Topics to be covered
Pre-check conditions
Starting & Stopping sequences
Loading of unit
Emergency Stopping
Parameter monitoring and control
Layout of Presentation
• Unit Operation Control
• Pre-Check Conditions
• Starting Sequence
• Parameter Monitoring & Control
• Stopping Sequence
• Emergency Stopping
Unit Operation Control(1)
• Manual control
• Semi-automatic control
• Fully automatic control
• Offsite supervisory control
Unit Operation Control(2)
Manual Control:-
In this type of control, the chain of the pre-
starting checks, starting, synchronizing, loading
and stopping is selected and performed in turn by
hand whether mechanically or by push buttons.
Unit Operation Control(3)
Semi-automatic control:-
In this type of control, from a single manual starting
impulse a unit may be brought to the ready to
synchronize condition by the automatic selection,
performance, and providing of a sequence of
controls.
Likewise a similar stopping impulse completely
shutdown the unit.
Synchronizing and loading control remain manual
functions from the local and remote control, points.
Unit Operation Control(4)
Fully automatic control:-
In this type of control, means are provided for
running up, automatically synchronizing and
loading up to a predetermined quantity on receipt
of a single starting impulse. Subsequent manual
variations of loading and excitation may be
provided as a remote control function.
The corresponding stopping impulse will cause the
load to be reduced, the unit to be disconnected
from the bus bars and the turbine to be shutdown
completely.
Unit Operation Control(5)
Offsite supervisory control:-
Starting, stopping, switch closing or opening and
other functions initiated from a remote point,
together with indications of successful
operations of voltage and load control and of
the repetition of alarm conditions at the remote
control point. The equipment is ancillary to
either semiautomatic or fully automatic unit
control.
Unit Operation Control(6)
Control Hierarchy of Hydro-electric Plants:-
Control category Subcategory Remarks
Location Local Control is local at the controlled equipment or within sight
of the equipment.
Centralized Control is remote from the controlled equipment, but
within the plant.
Offsite Control location is remote from the project.
Mode Manual Each operation needs a separate and discrete initiation;
could be applicable to any of the three locations.
Automatic Several operations are precipitated by a single initiation;
could be applicable to any of the three locations
Operation
(Supervision)
Attended Operator is available at all times to initiate control action
Un-attended Operation staff is not normally available at the project site
Pre-check conditions(1)
There is no work-permit , outstanding.
Intake gate fully open.
Draft tube gate is fully open.
Protective devices reset.
Wicket gates closed.
Pre-check conditions(2)
Control supply(Generally DC) to Unit control
Board(UCB), Control & Metering Relay(CMR)
Panel, Excitation system, Governor cubicle etc.
are healthy.
AC supply to UCB, CMR and all unit auxiliaries
are made ON.
Governor in automatic position.
OPU Pressure is normal.
Oil level in the lubrication system normal.
Pre-check conditions(3)
Compressed air system normal.
Brake pressure is normal.
Cooling water supply to bearing coolers & shaft
seal is healthy.
Guide vane servomotor lock is released.
Space heaters of generator are OFF.
Generator/GT Circuit Breaker is open.
All temporary earthling arrangements are removed
off live conductors/wires.
Pre-check conditions(4)
All earth switches in Generator/GT bay of
switchyard are open.
Generator brakes are released.
Generator field breaker is open.
Water level normal.
Pre-check conditions(5)
Many of the above checks and operations may
be built up in the starting interlocks and starting
sequence. These variations are to be checked
with particular Power Station.
Unit Operation Sequence
• Unit operation sequence refers to the safe
operation of machine in a particular sequence,
without any damage to plant and its associated
equipment's, thereby giving birth to successful
generation.
• Starting sequence
• Stopping sequence
Starting Sequence(1)
4 steps:-
1. Generally opens the main inlet valve & start unit
auxiliaries.
2. The turbine is started and brought up to speed no
load and field breaker is closed.
3. The paralleling of the unit is carried out & unit is
synchronized with generator bus by closing the
Generator/GT circuit breaker.
4. Loading of the unit is carried out up to a preset
value.
Starting Sequence(2)
Starting the Unit:-
