1. 60260 Federal Register / Vol. 74, No. 223 / Friday, November 20, 2009 / Notices
to the Office of Federal Activities at Dated: November 17, 2009. County, CO, Comment Period Ends:
202–564–7146 or http://www.epa.gov/ Robert W. Hargrove, 01/15/2010, Contact: David
compliance/nepa/. Director, NEPA Compliance Division, Office Beckhouse 720–963–3306.
An explanation of the ratings assigned of Federal Activities. EIS No. 20090396, Draft Supplement,
to draft environmental impact [FR Doc. E9–27966 Filed 11–20–09; 8:45 am] CGD, AL, Bienville Offshore Energy
statements (EISs) was published in FR BILLING CODE 6560–50–P Terminal (BOET) Deepwater Port
dated July 17, 2009 (74 FR 34754). License Application Amendment
Draft EISs (Docket # USCG–2006–24644),
ENVIRONMENTAL PROTECTION Proposes to Construct and Operate a
EIS No. 20090312, ERP No. D–COE– AGENCY Liquefied Natural Gas Receiving and
F39043–OH, Cleveland Harbor Regasification Facility, Outer
Dredged Material Management Plan, [ER–FRL–8799–4]
Continental Shelf of the Gulf of
Operations and Maintenance, Environmental Impacts Statements; Mexico, South of Fort Morgan, AL,
Cuyahoga County, OH. Notice of Availability Comment Period Ends: 01/04/2010,
Summary: EPA expressed Contact: Lt. Hannah Kawamoto 202–
environmental concerns about air Responsible Agency: Office of Federal 372–1438.
quality impacts, and recommended Activities, General Information (202)
564–1399 or http://www.epa.gov/ EIS No. 20090397, Draft EIS, USA, 00,
implementation of mitigation measures.
compliance/nepa/. Programmatic—Louisiana Coastal
Rating EC2.
Area (LCA) Beneficial Use of Dredged
EIS No. 20090315, ERP No. D–FTA– Weekly receipt of Environmental Impact
Material (BUDMAT) Program Study,
K40273–CA, Crenshaw Transit Statements.
To Establish the Structure and
Corridor Project, Proposes to Improve Filed 11/09/2009 through 11/13/2009.
Management Architecture of the
Transit Services, Funding, Los Pursuant to 40 CFR 1506.9.
BUDMAT Program, Implementation,
Angeles County Metropolitan EIS No. 20090391, Final EIS, AFS, CA, MS, TX and LA, Comment Period
Transportation Authority (LACMTA), Salt Timber Harvest and Fuel Hazard Ends: 01/04/2010, Contact: Elizabeth
Los Angeles County, CA. Reduction Project, Proposing McCasland 504–862–2021.
Summary: EPA expressed Vegetation Management in the Salt
Creek Watershed, South Fork Amended Notices.
environmental concerns about the air
quality analysis, and offered additional Management Unit, Hayfork Ranger EIS No. 20090324, Draft EIS, AFS, 00,
suggestions for water quality impact District, Shasta-Trinity National Nebraska National Forests and
analysis and mitigation. Rating EC2. Forest, Trinity County, CA, Wait Grassland Travel Management Project,
EIS No. 20090382, ERP No. D–IBR– Period Ends: 12/21/2009, Contact: Proposes to Designate Routes and
K39123–CA, Central Valley Project Sand Mack 406–375–2638. Areas Open to Motorized Travel,
Water Supply Contracts Under Public EIS No. 20090392, Draft Supplement, Buffalo Gap National Grassland,
Law 101–514 (Section 206), Proposed FHW, HI, Saddle Road (HI–200) Oglala National Grassland, Samuel R.
Water Service Contracts with the El Improvements Project. Proposed McKelvie National Forest, and the
Dorado County Water Agency, El Improvement from Mamalahoa Pine Ridge and Bessey Units of the
Dorado County, CA. Highway (HI–190) to Milepost 41, Nebraska National Forest, Fall River,
Hawaii County, HI, Comment Period Custer, Pennington, Jackson Counties;
Summary: EPA does not object to the SD and Sioux, Dawes, Cherry,
Ends: 01/07/2010, Contact: Melissa
proposed action. Rating LO. Thomas and Blaine Counties, NE.,
Dickard 720–963–3691.
Final EISs EIS No. 20090393, Final EIS, DOE, MN, Comment Period Ends: 12/24/2009,
Mesaba Energy Project, Proposes to Contact: Mark Reichert 530–841–
EIS No. 20090340, ERP No. F–AFS–
Design, Construct and Operate a Coal- 4422.
J65499–UT, Pockets Resource
Management Project, Additional Based Integrated Gasification Cycle Revision to FR Published 09/25/2009:
Information on Analysis and (IGCC) Electric Power Generating Extending Comment Period from 11/09/
Disclosure on the Effect of the PA and Facility, Located in the Taconite Tax 2009 to 12/24/2009.
Alternatives on Three Unroaded and Relief Area (TTRA), Itasca and St.
Louis Counties, MN, Wait Period EIS No. 20090366, Final EIS, FHW, CO,
Undeveloped Areas Identified on a
Ends: 12/21/2009, Contact: Richard A. US–36 Corridor, Multi-Modal
2005 Draft Map, Proposes to Salvage
Hargis, Jr 412–386–6065. Transportation Improvements
Dead and Dying Spruce/Fir,
EIS No. 20090394, Draft EIS, USN, GU, between I–25 in Adams County and
Regenerate Aspen, and Manage
Guam and Commonwealth of the Foothills Parkway/Table Mesa Drive
Travel, Escalate Ranger District, Dixie
Northern Mariana Islands (CNMI) in Boulder, Adams, Denver,
National Forest, Garfield County, UT.
Military Relocation, Proposed Broomfield, Boulder and Jefferson
Summary: No formal comment letter Relocating Marines from Okinawa, Counties, CO, Wait Period Ends: 12/
was sent to the preparing agency. Visiting Aircraft Carrier Berthing, and 14/2009, Contact: Monica Pavlik 720–
EIS No. 20090375, ERP No. F–AFS– Army Air and Missile Defense Task 963–3012.
L65575–OR, Deadlog Vegetation Force, Implementation, GU, Comment
Management Project, To Implement Revision to FR Notice Published 10/
Period Ends: 01/04/2010, Contact: 30/2009: Extending Comment Period
Treatments that would Reduce the
srobinson on DSKHWCL6B1PROD with NOTICES
Kyle Fujimoto 808–472–1442. from 11/30/2009 to 12/14/2009.
Risk of High Intensity, Stand EIS No. 20090395, Draft EIS, FTA, CO,
Replacement Wildlife and the Risk of North Metro Corridor Project, Dated: November 17, 2009.
Heavy Tree Mortality from Insects and Proposed a Commuter Rail Transit Robert W. Hargrove,
Disease, Deschutes National Forest from downtown Denver, Colorado, Director, NEPA Compliance Division, Office
Lands, Deschutes County, OR. north to State Highway (SH) 7, in the of Federal Activities.
Summary: EPA does not object to the Cities of Denver, Commerce City, [FR Doc. E9–27968 Filed 11–19–09; 8:45 am]
proposed action. Thornton, Northglenn, and Adams BILLING CODE 6560–50–P
VerDate Nov<24>2008 17:03 Nov 19, 2009 Jkt 220001 PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:FRFM20NON1.SGM 20NON1