March 2, 2011
Eastern Alberta DC Transmission Line:
Heathfield Converter Station and AC Transmission Line
Why are you receiving this project
information package?
As part of the ATCO Electric's Eastern Alberta DC
Transmission Line project, a converter station is
required in the Gibbons-Redwater area to convert
power from alternating current (AC) to direct current
(DC), and a short 500 kV AC transmission line is
required to connect the converter station to the
electrical grid at AltaLink's proposed Heartland
substation.
We have prepared this information package for
landowners, occupants, agencies and interested
parties located near the proposed converter station
and AC transmission line. We invite any comments,
questions or concerns you may have.Project Overview
ATCO Electric is planning to build a 500 kilovolt
(kV), DC transmission line between the Gibbons-
Redwater area northeast of Edmonton and the
West Brooks area southeast of Calgary. The
project includes a converter station at each end to
convert power from AC to DC, and AC
transmission lines to connect the project to the rest
of the transmission system.
The facilities at the north end of the project include:
 The Heathfield converter station (previously
called the Northeast converter station).
 A 500 kV AC double circuit transmission line
from the Heathfield converter station to the
Heartland substation.
Your comments and concerns are
important to us. Please contact us:
Telephone toll-free: 1-866-650-2463
Fax: 780-420-3666
Email: HVDC@atcoelectric.com
Website: www.atcoelectric.com
HVDC Project
ATCO Electric
10035 – 105 Street
Edmonton, AB T5J 2V6
Eastern Alberta DC Transmission Line – Heathfield Converter Station and AC Transmission Line, March 2011 Page 1
Regulatory Process
ATCO Electric has been directed by the Alberta
Electric System Operator to prepare an application
to the Alberta Utilities Commission (AUC) for a
500 kV DC transmission line between the Edmonton
and Calgary areas on the eastern side of the
province. The proposed Heathfield converter station
and AC transmission line described here will be
included in the application.
For more information on how you can participate in
the application process please refer to the enclosed
AUC brochure Public Involvement in Needs or
Facilities Applications.
A separate approval process is required by Industry
Canada for the telecommunications tower which will
be located within the converter station site. General
information relating to antenna systems is provided
on Industry Canada’s Spectrum Management and
Telecommunications website at:
http://strategis.ic.gc.ca/antennae.
Heathfield Converter Station 2029S
The proposed Heathfield (previously "Northeast")
converter station is needed to convert power from AC
to DC, and is to be located near AltaLink's proposed
Heartland substation east of Gibbons.
The proposed converter station site is located at
Section 21, Township 56, Range 22-W4M, across the
road from the Heartland substation property (see
photo detail map PD2-01NR1), in the Heartland
industrial zone within Sturgeon County.
The converter station site requires sufficient area to
accommodate the 500 kV DC terminal and 500 kV AC
substation equipment, the incoming Eastern Alberta
500 kV DC line 13L50, and the 500 kV AC line
(12L70/12L85) that will connect the converter station
to the proposed Heartland substation.
The converter station will consist of a fenced area of
about 500 by 500 metres containing transformers,
breakers, a converter valve hall, reactors, filters, a
telecommunications tower, an emergency/back-up
generator, control buildings, and related support
equipment and structures.
The converter will have an initial capacity of
1000 megawatts (MW) but the station will be designed
to accommodate additional capacity in the future with
minimal expansion of the initial fenced area.
Site Selection
The site was selected to meet a number of criteria:
 As close as possible to the Heartland substation to
minimize the length of AC connections.
 Sufficient area for converter station development.
 Suitable site conditions (level, well-drained).
 Adequate setback from residences and adjacent
development.
 Avoidance of environmentally sensitive areas.Typical 500 kV DC Converter Station
Eastern Alberta DC Transmission Line – Heathfield Converter Station and AC Transmission Line, March 2011 Page 2
Telecommunications Tower Details
A telecommunications tower is needed at the
Heathfield converter station to communicate with
ATCO Electric’s radio and data communication
regional network and with AltaLink’s network at the
proposed Heartland substation. The tower, located
within the fenced area of the converter station, will
be a self-supported structure about 71 metres tall
and about 7 metres wide at the base. The tower will
support two microwave antenna dishes and related
communications equipment. Examples of towers
with one dish are shown to the right.
The new tower will have lighting to meet Transport
Canada aeronautical safety requirements and will be
operated in compliance with Health Canada’s Safety
Code 6 for the protection of the general public and
local radio signals. Design and construction will
meet applicable standards and will follow good
engineering practices including structural integrity.
Typical Back-up Generator
Back-up Generator
The converter station will include a back-up diesel
generator to supply emergency power for lighting,
heating and communications in the event of a
regional power blackout. As unlikely as such an
event may be, certain components in the converter
system cannot be allowed to freeze, and lighting
and communications are critical to restoring
operation. Except during such an emergency, the
generator would operate for about 30 minutes
once a month to confirm that it will operate when
needed.
The generator planned for this site would have
capacity of about 1250 kilowatts, and would
