SlideShare uma empresa Scribd logo
1 de 12
Document Page 1/13
MINISTRY OF EDUCATION, MALAYSIA
VOCATIONAL COLLEGE STANDARD CURRICULUM
COURSE INFORMATION
PROGRAMME : CONSTRUCTION TECHNOLOGY
COURSE NAME : INTORDUCTION OF SITE PREPARATION
COURSE CODE : WTP 1012
YEAR/SEMESTER : 1 / SEMESTER 1
CREDIT UNIT : 2.0
CONTACT HOUR : FACE TO FACE : 4.0 HOURS / WEEK
NON FACE TO FACE :
COURSE TYPE : VOCATIONAL
PREREQUISITE : -
CORE REQUISITE :
Document Page 2/13
COURSE OUTCOMES
At the end of the course, the students should be able to:-
1. Identify land/site preparation requirement
2. Prepare land/site preparation tools, equipment and materials
3. Carry out pegging and setting out work
4. Carry out hoarding installation
COURSE DESCRIPTION
Land/Site Preparation consists of clearing away the trees, debris, rubbish, etc, relocating obstructions and levelling the platform area from
building site, doing whatever rough grading that is necessary, and staking the house location in preparation for installation of the footings and
foundation.
The person who is competent in land/site preparation should be able to identify land/site preparation requirement, prepare land/site preparation
tools, equipment and materials, carry out pegging and setting out work, carry out hoarding installation, perform site clearing work, coordinate
land/site preparation inspection and perform foundation activities.
The outcome of this competency is to ensure the land/site is prepared and qualified for any and all construction works in accordance to the construction
drawing
Document Page 3/13
CONTENT AND LEARNING STANDARDS
PROGRAMME : CONSTRUCTION TECHNOLOGY
COURSE NAME : INTORDUCTION OF SITE PREPARATION
CODE NAME : WTP 1012
CONTACT HOURS CONTENT STANDARD LEARNING STANDARD ASSESSMENT CRITERIA
80 HOURS
(20 WEEKS)
1. IDENTIFY LAND /
SITE
PREPARATION
REQUIREMENT
RELATED KNOWLEDGE :
i. Contract documents
ii. Content of contract documents
 Drawing
 Specification
 Bill of Quantities
 Cost
 Duration
iii. Land / site preparation documents
 Land ownership title
o Types of grant
o Land Status
o Caveat
 Local authority requirement
 Temporary site requirement
ASSESSMENT CRITERIA
i. Types and functions of land / site
document listed and explained
ii. information regarding land/site listed
and explained
iii. Safety requirements on land / site
preparation listed and explained
Document Page 4/13
 Approved construction drawing
o Infrastructure plan
o Mechanical and Electrical plan
o Building plan
iv. Purpose of land / site preparation
v. Land / site preparation resources such as
 Machinery
 Manpower
 Material
 Money
vi. Types of building foundation such as
 Piling
 Pad footing
 Raft Foundation
 Strip Footing
vii. Land / site preparation safety
requirements
APPLIED SKILLS:
i. Interpret building construction documents
ii. Finalize approved construction drawing
details
iii. Identify types of land / site preparation
foundation
iv. Determine information of land / site
Document Page 5/13
2. PREPARE LAND /
SITE PREPARATION
TOOLS, EQUIPMENT
AND MATERIALS
preparation requirement
v. Determine safety requirements
ATTITUDE/ SAFETY/ ENVIRONMENTAL :
Attitude:
 Meticulous and detail in
interpreting contract and land / site
preparation documents
 Honesty in the privacy and
confidentiality of the contract
documents
RELATED KNOWLEDGE :
i. Purpose of method statement
ii. Types and functions of land / site
preparation tools such as
 Hand tools
 Power tools
 Chainsaw
 Drill
iii. Types and functions of land / site
preparation equipment such as
 Back Hoe
 Excavator
 Back Pusher
 Lorry
 Compactor
ASSESSMENT CRITERIA
i. Types and functions of land/site preparation
tools and equipment listed and explained
(hand tools, power tools, back hoe,
excavator, back pusher, lorry) determined
ii. Types and functions of land/site preparation
materials listed and explained (metal, timber,
cement, nails/screws) determined
iii. Land / site preparation tools, equipment and
materials condition checked in good
condition and ready for used according to
approved method statement
Document Page 6/13
