TYPES OF APPRAISAL
 Market Appraisal - Potential market, Location and
accessibility of consumer
 Technical Appraisal - Technical Viability, Operating at
optimum level?
 Financial Appraisal - Profitability, NPV, IRR, pay back Financial Appraisal - Profitability, NPV, IRR, pay back
period, Level of Risk etc
 Socio-Economic Appraisal - Social Cost benefits, level of
savings in society
 Ecological Appraisal - Impact of the project on quality of
Air, Water, Noise, Vegetation, Human life. Likely
Damage and the cost of restoration eg. Industries
FINANCIAL APPRAISAL
The Financial Appraisal test demonstrates-
methods for analyzing and evaluating a
range of fictional accounting ratios and other
commercial data to enable the candidate tocommercial data to enable the candidate to
assess the potential risks and returns of
applications and to make preliminary
recommendations on whether or not to
advance funds.
WHY NECESSARY?
• Main problem– unlimited wants/limited
resources.
• Judicious decision required – how much to
invest/where to invest/when to invest ininvest/where to invest/when to invest in
each sector of economy to achieve highest
growth of economy.
• All sectors are required to be developed at
minimum cost while achieving highest
overall economic growth
INVESTMENT CRITERIA
To investigate efficiency and profitability of
investment in a project. Two Categories of
Investment Criteria are used :
i. Non- Discounting Cash Flow Methodsi. Non- Discounting Cash Flow Methods
ii. Discounting Cash Flow Methods (DCF
method)
NON- DISCOUNTING CASH FLOW
METHODS
• Pay back period
• Rate of Return
• Annual Equivalent Method• Annual Equivalent Method
PAY BACK PERIOD
o Time in years, necessary to accumulate from
annual cash flow (cash receipts minus cash
payments – but not depreciation) – an
amount equal to initial investment.
o Simple – but ignores time value of money.
RATE OF RETURN
o Expresses profit as percentage of Capital
employed.
o Relates average annual expected incomeo Relates average annual expected income
to total initial investment.
o Both Pay back period and ROR are
popular in private industry.
ANNUAL EQUIVALENT METHOD
Total cost is converted into total annual
amounts by replacing the investment cost
with an annual equivalent cost, adding
annual operating cost, and getting the ratioannual operating cost, and getting the ratio
between the annual benefits and the total
annual cost.
DISCOUNTING CASH FLOW METHODS
 Concept: Taking time value of money
Rs. 100 today at 10% annual interest would be Rs.
110/- after a year, Rs. 121/- after 2 years , Rs.
133/- after 3 years
 Techniques:
• Net Present Values (NPV)
• Internal Rate of Return
• Benefit/Cost Ratio.
CASH FLOW
The total amount of money being transferred into and out of a business.
Year 2012 2013 2014 2015 2016
Outflows
Infrastructure Capital Costs 139.05 324.27 382.07 450.74 340.25
Infrastructure O&M Costs 28.5 33.5 43.1 52.0 57.5
Fleet Procurement Costs 0.0 0.0 22.0 43.2 30.2
Bus O&M Costs 11.4 23.0 68.5
Other System Costs 0.6 1.2 3.4
Total Outflows 167.53 357.72 459.16 570.17 499.83Total Outflows 167.53 357.72 459.16 570.17 499.83
Inflows
Fare Revenue pa (Rs crore) 11.0 21.8 62.7
Indirect Revenue 0.8 1.5 4.4
Bus Salvage Value 0.00 0.00 0.00 0.00
Grants for
Infrastructure Capital Costs- GOI + GoG 49.25 130.81 147.22 195.29 141.99
Fleet Procurement Costs (GOI+GoG) 0.00 0.00 17.64 34.56 24.15
Devolvements from UTF (D) 0.00 0.00 75.00 80.25 85.87
Total Inflows 49.25 130.81 251.58 333.38 319.09
Annual Cashflow -118.29 -226.92 -207.59 -236.79 -180.74
PRESENT VALUE (PV)
 The value in the present of a sum of money, in
contrast to some future value it will have when it
