SlideShare uma empresa Scribd logo
1 de 5
Baixar para ler offline
Authors are fully responsible for corrections of any typographical, technical and content errors.
GIBA Conference Proceedings are not copyrighted.
GLOBAL INTERDISCIPLINARY
BUSINESS-ECONOMICS
ADVANCEMENT CONFERENCE
CONFERENCE PROCEEDINGS
MAY 15-18, 2014
Clearwater Beach, Florida, USA
Co-Editors:
Prof. Dr. Cihan Cobanoglu
Prof. Dr. Serdar Ongan
ISSN: 2333-4207
Global Interdisciplinary Business-Economics Advancement Conference
ISSN: 2333-4207 212
Real Option Strategic Approach to Find Optimal Company’s Source
of Financing
Dmytro Shestakov
The National University of “Kyiv-Mohyla Academy”
Doctoral School, Ukraine
dshestakov.ua@gmail.com
Abstract
This article is devoted to investigation and evaluation of the project expanded NPV rather than simple
or passive NPV depending on its available options of financing using real option approach. This
approach combines ideas of corporate finance, real options and game theory and concludes to the Risk-
Neutral Probability measure and the value of a Call Option that comes from Black-Scholes-Merton
model. The findings enable us to estimate the value of managerial decisions, project flexibility and help
managers to select the best choice of strategic financing and its available options and their respective
combination.
Keywords: Strategic Real Options, Strategic Planning, Strategy Valuation, Expanded Net Present Value
(ENPV), Call Option, Exercise Value (EV).
Introduction
Any project whether it is launching or developing requires financing, that in most cases is covered by
own funds partially, whereas the rest of by attracted facilities. On the one hand, financing attraction
varies in different forms, e.g. loan, mezzanine, equity financing, or even concluding forward contracts.
On the other hand, the proportion of each available source is important and stays under question.
Therefore, the problem of better choice between available financing options and their respective
combination exists.
Correct decision thus is especially important as a real option implies the value that includes any direct
and indirect costs and benefits connected with using such an option, besides its direct influence on
investment attractiveness ratios and ultimate valuation of a project. Moreover, since financing attraction
requires a valid business valuation, the real option effect is an integral part of any calculations connected
with such.
Theory
Corporate or strategic real option models synthesize the newest developments in corporate finance and
real options and game theory to help bridge the gap between traditional corporate finance and strategic
planning. It enables to estimate the value of a managerial decision, timing it depending on key variables
and market conditions and thus is suitable to valuing strategy and its flexibility. The opportunity to invest
or make any other decision that implies an ultimate cash flow effect is thus analogous to a call or put
option with an inherent exercise price.
In pursuit of its decision-making goals, real-options modelling conclude into expanded Net Present
Value (ENPV), rather than simple NPV, that is much more relevant base for either a feasibility study of
any project, an investment and managerial decision. The key here is that ENPV criterion incorporates,
along with simple NPV of expected cash flows from an immediate investment, the flexibility of the
combined options embedded in the project. Such an option could be for instance the opportunity to
change a source of financing due to a certain circumstance occurred in future.
In order to assess the company ENPV depending on its available financing options we use real option
approach that concludes to the Risk-Neutral Probability measure (1) and the value of a Call Option that
comes from adjusted Black-Scholes-Merton equation (3).
du
d
SS
SSr
p



)1(
(1)
Global Interdisciplinary Business-Economics Advancement Conference
ISSN: 2333-4207 213
where S is the initial stock price that can go either up to u
S or down to d
S . If the risk-free interest
rate is 0r , and ud
SSrS  )1( , then the risk-neutral probability of an upward stock
movement is given by the number p .
Adjusting the equation (1) to a real option case we get





VV
VVr
p
)1(
(2)
where V is the gross value of expected cash inflows that can go either up to 
V or down to 
V .
r
CpCp
C




1
)1(
(3)
where C is the ENPV or Call Option, )0,( IVMaxC  
, )0,( IVMaxC  
, I is the
investments or Exercise Value of Call Option.
Risk-Neutral Probability is the most important principle in derivative valuation. It states that the value
of a derivative is its expected future value discounted at the risk-free interest rate. This is exactly the
same result that we would obtain if we assumed that the world was risk-neutral. In such a world, investors
would require no compensation for risk. This means that the expected return on all securities would be
the risk-free interest rate.
Methods
We apply Discounted Cash Flow (DCF) rather than standard NPV approach because of two fundamental
differences between them. The first is that DCF allows apply different discount rate through analysed
periods whereas NPV just single discount rate does (left-site part of formula (4)). On the other hand,
using DCF valuation we apply Terminal Value (TV, formula (4, 6)) that is the present value at a future
point in time of all future cash flows when we expect stable or perpetuity growth rate forever. TV is most
often used in multi-stage cash flow analysis and allows for the limitation of cash flow projections to a
several-year period.
  

 TV
WACC
FCFE
DCF n
1
(4)
where FCFE or Free Cash Flow to Equity is the cash flow paid to the equity shareholders of the
project after all expenses, reinvestment and debt repayment in time n.
)1( TR
DE
D
R
DE
E
WACC de 



 (5)
where WACC or the Weighted-Average Cost of Capital, E and D is the company’s equity and
debt respectively, eR is the cost of equity or required Return on Equity (ROE), T is a corporate tax
rate.
n
n
n
WACC
CF
gWACC
WACC
TV
)1(
)1(
1
1





 (6)
where g is perpetuity growth rate of the company’s cash flows.
Results
Whereas ENPV criterion incorporates the flexibility of the combined options embedded in the project
we assume the company has an option to change a source of financing after the project has been launched
shown in Figure 1.
Global Interdisciplinary Business-Economics Advancement Conference
ISSN: 2333-4207 214
Fig. 1. Financing options decision tree
Options reproduced in Fig. 1 anticipate the company’s investment (I) to launch the project is initially
structured as 75% of Equity and 25% of Debt capital. The company has an option to change the capital
structure after starting the project due to decrease of its riskiness. Thus it can choose between increase
in Debt 1) up to 50% or 2) up to 75%. Hence, the calculations showed in Table 1 depict all consecutive
NPV components for each option.
Table 1. NPV components
The Base figures in Table 1 mean zero (0) or a launch period, which is a set base for all other scenarios
(options) available. Hence, the NPV figure include the Base part and a particular variable inherent to
each Equity, D&E and Debt financing option that is separated only in Table 1.
It is obvious that the key company valuation component TV hugely depends on the cost of capital, as we
can see by the standard deviation (STD) measure in Table 1. The reason for such a deep tie of it to
WACC can be explained by the equations (6) and (5). Behind that, we can see the extremes of NPV due
to a key WACC component deviation, i.e. Debt interest rate (IR) showed in Table 2.
Table 2. NPV sensitivity analysis
We assume the initial IR is %12 per annum and can deviate within %25 . Since the change in IR affects
NPV non-linear, it takes negative and positive effect in case of IR ups and downs respectively. The
company can grasp possible benefits from IR change once any occurred or even can suffer negative
impact. Moreover, the company can secure its utmost IR risk connected with Equity scenario by
switching to other available ones. Therefore, the worst NPV in such case is 3.7$ million instead of
6.6$ million showed in Table 2, whereas the best one 5.13$ million is still available to achieve.
Following the equations (2) and (4) we calculate V ,