include associated cabling, controls, and fuel
storage tanks with appropriate spill containment
features.
Typical Telecommunications Tower
Eastern Alberta DC Transmission Line – Heathfield Converter Station and AC Transmission Line, March 2011 Page 3
500 kV AC Transmission Line 12L70/12L85
The Heathfield converter station will be connected to
the electric system by a short 500 kV AC double circuit
transmission line between the converter station and
AltaLink's proposed Heartland substation as shown on
photo detail map PD2–01NR1.
This line will be approximately 1600 metres in length
and constructed using steel lattice towers as shown
below. Depending on final survey and design, there
would be approximately two or three of each of the two
structure types shown.
500 kV AC Transmission Line
The structures will carry two 500 kV AC circuits. Each
circuit will be comprised of three bundles of three
1590 MCM Falcon conductor wires, with the capacity to
carry 3464 MVA (megavolt-amperes) on each circuit.
The line will have two overhead shield wires for lightning
protection. One of the shield wires will incorporate fibre
optic cable to facilitate communications between
substations.
The structure designs are the same as those to be used
for AltaLink/EPCOR's Heartland 500 kV AC transmission
line.
Typical Span
Between Towers:
365 metres
Minimum above-ground
conductor height:
approx. 22 metres at tower
12 metres between towers
(higher where required per
safety codes).
Details may vary
with final designs.
500 kV AC Double Circuit Typical 500 kV AC Double Circuit
Tangent Tower Deadend Tower
(straight alignments) (corners and termination points)
Eastern Alberta DC Transmission Line – Heathfield Converter Station and AC Transmission Line, March 2011 Page 4
Proposed Right-of-Way and Alignment
Adjacent to AltaLink/EPCOR Proposed Line
Routing and Right-of-Way
The routing of the transmission line will be as direct
as possible across ATCO Electric's converter station
property and AltaLink's substation property. For
over half its length, the line would parallel
AltaLink/EPCOR's preferred route for the proposed
Heartland 500 kV AC transmission line. Where the
two lines run in parallel, structure locations would
match those planned for the AltaLink/EPCOR line as
closely as possible to minimize the visual impact
when viewed from the north or south.
The standard minimum right-of-way is 70 metres
wide (35 metres each side of centre line). Where
the line parallels the AltaLink/EPCOR transmission
line, additional right-of-way would be required for
safe separation between the lines, as shown on the
drawing to the right.
Connection of ATCO Electric's proposed 500 kV AC
line at Heartland substation will require minor
alterations to AltaLink's proposed substation layout,
and a minor adjustment of the alignment of the
AltaLink/EPCOR 500 kV AC line as it enters the
Heartland substation. Details of these alterations
will be provided separately by AltaLink.
Environmental Considerations
Construction, reclamation and subsequent activities
will all be carried out in accordance with Alberta
Environment's Environmental Protection Guidelines
for Electric Transmission Facilities.
We will ensure that the converter station and
transmission line are designed to meet the noise
limits set by the AUC.
Additional Information
Selected Information Sheets (Transmission Lines On Or
Near Your Property) will provide more information about
typical transmission construction, environmental
considerations, electrical effects and AC electric and
magnetic fields (EMF).
Consultation
We are committed to responsible development, and to
conducting an open and transparent consultation process.
The first step in this process is to provide you this project
information package and invite your feedback.
In addition, if your property is on or immediately adjacent to
the converter station site or transmission line, one of our
representatives will contact you to arrange a personal
meeting to discuss your concerns.
Following a review of the feedback received ATCO Electric
expects to file a Facility Application to the AUC in the spring
of 2011 to obtain approval for the construction and
operation of these transmission facilities.
Eastern Alberta DC Transmission Line – Heathfield Converter Station and AC Transmission Line, March 2011 Page 5
ATCO Electric
Albertans have counted on us for the safe, reliable and
cost-effective delivery of electricity to their homes,
farms and businesses for more than 80 years.
Headquartered in Edmonton, ATCO Electric has
38 service offices serving almost two-thirds of the
province in northern and east-central Alberta.
We help keep the lights on across the province by
building, operating and maintaining more than
69,000 kilometres of transmission and distribution
power lines. We also operate 12,000 kilometres of
distribution power lines on behalf of Rural
Electrification Associations.
We are committed to responsible development and
environmental practices. We conduct an open and
transparent consultation process, carefully considering
the impacts to landowners, communities and the
environment.
Included in this package:
 Project Information
 Information Sheets: Transmission Lines On Or Near
Your Property, Sheets 5, 7, 8 and 9
 Photo Detail Map PD2-01NR1
 AUC Brochure: Public Involvement in Needs or
Facilities Applications
 Reply Form and Envelope
Proposed Timeline*
February 2011
Consultation with landowners and agencies
within 800 metres of the converter station site
or transmission line.
Spring 2011
Submission of the facility application to the
Alberta Utilities Commission (AUC).
Early 2012
Start construction, provided AUC approval is
granted and right-of-way has been obtained.
Mid to Late 2014
Facilities completed and operating.
*Timing may be adjusted to reflect final plans.
Eastern Alberta DC Transmission Line – Heathfield Converter Station and AC Transmission Line, March 2011 Page 6

