3. 3
Leaside Station Construction Activities
Area Current Activities
Main Entrance
• Concrete works continue
• Formwork and rebar installation continues
• Waterproofing is ongoing
Station Box
• Waterproofing is in progress
• Segment removal and excavation is in progress
Secondary
Entrance
• Hauling soil and tunnel segments is in progress
• Drilling of tiebacks is ongoing
Surface Level
• Traffic change implemented on January 22, 2020, will be in
place through to fall 2020.
4. 4
Leaside Station: Look Ahead
Year What to Expect
2020
• Deep excavation, hauling, concrete works and material
deliveries will continue on the surface through 2020
• Extended construction hours will continue through 2020
• Main and secondary entrance sites will continue to be the
main access points for the deep excavation underneath
Eglinton Avenue
• Periodic additional lane closures may be required to facilitate
deliveries, dewatering and concrete works
• Permanent works have commenced at the main entrance and
will continue into late 2020, including waterproofing,
formwork, rebar installation and concrete works
5. 5
Leaside Station Traffic Configuration
Current through to fall 2020
• Progression of final
excavation of the station box
and permanent works at both
entrances requires new traffic
staging.
• Lane restrictions are required
to accommodate these
simultaneous construction
activities, vehicles and crews
members.
8. 8
Emergency Exit 3 Update
• Lanes have been restored.
• A small work zone will remain at
the emergency exit building on
the boulevard through 2020.
• The emergency exit building will
be permanently in place on the
boulevard.
10. 10
Laird Station Construction Activities
Area Current Activities
Main Entrance
• Concrete works continue
• Rebar and formwork continue
Secondary
Entrance
• Excavation continues
• Ongoing waterproofing on platform slab and west walls
Cavern
• Concrete works for platforms, track slab and arches is ongoing
• Rebar and formwork continue at the platform and east
headwall
• Tunnel and arch waterproofing is ongoing
11. 11
Laird Station: Look Ahead
Year What to Expect
2020
• Permanent works will continue:
• Waterproofing, form and rebar and concrete works will occur
inside of the completed cavern
• During the concrete works, there will be continuous delivery of
concrete to the surface sites, lane restrictions may be required
• Utility and road restoration to begin mid-2020
• Overnight works will continue through to summer 2020