V and

V in Table 3 by adding Exercise Price
to NPV ,

NPV and

NPV respectively.
Table 3. Gross cash inflows calculation
Equity, 75%
Debt, 75%
Debt & Equity, 50%
Base Equity D&E Debt STD
NPV, USD mln (7.2) 14.4 15.9 17.8 15.0%
FCFE, USD mln (7.2) 9.0 9.1 9.1 1.4%
Gross FCFE, USD mln 1.3 9.0 9.1 9.1 1.4%
less CapEx(I), USD mln 8.5 - - - -
TV, USD mln - 5.4 6.8 8.6 32.7%
WACC, % 17.4% 17.4% 14.9% 12.3% 24.5%
+ 25% Base IR - 25%
NPVe, USD mln 6.6 7.2 7.8
FCFEe, USD mln 1.5 1.8 2.1
TVe, USD mln 5.2 5.4 5.7
WACCe, % 18.0% 17.4% 16.8%
NPVde, USD mln 7.3 8.7 10.2
FCFEde, USD mln 1.2 1.9 2.6
TVde, USD mln 6.1 6.8 7.6
WACCde, % 16.1% 14.9% 13.6%
NPVd, USD mln 8.2 10.6 13.5
FCFEd, USD mln 0.9 2.0 3.1
TVd, USD mln 7.3 8.6 10.4
WACCd, % 14.1% 12.3% 10.5%
Global Interdisciplinary Business-Economics Advancement Conference
ISSN: 2333-4207 215
Summarizing the data in Table 3 we obtain the capital investment opportunity showed in Fig. 2.
Fig. 2. Investment opportunity decision tree
Conclusions
Consider again the financing opportunity shown in Fig. 2. The company has an option to launch the
project that involves making a capital expenditure (CapEx) of 5.8$0 I million (in present value
terms). The gross value of expected future cash inflows from the project, 7.15$0 V million, may
differ in line with financing options available to 0.22$
V million or 8.15$
V million (with
equal probability, 5.0q ) due to uncertainty over the Debt interest rate including. The opportunity to
invest provided by the project is analogous to a Call Option on the value of the completed project (V )
with an exercise price equal to the required outlay, 5.8$0 I million.
The value of this investment opportunity obtained from the end-of-period expected values with
expectations taken over risk-neutral probabilities calculated by equation (2) in Fig. 3, discounted at the
risk-free rate (here 09.0r ): the ENPV or Call Option according to the equation (3) is 9.7$ million,
showed in Fig. 4.
2.0
8.150.22
8.157.15)09.01()1(






 

VV
VVr
p
Fig. 3. Risk-neutral probability calculation
9.7
09.01
3.7)2.01(5.132.0
1
)1(








r
CpCp
C
Fig. 4. Call option calculation
The value of the financing option (ENPV) exceeds passive NPV of Equity scenario commitment of 15.7
– 8.5 (i.e., 7.9 > 7.2 million). Therefore, it is reasonable to change the capital structure after starting the
project and replace Equity capital by increasing Debt up to 75%.
References
Abel A., Dixit A. K., Eberly J. C., Pindyck R. S. (1995). Options, the Value of Capital, and Investment. MIT-CEEPR
95-006. Massachusetts, Massachusetts Institute of Technology.
Dixit A. K., Pindyck R. S. (1994). Investment Under Uncertainty. Library of Congress Cataloging-in-Publication
Data. Princeton, Princeton University Press.
Luehrman T. A. (1998). Strategy as a Portfolio of Real Options. Reprint Number 98506. Boston, Harvard Business Review.
Tirole, J. (2006). The Theory of Corporate Finance. Princeton, Princeton University Press.
Smit H. T. J., Trigeorgis L. (2004). Strategic Investment: Real Options and Games. Princeton, Princeton University Press.
Ван Хорн Д. К., Вахович Д. М. мл. (2008). Основы Финансового Менеджмента. 12-е изд. СПб, Вильямс.
Кит П., Янг Ф. (2008). Управленческая Экономика. Инструментарий Руководителя. 5-е изд. СПб, Питер.
Огиер Т., Рагман Д., Спайсер Л. (2007). Настоящая Стоимость Капитала: Практическое Руководство по
Принятию Финансовых Решений. пер. с англ. В. Теплых, А. Ватченко. Днепропетровск, Баланс
Бизнес Букс.
Equity D&E Debt
Exercise price, USD mln 8.5 8.5 8.5
NPV, USD mln 7.2 8.7 10.6
NPV+, USD mln 7.8 10.2 13.5
NPV-, USD mln 6.6 7.3 8.2
V, USD mln 15.7 17.2 19.1
V+, USD mln 16.4 18.7 22.0
V-, USD mln 15.1 15.8 16.7
V =
15.7
V+ = 22.0
V- = 15.8

Mais conteúdo relacionado

Mais procurados

Capital budgeting and risk
Capital budgeting and riskCapital budgeting and risk
Capital budgeting and riskUrusha Hada
 
Risk In Capital Budgeting
Risk In Capital BudgetingRisk In Capital Budgeting
Risk In Capital BudgetingNoman
 
Class 28 30 (Risk Analysis In Capital Budgeting)
Class 28 30 (Risk Analysis In Capital Budgeting)Class 28 30 (Risk Analysis In Capital Budgeting)
Class 28 30 (Risk Analysis In Capital Budgeting)Bharti AXA Life Insurance
 
1999 McKinsey Capturing Value from Optionality in R&D
1999 McKinsey Capturing Value from Optionality in R&D1999 McKinsey Capturing Value from Optionality in R&D
1999 McKinsey Capturing Value from Optionality in R&DAleksandar Ruzicic
 