has been invested at compound interest.
 PV = FV / (1+r)n
 PV is Present Value
 FV is Future Value
 r is the interest rate (as a decimal, so 0.10, not 10%)
 n is the number of years
instead of "adding 10%" to each year it is easier to
multiply by 1.10
Future Back to Now: what money in the future is worth now, go
backwards (dividing by 1.10 each year instead of multiplying):
Examples:
1) Sam promises you $500 next year, what is the Present
Value? (r=10%)
To take a future payment backwards one year divide by
1.10
So $500 next year is $500 ÷ 1.10 = $454.55 now
The Present Value is $454.55
PV = FV / (1+r)n
2) Alex promises you $900 in 3 years, what is the Present
Value? (r=10%)
To take a future payment backwards three years divide by
1.10 three times
So $900 in 3 years is:
$900 ÷ 1.10 ÷ 1.10 ÷ 1.10
$900 ÷ (1.10 × 1.10 × 1.10)
$900 ÷ (1.10)^3
$900 ÷ 1.331
$676.18 now
NET PRESENT VALUE
 Net Present Value (NPV) is the difference
between the present value of cash inflows and
the present value of cash outflows. NPV is used
in capital budgeting to analyze the profitability
of a projected investment or project.of a projected investment or project.
 NPV = ∑ {Future Value/(1+r)^n} - Initial
Investment
where r is the rate of return and n is the number
of time periods.
Example:
 Assume a company wants to analyze the predicted
profitability of a project that requires an initial outlay of
$10,000. Over the course of three years, the project is
expected to generate revenues of $2,000, $7,000 and
$11,000, respectively. The anticipated discount rate is
4.5%. At first glance, it seems the returns are nearly
double the investment. However, a dollar earned in three
years is not as valuable as a dollar earned today, so the
company's accountant calculates the NPV as follows tocompany's accountant calculates the NPV as follows to
determine profitability while accounting for the
discounted time value of the projected revenues:
 NPV = ∑ {Future Value/(1+r)^n} - Initial Investment
= {$2,000/(1+.045)^1} + {$7,000/(1+.045)^2} +
{$11,000/(1+.045)^3} - $10,000
= $1,913.88 + $6,410.11 + $9,639.26 - $10,000
= $7,963.25
INTERNAL RATE OF RETURN
 The IRR is the interest rate, also called the
discount rate, that is required to bring the net
present value (NPV) to zero. That is, the
interest rate that would result in the present value of
the capital investment, or cash outflow, being equal
to the value of the total returns over time, or cashto the value of the total returns over time, or cash
inflow.
 NPV= ∑ {FV/ (1+r)^n} - Initial Investment
where r is the interest rate and n is the number of
time periods. IRR is calculated using the NPV
formula by solving for r if the NPV equals zero.
Year 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033
Outflows
Infrastructure Capital Costs 23.45 46.90 46.90
139.0
5
324.2
7
382.0
7
450.7
4
340.2
5
184.3
5
168.7
5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Infrastructure O&M Costs 0.0 11.5 21.9 28.5 33.5 43.1 52.0 57.5 65.8 66.0 65.7 72.6 83.0 83.3 82.9 91.7 104.8 105.1 104.7 115.7 0.0 0.0 0.0 0.0 0.0
Fleet Procurement Costs 0.0 0.0 0.0 0.0 0.0 22.0 43.2 30.2 55.5 111.9 118.7 94.0 112.0 148.6 221.3 60.7 153.8 163.1 141.3 187.2 247.6 358.4 158.4 302.4 310.0
Bus O&M Costs 11.4 23.0 68.5 99.8 161.9 231.1 280.8 335.6 395.9 507.0 542.9 583.2 626.4 663.7 712.8 766.8 824.7 884.0 947.4
1012.
3
Other System Costs 0.6 1.2 3.4 5.0 8.1 11.6 14.0 16.8 19.8 25.4 27.1 29.2 31.3 33.2 35.6 38.3 41.2 44.2 47.4 50.6
Total Outflows 23.45 58.36 68.81
167.5
3
357.7
2
459.1
6
570.1
7
499.8
3
410.4
2
516.6
5
427.0
0
461.4
1
547.4
0
647.5
2
836.6
9
722.4
2
871.0
1
925.9
5
942.9
