SlideShare uma empresa Scribd logo
1 de 4
David Arkell 
67 Sandford Avenue, Loughton, Essex. IG10 2AP 
e-mail david.arkell57@sky.com Mobile 07896 576 667 
Profile 
Role Construction Manager 
Commercial Fit out. 
I began my working career as an ACM for Overbury 9 years ago. I spent 3 years with them, I 
left them to join ISG and have worked with them ever since as a Construction Manager. 
I have worked on projects with values between £0.5million to £50 million gaining valuable 
experiences along the way. I have enjoyed the experience of delivering major projects on time 
and snag free. I have a good reputation within the industry; have been proactive with the mind 
set "The Client is always right" instilled by both companies. 
Roles and Responsibilities: 
Design co-ordination 
Site Inductions 
Health & safety on site 
Managing Contractors 
Quality management and delivery 
Overall programme delivery 
Closing out defects / Handover 
Health, Safety & Environmental Training: 
SMSTS 
CSCS Health & Safety Awareness (Management) 
First Aid at Work (4 days) 
Method Statement/Risk Assessment (Day 3 IOSH) 
Understanding Minimum H&S / Welfare Standards 
IOSH (4 day) 
Environmental Training 
Specific H, S & E Company Induction / Refresher 
Fire Safety Practical and/or Marshall 
H&S Awareness (2 day) 
Asbestos Awareness course 
Site Management (2 day) 
PASMA 
Work Experience: 
7/8 St James Square Galliford Try 
Value £30 million 
Construction Manager 
Role and responsibilities 
Transition from new build to Cat A 
Construction of service risers and associated M&E install, general floors, WC cores and stair 
cores, Shower block and disabled WCs and showers over 8 levels.
Bush House, ISG 
Value £52 million 
Construction Manager 
Role responsible for North East Block and Basement levels 
AG Gallaghe r’s , ISG 
Value £5.2 million 
Duration – 12 Weeks 
Construction Manager 
Responsible for Level 7 Specialist floor consisting of AV Board room & meeting rooms, 
dining room/kitchen and reception greeting area with four toilet pods. 
Savills, Margaret St, ISG 
Value £9 million 
Duration – 17 weeks 
Construction Manager 
Responsible for two general floors, 2 specialist floors with adjoining staircase and reception 
area, executive meeting rooms and greeting areas. Also basement level including shower 
blocks and changing rooms. 
Statoil, Paddington, ISG 
Value £6 million 
Duration – 12 weeks 
Construction Manager 
Responsible for fit out of one specialist floor, consisting of AV executive meeting rooms, tea 
points and fall out areas. 4 toiled pods and general office space. 
Aviva 20 Gracechurch St ISG 
Value £1.5 million 
Construction Manager 
Responsible for strip out and return to Cat A of two tower floors this consisted of install of 
new VAVs, sprinkler system, all new ductwork supplies BMS system, lighting and controls 
smoke alarm system, new ceiling and raised floor install, strip out of four toilet pods and two 
disabled toilet pods and reinstated to new architects specifications. PC achieved with a 98% 
ISG quality award. 
Hammerson 99, Bishopsgate ISG
Value £9.5 million 
Construction Manager 
Responsible for the strip out and return to Cat A of four podium floors and three tower floors. 
This consisted of new FCUs, pipe work and all ductwork supplies, BMS system, sprinkler 
range, smoke alarm and security system, New ceilings and raised floors and all new wall 
linings and lighting. PC achieved. 
Academy of Engineering Pall Mall Knight Harward 
Value £4.5 million 
Construction Manager 
Responsible for the refurbish of three floors. AHU and plantroom install to the roof level 
Shaft and Lift install over all floors, toilets and shower room install and terrace refurb to the 
front of building. PC achieved. 
Goldman Sachs Project 133 Fleet Street (ISG) 
Value £30 million 
Construction Manager 
Responsible for three general floors Levels 6, 7 and 8 – Floor manger 
Responsible for the management and installation of 1 passenger and 1 goods Hoist over 10 
floors. PC achieved. 
Pinsent Mason (ISG) 
Value £16 million 
Responsible for 3 general floors, the auditorium and ground floor reception and 2 basement 
levels consisting of shower rooms, 3 toilets pods and legal roller racking room. This project 
consisted of 16 floors Cat A fitted out to Cat Bs the duration of the project was 24 weeks 
delivered on PC date with at the clients request of less than 50 outstanding snags over all 
floors. 
Standard Bank, 20 Gresham Street. (ISG) 
Value £3 million 
Returned to Standard Bank to fit out the 4th Floor and complete a restack on the 1st Floor, 
delivered on time with minimal snags. 
KPMG – Canary Wharf (ISG) 
Value £50 million 
Responsible over 12 floors, on floor plant rooms and roller racking rooms 
Standard Bank, 20 Gresham Street. (ISG) 
Value £16 million 
4 floors, 2 shell and core floors, and 2 CAT-A floors. 
Move to a full fit out 1 dealer floor, 2 specialist floors and 1 general floor. 
My part of the package was the dealer floor and specialist floor. 
Levels 2 and 3, delivered on PC date, minimal snags. 
20 Gracechurch Street 
- Tower works (ISG)
Value - £9 million 
7 floors stripped out and returned to CAT-A. 
15th floor was delivered as a marketing suite floor 2nd London wall. 
Between this job I also spent 3 weeks on Eversheds troubleshooting on specialist floors to 
achieve handover for PC Date. 
Deutsche Bank, Winchester House 
(ISG) 
Value £500k 
My first solo project fitting out an auditorium. Delivered on the PC date with 5 outstanding 
snags. 
Curtains, blinds, lighting all interfaced with the AV system. Tiered seating and desking. 
Installation of a lectern and re-carpeted. 
I worked for ISG from 2007 to 2011 
Calyon Corporate & Investment Bank (Overbury) 
Broadwalk House, London – Fit-out and restack of two dealer floors whilst allowing full 
trading to continue, full mechanical and electrical services upgrade to facilitate 400no: new 
dealing positions with the installation of two new UPS units to allow full back up of services - 
£13.3 Million in 70 weeks 
Northern Trust 
(Overbury) 
Canary Wharf London – This project was a full overhaul of existing electrical and mechanical 
services whilst client was in full occupation in an 11 storey building with the installation of 
new partitions, ceilings, carpets and a complete redecoration to 2no: floors with an installation 
of a new high spec reception area with conferencing facilities - £3.1 million in 16 weeks. 
Defra 
(Overbury) 
Nobel House, Smith Square, SW1 - Phased refurbishment of all nine floors at Nobel House 
(covering over 180,000 sq ft) whilst Defra was in full occupation. The works were carried out 
in eight phases involving the systematic relocation of departments - £25.5m in 105 weeks 
Referees 
Ben Gulley ISG 07961-966216 
Andy Hargrave ISG 07764-144436