Risk Analysis & Capital Budgeting
Risk Analysis & Capital BudgetingRisk Analysis & Capital Budgeting
Risk Analysis & Capital Budgetingyashpal01
 
Risk analysis in capital bugeting
Risk analysis in capital bugetingRisk analysis in capital bugeting
Risk analysis in capital bugetingDr. Ravneet Kaur
 
Risk analysis in capital budgeting
Risk analysis in capital budgetingRisk analysis in capital budgeting
Risk analysis in capital budgetingVikram g b
 
Risk And Uncertainty Lecture 2
Risk And Uncertainty Lecture 2Risk And Uncertainty Lecture 2
Risk And Uncertainty Lecture 2Muhammad Ijaz Syed
 
Uncertainty and Consumer Behavior
Uncertainty and Consumer BehaviorUncertainty and Consumer Behavior
Uncertainty and Consumer BehaviorPradiptaNarendra1
 
Transition matrices and PD’s term structure - Anna Cornaglia
Transition matrices and PD’s term structure - Anna CornagliaTransition matrices and PD’s term structure - Anna Cornaglia
Transition matrices and PD’s term structure - Anna CornagliaLászló Árvai
 
ECO 550 week 2 quiz chapter 1 & 2 all possible questions 100%
ECO 550 week 2 quiz chapter 1 & 2   all possible questions 100%ECO 550 week 2 quiz chapter 1 & 2   all possible questions 100%
ECO 550 week 2 quiz chapter 1 & 2 all possible questions 100%hwguiders4po3
 
Uncertainty, Risk, and Risk Management
Uncertainty, Risk, and Risk ManagementUncertainty, Risk, and Risk Management
Uncertainty, Risk, and Risk ManagementJulio Huato
 

Mais procurados (18)

Ch 12
Ch 12Ch 12
Ch 12
 
Capital budgeting and risk
Capital budgeting and riskCapital budgeting and risk
Capital budgeting and risk
 
Risk In Capital Budgeting
Risk In Capital BudgetingRisk In Capital Budgeting
Risk In Capital Budgeting
 
Class 28 30 (Risk Analysis In Capital Budgeting)
Class 28 30 (Risk Analysis In Capital Budgeting)Class 28 30 (Risk Analysis In Capital Budgeting)
Class 28 30 (Risk Analysis In Capital Budgeting)
 
Course03
Course03Course03
Course03
 
1999 McKinsey Capturing Value from Optionality in R&D
1999 McKinsey Capturing Value from Optionality in R&D1999 McKinsey Capturing Value from Optionality in R&D
1999 McKinsey Capturing Value from Optionality in R&D
 
Risk Analysis & Capital Budgeting
Risk Analysis & Capital BudgetingRisk Analysis & Capital Budgeting
Risk Analysis & Capital Budgeting
 
Risk analysis in capital bugeting
Risk analysis in capital bugetingRisk analysis in capital bugeting
Risk analysis in capital bugeting
 
Risk analysis in capital budgeting
Risk analysis in capital budgetingRisk analysis in capital budgeting
Risk analysis in capital budgeting
 
Risk And Uncertainty Lecture 2
Risk And Uncertainty Lecture 2Risk And Uncertainty Lecture 2
Risk And Uncertainty Lecture 2
 
Uncertainty and Consumer Behavior
Uncertainty and Consumer BehaviorUncertainty and Consumer Behavior
Uncertainty and Consumer Behavior
 
Risk Adjusted Discount Rate
Risk Adjusted Discount RateRisk Adjusted Discount Rate
Risk Adjusted Discount Rate
 
Transition matrices and PD’s term structure - Anna Cornaglia
Transition matrices and PD’s term structure - Anna CornagliaTransition matrices and PD’s term structure - Anna Cornaglia
Transition matrices and PD’s term structure - Anna Cornaglia
 
Chapter 5
Chapter 5Chapter 5
Chapter 5
 
Quantitative methods - Level I - CFA Program
Quantitative methods - Level I - CFA ProgramQuantitative methods - Level I - CFA Program
Quantitative methods - Level I - CFA Program
 
ECO 550 week 2 quiz chapter 1 & 2 all possible questions 100%
ECO 550 week 2 quiz chapter 1 & 2   all possible questions 100%ECO 550 week 2 quiz chapter 1 & 2   all possible questions 100%
ECO 550 week 2 quiz chapter 1 & 2 all possible questions 100%
 
Uncertainty, Risk, and Risk Management
Uncertainty, Risk, and Risk ManagementUncertainty, Risk, and Risk Management
Uncertainty, Risk, and Risk Management
 
Economics - Level II - CFA Program
Economics - Level II - CFA ProgramEconomics - Level II - CFA Program
Economics - Level II - CFA Program
 

Semelhante a GLOBAL INTERDISCIPLINARY BUSINESS-ECONOMICS ADVANCEMENT CONFERENCE, GIBA 2014

Research paper
Research paperResearch paper
Research paperRokibul Rs
 
RISK ANALYSIS IN CAPITAL BUDGETING
RISK ANALYSIS IN CAPITAL BUDGETINGRISK ANALYSIS IN CAPITAL BUDGETING
RISK ANALYSIS IN CAPITAL BUDGETINGPANKAJ PANDEY
 
choosing innovation project
choosing innovation projectchoosing innovation project
choosing innovation projectRazwand
 
THAI MUSIC-Mariestela e
THAI MUSIC-Mariestela eTHAI MUSIC-Mariestela e
THAI MUSIC-Mariestela eMj Rufin
 
Ch14sol cash flow estimation
Ch14sol cash flow estimationCh14sol cash flow estimation
Ch14sol cash flow estimationHassan Zada
 
Chapter 10: Risk and Refinements In Capital Budgeting
Chapter 10: Risk and Refinements In Capital BudgetingChapter 10: Risk and Refinements In Capital Budgeting
Chapter 10: Risk and Refinements In Capital BudgetingFiaz Ahmad
 
Chapter 10:Risk and Refinements In Capital Budgeting
Chapter 10:Risk and Refinements In Capital BudgetingChapter 10:Risk and Refinements In Capital Budgeting
Chapter 10:Risk and Refinements In Capital BudgetingInocentshuja Ahmad
 
present worth analysis.ppt
present worth analysis.pptpresent worth analysis.ppt
present worth analysis.pptashwinigupta38
 
economy Chapter5_by louy Al hami
economy Chapter5_by louy Al hami economy Chapter5_by louy Al hami
economy Chapter5_by louy Al hami Louy Alhamy
 