Mais conteúdo relacionado

Mais procurados

Power line carrier communication(with awesome animation work)
Power line carrier communication(with awesome animation work)Power line carrier communication(with awesome animation work)
Power line carrier communication(with awesome animation work)Mohit Agarwal
 
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communicationRrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communicationDushyant Singh Chouhan
 
IRJET- Design and Analysis of Typical Chemical Industry Electrical Distributi...
IRJET- Design and Analysis of Typical Chemical Industry Electrical Distributi...IRJET- Design and Analysis of Typical Chemical Industry Electrical Distributi...
IRJET- Design and Analysis of Typical Chemical Industry Electrical Distributi...IRJET Journal
 
IRJET-Modern Z-Source Power Conversion Topologies: A Review
IRJET-Modern Z-Source Power Conversion Topologies: A ReviewIRJET-Modern Z-Source Power Conversion Topologies: A Review
IRJET-Modern Z-Source Power Conversion Topologies: A ReviewIRJET Journal
 
Power Line Carrier Communication
Power Line Carrier CommunicationPower Line Carrier Communication
Power Line Carrier CommunicationNeha Gethe
 
Agent based Load Management for Microgrid
Agent based Load Management for MicrogridAgent based Load Management for Microgrid
Agent based Load Management for MicrogridMohamed Abbas
 
Manufacturing of an insulator through embedded scada using power line carrier...
Manufacturing of an insulator through embedded scada using power line carrier...Manufacturing of an insulator through embedded scada using power line carrier...
Manufacturing of an insulator through embedded scada using power line carrier...Rahul Kalra
 
Metro rail project in india year 2017
Metro rail project in india year 2017Metro rail project in india year 2017
Metro rail project in india year 2017Mahesh Chandra Manav
 
Plcc presentation
Plcc presentationPlcc presentation
Plcc presentationMAHESH SONI
 
Power line carrier communication
Power line carrier communicationPower line carrier communication
Power line carrier communicationManoj Chowdary
 
Receiver Module of Smart power monitoring and metering distribution system u...
Receiver Module of Smart power monitoring and metering  distribution system u...Receiver Module of Smart power monitoring and metering  distribution system u...
Receiver Module of Smart power monitoring and metering distribution system u...IJMER
 
Neil Kirby: VSC HVDC Transmission and Emerging Technologies in DC Grids
Neil Kirby: VSC HVDC Transmission and Emerging Technologies in DC GridsNeil Kirby: VSC HVDC Transmission and Emerging Technologies in DC Grids
Neil Kirby: VSC HVDC Transmission and Emerging Technologies in DC GridsEnergyTech2015
 
POWER LINE CARRIER COMMUNICATION
POWER LINE CARRIER COMMUNICATIONPOWER LINE CARRIER COMMUNICATION
POWER LINE CARRIER COMMUNICATIONAtul Kumar Sharma
 
Power line carrier communication (plcc)
Power line carrier communication (plcc)Power line carrier communication (plcc)
Power line carrier communication (plcc)vishwesh sharma
 

Mais procurados (20)

Power line carrier communication(with awesome animation work)
Power line carrier communication(with awesome animation work)Power line carrier communication(with awesome animation work)
Power line carrier communication(with awesome animation work)
 
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communicationRrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
 
PLCC application
PLCC applicationPLCC application
PLCC application
 
IRJET- Design and Analysis of Typical Chemical Industry Electrical Distributi...
IRJET- Design and Analysis of Typical Chemical Industry Electrical Distributi...IRJET- Design and Analysis of Typical Chemical Industry Electrical Distributi...
IRJET- Design and Analysis of Typical Chemical Industry Electrical Distributi...
 
Plcc
PlccPlcc
Plcc
 
Ppt
PptPpt
Ppt
 
IRJET-Modern Z-Source Power Conversion Topologies: A Review
IRJET-Modern Z-Source Power Conversion Topologies: A ReviewIRJET-Modern Z-Source Power Conversion Topologies: A Review
IRJET-Modern Z-Source Power Conversion Topologies: A Review
 
Power Line Carrier Communication
Power Line Carrier CommunicationPower Line Carrier Communication
Power Line Carrier Communication
 
Agent based Load Management for Microgrid
Agent based Load Management for MicrogridAgent based Load Management for Microgrid
Agent based Load Management for Microgrid
 
Manufacturing of an insulator through embedded scada using power line carrier...
Manufacturing of an insulator through embedded scada using power line carrier...Manufacturing of an insulator through embedded scada using power line carrier...
Manufacturing of an insulator through embedded scada using power line carrier...
 
Metro rail project in india year 2017
Metro rail project in india year 2017Metro rail project in india year 2017
Metro rail project in india year 2017
 
Power Line carrier communication
Power Line carrier communicationPower Line carrier communication
Power Line carrier communication
 
Report on PLCC
Report on PLCCReport on PLCC
Report on PLCC
 
Plcc presentation
Plcc presentationPlcc presentation
Plcc presentation
 
Power line carrier communication
Power line carrier communicationPower line carrier communication
Power line carrier communication
 
Receiver Module of Smart power monitoring and metering distribution system u...
Receiver Module of Smart power monitoring and metering  distribution system u...Receiver Module of Smart power monitoring and metering  distribution system u...
Receiver Module of Smart power monitoring and metering distribution system u...
 
Electric09
Electric09Electric09
Electric09
 
Neil Kirby: VSC HVDC Transmission and Emerging Technologies in DC Grids
Neil Kirby: VSC HVDC Transmission and Emerging Technologies in DC GridsNeil Kirby: VSC HVDC Transmission and Emerging Technologies in DC Grids
Neil Kirby: VSC HVDC Transmission and Emerging Technologies in DC Grids
 
POWER LINE CARRIER COMMUNICATION
POWER LINE CARRIER COMMUNICATIONPOWER LINE CARRIER COMMUNICATION
POWER LINE CARRIER COMMUNICATION
 
Power line carrier communication (plcc)
Power line carrier communication (plcc)Power line carrier communication (plcc)
Power line carrier communication (plcc)
 

Destaque

BP_2010_05_High Eff Low Profile ACDC Power_SMappus May 2010_Edit SM
BP_2010_05_High Eff Low Profile ACDC Power_SMappus May 2010_Edit SMBP_2010_05_High Eff Low Profile ACDC Power_SMappus May 2010_Edit SM
BP_2010_05_High Eff Low Profile ACDC Power_SMappus May 2010_Edit SMSteve Mappus
 
FEBFAN7688_I00250A
FEBFAN7688_I00250AFEBFAN7688_I00250A
FEBFAN7688_I00250ASteve Mappus
 
Drvg_HB_LED_HP Ind_Light Fix
Drvg_HB_LED_HP Ind_Light FixDrvg_HB_LED_HP Ind_Light Fix
Drvg_HB_LED_HP Ind_Light FixSteve Mappus
 