 Ready to start signal appears in control room
 Start command is given.
 Inlet valve opening sequence starts
By pass valve opens
Spiral casing pressurized
Inlet valve opens
By pass valve closed.
 H.P. oil injection pump starts.
Starting Sequence(3)
Cooling Water flow to bearings, stator coolers and
transformer cooler starts and cooling water
established relay energized.
Open command given to guide vane limiter.
 Guide vanes open to start position.
 Machine starts rolling.
 Machine speed reaches 80%.
Starting Sequence(4)
Governor starts functioning.
Machine speed reaches 90%.
Generator Field excitation starts.
Generator Voltage reaches normal.
Machine ready to synchronize.
Note down the starting time of machine.
Starting Sequence(5)
Synchronization of Unit:-
 Inform RLDC and receiving-end about synchronization.
 Check that Bus selection isolator is in close position.
 Check that Bus Bar is charged.
 Make the synchronizing selector switch on.
 Match voltage & frequency of the Generator with that
of the grid.
Starting Sequence(6)
Make synchro-scope indicator start rotating in
clock-wise direction at a very slow speed.
Close Circuit Breaker at 11o’clock position of
synchro-scope indicator.
Increase the Power Generation by Power Raise/
Lower switch.
Note down the synchronization time of the unit.
Parameter monitoring and control(1)
 Attend any alarm appearing in control room
 Identify critical points of the Power station Like :-
• Temperature of bearings.
• Temperature of Stator.
• Temperature of Generator Transformers.
• Cooling water flow in shaft seal different bearings,
stator air cooler, transformer cooler and running of
pumps, choking of coolers.
Parameter monitoring and control(2)
• Leakage water level in turbine pit.
• Running of drainage/dewatering pumps.
• Voltage at HV Bus and reactive Power flow.
• Stator & field currents.
• OPU Pressure and oil level in OPU
Pressure tank (should not be high)
• Oil level in bearings.
• Machine vibrations.
• Abnormal sound from the machine.
Parameter monitoring and control(3)
Take hourly reading of Tail water level.
Obtain hourly reading of Dam water level from
Dam Control Room.
Fill up hourly log sheet for various parameters of
the machine.
Co-ordinate with RLDC and Remote end for any
shutdown of machine/ line and major change in
generation.
Stopping Sequence(1)
 Inform RLDC and receiving end.
 Reduce the load of the machine slowly.
 When load is reduced around 10-15% of full load, open the
generator C.B.
 Check that C.B. has opened.
 Give stop command
• Generator C.B. opens if not open already.
• Generator Field breaker opens and closing starts.
Stopping Sequence(2)
• Guide vane is closed.
• Machine retards.
• The bearing H.P. oil pump starts,
• At 25% of rated speed, Generator Brakes are
applied.
• Machine comes to stand still.
• H.P. Oil pump stops.
• Generator Brakes released.
Stopping Sequence(3)
 Cooling water to stator, transformer and bearings is closed.
 G.V. servomotor is locked.
 Generator Isolation (EHV) is opened
 Make a record of time of opening of Generator C.B. and
stopping of machine.
Emergency Stopping(1)
TRIPPING OF MACHINE ON FAULT(1):-
Protection relay operates  Trip Relay operates.
Generator C.B. is opened.
Generator Field breaker is opened.
Closing command is given to guide vanes and inlet
valve.
Stop sequence starts as in case of manual stopping
of the machine.
Note down the operated protection relays, flags
after ensuring that machine has stopped.
Emergency Stopping(2)
TRIPPING OF MACHINE ON FAULT(2):-
 Take print out of Sequential Event Recorder.
 In case of tripping of lines/load throw-off, communicate
with remote end and get information about operation of
relays at receiving end. Also take print out of Sequential
Event Recorder (SER) & Fault Disturbance Recorder.
 Intimate maintenance staff giving as much detail as
known.
Emergency Stopping(3)
Increase in water level inside Power House :-
1. Raise Alarm.
2. Intimate Project In charge.
3. Try to stop the source of leakage water.
4. If the leakage is from the machine immediately close the
intake gate after opening the generator circuit breaker and
giving stop command to the machine.
5. Ensure that Power Supply to Drainage & Dewatering pumps
is not shut down.
6. Run the available drainage / dewatering pumps or any other
available pumps to pump out the water.
Emergency Stopping(4)
Fire:-
1. Raise Alarm.
2. If fire is in the machine or Transformer
• Give stop command.
• Release CO2 or water through mulsi fire system as per
the provision .
3. Intimate fire station.
4. Try to isolate other equipment from the source of fire.
Thank You