Company value
 Company value Company value
Company valueTim Smith
 
Company value
 Company value Company value
Company valueTim Smith
 
Chapter13 specialdecisionsituations
Chapter13 specialdecisionsituationsChapter13 specialdecisionsituations
Chapter13 specialdecisionsituationsAKSHAYA0000
 
Importance of wacc and npv on investment decisions
Importance of wacc and npv on investment decisionsImportance of wacc and npv on investment decisions
Importance of wacc and npv on investment decisionsCharm Rammandala
 

Semelhante a GLOBAL INTERDISCIPLINARY BUSINESS-ECONOMICS ADVANCEMENT CONFERENCE, GIBA 2014 (20)

Research paper
Research paperResearch paper
Research paper
 
RISK ANALYSIS IN CAPITAL BUDGETING
RISK ANALYSIS IN CAPITAL BUDGETINGRISK ANALYSIS IN CAPITAL BUDGETING
RISK ANALYSIS IN CAPITAL BUDGETING
 
17738379 capital-budgeting
17738379 capital-budgeting17738379 capital-budgeting
17738379 capital-budgeting
 
choosing innovation project
choosing innovation projectchoosing innovation project
choosing innovation project
 
Pm 6
Pm 6Pm 6
Pm 6
 
THAI MUSIC-Mariestela e
THAI MUSIC-Mariestela eTHAI MUSIC-Mariestela e
THAI MUSIC-Mariestela e
 
Ch14sol cash flow estimation
Ch14sol cash flow estimationCh14sol cash flow estimation
Ch14sol cash flow estimation
 
Introducing financial analysis
Introducing financial analysisIntroducing financial analysis
Introducing financial analysis
 
CCP_SEC6_Economic Analysis Statistics and Probability and Risk
CCP_SEC6_Economic Analysis Statistics and Probability and RiskCCP_SEC6_Economic Analysis Statistics and Probability and Risk
CCP_SEC6_Economic Analysis Statistics and Probability and Risk
 
Chapter 10: Risk and Refinements In Capital Budgeting
Chapter 10: Risk and Refinements In Capital BudgetingChapter 10: Risk and Refinements In Capital Budgeting
Chapter 10: Risk and Refinements In Capital Budgeting
 
Chapter 10:Risk and Refinements In Capital Budgeting
Chapter 10:Risk and Refinements In Capital BudgetingChapter 10:Risk and Refinements In Capital Budgeting
Chapter 10:Risk and Refinements In Capital Budgeting
 
present worth analysis.ppt
present worth analysis.pptpresent worth analysis.ppt
present worth analysis.ppt
 
economy Chapter5_by louy Al hami
economy Chapter5_by louy Al hami economy Chapter5_by louy Al hami
economy Chapter5_by louy Al hami
 
Company value
 Company value Company value
Company value
 
Company value
 Company value Company value
Company value
 
An Empirical Approach to Risk Assesment
An Empirical Approach to Risk Assesment An Empirical Approach to Risk Assesment
An Empirical Approach to Risk Assesment
 
Ppt 2
Ppt 2Ppt 2
Ppt 2
 
Chapter13 specialdecisionsituations
Chapter13 specialdecisionsituationsChapter13 specialdecisionsituations
Chapter13 specialdecisionsituations
 
Importance of wacc and npv on investment decisions
Importance of wacc and npv on investment decisionsImportance of wacc and npv on investment decisions
Importance of wacc and npv on investment decisions
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 

Mais de Dmytro Shestakov

The Hypotheses Testing Method for Evaluation of Startup Projects
The Hypotheses Testing Method for Evaluation of Startup ProjectsThe Hypotheses Testing Method for Evaluation of Startup Projects
The Hypotheses Testing Method for Evaluation of Startup ProjectsDmytro Shestakov
 
Специфіка інноваційного проекту як передумова управління ризиками інвестиційн...
Специфіка інноваційного проекту як передумова управління ризиками інвестиційн...Специфіка інноваційного проекту як передумова управління ризиками інвестиційн...
Специфіка інноваційного проекту як передумова управління ризиками інвестиційн...Dmytro Shestakov
 
The Degree Of Innovation: Through Incremental To Radical
The Degree Of Innovation: Through Incremental To RadicalThe Degree Of Innovation: Through Incremental To Radical
The Degree Of Innovation: Through Incremental To RadicalDmytro Shestakov
 
UNDERSTANDING INNOVATION: PROCESS, PROJECT AND PRODUCT-CENTRIC VIEWS
UNDERSTANDING INNOVATION: PROCESS, PROJECT AND PRODUCT-CENTRIC VIEWSUNDERSTANDING INNOVATION: PROCESS, PROJECT AND PRODUCT-CENTRIC VIEWS
UNDERSTANDING INNOVATION: PROCESS, PROJECT AND PRODUCT-CENTRIC VIEWSDmytro Shestakov
 
Strategy of Innovations Development in Ukraine Part I. Introduction. Dmytro S...
Strategy of Innovations Development in Ukraine Part I. Introduction. Dmytro S...Strategy of Innovations Development in Ukraine Part I. Introduction. Dmytro S...
Strategy of Innovations Development in Ukraine Part I. Introduction. Dmytro S...Dmytro Shestakov
 
Стратегія Розвитку Інновацій в Україні. Частина Перша. Вступ. Дмитро Шестаков...
Стратегія Розвитку Інновацій в Україні. Частина Перша. Вступ. Дмитро Шестаков...Стратегія Розвитку Інновацій в Україні. Частина Перша. Вступ. Дмитро Шестаков...
Стратегія Розвитку Інновацій в Україні. Частина Перша. Вступ. Дмитро Шестаков...Dmytro Shestakov
 
GLOBAL CONFERENCE ON BUSINESS AND ECONOMICS, GLOBE 2018
GLOBAL CONFERENCE ON BUSINESS AND ECONOMICS, GLOBE 2018GLOBAL CONFERENCE ON BUSINESS AND ECONOMICS, GLOBE 2018
GLOBAL CONFERENCE ON BUSINESS AND ECONOMICS, GLOBE 2018Dmytro Shestakov
 
Стратегія Розвитку Інновацій в Україні. Частина Друга. План Дій (Дмитро Шеста...
Стратегія Розвитку Інновацій в Україні. Частина Друга. План Дій (Дмитро Шеста...Стратегія Розвитку Інновацій в Україні. Частина Друга. План Дій (Дмитро Шеста...
Стратегія Розвитку Інновацій в Україні. Частина Друга. План Дій (Дмитро Шеста...Dmytro Shestakov
 
