SlideShare uma empresa Scribd logo
1 de 17
By:-
Deepesh Kumar Mishra
11202732
Satna Cement Works
Birla Corp. Ltd.
Six Weeks Training Report
Satna Cement Plant
Counted amongst the larger plants of the Cement Division, Satna Cement Works
and Birla Vikas Cement at Satna (MP) along with Raebareli Cement Works (UP)
have an installed capacity of 2.36 million tones at present, which is projected to rise
to 2.84 million tones after the present expansion/modification.
Birla Cement Samrat and Birla Cement Khajuraho are already leading Brands and
frontrunners of company’s activities. Riding on the glory of very high standards of
quality, the company products are premierly priced in all the markets where it is
available.
00. Limestone Quarry and Crushing plant 09. Cooler
01. Limestone Stockpile 10. Deep Bucket Conveyor
02. Additives Hopper 11/12. Clinker/Gypsum Storage
03. Additives Storage 13. Coal Mill Building
04. Raw Mill Building 14. Cement Mill and Bag House
05. Blending and Storage Silo 15. Cement Storage Silo
06. Preheater 16. Packing & Dispatch
07. Gas Conditioning Tower and ESP 17. Central Control Room
08. Kiln
Plant Layout
Process Flow Chart
00. Limestone Quarry and Crushing plant
The major raw material for cement production is
limestone.
The limestone most suitable for cement production
must have some ingredients in specified quantities
i.e., calcium carbonates, silica, alumina, iron,etc
Belt Conveyors
The quarried raw material is transported to the
cement plant, using mechanical conveying
equipment such as ropeways or belt conveyors, or
by vehicles like wagons and trucks.
There are mainly two types of crushers available
- compression type or impact type crushers.
Imapct Crusher
01 Limestone Stock Pile
Circular or longitudinal stock piles are used to store
the material.
A number of layers are stacked in circular or
longitudinal piles and are reclaimed in transverse,
cross-sectional slices.
02 & 03 Additives Storage Hopper
In order to get the required composition of raw
material, certain additives such as iron ore, bauxite,
laterite, quartzite and flourspar are added in required
quantities.
These additives are stored at the plant in separate
hoppers and are extracted using belt conveyors in
conjunction with belt-weighing equipment.
04 Raw Mill Building
VRM
The raw material is finish-ground before being fed
into the kiln for clinkering. This grinding is done
using either ball mills or vertical roller mills (VRM).
VRM uses the compression principle to grind the raw
material.
The main advantage of VRM is higher grinding
efficiency and ability to accept material with higher
moisture content.
Normally the energy consumption level in VRM is
10 to 20 percent lower than in ball mills.
05 Blending and Storage Silo
In order to blend and homogenize the raw materials
properly, continuous blending silos are used.
As there are various sources of raw materials, it becomes
necessary to blend and homogenize these different
materials efficiently to counteract fluctuation in the
chemical composition of the raw meal.
06 Preheater
Clinkering takes place in the kiln and the preheater
system.Preheater systems offer heat transfer from the
hot kiln gases.
07 Gas Conditioning Tower and ESP
The conditioning tower is used to reduce the temperature and to increase the moisture level
of the dusty exhaust gas from the kiln, before it is passed through the bag house and ESPs.
The Electrostatic Precipitators are used in cement plants particularly for removal of dust
from the exit gases of cement kilns and from the exhaust air discharged by dryers,
combined grinding and drying plants, finishing mills and raw mills through water injection.
08 Kiln
A kiln is the heart of any cement plant.
It is basically a long cylindrical-shaped pipe, and
rotates in a horizontal position. Its internal surface is
lined by refractory bricks. Limestone and additives
are calcined in this. The output of the kiln is called
clinker.
09 Cooler
The clinker coming out of the kiln is hot. It is cooled
in a set-up called a cooler. In the cooler, cold air is
blown to effect heat exchange between hot clinker
and cold air.
10 Deep Bucket Conveyor
The deep bucket conveyor is essentially an equipment to
lift material vertically.
11 Clinker Storage
The output of the kiln is stored before it is fed to the
cement mill for conversion to cement.
12 Gypsum Storage
The storage space is used for gypsum storage.
13 Coal Mill Building
The coal mill building houses the
mill for grinding lumpy coals. This
fine ground coal is used for burning
in the kiln.
14 Cement Mill and Bag House
Clinker, along with additives, is ground in a
cement mill. The output of a cement mill is the
final product viz. Cement.
The term bag house is applied to large filters
containing a number of tubular bags mounted in a
usually rectangular casing. The dust laden air is
drawn through them by suction.
15 Cement Storage Silo
The cement storage silo is used for storing the finished
product – cement.
16 Packing and Dispatch
The cement is packed with the
help of a rotary packer and finally
dispatched to the market.
17 Central Control Room
It is the nerve center of the cement plant since all equipment is controlled from this
place. It is the place from where all the process parameters are controlled.
Gantt Chart of 6 weeks Training
Cement Production Process