3
1051.
35
1052.
70
1224.
35
1086.
59
1297.
15
1372.
85
Inflows
Fare Revenue pa (Rs crore) 11.0 21.8 62.7 90.8 148.0 219.3 267.2 320.0 378.2 502.0 536.7 578.4 623.0 671.0 722.4 777.6 836.9 900.4 968.5
1036.
3
Indirect Revenue 0.8 1.5 4.4 6.4 10.4 15.3 18.7 22.4 26.5 35.1 37.6 40.5 43.6 47.0 50.6 54.4 58.6 63.0 67.8 72.5
Bus Salvage Value 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.30 2.20 4.32 3.02 5.55 11.19 11.87 9.40 11.20 14.86 22.13 6.07 15.38
Grants for
Infrastructure Capital Costs-
GOI + GoG 16.42 32.83 32.83 49.25
130.8
1
147.2
2
195.2
9
141.9
9
129.0
5
118.1
3
993.8
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Fleet Procurement Costs
(GOI+GoG) 0.00 0.00 0.00 0.00 0.00 17.64 34.56 24.15 44.44 89.55 94.93 75.18 89.64
118.8
7
177.0
8 48.60
123.0
7
130.4
5
113.0
5
149.7
4
198.0
5
286.7
3
126.7
3
241.9
3
247.9
8
Devolvements from UTF (D) 0.00 0.00 0.00 0.00 0.00 75.00 80.25 85.87 91.88 98.31
105.1
9
112.5
5
120.4
3
128.8
6
137.8
8
147.5
4
157.8
6
168.9
1
180.7
4
193.3
9
206.9
3
221.4
1
236.9
1
253.4
9
271.2
4
Total Inflows 16.42 32.83 32.83 49.25
130.8
1
251.5
8
333.3
8
319.0
9
362.5
6
464.3
3
1428.
56
473.6
2
553.7
8
654.5
8
856.4
1
773.4
5
905.3
3
977.2
1
1023.
61
1125.
54
1248.
26
1418.
43
1349.
17
1537.
75
1643.
49
Annual Cashflow -7.04 -25.53-35.98
-
118.2
9
-
226.9
2
-
207.5
9
-
236.7
9
-
180.7
4 -47.86-52.32
1001.
56 12.21 6.37 7.05 19.72 51.04 34.32 51.26 80.68 74.20
195.5
6
194.0
8
262.5
8
240.6
0
270.6
3
IRR 8.01%
Use Excel formula to calculate IRR
=IRR(D25:AB25,0.1) = IRR (select the total annual cash flow)
COST BENEFIT ANALYSIS
 Cost-Benefit Analysis (CBA) estimates and totals up
the equivalent money value of the benefits and costs
to the community of projects to establish whether
they are worthwhile.
 Main measure of cost and benefit – is difference in
costs and benefits ‘with’ and ‘without’ projectcosts and benefits ‘with’ and ‘without’ project
 What level of output would be with the project and
what they would have been without it
 Economic Cost: The cost in economic terms means
the cost of the resource actually forgone, free from
the effect of taxes, subsidy
(factor-0.85)
STEPS INVOLVED IN A FINANCIAL
APPRAISAL OF A PROJECT
(i) A forecast of demand,
(ii) Estimation of financial costs; capital and
annual maintenance/recurring cost
(iii) Estimation of benefits on the basis of(iii) Estimation of benefits on the basis of
forecasted future traffic and
(iv) Comparison of costs and benefits for
assessing viability.
COST BENEFIT ANALYSIS of MRTS
PROJECT
• Basics involve traffic projection, estimation of costs, benefits and
conducting appraisal using ‘with’ and ‘without’ approach.
• Cost streams
 Capital cost- civil works, rolling stock, signaling, interest
(current lending rate), construction of bus way, buses
 Operating costs-metro, bus way, existing buses/private Operating costs-metro, bus way, existing buses/private
vehicle that will continue even after MRTS.
• Benefit items
 Capital and operating cost of traffic if MRTS is not taken up
This become benefit (as this is not incurred after MRTS)
 Saving due to decongestion
 Saving in travel time
 Saving in petrol/ diesel consumption
• IRR/EIRR
DECISION RULES
• NPV - Accept all projects with a positive NPV when
discounted at a rate reflecting the opportunity cost
of capital.
(Shouldn’t use NPV alone, club it with IRR)
• IRR - Accept all projects with an IRR reflecting the• IRR - Accept all projects with an IRR reflecting the
opportunity cost of capital.
• B/C - Accept all projects with a ratio (gross
benefit/Above 1.00 when discounted at a gross
costs) rate reflecting the opportunity cost of
capital.

