Data Center Air Flow Solutions

                       Converting Chaos into Order




Managing Your Infrastructure……The Smart Way
Agenda
   •   Industry Trends and Findings
   •   Data Center Issues
   •   Wright Line Strategies
   •   Wight Line Product Solutions
        – Air Flow Management Products (Wright Line and Vendor Neutral)
              • Heat Containment
              • Isle Containment
              • Independent Containment




 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary   2
Industry Findings and Trends
   • Power consumption is so significant that accommodating the increase in
     IT power consumption over the next five years will require the U.S. to
     construct 10 major power plants. If current trends continue, we will need
     another 20 between 2010 and 2015. That’s 30 power plants that need to
     be built just to accommodate the growth within IT power.
                         » Source: Uptime Institute
   • Forecasts indicate that unless energy efficiency is improved beyond
     current trends, the federal government’s electricity cost for servers and
     data centers could be nearly $740 million annually by 2011, with a peak
     load of approximately 1.2 GW.
                         » Source: Report to Congress on Server and Data Center Energy
                           Efficiency Public Law 109-431
                         » U.S. Environmental Protection Agency ENERGY STAR Program ,
                           August 2, 2007


 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary               3
Industry Findings and Trends
   • People think that a $2,500 server is so cheap you don’t have to worry
     about it. But over three years, the cost of electricity nearly equals the
     cost of the server and that’s without the Capital Expenditure for building
     the data center or the cost of running it.
                         » Source: Uptime Institute
   • All data centers should optimize air flow, but this step is especially
     effective in legacy data centers where air flow management was not
     considered at build-out or where current implementation is conventional
     hot-aisle cold-aisle set-up. In these arrangements there is poor
     separation between the cold supply and hot return airstreams. Creating a
     physical barrier separating hot and cold airstreams to provide the highest
     degree of separation. Any of three approaches—cold aisle containment,
     hot aisle containment, and rack containment could provide the physical
     separation with each one offering its own advantages and limitations.
                         » Source: Silicon Valley Leadership Group
   • Business will continue to look for ways to reduce data center operational
     costs. Data Center Energy Consumption has reached the CEO’s desk
     and will continue to become a strategic issue.
                         » Source: McKinzey Report

 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary        4
Industry Findings and Trends
• Data Center Facilities Reducing Data Center Power Consumption
     – Data Center Power Consumption is Getting More Important
           • As a major concern power consumption/conservation increased from 48% to
             55%
           • The behavior concerning power consumption has begun to change
                – "When the power bill gets really significant, it ends up on the CEO's desk. "When he
                  sees that the biggest user is IT, IT has to deal with it."
                – Still 28% of survey respondents don't know whether their power bill has increased
                  or decreased – though this is an improvement over the 36% who didn't know last
                  year.
                – For the respondents who are paying attention, a majority see major increases in the
                  power bill for their data centers. 44% have seen an increase, and 19% say the
                  increase is greater than 10%.
          • Hot Aisle/Cold Aisle Containment -- the practice of sealing hot aisles and cold
             aisles in a data center –gained traction in 2009
          • Some data centers do hot-aisle and cold-aisle containment themselves, and
             some buy a system from a provider, such as Wright Line, APC and Liebert
          • Containment really wasn't on the radar until late last year, but already 30% of
             respondents have implemented it, and an additional 15% plan to next year
          • The cold-aisle containment strategy is slightly more popular with
             respondents than is hot-aisle or plenum containment
                                                                     Source: Uptime Institute
 Managing Your Infrastructure……The Smart                             2009 Data Center Survey
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary                           5
Industry Findings and Trends
   • Increasing Computer Room Air Conditioner Performance
       – ASHRAE TC9.9 and Ambient Conditions
            •   Dry Bulb Temperature 68 to 77 Degree Fahrenheit
                    –      The trick is there is usually a range of temperatures, not one temperature
            •   40 – 55% RH at Air Inlet
   • It’s all about the Delta T (^T)
       – 30 Ton Units are Not Really 30 Ton Units. It’s 30 Tons at some operating
         conditions
          • Examples
            •   A 30 Ton nominal,downflow, chilled water CRAC unit may have a sensible
                capacity of 27 Tons at 72 degrees, but only 23 Tons when operated at 68
                degrees. 18% more capacity at the higher operating temperature!
            •   Capturing return air at a higher temperature allows for a higher Delta T and
                increase performance.
            •   88 degrees entering the CRAC will produce 30 Tons. A 30% improvement!

                                                                              Source: Data Center Journal
 Managing Your Infrastructure……The Smart
                                                © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way    Confidential and Proprietary                                 6
Industry Findings and Trends
   • Increasing Chiller Temperature Yields Significant Savings
        – “Normally, for centrifugal compressor-based chillers, an increase of one
          degree in the chilled water supply temperature can increase the
          operational efficiency of the chiller by 1 to 2 percent. If a chiller can
          supply chilled water at 55°F, it will be approximately 15 to 30 percent
          more efficient than when it produces chilled water at 40°F (cooler).”




                                                                   Source: Dr. Tengfang Xu
                                                                   June 15, 2005,
                                                                   Lawrence Berkeley National Laboratory

 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary                                 7
Problems In The Data Center
   • Legacy Designs or Lack Thereof
   • Conventional Designs that did not Anticipate Shifts in
     Technology
   • On-Going Changes That Effect The Dynamics Of The Data
     Center
   • 24X7X365 Uptime
   • Lack Of Funding - On-Going Capital & Operational Expenses
        – Doing More With Less
   • Perceived and Real Risks
   • Usually Number One Problem from an Immediate Need:
        – Heat and Power ( I have enough cooling, but I still have heat
          problems and we are running out of power.)

 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary   8
Current State of Most Data Centers Regarding Air Flow
   Management
   • Over Provisioned Air Cooling Adding To Cost
              • Yet Cooling Is Still A Problem
        – 90% Of Data Centers Have Enough or Too Much Cooling
        – 60% Of The Cool Air Is Wasted Due To:
              • Air Mixing
              • Air Stratification
              • Bypass Air
        – Why The Problem?
              • Traditional Data Center Designs are not Predictable and Consistent
              • Technological Changes That Were Not Planned or Anticipated
              • Immediate Business Needs Creating Short Term Solutions Without
                Consideration to Efficiency
              • The Cost Of Running A Data Center Has Reached The Radar of CEOs and
                 C Level Executives
                   – CapEx and OpEx Expenses
                   – Green Initiatives

 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary            9
The “Four Temps”: Do you have chaos cooling?




• Supply Path ∆T
  µT4-µT1= Supply losses and
  entitlement for cooling performance gain
• Return Path ∆T
  µT3-µT2= Return losses and entitlement for efficiency gain
 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary   10
Wright Lines Answers To Technical and Business
   Objectives
   • Wright Line Can Help Clients Reduce Capital & Operational
     Expenses
        – Reduce The Need For Cooling
        – Reduce Heat Within The Data Center
        – Increase Density Levels within Enclosures and Increase Floor
          Space
        – Implement A More Predictable Environment
        – Maximize Existing Infrastructure Investments
              •   Cooling
              •   Power
              •   Floor Space
              •   Less or Lack of Disruption
              •   Stranded Assets

 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary   11
Wright Line Methodology
   • Analyze the Current Environment - Planning
        – Industry Specifications: PUE, DCiE
        – Utilizing Modeling Tools (CFD)
        – Utilizing Practical “ Horse Sense”
              •   How much power and AC do I need now and the foreseeable future?
              •   Can the current data center be adapted to the new technology?
              •   What are the biggest pay backs?
              •   What is the best phased approach to move forward?
   • Our Solutions Utilize Services and Enabling Technology
        – Provides a Road Map To Achieve the Technological and Business
          Objectives to Provide The Fastest ROI That Is Practical In Your
          Environment

 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary          12
Why Chaos Cooling in a Data Center?
   • Legacy cooling designs employ an open supply and
     return air methodology that drives mixing of both
     supply and return air streams
   • Cool air in a legacy data center is used for many
     purposes
              • Cool IT equipment
              • Keep warm air away from IT inlets
              • Move warm air toward the return system

   • Minor changes in any element of the data center
     create unpredictable behavior which decreases
     reliability

 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary   13
How Does Chaos Manifest Itself in the Data Center?