Mais conteúdo relacionado

Mais procurados

Interactive inverters
Interactive invertersInteractive inverters
Interactive inverters
mareenotmarie
 
Generator protection calculations settings
Generator protection calculations settingsGenerator protection calculations settings
Generator protection calculations settings
michaeljmack
 

Mais procurados (20)

Protection Of Generator
Protection Of GeneratorProtection Of Generator
Protection Of Generator
 
Vfd
VfdVfd
Vfd
 
importance of reactive power in power system
importance of reactive power in power systemimportance of reactive power in power system
importance of reactive power in power system
 
MTDC SYSTEMS
MTDC SYSTEMSMTDC SYSTEMS
MTDC SYSTEMS
 
Generator Protection By - Er Rahul Sharma
Generator Protection By - Er Rahul Sharma Generator Protection By - Er Rahul Sharma
Generator Protection By - Er Rahul Sharma
 
substation 220 kv
substation 220 kv substation 220 kv
substation 220 kv
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
Hydrology & Site Selection of Hydro Power Plant
Hydrology & Site Selection of Hydro Power PlantHydrology & Site Selection of Hydro Power Plant
Hydrology & Site Selection of Hydro Power Plant
 
Water hammer in hydropower plant
Water hammer in hydropower plantWater hammer in hydropower plant
Water hammer in hydropower plant
 
Governing of francis turbine
Governing of francis turbineGoverning of francis turbine
Governing of francis turbine
 
Major electrical equipment in power plants
Major electrical equipment in power plantsMajor electrical equipment in power plants
Major electrical equipment in power plants
 
Interactive inverters
Interactive invertersInteractive inverters
Interactive inverters
 
VSC based HVDC system
VSC based HVDC systemVSC based HVDC system
VSC based HVDC system
 
Generator protection calculations settings
Generator protection calculations settingsGenerator protection calculations settings
Generator protection calculations settings
 
Transformer Accessories for Testing and Protection
Transformer Accessories for Testing and ProtectionTransformer Accessories for Testing and Protection
Transformer Accessories for Testing and Protection
 
Design of substation (with Transformer Design)
Design of substation (with Transformer Design) Design of substation (with Transformer Design)
Design of substation (with Transformer Design)
 
hydroelectric power plant_overview.ppt
hydroelectric power plant_overview.ppthydroelectric power plant_overview.ppt
hydroelectric power plant_overview.ppt
 
Chapter two-Classification of Hydroelectric Power Plants
Chapter two-Classification of Hydroelectric Power PlantsChapter two-Classification of Hydroelectric Power Plants
Chapter two-Classification of Hydroelectric Power Plants
 
Kaplan turbine
Kaplan turbineKaplan turbine
Kaplan turbine
 
Reactive Power : Problems and Solutions
Reactive Power : Problems and SolutionsReactive Power : Problems and Solutions
Reactive Power : Problems and Solutions
 

Semelhante a Operation of hydro power plants

Dgps control system
Dgps control systemDgps control system
Dgps control system
Aryan Raj
 