A Five – Level Integrated AC – DC Converter
A Five – Level Integrated AC – DC ConverterA Five – Level Integrated AC – DC Converter
A Five – Level Integrated AC – DC ConverterIJTET Journal
 
Analysis of PMSG in Wind Integration using T Source Inverter with Simple Boos...
Analysis of PMSG in Wind Integration using T Source Inverter with Simple Boos...Analysis of PMSG in Wind Integration using T Source Inverter with Simple Boos...
Analysis of PMSG in Wind Integration using T Source Inverter with Simple Boos...IJTET Journal
 
Apollo Solar TSW Inverter Training
Apollo Solar TSW Inverter TrainingApollo Solar TSW Inverter Training
Apollo Solar TSW Inverter Trainingjen_seder
 
Efficiency evaluation of single phase solutions for ac-dc pfc boost converter...
Efficiency evaluation of single phase solutions for ac-dc pfc boost converter...Efficiency evaluation of single phase solutions for ac-dc pfc boost converter...
Efficiency evaluation of single phase solutions for ac-dc pfc boost converter...Murray Edington
 
A Hybrid Control Scheme for Fault Ride-Through Capability using Line-Side Con...
A Hybrid Control Scheme for Fault Ride-Through Capability using Line-Side Con...A Hybrid Control Scheme for Fault Ride-Through Capability using Line-Side Con...
A Hybrid Control Scheme for Fault Ride-Through Capability using Line-Side Con...Suganthi Thangaraj
 
A Single-Stage High-Frequency Isolated Secondary- Side Controlled AC-DC Conve...
A Single-Stage High-Frequency Isolated Secondary- Side Controlled AC-DC Conve...A Single-Stage High-Frequency Isolated Secondary- Side Controlled AC-DC Conve...
A Single-Stage High-Frequency Isolated Secondary- Side Controlled AC-DC Conve...IDES Editor
 
SS-Home Appliances & Plastics Furniture Division
SS-Home Appliances & Plastics Furniture DivisionSS-Home Appliances & Plastics Furniture Division
SS-Home Appliances & Plastics Furniture DivisionSarwar Son's®
 
Harmonic Mitigation Method for the DC-AC Converter in a Single Phase System
Harmonic Mitigation Method for the DC-AC Converter in a Single Phase SystemHarmonic Mitigation Method for the DC-AC Converter in a Single Phase System
Harmonic Mitigation Method for the DC-AC Converter in a Single Phase SystemIJTET Journal
 
HOISTING AND EARTHWORK EQUIPMENT
HOISTING AND EARTHWORK EQUIPMENT HOISTING AND EARTHWORK EQUIPMENT
HOISTING AND EARTHWORK EQUIPMENT venugopal battula
 
8 ee362_l_dc_dc_buckboost_ppt (1)
 8 ee362_l_dc_dc_buckboost_ppt (1) 8 ee362_l_dc_dc_buckboost_ppt (1)
8 ee362_l_dc_dc_buckboost_ppt (1)balaji kumar
 
Simulation of three-phase bridge rectifier using MATLAB/ SIMULINK for harmoni...
Simulation of three-phase bridge rectifier using MATLAB/ SIMULINK for harmoni...Simulation of three-phase bridge rectifier using MATLAB/ SIMULINK for harmoni...
Simulation of three-phase bridge rectifier using MATLAB/ SIMULINK for harmoni...IJMER
 

Destaque (20)

A Three-Level Integrated AC–DC Converter
A Three-Level Integrated AC–DC ConverterA Three-Level Integrated AC–DC Converter
A Three-Level Integrated AC–DC Converter
 
BP_2010_05_High Eff Low Profile ACDC Power_SMappus May 2010_Edit SM
BP_2010_05_High Eff Low Profile ACDC Power_SMappus May 2010_Edit SMBP_2010_05_High Eff Low Profile ACDC Power_SMappus May 2010_Edit SM
BP_2010_05_High Eff Low Profile ACDC Power_SMappus May 2010_Edit SM
 
FEBFAN7688_I00250A
FEBFAN7688_I00250AFEBFAN7688_I00250A
FEBFAN7688_I00250A
 
Drvg_HB_LED_HP Ind_Light Fix
Drvg_HB_LED_HP Ind_Light FixDrvg_HB_LED_HP Ind_Light Fix
Drvg_HB_LED_HP Ind_Light Fix
 
A Five – Level Integrated AC – DC Converter
A Five – Level Integrated AC – DC ConverterA Five – Level Integrated AC – DC Converter
A Five – Level Integrated AC – DC Converter
 
Analysis of PMSG in Wind Integration using T Source Inverter with Simple Boos...
Analysis of PMSG in Wind Integration using T Source Inverter with Simple Boos...Analysis of PMSG in Wind Integration using T Source Inverter with Simple Boos...
Analysis of PMSG in Wind Integration using T Source Inverter with Simple Boos...
 
Apollo Solar TSW Inverter Training
Apollo Solar TSW Inverter TrainingApollo Solar TSW Inverter Training
Apollo Solar TSW Inverter Training
 
Efficiency evaluation of single phase solutions for ac-dc pfc boost converter...
Efficiency evaluation of single phase solutions for ac-dc pfc boost converter...Efficiency evaluation of single phase solutions for ac-dc pfc boost converter...
Efficiency evaluation of single phase solutions for ac-dc pfc boost converter...
 
A Hybrid Control Scheme for Fault Ride-Through Capability using Line-Side Con...
A Hybrid Control Scheme for Fault Ride-Through Capability using Line-Side Con...A Hybrid Control Scheme for Fault Ride-Through Capability using Line-Side Con...
A Hybrid Control Scheme for Fault Ride-Through Capability using Line-Side Con...
 
