentation, and all yard piping, site grading, landscaping and paving.
Completion: May 2007
Rangeline Road Water Treatment Plant, Port St. Lucie, Florida, $12,000,000 +
Project consisted of 4.0 MG pre-stressed concrete ground storage reservoir, high service pump building with high service
pumping facilities, motor control equipment, restroom, storage room and instrumentation/controls. Chlorine and ammonia
building including ammonia/chlorine feed system and associated rooms, 1-ton chlorine cylinder storage, ammonia storage
tank, weighing facilities, bridge crane, safety room and safety equipment. Generator building with standby diesel generator
set, fuel day tank, fuel storage tank, and fuel system. Hydropneumatic tank and associated equipment. All associated on-site
yard piping, flow meter assemblies, plumbing, site work, stormwater pond, grading, drainage, electrical, HVAC,
instrumentation and controls for system operation and monitoring. Completion: June 2009
ESTIMATING & PURCHASING EXPERIENCE ………. continued:
Indian Hills Water Treatment Plant Improvements, $2 million
Grant Street WWTP/Melbourne, Florida, $5.3 million
Miller Street WWTF/Clay County, Florida, $5.8 million
Miramar WWTP/Miramar, Florida, $4.2 million
R.C. Willis WTP/Palatka, Florida, $12 million
Oak Run WWTP/Marion County, Florida, $10 million
Stonecrest WWTP/ Marion County, Florida, $10 million
Southport Booster Pump Station Design-Build/ Port St. Lucie, Florida, $2.5 million
Prineville R.O. WTP/City of Port St. Lucie, Florida, $6 ,million
Sunburst Lane WTP/ Clermont, Florida, 3.9 million
MId-Clay WWTF/ Clay County, Florida, $2.6 million
Green Cove Springs West/ Clay County, Florida, $2.4 million
Madison WWTP/ Madison, Florida, $$4.5 million
Northwest Sub-Regional WTP & WWTP/ Marion County, Florida, $3.5 million
Southlake Utility WTP & WWTP/ Clermont, Florida, $2.5 million
And many more…..

Mais conteúdo relacionado

Mais procurados

PIA Magazine May - June 2014 (lift-out)
PIA Magazine May - June 2014 (lift-out)PIA Magazine May - June 2014 (lift-out)
PIA Magazine May - June 2014 (lift-out)Matt Kirkbride
 
Natural Gas an Inside Propective 2-19-14
Natural Gas an Inside Propective 2-19-14Natural Gas an Inside Propective 2-19-14
Natural Gas an Inside Propective 2-19-14James M. Bright, P.E.
 
Leed Water Efficiency Credits V3
Leed   Water Efficiency Credits  V3Leed   Water Efficiency Credits  V3
Leed Water Efficiency Credits V3NazarethTankarian
 
Climax Nomination for 2014 Hardrock Mining Reclamation Awards
Climax Nomination for 2014 Hardrock Mining Reclamation AwardsClimax Nomination for 2014 Hardrock Mining Reclamation Awards
Climax Nomination for 2014 Hardrock Mining Reclamation AwardsKathy Remias
 
Fish Market Drainage At Abu Hamour
Fish Market Drainage At Abu HamourFish Market Drainage At Abu Hamour
Fish Market Drainage At Abu HamourMohamed ElSirsy
 
water harvesting syatem
water harvesting syatemwater harvesting syatem
water harvesting syatemManish Singh
 
Permitting potable water from rainwater- AIA Houston- September 2014
Permitting potable water from rainwater- AIA Houston- September 2014Permitting potable water from rainwater- AIA Houston- September 2014
Permitting potable water from rainwater- AIA Houston- September 2014GreeNexus Consulting, LLC
 
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...Michael Hewitt, GISP
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description detailsAonghus Murray
 
Il materiale - CIPP, Timo Münstermann
Il materiale - CIPP, Timo MünstermannIl materiale - CIPP, Timo Münstermann
Il materiale - CIPP, Timo MünstermannServizi a rete
 
History of California Indoor Dual Plumbed Codes and Regulations
History of California Indoor Dual Plumbed Codes and RegulationsHistory of California Indoor Dual Plumbed Codes and Regulations
History of California Indoor Dual Plumbed Codes and RegulationsSan Diego County Water Authority
 