Strategy of Innovations Development in Ukraine Part II. Action Plan (Dmytro S...
Strategy of Innovations Development in Ukraine Part II. Action Plan (Dmytro S...Strategy of Innovations Development in Ukraine Part II. Action Plan (Dmytro S...
Strategy of Innovations Development in Ukraine Part II. Action Plan (Dmytro S...Dmytro Shestakov
 

Mais de Dmytro Shestakov (9)

The Hypotheses Testing Method for Evaluation of Startup Projects
The Hypotheses Testing Method for Evaluation of Startup ProjectsThe Hypotheses Testing Method for Evaluation of Startup Projects
The Hypotheses Testing Method for Evaluation of Startup Projects
 
Специфіка інноваційного проекту як передумова управління ризиками інвестиційн...
Специфіка інноваційного проекту як передумова управління ризиками інвестиційн...Специфіка інноваційного проекту як передумова управління ризиками інвестиційн...
Специфіка інноваційного проекту як передумова управління ризиками інвестиційн...
 
The Degree Of Innovation: Through Incremental To Radical
The Degree Of Innovation: Through Incremental To RadicalThe Degree Of Innovation: Through Incremental To Radical
The Degree Of Innovation: Through Incremental To Radical
 
UNDERSTANDING INNOVATION: PROCESS, PROJECT AND PRODUCT-CENTRIC VIEWS
UNDERSTANDING INNOVATION: PROCESS, PROJECT AND PRODUCT-CENTRIC VIEWSUNDERSTANDING INNOVATION: PROCESS, PROJECT AND PRODUCT-CENTRIC VIEWS
UNDERSTANDING INNOVATION: PROCESS, PROJECT AND PRODUCT-CENTRIC VIEWS
 
Strategy of Innovations Development in Ukraine Part I. Introduction. Dmytro S...
Strategy of Innovations Development in Ukraine Part I. Introduction. Dmytro S...Strategy of Innovations Development in Ukraine Part I. Introduction. Dmytro S...
Strategy of Innovations Development in Ukraine Part I. Introduction. Dmytro S...
 
Стратегія Розвитку Інновацій в Україні. Частина Перша. Вступ. Дмитро Шестаков...
Стратегія Розвитку Інновацій в Україні. Частина Перша. Вступ. Дмитро Шестаков...Стратегія Розвитку Інновацій в Україні. Частина Перша. Вступ. Дмитро Шестаков...
Стратегія Розвитку Інновацій в Україні. Частина Перша. Вступ. Дмитро Шестаков...
 
GLOBAL CONFERENCE ON BUSINESS AND ECONOMICS, GLOBE 2018
GLOBAL CONFERENCE ON BUSINESS AND ECONOMICS, GLOBE 2018GLOBAL CONFERENCE ON BUSINESS AND ECONOMICS, GLOBE 2018
GLOBAL CONFERENCE ON BUSINESS AND ECONOMICS, GLOBE 2018
 
Стратегія Розвитку Інновацій в Україні. Частина Друга. План Дій (Дмитро Шеста...
Стратегія Розвитку Інновацій в Україні. Частина Друга. План Дій (Дмитро Шеста...Стратегія Розвитку Інновацій в Україні. Частина Друга. План Дій (Дмитро Шеста...
Стратегія Розвитку Інновацій в Україні. Частина Друга. План Дій (Дмитро Шеста...
 
Strategy of Innovations Development in Ukraine Part II. Action Plan (Dmytro S...
Strategy of Innovations Development in Ukraine Part II. Action Plan (Dmytro S...Strategy of Innovations Development in Ukraine Part II. Action Plan (Dmytro S...
Strategy of Innovations Development in Ukraine Part II. Action Plan (Dmytro S...
 

Último

Kurla Capable Call Girls ,07506202331, Sion Affordable Call Girls
Kurla Capable Call Girls ,07506202331, Sion Affordable Call GirlsKurla Capable Call Girls ,07506202331, Sion Affordable Call Girls
Kurla Capable Call Girls ,07506202331, Sion Affordable Call GirlsPriya Reddy
 
Dubai Call Girls Deira O525547819 Dubai Call Girls Bur Dubai Multiple
Dubai Call Girls Deira O525547819 Dubai Call Girls Bur Dubai MultipleDubai Call Girls Deira O525547819 Dubai Call Girls Bur Dubai Multiple
Dubai Call Girls Deira O525547819 Dubai Call Girls Bur Dubai Multiplekojalpk89
 
Test bank for advanced assessment interpreting findings and formulating diffe...
Test bank for advanced assessment interpreting findings and formulating diffe...Test bank for advanced assessment interpreting findings and formulating diffe...
Test bank for advanced assessment interpreting findings and formulating diffe...robinsonayot
 
Lion One Corporate Presentation May 2024
Lion One Corporate Presentation May 2024Lion One Corporate Presentation May 2024
Lion One Corporate Presentation May 2024Adnet Communications
 
Business Principles, Tools, and Techniques in Participating in Various Types...
Business Principles, Tools, and Techniques  in Participating in Various Types...Business Principles, Tools, and Techniques  in Participating in Various Types...
Business Principles, Tools, and Techniques in Participating in Various Types...jeffreytingson
 
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...Henry Tapper
 
Vip Call Girls Rasulgada😉 Bhubaneswar 9777949614 Housewife Call Girls Servic...
Vip Call Girls Rasulgada😉  Bhubaneswar 9777949614 Housewife Call Girls Servic...Vip Call Girls Rasulgada😉  Bhubaneswar 9777949614 Housewife Call Girls Servic...
Vip Call Girls Rasulgada😉 Bhubaneswar 9777949614 Housewife Call Girls Servic...Call Girls Mumbai
 
Female Russian Escorts Mumbai Call Girls-((ANdheri))9833754194-Jogeshawri Fre...
Female Russian Escorts Mumbai Call Girls-((ANdheri))9833754194-Jogeshawri Fre...Female Russian Escorts Mumbai Call Girls-((ANdheri))9833754194-Jogeshawri Fre...
Female Russian Escorts Mumbai Call Girls-((ANdheri))9833754194-Jogeshawri Fre...priyasharma62062
 
