PRECAST CONSTRUCTION
DIVYA VISHNOI
ASSISTANT PROFESSOR
Scope
INTRODUCTION
 What is precast?
 Advantages
 Case studies of precast buildings(India/abroad)
 Companies involved in precast buildings (India/abroad)
ELEMENTS OF PRECAST BUILDINGS AND VARIOUS SYSTE
MS
 Precast footings
 Beams
 Columns
 Slab
 Shearwalls
 Partitionwalls
 Connection between precast elements
Introduction
 WHAT IS PRECAST ?
Precast concrete is a construction product produced by
casting concrete in a reusable mold or "form" which is th
en cured in a controlled environment, transported to the
constructionsiteand lifted and set into place.
Differences between Precast and Cast-in- situ
PRECAST BUILDINGS CONVENTIONAL BUILDINGS
Designed, manufactured, and tested under s
upervision of experienced management.
Concretecastat sitewherecontrac
tors do not take care of mix desig
n proportions.
Entire concrete blocks are cured uniformly for
the required amountof time.
Curing is not done uniformlyatsites.
Production is not hamperedwith
weatherdelays
Production is severely hampered.
Aesthetically pleasingappearance Special aesthetic designrequired
Environment -friendly Non environment-friendly
Stationary equipment efficiency designed for
repetitive production. Costof formwork peru
nit to be lower than for site-castproduction.
Special design and features develope
dfor each project at highercosts
Greater flexibility : Design and manufact
uring at samelocation.
Not flexible
Construction is faster. Construction is comparativelyslower.
Precast elements
A precast building is constructed by assembling and connec
ting various prefabricated elements required in the building
structure. These elements are:
 Precast slabs
 Precast beams
 Precast columns
 Precast walls
 Precast foundation
Precast Slab
Precast slabs are cast in a factory environment and include t
he following pre stressed concrete options:
Hollow core units:
A Hollow core slab offers the ideal structural section by redu
cing deadweightwhile providing the maximum structural ef
ficiency within the slab depth. Precast floors are available wi
th a variety of factory-formed notches, slots and reinforcem
ent arrangements which offervarious design approaches.
Precast Slab
Double-tee units:
Double Tee (TT) slabs are two symmetrically placed beams interacting w
ith a slab forming in one section with a “double tee” shape made in preca
st, pre stressed concrete.
Resistant to moistureand corrosion. Parking garages, office buildings, co
mmercial buildings, factories, industrial buildings, etc., are all ideal appli
cations.
Made with G50 concrete and ½” strands ASTM A416 as standard, each d
ouble Tee slab is normally 2400mm wide.
BEARING SUPPORTS FOR DOUBLE TEE SLABS
Double tee slabs can be supported on many types of suppo
rts designed to carry the required dead and live loads. Preca
st beams, precast walls, poured concrete beams and walls, m
asonry walls, insulated concrete forming system walls and st
ructural steel beams are all suitable for use with double tee s
labs as load bearingsystems.
Solid concrete units:
These are simple solid core slabs which appear same as solid sl
abs cast in situ; theonlydifference being that theyare prefabri
cated.
 Slab Depths: range from 75mm to 240mm with upstands – giving over
all
depths between 150mm and 300mm.
 Slab Widths: Usually manufactured to 600mm or 1200mm nominalsize
.
 Rapid Construction: Precast slabs are manufactured to the specific nee
ds of the building, eliminating shuttering and adding to speed of cons
truction.
 Design Efficient: Composite floors can be designed to act compositely
with the structureof the building to reduce membersizes.
 Soffit Finish: The soffit of the solid prestressed slab is generally from a
steel mould and is therefore suitable for an exposed finish in structures
such as car parks, industrial buildings and for a wide variety of applied
finishes in other types of buildings.
Biaxial voided slabs :
 A relatively new technology developed in Europe has taken the efficienc
y of cast-in-place flatplate slabs to new heights.
 Floor spans up to 17 meters (~56 feet) and overall slab thicknesses up to
60 cm (~24 inches).
 These slabs are more efficient than traditional structural floor systems
commonly used in the construction of office buildings. The main effect
of the voided slab system is to decrease the overall weight by as much as
35% when compared to a solid slab of the same capacity, while still offer
ing otheradvantages.
 The voided slab system has the same bearing capacity as conventional c
oncrete solid slabs, and standard design and detailing techniques can b
e directlyapplied.
Precast Beams
Beams and beam shells are both used for suspended floor
ing. Beams are typically used as ledges for other forms of p
recast flooring to sit on, but can also be used as a flooring
option in their own right. They are generally manufactured
to suit each particular situation and profiles can include
 Tee-beams,
 L-beams,
 Rectangularbeams,
 U-beamsand
 Beam shells.
 Beamscan beeitherreinforced or pre stressed.
Tee-Beams :
 Tee-beams (either single or double) cover the span range
beyond slab-type members such as hollowcoreplanks.
 Tee-beamsare averyefficient structural shape.
 The units are generally cast with straight strands or defle
cted strands, depending on designconsiderations.
 The Tee-beams are the basis for the design of economic
al, fire rated structures where construction time, long s
pans or heavy loadings are important cost influences.
Inverted Tee-Beams (Ledger) :
 Inverted Tee-beams are generally used for flooring syste
ms like beam and infill where they provide a ledger for p
recast floor units to sit on. Inverted Tee-beams are struct
urallysimilar toa standard single Tee-beam.
L-Beam (Spandrel):
 L-beams havean 'L' shape profile which providesa ledge
fora precast flooring system to sit on.
 These beamsare generally used tospan clearsections