Cliff Denholm, Stream Restoration Incorporated, "Passive Treatment of Acidi...
Cliff  Denholm, Stream Restoration Incorporated,  "Passive Treatment of Acidi...Cliff  Denholm, Stream Restoration Incorporated,  "Passive Treatment of Acidi...
Cliff Denholm, Stream Restoration Incorporated, "Passive Treatment of Acidi...Michael Hewitt, GISP
 
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKSDAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKSIslam Nassef
 
Dual Plumbed Systems and Cross Connection Control (California Department of P...
Dual Plumbed Systems and Cross Connection Control (California Department of P...Dual Plumbed Systems and Cross Connection Control (California Department of P...
Dual Plumbed Systems and Cross Connection Control (California Department of P...San Diego County Water Authority
 
Ryan A. McCampbell, Bloomsburg University, "A Cost-Benefit Analysis of AMD Re...
Ryan A. McCampbell, Bloomsburg University, "A Cost-Benefit Analysis of AMD Re...Ryan A. McCampbell, Bloomsburg University, "A Cost-Benefit Analysis of AMD Re...
Ryan A. McCampbell, Bloomsburg University, "A Cost-Benefit Analysis of AMD Re...Michael Hewitt, GISP
 
Water transportation to drilling sites
Water transportation to drilling sitesWater transportation to drilling sites
Water transportation to drilling sitesMartin Preene
 
Marange Resources Water Supply System Design-Odzi to Concession Pipeline
Marange Resources Water Supply System Design-Odzi to Concession PipelineMarange Resources Water Supply System Design-Odzi to Concession Pipeline
Marange Resources Water Supply System Design-Odzi to Concession PipelineAugustine Marume
 
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...Michael Hewitt, GISP
 
DEPLETED OIL FIELDS - Regeneration with Water_Shutoff - EUCO Group
DEPLETED OIL FIELDS - Regeneration with Water_Shutoff - EUCO GroupDEPLETED OIL FIELDS - Regeneration with Water_Shutoff - EUCO Group
DEPLETED OIL FIELDS - Regeneration with Water_Shutoff - EUCO GroupBoris Svasta
 

Mais procurados (20)

PIA Magazine May - June 2014 (lift-out)
PIA Magazine May - June 2014 (lift-out)PIA Magazine May - June 2014 (lift-out)
PIA Magazine May - June 2014 (lift-out)
 
Natural Gas an Inside Propective 2-19-14
Natural Gas an Inside Propective 2-19-14Natural Gas an Inside Propective 2-19-14
Natural Gas an Inside Propective 2-19-14
 
Leed Water Efficiency Credits V3
Leed   Water Efficiency Credits  V3Leed   Water Efficiency Credits  V3
Leed Water Efficiency Credits V3
 
Climax Nomination for 2014 Hardrock Mining Reclamation Awards
Climax Nomination for 2014 Hardrock Mining Reclamation AwardsClimax Nomination for 2014 Hardrock Mining Reclamation Awards
Climax Nomination for 2014 Hardrock Mining Reclamation Awards
 
Fish Market Drainage At Abu Hamour
Fish Market Drainage At Abu HamourFish Market Drainage At Abu Hamour
Fish Market Drainage At Abu Hamour
 
water harvesting syatem
water harvesting syatemwater harvesting syatem
water harvesting syatem
 
Permitting potable water from rainwater- AIA Houston- September 2014
Permitting potable water from rainwater- AIA Houston- September 2014Permitting potable water from rainwater- AIA Houston- September 2014
Permitting potable water from rainwater- AIA Houston- September 2014
 
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description details
 
Il materiale - CIPP, Timo Münstermann
Il materiale - CIPP, Timo MünstermannIl materiale - CIPP, Timo Münstermann
Il materiale - CIPP, Timo Münstermann
 
History of California Indoor Dual Plumbed Codes and Regulations
History of California Indoor Dual Plumbed Codes and RegulationsHistory of California Indoor Dual Plumbed Codes and Regulations
History of California Indoor Dual Plumbed Codes and Regulations
 
Cliff Denholm, Stream Restoration Incorporated, "Passive Treatment of Acidi...
Cliff  Denholm, Stream Restoration Incorporated,  "Passive Treatment of Acidi...Cliff  Denholm, Stream Restoration Incorporated,  "Passive Treatment of Acidi...
Cliff Denholm, Stream Restoration Incorporated, "Passive Treatment of Acidi...
 