CBD Belapur((Thane)) Charming Call Girls📞❤9833754194 Kamothe Beautiful Call G...
CBD Belapur((Thane)) Charming Call Girls📞❤9833754194 Kamothe Beautiful Call G...CBD Belapur((Thane)) Charming Call Girls📞❤9833754194 Kamothe Beautiful Call G...
CBD Belapur((Thane)) Charming Call Girls📞❤9833754194 Kamothe Beautiful Call G...priyasharma62062
 
Significant AI Trends for the Financial Industry in 2024 and How to Utilize Them
Significant AI Trends for the Financial Industry in 2024 and How to Utilize ThemSignificant AI Trends for the Financial Industry in 2024 and How to Utilize Them
Significant AI Trends for the Financial Industry in 2024 and How to Utilize Them360factors
 
Mahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Mahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot GirlsMahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Mahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot GirlsDeepika Singh
 
Call Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budgetSareena Khatun
 
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & RequirementsExplore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirementsmarketingkingdomofku
 
Benefits & Risk Of Stock Loans
Benefits & Risk Of Stock LoansBenefits & Risk Of Stock Loans
Benefits & Risk Of Stock LoansMartinRowse
 
Certified Kala Jadu, Black magic specialist in Rawalpindi and Bangali Amil ba...
Certified Kala Jadu, Black magic specialist in Rawalpindi and Bangali Amil ba...Certified Kala Jadu, Black magic specialist in Rawalpindi and Bangali Amil ba...
Certified Kala Jadu, Black magic specialist in Rawalpindi and Bangali Amil ba...batoole333
 
7 steps to achieve financial freedom.pdf
7 steps to achieve financial freedom.pdf7 steps to achieve financial freedom.pdf
7 steps to achieve financial freedom.pdfthemoneyacademy07
 
Webinar on E-Invoicing for Fintech Belgium
Webinar on E-Invoicing for Fintech BelgiumWebinar on E-Invoicing for Fintech Belgium
Webinar on E-Invoicing for Fintech BelgiumFinTech Belgium
 
cost-volume-profit analysis.ppt(managerial accounting).pptx
cost-volume-profit analysis.ppt(managerial accounting).pptxcost-volume-profit analysis.ppt(managerial accounting).pptx
cost-volume-profit analysis.ppt(managerial accounting).pptxazadalisthp2020i
 
falcon-invoice-discounting-unlocking-prime-investment-opportunities
falcon-invoice-discounting-unlocking-prime-investment-opportunitiesfalcon-invoice-discounting-unlocking-prime-investment-opportunities
falcon-invoice-discounting-unlocking-prime-investment-opportunitiesFalcon Invoice Discounting
 
Strategic Resources May 2024 Corporate Presentation
Strategic Resources May 2024 Corporate PresentationStrategic Resources May 2024 Corporate Presentation
Strategic Resources May 2024 Corporate PresentationAdnet Communications
 

Último (20)

Kurla Capable Call Girls ,07506202331, Sion Affordable Call Girls
Kurla Capable Call Girls ,07506202331, Sion Affordable Call GirlsKurla Capable Call Girls ,07506202331, Sion Affordable Call Girls
Kurla Capable Call Girls ,07506202331, Sion Affordable Call Girls
 
Dubai Call Girls Deira O525547819 Dubai Call Girls Bur Dubai Multiple
Dubai Call Girls Deira O525547819 Dubai Call Girls Bur Dubai MultipleDubai Call Girls Deira O525547819 Dubai Call Girls Bur Dubai Multiple
Dubai Call Girls Deira O525547819 Dubai Call Girls Bur Dubai Multiple
 
Test bank for advanced assessment interpreting findings and formulating diffe...
Test bank for advanced assessment interpreting findings and formulating diffe...Test bank for advanced assessment interpreting findings and formulating diffe...
Test bank for advanced assessment interpreting findings and formulating diffe...
 
Lion One Corporate Presentation May 2024
Lion One Corporate Presentation May 2024Lion One Corporate Presentation May 2024
Lion One Corporate Presentation May 2024
 
Business Principles, Tools, and Techniques in Participating in Various Types...
Business Principles, Tools, and Techniques  in Participating in Various Types...Business Principles, Tools, and Techniques  in Participating in Various Types...
Business Principles, Tools, and Techniques in Participating in Various Types...
 
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
20240419-SMC-submission-Annual-Superannuation-Performance-Test-–-design-optio...
 
Vip Call Girls Rasulgada😉 Bhubaneswar 9777949614 Housewife Call Girls Servic...
Vip Call Girls Rasulgada😉  Bhubaneswar 9777949614 Housewife Call Girls Servic...Vip Call Girls Rasulgada😉  Bhubaneswar 9777949614 Housewife Call Girls Servic...
Vip Call Girls Rasulgada😉 Bhubaneswar 9777949614 Housewife Call Girls Servic...
 
Female Russian Escorts Mumbai Call Girls-((ANdheri))9833754194-Jogeshawri Fre...
Female Russian Escorts Mumbai Call Girls-((ANdheri))9833754194-Jogeshawri Fre...Female Russian Escorts Mumbai Call Girls-((ANdheri))9833754194-Jogeshawri Fre...
Female Russian Escorts Mumbai Call Girls-((ANdheri))9833754194-Jogeshawri Fre...
 
CBD Belapur((Thane)) Charming Call Girls📞❤9833754194 Kamothe Beautiful Call G...
CBD Belapur((Thane)) Charming Call Girls📞❤9833754194 Kamothe Beautiful Call G...CBD Belapur((Thane)) Charming Call Girls📞❤9833754194 Kamothe Beautiful Call G...
CBD Belapur((Thane)) Charming Call Girls📞❤9833754194 Kamothe Beautiful Call G...
 
Significant AI Trends for the Financial Industry in 2024 and How to Utilize Them
Significant AI Trends for the Financial Industry in 2024 and How to Utilize ThemSignificant AI Trends for the Financial Industry in 2024 and How to Utilize Them
Significant AI Trends for the Financial Industry in 2024 and How to Utilize Them
 
Mahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Mahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot GirlsMahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Mahendragarh Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
 
Call Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Howrah ( 8250092165 ) Cheap rates call girls | Get low budget
 
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & RequirementsExplore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
 
Benefits & Risk Of Stock Loans
Benefits & Risk Of Stock LoansBenefits & Risk Of Stock Loans
Benefits & Risk Of Stock Loans
 
Certified Kala Jadu, Black magic specialist in Rawalpindi and Bangali Amil ba...
Certified Kala Jadu, Black magic specialist in Rawalpindi and Bangali Amil ba...Certified Kala Jadu, Black magic specialist in Rawalpindi and Bangali Amil ba...
Certified Kala Jadu, Black magic specialist in Rawalpindi and Bangali Amil ba...
 