Turbine Governing System
Turbine Governing SystemTurbine Governing System
Turbine Governing System
Salil Vaidya
 
94716008 burner-management-system-et-2008
94716008 burner-management-system-et-200894716008 burner-management-system-et-2008
94716008 burner-management-system-et-2008
Mowaten Masry
 

Semelhante a Operation of hydro power plants (20)

mn03010.pdf
mn03010.pdfmn03010.pdf
mn03010.pdf
 
AUTOMATIC TURBINE RUNUP SYSTEM
AUTOMATIC TURBINE RUNUP SYSTEMAUTOMATIC TURBINE RUNUP SYSTEM
AUTOMATIC TURBINE RUNUP SYSTEM
 
Dgps control system
Dgps control systemDgps control system
Dgps control system
 
Turbine Governing System
Turbine Governing SystemTurbine Governing System
Turbine Governing System
 
On Power Plant Operation cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdfOn Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation cource In Urdu by Khalid ayaz Soomro.pdf
 
ABC of BMS.pdf
ABC of BMS.pdfABC of BMS.pdf
ABC of BMS.pdf
 
Synchronising the 210MW unit to the 220KV grid
Synchronising the 210MW unit to the 220KV gridSynchronising the 210MW unit to the 220KV grid
Synchronising the 210MW unit to the 220KV grid
 
06 vat300 e_c3-1_rev_b
06 vat300 e_c3-1_rev_b06 vat300 e_c3-1_rev_b
06 vat300 e_c3-1_rev_b
 
660 mw turbo governing & protection system
660 mw turbo  governing & protection system660 mw turbo  governing & protection system
660 mw turbo governing & protection system
 
Instrumentation positioner presentation
Instrumentation positioner presentationInstrumentation positioner presentation
Instrumentation positioner presentation
 
94716008 burner-management-system-et-2008
94716008 burner-management-system-et-200894716008 burner-management-system-et-2008
94716008 burner-management-system-et-2008
 
Hst ppt
Hst pptHst ppt
Hst ppt
 
369051174-Basic-of-Commissioning.pdf
369051174-Basic-of-Commissioning.pdf369051174-Basic-of-Commissioning.pdf
369051174-Basic-of-Commissioning.pdf
 
On off controller
On off controllerOn off controller
On off controller
 
Instrumentation & control of typical material handling of FGD Plant
Instrumentation & control of typical material handling of FGD PlantInstrumentation & control of typical material handling of FGD Plant
Instrumentation & control of typical material handling of FGD Plant
 
Pcb automatic vaccum loader user guidance | SunzonTech
Pcb automatic vaccum loader user guidance | SunzonTechPcb automatic vaccum loader user guidance | SunzonTech
Pcb automatic vaccum loader user guidance | SunzonTech
 
Lab equip list
Lab equip listLab equip list
Lab equip list
 
Combined control unit ppt
Combined control unit pptCombined control unit ppt
Combined control unit ppt
 
Design & Implementation of "Double Head liquid filling machine"
Design & Implementation of "Double Head liquid filling machine"Design & Implementation of "Double Head liquid filling machine"
Design & Implementation of "Double Head liquid filling machine"
 
classic control and PLC training report
classic control and PLC training reportclassic control and PLC training report
classic control and PLC training report
 

Último

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 

Último (20)