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKSDAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
DAMMAM SECOND INDUSTRIAL CITY - IPS REHABILITATION WORKS
 
Dual Plumbed Systems and Cross Connection Control (California Department of P...
Dual Plumbed Systems and Cross Connection Control (California Department of P...Dual Plumbed Systems and Cross Connection Control (California Department of P...
Dual Plumbed Systems and Cross Connection Control (California Department of P...
 
Ryan A. McCampbell, Bloomsburg University, "A Cost-Benefit Analysis of AMD Re...
Ryan A. McCampbell, Bloomsburg University, "A Cost-Benefit Analysis of AMD Re...Ryan A. McCampbell, Bloomsburg University, "A Cost-Benefit Analysis of AMD Re...
Ryan A. McCampbell, Bloomsburg University, "A Cost-Benefit Analysis of AMD Re...
 
Water transportation to drilling sites
Water transportation to drilling sitesWater transportation to drilling sites
Water transportation to drilling sites
 
Marange Resources Water Supply System Design-Odzi to Concession Pipeline
Marange Resources Water Supply System Design-Odzi to Concession PipelineMarange Resources Water Supply System Design-Odzi to Concession Pipeline
Marange Resources Water Supply System Design-Odzi to Concession Pipeline
 
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
 
DEPLETED OIL FIELDS - Regeneration with Water_Shutoff - EUCO Group
DEPLETED OIL FIELDS - Regeneration with Water_Shutoff - EUCO GroupDEPLETED OIL FIELDS - Regeneration with Water_Shutoff - EUCO Group
DEPLETED OIL FIELDS - Regeneration with Water_Shutoff - EUCO Group
 
ASCE OC - EWRI: OCWD Mid-Basin Injection: Centennial Park Project
ASCE OC - EWRI: OCWD Mid-Basin Injection: Centennial Park ProjectASCE OC - EWRI: OCWD Mid-Basin Injection: Centennial Park Project
ASCE OC - EWRI: OCWD Mid-Basin Injection: Centennial Park Project
 

Destaque

Louisiana indian tribes
Louisiana indian tribesLouisiana indian tribes
Louisiana indian tribesmbordelon2
 
Presentation1 INCALZIREA GLOBALA
Presentation1 INCALZIREA GLOBALAPresentation1 INCALZIREA GLOBALA
Presentation1 INCALZIREA GLOBALAGeorgiana Truta
 
Planificación de proyectos
Planificación de proyectosPlanificación de proyectos
Planificación de proyectosGustavo León
 
aravind report
aravind reportaravind report
aravind reportaravind r
 
Cruise Ships vs. Hotel Conferences
Cruise Ships vs. Hotel ConferencesCruise Ships vs. Hotel Conferences
Cruise Ships vs. Hotel ConferencesUnique Venues
 
La Gestión de Imagen como factor clave de posicionamiento
La Gestión de Imagen como factor clave de posicionamientoLa Gestión de Imagen como factor clave de posicionamiento
La Gestión de Imagen como factor clave de posicionamientoartblau
 
Covering the coup (whole article)
Covering the coup (whole article)Covering the coup (whole article)
Covering the coup (whole article)Clars Botecario
 
Case Study - Rebranding Spa
Case Study - Rebranding SpaCase Study - Rebranding Spa
Case Study - Rebranding SpaQuatre Mains
 
Студия ГрафПром
Студия ГрафПромСтудия ГрафПром
Студия ГрафПромAlina Vilk
 
Tl briefing numeracy in the curriculum
Tl briefing numeracy in the curriculumTl briefing numeracy in the curriculum
Tl briefing numeracy in the curriculumDavid Fawcett
 

Destaque (20)

Louisiana indian tribes
Louisiana indian tribesLouisiana indian tribes
Louisiana indian tribes
 
Presentation1 INCALZIREA GLOBALA
Presentation1 INCALZIREA GLOBALAPresentation1 INCALZIREA GLOBALA
Presentation1 INCALZIREA GLOBALA
 
