1. CURRICULAM VITAE
DABBIRU VENKATA RAMANA MURTHY
D/NO: 32-10-57/3
Venkateswara Colony
Sheela Nagar
Visakhapatnam-530012
AP, INDIA
Contact mobile no +91-9966070722/7742684502
Email id: dabbiru.murthy@gmail.com
Career Profile
Having 19+ years total experience which includes 12 years Gulf experience in OIL &
GAS PLANTS, Such as TURBINES, CENTRIFUGAL COMPRESSORS & PUMPS, GAS
ENGINES, HEAVY VALVES mechanical parts and Equipment installations in various
construction and maintenance projects.(Oil gathering center, Refineries, Petrochemical plants,
crude Oil distribution systems, crude oil desalting system, flare gas recovery systems, condensate
recovery units)
Associated with Major Multinational Companies like AL NASR, KNPC, KOC, QATAR
PETROLEUM (QP), QVC, L&T, SHOFT Engineering & Construction, and HOFINCONS
INDUSTRIAL SERVICES. Maintenance, Testing and Pre-commissioning, Erection of associated
Equipment’s for Refineries, Offshore & ON-Shore Oil & Gas projects.
EDUCATION QUALIFICATION
Technical Qualifications : Diploma in Mechanical Engineering
Computer knowledge : MS-Office , Windows 98/2000/XP/SAP SYSTEM
.
Employment Record
2. Present position
1) EMPLOYER : CAIRN INDIA LTD,
PERIOD : From 03rd
Oct 2011 to till Date,
POSITION HELD : Sr MECHANICAL ENGINEER
Key responsibilities
Preparing Preventive Maintenance schedule of equipment’s as per manufacturer
recommendation and compliance thereof.
Shutdown supervision and execution with assigned work force for all departments in
complex. Coordinating with contractors for job allocation, and completion thereof in time.
Preparation of critical spares required and inventories control.
Documents maintaining of ISO 9001, ISO 14001, OHSAS 14001
Development of the standard maintenance practices (SMPs) and Risk assessments.
Development of the subordinates & juniors by planning of the training & validation test.
Good working experience in industrial SAP system.
Having the experience of better utilization of manpower, machines material & shift handling.
2) EMPLOYER : CONSTRUCTION DEVALOPMENT COMPANY,
PROJECT : QATAR VINYL COMPANY,
PERIOD : From 14th
March 2011 to 25th
September
POSITION HELD : MECHANICAL SUPARVISOR
Key responsibilities
.
Review of P & ID’s, Isometric Drawing, & equipment Drawings.
Involved in 50 MV GE TURBAIN intermediate overhauling and major involvement in hot
path inspection
Recycle gas compressor , atlas copco air compressor, chlorine compressor major overhauling
Making all kind of alignments such as rim face, reverse, and laser alignments
Dismantling of mechanical seals serviceing,re-assembling and testing
3. 3) EMPLOYER : BRUNEL INDIA PRIVATE LIMITED
CLIENT : CAIRN INDIA PVT LTD
PERIOD : From June 2010 to Feb 2011
POSITION HELD : MECHANICAL ENGINEER
Key responsibilities
Responsible to check specifications and drawings with latest revision.
Preventive maintenance of all kind rotating equipment
Involved in TRIVENI 12 MV STEAM TURBAIN in major shutdown
Daily check of all oil and gas pads
To take the permit responsibility in all kind of jobs
Witness for Hydro static/Pneumatic test.
4) EMPLOYER : CONSTRUCTION DEVALOPMENT COMPANY,
PROJECT : QATAR VINYL COMPANY& QATAR PETROLIUMS
PERIOD : From May 2009 to June 2010
POSITION HELD : MECHANICAL ENGINEER
Key responsibilities
Major shutdown of four 50 MV GE TURBAINS
Involved in total fuel combines chamber for dismantling
Involved in main crank shaft leaner arty test and shaft trueness
Replaced the all lube oil system modification
Inspect the packages with approved P & ID and as built isometric drawings.
Responsible to co-ordinate material issue and control.
Responsible to ensure material conformity before issue and use
4. 5) EMPLOYER : LARSON & TOUBRO INDIA LTD
PROJECT : VISAKAPATNAM VESSAL PROJECT
OWNER : NAVEL DOCK YARD
PERIOD : From March 2006 to May 2009
POSITION HELD : MECHANICAL SUPERVISOR
Key responsibilities
Ensuring conformity to Drawings, specifications & Codes.