    • Recirculation of air from IT equipment exhaust finds its
      way to IT inlet and can reduce server performance and
      even cause servers to stop working
    • Air stratification is the layering of different temperature air
      masses and forces set points of precision cooling
      equipment to be lower than recommended
    • Bypass Air is the remixing of cool supply air that directly
      enters the return air stream and drives down precision
      cooling efficiencies
        To prevent processing impact, data centers produce
          significantly more cold air than is required for IT
                              devices
 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary   14
Recirculation
  • Hot air exhaust circulating
    back into its own intake can
    cause device thermal
    overload.
  • Typical manufacturer inlet
    temperature threshold for
    device operations is 95°F.
  • Exceeding manufacturers’
    operating device threshold
    can lead to unplanned
    computing system outages
    and data loss.
 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary   15
Temperature Stratification
  • Significant gradient of air
    temperatures beyond
    ASHRAE TC9.9 places
    devices at risk of thermal
    overload
  • Maintaining inlet
    temperature gradients
    within the ASHRAE
    recommended range
    significantly saves energy
                                     Manufacturer
                   ASHRAE TC9.9      Specification
    Device Inlet
    Temperature
    Range          (64.4 - 80.6)ºF   (50 - 95)ºF

 Managing Your Infrastructure……The Smart
                                                © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way    Confidential and Proprietary   16
Re-Mixing Air Streams – Bypass Airflow
   • Jet stream of high-velocity
     air has enough
     momentum to completely
     bypass the front of the IT
     rack which creates bypass
     airflow

   • Significant efficiencies
     and cost savings can be
     realized by eliminating
     bypass airflow.

 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary   17
Converting Chaos into Order
   • Four Types of Solutions Can Be Employed
         –   Rack-based Heat Containment
         –   Cold Aisle Containment
         –   Hot Aisle Containment
         –   Independent Containment
   • Two phases exist for each type
         – Partial Containment
         – Total Containment
   • Two methods for implementation exist
         – Integrated to the Rack
         – Independent to the Rack
   A variety of site-based constraints and consumer preferences can
                         drive the best selection
 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary   18
Wright Line’s Evolution of Airflow Management
Rear
 Fan
Doors Fan and Duct system            1st Gen. HCS                 2nd Gen. HCS              Aisle Containment




1996     1997 1998     1999   2000    2001 2002          2003          2004   2005   2006   2007   2008   2009


 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary                                       19
Control Chaotic Cooling
                              Wright Line
                               Products




Managing Your Infrastructure……The Smart Way
Basic Data Center
                         Low Level Solutions




Managing Your Infrastructure……The Smart Way
Wright Line Product Solutions
   • First Steps
        –   Seal Up The Room and Racks
        –   Maximize Air Flow and Redirect Air                                  • Universal Air Seal Kits
              •   Blanking Panels




        Seal Up The Floor
        Koldlock



 Managing Your Infrastructure……The Smart
                                                  © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way      Confidential and Proprietary                               22
Paramount High Flow Doors Front and Back
    • High Flow Doors offer
      exceptional airflow with 75%
      perforation – a 19% increase
      over industry standard
    • Unique perforation pattern
      results in a reduction of raw
      material consumption by over
      60% - a ‘green’ benefit
    • Doors feature tool-less door
      removal, a brushed aluminum
      door pull and a variety of locks




 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential andLLC, 2007
                                               © Wright Line Proprietary   23
Rack-Based
                              Heat Containment




 Managing Your Infrastructure……The Smart Way
                                                © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way    Confidential and Proprietary   24
Heat Containment
    • Wright Lines Heat Containment
      System Features:
         –   Scalable Heat Containment –
             Implement heat containment with minimal
             interruption to operations by building up
             from existing enclosures
      . –    Increased Rack Capacity – By isolating
             the heat from the cold supply air, you can
      .      load over 25kW of equipment in an
      .      enclosure
         –   Save White Space – No additional air
             conditioners or other space consuming
             equipment required
         –   Increase CRAC Cooling Efficiency – All
             cold supply air used primarily to cool IT
             equipment and hot air exhaust is direct
             back to the CRAC intake at a higher ∆T.
             Great for your “green initiatives”.
         –   Create a Predictable Environment – By
             actively controlling and normalizing
             supply temperature, you can eliminate
             recirculation and stratification.



 Managing Your Infrastructure……The Smart
                                                 © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way     Confidential and Proprietary   25
What is Rack-based Heat Containment
   • Stage 1- A Chimney structure that
     mounts directly to a top rear of IT Rack
     Allows hot air to rise directly to high
     stratification layers
   • Stage 2 - Connects the exhaust air
     directly back to the Return Air path of
     typical air conditioning systems
   • Can be passive or may be an active
     configuration with implementation of
     fans in the chimney
        – Active control of fans based on
          temperature or pressure

 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary   26
Rack Based Containment In A Data Center
   • Flexibility In Regards to Traditional Hot and Cold Isle
     Configurations




        - Maximize White Space
        - Working with Space Constraints
        - Integrating HCS with Current Infrastructure
        - Reducing CapEx and OpEx

 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary   27
Legacy Challenges – Lighting, Cabling & Power
  • Rack-based
    containment allows
    for standard cable
    and wiring best
    practices
  • Can be retro-fitted in
    the field without
    interruption of
    processing equipment
  • Custom
    configurations
    available
 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential andLLC, 2009
                                               © Wright Line Proprietary   28
Overhead Flexibility




 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary   29
Heat Containment - Wright Line and 3rd Party Enclosures
   Addressing Flexibility and Investment Protection
  - Maximize Existing
    Infrastructure Investments
  - Minimize Disruptions
       - As your applications grow or you
         consolidate servers, cooling
         capacity can be increased
         simply by modifying the doors,
         side panels and tops of your
         enclosure system. The base
         enclosure remains the same,
         lowering your Total Cost of
         Ownership (TCO).



 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary   30
Paramount Tower of Cool™

    For applications where a full HCS deployment is
    unnecessary, the patented Tower of Cool, which utilizes
    High Delta Temperature Cooling (HDTC), can be a
    perfect alternative. The Tower of Cool efficiently cools
    10kW of equipment within 44U, by incorporating the
    building air conditioning system and the enclosure into
    one closed-loop cooling system. The Tower of Cool is
    also the perfect solution for providing supplemental spot
    cooling in legacy data centers.

    By preventing stratified air from entering the top of the
    enclosure, the Tower of Cool distributes cold air which
    allows equipment to run at lower temperatures,
    resulting in increased hardware reliability.

                                                The Tower of Cool, using specialized doors and
                                                fans, captures cold air from the raised floor
                                                plenum and distributes it throughout the rack.