Mais conteúdo relacionado

Mais procurados

1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
Candice Spiroski
 
50 Southwark Street AA Group
50 Southwark Street AA Group50 Southwark Street AA Group
50 Southwark Street AA Group
Amanda Dunn
 
JAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyJAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE Navy
Mike Bisland
 
Sabah Jereige CV 2016
Sabah Jereige CV 2016Sabah Jereige CV 2016
Sabah Jereige CV 2016
Sabah JEREIGE
 
213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15
Ron O'Connor
 
Western Segment Open House Slides
 Western Segment  Open House Slides Western Segment  Open House Slides
Western Segment Open House Slides
Crosstown TO
 

Mais procurados (20)

Helix Electric
Helix ElectricHelix Electric
Helix Electric
 
The Deep - Hull
The Deep -  HullThe Deep -  Hull
The Deep - Hull
 
Nabil Soliman
Nabil SolimanNabil Soliman
Nabil Soliman
 
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
1604 Syd City Centre COMMUNITY UPDATE project update_FINAL
 
Appendices
AppendicesAppendices
Appendices
 
3rd Street Project Overview
3rd Street Project Overview3rd Street Project Overview
3rd Street Project Overview
 
Retail Projects
Retail ProjectsRetail Projects
Retail Projects
 
50 Southwark Street AA Group
50 Southwark Street AA Group50 Southwark Street AA Group
50 Southwark Street AA Group
 
Mep contractors in abu dhabi
Mep contractors in abu dhabiMep contractors in abu dhabi
Mep contractors in abu dhabi
 
JAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyJAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE Navy
 
Sabah Jereige CV 2016
Sabah Jereige CV 2016Sabah Jereige CV 2016
Sabah Jereige CV 2016
 
wayne prescott cv
wayne prescott cvwayne prescott cv
wayne prescott cv
 
i+iconUSA Corporate Presentation
i+iconUSA Corporate Presentationi+iconUSA Corporate Presentation
i+iconUSA Corporate Presentation
 