A Single-Stage High-Frequency Isolated Secondary- Side Controlled AC-DC Conve...
A Single-Stage High-Frequency Isolated Secondary- Side Controlled AC-DC Conve...A Single-Stage High-Frequency Isolated Secondary- Side Controlled AC-DC Conve...
A Single-Stage High-Frequency Isolated Secondary- Side Controlled AC-DC Conve...
 
SS-Home Appliances & Plastics Furniture Division
SS-Home Appliances & Plastics Furniture DivisionSS-Home Appliances & Plastics Furniture Division
SS-Home Appliances & Plastics Furniture Division
 
Harmonic Mitigation Method for the DC-AC Converter in a Single Phase System
Harmonic Mitigation Method for the DC-AC Converter in a Single Phase SystemHarmonic Mitigation Method for the DC-AC Converter in a Single Phase System
Harmonic Mitigation Method for the DC-AC Converter in a Single Phase System
 
HOISTING AND EARTHWORK EQUIPMENT
HOISTING AND EARTHWORK EQUIPMENT HOISTING AND EARTHWORK EQUIPMENT
HOISTING AND EARTHWORK EQUIPMENT
 
8 ee362_l_dc_dc_buckboost_ppt (1)
 8 ee362_l_dc_dc_buckboost_ppt (1) 8 ee362_l_dc_dc_buckboost_ppt (1)
8 ee362_l_dc_dc_buckboost_ppt (1)
 
Simulation of three-phase bridge rectifier using MATLAB/ SIMULINK for harmoni...
Simulation of three-phase bridge rectifier using MATLAB/ SIMULINK for harmoni...Simulation of three-phase bridge rectifier using MATLAB/ SIMULINK for harmoni...
Simulation of three-phase bridge rectifier using MATLAB/ SIMULINK for harmoni...
 
Electric fan
Electric fanElectric fan
Electric fan
 
Ceiling fan
Ceiling fanCeiling fan
Ceiling fan
 
Energy Saving fan .ppt
Energy Saving   fan .ppt Energy Saving   fan .ppt
Energy Saving fan .ppt
 
Study of fans
Study of fansStudy of fans
Study of fans
 
Dc to AC inverter
Dc to AC inverterDc to AC inverter
Dc to AC inverter
 

Semelhante a AC-DC Converter Station - ED & Siemens - Heathfield Conv Stn Proj Info

HIGH VOLTAGE DIRECT CURRENT TRANSMISSION.pdf
HIGH VOLTAGE DIRECT CURRENT TRANSMISSION.pdfHIGH VOLTAGE DIRECT CURRENT TRANSMISSION.pdf
HIGH VOLTAGE DIRECT CURRENT TRANSMISSION.pdfEMERSON EDUARDO RODRIGUES
 
Ppt power grid design
Ppt power grid designPpt power grid design
Ppt power grid designsusanta das
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
High Voltage DC Transmission
High Voltage DC TransmissionHigh Voltage DC Transmission
High Voltage DC Transmissionkrishna koundinya
 
220kV Grid Transmission Substation vt report
220kV Grid Transmission Substation vt report220kV Grid Transmission Substation vt report
220kV Grid Transmission Substation vt reportk,l polytechnic roorkee
 
WIRELESS POWER TRANSMISSION Project
WIRELESS POWER TRANSMISSION ProjectWIRELESS POWER TRANSMISSION Project
WIRELESS POWER TRANSMISSION Projectsagnikchoudhury
 
NTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportNTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportAneel-k Suthar
 
Wireless Power Transfer Project
Wireless Power Transfer  ProjectWireless Power Transfer  Project
Wireless Power Transfer Projectsagnikchoudhury
 
power grid design
power grid designpower grid design
power grid designsusanta das
 
Saturated core fault current limiter field experience at a distribution subst...
Saturated core fault current limiter field experience at a distribution subst...Saturated core fault current limiter field experience at a distribution subst...
Saturated core fault current limiter field experience at a distribution subst...Franco Moriconi
 
internship report of 220/132 kV substation
internship report of 220/132 kV substationinternship report of 220/132 kV substation
internship report of 220/132 kV substationShivamUpadhyay86734
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Design, Test and Demonstration of Saturable Reactor High-Temperature Supercon...
Design, Test and Demonstration of Saturable Reactor High-Temperature Supercon...Design, Test and Demonstration of Saturable Reactor High-Temperature Supercon...
Design, Test and Demonstration of Saturable Reactor High-Temperature Supercon...Franco Moriconi
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxShubhoDas5
 
Mobile Grid Station Paper By Obaid Ur Rahman
Mobile Grid Station Paper By Obaid Ur RahmanMobile Grid Station Paper By Obaid Ur Rahman
Mobile Grid Station Paper By Obaid Ur RahmanIEEEP Karachi
 
THD ANALYSIS OF LFAC TRANSMISSION SYSTEM
THD ANALYSIS OF LFAC TRANSMISSION SYSTEMTHD ANALYSIS OF LFAC TRANSMISSION SYSTEM
THD ANALYSIS OF LFAC TRANSMISSION SYSTEMijiert bestjournal
 

Semelhante a AC-DC Converter Station - ED & Siemens - Heathfield Conv Stn Proj Info (20)

HIGH VOLTAGE DIRECT CURRENT TRANSMISSION.pdf
HIGH VOLTAGE DIRECT CURRENT TRANSMISSION.pdfHIGH VOLTAGE DIRECT CURRENT TRANSMISSION.pdf
HIGH VOLTAGE DIRECT CURRENT TRANSMISSION.pdf
 