 Managing Your Infrastructure……The Smart
                                                   © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way       Confidential and Proprietary                   31
Airflow Manager for Switches and Routers

       Features
       - Helps eliminate overheating of
        network racks and other nearby
        equipment by allowing front to rear
        airflow through the switch or router
       - Improves efficiency by preventing
        hot exhaust air from mixing with
        cold intake air.
       - Allows the switch or router
        assembly to be mounted facing the
        front or rear of the enclosure.
       - Resolves the difficult issue of how
        to mount a switch or Router with
        unique airflow requirements


 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary   32
Cold and Hot Aisle
                                Containment




Managing Your Infrastructure……The Smart Way
What is Cold Aisle Containment?
 • Stage I – Partial Containment:
       – Typically configured with a set of End of Row Doors and the
         installation of Blanking Panels in all open IT U space
 • Stage 2 – Total Containment:
       – Incorporates the Aisle Ceiling structure which spans the aisle
         from the front of one row of racks to the front of the opposing row of
         racks
   Why Implement Cold Aisle Containment?
   • Save Energy – Reduce your cold air supply in an open
     environment with reduction or elimination of hot and cold air
     mixing
   • Provide Predictability – By reducing or eliminating re-mixing of
     hot and cold air in a dynamic data center environment
 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary        34
Cold Aisle Containment Challenges
   • The temperature in the remainder of the data center may
     become too hot for optimal employee productivity
   • The local Authority Having Jurisdiction (AHJ) may interpret
     total containment as a “room within a room” which may
     present additional challenges:
        – Fire Detection and Fire Suppression Systems

   • Reduction in thermal inertia for outage ride-through
   • The clear ceilings that are utilized in the contained row may
     present some cleaning issues


 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary   35
What is Independent Hot Aisle Containment?
  • Stage 1– Partial Containment:
        – Configured with a set of End of Row Doors driving heat upwards
          to the preferred stratification layer
  • Stage 2 – Total Containment
        – Incorporates the Aisle Ceiling structure which spans the aisle
          and allows for return chimney installation

  Why Implement Hot Aisle Containment?
  • All energy used to move/produce cool air is used to cool IT equipment
  • Air conditioner set points can be tuned to deliver ideal inlet air temp to IT
    equipment and eliminate the energy from overcooling
  • Warm air is sent directly back to conditioning systems increasing overall
    cooling performance
  • Predictable air management is obtained
 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary          36
Hot Aisle Containment Challenges
   • The temperature in the hot aisle could become too hot for
     optimal employee productivity
   • The local Authority Having Jurisdiction (AHJ) may interpret
     total containment as a “room within a room” which may
     present additional challenges:
        – Fire Detection and Fire Suppression Systems
   • With ceiling space consumed with exhaust chimneys,
     lighting in the rows can become an issue.




 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary   37
Anatomy of a Contained Row
   • End of Row Doors
   • Aisle Ceiling (Optional)
   • Integrated to the Racks
   • Available for Wright Line
     racks or third-party racks
   • Shown here in 4’ cold aisle
     width configuration
         – Available for up to 8’ width
   • Can be deployed for
     hot and cold aisles
         – Cold Air Shown
 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary   38
Total Cold Aisle Containment




 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary   39
Aisle Containment




 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary   40
Cold Aisle Delivers Performance and Efficiency
  Open
  Chaos
  System




  Partial
  Containment
  with End of
  Row Doors


  Total
  Containment
  with Doors
  & Ceiling

 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential andLLC, 2009
                                               © Wright Line Proprietary   41
Total Containment – Hot and Cold




     This illustrates a Total Containment System where both the Supply and
     Return Air Streams are captured to provide for a completely closed loop
     system. This will increase efficiencies and increase overall
     infrastructure capacity.
 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary     42
End Of Row Doors
    Features & Benefits:
    Ease of Installation – Field-installable,
    rack-integrated and freestanding options
    available
    Rack Agnostic – Flexible enough to install
    almost anywhere on any manufacturer's
    brand
    Enclosure
    Improve Efficiency and Predictability –
    Increases cold air intake efficiency, from the
    bottom of the enclosure to the top, within
    the cold aisle. Decreases wasted air by as
    much as 70%
                                                                      Café Doors   Single Swing End Door
    Variety of Door Models – Café-style doors
    and containment walls
   Minimize Air Re-mixing – Cost-effectively
   minimize air mixing between the hot and
 Managing Your Infrastructure……The Smart cold air
   cold aisle while keeping the uniform
   supply in front of the servers for a longer© Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way  Confidential and Proprietary                            43

   period of time
End Of Row Curtains
  Features
  -     Ease of Installation – Field-installable,
        rack integrated and ceiling-integrated
        options available
  -     Rack Agnostic – Flexible enough to install
        almost anywhere on any manufacturer's
        brand enclosure
  -     Improve Efficiency and Predictability –
        Increases cold air intake efficiency, from
        the bottom of the enclosure to the top,
        within the cold aisle. Decreases wasted air
        by as much as 55%
  -     Variety of Curtain Models – Choose from
        various styles of curtains – from simple end
        of aisle containment curtains to building-
        integrated curtains, which can become
        containment walls                                    End of Row Curtains Providing
  -     Minimize Air Re-mixing – Cost-effectively            Cold Air Containment with Rack
        minimize air mixing between the hot and
        cold aisle while keeping the uniform cold
                                                             Based Chimneys for Heat
        air supply in front of the servers for a             Containment
        longer period of time

 Managing Your Infrastructure……The Smart
                                                 © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way     Confidential and Proprietary                  44
Simple Aisle Curtain Solution




               • Curtain systems exhibit substantial leakage but
               can provide a cost effective strategy to isolate air
               streams in the Data Center…better than nothing!
 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary   45
Independent
          Hot and Cold Aisle Containment




Managing Your Infrastructure……The Smart Way
Independent Hot and Cold Aisle Added Benefits
  Flexibility Finally Returns to the IT Manager
        –    Ability to support any Vendor IT Rack of any depth or height
        –    Ability to support any density anywhere on the white space
        –    Available Rack space unencumbered by cooling equipment in the rack rows
        –    Adds, Moves and change happens everyday
  Cooling Performance Achieved by Facility Manager
        – Efficient cooling systems cost less to operate
        – Optimized designs that match cooling capacity and demand will
          cost less to purchase
        – Predictable performance in a dynamic environment drives reliability

            Yields a savings greater than 30% reduction in the
             energy consumed in a typical legacy data center
 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary         47
Independent Containment System
                                      Ambient lighting with clear
                                      roof
                                                                              Move racks
                                                                              on demand


        Fits any size rack
                                                                                 End of
        Vertical blanking system
                                                                                 Row
        maintains containment integrity
                                                                                 Doors
        Add Adjustable Chimneys
        with load                                                            Extend aisle
                                                                             with load growth
        Can Be Deployed as Hot or
        Cold Isle Containment

 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary                      48
Aisle Containment with Expansion Frame
                - Scalability
                - Flexibility
                - Investment Protection




 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential andLLC, 2009
                                               © Wright Line Proprietary   49
Independent Containment System
                                                                 Features:
                                                                 Supports various number of racks
                                                                 End of Row Café Doors
                                                                 Standard Exhaust Chimneys



                                                                                          Vertical
                                                                                          Blanking
                                                                                          System Various
                                                                                          Rack Positions
                                                                                          and Heights