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Comparison of npv with irr
Comparison of npv with irrComparison of npv with irr
Comparison of npv with irr
 
Working capital
Working capitalWorking capital
Working capital
 
Generation and Screening of Project Ideas
Generation and Screening of Project Ideas Generation and Screening of Project Ideas
Generation and Screening of Project Ideas
 
Project Financing
Project FinancingProject Financing
Project Financing
 
Social Cost Benefit Analysis
Social Cost Benefit Analysis Social Cost Benefit Analysis
Social Cost Benefit Analysis
 
Difference between PERT and CPM
Difference between PERT and CPMDifference between PERT and CPM
Difference between PERT and CPM
 
Project formulation (1)
Project formulation (1)Project formulation (1)
Project formulation (1)
 
Social Cost Benefit Analysis - SCBA - Seminar by Mohan Kumar G
Social Cost Benefit Analysis - SCBA - Seminar by Mohan Kumar GSocial Cost Benefit Analysis - SCBA - Seminar by Mohan Kumar G
Social Cost Benefit Analysis - SCBA - Seminar by Mohan Kumar G
 
Working capital management ppt
Working capital management pptWorking capital management ppt
Working capital management ppt
 
Project identification & screening
Project identification & screeningProject identification & screening
Project identification & screening
 
NPV v/s IRR
NPV v/s IRRNPV v/s IRR
NPV v/s IRR
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 
Generation & Screening of Project Idea
Generation & Screening of Project IdeaGeneration & Screening of Project Idea
Generation & Screening of Project Idea
 
Project Formulation
Project FormulationProject Formulation
Project Formulation
 
Sebi guidelines for merchant bankers
Sebi guidelines for merchant bankersSebi guidelines for merchant bankers
Sebi guidelines for merchant bankers
 
Break even point
Break even pointBreak even point
Break even point
 
Sources of project financing
Sources of project financingSources of project financing
Sources of project financing
 
Operations research-an-introduction
Operations research-an-introductionOperations research-an-introduction
Operations research-an-introduction
 
CAPM
CAPMCAPM
CAPM
 
Types of project
Types of projectTypes of project
Types of project
 

Destaque

Methodology For Formulation And Appraisal of a Project
Methodology For Formulation And Appraisal of a ProjectMethodology For Formulation And Appraisal of a Project
Methodology For Formulation And Appraisal of a Project
imrohan1
 
Project appraisal
Project appraisalProject appraisal
Project appraisal
Gotham Ram
 

Destaque (20)

Financial appraisal techniques
Financial appraisal techniquesFinancial appraisal techniques
Financial appraisal techniques
 
Financial Appraisal
Financial AppraisalFinancial Appraisal
Financial Appraisal
 
Project appraisal and Analysis
Project appraisal and AnalysisProject appraisal and Analysis
Project appraisal and Analysis
 
Valuation techniques project appraisal method
Valuation techniques  project appraisal method Valuation techniques  project appraisal method
Valuation techniques project appraisal method
 
Methodology For Formulation And Appraisal of a Project
Methodology For Formulation And Appraisal of a ProjectMethodology For Formulation And Appraisal of a Project
Methodology For Formulation And Appraisal of a Project
 
Project Appraisal
Project AppraisalProject Appraisal
Project Appraisal
 
Project appraisal
Project appraisalProject appraisal
Project appraisal
 
Project Appraisal chapter 2
Project Appraisal chapter 2Project Appraisal chapter 2
Project Appraisal chapter 2
 
Project appraisal for financial markets
Project appraisal for financial marketsProject appraisal for financial markets
Project appraisal for financial markets
 
Market appraisal full ppt in 13 slides
Market appraisal full ppt in 13 slidesMarket appraisal full ppt in 13 slides
Market appraisal full ppt in 13 slides
 
Project financing and appraisal atul rai
Project financing and appraisal atul raiProject financing and appraisal atul rai
Project financing and appraisal atul rai
 
Project formulation and appraisal
Project formulation and appraisalProject formulation and appraisal
Project formulation and appraisal
 
Introduction to statistics
Introduction to statisticsIntroduction to statistics
Introduction to statistics
 
Performance appraisal importance
Performance appraisal importancePerformance appraisal importance
Performance appraisal importance
 
1 Definition of project
1   Definition of project1   Definition of project
1 Definition of project
 
Case studies on economic appraisal of adaptation options in some countries
Case studies on economic appraisal of adaptation options in some countriesCase studies on economic appraisal of adaptation options in some countries
Case studies on economic appraisal of adaptation options in some countries
 
Market assistant performance appraisal
Market assistant performance appraisalMarket assistant performance appraisal
Market assistant performance appraisal
 
V trust appraisal market updates
V trust appraisal market updatesV trust appraisal market updates
V trust appraisal market updates
 
Financial Management Investment Appraisal
Financial  Management    Investment  AppraisalFinancial  Management    Investment  Appraisal
Financial Management Investment Appraisal
 