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 

Operation of hydro power plants

  • 1. Operation of Hydro Power Plants Dinesh Prasad dineshprasad04215@gmail.com
  • 2. Topics to be covered Pre-check conditions Starting & Stopping sequences Loading of unit Emergency Stopping Parameter monitoring and control
  • 3. Layout of Presentation • Unit Operation Control • Pre-Check Conditions • Starting Sequence • Parameter Monitoring & Control • Stopping Sequence • Emergency Stopping
  • 4. Unit Operation Control(1) • Manual control • Semi-automatic control • Fully automatic control • Offsite supervisory control
  • 5. Unit Operation Control(2) Manual Control:- In this type of control, the chain of the pre- starting checks, starting, synchronizing, loading and stopping is selected and performed in turn by hand whether mechanically or by push buttons.
  • 6. Unit Operation Control(3) Semi-automatic control:- In this type of control, from a single manual starting impulse a unit may be brought to the ready to synchronize condition by the automatic selection, performance, and providing of a sequence of controls. Likewise a similar stopping impulse completely shutdown the unit. Synchronizing and loading control remain manual functions from the local and remote control, points.
  • 7. Unit Operation Control(4) Fully automatic control:- In this type of control, means are provided for running up, automatically synchronizing and loading up to a predetermined quantity on receipt of a single starting impulse. Subsequent manual variations of loading and excitation may be provided as a remote control function. The corresponding stopping impulse will cause the load to be reduced, the unit to be disconnected from the bus bars and the turbine to be shutdown completely.
  • 8. Unit Operation Control(5) Offsite supervisory control:- Starting, stopping, switch closing or opening and other functions initiated from a remote point, together with indications of successful operations of voltage and load control and of the repetition of alarm conditions at the remote control point. The equipment is ancillary to either semiautomatic or fully automatic unit control.
  • 9. Unit Operation Control(6) Control Hierarchy of Hydro-electric Plants:- Control category Subcategory Remarks Location Local Control is local at the controlled equipment or within sight of the equipment. Centralized Control is remote from the controlled equipment, but within the plant. Offsite Control location is remote from the project. Mode Manual Each operation needs a separate and discrete initiation; could be applicable to any of the three locations. Automatic Several operations are precipitated by a single initiation; could be applicable to any of the three locations Operation (Supervision) Attended Operator is available at all times to initiate control action Un-attended Operation staff is not normally available at the project site
  • 10. Pre-check conditions(1) There is no work-permit , outstanding. Intake gate fully open. Draft tube gate is fully open. Protective devices reset. Wicket gates closed.
  • 11. Pre-check conditions(2) Control supply(Generally DC) to Unit control Board(UCB), Control & Metering Relay(CMR) Panel, Excitation system, Governor cubicle etc. are healthy. AC supply to UCB, CMR and all unit auxiliaries are made ON. Governor in automatic position. OPU Pressure is normal. Oil level in the lubrication system normal.
  • 12. Pre-check conditions(3) Compressed air system normal. Brake pressure is normal. Cooling water supply to bearing coolers & shaft seal is healthy. Guide vane servomotor lock is released. Space heaters of generator are OFF. Generator/GT Circuit Breaker is open. All temporary earthling arrangements are removed off live conductors/wires.
  • 13. Pre-check conditions(4) All earth switches in Generator/GT bay of switchyard are open. Generator brakes are released. Generator field breaker is open. Water level normal.
  • 14. Pre-check conditions(5) Many of the above checks and operations may be built up in the starting interlocks and starting sequence. These variations are to be checked with particular Power Station.
  • 15.
  • 16. Unit Operation Sequence • Unit operation sequence refers to the safe operation of machine in a particular sequence, without any damage to plant and its associated equipment's, thereby giving birth to successful generation. • Starting sequence • Stopping sequence
  • 17. Starting Sequence(1) 4 steps:- 1. Generally opens the main inlet valve & start unit auxiliaries. 2. The turbine is started and brought up to speed no load and field breaker is closed. 3. The paralleling of the unit is carried out & unit is synchronized with generator bus by closing the Generator/GT circuit breaker. 4. Loading of the unit is carried out up to a preset value.