and are reinforced and/orprestressed.
Rectangular Beams:
 Rectangular beams get their name from the end profile.
These beams are generally used to span clear sections an
d are reinforced and/or prestressed.
U-Beams:
 U-beams as the name suggests have a 'U' shaped profile.
These beams are generally used to span clear sections an
d are reinforced and/orpretensioned.
used for single-unitmore commonly
bridges than with composite f looring
 They are
pedestrian
systems.
Beam Shells:
 This is a complimentary composite system of precast elemnts
that contain all the positive main beam reinforcement and m
ost/all of the stirrups in a minimum volume of concrete for ec
onomy and ease ofhandling.
 They are generally ‘U’ shaped and mostly used in conjunction
with precast flooring such as hollowcore or permanent formw
ork panels to eliminate on site forming.
Precast Columns
 Precast concrete columns are modular in design in o
rder to be made intodifferent heights.
 Widths are 12", 18" and24".
 Columns are not structural, but can be used as such
only after a structural engineer has adapted them to
a building.
 Precast column can be produced as either single st
orey corbel columnor multi storey corbel column.
 Columns can either be rectangular or circular in sectio
n.
 Projecting rebar can be provided for tying in to in-situ f
loors. Options for foundation connections include cast i
n base plates, dowel tubes or projections.
 Beam support is achieved by either flared heads, corbel
s or bolt-onbrackets.
Precast Walls
A wall systemcan be comprised of :
 flat orcurved panels (solid, hollow-core, or insulated)
 window or mullionpanels
 ribbed panels
 double-tee .
Precast Footings
Precast footings are a recentinnovation.
 No holes need to be dug for footings, as the precast
blocks are set on grade, and the posts, columns or b
eams fit in pocketscast in the concrete block.
 Precast concrete foundations are pre-engineered sy
stems manufactured in a controlledenvironment.
Precast footings Cast in situ footings
•Built off site •Formed and cast on site
•Lowest site impact (0.5-1.0 days) •High site impact (5-8 days)
•Negligible impact by weather •Construction impacted by weather
•Panelized = joints for expansion and
Contraction
•Monolithically cast = cracks
Type of Precast Systems
The type of structural system in mind:
 The purpose of building,
 The efficiency of thesystem,
 The locationand
 The client’s need.
 Depending on the load-bearing structure, precast system
s can be divided into the followcategories:
 Large-panel systems
 Framesystems
 Slab-column systems withwalls
 Mixed systems
Large panel system
“Large-panel system” refers to multistory structures composed of large
wall and floor concretepanels connected in thevertical and horizontal
directions so that the wall panels enclose appropriate spaces for the ro
oms within abuilding.
 These panels form a box-likestructure.
 Both vertical and horizontal panels resistgravity load.
 Wall panels are usually one storey high.
 Horizontal floor and roof panels span eitheras one-wayor two-w
ay slabs.
 When properly joined together, these horizontal elements act
as diaphragms that transfer the lateral loads to the walls.
 Depending on wall layout, thereare
three basic configurations of large-
panel buildings:
 Cross-wall system : The main walls th
at resist gravity and lateral loads are pla
ced in the short direction of the buildin
g.
 Longitudinal-wall system: The walls
resisting gravity and lateral loads are pl
aced in the longitudinaldirection.
 Two-way system. The walls are placed i
n bothdirections.
Frame Systems
 Precast frames can be constructed using either linear
elements orspatial beam column sub-assemblages.
 The use of linear elements generally means placing t
he connecting faces at the beam-column junctions.
The beams can be seated on corbels at the columns,
for ease of construction and to aid the shear transfer
from the beam to thecolumn.
 The beam-column joints accomplished in this way ar
e hinged.
 However, rigid beam-column connections are used in
some cases, when the continuity of longitudinal rei
nforcement through the beam-column joint needs to
be ensured.
 The componentsof a precast reinforced concrete
frame are shown inFigure:
Slab Column Systems
 These systems rely on shear walls to sustain lateral l
oad effects, whereas the slab-column structure resist
s mainly gravity loads.
 There are two main systems in this category:
 Lift-slab system withwalls
 Prestressed slab-columnsystem
 Lift –slabsystem:
 The load-bearing structure consists of precast reinforced
concrete columns andslabs.
 Precastcolumns areusually two stories high.
 All precast structural elements are assembled by means of
special joints.
 Precast concrete floor slabs are lifted from the ground up to th
e final height by liftingcranes.
 The slab panels are lifted to the top of the column and then
moved downwards to the finalposition.
 Temporarysupports are used to keep the slabs in the position
until theconnectionwith thecolumns has beenachieved.
The prestressed slab-columnsystem:
 Horizontal prestressing in two orthogonal directions to achi
evecontinuity.
 The precastconcretecolumn elementsare 1 to 3 stories high.
 After erecting the slabs and columns of a storey, the columns a
nd floor slabs are prestressed by means of prestressing tendon
s that pass through ducts in the columns at the floor level and
along the gaps left betweenadjacentslabs.
 After prestressing, the gaps between the slabs are filled with i
n situ concrete and the tendons then become bonded with th
e spans.
post-tensioned slab columnconnection
References
1) “Building Construction” authored by S.C. Rangwala, Charotar publishing house Pvt. L
td.
2) “Building Construction” authored by Bindra and Arora, Dhanpat Rai Publication.
3) “Building Construction” authored by M.L. Gambhir, Tata Meghraw Hills publication.
Precast construction
Precast construction