Planificación de proyectos
Planificación de proyectosPlanificación de proyectos
Planificación de proyectos
 
Power "la vista"
Power "la vista" Power "la vista"
Power "la vista"
 
aravind report
aravind reportaravind report
aravind report
 
Cruise Ships vs. Hotel Conferences
Cruise Ships vs. Hotel ConferencesCruise Ships vs. Hotel Conferences
Cruise Ships vs. Hotel Conferences
 
Poster Analysis
Poster AnalysisPoster Analysis
Poster Analysis
 
La Gestión de Imagen como factor clave de posicionamiento
La Gestión de Imagen como factor clave de posicionamientoLa Gestión de Imagen como factor clave de posicionamiento
La Gestión de Imagen como factor clave de posicionamiento
 
INCALZIREA GLOBALA
INCALZIREA GLOBALAINCALZIREA GLOBALA
INCALZIREA GLOBALA
 
Covering the coup (whole article)
Covering the coup (whole article)Covering the coup (whole article)
Covering the coup (whole article)
 
Segi empat
Segi empatSegi empat
Segi empat
 
Case Study - Rebranding Spa
Case Study - Rebranding SpaCase Study - Rebranding Spa
Case Study - Rebranding Spa
 
Trabajo de vacaciones
Trabajo de vacacionesTrabajo de vacaciones
Trabajo de vacaciones
 
Студия ГрафПром
Студия ГрафПромСтудия ГрафПром
Студия ГрафПром
 
Gebeurtenis
GebeurtenisGebeurtenis
Gebeurtenis
 
Tl briefing numeracy in the curriculum
Tl briefing numeracy in the curriculumTl briefing numeracy in the curriculum
Tl briefing numeracy in the curriculum
 
Промокоды МИФ
Промокоды МИФПромокоды МИФ
Промокоды МИФ
 
Projet de formation - MRP
Projet de formation - MRPProjet de formation - MRP
Projet de formation - MRP
 
ENTHEOGENS II
ENTHEOGENS IIENTHEOGENS II
ENTHEOGENS II
 
Autologue Design(3)
Autologue Design(3)Autologue Design(3)
Autologue Design(3)
 

Semelhante a Donnie Belloit_Reume

WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16Tim Bail
 
My CV, Shahar Ali tuhin
My CV, Shahar Ali tuhinMy CV, Shahar Ali tuhin
My CV, Shahar Ali tuhinMohammed ali
 
dancookgcc2014
dancookgcc2014dancookgcc2014
dancookgcc2014GWT
 
odun dgdgf_125332.pptx
odun dgdgf_125332.pptxodun dgdgf_125332.pptx
odun dgdgf_125332.pptxAgohaChinonso
 
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...DOE Office of River Protection
 
Building Services Project 2: How Seng Guan
Building Services Project 2: How Seng GuanBuilding Services Project 2: How Seng Guan
Building Services Project 2: How Seng Guanshacjhow
 
Hand book onplumbing installation for building
Hand book onplumbing installation for buildingHand book onplumbing installation for building
Hand book onplumbing installation for buildingvanthanhxd07
 
Fairfax County Tertiary Filtration System Rehabilitation July 2020
Fairfax County Tertiary Filtration System Rehabilitation July 2020Fairfax County Tertiary Filtration System Rehabilitation July 2020
Fairfax County Tertiary Filtration System Rehabilitation July 2020Fairfax County
 
Solids Processing Rehabilitation Phase II
Solids Processing Rehabilitation Phase IISolids Processing Rehabilitation Phase II
Solids Processing Rehabilitation Phase IIFairfax County
 

Semelhante a Donnie Belloit_Reume (20)

Unu gtp-sc-12-36
Unu gtp-sc-12-36Unu gtp-sc-12-36
Unu gtp-sc-12-36
 
tanajib
tanajibtanajib
tanajib
 
SCOTT RESUME
SCOTT RESUMESCOTT RESUME
SCOTT RESUME
 
WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16WET Feature 4 - Building bigger and better - Jan_16
WET Feature 4 - Building bigger and better - Jan_16
 