                                                                             Available in Seismic Version
 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary                                  50
Independent Containment System




 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary   51
Summary of Wright Line’s Containment Strategies
  • Wright Line Designs, Engineers and Manufacturers a Complete Portfolio of
    Products that Address Airflow Management Solutions within the Data Center
        – Ease of Use
        – Ease of Installation
        – Lowest Total Cost of Ownership
             • Reduction in CapEx and OpEx
  • Airflow Strategies – Isolate and Separate Hot and Cold Air
        – Total Containment
        – Partial Containment
  • Air Flow Products
        –   Heat Containment
        –   Cold Isle Containment
        –   Hot Isle Containment
        –   Independent Containment
        –   Wright Line and 3rd Party Solutions




 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary      52
Summary of Wright Line’s Containment Strategies

     • Eliminate recirculation, air stratification and bypass air.
     • Create predictability in your data center.
     • Road to containment can be achieved through
       several stages.
           – Main emphasis being scalable and flexible products that
             decrease your Total Cost of Ownership
     • Collaborative approach – not a one-size-fits-all
       solution, every site is unique and every project is
       different.
     • Energy savings … improves operational efficiencies.
     • Increase reliability by shedding electrical loads and
       isolating air streams.

 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary   53
Wright Line Converting Chaotic Air
                  Flow Into Order

      • Thank You For Your Time
      • Contact Information
           –   Danny Newman
           –   Cell: 205-410-4216
           –   Office: 205-980-6143
           –   Email: danny.newman@wrightline.com




 Managing Your Infrastructure……The Smart
                                               © Wright Line LLC, 2007
 Way
Managing Your Infrastructure……The Smart Way   Confidential and Proprietary   54

Mais conteúdo relacionado

Mais procurados

[Webinar Presentation] Best Practices for IT/OT Convergence
[Webinar Presentation] Best Practices for IT/OT Convergence[Webinar Presentation] Best Practices for IT/OT Convergence
[Webinar Presentation] Best Practices for IT/OT ConvergenceSchneider Electric
 
2009 Going Green Data Center Presentation
2009 Going Green Data Center Presentation2009 Going Green Data Center Presentation
2009 Going Green Data Center Presentationenternet
 
Improvements in Data Center Management
Improvements in Data Center ManagementImprovements in Data Center Management
Improvements in Data Center ManagementScottMadden, Inc.
 
Denison university success story schneider electric
Denison university success story schneider electricDenison university success story schneider electric
Denison university success story schneider electricSchneider Electric
 
IIoT + Predictive Analytics: Solving for Disruption in Oil & Gas and Energy &...
IIoT + Predictive Analytics: Solving for Disruption in Oil & Gas and Energy &...IIoT + Predictive Analytics: Solving for Disruption in Oil & Gas and Energy &...
IIoT + Predictive Analytics: Solving for Disruption in Oil & Gas and Energy &...DataWorks Summit
 
Low Complexity + Low Cost = High Availability
Low Complexity + Low Cost = High AvailabilityLow Complexity + Low Cost = High Availability
Low Complexity + Low Cost = High AvailabilityUptime Institute
 
Building a Sustainable Data Center
Building a Sustainable Data CenterBuilding a Sustainable Data Center
Building a Sustainable Data CenterAngela Miller
 
What Does It Cost to Build a Data Center? (SlideShare)
What Does It Cost to Build a Data Center? (SlideShare)What Does It Cost to Build a Data Center? (SlideShare)
What Does It Cost to Build a Data Center? (SlideShare)SP Home Run Inc.
 
Big Data Analytics Transforms Utilities and Cities
Big Data Analytics Transforms Utilities and CitiesBig Data Analytics Transforms Utilities and Cities
Big Data Analytics Transforms Utilities and CitiesBlack & Veatch
 
Green IT: Start Saving Money
Green IT: Start Saving MoneyGreen IT: Start Saving Money
Green IT: Start Saving MoneySymantec
 
Carbon Footprinting Compliance Schemes - Australia
Carbon Footprinting Compliance Schemes - AustraliaCarbon Footprinting Compliance Schemes - Australia
Carbon Footprinting Compliance Schemes - AustraliaOcean Software
 
SC17 Panel: Energy Efficiency Gains From HPC Software
SC17 Panel: Energy Efficiency Gains From HPC SoftwareSC17 Panel: Energy Efficiency Gains From HPC Software
SC17 Panel: Energy Efficiency Gains From HPC Softwareinside-BigData.com
 
Implementing energy efficient data centers
Implementing energy efficient  data centersImplementing energy efficient  data centers
Implementing energy efficient data centersSchneider Electric India
 
The Mine Central Control Room: From Concept to Reality
The Mine Central Control Room: From Concept to Reality The Mine Central Control Room: From Concept to Reality
The Mine Central Control Room: From Concept to Reality Schneider Electric
 
IT service provider, IT outsourcing, OneNeck IT Services
IT service provider, IT outsourcing, OneNeck IT ServicesIT service provider, IT outsourcing, OneNeck IT Services
IT service provider, IT outsourcing, OneNeck IT Servicesoneneckitservices
 
Comprehensive Energy Management Strategy
Comprehensive Energy Management StrategyComprehensive Energy Management Strategy
Comprehensive Energy Management StrategySchneider Electric
 

Mais procurados (20)

[Webinar Presentation] Best Practices for IT/OT Convergence
[Webinar Presentation] Best Practices for IT/OT Convergence[Webinar Presentation] Best Practices for IT/OT Convergence
[Webinar Presentation] Best Practices for IT/OT Convergence
 
2009 Going Green Data Center Presentation
2009 Going Green Data Center Presentation2009 Going Green Data Center Presentation
2009 Going Green Data Center Presentation
 
Data Center Power Strategies
Data Center Power StrategiesData Center Power Strategies
Data Center Power Strategies
 
Improvements in Data Center Management
Improvements in Data Center ManagementImprovements in Data Center Management
Improvements in Data Center Management
 
Business intelligence
Business intelligence Business intelligence
Business intelligence
 
Denison university success story schneider electric
Denison university success story schneider electricDenison university success story schneider electric
Denison university success story schneider electric
 
IIoT + Predictive Analytics: Solving for Disruption in Oil & Gas and Energy &...
IIoT + Predictive Analytics: Solving for Disruption in Oil & Gas and Energy &...IIoT + Predictive Analytics: Solving for Disruption in Oil & Gas and Energy &...
IIoT + Predictive Analytics: Solving for Disruption in Oil & Gas and Energy &...
 
