CRDenergy.
RC741304
PROTOTYPE FOR
ю SPGP PROJECTS
SmallPower
Generation
for Industrial Applications
Economic andTechnicalFeasibilityAssessment
SmallPowerGenerationPlant
Small Power Generation Plant solution (SPGP) continues to be an important segment of Electrical
Energy production. The increasing demand for energy has to be satisfied while considering the impact on
the global environment. SPGP plays an important role in industrial applications. Small size
cogeneration plants sited close to industrial energy consumption can deliver power with high fuel
efficiency and low emissions, and with modest space requirements. CRDenergy can offer to its
customers complete solutions from feasibility studies to the actual turnkey cogeneration plant construction,
aftermarket services and customized financial solutions. We are using oil and gas industrial port city Port
Harcourt city (PH) in Nigeria, African largest economy as a case study, with its complexity, it reflects the
shortage of power or barriers and opportunity encountered in every growing economy . Avoiding the
structural complexity of building large scale power plant; SPGP offers a flexible, realiable, close to
consumer option that can be multipled in multiple units and easily transformed to negbourhood service
station in industrial hubs.
CRDenergy.
RC741304
List of contents
1. The CRDenergy Initiative: An Overview
1.1. A small power generation plant Opportunities for PH
2. Energy Situation
3. Project Economic feasibility assessment
4. Project Capital requirement
5. Taxation
6. Financial Source
7. Actual Project cost
8. Annaul cost of runing installation
9. Cost of power generation
10. Revenue, pay back & subside
11. Power Sales Strategies
12. Alternative Power sales Strategies
13. Utility Grid Connection Proximity and Requirements
14. Additional Value Added Benefits
14.a. NERC Generation Tariff Methodology
15. Installation Site
16. Preliminary System Design
17. Plant Operations and Maintenance Cost
18. Project schedule
19. Environmental aspects
20. Electricity Generation License
20.1. Licensing Fees
21. Gas Consumption for SPGP
22. Gas Turbine Principle of Operation
22.1. Classification of Gas turbines
22.2. Types of Gas Turbines
22.3. Chosen Gas Turbine
23. Turbine Control
24. Balance of Plant Equipment
25. Characteristics Duty Long-permissible modes
25.1. Turbogenerator provides stable operation
26. Turbine Generator Excitation System
27. Quality and Warranty
28. Recommendations And Conclusion
29. Technical Recommendations
30. Environmental Recommendations
31. Economical Recommendations
32. Policy Recommendation
33. Diagram of Nigerian National Grid
CRDenergy.
RC741304
1.The CRDenergy Initiative: An Overview
A SPGP is powered by gas turbine generator installed on an industrial site for the dual
purpose of power generation and electricity reliability. A SPGP is most effective at producing
electricity when industries in Port harcourt (PH) industrial hub need it most – for steady,
continual productivity, 24hours-365 days. A SPGP can be installed quickly (3 - 6 months
construction time), can generate immediate power that will not fluctuate in price, and can
provide relief to the energy system during peak demand periods, such as those being
experienced in Port harcourt(PH). A SPGP will provide Port harcourt(PH) industries with the
opportunity to generate environmentally benign electricity and maintain local control over
energy revenues (instead of exporting these funds to non-resident energy providers).
CRDenergy has an opportunity to transform these innovative, environmentally benign, and
economically viable power generating assets for the energy-stressed industries in Port
harcourt(PH) industrial hub.
1.1. A SPGP Opportunities for Port harcourt.
CRDenergy has taken the initiative to undertaken a detailed technology and economic feasibility
study to determine the viability of developing up to a six megawatt (6+MW) SPGPs at different
ports within the City. In addition, with expected continued shortfalls in electricity generation
supplies likely, a SPGP could be a cost-effective means of enhancing electricity reliability and
reducing electricity price volatility. This study has determined that a A SPGP can be an
economically viable option for power production. It can be operate off-grid and runs as
neighborhood power station or it can be easily integrated into national grid.
2. Energy Situation
Energy prices hit new all time highs in January of 2015. Forecast of electricity demand is much
higher than previously analyzied, as a result, retail energy prices are still well over 60% higher
than the same period the previous year. In addition to rising energy costs, the scarcity of
energy supplies throughout the state have resulted in an unprecedented number of power
black out.
There are a number of reasons that electricity consumers in PH may continue to experience
black out and high energy prices, including:
• Electricity demand is forecasted to continue to increase over the next five years in the Rivers
state;
• New power plants planned for construction are not expected to keep up with the rising
demand for electricity in the PH marketplace;
• The time lag for developing conventional power plants in PH is currently about 2-3 years;
• Nationwide, commodity prices for natural gas continue to increase as demand outstrips
supply;
• There are few available generation sites located near national grid transmission lines within
the state;
The use of Open Cycle Gas Turbine Plant, such as SPGP, can provide a long term
solution to these concerns.