iv. Types and functions of land / site
preparation materials
 Hoarding
 Metal
 Timber
 Timber post/frame
 Cement
 Nails/Screws
v. Land / site preparation tools, equipment
and materials acquisition arrangement
 Outsourcing
 In house
APPLIED SKILLS:
 Determine types and functions of
land / site preparation tools and
equipment
 Determine types and functions of
land / site preparation materials
 Coordinate and arrange land / site
preparation tools, equipment and
materials
ATTITUDE/ SAFETY/ ENVIRONMENTAL :
Attitude:
- Meticulous in preparing tools, equipment
and materials
Document Page 7/13
3. CARRY OUT
PEGGING AND
SETTING OUT
WORK
RELATED KNOWLEDGE :
i. Land / site area survey work
 Boundary
 Bearing
 Distance
 Coordinate
 Levelling
ii. Types and function of survey equipment
such as
 Compass
 Theodolite
 Stuff
 Tripod
 Prism
 Dumpy level
 Pole
 Measuring tape/laser meter
iii. Survey work coordination
iv. Proposed pegging and setting out
v. Pegging method
vi. Temporary/ establish offset setting point
vii. Pegging tools and materials such as
 Hammer
 Nails
 Timber peg
 String
 Concrete peg
 Paint
ASSESSMENT CRITERIA
i. Land / site preparation area and location
confirmed according to approved drawing
ii. Land / site area survey work properly done
according to land ownership grant
iii. Land / site /construction area pegging
properly done and quality checked
according to industrial practices.
Document Page 8/13
APPLIED SKILLS:
 Identify land / site preparation area
and location
 Survey land / site area
 Peg land / site/
 Construction area
ATTITUDE/ SAFETY/ ENVIRONMENTAL:
Attitude:
- Diligent, patient and meticulous in carrying
out work
Safety:
- Adhere to safety requirement
- Wear proper PPE
Document Page 9/13
4. CARRY OUT
HOARDING
INSTALLATION
RELATED KNOWLEDGE :
i. Type of hoarding such as
 Metal
 Timber
 Plywood
ii. Authority bodies requirements on hoarding
installation
 Size
 Height
 Position/ location
iii. Hoarding installation sequence
 Measure
 Mark post distance
 Excavate/Dig hole
 Erect post
 Assemble frame members
 Install panels
iv. Hoarding installation quality such as
 Verticality
 Alignment
 Strengthens
 Durability
 Jointing
ASSESSMENT CRITERIA
i. Types of hoarding listed and explained
according to approved budget and
construction period.
ii. Size and height of hoarding confirmed
according to authority bodies requirement
iii. Hoarding post erected and quality checked
according to engineering construction
practices
iv. Frame and hoarding installed and quality
checked according to engineering
construction practices
Document Page 10/13
APPLIED SKILLS:
i. Determine types of hoarding
ii. Determine size and height of hoarding
iii. Install hoarding post
iv. Install frame hoarding
ATTITUDE/ SAFETY/ ENVIRONMENTAL :
Attitude:
- Diligent, patient and meticulous in carrying
out work
Safety:
- Adhere to safety requirement
- Wear proper PPE
.
Document Page 11/13
EMPLOYABILITY SKILLS
TOOLS, EQUIPMENT AND MATERIALS (TEM)
ITEMS RATIO (TEM : Trainees)
 Wall chart
 Photo
 Slide projector
 Tools and equipment manual
 Various types of fire extinguisher
 Audio-visual-aid
 First Aid box
 All related building hand tools
 List of machine tools
 Catalogues
 Brochures
 Safety attire
 All related building power tools
 Safety attire
 All related building equipment/ plant
 Materials
 Tools
1:5
1:5
1:5
1:5
1:5
1 :30
1:5
1:5
1:5
1:10
1:1
1:5
1:1
1:5
1:5
1:5
1:5
1:5
Core Abilities
SILA RUJUK LAMPIRAN A : JADUAL PEMETAAN NOSS DAN KSKV
SILA RUJUK LAMPIRAN B : JADUAL PEMETAAN NOSS DAN CORE ABILITY TAHAP 1, 2, 3
Document Page 12/13
 Equipment
 Manuals
 Storage facilities
1:5
REFERENCES
References
Misnan M Saidin,M Yusof Zakaria, Mohamed A,Hakim & Dalib A Rahman, Pengurusan Keselamatan Projek Pembinaan
:UniversitiTeknologi Malaysia.
Salleh, NurulAzita & Hussin AbdAziz, Penggunaan Alat Keselamatan di Tapak Bina :Dewan Bahasa Pustaka.
Construction Technology : Pearson Prentice Hall.
R. Barry (2001). KursusSeni Bina Jilid2 :IBS Buku Sdn. Bhd.
Mohamed Abd Hakim & Wan MatWan Min. Teknologi Penyelenggaraan Bangunan : Dewan Bahasa Pustaka.