Trenchless Rehabilitation of Sewer & Water Networks
Trenchless Rehabilitation of Sewer & Water NetworksTrenchless Rehabilitation of Sewer & Water Networks
Trenchless Rehabilitation of Sewer & Water Networks
 
Jack Oler 1
Jack Oler 1Jack Oler 1
Jack Oler 1
 
1 80 fineshed
1 80 fineshed1 80 fineshed
1 80 fineshed
 
wsa
wsawsa
wsa
 
My CV, Shahar Ali tuhin
My CV, Shahar Ali tuhinMy CV, Shahar Ali tuhin
My CV, Shahar Ali tuhin
 
dancookgcc2014
dancookgcc2014dancookgcc2014
dancookgcc2014
 
odun dgdgf_125332.pptx
odun dgdgf_125332.pptxodun dgdgf_125332.pptx
odun dgdgf_125332.pptx
 
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
 
Resume Ramagost_K 7_2016
Resume Ramagost_K 7_2016Resume Ramagost_K 7_2016
Resume Ramagost_K 7_2016
 
Resume ramagost k 7 2016
Resume ramagost k 7 2016Resume ramagost k 7 2016
Resume ramagost k 7 2016
 
Barker.R.CV.
Barker.R.CV.Barker.R.CV.
Barker.R.CV.
 
Building Services Project 2: How Seng Guan
Building Services Project 2: How Seng GuanBuilding Services Project 2: How Seng Guan
Building Services Project 2: How Seng Guan
 
Hand book onplumbing installation for building
Hand book onplumbing installation for buildingHand book onplumbing installation for building
Hand book onplumbing installation for building
 
Harshad Patel Resume- hkp-G15
Harshad Patel Resume- hkp-G15Harshad Patel Resume- hkp-G15
Harshad Patel Resume- hkp-G15
 
Fairfax County Tertiary Filtration System Rehabilitation July 2020
Fairfax County Tertiary Filtration System Rehabilitation July 2020Fairfax County Tertiary Filtration System Rehabilitation July 2020
Fairfax County Tertiary Filtration System Rehabilitation July 2020
 
Solids Processing Rehabilitation Phase II
Solids Processing Rehabilitation Phase IISolids Processing Rehabilitation Phase II
Solids Processing Rehabilitation Phase II
 