CRDenergy.
RC741304
Economic Analysis
3. Project Economic feasibility assessment
This assessment was done in a systematic way. This included defining or evaluating the
financial requirements of the project or capital investment required, which will be classified into
different categories, namely Engineering, Procurement and Construction costs (EPC).
Furthermore, the operations and maintenance cost of the SPGP were also taken into
consideration. As a measure of its viability several factors were evaluated, namely; the project
internal rate of return (IRR), payback period and the overall project net present value (NPV) at
the end of the expected Plant life.
4. Project Capital requirement
In order to simplify the analysis and as well as to use the standard economic evaluation that is
normally done for any power plant, the overall plant capital requirement was determined using
the plant capacity first.
Hence, the capital requirement for a SPGP as defined in the review, ranges between
USD$0.16,1528.00/kW and typically is USD$ 0.18.00/kW from experience.
Thus for a 6 MW SPGP the Capital requirement is:
Thus the Project total capital requirement is: USD$1,270,000.00.
The Capital Requirement will be spread over six construction months, assuming equal
investment in both years.
5. Taxation
Company tax of 32% and annual depreciation rate of 33.3% as recommended by NERC
6. Financial Source
Amount (NGN)/ Million
1. Capital investment 310,798.00
. 2. Loan 952,500.00
Total cost USD$1,263,298.00
Term of payment & guarantee: Documentary letter of credit / Equity evaluation and Capital investment
on agreement with bank
A further economic evaluation will be undertaken by C&RD to elavuate long term economic
proxies before the implementation of the project;
1. Short term cash flow projection
2. Medium term cash flow projection
3. Funding arrangements
4. Asset base
5. Risk Management Strategy
6. Management experience and dep
CRDenergy.
RC741304
7. Actual Project cost
Amount (NGN)/ Million
1. Complete delivering set of Turbine generator T-6-2U3 air-cooled for
coupling to a steam turbine consisting of Turbo generator with air
cooler, support plate or foundation pins; Mounting accessories and
special tools; Installation materials to the generator; Hardware thermal 395,250.00
control; Cover sound proof; The pumps supplying water to the cooling
. coil; Excitation system
2. Logistic, Engineering and installation (ELSIB Russia experts on site) 34,448.00
3. Installation facility construction 52,000.00
4. Labour, transportation, miscelaneous, etc) 15,800.00
(The total number of employees in SPGP is 6. After the completion of the
new plant, it will keep the same organization. It consists of 2 engineers
. and 2 operators and 1 maintenance workers/transporter.)
5. O&M cost- water, chemicals, lubricants & training expenses 50,000.00
6. Insurance & Licencing 50,000.00
Total cost USD$550,698.00
This cost evaluation is approximated to six months of Engineering, Procurement and Construction
operational period and six months of active service. The SPGP starts generating revenue for operational
purpose after this period, revenue & pay backs and debit servicing will resume with 10 years to 20 years
till 40 years service line of SPGP.
8. Annaul cost of runing installation Amount (NGN)/Million
1. Labour, transportation, miscelaneous, etc) 35,800.00
2. O&M cost- water, chemicals, lubricants & training expenses 30,000.00
3. On average plus/minus cost of gas per annual will be
, 10 000 000m³/ 353 146 667ft³/10000000000L 600 000.00
Total cost USD$ 665,800.00
9. Cost of power generation
Cost of power in nigeria can valued in different catagory depending on your operating license and
distribution limits.
On average USD$0.17per kwh x 100 000 kWh per day average = USD$ 15, 000.00
(OFF GRID/DIRECT BLOCK MONTHLY SALES FOR INDUSTRIAL CATEGORY D2)
Muitply by 356 depends on annual consumption ratio = USD$5,340,000.00 per annual. This evaluation is
made with most minimal 33% power output ratio of 4000 Kwh per hour, actual value may be valued at
4000 kWh power out/ per minute, depending electricity power comsumption.
CRDenergy.
RC741304
On average USD$0.17.00 per kw x 4000 kw = USD$ 560.00/consumption ratio 75%
(GRID CONNECTED TCN SALE FOR INDUSTRIAL CATEGORY D2)
Muitly by minute depends on minute consumption ratio x 60 minutes = USD$ 33,600.00
Muiltply by hour depends on hour consumption ratio x 24 hours = USD$ 6,720.00
Multiply by 356 depends on annual consumption ratio = USD$2,392,320.00
This cost evaluation of this report is base on net minimal of USD$875,000.00 /33% power output ratio
per annual. If we reverse the value for residential category R2 assesment, the value will be half of the
this cost.