7 steps to achieve financial freedom.pdf
7 steps to achieve financial freedom.pdf7 steps to achieve financial freedom.pdf
7 steps to achieve financial freedom.pdf
 
Webinar on E-Invoicing for Fintech Belgium
Webinar on E-Invoicing for Fintech BelgiumWebinar on E-Invoicing for Fintech Belgium
Webinar on E-Invoicing for Fintech Belgium
 
cost-volume-profit analysis.ppt(managerial accounting).pptx
cost-volume-profit analysis.ppt(managerial accounting).pptxcost-volume-profit analysis.ppt(managerial accounting).pptx
cost-volume-profit analysis.ppt(managerial accounting).pptx
 
falcon-invoice-discounting-unlocking-prime-investment-opportunities
falcon-invoice-discounting-unlocking-prime-investment-opportunitiesfalcon-invoice-discounting-unlocking-prime-investment-opportunities
falcon-invoice-discounting-unlocking-prime-investment-opportunities
 
Strategic Resources May 2024 Corporate Presentation
Strategic Resources May 2024 Corporate PresentationStrategic Resources May 2024 Corporate Presentation
Strategic Resources May 2024 Corporate Presentation
 

GLOBAL INTERDISCIPLINARY BUSINESS-ECONOMICS ADVANCEMENT CONFERENCE, GIBA 2014

  • 1. Authors are fully responsible for corrections of any typographical, technical and content errors. GIBA Conference Proceedings are not copyrighted. GLOBAL INTERDISCIPLINARY BUSINESS-ECONOMICS ADVANCEMENT CONFERENCE CONFERENCE PROCEEDINGS MAY 15-18, 2014 Clearwater Beach, Florida, USA Co-Editors: Prof. Dr. Cihan Cobanoglu Prof. Dr. Serdar Ongan ISSN: 2333-4207
  • 2. Global Interdisciplinary Business-Economics Advancement Conference ISSN: 2333-4207 212 Real Option Strategic Approach to Find Optimal Company’s Source of Financing Dmytro Shestakov The National University of “Kyiv-Mohyla Academy” Doctoral School, Ukraine dshestakov.ua@gmail.com Abstract This article is devoted to investigation and evaluation of the project expanded NPV rather than simple or passive NPV depending on its available options of financing using real option approach. This approach combines ideas of corporate finance, real options and game theory and concludes to the Risk- Neutral Probability measure and the value of a Call Option that comes from Black-Scholes-Merton model. The findings enable us to estimate the value of managerial decisions, project flexibility and help managers to select the best choice of strategic financing and its available options and their respective combination. Keywords: Strategic Real Options, Strategic Planning, Strategy Valuation, Expanded Net Present Value (ENPV), Call Option, Exercise Value (EV). Introduction Any project whether it is launching or developing requires financing, that in most cases is covered by own funds partially, whereas the rest of by attracted facilities. On the one hand, financing attraction varies in different forms, e.g. loan, mezzanine, equity financing, or even concluding forward contracts. On the other hand, the proportion of each available source is important and stays under question. Therefore, the problem of better choice between available financing options and their respective combination exists. Correct decision thus is especially important as a real option implies the value that includes any direct and indirect costs and benefits connected with using such an option, besides its direct influence on investment attractiveness ratios and ultimate valuation of a project. Moreover, since financing attraction requires a valid business valuation, the real option effect is an integral part of any calculations connected with such. Theory Corporate or strategic real option models synthesize the newest developments in corporate finance and real options and game theory to help bridge the gap between traditional corporate finance and strategic planning. It enables to estimate the value of a managerial decision, timing it depending on key variables and market conditions and thus is suitable to valuing strategy and its flexibility. The opportunity to invest or make any other decision that implies an ultimate cash flow effect is thus analogous to a call or put option with an inherent exercise price. In pursuit of its decision-making goals, real-options modelling conclude into expanded Net Present Value (ENPV), rather than simple NPV, that is much more relevant base for either a feasibility study of any project, an investment and managerial decision. The key here is that ENPV criterion incorporates, along with simple NPV of expected cash flows from an immediate investment, the flexibility of the combined options embedded in the project. Such an option could be for instance the opportunity to change a source of financing due to a certain circumstance occurred in future. In order to assess the company ENPV depending on its available financing options we use real option approach that concludes to the Risk-Neutral Probability measure (1) and the value of a Call Option that comes from adjusted Black-Scholes-Merton equation (3). du d SS SSr p    )1( (1)
  • 3. Global Interdisciplinary Business-Economics Advancement Conference ISSN: 2333-4207 213 where S is the initial stock price that can go either up to u S or down to d S . If the risk-free interest rate is 0r , and ud SSrS  )1( , then the risk-neutral probability of an upward stock movement is given by the number p . Adjusting the equation (1) to a real option case we get      VV VVr p )1( (2) where V is the gross value of expected cash inflows that can go either up to  V or down to  V . r CpCp C     1 )1( (3) where C is the ENPV or Call Option, )0,( IVMaxC   , )0,( IVMaxC   , I is the investments or Exercise Value of Call Option. Risk-Neutral Probability is the most important principle in derivative valuation. It states that the value of a derivative is its expected future value discounted at the risk-free interest rate. This is exactly the same result that we would obtain if we assumed that the world was risk-neutral. In such a world, investors would require no compensation for risk. This means that the expected return on all securities would be the risk-free interest rate. Methods We apply Discounted Cash Flow (DCF) rather than standard NPV approach because of two fundamental differences between them. The first is that DCF allows apply different discount rate through analysed periods whereas NPV just single discount rate does (left-site part of formula (4)). On the other hand, using DCF valuation we apply Terminal Value (TV, formula (4, 6)) that is the present value at a future point in time of all future cash flows when we expect stable or perpetuity growth rate forever. TV is most often used in multi-stage cash flow analysis and allows for the limitation of cash flow projections to a several-year period.      TV WACC FCFE DCF n 1 (4) where FCFE or Free Cash Flow to Equity is the cash flow paid to the equity shareholders of the project after all expenses, reinvestment and debt repayment in time n. )1( TR DE D R DE E WACC de      (5) where WACC or the Weighted-Average Cost of Capital, E and D is the company’s equity and debt respectively, eR is the cost of equity or required Return on Equity (ROE), T is a corporate tax rate. n n n WACC CF gWACC WACC TV )1( )1( 1 1       (6) where g is perpetuity growth rate of the company’s cash flows. Results Whereas ENPV criterion incorporates the flexibility of the combined options embedded in the project we assume the company has an option to change a source of financing after the project has been launched shown in Figure 1.