Donnie Belloit_Reume

  • 1. Donnie J. Belloit Chief Estimator / Purchaser E-Mail: dbelloit@att.net Phone: 904-860-7903  Years in discipline: 25 (WPC Industrial Contractors LLC) Mr. Belloit has 25 years of estimating experience in the Water and Wastewater Plant construction industryto drawfromfor hisestimatesfor bidsandproposals. Hereviewsproposalspecifications,project plan drawings, attends pre-bid meetings, etc. to determine scope of work and required contents of estimates, provides complete detailed estimates on complex projects, prepares the required documentation using a variety of bid forms, creates bids for any of the following types of estimates: hard bid, negotiated,unit price,lumpsum, design-build,communicatesandworkswithdesignteams to develop projectdocumentsandcosts at variousdesignstages,andattends designmeetings,adviseclients of design decisions which affect cost and offer creative alternatives as well as practical cost-savings suggestions. Mr. Belloit is experienced in all phases of construction and has special training in mechanical piping, pumping systems, and chemical piping applications. He also has expertise in development of estimation methodologies, identification of major cost components, performing bid evaluations, cost factor analysis, risk analysis, change order analysis and price/budget negotiations. In addition he has previously performed as purchasing manager performing buyout of major equipment, and functioned as liaison between the engineer and general contractor regarding the approval and delivery of required approved shop drawings for multi-million dollar Water and Wastewater projects. HasworkedwithWinEst estimatingsoftwarefor20plusyearsformulating estimatesforprojectbidsand would be able to adapt to other type estimating programs. Recent Experience Jacksonville Beach Wastewater Treatment Plant Improvements, Jacksonville Beach, Florida, $20,000,000 + Project consisted of (4) new sequential batch reactors (SBR) Waste Treatment Process facilities, new influent bar screen structure, renovation of on-site lift station 14, new SBR blower building/maintenance office, modification to existing belt press facility, conversion of part of effluent tanks into new high level disinfection chlorine contact tanks, new on-site reuse system, new digester blower equipment, sludge pumps, yard pump station, sludge transfer pumps, new process yard piping between various structures, new state-of-the-art electrical control system, new drying bed facility, phase demolition of the old plant facilities, and maintaining existing waste treatment to capacity during construction of new facilities. Completion: January 2014 City of LaBelle Membrane Water Treatment Facility, LaBelle, Florida, $8,500,000 + Project consisted of furnishing all labor, equipment and materials for the construction of the water treatment facility consisting of, but not limited to, the following: 1.5 MGD membrane water treatment system in building, chlorine contact chamber, finished water storage tank, concentrate storage tank, degasifier system, chlorination system and building, high service pumps, transfer pumps, chemical feed systems, chemical building, concentrate pumps, plant piping, sewer pump station, septic system, stormwater management system, and paving of roads and parking; Approximately 11,250 linear feet (IF) 16-inch PVC raw water main and all necessary appurtenances; Approximately 3,100 IF of 12-inch PVC distribution water main and all necessary appurtenances; Modifications to existing piping and controls at existing City of LaBelle Water Treatment Facility site; All associated related fencing, site grading, electrical work, instrumentation work, restoration work, necessary permits, testing, painting, disposal of demolished or removed items and materials, cleanup work, temporary
  • 2. utilities, and other miscellaneous items of work as shown on the Drawings, specified, or otherwise required for a complete and operable water treatment facility. Completion: September 2014 Oldsmar Alternative Water Supply Project, Oldsmar, Florida, $9,000,000 + One new brackish water Reverse Osmosis Water Treatment Plant (ROWTP) with a production capacity of 3.2 MGD, consisting of a new administration building including, control room, laboratory, offices, and associated appurtenances connected to a process area consisting of high bay structure containing process equipment and associated appurtenances that support the facility. Installation of water treatment process equipment, transfer pumps, bio-trickling filter odor control towers, process waste holding pump station, bulk chemical storage tanks, and chemical day tanks. A 1 MG pre-stressed concrete ground storage tank, associated piping and valves in the building and in the yard, electrical systems (i.e., motor control equipment, variable frequency drives, building and site lighting, emergency generator and fuel tank, wire/conduit, etc. Instrumentation (i.e., field devices, PLCs, panels, computers, integration, etc.), Site work, Equipment/systems for 11 raw water production wells, submersible well pumps, valves, piping, concrete vaults, flow meters, electrical, emergency generators, instrumentation, various ancillary items. Equipment/systems for 1 deep injection well (DIW) and 2 monitor wells related to Byproduct disposal, including piping, valves, flow meter, electrical, instrumentation, submersible pumps for the monitor wells, various ancillary items, and site work. Completion: October 2012 Buckman Water Reclamation Facility, Phase 1 & 2, $16,000,000 + Project for JEA (Hai Vu, P.E.) including: Replacement of primary clarifier effluent weir, addition of side stream pump station and effluent