Mais conteúdo relacionado

Semelhante a WTP 1012 INTRODUCTION OF SITE PREPARATION.docx

01. cv qc civil structur & wi
01. cv qc civil structur & wi01. cv qc civil structur & wi
01. cv qc civil structur & wiDidi sudiprayitna
 
SLK Carpentry 9 Quarter 1
SLK Carpentry 9 Quarter 1SLK Carpentry 9 Quarter 1
SLK Carpentry 9 Quarter 1Nhatz Marticio
 
Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels Canberra Institute of technology
 
Mason54competency
Mason54competencyMason54competency
Mason54competencytuya sambuu
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)I'mMiss Lily
 
‫C.V - Copy - نسخة
‫C.V - Copy - نسخة‫C.V - Copy - نسخة
‫C.V - Copy - نسخةMohammed Mudowi
 
Kenneth Ezeukwu CV-3(2) Updated
Kenneth Ezeukwu CV-3(2) UpdatedKenneth Ezeukwu CV-3(2) Updated
Kenneth Ezeukwu CV-3(2) UpdatedKenneth Ezeukwu
 
educational program hemp blocks and lime plaster
educational program hemp blocks and lime plastereducational program hemp blocks and lime plaster
educational program hemp blocks and lime plasterlibnam
 
Doucette, Jonathan - Resume - March 2014
Doucette, Jonathan -  Resume - March 2014Doucette, Jonathan -  Resume - March 2014
Doucette, Jonathan - Resume - March 2014Jon Doucette
 
Site report
Site reportSite report
Site reportYunshi94
 
Resume Mazen December 9, 15
Resume Mazen  December 9, 15Resume Mazen  December 9, 15
Resume Mazen December 9, 15Mazen Charrouf
 
12 constructionsafety-111212032526-phpapp01
12 constructionsafety-111212032526-phpapp0112 constructionsafety-111212032526-phpapp01
12 constructionsafety-111212032526-phpapp01nhut nguyen
 
Update - CV[2 e] - --AIS
Update - CV[2 e] - --AISUpdate - CV[2 e] - --AIS
Update - CV[2 e] - --AISFelix Doghudje
 
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...Saleem P.P
 

Semelhante a WTP 1012 INTRODUCTION OF SITE PREPARATION.docx (20)

Operation sheet 1.doc
Operation sheet 1.docOperation sheet 1.doc
Operation sheet 1.doc
 
Practical Assessment 3 - Reinforcement
Practical Assessment 3 - ReinforcementPractical Assessment 3 - Reinforcement
Practical Assessment 3 - Reinforcement
 
01. cv qc civil structur & wi
01. cv qc civil structur & wi01. cv qc civil structur & wi
01. cv qc civil structur & wi
 
SLK Carpentry 9 Quarter 1
SLK Carpentry 9 Quarter 1SLK Carpentry 9 Quarter 1
SLK Carpentry 9 Quarter 1
 
Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels
 
Mason54competency
Mason54competencyMason54competency
Mason54competency
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)
 
‫C.V - Copy - نسخة
‫C.V - Copy - نسخة‫C.V - Copy - نسخة
‫C.V - Copy - نسخة
 
Jaime-Mendoza-Resume
Jaime-Mendoza-ResumeJaime-Mendoza-Resume
Jaime-Mendoza-Resume
 
Kenneth Ezeukwu CV-3(2) Updated
Kenneth Ezeukwu CV-3(2) UpdatedKenneth Ezeukwu CV-3(2) Updated
Kenneth Ezeukwu CV-3(2) Updated
 
Student Practical Assessment_DEMOLITION
Student Practical Assessment_DEMOLITIONStudent Practical Assessment_DEMOLITION
Student Practical Assessment_DEMOLITION
 
educational program hemp blocks and lime plaster
educational program hemp blocks and lime plastereducational program hemp blocks and lime plaster
educational program hemp blocks and lime plaster
 
Doucette, Jonathan - Resume - March 2014
Doucette, Jonathan -  Resume - March 2014Doucette, Jonathan -  Resume - March 2014
Doucette, Jonathan - Resume - March 2014
 
Ibamayotto resume 2015
Ibamayotto resume 2015Ibamayotto resume 2015
Ibamayotto resume 2015
 
Site report
Site reportSite report
Site report
 
Resume Mazen December 9, 15
Resume Mazen  December 9, 15Resume Mazen  December 9, 15
Resume Mazen December 9, 15
 
3. Practical Assessment Skillion roof.docx
3. Practical Assessment Skillion roof.docx3. Practical Assessment Skillion roof.docx
3. Practical Assessment Skillion roof.docx
 