Going Modular? Lessons learned from 500 modular data center implementations
Going Modular?  Lessons learned from 500 modular data center implementations Going Modular?  Lessons learned from 500 modular data center implementations
Going Modular? Lessons learned from 500 modular data center implementations
 
Low Complexity + Low Cost = High Availability
Low Complexity + Low Cost = High AvailabilityLow Complexity + Low Cost = High Availability
Low Complexity + Low Cost = High Availability
 
Presentation on Green Data Centres
Presentation on Green Data CentresPresentation on Green Data Centres
Presentation on Green Data Centres
 
Building a Sustainable Data Center
Building a Sustainable Data CenterBuilding a Sustainable Data Center
Building a Sustainable Data Center
 
What Does It Cost to Build a Data Center? (SlideShare)
What Does It Cost to Build a Data Center? (SlideShare)What Does It Cost to Build a Data Center? (SlideShare)
What Does It Cost to Build a Data Center? (SlideShare)
 
Big Data Analytics Transforms Utilities and Cities
Big Data Analytics Transforms Utilities and CitiesBig Data Analytics Transforms Utilities and Cities
Big Data Analytics Transforms Utilities and Cities
 
Green IT: Start Saving Money
Green IT: Start Saving MoneyGreen IT: Start Saving Money
Green IT: Start Saving Money
 
Carbon Footprinting Compliance Schemes - Australia
Carbon Footprinting Compliance Schemes - AustraliaCarbon Footprinting Compliance Schemes - Australia
Carbon Footprinting Compliance Schemes - Australia
 
SC17 Panel: Energy Efficiency Gains From HPC Software
SC17 Panel: Energy Efficiency Gains From HPC SoftwareSC17 Panel: Energy Efficiency Gains From HPC Software
SC17 Panel: Energy Efficiency Gains From HPC Software
 
Implementing energy efficient data centers
Implementing energy efficient  data centersImplementing energy efficient  data centers
Implementing energy efficient data centers
 
The Mine Central Control Room: From Concept to Reality
The Mine Central Control Room: From Concept to Reality The Mine Central Control Room: From Concept to Reality
The Mine Central Control Room: From Concept to Reality
 
IT service provider, IT outsourcing, OneNeck IT Services
IT service provider, IT outsourcing, OneNeck IT ServicesIT service provider, IT outsourcing, OneNeck IT Services
IT service provider, IT outsourcing, OneNeck IT Services
 
Comprehensive Energy Management Strategy
Comprehensive Energy Management StrategyComprehensive Energy Management Strategy
Comprehensive Energy Management Strategy
 

Semelhante a Air Flow Presentation 0218

Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxSchneider Electric
 
Commercial Overview DC Session 4 Introduction To Energy In The Data Centre
Commercial Overview   DC Session 4   Introduction To Energy In The Data CentreCommercial Overview   DC Session 4   Introduction To Energy In The Data Centre
Commercial Overview DC Session 4 Introduction To Energy In The Data Centrepaul_mathews
 
Enhance your aged infrastructure without impacting operations
Enhance your aged infrastructure without impacting operationsEnhance your aged infrastructure without impacting operations
Enhance your aged infrastructure without impacting operationsEaton Electrical
 
The Future of Data Warehousing: ETL Will Never be the Same
The Future of Data Warehousing: ETL Will Never be the SameThe Future of Data Warehousing: ETL Will Never be the Same
The Future of Data Warehousing: ETL Will Never be the SameCloudera, Inc.
 
Retrofit, build, or go cloud/colo? Choosing your best direction
Retrofit, build, or go cloud/colo?  Choosing your best directionRetrofit, build, or go cloud/colo?  Choosing your best direction
Retrofit, build, or go cloud/colo? Choosing your best directionSchneider Electric
 
System Level Data and Technology Requirements of REV
System Level Data and Technology Requirements of REV System Level Data and Technology Requirements of REV
System Level Data and Technology Requirements of REV Smarter Grid Solutions
 
Koomeyondatacenterelectricityuse v9
Koomeyondatacenterelectricityuse v9Koomeyondatacenterelectricityuse v9
Koomeyondatacenterelectricityuse v9Jonathan Koomey
 
Case Study: Datotel Extended the Power of Infrastructure Management to the Ph...
Case Study: Datotel Extended the Power of Infrastructure Management to the Ph...Case Study: Datotel Extended the Power of Infrastructure Management to the Ph...
Case Study: Datotel Extended the Power of Infrastructure Management to the Ph...CA Technologies
 
The Connected Building Transformation
The Connected Building TransformationThe Connected Building Transformation
The Connected Building TransformationTrane Commercial
 
The New Role of Data in the Changing Energy & Utilities Landscape
The New Role of Data in the Changing Energy & Utilities LandscapeThe New Role of Data in the Changing Energy & Utilities Landscape
The New Role of Data in the Changing Energy & Utilities LandscapeDenodo
 
Using Data Platforms That Are Fit-For-Purpose
Using Data Platforms That Are Fit-For-PurposeUsing Data Platforms That Are Fit-For-Purpose
Using Data Platforms That Are Fit-For-PurposeDATAVERSITY
 
Coppertree Energy Metering and Dashboards
Coppertree Energy Metering and Dashboards Coppertree Energy Metering and Dashboards
Coppertree Energy Metering and Dashboards CopperTree Analytics
 
It Presentation 2011 Santa Clara1
It Presentation   2011 Santa Clara1It Presentation   2011 Santa Clara1
It Presentation 2011 Santa Clara1Peter Kendall
 
Data Center Management: Where Brain Meet Braun
Data Center Management: Where Brain Meet BraunData Center Management: Where Brain Meet Braun
Data Center Management: Where Brain Meet BraunAFCOM
 
Energy solutions for federal facilities : How to harness sustainable savings ...
Energy solutions for federal facilities : How to harness sustainable savings ...Energy solutions for federal facilities : How to harness sustainable savings ...
Energy solutions for federal facilities : How to harness sustainable savings ...Schneider Electric
 
Datacenter Strategy, Design, and Build
Datacenter Strategy, Design, and BuildDatacenter Strategy, Design, and Build
Datacenter Strategy, Design, and BuildChristopher Kelley
 
COMMON PROBLEMS AND CHALLENGES IN DATA CENTRES
COMMON PROBLEMS AND CHALLENGES IN DATA CENTRESCOMMON PROBLEMS AND CHALLENGES IN DATA CENTRES
COMMON PROBLEMS AND CHALLENGES IN DATA CENTRESKamran Hassan
 
Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...
Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...
Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...Panduit
 
Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...
Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...
Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...Panduit
 

Semelhante a Air Flow Presentation 0218 (20)

Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptx
 
Commercial Overview DC Session 4 Introduction To Energy In The Data Centre
Commercial Overview   DC Session 4   Introduction To Energy In The Data CentreCommercial Overview   DC Session 4   Introduction To Energy In The Data Centre
Commercial Overview DC Session 4 Introduction To Energy In The Data Centre
 
Enhance your aged infrastructure without impacting operations
Enhance your aged infrastructure without impacting operationsEnhance your aged infrastructure without impacting operations
Enhance your aged infrastructure without impacting operations
 
The Future of Data Warehousing: ETL Will Never be the Same
The Future of Data Warehousing: ETL Will Never be the SameThe Future of Data Warehousing: ETL Will Never be the Same
The Future of Data Warehousing: ETL Will Never be the Same
 
Retrofit, build, or go cloud/colo? Choosing your best direction
Retrofit, build, or go cloud/colo?  Choosing your best directionRetrofit, build, or go cloud/colo?  Choosing your best direction
Retrofit, build, or go cloud/colo? Choosing your best direction
 
System Level Data and Technology Requirements of REV
System Level Data and Technology Requirements of REV System Level Data and Technology Requirements of REV
System Level Data and Technology Requirements of REV
 
Koomeyondatacenterelectricityuse v9
Koomeyondatacenterelectricityuse v9Koomeyondatacenterelectricityuse v9
Koomeyondatacenterelectricityuse v9
 
Case Study: Datotel Extended the Power of Infrastructure Management to the Ph...
Case Study: Datotel Extended the Power of Infrastructure Management to the Ph...Case Study: Datotel Extended the Power of Infrastructure Management to the Ph...
Case Study: Datotel Extended the Power of Infrastructure Management to the Ph...
 