Mais conteúdo relacionado

Mais procurados

Cement Manufacuring Training presentation
Cement Manufacuring Training presentationCement Manufacuring Training presentation
Cement Manufacuring Training presentationSumit Gupta
 
Cement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionCement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionShyam Anandjiwala
 
Cement Plant Introduction
Cement Plant IntroductionCement Plant Introduction
Cement Plant IntroductionSummer Wei
 
comprehensive project - I on cement industry PPT
comprehensive project - I on cement industry PPTcomprehensive project - I on cement industry PPT
comprehensive project - I on cement industry PPTMansi Bhimani
 
ppt on cement industry in india
ppt on cement industry in indiappt on cement industry in india
ppt on cement industry in indiajs slides
 
Jk lakshmi cement ltd
Jk lakshmi cement ltdJk lakshmi cement ltd
Jk lakshmi cement ltdCyber4Tech
 
Cement Plant Process and Instruments Used
Cement Plant Process and Instruments UsedCement Plant Process and Instruments Used
Cement Plant Process and Instruments UsedRavi Roy
 
Udaipur cement industries limited
Udaipur cement industries limitedUdaipur cement industries limited
Udaipur cement industries limitedHome
 
Cement manufacturing process
Cement manufacturing processCement manufacturing process
Cement manufacturing processHavalarif
 
Cement industry : grinding process of ball mill
Cement industry : grinding process of ball millCement industry : grinding process of ball mill
Cement industry : grinding process of ball millPankaj Verma
 
Powerpoint presentation on CEMENT {PPT}
Powerpoint presentation on CEMENT {PPT}Powerpoint presentation on CEMENT {PPT}
Powerpoint presentation on CEMENT {PPT}Prateek Soni
 
Cement manufacturing process new
Cement manufacturing process newCement manufacturing process new
Cement manufacturing process newAshvani Shukla
 
Cement Industry and Audit Presentation
Cement Industry and Audit PresentationCement Industry and Audit Presentation
Cement Industry and Audit PresentationSaurabh Pandey
 
Presentation1
Presentation1Presentation1
Presentation1raju_786
 
Cement manufacturing process
Cement manufacturing process Cement manufacturing process
Cement manufacturing process Rohan Sharma
 

Mais procurados (20)

Cement Manufacuring Training presentation
Cement Manufacuring Training presentationCement Manufacuring Training presentation
Cement Manufacuring Training presentation
 
Cement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionCement Manufacturing Plant Construction
Cement Manufacturing Plant Construction
 
Cement Plant Introduction
Cement Plant IntroductionCement Plant Introduction
Cement Plant Introduction
 
comprehensive project - I on cement industry PPT
comprehensive project - I on cement industry PPTcomprehensive project - I on cement industry PPT
comprehensive project - I on cement industry PPT
 
ppt on cement industry in india
ppt on cement industry in indiappt on cement industry in india
ppt on cement industry in india
 
Jk lakshmi cement ltd
Jk lakshmi cement ltdJk lakshmi cement ltd
Jk lakshmi cement ltd
 
Cement Plant Process and Instruments Used
Cement Plant Process and Instruments UsedCement Plant Process and Instruments Used
Cement Plant Process and Instruments Used
 