12 constructionsafety-111212032526-phpapp01
12 constructionsafety-111212032526-phpapp0112 constructionsafety-111212032526-phpapp01
12 constructionsafety-111212032526-phpapp01
 
Update - CV[2 e] - --AIS
Update - CV[2 e] - --AISUpdate - CV[2 e] - --AIS
Update - CV[2 e] - --AIS
 
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
 

Último

Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsKarakKing
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...Nguyen Thanh Tu Collection
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxAmanpreet Kaur
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Pooja Bhuva
 

Último (20)

Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 

WTP 1012 INTRODUCTION OF SITE PREPARATION.docx

  • 1. Document Page 1/13 MINISTRY OF EDUCATION, MALAYSIA VOCATIONAL COLLEGE STANDARD CURRICULUM COURSE INFORMATION PROGRAMME : CONSTRUCTION TECHNOLOGY COURSE NAME : INTORDUCTION OF SITE PREPARATION COURSE CODE : WTP 1012 YEAR/SEMESTER : 1 / SEMESTER 1 CREDIT UNIT : 2.0 CONTACT HOUR : FACE TO FACE : 4.0 HOURS / WEEK NON FACE TO FACE : COURSE TYPE : VOCATIONAL PREREQUISITE : - CORE REQUISITE :
  • 2. Document Page 2/13 COURSE OUTCOMES At the end of the course, the students should be able to:- 1. Identify land/site preparation requirement 2. Prepare land/site preparation tools, equipment and materials 3. Carry out pegging and setting out work 4. Carry out hoarding installation COURSE DESCRIPTION Land/Site Preparation consists of clearing away the trees, debris, rubbish, etc, relocating obstructions and levelling the platform area from building site, doing whatever rough grading that is necessary, and staking the house location in preparation for installation of the footings and foundation. The person who is competent in land/site preparation should be able to identify land/site preparation requirement, prepare land/site preparation tools, equipment and materials, carry out pegging and setting out work, carry out hoarding installation, perform site clearing work, coordinate land/site preparation inspection and perform foundation activities. The outcome of this competency is to ensure the land/site is prepared and qualified for any and all construction works in accordance to the construction drawing
  • 3. Document Page 3/13 CONTENT AND LEARNING STANDARDS PROGRAMME : CONSTRUCTION TECHNOLOGY COURSE NAME : INTORDUCTION OF SITE PREPARATION CODE NAME : WTP 1012 CONTACT HOURS CONTENT STANDARD LEARNING STANDARD ASSESSMENT CRITERIA 80 HOURS (20 WEEKS) 1. IDENTIFY LAND / SITE PREPARATION REQUIREMENT RELATED KNOWLEDGE : i. Contract documents ii. Content of contract documents  Drawing  Specification  Bill of Quantities  Cost  Duration iii. Land / site preparation documents  Land ownership title o Types of grant o Land Status o Caveat  Local authority requirement  Temporary site requirement ASSESSMENT CRITERIA i. Types and functions of land / site document listed and explained ii. information regarding land/site listed and explained iii. Safety requirements on land / site preparation listed and explained
  • 4. Document Page 4/13  Approved construction drawing o Infrastructure plan o Mechanical and Electrical plan o Building plan iv. Purpose of land / site preparation v. Land / site preparation resources such as  Machinery  Manpower  Material  Money vi. Types of building foundation such as  Piling  Pad footing  Raft Foundation  Strip Footing vii. Land / site preparation safety requirements APPLIED SKILLS: i. Interpret building construction documents ii. Finalize approved construction drawing details iii. Identify types of land / site preparation foundation iv. Determine information of land / site
  • 5. Document Page 5/13 2. PREPARE LAND / SITE PREPARATION TOOLS, EQUIPMENT AND MATERIALS preparation requirement v. Determine safety requirements ATTITUDE/ SAFETY/ ENVIRONMENTAL : Attitude:  Meticulous and detail in interpreting contract and land / site preparation documents  Honesty in the privacy and confidentiality of the contract documents RELATED KNOWLEDGE : i. Purpose of method statement ii. Types and functions of land / site preparation tools such as  Hand tools  Power tools  Chainsaw  Drill iii. Types and functions of land / site preparation equipment such as  Back Hoe  Excavator  Back Pusher  Lorry  Compactor ASSESSMENT CRITERIA i. Types and functions of land/site preparation tools and equipment listed and explained (hand tools, power tools, back hoe, excavator, back pusher, lorry) determined ii. Types and functions of land/site preparation materials listed and explained (metal, timber, cement, nails/screws) determined iii. Land / site preparation tools, equipment and materials condition checked in good condition and ready for used according to approved method statement