Mais conteúdo relacionado

Mais procurados

Prefabrication construction
Prefabrication constructionPrefabrication construction
Prefabrication constructionDivya Vishnoi
 
Presentation of precast concrete
Presentation of precast concretePresentation of precast concrete
Presentation of precast concreteAshik Ásh
 
Basement construction report
Basement construction reportBasement construction report
Basement construction reportANKITAARORA85
 
Prefabricated components
Prefabricated componentsPrefabricated components
Prefabricated componentsSofia Rajesh
 
Tilt up concrete structures
Tilt up concrete structuresTilt up concrete structures
Tilt up concrete structuresMECandPMV
 
modular coordination
modular coordinationmodular coordination
modular coordinationShailja km
 
Defects and remedies of building
Defects and remedies of buildingDefects and remedies of building
Defects and remedies of buildingtoshi gupta
 
Temporary Work in Building Construction
Temporary Work in Building ConstructionTemporary Work in Building Construction
Temporary Work in Building ConstructionEr.Karan Chauhan
 
What is post tensioning
What is post tensioningWhat is post tensioning
What is post tensioningCharlie Gupta
 
Precast and Prefabricated components and structures and the connection betwee...
Precast and Prefabricated components and structures and the connection betwee...Precast and Prefabricated components and structures and the connection betwee...
Precast and Prefabricated components and structures and the connection betwee...nishant patyal
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildingsKarthik Suresh
 
Prefabrication types and Applications explained
Prefabrication types and Applications explainedPrefabrication types and Applications explained
Prefabrication types and Applications explainedEyad Reda
 
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSASHOK KUMAR TIWARY
 
Prefabrication in construction
Prefabrication in constructionPrefabrication in construction
Prefabrication in constructionShailja km
 
Pre cast vs cast-in-situ concrete
Pre cast vs cast-in-situ concretePre cast vs cast-in-situ concrete
Pre cast vs cast-in-situ concreteRajat Nainwal
 

Mais procurados (20)

Prefabrication construction
Prefabrication constructionPrefabrication construction
Prefabrication construction
 
Presentation of precast concrete
Presentation of precast concretePresentation of precast concrete
Presentation of precast concrete
 
Basement construction report
Basement construction reportBasement construction report
Basement construction report
 
Prefabricated components
Prefabricated componentsPrefabricated components
Prefabricated components
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
 
PreCast Construction
PreCast ConstructionPreCast Construction
PreCast Construction
 
Tilt up concrete structures
Tilt up concrete structuresTilt up concrete structures
Tilt up concrete structures
 
modular coordination
modular coordinationmodular coordination
modular coordination
 
Defects and remedies of building
Defects and remedies of buildingDefects and remedies of building
Defects and remedies of building
 
Temporary Work in Building Construction
Temporary Work in Building ConstructionTemporary Work in Building Construction
Temporary Work in Building Construction
 
Precast Construction
Precast ConstructionPrecast Construction
Precast Construction
 
What is post tensioning
What is post tensioningWhat is post tensioning
What is post tensioning
 
Precast and Prefabricated components and structures and the connection betwee...
Precast and Prefabricated components and structures and the connection betwee...Precast and Prefabricated components and structures and the connection betwee...
Precast and Prefabricated components and structures and the connection betwee...
 