Technical appraisal and change impact analysis - IDCC17 workshop
Technical appraisal and change impact analysis - IDCC17 workshopTechnical appraisal and change impact analysis - IDCC17 workshop
Technical appraisal and change impact analysis - IDCC17 workshop
 

Semelhante a Financial appraisal

Capital budgeting cash flow estimation
Capital budgeting cash flow estimationCapital budgeting cash flow estimation
Capital budgeting cash flow estimation
Prafulla Tekriwal
 
Fundamental Skills for Real Estate Development Professionals I – Financial An...
Fundamental Skills for Real Estate Development Professionals I – Financial An...Fundamental Skills for Real Estate Development Professionals I – Financial An...
Fundamental Skills for Real Estate Development Professionals I – Financial An...
Virtual ULI
 
Lecture cash flow evaluation new
Lecture cash flow evaluation newLecture cash flow evaluation new
Lecture cash flow evaluation new
Bsgr Planmin
 
Lecture cash flow evaluation new
Lecture cash flow evaluation newLecture cash flow evaluation new
Lecture cash flow evaluation new
Bsgr Planmin
 
UTSFinmagecapitalbugproject
UTSFinmagecapitalbugprojectUTSFinmagecapitalbugproject
UTSFinmagecapitalbugproject
Joshua C
 

Semelhante a Financial appraisal (20)

Capital budgeting cash flow estimation
Capital budgeting cash flow estimationCapital budgeting cash flow estimation
Capital budgeting cash flow estimation
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
Fundamental Skills for Real Estate Development Professionals I – Financial An...
Fundamental Skills for Real Estate Development Professionals I – Financial An...Fundamental Skills for Real Estate Development Professionals I – Financial An...
Fundamental Skills for Real Estate Development Professionals I – Financial An...
 
Capital Investment Analysis
Capital Investment AnalysisCapital Investment Analysis
Capital Investment Analysis
 
[Project] Financial management
[Project] Financial management[Project] Financial management
[Project] Financial management
 
Cap budget [autosaved]
Cap budget [autosaved]Cap budget [autosaved]
Cap budget [autosaved]
 
Cf Capital Budgeting 6
Cf Capital Budgeting 6Cf Capital Budgeting 6
Cf Capital Budgeting 6
 
Cf Capital Budgeting 6
Cf Capital Budgeting 6Cf Capital Budgeting 6
Cf Capital Budgeting 6
 
Cf%20 Capital%20 Budgeting%206
Cf%20 Capital%20 Budgeting%206Cf%20 Capital%20 Budgeting%206
Cf%20 Capital%20 Budgeting%206
 
Lecture cash flow evaluation new
Lecture cash flow evaluation newLecture cash flow evaluation new
Lecture cash flow evaluation new
 
Lecture cash flow evaluation new
Lecture cash flow evaluation newLecture cash flow evaluation new
Lecture cash flow evaluation new
 
Chapter8 investmentcriteria
Chapter8 investmentcriteriaChapter8 investmentcriteria
Chapter8 investmentcriteria
 
Capital Budgeting Er. S Sood
Capital Budgeting Er. S SoodCapital Budgeting Er. S Sood
Capital Budgeting Er. S Sood
 
Fundamental Skills for Real Estate Development Professionals I. Financial An...
Fundamental Skills for Real Estate Development Professionals I.  Financial An...Fundamental Skills for Real Estate Development Professionals I.  Financial An...
Fundamental Skills for Real Estate Development Professionals I. Financial An...
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
UTSFinmagecapitalbugproject
UTSFinmagecapitalbugprojectUTSFinmagecapitalbugproject
UTSFinmagecapitalbugproject
 
capital budgeting In financial management
capital budgeting In financial managementcapital budgeting In financial management
capital budgeting In financial management
 
Eng econ lecture
Eng econ lectureEng econ lecture
Eng econ lecture
 
PPAM-AK PPT.pptx
PPAM-AK PPT.pptxPPAM-AK PPT.pptx
PPAM-AK PPT.pptx
 

Mais de Dhwani Shah

Mais de Dhwani Shah (7)

Frequency distribution, central tendency, measures of dispersion
Frequency distribution, central tendency, measures of dispersionFrequency distribution, central tendency, measures of dispersion
Frequency distribution, central tendency, measures of dispersion
 
Traffic & Transportation surveys
Traffic & Transportation surveysTraffic & Transportation surveys
Traffic & Transportation surveys
 
Introduction to environment
Introduction to environmentIntroduction to environment
Introduction to environment
 