Ppt power grid design
Ppt power grid designPpt power grid design
Ppt power grid design
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
 
High Voltage DC Transmission
High Voltage DC TransmissionHigh Voltage DC Transmission
High Voltage DC Transmission
 
A 220kV Substation
A 220kV SubstationA 220kV Substation
A 220kV Substation
 
220kV Grid Transmission Substation vt report
220kV Grid Transmission Substation vt report220kV Grid Transmission Substation vt report
220kV Grid Transmission Substation vt report
 
WIRELESS POWER TRANSMISSION Project
WIRELESS POWER TRANSMISSION ProjectWIRELESS POWER TRANSMISSION Project
WIRELESS POWER TRANSMISSION Project
 
NTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportNTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship report
 
Wireless Power Transfer Project
Wireless Power Transfer  ProjectWireless Power Transfer  Project
Wireless Power Transfer Project
 
Design and Construction of 2KVA AC/DC Inverter
Design and Construction of 2KVA AC/DC InverterDesign and Construction of 2KVA AC/DC Inverter
Design and Construction of 2KVA AC/DC Inverter
 
Hvdc system.pptx
Hvdc system.pptxHvdc system.pptx
Hvdc system.pptx
 
power grid design
power grid designpower grid design
power grid design
 
CESC LTD. TRAINING REPORT
CESC LTD. TRAINING REPORTCESC LTD. TRAINING REPORT
CESC LTD. TRAINING REPORT
 
Saturated core fault current limiter field experience at a distribution subst...
Saturated core fault current limiter field experience at a distribution subst...Saturated core fault current limiter field experience at a distribution subst...
Saturated core fault current limiter field experience at a distribution subst...
 
internship report of 220/132 kV substation
internship report of 220/132 kV substationinternship report of 220/132 kV substation
internship report of 220/132 kV substation
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
 
Design, Test and Demonstration of Saturable Reactor High-Temperature Supercon...
Design, Test and Demonstration of Saturable Reactor High-Temperature Supercon...Design, Test and Demonstration of Saturable Reactor High-Temperature Supercon...
Design, Test and Demonstration of Saturable Reactor High-Temperature Supercon...
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptx
 
Mobile Grid Station Paper By Obaid Ur Rahman
Mobile Grid Station Paper By Obaid Ur RahmanMobile Grid Station Paper By Obaid Ur Rahman
Mobile Grid Station Paper By Obaid Ur Rahman
 
THD ANALYSIS OF LFAC TRANSMISSION SYSTEM
THD ANALYSIS OF LFAC TRANSMISSION SYSTEMTHD ANALYSIS OF LFAC TRANSMISSION SYSTEM
THD ANALYSIS OF LFAC TRANSMISSION SYSTEM
 

Mais de Dario Gnoato

01 - Hoku Nui Pond 6 & Halau Rd
01 - Hoku Nui Pond 6 & Halau Rd01 - Hoku Nui Pond 6 & Halau Rd
01 - Hoku Nui Pond 6 & Halau RdDario Gnoato
 
1993 - College - Completed with Honors letter
1993 - College - Completed with Honors letter1993 - College - Completed with Honors letter
1993 - College - Completed with Honors letterDario Gnoato
 
PCS Rockanville storage building
PCS Rockanville storage buildingPCS Rockanville storage building
PCS Rockanville storage buildingDario Gnoato
 
2014 Award of Excellence in Opertations - AT
2014 Award of Excellence in Opertations - AT2014 Award of Excellence in Opertations - AT
2014 Award of Excellence in Opertations - ATDario Gnoato
 
Quentin L Seven Mile Dam Anchors Presentation
Quentin L Seven Mile Dam Anchors PresentationQuentin L Seven Mile Dam Anchors Presentation
Quentin L Seven Mile Dam Anchors PresentationDario Gnoato
 
2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
2000 Revelstoke Bridge Re-Hab 2000 meeting presentation2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
2000 Revelstoke Bridge Re-Hab 2000 meeting presentationDario Gnoato
 
2003 Seven Mile Dam Ph 2 Presentation, Karen and Ajay
2003 Seven Mile Dam Ph 2 Presentation, Karen and Ajay2003 Seven Mile Dam Ph 2 Presentation, Karen and Ajay
2003 Seven Mile Dam Ph 2 Presentation, Karen and AjayDario Gnoato
 
2005 Seymour Dam Presentation R6
2005 Seymour Dam Presentation R62005 Seymour Dam Presentation R6
2005 Seymour Dam Presentation R6Dario Gnoato
 
article_transforming_culture_in_larger_organizations
article_transforming_culture_in_larger_organizationsarticle_transforming_culture_in_larger_organizations
article_transforming_culture_in_larger_organizationsDario Gnoato
 
Explosive Compaction of Foundation Soils Seymour Falls Dam
Explosive Compaction of Foundation Soils Seymour Falls DamExplosive Compaction of Foundation Soils Seymour Falls Dam
Explosive Compaction of Foundation Soils Seymour Falls DamDario Gnoato
 
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15Dario Gnoato
 

Mais de Dario Gnoato (11)

01 - Hoku Nui Pond 6 & Halau Rd
01 - Hoku Nui Pond 6 & Halau Rd01 - Hoku Nui Pond 6 & Halau Rd
01 - Hoku Nui Pond 6 & Halau Rd
 
1993 - College - Completed with Honors letter
1993 - College - Completed with Honors letter1993 - College - Completed with Honors letter
1993 - College - Completed with Honors letter
 
PCS Rockanville storage building
PCS Rockanville storage buildingPCS Rockanville storage building
PCS Rockanville storage building
 