Udaipur cement industries limited
Udaipur cement industries limitedUdaipur cement industries limited
Udaipur cement industries limited
 
Cement manufacturing process
Cement manufacturing processCement manufacturing process
Cement manufacturing process
 
cement industry
cement industrycement industry
cement industry
 
Cement industry : grinding process of ball mill
Cement industry : grinding process of ball millCement industry : grinding process of ball mill
Cement industry : grinding process of ball mill
 
Powerpoint presentation on CEMENT {PPT}
Powerpoint presentation on CEMENT {PPT}Powerpoint presentation on CEMENT {PPT}
Powerpoint presentation on CEMENT {PPT}
 
Cement manufacturing process new
Cement manufacturing process newCement manufacturing process new
Cement manufacturing process new
 
Cement Industry and Audit Presentation
Cement Industry and Audit PresentationCement Industry and Audit Presentation
Cement Industry and Audit Presentation
 
Presentation1
Presentation1Presentation1
Presentation1
 
Lucky cement internship report
Lucky cement internship reportLucky cement internship report
Lucky cement internship report
 
Cement industry
Cement industryCement industry
Cement industry
 
Cement manufacturing process
Cement manufacturing process Cement manufacturing process
Cement manufacturing process
 
Cement- presentation
Cement- presentationCement- presentation
Cement- presentation
 
Cement course
Cement courseCement course
Cement course
 

Semelhante a Cement Production Process

Training - Cement manufacturing Unit operation.pptx
Training - Cement manufacturing Unit operation.pptxTraining - Cement manufacturing Unit operation.pptx
Training - Cement manufacturing Unit operation.pptxsantosh509014
 
Ankittttttttttttttttttttttt.pptx
Ankittttttttttttttttttttttt.pptxAnkittttttttttttttttttttttt.pptx
Ankittttttttttttttttttttttt.pptxAnkitSharma892379
 
Program Development of Cement Industry at Jamshoro, Sindh
Program Development of Cement Industry at Jamshoro, SindhProgram Development of Cement Industry at Jamshoro, Sindh
Program Development of Cement Industry at Jamshoro, SindhRana Ahtisham
 
Industrial Training Presentation
Industrial Training PresentationIndustrial Training Presentation
Industrial Training PresentationKeneth Misquith
 
Overall increase in efficiency in raw meals
Overall increase in efficiency in raw mealsOverall increase in efficiency in raw meals
Overall increase in efficiency in raw mealseSAT Publishing House
 
Basic of cement-Amit Payal
Basic of cement-Amit Payal Basic of cement-Amit Payal
Basic of cement-Amit Payal AMIT PAYAL
 
Maple Leaf Cement Company Ltd 2
Maple Leaf Cement Company Ltd 2Maple Leaf Cement Company Ltd 2
Maple Leaf Cement Company Ltd 2Talha Choudhary
 
Report of Cement Industry
Report of Cement Industry Report of Cement Industry
Report of Cement Industry Muhammad Ahmed
 
111658903 kiln-burning-systems
111658903 kiln-burning-systems111658903 kiln-burning-systems
111658903 kiln-burning-systemsIngrid McKenzie
 
Aditya birla cement training report
Aditya birla cement training reportAditya birla cement training report
Aditya birla cement training reportravi kant
 
Report on Summer Training at NSPCL By Aniket Suman
Report on Summer Training at NSPCL By Aniket SumanReport on Summer Training at NSPCL By Aniket Suman
Report on Summer Training at NSPCL By Aniket SumanAniket_1415
 
Vocational Training at Burn Standard
Vocational Training at Burn StandardVocational Training at Burn Standard
Vocational Training at Burn StandardWrik Bhattacharyya
 
Cement process manufacturing - Infographic | VisionTIR
Cement process manufacturing - Infographic | VisionTIRCement process manufacturing - Infographic | VisionTIR
Cement process manufacturing - Infographic | VisionTIRMesurex
 
Visakhapatnam steel plant
Visakhapatnam steel plantVisakhapatnam steel plant
Visakhapatnam steel plantVenkata Swamy
 