Project cycle
Project cycleProject cycle
Project cycle
 
Traffic and Transportation problems
Traffic and Transportation problemsTraffic and Transportation problems
Traffic and Transportation problems
 
Basics of transportation planning
Basics of transportation planningBasics of transportation planning
Basics of transportation planning
 
Introduction to transport planning
Introduction to transport planningIntroduction to transport planning
Introduction to transport planning
 

Último

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 

Último (20)

Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 

Financial appraisal

  • 1. Subject: FINANCIAL APPRAISAL Subject: URBAN FINANCE Dhwani Shah, Assistant Professor Bhaikaka Centre for Human Settlements, APIED, Vallabh Vidyanagar. Date- 17/12/2015
  • 2. TYPES OF APPRAISAL  Market Appraisal - Potential market, Location and accessibility of consumer  Technical Appraisal - Technical Viability, Operating at optimum level?  Financial Appraisal - Profitability, NPV, IRR, pay back Financial Appraisal - Profitability, NPV, IRR, pay back period, Level of Risk etc  Socio-Economic Appraisal - Social Cost benefits, level of savings in society  Ecological Appraisal - Impact of the project on quality of Air, Water, Noise, Vegetation, Human life. Likely Damage and the cost of restoration eg. Industries
  • 3. FINANCIAL APPRAISAL The Financial Appraisal test demonstrates- methods for analyzing and evaluating a range of fictional accounting ratios and other commercial data to enable the candidate tocommercial data to enable the candidate to assess the potential risks and returns of applications and to make preliminary recommendations on whether or not to advance funds.
  • 4. WHY NECESSARY? • Main problem– unlimited wants/limited resources. • Judicious decision required – how much to invest/where to invest/when to invest ininvest/where to invest/when to invest in each sector of economy to achieve highest growth of economy. • All sectors are required to be developed at minimum cost while achieving highest overall economic growth
  • 5. INVESTMENT CRITERIA To investigate efficiency and profitability of investment in a project. Two Categories of Investment Criteria are used : i. Non- Discounting Cash Flow Methodsi. Non- Discounting Cash Flow Methods ii. Discounting Cash Flow Methods (DCF method)
  • 6. NON- DISCOUNTING CASH FLOW METHODS • Pay back period • Rate of Return • Annual Equivalent Method• Annual Equivalent Method
  • 7. PAY BACK PERIOD o Time in years, necessary to accumulate from annual cash flow (cash receipts minus cash payments – but not depreciation) – an amount equal to initial investment. o Simple – but ignores time value of money.
  • 8. RATE OF RETURN o Expresses profit as percentage of Capital employed. o Relates average annual expected incomeo Relates average annual expected income to total initial investment. o Both Pay back period and ROR are popular in private industry.
  • 9. ANNUAL EQUIVALENT METHOD Total cost is converted into total annual amounts by replacing the investment cost with an annual equivalent cost, adding annual operating cost, and getting the ratioannual operating cost, and getting the ratio between the annual benefits and the total annual cost.
  • 10. DISCOUNTING CASH FLOW METHODS  Concept: Taking time value of money Rs. 100 today at 10% annual interest would be Rs. 110/- after a year, Rs. 121/- after 2 years , Rs. 133/- after 3 years  Techniques: • Net Present Values (NPV) • Internal Rate of Return • Benefit/Cost Ratio.