Precast concrete
Precast concretePrecast concrete
Precast concrete
 
Framed structures
Framed structures Framed structures
Framed structures
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildings
 
Prefabrication types and Applications explained
Prefabrication types and Applications explainedPrefabrication types and Applications explained
Prefabrication types and Applications explained
 
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
 
Prefabrication in construction
Prefabrication in constructionPrefabrication in construction
Prefabrication in construction
 
Pre cast vs cast-in-situ concrete
Pre cast vs cast-in-situ concretePre cast vs cast-in-situ concrete
Pre cast vs cast-in-situ concrete
 

Semelhante a Precast construction

Case Study: High Rise Buildings
Case Study: High Rise BuildingsCase Study: High Rise Buildings
Case Study: High Rise BuildingsPrasad Thanthratey
 
High rise building design
High rise building design High rise building design
High rise building design Somesh Siddharth
 
Finalppthighrise 130504010636-phpapp02
Finalppthighrise 130504010636-phpapp02Finalppthighrise 130504010636-phpapp02
Finalppthighrise 130504010636-phpapp02satwik345
 
High rise structure
High rise structureHigh rise structure
High rise structureAnuj Singhal
 
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...Deepak Verma
 
Concrete cast in_place_and_pre_cast_slab
Concrete cast in_place_and_pre_cast_slabConcrete cast in_place_and_pre_cast_slab
Concrete cast in_place_and_pre_cast_slabDivineGraceFernando
 
Large span structures
Large span structuresLarge span structures
Large span structuresaduiti
 
Chapters-3,4,5.pptx
Chapters-3,4,5.pptxChapters-3,4,5.pptx
Chapters-3,4,5.pptxssuserc0bf9b
 
Pre - Engineered Metal Buildings - The Latest Trend In Building construction
Pre - Engineered Metal Buildings - The Latest Trend In Building constructionPre - Engineered Metal Buildings - The Latest Trend In Building construction
Pre - Engineered Metal Buildings - The Latest Trend In Building constructionmustafa hussain
 
Pre engineered metal buildings - the latest trend in building construction
Pre   engineered metal buildings - the latest trend in building constructionPre   engineered metal buildings - the latest trend in building construction
Pre engineered metal buildings - the latest trend in building constructionhlksd
 
Pre - Engineered Metal Buildings - The Latest Trend In Building construction
Pre - Engineered Metal Buildings - The Latest Trend In Building constructionPre - Engineered Metal Buildings - The Latest Trend In Building construction
Pre - Engineered Metal Buildings - The Latest Trend In Building constructionmustafa hussain
 
08 - Portal Frame.pptx
08 - Portal Frame.pptx08 - Portal Frame.pptx
08 - Portal Frame.pptx2022786965
 
Architectural structures shear-wall.ppt
Architectural structures shear-wall.pptArchitectural structures shear-wall.ppt
Architectural structures shear-wall.pptMohdAzharNumaniShah
 
Lateral stability of building structures
Lateral stability of building structuresLateral stability of building structures
Lateral stability of building structuresWolfgang Schueller
 
CONSTRUCTION SYSTEMS FOR HIGH RISE AND LONG SPAN BUILDING.pdf
CONSTRUCTION SYSTEMS FOR HIGH RISE AND LONG SPAN BUILDING.pdfCONSTRUCTION SYSTEMS FOR HIGH RISE AND LONG SPAN BUILDING.pdf
CONSTRUCTION SYSTEMS FOR HIGH RISE AND LONG SPAN BUILDING.pdfdaynight6
 
CONSTRUCTION SYSTEMS FOR HIGH RISE AND LONG SPAN BUILDING.pdf
CONSTRUCTION SYSTEMS FOR HIGH RISE AND LONG SPAN BUILDING.pdfCONSTRUCTION SYSTEMS FOR HIGH RISE AND LONG SPAN BUILDING.pdf
CONSTRUCTION SYSTEMS FOR HIGH RISE AND LONG SPAN BUILDING.pdfdaynight6
 
Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62hlksd
 

Semelhante a Precast construction (20)

Case Study: High Rise Buildings
Case Study: High Rise BuildingsCase Study: High Rise Buildings
Case Study: High Rise Buildings
 
High rise building design
High rise building design High rise building design
High rise building design
 
Finalppthighrise 130504010636-phpapp02
Finalppthighrise 130504010636-phpapp02Finalppthighrise 130504010636-phpapp02
Finalppthighrise 130504010636-phpapp02
 
high rise building
high rise buildinghigh rise building
high rise building
 
High rise structure
High rise structureHigh rise structure
High rise structure
 
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
Prefabrication & Pre-CASTING, Advanced Structural Concretes Materials for Pre...
 
Shear wall
Shear wallShear wall
Shear wall
 
Concrete cast in_place_and_pre_cast_slab
Concrete cast in_place_and_pre_cast_slabConcrete cast in_place_and_pre_cast_slab
Concrete cast in_place_and_pre_cast_slab
 
Large span structures
Large span structuresLarge span structures
Large span structures
 
Type of high rise building
Type of high rise buildingType of high rise building
Type of high rise building
 
Chapters-3,4,5.pptx
Chapters-3,4,5.pptxChapters-3,4,5.pptx
Chapters-3,4,5.pptx
 
Pre - Engineered Metal Buildings - The Latest Trend In Building construction
Pre - Engineered Metal Buildings - The Latest Trend In Building constructionPre - Engineered Metal Buildings - The Latest Trend In Building construction
Pre - Engineered Metal Buildings - The Latest Trend In Building construction
 
Pre engineered metal buildings - the latest trend in building construction
Pre   engineered metal buildings - the latest trend in building constructionPre   engineered metal buildings - the latest trend in building construction
Pre engineered metal buildings - the latest trend in building construction
 
Pre - Engineered Metal Buildings - The Latest Trend In Building construction
Pre - Engineered Metal Buildings - The Latest Trend In Building constructionPre - Engineered Metal Buildings - The Latest Trend In Building construction
Pre - Engineered Metal Buildings - The Latest Trend In Building construction
 
08 - Portal Frame.pptx
08 - Portal Frame.pptx08 - Portal Frame.pptx
08 - Portal Frame.pptx
 
Architectural structures shear-wall.ppt
Architectural structures shear-wall.pptArchitectural structures shear-wall.ppt
Architectural structures shear-wall.ppt
 
Lateral stability of building structures
Lateral stability of building structuresLateral stability of building structures
Lateral stability of building structures
 
CONSTRUCTION SYSTEMS FOR HIGH RISE AND LONG SPAN BUILDING.pdf
CONSTRUCTION SYSTEMS FOR HIGH RISE AND LONG SPAN BUILDING.pdfCONSTRUCTION SYSTEMS FOR HIGH RISE AND LONG SPAN BUILDING.pdf
CONSTRUCTION SYSTEMS FOR HIGH RISE AND LONG SPAN BUILDING.pdf
 
CONSTRUCTION SYSTEMS FOR HIGH RISE AND LONG SPAN BUILDING.pdf
CONSTRUCTION SYSTEMS FOR HIGH RISE AND LONG SPAN BUILDING.pdfCONSTRUCTION SYSTEMS FOR HIGH RISE AND LONG SPAN BUILDING.pdf
CONSTRUCTION SYSTEMS FOR HIGH RISE AND LONG SPAN BUILDING.pdf
 
Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62
 

Mais de Divya Vishnoi

Understanding of Disasters
Understanding of DisastersUnderstanding of Disasters
Understanding of DisastersDivya Vishnoi
 
Expansion joints in bridge
Expansion joints in bridgeExpansion joints in bridge
Expansion joints in bridgeDivya Vishnoi
 
Failures of an earthen dam
Failures of an earthen damFailures of an earthen dam
Failures of an earthen damDivya Vishnoi
 
Force acting on gravity dam
Force acting on gravity damForce acting on gravity dam
Force acting on gravity damDivya Vishnoi
 
Gravity dam stability analysis
Gravity dam stability analysisGravity dam stability analysis
Gravity dam stability analysisDivya Vishnoi
 
Theory for impervious floor
Theory for impervious floorTheory for impervious floor
Theory for impervious floorDivya Vishnoi
 
Failure of weir and barrage
Failure of weir and barrageFailure of weir and barrage
Failure of weir and barrageDivya Vishnoi
 
Temporary structures
Temporary structuresTemporary structures
Temporary structuresDivya Vishnoi
 