piping. Modifications to the aeration basins to include new effluent gates, floating mixers, four new air valves and actuators, baffle walls, overflow weir structure, enlarged sluice gates, scum collection and pump station, four recycle pumps and piping and associated structural, mechanical, electrical and instrumentation and control work. New RAS flow meter with vault, demolition and replacement of four secondary clarifier mechanisms, replacement of two clarifier dewatering pump valves. Addition of HVAC to Chem Scan Building, ventilation of the new Secondary Building, rehabilitation of the old Secondary Clarifier Control Building to include new MCC, HVAC, lights, stairs and all associated appurtenances. Construction of a new grit removal basin, consisting of 3 flow channels. Conversion of the existing pre-aeration basin into a 3 channel grit removal basin. Influent flow distribution and effluent flow control. Installation of grit handling equipment. Improvements to the installation of a grit drainage pad and pump station. Decommissioning of existing grit removal facilities. Electrical, instrumentation and controls. Conversion of the existing pre-aeration basin into a 3 channel grit removal basin. Blower improvements including removal and salvage of existing blower, installation of three new turbo blowers, installation of new stainless steel discharge piping, valves and appurtenances. All electrical and instrumentation. Completion: November 2014 James Anderson Reverse Osmosis WTP, City of Port St. Lucie, Florida. $ 47,000,000 + Project consisting of all labor, materials and equipment to construct an operation/laboratory, emergency power and membrane filtration building with new treatment equipment and chemical feed systems and 22 MGD of water treatment plant capacity including RO treatment skids, including skid assemblies, piping, vessels, membranes, and instrumentation; blend and feed water micron filter systems, high pressure feed pumps, transfer pumps including piping, high service pumps including piping, chemical feed systems including pumps, piping and tanks, 4 mg potable water ground storage tanks including site work, piping and coatings; electrical including wiring, conduit, field panels, transformer, transfer switches, generators and motor control centers; instrumentation including programming, panels, instruments and telemetry; ductile yard piping; post treatment modifications including: 6.0 mgd Degasifier, 18 scfm blowers, 36,000 scfm scrubber systems and ducting; well houses including site work, pumps, piping, electrical and instrumentation; 30” transmission main. Completion: June 2009 Atlantic Beach Florida Wastewater Treatment Plant TMDL Compliance Improvements, Atlantic Beach, Florida, $5,000,000 + The project work that was performed included construction of improvements to the City’s Wastewater Treatment Plant #1 (WWTP #1), located at 1100 Sandpiper Lane, Atlantic Beach, FL 32233 and Phase-out of Atlantic Beach Wastewater Plant #2 (WWTP #2), located at 739 Renault Dr., Jacksonville, FL. WWTP #1 is an existing 3.0 MGD Domestic Wastewater Treatment Plant that was upgraded to provide 4-stage biological nitrogen removal and re-rating to 3.5 MGD capacity. WWTP #2 is an existing 1.9 MGD Sequencing Batch Reactor plant which was de-commissioned. The work generally consisted of furnishing all labor, materials and equipment necessary to final construction. Completion: December 2012
  • 3. Blacksford Water Reclamation Facility Phase II, $12,000,000 + Project for JEA (Hai Vu, P.E.) including: Expansion/rehabilitation of the existing WTP and construction of a new SBR treatment facility, sludge handling, chemical feed systems, blowers, odor control system, reuse pump station, UV facility, reuse storage tank, EQ tank, electrical building, electrical, instrumentation, and all yard piping, site grading, landscaping and paving. Completion: May 2007 Rangeline Road Water Treatment Plant, Port St. Lucie, Florida, $12,000,000 + Project consisted of 4.0 MG pre-stressed concrete ground storage reservoir, high service pump building with high service pumping facilities, motor control equipment, restroom, storage room and instrumentation/controls. Chlorine and ammonia building including ammonia/chlorine feed system and associated rooms, 1-ton chlorine cylinder storage, ammonia storage tank, weighing facilities, bridge crane, safety room and safety equipment. Generator building with standby diesel generator set, fuel day tank, fuel storage tank, and fuel system. Hydropneumatic tank and associated equipment. All associated on-site yard piping, flow meter assemblies, plumbing, site work, stormwater pond, grading, drainage, electrical, HVAC, instrumentation and controls for system operation and monitoring. Completion: June 2009 ESTIMATING & PURCHASING EXPERIENCE ………. continued: Indian Hills Water Treatment Plant Improvements, $2 million Grant Street WWTP/Melbourne, Florida, $5.3 million Miller Street WWTF/Clay County, Florida, $5.8 million Miramar WWTP/Miramar, Florida, $4.2 million R.C. Willis WTP/Palatka, Florida, $12 million Oak Run WWTP/Marion County, Florida, $10 million Stonecrest WWTP/ Marion County, Florida, $10 million Southport Booster Pump Station Design-Build/ Port St. Lucie, Florida, $2.5 million Prineville R.O. WTP/City of Port St. Lucie, Florida, $6 ,million Sunburst Lane WTP/ Clermont, Florida, 3.9 million MId-Clay WWTF/ Clay County, Florida, $2.6 million Green Cove Springs West/ Clay County, Florida, $2.4 million Madison WWTP/ Madison, Florida, $$4.5 million Northwest Sub-Regional WTP & WWTP/ Marion County, Florida, $3.5 million Southlake Utility WTP & WWTP/ Clermont, Florida, $2.5 million And many more…..