  • 11. CASH FLOW The total amount of money being transferred into and out of a business. Year 2012 2013 2014 2015 2016 Outflows Infrastructure Capital Costs 139.05 324.27 382.07 450.74 340.25 Infrastructure O&M Costs 28.5 33.5 43.1 52.0 57.5 Fleet Procurement Costs 0.0 0.0 22.0 43.2 30.2 Bus O&M Costs 11.4 23.0 68.5 Other System Costs 0.6 1.2 3.4 Total Outflows 167.53 357.72 459.16 570.17 499.83Total Outflows 167.53 357.72 459.16 570.17 499.83 Inflows Fare Revenue pa (Rs crore) 11.0 21.8 62.7 Indirect Revenue 0.8 1.5 4.4 Bus Salvage Value 0.00 0.00 0.00 0.00 Grants for Infrastructure Capital Costs- GOI + GoG 49.25 130.81 147.22 195.29 141.99 Fleet Procurement Costs (GOI+GoG) 0.00 0.00 17.64 34.56 24.15 Devolvements from UTF (D) 0.00 0.00 75.00 80.25 85.87 Total Inflows 49.25 130.81 251.58 333.38 319.09 Annual Cashflow -118.29 -226.92 -207.59 -236.79 -180.74
  • 12. PRESENT VALUE (PV)  The value in the present of a sum of money, in contrast to some future value it will have when it has been invested at compound interest.  PV = FV / (1+r)n  PV is Present Value  FV is Future Value  r is the interest rate (as a decimal, so 0.10, not 10%)  n is the number of years
  • 13. instead of "adding 10%" to each year it is easier to multiply by 1.10 Future Back to Now: what money in the future is worth now, go backwards (dividing by 1.10 each year instead of multiplying):
  • 14. Examples: 1) Sam promises you $500 next year, what is the Present Value? (r=10%) To take a future payment backwards one year divide by 1.10 So $500 next year is $500 ÷ 1.10 = $454.55 now The Present Value is $454.55 PV = FV / (1+r)n 2) Alex promises you $900 in 3 years, what is the Present Value? (r=10%) To take a future payment backwards three years divide by 1.10 three times So $900 in 3 years is: $900 ÷ 1.10 ÷ 1.10 ÷ 1.10 $900 ÷ (1.10 × 1.10 × 1.10) $900 ÷ (1.10)^3 $900 ÷ 1.331 $676.18 now
  • 15. NET PRESENT VALUE  Net Present Value (NPV) is the difference between the present value of cash inflows and the present value of cash outflows. NPV is used in capital budgeting to analyze the profitability of a projected investment or project.of a projected investment or project.  NPV = ∑ {Future Value/(1+r)^n} - Initial Investment where r is the rate of return and n is the number of time periods.
  • 16. Example:  Assume a company wants to analyze the predicted profitability of a project that requires an initial outlay of $10,000. Over the course of three years, the project is expected to generate revenues of $2,000, $7,000 and $11,000, respectively. The anticipated discount rate is 4.5%. At first glance, it seems the returns are nearly double the investment. However, a dollar earned in three years is not as valuable as a dollar earned today, so the company's accountant calculates the NPV as follows tocompany's accountant calculates the NPV as follows to determine profitability while accounting for the discounted time value of the projected revenues:  NPV = ∑ {Future Value/(1+r)^n} - Initial Investment = {$2,000/(1+.045)^1} + {$7,000/(1+.045)^2} + {$11,000/(1+.045)^3} - $10,000 = $1,913.88 + $6,410.11 + $9,639.26 - $10,000 = $7,963.25
  • 17. INTERNAL RATE OF RETURN  The IRR is the interest rate, also called the discount rate, that is required to bring the net present value (NPV) to zero. That is, the interest rate that would result in the present value of the capital investment, or cash outflow, being equal to the value of the total returns over time, or cashto the value of the total returns over time, or cash inflow.  NPV= ∑ {FV/ (1+r)^n} - Initial Investment where r is the interest rate and n is the number of time periods. IRR is calculated using the NPV formula by solving for r if the NPV equals zero.
  • 18. Year 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Outflows Infrastructure Capital Costs 23.45 46.90 46.90 139.0 5 324.2 7 382.0 7 450.7 4 340.2 5 184.3 5 168.7 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Infrastructure O&M Costs 0.0 11.5 21.9 28.5 33.5 43.1 52.0 57.5 65.8 66.0 65.7 72.6 83.0 83.3 82.9 91.7 104.8 105.1 104.7 115.7 0.0 0.0 0.0 0.0 0.0 Fleet Procurement Costs 0.0 0.0 0.0 0.0 0.0 22.0 43.2 30.2 55.5 111.9 118.7 94.0 112.0 148.6 221.3 60.7 153.8 163.1 141.3 187.2 247.6 358.4 158.4 302.4 310.0 Bus O&M Costs 11.4 23.0 68.5 99.8 161.9 231.1 280.8 335.6 395.9 507.0 542.9 583.2 626.4 663.7 712.8 766.8 824.7 884.0 947.4 1012. 