Roof and roof covering
Roof and roof coveringRoof and roof covering
Roof and roof coveringDivya Vishnoi
 
Ground and upper floor
Ground and upper floorGround and upper floor
Ground and upper floorDivya Vishnoi
 
Mortar plaster pointing
Mortar plaster pointingMortar plaster pointing
Mortar plaster pointingDivya Vishnoi
 
Brick masonry and stone masonry
Brick masonry and stone masonryBrick masonry and stone masonry
Brick masonry and stone masonryDivya Vishnoi
 
Tension coefficient method
Tension coefficient methodTension coefficient method
Tension coefficient methodDivya Vishnoi
 

Mais de Divya Vishnoi (20)

Understanding of Disasters
Understanding of DisastersUnderstanding of Disasters
Understanding of Disasters
 
Expansion joints in bridge
Expansion joints in bridgeExpansion joints in bridge
Expansion joints in bridge
 
Hydropower
HydropowerHydropower
Hydropower
 
Spillways
SpillwaysSpillways
Spillways
 
Failures of an earthen dam
Failures of an earthen damFailures of an earthen dam
Failures of an earthen dam
 
Force acting on gravity dam
Force acting on gravity damForce acting on gravity dam
Force acting on gravity dam
 
Gravity dam stability analysis
Gravity dam stability analysisGravity dam stability analysis
Gravity dam stability analysis
 
Theory for impervious floor
Theory for impervious floorTheory for impervious floor
Theory for impervious floor
 
Failure of weir and barrage
Failure of weir and barrageFailure of weir and barrage
Failure of weir and barrage
 
Diversion head work
Diversion head workDiversion head work
Diversion head work
 
Cross drainage work
Cross drainage workCross drainage work
Cross drainage work
 
Building foundation
Building foundationBuilding foundation
Building foundation
 
Temporary structures
Temporary structuresTemporary structures
Temporary structures
 
Damp proof course
Damp proof courseDamp proof course
Damp proof course
 
Roof and roof covering
Roof and roof coveringRoof and roof covering
Roof and roof covering
 
Ground and upper floor
Ground and upper floorGround and upper floor
Ground and upper floor
 
Mortar plaster pointing
Mortar plaster pointingMortar plaster pointing
Mortar plaster pointing
 
Brick masonry and stone masonry
Brick masonry and stone masonryBrick masonry and stone masonry
Brick masonry and stone masonry
 
Tension coefficient method
Tension coefficient methodTension coefficient method
Tension coefficient method
 
IS 13827
IS 13827IS 13827
IS 13827
 

Último

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 

Último (20)