Untitled presentation-steelplant information
Untitled presentation-steelplant informationUntitled presentation-steelplant information
Untitled presentation-steelplant informationsantoshadd82
 

Semelhante a Cement Production Process (20)

umesh
umeshumesh
umesh
 
Training - Cement manufacturing Unit operation.pptx
Training - Cement manufacturing Unit operation.pptxTraining - Cement manufacturing Unit operation.pptx
Training - Cement manufacturing Unit operation.pptx
 
Ankittttttttttttttttttttttt.pptx
Ankittttttttttttttttttttttt.pptxAnkittttttttttttttttttttttt.pptx
Ankittttttttttttttttttttttt.pptx
 
CEMNAT MANUFACTRING
CEMNAT MANUFACTRINGCEMNAT MANUFACTRING
CEMNAT MANUFACTRING
 
Program Development of Cement Industry at Jamshoro, Sindh
Program Development of Cement Industry at Jamshoro, SindhProgram Development of Cement Industry at Jamshoro, Sindh
Program Development of Cement Industry at Jamshoro, Sindh
 
Industrial Training Presentation
Industrial Training PresentationIndustrial Training Presentation
Industrial Training Presentation
 
Overall increase in efficiency in raw meals
Overall increase in efficiency in raw mealsOverall increase in efficiency in raw meals
Overall increase in efficiency in raw meals
 
Manufacturing of cement
Manufacturing of cementManufacturing of cement
Manufacturing of cement
 
Basic of cement-Amit Payal
Basic of cement-Amit Payal Basic of cement-Amit Payal
Basic of cement-Amit Payal
 
Maple Leaf Cement Company Ltd 2
Maple Leaf Cement Company Ltd 2Maple Leaf Cement Company Ltd 2
Maple Leaf Cement Company Ltd 2
 
Report of Cement Industry
Report of Cement Industry Report of Cement Industry
Report of Cement Industry
 
111658903 kiln-burning-systems
111658903 kiln-burning-systems111658903 kiln-burning-systems
111658903 kiln-burning-systems
 
Aditya birla cement training report
Aditya birla cement training reportAditya birla cement training report
Aditya birla cement training report
 
Report on Summer Training at NSPCL By Aniket Suman
Report on Summer Training at NSPCL By Aniket SumanReport on Summer Training at NSPCL By Aniket Suman
Report on Summer Training at NSPCL By Aniket Suman
 
Vocational Training at Burn Standard
Vocational Training at Burn StandardVocational Training at Burn Standard
Vocational Training at Burn Standard
 
Rotary kiln
Rotary kilnRotary kiln
Rotary kiln
 
Cement process manufacturing - Infographic | VisionTIR
Cement process manufacturing - Infographic | VisionTIRCement process manufacturing - Infographic | VisionTIR
Cement process manufacturing - Infographic | VisionTIR
 
Visakhapatnam steel plant
Visakhapatnam steel plantVisakhapatnam steel plant
Visakhapatnam steel plant
 
Untitled presentation-steelplant information
Untitled presentation-steelplant informationUntitled presentation-steelplant information
Untitled presentation-steelplant information
 
Pranava
PranavaPranava
Pranava
 

Último

Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringJuanCarlosMorales19600
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 

Último (20)

Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineering
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 