3 Other System Costs 0.6 1.2 3.4 5.0 8.1 11.6 14.0 16.8 19.8 25.4 27.1 29.2 31.3 33.2 35.6 38.3 41.2 44.2 47.4 50.6 Total Outflows 23.45 58.36 68.81 167.5 3 357.7 2 459.1 6 570.1 7 499.8 3 410.4 2 516.6 5 427.0 0 461.4 1 547.4 0 647.5 2 836.6 9 722.4 2 871.0 1 925.9 5 942.9 3 1051. 35 1052. 70 1224. 35 1086. 59 1297. 15 1372. 85 Inflows Fare Revenue pa (Rs crore) 11.0 21.8 62.7 90.8 148.0 219.3 267.2 320.0 378.2 502.0 536.7 578.4 623.0 671.0 722.4 777.6 836.9 900.4 968.5 1036. 3 Indirect Revenue 0.8 1.5 4.4 6.4 10.4 15.3 18.7 22.4 26.5 35.1 37.6 40.5 43.6 47.0 50.6 54.4 58.6 63.0 67.8 72.5 Bus Salvage Value 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.30 2.20 4.32 3.02 5.55 11.19 11.87 9.40 11.20 14.86 22.13 6.07 15.38 Grants for Infrastructure Capital Costs- GOI + GoG 16.42 32.83 32.83 49.25 130.8 1 147.2 2 195.2 9 141.9 9 129.0 5 118.1 3 993.8 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Fleet Procurement Costs (GOI+GoG) 0.00 0.00 0.00 0.00 0.00 17.64 34.56 24.15 44.44 89.55 94.93 75.18 89.64 118.8 7 177.0 8 48.60 123.0 7 130.4 5 113.0 5 149.7 4 198.0 5 286.7 3 126.7 3 241.9 3 247.9 8 Devolvements from UTF (D) 0.00 0.00 0.00 0.00 0.00 75.00 80.25 85.87 91.88 98.31 105.1 9 112.5 5 120.4 3 128.8 6 137.8 8 147.5 4 157.8 6 168.9 1 180.7 4 193.3 9 206.9 3 221.4 1 236.9 1 253.4 9 271.2 4 Total Inflows 16.42 32.83 32.83 49.25 130.8 1 251.5 8 333.3 8 319.0 9 362.5 6 464.3 3 1428. 56 473.6 2 553.7 8 654.5 8 856.4 1 773.4 5 905.3 3 977.2 1 1023. 61 1125. 54 1248. 26 1418. 43 1349. 17 1537. 75 1643. 49 Annual Cashflow -7.04 -25.53-35.98 - 118.2 9 - 226.9 2 - 207.5 9 - 236.7 9 - 180.7 4 -47.86-52.32 1001. 56 12.21 6.37 7.05 19.72 51.04 34.32 51.26 80.68 74.20 195.5 6 194.0 8 262.5 8 240.6 0 270.6 3 IRR 8.01% Use Excel formula to calculate IRR =IRR(D25:AB25,0.1) = IRR (select the total annual cash flow)
  • 19. COST BENEFIT ANALYSIS  Cost-Benefit Analysis (CBA) estimates and totals up the equivalent money value of the benefits and costs to the community of projects to establish whether they are worthwhile.  Main measure of cost and benefit – is difference in costs and benefits ‘with’ and ‘without’ projectcosts and benefits ‘with’ and ‘without’ project  What level of output would be with the project and what they would have been without it  Economic Cost: The cost in economic terms means the cost of the resource actually forgone, free from the effect of taxes, subsidy (factor-0.85)
  • 20. STEPS INVOLVED IN A FINANCIAL APPRAISAL OF A PROJECT (i) A forecast of demand, (ii) Estimation of financial costs; capital and annual maintenance/recurring cost (iii) Estimation of benefits on the basis of(iii) Estimation of benefits on the basis of forecasted future traffic and (iv) Comparison of costs and benefits for assessing viability.
  • 21. COST BENEFIT ANALYSIS of MRTS PROJECT • Basics involve traffic projection, estimation of costs, benefits and conducting appraisal using ‘with’ and ‘without’ approach. • Cost streams  Capital cost- civil works, rolling stock, signaling, interest (current lending rate), construction of bus way, buses  Operating costs-metro, bus way, existing buses/private Operating costs-metro, bus way, existing buses/private vehicle that will continue even after MRTS. • Benefit items  Capital and operating cost of traffic if MRTS is not taken up This become benefit (as this is not incurred after MRTS)  Saving due to decongestion  Saving in travel time  Saving in petrol/ diesel consumption • IRR/EIRR
  • 22. DECISION RULES • NPV - Accept all projects with a positive NPV when discounted at a rate reflecting the opportunity cost of capital. (Shouldn’t use NPV alone, club it with IRR) • IRR - Accept all projects with an IRR reflecting the• IRR - Accept all projects with an IRR reflecting the opportunity cost of capital. • B/C - Accept all projects with a ratio (gross benefit/Above 1.00 when discounted at a gross costs) rate reflecting the opportunity cost of capital.