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 

Precast construction

  • 1. ALLPPT.com _ Free PowerPoint Templates, Diagrams and Charts BUILDING MATERIALS & CONSTRUCTIONS POORNIMA COLLEGE OF ENGINEERING, JAIPUR DEPARTMENT OF CIVIL ENGINEERING PRECAST CONSTRUCTION DIVYA VISHNOI ASSISTANT PROFESSOR
  • 2. Scope INTRODUCTION  What is precast?  Advantages  Case studies of precast buildings(India/abroad)  Companies involved in precast buildings (India/abroad) ELEMENTS OF PRECAST BUILDINGS AND VARIOUS SYSTE MS  Precast footings  Beams  Columns  Slab  Shearwalls  Partitionwalls  Connection between precast elements
  • 3. Introduction  WHAT IS PRECAST ? Precast concrete is a construction product produced by casting concrete in a reusable mold or "form" which is th en cured in a controlled environment, transported to the constructionsiteand lifted and set into place.
  • 4. Differences between Precast and Cast-in- situ PRECAST BUILDINGS CONVENTIONAL BUILDINGS Designed, manufactured, and tested under s upervision of experienced management. Concretecastat sitewherecontrac tors do not take care of mix desig n proportions. Entire concrete blocks are cured uniformly for the required amountof time. Curing is not done uniformlyatsites. Production is not hamperedwith weatherdelays Production is severely hampered. Aesthetically pleasingappearance Special aesthetic designrequired Environment -friendly Non environment-friendly Stationary equipment efficiency designed for repetitive production. Costof formwork peru nit to be lower than for site-castproduction. Special design and features develope dfor each project at highercosts Greater flexibility : Design and manufact uring at samelocation. Not flexible Construction is faster. Construction is comparativelyslower.
  • 5. Precast elements A precast building is constructed by assembling and connec ting various prefabricated elements required in the building structure. These elements are:  Precast slabs  Precast beams  Precast columns  Precast walls  Precast foundation
  • 6. Precast Slab Precast slabs are cast in a factory environment and include t he following pre stressed concrete options: Hollow core units: A Hollow core slab offers the ideal structural section by redu cing deadweightwhile providing the maximum structural ef ficiency within the slab depth. Precast floors are available wi th a variety of factory-formed notches, slots and reinforcem ent arrangements which offervarious design approaches.
  • 7. Precast Slab Double-tee units: Double Tee (TT) slabs are two symmetrically placed beams interacting w ith a slab forming in one section with a “double tee” shape made in preca st, pre stressed concrete. Resistant to moistureand corrosion. Parking garages, office buildings, co mmercial buildings, factories, industrial buildings, etc., are all ideal appli cations. Made with G50 concrete and ½” strands ASTM A416 as standard, each d ouble Tee slab is normally 2400mm wide.
  • 8. BEARING SUPPORTS FOR DOUBLE TEE SLABS Double tee slabs can be supported on many types of suppo rts designed to carry the required dead and live loads. Preca st beams, precast walls, poured concrete beams and walls, m asonry walls, insulated concrete forming system walls and st ructural steel beams are all suitable for use with double tee s labs as load bearingsystems.
  • 9. Solid concrete units: These are simple solid core slabs which appear same as solid sl abs cast in situ; theonlydifference being that theyare prefabri cated.  Slab Depths: range from 75mm to 240mm with upstands – giving over all depths between 150mm and 300mm.  Slab Widths: Usually manufactured to 600mm or 1200mm nominalsize .  Rapid Construction: Precast slabs are manufactured to the specific nee ds of the building, eliminating shuttering and adding to speed of cons truction.  Design Efficient: Composite floors can be designed to act compositely with the structureof the building to reduce membersizes.  Soffit Finish: The soffit of the solid prestressed slab is generally from a steel mould and is therefore suitable for an exposed finish in structures such as car parks, industrial buildings and for a wide variety of applied finishes in other types of buildings.
  • 10. Biaxial voided slabs :  A relatively new technology developed in Europe has taken the efficienc y of cast-in-place flatplate slabs to new heights.  Floor spans up to 17 meters (~56 feet) and overall slab thicknesses up to 60 cm (~24 inches).  These slabs are more efficient than traditional structural floor systems commonly used in the construction of office buildings. The main effect of the voided slab system is to decrease the overall weight by as much as 35% when compared to a solid slab of the same capacity, while still offer ing otheradvantages.  The voided slab system has the same bearing capacity as conventional c oncrete solid slabs, and standard design and detailing techniques can b e directlyapplied.
  • 11. Precast Beams Beams and beam shells are both used for suspended floor ing. Beams are typically used as ledges for other forms of p recast flooring to sit on, but can also be used as a flooring option in their own right. They are generally manufactured to suit each particular situation and profiles can include  Tee-beams,  L-beams,  Rectangularbeams,  U-beamsand  Beam shells.  Beamscan beeitherreinforced or pre stressed.
  • 12. Tee-Beams :  Tee-beams (either single or double) cover the span range beyond slab-type members such as hollowcoreplanks.  Tee-beamsare averyefficient structural shape.  The units are generally cast with straight strands or defle cted strands, depending on designconsiderations.  The Tee-beams are the basis for the design of economic al, fire rated structures where construction time, long s pans or heavy loadings are important cost influences.
  • 13. Inverted Tee-Beams (Ledger) :  Inverted Tee-beams are generally used for flooring syste ms like beam and infill where they provide a ledger for p recast floor units to sit on. Inverted Tee-beams are struct urallysimilar toa standard single Tee-beam.