2014 Award of Excellence in Opertations - AT
2014 Award of Excellence in Opertations - AT2014 Award of Excellence in Opertations - AT
2014 Award of Excellence in Opertations - AT
 
Quentin L Seven Mile Dam Anchors Presentation
Quentin L Seven Mile Dam Anchors PresentationQuentin L Seven Mile Dam Anchors Presentation
Quentin L Seven Mile Dam Anchors Presentation
 
2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
2000 Revelstoke Bridge Re-Hab 2000 meeting presentation2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
 
2003 Seven Mile Dam Ph 2 Presentation, Karen and Ajay
2003 Seven Mile Dam Ph 2 Presentation, Karen and Ajay2003 Seven Mile Dam Ph 2 Presentation, Karen and Ajay
2003 Seven Mile Dam Ph 2 Presentation, Karen and Ajay
 
2005 Seymour Dam Presentation R6
2005 Seymour Dam Presentation R62005 Seymour Dam Presentation R6
2005 Seymour Dam Presentation R6
 
article_transforming_culture_in_larger_organizations
article_transforming_culture_in_larger_organizationsarticle_transforming_culture_in_larger_organizations
article_transforming_culture_in_larger_organizations
 
Explosive Compaction of Foundation Soils Seymour Falls Dam
Explosive Compaction of Foundation Soils Seymour Falls DamExplosive Compaction of Foundation Soils Seymour Falls Dam
Explosive Compaction of Foundation Soils Seymour Falls Dam
 
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15
Highway_40-10_Flood Repairs Report_2013_FINAL_Oct15
 