Review of P & ID’s, Isometric Drawing, Equipment Drawings
Responsible to monitors daily Equipment erecting activities.
To conduct Hydro testing and Pneumatic testing of pipe lines and to get it
inspected.
Alignment the 13 meter length and 350 mm dia of crank shaft with 8 dial gauges
Alignment of 16 ton main gear box with 12 ton thrust bearing
Involved in main heavy pumps, centrifugal compressors dismantling and
overhauling
Dismantling and assembling of heavy gate valves, gear boxes,
6) EMPLOYER : CONSTRUCTION DEVALOPMENT COMPANY,
PROJECT : QATAR VINYL COMPANY& QATAR PETROLIUMS
PERIOD : From Sep 2004 to Jan 2006
POSITION HELD : MECHANICAL FOREMAN & TECHANICIAN
Key responsibilities
Responsible to monitors daily preventive maintenance
Review of P & ID’s, Isometric Drawing,& Equipment Drawings
To conduct Hydro testing and Pneumatic testing of pipe lines and to get it
inspected.
5. 7) EMPLOYER : AL MEER TECHNICAL SERVICES WLL
OWNER : Kuwait Oil Company (KOC).
PERIOD : From June 1999 to May 2004
POSITION HELD : LEAD MECHANICAL TECHINICION
Key responsibilities
Review of P & ID’s, Isometric Drawing,& Equipment Drawings
To carry out the routine plant maintenance activities, connecting with onshore oil gathering
centers , booster station and super G.C – 27&28having a capacity of
200,000 BPD containing oil & gas separators , desalters , crude oil path
heaters , booster pumps and feed pumps
Involved in RUSTAN TA 1500, TB5000, GE 5002 Series solar turbine intermediate
overhauling , major overhaul of GE turbine
Involved in DRESSER CLARK – KAWASKI (RB5S,RB8S&RB7B) and
SOLAR(C304,C306 &C160)
Involved in COOPER BESSMER 16 V 250 GAS ENGINE and C.B INTEGRAL
COMPRESSOR mini checks and inter overhauling
Co-coordinating with site foreman and reporting head of department
8) EMPLOYER : AL NASR TRADEING & CONTRACTING WLL
CLINET : OMAN OIL COMPANY WLL
PERIOD : From April 1998 to Feb 1999.
POSITION HELD : SENIOR MECHANICAL TECHANICION
Key responsibilities
Read the equipment drawings, understand the scope of work, and distribute the work to the
work men.
Responsible for daily preventive maintenance jobs
Involved in erecting, commissioning, and overhauling of all kind of rotating
equipments
6. Maintenance of all kind of single stage and malty stage centrifugal pumps
Dynamic balance of crank shafts and lapping of compressor valve parts
Preparation of hydro test, tie-in, hot tap tie-in Packages & Coordinating quality control
activities.
Responsible for safety work of the project and maintains all safety records and
training to all crew for safe work and permit system.
9) EMPLOYER : HOFINCONS INDUSTRIAL SERVICES PVT LTD
CLINET : BELL GRNITO CERAMIC LTD
PERIOD : From June 1995 to March 1998.
POSITION HELD : SENIOR MECHANICAL TECHANICION
Key responsibilities
Alignment of 110 meter and 3.2 dia rotary kiln with three location foundation and 12
bearing pads
Blue matching of half bush bearing with gun metal
Involved in erecting, commissioning, and overhauling of all kind of rotating
equipments
Worked in 50 ton & 75 ball mills alignment with v belts
Aligned bull gear to pinion with dial gauge indicator
Checking the backlash of gear box with feeler gauge
Involved in dismantling of plate heat exchanger, and tube heat exchanger and
hydro test
DOCUMENTATION:
Good knowledge in understanding the Safety related documents, SMP, JSA, General
Procedures, stage inspection and Checklist related to Pre Commissioning, Commissioning,
and Maintenance activities
7. PERSONAL DETAILS
Name : D.V.R.MURTHY
Date of Birth : 28-08-1972
Gender : Male
Marital Status : Married
Nationality : Indian
Languages Known : English, Telugu, Hindi & Tamil
POSSPORT DETAILS
Passport No. : G2297419
Place of Issue : VISAKHAPATNAM
Date of Issue : 10 / 05 / 2007
Date of expiry : 09 / 05 / 2017.
DECLARATION
I here by declare that above information and particulars are correct to the best of my
knowledge and belief. I feel honored if called for an interview at your convenience.
D.V.R.Murthy