  • 14. L-Beam (Spandrel):  L-beams havean 'L' shape profile which providesa ledge fora precast flooring system to sit on.  These beamsare generally used tospan clearsections and are reinforced and/orprestressed.
  • 15. Rectangular Beams:  Rectangular beams get their name from the end profile. These beams are generally used to span clear sections an d are reinforced and/or prestressed. U-Beams:  U-beams as the name suggests have a 'U' shaped profile. These beams are generally used to span clear sections an d are reinforced and/orpretensioned. used for single-unitmore commonly bridges than with composite f looring  They are pedestrian systems.
  • 16. Beam Shells:  This is a complimentary composite system of precast elemnts that contain all the positive main beam reinforcement and m ost/all of the stirrups in a minimum volume of concrete for ec onomy and ease ofhandling.  They are generally ‘U’ shaped and mostly used in conjunction with precast flooring such as hollowcore or permanent formw ork panels to eliminate on site forming.
  • 17. Precast Columns  Precast concrete columns are modular in design in o rder to be made intodifferent heights.  Widths are 12", 18" and24".  Columns are not structural, but can be used as such only after a structural engineer has adapted them to a building.  Precast column can be produced as either single st orey corbel columnor multi storey corbel column.
  • 18.  Columns can either be rectangular or circular in sectio n.  Projecting rebar can be provided for tying in to in-situ f loors. Options for foundation connections include cast i n base plates, dowel tubes or projections.  Beam support is achieved by either flared heads, corbel s or bolt-onbrackets.
  • 19. Precast Walls A wall systemcan be comprised of :  flat orcurved panels (solid, hollow-core, or insulated)  window or mullionpanels  ribbed panels  double-tee .
  • 20.
  • 21. Precast Footings Precast footings are a recentinnovation.  No holes need to be dug for footings, as the precast blocks are set on grade, and the posts, columns or b eams fit in pocketscast in the concrete block.  Precast concrete foundations are pre-engineered sy stems manufactured in a controlledenvironment.
  • 22. Precast footings Cast in situ footings •Built off site •Formed and cast on site •Lowest site impact (0.5-1.0 days) •High site impact (5-8 days) •Negligible impact by weather •Construction impacted by weather •Panelized = joints for expansion and Contraction •Monolithically cast = cracks
  • 23. Type of Precast Systems The type of structural system in mind:  The purpose of building,  The efficiency of thesystem,  The locationand  The client’s need.  Depending on the load-bearing structure, precast system s can be divided into the followcategories:  Large-panel systems  Framesystems  Slab-column systems withwalls  Mixed systems
  • 24. Large panel system “Large-panel system” refers to multistory structures composed of large wall and floor concretepanels connected in thevertical and horizontal directions so that the wall panels enclose appropriate spaces for the ro oms within abuilding.  These panels form a box-likestructure.  Both vertical and horizontal panels resistgravity load.  Wall panels are usually one storey high.  Horizontal floor and roof panels span eitheras one-wayor two-w ay slabs.  When properly joined together, these horizontal elements act as diaphragms that transfer the lateral loads to the walls.
  • 25.  Depending on wall layout, thereare three basic configurations of large- panel buildings:  Cross-wall system : The main walls th at resist gravity and lateral loads are pla ced in the short direction of the buildin g.  Longitudinal-wall system: The walls resisting gravity and lateral loads are pl aced in the longitudinaldirection.  Two-way system. The walls are placed i n bothdirections.
  • 26. Frame Systems  Precast frames can be constructed using either linear elements orspatial beam column sub-assemblages.  The use of linear elements generally means placing t he connecting faces at the beam-column junctions. The beams can be seated on corbels at the columns, for ease of construction and to aid the shear transfer from the beam to thecolumn.  The beam-column joints accomplished in this way ar e hinged.  However, rigid beam-column connections are used in some cases, when the continuity of longitudinal rei nforcement through the beam-column joint needs to be ensured.
  • 27.  The componentsof a precast reinforced concrete frame are shown inFigure:
  • 28. Slab Column Systems  These systems rely on shear walls to sustain lateral l oad effects, whereas the slab-column structure resist s mainly gravity loads.  There are two main systems in this category:  Lift-slab system withwalls  Prestressed slab-columnsystem
  • 29.  Lift –slabsystem:  The load-bearing structure consists of precast reinforced concrete columns andslabs.  Precastcolumns areusually two stories high.  All precast structural elements are assembled by means of special joints.  Precast concrete floor slabs are lifted from the ground up to th e final height by liftingcranes.  The slab panels are lifted to the top of the column and then moved downwards to the finalposition.  Temporarysupports are used to keep the slabs in the position until theconnectionwith thecolumns has beenachieved.
  • 30. The prestressed slab-columnsystem:  Horizontal prestressing in two orthogonal directions to achi evecontinuity.  The precastconcretecolumn elementsare 1 to 3 stories high.  After erecting the slabs and columns of a storey, the columns a nd floor slabs are prestressed by means of prestressing tendon s that pass through ducts in the columns at the floor level and along the gaps left betweenadjacentslabs.  After prestressing, the gaps between the slabs are filled with i n situ concrete and the tendons then become bonded with th e spans. post-tensioned slab columnconnection
  • 31. References 1) “Building Construction” authored by S.C. Rangwala, Charotar publishing house Pvt. L td. 2) “Building Construction” authored by Bindra and Arora, Dhanpat Rai Publication. 3) “Building Construction” authored by M.L. Gambhir, Tata Meghraw Hills publication.