  • 4. Global Interdisciplinary Business-Economics Advancement Conference ISSN: 2333-4207 214 Fig. 1. Financing options decision tree Options reproduced in Fig. 1 anticipate the company’s investment (I) to launch the project is initially structured as 75% of Equity and 25% of Debt capital. The company has an option to change the capital structure after starting the project due to decrease of its riskiness. Thus it can choose between increase in Debt 1) up to 50% or 2) up to 75%. Hence, the calculations showed in Table 1 depict all consecutive NPV components for each option. Table 1. NPV components The Base figures in Table 1 mean zero (0) or a launch period, which is a set base for all other scenarios (options) available. Hence, the NPV figure include the Base part and a particular variable inherent to each Equity, D&E and Debt financing option that is separated only in Table 1. It is obvious that the key company valuation component TV hugely depends on the cost of capital, as we can see by the standard deviation (STD) measure in Table 1. The reason for such a deep tie of it to WACC can be explained by the equations (6) and (5). Behind that, we can see the extremes of NPV due to a key WACC component deviation, i.e. Debt interest rate (IR) showed in Table 2. Table 2. NPV sensitivity analysis We assume the initial IR is %12 per annum and can deviate within %25 . Since the change in IR affects NPV non-linear, it takes negative and positive effect in case of IR ups and downs respectively. The company can grasp possible benefits from IR change once any occurred or even can suffer negative impact. Moreover, the company can secure its utmost IR risk connected with Equity scenario by switching to other available ones. Therefore, the worst NPV in such case is 3.7$ million instead of 6.6$ million showed in Table 2, whereas the best one 5.13$ million is still available to achieve. Following the equations (2) and (4) we calculate V ,  V and  V in Table 3 by adding Exercise Price to NPV ,  NPV and  NPV respectively. Table 3. Gross cash inflows calculation Equity, 75% Debt, 75% Debt & Equity, 50% Base Equity D&E Debt STD NPV, USD mln (7.2) 14.4 15.9 17.8 15.0% FCFE, USD mln (7.2) 9.0 9.1 9.1 1.4% Gross FCFE, USD mln 1.3 9.0 9.1 9.1 1.4% less CapEx(I), USD mln 8.5 - - - - TV, USD mln - 5.4 6.8 8.6 32.7% WACC, % 17.4% 17.4% 14.9% 12.3% 24.5% + 25% Base IR - 25% NPVe, USD mln 6.6 7.2 7.8 FCFEe, USD mln 1.5 1.8 2.1 TVe, USD mln 5.2 5.4 5.7 WACCe, % 18.0% 17.4% 16.8% NPVde, USD mln 7.3 8.7 10.2 FCFEde, USD mln 1.2 1.9 2.6 TVde, USD mln 6.1 6.8 7.6 WACCde, % 16.1% 14.9% 13.6% NPVd, USD mln 8.2 10.6 13.5 FCFEd, USD mln 0.9 2.0 3.1 TVd, USD mln 7.3 8.6 10.4 WACCd, % 14.1% 12.3% 10.5%
  • 5. Global Interdisciplinary Business-Economics Advancement Conference ISSN: 2333-4207 215 Summarizing the data in Table 3 we obtain the capital investment opportunity showed in Fig. 2. Fig. 2. Investment opportunity decision tree Conclusions Consider again the financing opportunity shown in Fig. 2. The company has an option to launch the project that involves making a capital expenditure (CapEx) of 5.8$0 I million (in present value terms). The gross value of expected future cash inflows from the project, 7.15$0 V million, may differ in line with financing options available to 0.22$ V million or 8.15$ V million (with equal probability, 5.0q ) due to uncertainty over the Debt interest rate including. The opportunity to invest provided by the project is analogous to a Call Option on the value of the completed project (V ) with an exercise price equal to the required outlay, 5.8$0 I million. The value of this investment opportunity obtained from the end-of-period expected values with expectations taken over risk-neutral probabilities calculated by equation (2) in Fig. 3, discounted at the risk-free rate (here 09.0r ): the ENPV or Call Option according to the equation (3) is 9.7$ million, showed in Fig. 4. 2.0 8.150.22 8.157.15)09.01()1(          VV VVr p Fig. 3. Risk-neutral probability calculation 9.7 09.01 3.7)2.01(5.132.0 1 )1(         r CpCp C Fig. 4. Call option calculation The value of the financing option (ENPV) exceeds passive NPV of Equity scenario commitment of 15.7 – 8.5 (i.e., 7.9 > 7.2 million). Therefore, it is reasonable to change the capital structure after starting the project and replace Equity capital by increasing Debt up to 75%. References Abel A., Dixit A. K., Eberly J. C., Pindyck R. S. (1995). Options, the Value of Capital, and Investment. MIT-CEEPR 95-006. Massachusetts, Massachusetts Institute of Technology. Dixit A. K., Pindyck R. S. (1994). Investment Under Uncertainty. Library of Congress Cataloging-in-Publication Data. Princeton, Princeton University Press. Luehrman T. A. (1998). Strategy as a Portfolio of Real Options. Reprint Number 98506. Boston, Harvard Business Review. Tirole, J. (2006). The Theory of Corporate Finance. Princeton, Princeton University Press. Smit H. T. J., Trigeorgis L. (2004). Strategic Investment: Real Options and Games. Princeton, Princeton University Press. Ван Хорн Д. К., Вахович Д. М. мл. (2008). Основы Финансового Менеджмента. 12-е изд. СПб, Вильямс. Кит П., Янг Ф. (2008). Управленческая Экономика. Инструментарий Руководителя. 5-е изд. СПб, Питер. Огиер Т., Рагман Д., Спайсер Л. (2007). Настоящая Стоимость Капитала: Практическое Руководство по Принятию Финансовых Решений. пер. с англ. В. Теплых, А. Ватченко. Днепропетровск, Баланс Бизнес Букс. Equity D&E Debt Exercise price, USD mln 8.5 8.5 8.5 NPV, USD mln 7.2 8.7 10.6 NPV+, USD mln 7.8 10.2 13.5 NPV-, USD mln 6.6 7.3 8.2 V, USD mln 15.7 17.2 19.1 V+, USD mln 16.4 18.7 22.0 V-, USD mln 15.1 15.8 16.7 V = 15.7 V+ = 22.0 V- = 15.8