CV . 2017
CV . 2017CV . 2017
CV . 2017
 
213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15
 
Western Segment Open House Slides
 Western Segment  Open House Slides Western Segment  Open House Slides
Western Segment Open House Slides
 
Jones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meetingJones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meeting
 
CV - Dsouza UPDATED 03-04-2016
CV - Dsouza UPDATED 03-04-2016CV - Dsouza UPDATED 03-04-2016
CV - Dsouza UPDATED 03-04-2016
 
C.V for M.ZAKI
C.V  for M.ZAKIC.V  for M.ZAKI
C.V for M.ZAKI
 
Chaplin slide deck final
Chaplin slide deck finalChaplin slide deck final
Chaplin slide deck final
 

Destaque (14)

Slideshare Guerrero Moreno Ernesto 1-5
Slideshare Guerrero Moreno Ernesto 1-5Slideshare Guerrero Moreno Ernesto 1-5
Slideshare Guerrero Moreno Ernesto 1-5
 
周末創Blog
周末創Blog周末創Blog
周末創Blog
 
!!!atul
!!!atul!!!atul
!!!atul
 
Alan Rasof: How To Get Over Your Fear Of Networking
Alan Rasof: How To Get Over Your Fear Of NetworkingAlan Rasof: How To Get Over Your Fear Of Networking
Alan Rasof: How To Get Over Your Fear Of Networking
 
Rhythm.SG
Rhythm.SGRhythm.SG
Rhythm.SG
 
февраль филиал газета
февраль филиал газетафевраль филиал газета
февраль филиал газета
 
Jl Cbesondere Fotos
Jl Cbesondere FotosJl Cbesondere Fotos
Jl Cbesondere Fotos
 
APPEPCertificate UK
APPEPCertificate UKAPPEPCertificate UK
APPEPCertificate UK
 
Evento SugarCRM 2008 - Marketing 2.0 – Novas tendências e o E-CRM
Evento SugarCRM 2008 - Marketing 2.0 – Novas tendências e o E-CRMEvento SugarCRM 2008 - Marketing 2.0 – Novas tendências e o E-CRM
Evento SugarCRM 2008 - Marketing 2.0 – Novas tendências e o E-CRM
 
Algemene informatie Stevin
Algemene informatie StevinAlgemene informatie Stevin
Algemene informatie Stevin
 
Calentamiento Global
Calentamiento Global Calentamiento Global
Calentamiento Global
 
Екскурсія 9 клас
Екскурсія 9 класЕкскурсія 9 клас
Екскурсія 9 клас
 
Ти маєш знати...
Ти маєш знати...Ти маєш знати...
Ти маєш знати...
 
Manuel basico word
Manuel basico wordManuel basico word
Manuel basico word
 

Semelhante a Dave Arkell Latest CV

Take a look at some of our recent projects
Take a look at some of our recent projectsTake a look at some of our recent projects
Take a look at some of our recent projects
Katie Hayes
 
RoyManncv5Link
RoyManncv5LinkRoyManncv5Link
RoyManncv5Link
roy mann
 
Take a look at some of our recent projects.
Take a look at some of our recent projects. Take a look at some of our recent projects.
Take a look at some of our recent projects.
Tony Mantle
 
ProTec Recent Projects Brochure
ProTec Recent Projects BrochureProTec Recent Projects Brochure
ProTec Recent Projects Brochure
Steven MacDonald
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
Tim Read
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
Tim Read
 
09 flagship education projects 2012
09 flagship education projects 201209 flagship education projects 2012
09 flagship education projects 2012
JerramFalkus
 
223 Williams St ANCR Article
223 Williams St ANCR Article223 Williams St ANCR Article
223 Williams St ANCR Article
Paul Saly
 
Braithwaite Case Study Fit Out
Braithwaite Case Study Fit OutBraithwaite Case Study Fit Out
Braithwaite Case Study Fit Out
lukebraithwaite
 
12_Certificate_Baily Garner LLP_Aya
12_Certificate_Baily Garner LLP_Aya12_Certificate_Baily Garner LLP_Aya
12_Certificate_Baily Garner LLP_Aya
Aya Irin
 

Semelhante a Dave Arkell Latest CV (20)

Mountford Pigott LLP Asset Management Portfolio 2013
Mountford Pigott LLP Asset Management Portfolio 2013Mountford Pigott LLP Asset Management Portfolio 2013
Mountford Pigott LLP Asset Management Portfolio 2013
 
Take a look at some of our recent projects
Take a look at some of our recent projectsTake a look at some of our recent projects
Take a look at some of our recent projects
 
RoyManncv5Link
RoyManncv5LinkRoyManncv5Link
RoyManncv5Link
 
Take a look at some of our recent projects.
Take a look at some of our recent projects. Take a look at some of our recent projects.
Take a look at some of our recent projects.
 