Cement Production Process

  • 1. By:- Deepesh Kumar Mishra 11202732 Satna Cement Works Birla Corp. Ltd. Six Weeks Training Report
  • 3. Counted amongst the larger plants of the Cement Division, Satna Cement Works and Birla Vikas Cement at Satna (MP) along with Raebareli Cement Works (UP) have an installed capacity of 2.36 million tones at present, which is projected to rise to 2.84 million tones after the present expansion/modification. Birla Cement Samrat and Birla Cement Khajuraho are already leading Brands and frontrunners of company’s activities. Riding on the glory of very high standards of quality, the company products are premierly priced in all the markets where it is available.
  • 4. 00. Limestone Quarry and Crushing plant 09. Cooler 01. Limestone Stockpile 10. Deep Bucket Conveyor 02. Additives Hopper 11/12. Clinker/Gypsum Storage 03. Additives Storage 13. Coal Mill Building 04. Raw Mill Building 14. Cement Mill and Bag House 05. Blending and Storage Silo 15. Cement Storage Silo 06. Preheater 16. Packing & Dispatch 07. Gas Conditioning Tower and ESP 17. Central Control Room 08. Kiln Plant Layout
  • 6. 00. Limestone Quarry and Crushing plant The major raw material for cement production is limestone. The limestone most suitable for cement production must have some ingredients in specified quantities i.e., calcium carbonates, silica, alumina, iron,etc Belt Conveyors The quarried raw material is transported to the cement plant, using mechanical conveying equipment such as ropeways or belt conveyors, or by vehicles like wagons and trucks. There are mainly two types of crushers available - compression type or impact type crushers. Imapct Crusher
  • 7. 01 Limestone Stock Pile Circular or longitudinal stock piles are used to store the material. A number of layers are stacked in circular or longitudinal piles and are reclaimed in transverse, cross-sectional slices. 02 & 03 Additives Storage Hopper In order to get the required composition of raw material, certain additives such as iron ore, bauxite, laterite, quartzite and flourspar are added in required quantities. These additives are stored at the plant in separate hoppers and are extracted using belt conveyors in conjunction with belt-weighing equipment.
  • 8. 04 Raw Mill Building VRM The raw material is finish-ground before being fed into the kiln for clinkering. This grinding is done using either ball mills or vertical roller mills (VRM). VRM uses the compression principle to grind the raw material. The main advantage of VRM is higher grinding efficiency and ability to accept material with higher moisture content. Normally the energy consumption level in VRM is 10 to 20 percent lower than in ball mills.
  • 9. 05 Blending and Storage Silo In order to blend and homogenize the raw materials properly, continuous blending silos are used. As there are various sources of raw materials, it becomes necessary to blend and homogenize these different materials efficiently to counteract fluctuation in the chemical composition of the raw meal. 06 Preheater Clinkering takes place in the kiln and the preheater system.Preheater systems offer heat transfer from the hot kiln gases.
  • 10. 07 Gas Conditioning Tower and ESP The conditioning tower is used to reduce the temperature and to increase the moisture level of the dusty exhaust gas from the kiln, before it is passed through the bag house and ESPs. The Electrostatic Precipitators are used in cement plants particularly for removal of dust from the exit gases of cement kilns and from the exhaust air discharged by dryers, combined grinding and drying plants, finishing mills and raw mills through water injection. 08 Kiln A kiln is the heart of any cement plant. It is basically a long cylindrical-shaped pipe, and rotates in a horizontal position. Its internal surface is lined by refractory bricks. Limestone and additives are calcined in this. The output of the kiln is called clinker.
  • 11. 09 Cooler The clinker coming out of the kiln is hot. It is cooled in a set-up called a cooler. In the cooler, cold air is blown to effect heat exchange between hot clinker and cold air. 10 Deep Bucket Conveyor The deep bucket conveyor is essentially an equipment to lift material vertically.
  • 12. 11 Clinker Storage The output of the kiln is stored before it is fed to the cement mill for conversion to cement. 12 Gypsum Storage The storage space is used for gypsum storage.
  • 13. 13 Coal Mill Building The coal mill building houses the mill for grinding lumpy coals. This fine ground coal is used for burning in the kiln. 14 Cement Mill and Bag House Clinker, along with additives, is ground in a cement mill. The output of a cement mill is the final product viz. Cement. The term bag house is applied to large filters containing a number of tubular bags mounted in a usually rectangular casing. The dust laden air is drawn through them by suction.
  • 14. 15 Cement Storage Silo The cement storage silo is used for storing the finished product – cement. 16 Packing and Dispatch The cement is packed with the help of a rotary packer and finally dispatched to the market.
  • 15. 17 Central Control Room It is the nerve center of the cement plant since all equipment is controlled from this place. It is the place from where all the process parameters are controlled.
  • 16. Gantt Chart of 6 weeks Training