  • 18. Starting Sequence(2) Starting the Unit:-  Ready to start signal appears in control room  Start command is given.  Inlet valve opening sequence starts By pass valve opens Spiral casing pressurized Inlet valve opens By pass valve closed.  H.P. oil injection pump starts.
  • 19. Starting Sequence(3) Cooling Water flow to bearings, stator coolers and transformer cooler starts and cooling water established relay energized. Open command given to guide vane limiter.  Guide vanes open to start position.  Machine starts rolling.  Machine speed reaches 80%.
  • 20. Starting Sequence(4) Governor starts functioning. Machine speed reaches 90%. Generator Field excitation starts. Generator Voltage reaches normal. Machine ready to synchronize. Note down the starting time of machine.
  • 21. Starting Sequence(5) Synchronization of Unit:-  Inform RLDC and receiving-end about synchronization.  Check that Bus selection isolator is in close position.  Check that Bus Bar is charged.  Make the synchronizing selector switch on.  Match voltage & frequency of the Generator with that of the grid.
  • 22. Starting Sequence(6) Make synchro-scope indicator start rotating in clock-wise direction at a very slow speed. Close Circuit Breaker at 11o’clock position of synchro-scope indicator. Increase the Power Generation by Power Raise/ Lower switch. Note down the synchronization time of the unit.
  • 23.
  • 24. Parameter monitoring and control(1)  Attend any alarm appearing in control room  Identify critical points of the Power station Like :- • Temperature of bearings. • Temperature of Stator. • Temperature of Generator Transformers. • Cooling water flow in shaft seal different bearings, stator air cooler, transformer cooler and running of pumps, choking of coolers.
  • 25. Parameter monitoring and control(2) • Leakage water level in turbine pit. • Running of drainage/dewatering pumps. • Voltage at HV Bus and reactive Power flow. • Stator & field currents. • OPU Pressure and oil level in OPU Pressure tank (should not be high) • Oil level in bearings. • Machine vibrations. • Abnormal sound from the machine.
  • 26. Parameter monitoring and control(3) Take hourly reading of Tail water level. Obtain hourly reading of Dam water level from Dam Control Room. Fill up hourly log sheet for various parameters of the machine. Co-ordinate with RLDC and Remote end for any shutdown of machine/ line and major change in generation.
  • 27.
  • 28.
  • 29.
  • 30. Stopping Sequence(1)  Inform RLDC and receiving end.  Reduce the load of the machine slowly.  When load is reduced around 10-15% of full load, open the generator C.B.  Check that C.B. has opened.  Give stop command • Generator C.B. opens if not open already. • Generator Field breaker opens and closing starts.
  • 31. Stopping Sequence(2) • Guide vane is closed. • Machine retards. • The bearing H.P. oil pump starts, • At 25% of rated speed, Generator Brakes are applied. • Machine comes to stand still. • H.P. Oil pump stops. • Generator Brakes released.
  • 32. Stopping Sequence(3)  Cooling water to stator, transformer and bearings is closed.  G.V. servomotor is locked.  Generator Isolation (EHV) is opened  Make a record of time of opening of Generator C.B. and stopping of machine.
  • 33.
  • 34. Emergency Stopping(1) TRIPPING OF MACHINE ON FAULT(1):- Protection relay operates  Trip Relay operates. Generator C.B. is opened. Generator Field breaker is opened. Closing command is given to guide vanes and inlet valve. Stop sequence starts as in case of manual stopping of the machine. Note down the operated protection relays, flags after ensuring that machine has stopped.
  • 35. Emergency Stopping(2) TRIPPING OF MACHINE ON FAULT(2):-  Take print out of Sequential Event Recorder.  In case of tripping of lines/load throw-off, communicate with remote end and get information about operation of relays at receiving end. Also take print out of Sequential Event Recorder (SER) & Fault Disturbance Recorder.  Intimate maintenance staff giving as much detail as known.
  • 36. Emergency Stopping(3) Increase in water level inside Power House :- 1. Raise Alarm. 2. Intimate Project In charge. 3. Try to stop the source of leakage water. 4. If the leakage is from the machine immediately close the intake gate after opening the generator circuit breaker and giving stop command to the machine. 5. Ensure that Power Supply to Drainage & Dewatering pumps is not shut down. 6. Run the available drainage / dewatering pumps or any other available pumps to pump out the water.