The Connected Building Transformation
The Connected Building TransformationThe Connected Building Transformation
The Connected Building Transformation
 
The New Role of Data in the Changing Energy & Utilities Landscape
The New Role of Data in the Changing Energy & Utilities LandscapeThe New Role of Data in the Changing Energy & Utilities Landscape
The New Role of Data in the Changing Energy & Utilities Landscape
 
Using Data Platforms That Are Fit-For-Purpose
Using Data Platforms That Are Fit-For-PurposeUsing Data Platforms That Are Fit-For-Purpose
Using Data Platforms That Are Fit-For-Purpose
 
Coppertree Energy Metering and Dashboards
Coppertree Energy Metering and Dashboards Coppertree Energy Metering and Dashboards
Coppertree Energy Metering and Dashboards
 
It Presentation 2011 Santa Clara1
It Presentation   2011 Santa Clara1It Presentation   2011 Santa Clara1
It Presentation 2011 Santa Clara1
 
Data Center Management: Where Brain Meet Braun
Data Center Management: Where Brain Meet BraunData Center Management: Where Brain Meet Braun
Data Center Management: Where Brain Meet Braun
 
Energy solutions for federal facilities : How to harness sustainable savings ...
Energy solutions for federal facilities : How to harness sustainable savings ...Energy solutions for federal facilities : How to harness sustainable savings ...
Energy solutions for federal facilities : How to harness sustainable savings ...
 
10 fn s33
10 fn s3310 fn s33
10 fn s33
 
Datacenter Strategy, Design, and Build
Datacenter Strategy, Design, and BuildDatacenter Strategy, Design, and Build
Datacenter Strategy, Design, and Build
 
COMMON PROBLEMS AND CHALLENGES IN DATA CENTRES
COMMON PROBLEMS AND CHALLENGES IN DATA CENTRESCOMMON PROBLEMS AND CHALLENGES IN DATA CENTRES
COMMON PROBLEMS AND CHALLENGES IN DATA CENTRES
 
Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...
Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...
Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...
 
Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...
Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...
Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...
 

Último

CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Vector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector DatabasesVector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector DatabasesZilliz
 

Último (20)

CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Vector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector DatabasesVector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector Databases
 