AC-DC Converter Station - ED & Siemens - Heathfield Conv Stn Proj Info

  • 1. March 2, 2011 Eastern Alberta DC Transmission Line: Heathfield Converter Station and AC Transmission Line Why are you receiving this project information package? As part of the ATCO Electric's Eastern Alberta DC Transmission Line project, a converter station is required in the Gibbons-Redwater area to convert power from alternating current (AC) to direct current (DC), and a short 500 kV AC transmission line is required to connect the converter station to the electrical grid at AltaLink's proposed Heartland substation. We have prepared this information package for landowners, occupants, agencies and interested parties located near the proposed converter station and AC transmission line. We invite any comments, questions or concerns you may have.Project Overview ATCO Electric is planning to build a 500 kilovolt (kV), DC transmission line between the Gibbons- Redwater area northeast of Edmonton and the West Brooks area southeast of Calgary. The project includes a converter station at each end to convert power from AC to DC, and AC transmission lines to connect the project to the rest of the transmission system. The facilities at the north end of the project include:  The Heathfield converter station (previously called the Northeast converter station).  A 500 kV AC double circuit transmission line from the Heathfield converter station to the Heartland substation. Your comments and concerns are important to us. Please contact us: Telephone toll-free: 1-866-650-2463 Fax: 780-420-3666 Email: HVDC@atcoelectric.com Website: www.atcoelectric.com HVDC Project ATCO Electric 10035 – 105 Street Edmonton, AB T5J 2V6 Eastern Alberta DC Transmission Line – Heathfield Converter Station and AC Transmission Line, March 2011 Page 1
  • 2. Regulatory Process ATCO Electric has been directed by the Alberta Electric System Operator to prepare an application to the Alberta Utilities Commission (AUC) for a 500 kV DC transmission line between the Edmonton and Calgary areas on the eastern side of the province. The proposed Heathfield converter station and AC transmission line described here will be included in the application. For more information on how you can participate in the application process please refer to the enclosed AUC brochure Public Involvement in Needs or Facilities Applications. A separate approval process is required by Industry Canada for the telecommunications tower which will be located within the converter station site. General information relating to antenna systems is provided on Industry Canada’s Spectrum Management and Telecommunications website at: http://strategis.ic.gc.ca/antennae. Heathfield Converter Station 2029S The proposed Heathfield (previously "Northeast") converter station is needed to convert power from AC to DC, and is to be located near AltaLink's proposed Heartland substation east of Gibbons. The proposed converter station site is located at Section 21, Township 56, Range 22-W4M, across the road from the Heartland substation property (see photo detail map PD2-01NR1), in the Heartland industrial zone within Sturgeon County. The converter station site requires sufficient area to accommodate the 500 kV DC terminal and 500 kV AC substation equipment, the incoming Eastern Alberta 500 kV DC line 13L50, and the 500 kV AC line (12L70/12L85) that will connect the converter station to the proposed Heartland substation. The converter station will consist of a fenced area of about 500 by 500 metres containing transformers, breakers, a converter valve hall, reactors, filters, a telecommunications tower, an emergency/back-up generator, control buildings, and related support equipment and structures. The converter will have an initial capacity of 1000 megawatts (MW) but the station will be designed to accommodate additional capacity in the future with minimal expansion of the initial fenced area. Site Selection The site was selected to meet a number of criteria:  As close as possible to the Heartland substation to minimize the length of AC connections.  Sufficient area for converter station development.  Suitable site conditions (level, well-drained).  Adequate setback from residences and adjacent development.  Avoidance of environmentally sensitive areas.Typical 500 kV DC Converter Station Eastern Alberta DC Transmission Line – Heathfield Converter Station and AC Transmission Line, March 2011 Page 2
  • 3. Telecommunications Tower Details A telecommunications tower is needed at the Heathfield converter station to communicate with ATCO Electric’s radio and data communication regional network and with AltaLink’s network at the proposed Heartland substation. The tower, located within the fenced area of the converter station, will be a self-supported structure about 71 metres tall and about 7 metres wide at the base. The tower will support two microwave antenna dishes and related communications equipment. Examples of towers with one dish are shown to the right. The new tower will have lighting to meet Transport Canada aeronautical safety requirements and will be operated in compliance with Health Canada’s Safety Code 6 for the protection of the general public and local radio signals. Design and construction will meet applicable standards and will follow good engineering practices including structural integrity. Typical Back-up Generator Back-up Generator The converter station will include a back-up diesel generator to supply emergency power for lighting, heating and communications in the event of a regional power blackout. As unlikely as such an event may be, certain components in the converter system cannot be allowed to freeze, and lighting and communications are critical to restoring operation. Except during such an emergency, the generator would operate for about 30 minutes once a month to confirm that it will operate when needed. The generator planned for this site would have capacity of about 1250 kilowatts, and would include associated cabling, controls, and fuel storage tanks with appropriate spill containment features. Typical Telecommunications Tower Eastern Alberta DC Transmission Line – Heathfield Converter Station and AC Transmission Line, March 2011 Page 3
  • 4. 500 kV AC Transmission Line 12L70/12L85 The Heathfield converter station will be connected to the electric system by a short 500 kV AC double circuit transmission line between the converter station and AltaLink's proposed Heartland substation as shown on photo detail map PD2–01NR1. This line will be approximately 1600 metres in length and constructed using steel lattice towers as shown below. Depending on final survey and design, there would be approximately two or three of each of the two structure types shown. 500 kV AC Transmission Line The structures will carry two 500 kV AC circuits. Each circuit will be comprised of three bundles of three 1590 MCM Falcon conductor wires, with the capacity to carry 3464 MVA (megavolt-amperes) on each circuit. The line will have two overhead shield wires for lightning protection. One of the shield wires will incorporate fibre optic cable to facilitate communications between substations. The structure designs are the same as those to be used for AltaLink/EPCOR's Heartland 500 kV AC transmission line. Typical Span Between Towers: 365 metres Minimum above-ground conductor height: approx. 22 metres at tower 12 metres between towers (higher where required per safety codes). Details may vary with final designs. 500 kV AC Double Circuit Typical 500 kV AC Double Circuit Tangent Tower Deadend Tower (straight alignments) (corners and termination points) Eastern Alberta DC Transmission Line – Heathfield Converter Station and AC Transmission Line, March 2011 Page 4
  • 5. Proposed Right-of-Way and Alignment Adjacent to AltaLink/EPCOR Proposed Line Routing and Right-of-Way The routing of the transmission line will be as direct as possible across ATCO Electric's converter station property and AltaLink's substation property. For over half its length, the line would parallel AltaLink/EPCOR's preferred route for the proposed Heartland 500 kV AC transmission line. Where the two lines run in parallel, structure locations would match those planned for the AltaLink/EPCOR line as closely as possible to minimize the visual impact when viewed from the north or south. The standard minimum right-of-way is 70 metres wide (35 metres each side of centre line). Where the line parallels the AltaLink/EPCOR transmission line, additional right-of-way would be required for safe separation between the lines, as shown on the drawing to the right. Connection of ATCO Electric's proposed 500 kV AC line at Heartland substation will require minor alterations to AltaLink's proposed substation layout, and a minor adjustment of the alignment of the AltaLink/EPCOR 500 kV AC line as it enters the Heartland substation. Details of these alterations will be provided separately by AltaLink. Environmental Considerations Construction, reclamation and subsequent activities will all be carried out in accordance with Alberta Environment's Environmental Protection Guidelines for Electric Transmission Facilities. We will ensure that the converter station and transmission line are designed to meet the noise limits set by the AUC. Additional Information Selected Information Sheets (Transmission Lines On Or Near Your Property) will provide more information about typical transmission construction, environmental considerations, electrical effects and AC electric and magnetic fields (EMF). Consultation We are committed to responsible development, and to conducting an open and transparent consultation process. The first step in this process is to provide you this project information package and invite your feedback. In addition, if your property is on or immediately adjacent to the converter station site or transmission line, one of our representatives will contact you to arrange a personal meeting to discuss your concerns. Following a review of the feedback received ATCO Electric expects to file a Facility Application to the AUC in the spring of 2011 to obtain approval for the construction and operation of these transmission facilities. Eastern Alberta DC Transmission Line – Heathfield Converter Station and AC Transmission Line, March 2011 Page 5
  • 6. ATCO Electric Albertans have counted on us for the safe, reliable and cost-effective delivery of electricity to their homes, farms and businesses for more than 80 years. Headquartered in Edmonton, ATCO Electric has 38 service offices serving almost two-thirds of the province in northern and east-central Alberta. We help keep the lights on across the province by building, operating and maintaining more than 69,000 kilometres of transmission and distribution power lines. We also operate 12,000 kilometres of distribution power lines on behalf of Rural Electrification Associations. We are committed to responsible development and environmental practices. We conduct an open and transparent consultation process, carefully considering the impacts to landowners, communities and the environment. Included in this package:  Project Information  Information Sheets: Transmission Lines On Or Near Your Property, Sheets 5, 7, 8 and 9  Photo Detail Map PD2-01NR1  AUC Brochure: Public Involvement in Needs or Facilities Applications  Reply Form and Envelope Proposed Timeline* February 2011 Consultation with landowners and agencies within 800 metres of the converter station site or transmission line. Spring 2011 Submission of the facility application to the Alberta Utilities Commission (AUC). Early 2012 Start construction, provided AUC approval is granted and right-of-way has been obtained. Mid to Late 2014 Facilities completed and operating. *Timing may be adjusted to reflect final plans. Eastern Alberta DC Transmission Line – Heathfield Converter Station and AC Transmission Line, March 2011 Page 6