  • 6. Document Page 6/13 iv. Types and functions of land / site preparation materials  Hoarding  Metal  Timber  Timber post/frame  Cement  Nails/Screws v. Land / site preparation tools, equipment and materials acquisition arrangement  Outsourcing  In house APPLIED SKILLS:  Determine types and functions of land / site preparation tools and equipment  Determine types and functions of land / site preparation materials  Coordinate and arrange land / site preparation tools, equipment and materials ATTITUDE/ SAFETY/ ENVIRONMENTAL : Attitude: - Meticulous in preparing tools, equipment and materials
  • 7. Document Page 7/13 3. CARRY OUT PEGGING AND SETTING OUT WORK RELATED KNOWLEDGE : i. Land / site area survey work  Boundary  Bearing  Distance  Coordinate  Levelling ii. Types and function of survey equipment such as  Compass  Theodolite  Stuff  Tripod  Prism  Dumpy level  Pole  Measuring tape/laser meter iii. Survey work coordination iv. Proposed pegging and setting out v. Pegging method vi. Temporary/ establish offset setting point vii. Pegging tools and materials such as  Hammer  Nails  Timber peg  String  Concrete peg  Paint ASSESSMENT CRITERIA i. Land / site preparation area and location confirmed according to approved drawing ii. Land / site area survey work properly done according to land ownership grant iii. Land / site /construction area pegging properly done and quality checked according to industrial practices.
  • 8. Document Page 8/13 APPLIED SKILLS:  Identify land / site preparation area and location  Survey land / site area  Peg land / site/  Construction area ATTITUDE/ SAFETY/ ENVIRONMENTAL: Attitude: - Diligent, patient and meticulous in carrying out work Safety: - Adhere to safety requirement - Wear proper PPE
  • 9. Document Page 9/13 4. CARRY OUT HOARDING INSTALLATION RELATED KNOWLEDGE : i. Type of hoarding such as  Metal  Timber  Plywood ii. Authority bodies requirements on hoarding installation  Size  Height  Position/ location iii. Hoarding installation sequence  Measure  Mark post distance  Excavate/Dig hole  Erect post  Assemble frame members  Install panels iv. Hoarding installation quality such as  Verticality  Alignment  Strengthens  Durability  Jointing ASSESSMENT CRITERIA i. Types of hoarding listed and explained according to approved budget and construction period. ii. Size and height of hoarding confirmed according to authority bodies requirement iii. Hoarding post erected and quality checked according to engineering construction practices iv. Frame and hoarding installed and quality checked according to engineering construction practices
  • 10. Document Page 10/13 APPLIED SKILLS: i. Determine types of hoarding ii. Determine size and height of hoarding iii. Install hoarding post iv. Install frame hoarding ATTITUDE/ SAFETY/ ENVIRONMENTAL : Attitude: - Diligent, patient and meticulous in carrying out work Safety: - Adhere to safety requirement - Wear proper PPE .
  • 11. Document Page 11/13 EMPLOYABILITY SKILLS TOOLS, EQUIPMENT AND MATERIALS (TEM) ITEMS RATIO (TEM : Trainees)  Wall chart  Photo  Slide projector  Tools and equipment manual  Various types of fire extinguisher  Audio-visual-aid  First Aid box  All related building hand tools  List of machine tools  Catalogues  Brochures  Safety attire  All related building power tools  Safety attire  All related building equipment/ plant  Materials  Tools 1:5 1:5 1:5 1:5 1:5 1 :30 1:5 1:5 1:5 1:10 1:1 1:5 1:1 1:5 1:5 1:5 1:5 1:5 Core Abilities SILA RUJUK LAMPIRAN A : JADUAL PEMETAAN NOSS DAN KSKV SILA RUJUK LAMPIRAN B : JADUAL PEMETAAN NOSS DAN CORE ABILITY TAHAP 1, 2, 3
  • 12. Document Page 12/13  Equipment  Manuals  Storage facilities 1:5 REFERENCES References Misnan M Saidin,M Yusof Zakaria, Mohamed A,Hakim & Dalib A Rahman, Pengurusan Keselamatan Projek Pembinaan :UniversitiTeknologi Malaysia. Salleh, NurulAzita & Hussin AbdAziz, Penggunaan Alat Keselamatan di Tapak Bina :Dewan Bahasa Pustaka. Construction Technology : Pearson Prentice Hall. R. Barry (2001). KursusSeni Bina Jilid2 :IBS Buku Sdn. Bhd. Mohamed Abd Hakim & Wan MatWan Min. Teknologi Penyelenggaraan Bangunan : Dewan Bahasa Pustaka.