Air Flow Presentation 0218

  • 1. Data Center Air Flow Solutions Converting Chaos into Order Managing Your Infrastructure……The Smart Way
  • 2. Agenda • Industry Trends and Findings • Data Center Issues • Wright Line Strategies • Wight Line Product Solutions – Air Flow Management Products (Wright Line and Vendor Neutral) • Heat Containment • Isle Containment • Independent Containment Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 2
  • 3. Industry Findings and Trends • Power consumption is so significant that accommodating the increase in IT power consumption over the next five years will require the U.S. to construct 10 major power plants. If current trends continue, we will need another 20 between 2010 and 2015. That’s 30 power plants that need to be built just to accommodate the growth within IT power. » Source: Uptime Institute • Forecasts indicate that unless energy efficiency is improved beyond current trends, the federal government’s electricity cost for servers and data centers could be nearly $740 million annually by 2011, with a peak load of approximately 1.2 GW. » Source: Report to Congress on Server and Data Center Energy Efficiency Public Law 109-431 » U.S. Environmental Protection Agency ENERGY STAR Program , August 2, 2007 Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 3
  • 4. Industry Findings and Trends • People think that a $2,500 server is so cheap you don’t have to worry about it. But over three years, the cost of electricity nearly equals the cost of the server and that’s without the Capital Expenditure for building the data center or the cost of running it. » Source: Uptime Institute • All data centers should optimize air flow, but this step is especially effective in legacy data centers where air flow management was not considered at build-out or where current implementation is conventional hot-aisle cold-aisle set-up. In these arrangements there is poor separation between the cold supply and hot return airstreams. Creating a physical barrier separating hot and cold airstreams to provide the highest degree of separation. Any of three approaches—cold aisle containment, hot aisle containment, and rack containment could provide the physical separation with each one offering its own advantages and limitations. » Source: Silicon Valley Leadership Group • Business will continue to look for ways to reduce data center operational costs. Data Center Energy Consumption has reached the CEO’s desk and will continue to become a strategic issue. » Source: McKinzey Report Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 4
  • 5. Industry Findings and Trends • Data Center Facilities Reducing Data Center Power Consumption – Data Center Power Consumption is Getting More Important • As a major concern power consumption/conservation increased from 48% to 55% • The behavior concerning power consumption has begun to change – "When the power bill gets really significant, it ends up on the CEO's desk. "When he sees that the biggest user is IT, IT has to deal with it." – Still 28% of survey respondents don't know whether their power bill has increased or decreased – though this is an improvement over the 36% who didn't know last year. – For the respondents who are paying attention, a majority see major increases in the power bill for their data centers. 44% have seen an increase, and 19% say the increase is greater than 10%. • Hot Aisle/Cold Aisle Containment -- the practice of sealing hot aisles and cold aisles in a data center –gained traction in 2009 • Some data centers do hot-aisle and cold-aisle containment themselves, and some buy a system from a provider, such as Wright Line, APC and Liebert • Containment really wasn't on the radar until late last year, but already 30% of respondents have implemented it, and an additional 15% plan to next year • The cold-aisle containment strategy is slightly more popular with respondents than is hot-aisle or plenum containment Source: Uptime Institute Managing Your Infrastructure……The Smart 2009 Data Center Survey © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 5
  • 6. Industry Findings and Trends • Increasing Computer Room Air Conditioner Performance – ASHRAE TC9.9 and Ambient Conditions • Dry Bulb Temperature 68 to 77 Degree Fahrenheit – The trick is there is usually a range of temperatures, not one temperature • 40 – 55% RH at Air Inlet • It’s all about the Delta T (^T) – 30 Ton Units are Not Really 30 Ton Units. It’s 30 Tons at some operating conditions • Examples • A 30 Ton nominal,downflow, chilled water CRAC unit may have a sensible capacity of 27 Tons at 72 degrees, but only 23 Tons when operated at 68 degrees. 18% more capacity at the higher operating temperature! • Capturing return air at a higher temperature allows for a higher Delta T and increase performance. • 88 degrees entering the CRAC will produce 30 Tons. A 30% improvement! Source: Data Center Journal Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 6
  • 7. Industry Findings and Trends • Increasing Chiller Temperature Yields Significant Savings – “Normally, for centrifugal compressor-based chillers, an increase of one degree in the chilled water supply temperature can increase the operational efficiency of the chiller by 1 to 2 percent. If a chiller can supply chilled water at 55°F, it will be approximately 15 to 30 percent more efficient than when it produces chilled water at 40°F (cooler).” Source: Dr. Tengfang Xu June 15, 2005, Lawrence Berkeley National Laboratory Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 7
  • 8. Problems In The Data Center • Legacy Designs or Lack Thereof • Conventional Designs that did not Anticipate Shifts in Technology • On-Going Changes That Effect The Dynamics Of The Data Center • 24X7X365 Uptime • Lack Of Funding - On-Going Capital & Operational Expenses – Doing More With Less • Perceived and Real Risks • Usually Number One Problem from an Immediate Need: – Heat and Power ( I have enough cooling, but I still have heat problems and we are running out of power.) Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 8
  • 9. Current State of Most Data Centers Regarding Air Flow Management • Over Provisioned Air Cooling Adding To Cost • Yet Cooling Is Still A Problem – 90% Of Data Centers Have Enough or Too Much Cooling – 60% Of The Cool Air Is Wasted Due To: • Air Mixing • Air Stratification • Bypass Air – Why The Problem? • Traditional Data Center Designs are not Predictable and Consistent • Technological Changes That Were Not Planned or Anticipated • Immediate Business Needs Creating Short Term Solutions Without Consideration to Efficiency • The Cost Of Running A Data Center Has Reached The Radar of CEOs and C Level Executives – CapEx and OpEx Expenses – Green Initiatives Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 9
  • 10. The “Four Temps”: Do you have chaos cooling? • Supply Path ∆T µT4-µT1= Supply losses and entitlement for cooling performance gain • Return Path ∆T µT3-µT2= Return losses and entitlement for efficiency gain Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 10
  • 11. Wright Lines Answers To Technical and Business Objectives • Wright Line Can Help Clients Reduce Capital & Operational Expenses – Reduce The Need For Cooling – Reduce Heat Within The Data Center – Increase Density Levels within Enclosures and Increase Floor Space – Implement A More Predictable Environment – Maximize Existing Infrastructure Investments • Cooling • Power • Floor Space • Less or Lack of Disruption • Stranded Assets Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 11
  • 12. Wright Line Methodology • Analyze the Current Environment - Planning – Industry Specifications: PUE, DCiE – Utilizing Modeling Tools (CFD) – Utilizing Practical “ Horse Sense” • How much power and AC do I need now and the foreseeable future? • Can the current data center be adapted to the new technology? • What are the biggest pay backs? • What is the best phased approach to move forward? • Our Solutions Utilize Services and Enabling Technology – Provides a Road Map To Achieve the Technological and Business Objectives to Provide The Fastest ROI That Is Practical In Your Environment Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 12
  • 13. Why Chaos Cooling in a Data Center? • Legacy cooling designs employ an open supply and return air methodology that drives mixing of both supply and return air streams • Cool air in a legacy data center is used for many purposes • Cool IT equipment • Keep warm air away from IT inlets • Move warm air toward the return system • Minor changes in any element of the data center create unpredictable behavior which decreases reliability Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 13
  • 14. How Does Chaos Manifest Itself in the Data Center? • Recirculation of air from IT equipment exhaust finds its way to IT inlet and can reduce server performance and even cause servers to stop working • Air stratification is the layering of different temperature air masses and forces set points of precision cooling equipment to be lower than recommended • Bypass Air is the remixing of cool supply air that directly enters the return air stream and drives down precision cooling efficiencies To prevent processing impact, data centers produce significantly more cold air than is required for IT devices Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 14
  • 15. Recirculation • Hot air exhaust circulating back into its own intake can cause device thermal overload. • Typical manufacturer inlet temperature threshold for device operations is 95°F. • Exceeding manufacturers’ operating device threshold can lead to unplanned computing system outages and data loss. Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 15
  • 16. Temperature Stratification • Significant gradient of air temperatures beyond ASHRAE TC9.9 places devices at risk of thermal overload • Maintaining inlet temperature gradients within the ASHRAE recommended range significantly saves energy Manufacturer ASHRAE TC9.9 Specification Device Inlet Temperature Range (64.4 - 80.6)ºF (50 - 95)ºF Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 16
  • 17. Re-Mixing Air Streams – Bypass Airflow • Jet stream of high-velocity air has enough momentum to completely bypass the front of the IT rack which creates bypass airflow • Significant efficiencies and cost savings can be realized by eliminating bypass airflow. Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 17
  • 18. Converting Chaos into Order • Four Types of Solutions Can Be Employed – Rack-based Heat Containment – Cold Aisle Containment – Hot Aisle Containment – Independent Containment • Two phases exist for each type – Partial Containment – Total Containment • Two methods for implementation exist – Integrated to the Rack – Independent to the Rack A variety of site-based constraints and consumer preferences can drive the best selection Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 18
  • 19. Wright Line’s Evolution of Airflow Management Rear Fan Doors Fan and Duct system 1st Gen. HCS 2nd Gen. HCS Aisle Containment 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 19
  • 20. Control Chaotic Cooling Wright Line Products Managing Your Infrastructure……The Smart Way
  • 21. Basic Data Center Low Level Solutions Managing Your Infrastructure……The Smart Way
  • 22. Wright Line Product Solutions • First Steps – Seal Up The Room and Racks – Maximize Air Flow and Redirect Air • Universal Air Seal Kits • Blanking Panels Seal Up The Floor Koldlock Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 22
  • 23. Paramount High Flow Doors Front and Back • High Flow Doors offer exceptional airflow with 75% perforation – a 19% increase over industry standard • Unique perforation pattern results in a reduction of raw material consumption by over 60% - a ‘green’ benefit • Doors feature tool-less door removal, a brushed aluminum door pull and a variety of locks Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential andLLC, 2007 © Wright Line Proprietary 23
  • 24. Rack-Based Heat Containment Managing Your Infrastructure……The Smart Way © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 24