ProTec Recent Projects Brochure
ProTec Recent Projects BrochureProTec Recent Projects Brochure
ProTec Recent Projects Brochure
 
Projects presentation1
Projects presentation1Projects presentation1
Projects presentation1
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 
AF CV June 2014
AF CV June 2014AF CV June 2014
AF CV June 2014
 
JG Molloy Brochure - Building On Our Reputation
JG Molloy Brochure - Building On Our ReputationJG Molloy Brochure - Building On Our Reputation
JG Molloy Brochure - Building On Our Reputation
 
Erwin Mendoza CV
Erwin Mendoza CVErwin Mendoza CV
Erwin Mendoza CV
 
09 flagship education projects 2012
09 flagship education projects 201209 flagship education projects 2012
09 flagship education projects 2012
 
Mipim2012
Mipim2012Mipim2012
Mipim2012
 
223 Williams St ANCR Article
223 Williams St ANCR Article223 Williams St ANCR Article
223 Williams St ANCR Article
 
Braithwaite Case Study Fit Out
Braithwaite Case Study Fit OutBraithwaite Case Study Fit Out
Braithwaite Case Study Fit Out
 
Eden Company Profile
Eden Company ProfileEden Company Profile
Eden Company Profile
 
12_Certificate_Baily Garner LLP_Aya
12_Certificate_Baily Garner LLP_Aya12_Certificate_Baily Garner LLP_Aya
12_Certificate_Baily Garner LLP_Aya
 
RA_CV - October 2016
RA_CV - October 2016RA_CV - October 2016
RA_CV - October 2016
 
Karl james davis cv new
Karl james davis cv newKarl james davis cv new
Karl james davis cv new
 
Baytree Dagenham Brochure
Baytree Dagenham BrochureBaytree Dagenham Brochure
Baytree Dagenham Brochure
 