  • 25. Heat Containment • Wright Lines Heat Containment System Features: – Scalable Heat Containment – Implement heat containment with minimal interruption to operations by building up from existing enclosures . – Increased Rack Capacity – By isolating the heat from the cold supply air, you can . load over 25kW of equipment in an . enclosure – Save White Space – No additional air conditioners or other space consuming equipment required – Increase CRAC Cooling Efficiency – All cold supply air used primarily to cool IT equipment and hot air exhaust is direct back to the CRAC intake at a higher ∆T. Great for your “green initiatives”. – Create a Predictable Environment – By actively controlling and normalizing supply temperature, you can eliminate recirculation and stratification. Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 25
  • 26. What is Rack-based Heat Containment • Stage 1- A Chimney structure that mounts directly to a top rear of IT Rack Allows hot air to rise directly to high stratification layers • Stage 2 - Connects the exhaust air directly back to the Return Air path of typical air conditioning systems • Can be passive or may be an active configuration with implementation of fans in the chimney – Active control of fans based on temperature or pressure Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 26
  • 27. Rack Based Containment In A Data Center • Flexibility In Regards to Traditional Hot and Cold Isle Configurations - Maximize White Space - Working with Space Constraints - Integrating HCS with Current Infrastructure - Reducing CapEx and OpEx Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 27
  • 28. Legacy Challenges – Lighting, Cabling & Power • Rack-based containment allows for standard cable and wiring best practices • Can be retro-fitted in the field without interruption of processing equipment • Custom configurations available Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential andLLC, 2009 © Wright Line Proprietary 28
  • 29. Overhead Flexibility Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 29
  • 30. Heat Containment - Wright Line and 3rd Party Enclosures Addressing Flexibility and Investment Protection - Maximize Existing Infrastructure Investments - Minimize Disruptions - As your applications grow or you consolidate servers, cooling capacity can be increased simply by modifying the doors, side panels and tops of your enclosure system. The base enclosure remains the same, lowering your Total Cost of Ownership (TCO). Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 30
  • 31. Paramount Tower of Cool™ For applications where a full HCS deployment is unnecessary, the patented Tower of Cool, which utilizes High Delta Temperature Cooling (HDTC), can be a perfect alternative. The Tower of Cool efficiently cools 10kW of equipment within 44U, by incorporating the building air conditioning system and the enclosure into one closed-loop cooling system. The Tower of Cool is also the perfect solution for providing supplemental spot cooling in legacy data centers. By preventing stratified air from entering the top of the enclosure, the Tower of Cool distributes cold air which allows equipment to run at lower temperatures, resulting in increased hardware reliability. The Tower of Cool, using specialized doors and fans, captures cold air from the raised floor plenum and distributes it throughout the rack. Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 31
  • 32. Airflow Manager for Switches and Routers Features - Helps eliminate overheating of network racks and other nearby equipment by allowing front to rear airflow through the switch or router - Improves efficiency by preventing hot exhaust air from mixing with cold intake air. - Allows the switch or router assembly to be mounted facing the front or rear of the enclosure. - Resolves the difficult issue of how to mount a switch or Router with unique airflow requirements Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 32
  • 33. Cold and Hot Aisle Containment Managing Your Infrastructure……The Smart Way
  • 34. What is Cold Aisle Containment? • Stage I – Partial Containment: – Typically configured with a set of End of Row Doors and the installation of Blanking Panels in all open IT U space • Stage 2 – Total Containment: – Incorporates the Aisle Ceiling structure which spans the aisle from the front of one row of racks to the front of the opposing row of racks Why Implement Cold Aisle Containment? • Save Energy – Reduce your cold air supply in an open environment with reduction or elimination of hot and cold air mixing • Provide Predictability – By reducing or eliminating re-mixing of hot and cold air in a dynamic data center environment Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 34
  • 35. Cold Aisle Containment Challenges • The temperature in the remainder of the data center may become too hot for optimal employee productivity • The local Authority Having Jurisdiction (AHJ) may interpret total containment as a “room within a room” which may present additional challenges: – Fire Detection and Fire Suppression Systems • Reduction in thermal inertia for outage ride-through • The clear ceilings that are utilized in the contained row may present some cleaning issues Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 35
  • 36. What is Independent Hot Aisle Containment? • Stage 1– Partial Containment: – Configured with a set of End of Row Doors driving heat upwards to the preferred stratification layer • Stage 2 – Total Containment – Incorporates the Aisle Ceiling structure which spans the aisle and allows for return chimney installation Why Implement Hot Aisle Containment? • All energy used to move/produce cool air is used to cool IT equipment • Air conditioner set points can be tuned to deliver ideal inlet air temp to IT equipment and eliminate the energy from overcooling • Warm air is sent directly back to conditioning systems increasing overall cooling performance • Predictable air management is obtained Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 36
  • 37. Hot Aisle Containment Challenges • The temperature in the hot aisle could become too hot for optimal employee productivity • The local Authority Having Jurisdiction (AHJ) may interpret total containment as a “room within a room” which may present additional challenges: – Fire Detection and Fire Suppression Systems • With ceiling space consumed with exhaust chimneys, lighting in the rows can become an issue. Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 37
  • 38. Anatomy of a Contained Row • End of Row Doors • Aisle Ceiling (Optional) • Integrated to the Racks • Available for Wright Line racks or third-party racks • Shown here in 4’ cold aisle width configuration – Available for up to 8’ width • Can be deployed for hot and cold aisles – Cold Air Shown Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 38
  • 39. Total Cold Aisle Containment Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 39
  • 40. Aisle Containment Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 40
  • 41. Cold Aisle Delivers Performance and Efficiency Open Chaos System Partial Containment with End of Row Doors Total Containment with Doors & Ceiling Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential andLLC, 2009 © Wright Line Proprietary 41
  • 42. Total Containment – Hot and Cold This illustrates a Total Containment System where both the Supply and Return Air Streams are captured to provide for a completely closed loop system. This will increase efficiencies and increase overall infrastructure capacity. Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 42
  • 43. End Of Row Doors Features & Benefits: Ease of Installation – Field-installable, rack-integrated and freestanding options available Rack Agnostic – Flexible enough to install almost anywhere on any manufacturer's brand Enclosure Improve Efficiency and Predictability – Increases cold air intake efficiency, from the bottom of the enclosure to the top, within the cold aisle. Decreases wasted air by as much as 70% Café Doors Single Swing End Door Variety of Door Models – Café-style doors and containment walls Minimize Air Re-mixing – Cost-effectively minimize air mixing between the hot and Managing Your Infrastructure……The Smart cold air cold aisle while keeping the uniform supply in front of the servers for a longer© Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 43 period of time
  • 44. End Of Row Curtains Features - Ease of Installation – Field-installable, rack integrated and ceiling-integrated options available - Rack Agnostic – Flexible enough to install almost anywhere on any manufacturer's brand enclosure - Improve Efficiency and Predictability – Increases cold air intake efficiency, from the bottom of the enclosure to the top, within the cold aisle. Decreases wasted air by as much as 55% - Variety of Curtain Models – Choose from various styles of curtains – from simple end of aisle containment curtains to building- integrated curtains, which can become containment walls End of Row Curtains Providing - Minimize Air Re-mixing – Cost-effectively Cold Air Containment with Rack minimize air mixing between the hot and cold aisle while keeping the uniform cold Based Chimneys for Heat air supply in front of the servers for a Containment longer period of time Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 44
  • 45. Simple Aisle Curtain Solution • Curtain systems exhibit substantial leakage but can provide a cost effective strategy to isolate air streams in the Data Center…better than nothing! Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 45
  • 46. Independent Hot and Cold Aisle Containment Managing Your Infrastructure……The Smart Way
  • 47. Independent Hot and Cold Aisle Added Benefits Flexibility Finally Returns to the IT Manager – Ability to support any Vendor IT Rack of any depth or height – Ability to support any density anywhere on the white space – Available Rack space unencumbered by cooling equipment in the rack rows – Adds, Moves and change happens everyday Cooling Performance Achieved by Facility Manager – Efficient cooling systems cost less to operate – Optimized designs that match cooling capacity and demand will cost less to purchase – Predictable performance in a dynamic environment drives reliability Yields a savings greater than 30% reduction in the energy consumed in a typical legacy data center Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 47
  • 48. Independent Containment System Ambient lighting with clear roof Move racks on demand Fits any size rack End of Vertical blanking system Row maintains containment integrity Doors Add Adjustable Chimneys with load Extend aisle with load growth Can Be Deployed as Hot or Cold Isle Containment Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 48
  • 49. Aisle Containment with Expansion Frame - Scalability - Flexibility - Investment Protection Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential andLLC, 2009 © Wright Line Proprietary 49
  • 50. Independent Containment System Features: Supports various number of racks End of Row Café Doors Standard Exhaust Chimneys Vertical Blanking System Various Rack Positions and Heights Available in Seismic Version Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 50
  • 51. Independent Containment System Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 51
  • 52. Summary of Wright Line’s Containment Strategies • Wright Line Designs, Engineers and Manufacturers a Complete Portfolio of Products that Address Airflow Management Solutions within the Data Center – Ease of Use – Ease of Installation – Lowest Total Cost of Ownership • Reduction in CapEx and OpEx • Airflow Strategies – Isolate and Separate Hot and Cold Air – Total Containment – Partial Containment • Air Flow Products – Heat Containment – Cold Isle Containment – Hot Isle Containment – Independent Containment – Wright Line and 3rd Party Solutions Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 52
  • 53. Summary of Wright Line’s Containment Strategies • Eliminate recirculation, air stratification and bypass air. • Create predictability in your data center. • Road to containment can be achieved through several stages. – Main emphasis being scalable and flexible products that decrease your Total Cost of Ownership • Collaborative approach – not a one-size-fits-all solution, every site is unique and every project is different. • Energy savings … improves operational efficiencies. • Increase reliability by shedding electrical loads and isolating air streams. Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 53
  • 54. Wright Line Converting Chaotic Air Flow Into Order • Thank You For Your Time • Contact Information – Danny Newman – Cell: 205-410-4216 – Office: 205-980-6143 – Email: danny.newman@wrightline.com Managing Your Infrastructure……The Smart © Wright Line LLC, 2007 Way Managing Your Infrastructure……The Smart Way Confidential and Proprietary 54