Dave Arkell Latest CV

  • 1. David Arkell 67 Sandford Avenue, Loughton, Essex. IG10 2AP e-mail david.arkell57@sky.com Mobile 07896 576 667 Profile Role Construction Manager Commercial Fit out. I began my working career as an ACM for Overbury 9 years ago. I spent 3 years with them, I left them to join ISG and have worked with them ever since as a Construction Manager. I have worked on projects with values between £0.5million to £50 million gaining valuable experiences along the way. I have enjoyed the experience of delivering major projects on time and snag free. I have a good reputation within the industry; have been proactive with the mind set "The Client is always right" instilled by both companies. Roles and Responsibilities: Design co-ordination Site Inductions Health & safety on site Managing Contractors Quality management and delivery Overall programme delivery Closing out defects / Handover Health, Safety & Environmental Training: SMSTS CSCS Health & Safety Awareness (Management) First Aid at Work (4 days) Method Statement/Risk Assessment (Day 3 IOSH) Understanding Minimum H&S / Welfare Standards IOSH (4 day) Environmental Training Specific H, S & E Company Induction / Refresher Fire Safety Practical and/or Marshall H&S Awareness (2 day) Asbestos Awareness course Site Management (2 day) PASMA Work Experience: 7/8 St James Square Galliford Try Value £30 million Construction Manager Role and responsibilities Transition from new build to Cat A Construction of service risers and associated M&E install, general floors, WC cores and stair cores, Shower block and disabled WCs and showers over 8 levels.
  • 2. Bush House, ISG Value £52 million Construction Manager Role responsible for North East Block and Basement levels AG Gallaghe r’s , ISG Value £5.2 million Duration – 12 Weeks Construction Manager Responsible for Level 7 Specialist floor consisting of AV Board room & meeting rooms, dining room/kitchen and reception greeting area with four toilet pods. Savills, Margaret St, ISG Value £9 million Duration – 17 weeks Construction Manager Responsible for two general floors, 2 specialist floors with adjoining staircase and reception area, executive meeting rooms and greeting areas. Also basement level including shower blocks and changing rooms. Statoil, Paddington, ISG Value £6 million Duration – 12 weeks Construction Manager Responsible for fit out of one specialist floor, consisting of AV executive meeting rooms, tea points and fall out areas. 4 toiled pods and general office space. Aviva 20 Gracechurch St ISG Value £1.5 million Construction Manager Responsible for strip out and return to Cat A of two tower floors this consisted of install of new VAVs, sprinkler system, all new ductwork supplies BMS system, lighting and controls smoke alarm system, new ceiling and raised floor install, strip out of four toilet pods and two disabled toilet pods and reinstated to new architects specifications. PC achieved with a 98% ISG quality award. Hammerson 99, Bishopsgate ISG
  • 3. Value £9.5 million Construction Manager Responsible for the strip out and return to Cat A of four podium floors and three tower floors. This consisted of new FCUs, pipe work and all ductwork supplies, BMS system, sprinkler range, smoke alarm and security system, New ceilings and raised floors and all new wall linings and lighting. PC achieved. Academy of Engineering Pall Mall Knight Harward Value £4.5 million Construction Manager Responsible for the refurbish of three floors. AHU and plantroom install to the roof level Shaft and Lift install over all floors, toilets and shower room install and terrace refurb to the front of building. PC achieved. Goldman Sachs Project 133 Fleet Street (ISG) Value £30 million Construction Manager Responsible for three general floors Levels 6, 7 and 8 – Floor manger Responsible for the management and installation of 1 passenger and 1 goods Hoist over 10 floors. PC achieved. Pinsent Mason (ISG) Value £16 million Responsible for 3 general floors, the auditorium and ground floor reception and 2 basement levels consisting of shower rooms, 3 toilets pods and legal roller racking room. This project consisted of 16 floors Cat A fitted out to Cat Bs the duration of the project was 24 weeks delivered on PC date with at the clients request of less than 50 outstanding snags over all floors. Standard Bank, 20 Gresham Street. (ISG) Value £3 million Returned to Standard Bank to fit out the 4th Floor and complete a restack on the 1st Floor, delivered on time with minimal snags. KPMG – Canary Wharf (ISG) Value £50 million Responsible over 12 floors, on floor plant rooms and roller racking rooms Standard Bank, 20 Gresham Street. (ISG) Value £16 million 4 floors, 2 shell and core floors, and 2 CAT-A floors. Move to a full fit out 1 dealer floor, 2 specialist floors and 1 general floor. My part of the package was the dealer floor and specialist floor. Levels 2 and 3, delivered on PC date, minimal snags. 20 Gracechurch Street - Tower works (ISG)
  • 4. Value - £9 million 7 floors stripped out and returned to CAT-A. 15th floor was delivered as a marketing suite floor 2nd London wall. Between this job I also spent 3 weeks on Eversheds troubleshooting on specialist floors to achieve handover for PC Date. Deutsche Bank, Winchester House (ISG) Value £500k My first solo project fitting out an auditorium. Delivered on the PC date with 5 outstanding snags. Curtains, blinds, lighting all interfaced with the AV system. Tiered seating and desking. Installation of a lectern and re-carpeted. I worked for ISG from 2007 to 2011 Calyon Corporate & Investment Bank (Overbury) Broadwalk House, London – Fit-out and restack of two dealer floors whilst allowing full trading to continue, full mechanical and electrical services upgrade to facilitate 400no: new dealing positions with the installation of two new UPS units to allow full back up of services - £13.3 Million in 70 weeks Northern Trust (Overbury) Canary Wharf London – This project was a full overhaul of existing electrical and mechanical services whilst client was in full occupation in an 11 storey building with the installation of new partitions, ceilings, carpets and a complete redecoration to 2no: floors with an installation of a new high spec reception area with conferencing facilities - £3.1 million in 16 weeks. Defra (Overbury) Nobel House, Smith Square, SW1 - Phased refurbishment of all nine floors at Nobel House (covering over 180,000 sq ft) whilst Defra was in full occupation. The works were carried out in eight phases involving the systematic relocation of departments - £25.5m in 105 weeks Referees Ben Gulley ISG 07961-966216 Andy Hargrave ISG 07764-144436