The Nigerian Electricity Regulatory Commission, NERC, has put into operation a Multi-Year Tariff Order,
MYTO, for the determination of the cost of electricity sold by distribution/retail companies for the period 1
June 2012 to 31 May 2017.
Consumers are charged in different categories, namely, residential, commercial, industrial, special and
street lighting.
Electricity consumption is measured in kilowatt-hour, kWh, and the energy charge is 2015,
USD$0.17.54, USD$0.17.24 per kWh in 2015 – 2016 and USD$0.16.13 in 2016 – 2017.
For PH Disco, the fixed monthly charge for industrial category D2 energy charge is USD$0.17 per kWh
in 2015 – 2016 and USD$0.15.39 per kWh in 2016 – 2017.
10. Revenue, pay back & subside
Total cost of investment USD$597,498.00 .
. Annaul cost of runing installation USD$665,800.00.
. Annual revenue generated USD$1,750,000.00
. Annual dividend USD$500,000.00
. Annual debt servicing/pay back USD$250,000.00
Economic Incentives
The following sections detail the economic incentives available to increase the economic potential
of the proposed SPGP system options. It should be noted that the availability and applicability of
these incentives varies, and therefore a range of financial impacts is presented.
11.Power Sales Strategies
This project is typically tailored for industrial customers that will purchases the output of the
proposed SPGP, definitely the will experience an annual decrease in their utility bills, stability and
non interrupted power flow. We evaluated different approach to transmitting electricity power to
the industrial consumers.
CRDenergy.
RC741304
First approach, a direct sales strategy; with an NERC license to sale and NERC conditions met on
transmission regulation, wiring, tec., SPGP operators will contract industries within her facility to
deliver power utility directly to the industries. A uniform agreement should be drawn in line with
NERC Multi-Year Tariff Order and tailored options will be considered in selling power blocks of
1000kWh per month (just under 15% of average industrial usage), the incremental cost on the
consumers utility bill would be ~USD$100.00 per month. Further studies will be undertaken to
evaluate procurement and installation of commercially sound metering, billing and collections by
the utility (including the ability to disconnect customers who default on payments).
Another alternative considered under the sales options was direct sales to industrial power
marketers. While this scenario may warrant further evaluation, CRDenergy contacted several
power marketers operating in Nigeria to determine their interest in purchasing electricity power
resources from an independent SPGP. While all were interested in purchasing electricity power
(since few industrial power marketers have any SPGP in their resource portfolios), none were
willing to pay more than 10 cents/kWh.
Selling directly into the industrial consumer or power marketers would be a high risk option,
especially if future energy prices were to drop below the USD$0.34/kWh level; prices below this
level would result in negative cash flow for the plant and would not accrue sufficient revenues to
meet the finance payment requirement. In addition, selling into the market reduces one of the
major benefits provided by electricity power - price stability.
12. Alternative Power sales Strategies
SPGP operators may also want to consider the option of selling the output of the SPGP directly
into the Power grid. While current market conditions indicate that selling the power directly into the
Power grid may result in immediate profits and positive cash flow, the future of the PH electricity
market is highly uncertain and extreme volatility in energy prices may continue to exist.
The energy from a SPGP can be sold at fixed prices under long-term contracts. Fixed price long-
term contracts are the lowest risk option since they guarantee a positive revenue stream from
energy sales. This strategy also provides advantages to the customer by providing a long-term
hedge against future price volatility - a value-added benefit in addition to any energy price savings
resulting from the long- term fixed price contract.
Under any of the direct sales strategies that require transmitting power through the grid, additional
costs will be incurred for these sales including, but not limited to, power scheduling and
transmission wheeling charges, administrative costs, and transaction costs. Discussions should
be initiated with NERC to determine the amount of these additional costs if direct sales strategies
are pursued.
On the role of the Nigerian Bulk Electricity Trading Plc (NBET) established protocol in
developing a model Power Purchase Agreement (PPA) for the IPP such that it is able to
shore up credit enhancements provided through the Federal Ministry of Finance will ease
investors’ consideration of the “project finance” option in investing in the sector.
CRDenergy may pursuant to a 20-year power purchase agreement, sell the electric power
generated at its power plant to NBET. NBET will make monthly capacity payments
reflecting capital, equity return, and fixed operation and maintenance costs plus monthly
energy payments reflecting a pass-through of fuel costs and variable operation and
maintenance expenses in respect of energy delivered.
CRDenergy.
RC741304
13. Utility Grid Connection Proximity and Requirements
An engineering feasibility study will be required by Transmission Company of Nigeria (TCN) &
Nigerian Electricity Regulatory Commission (NERC) to determine interconnection requirements
and line load capacity. SPGP facilities will be required to meet NERC standard interconnection
requirements to tie-in to its transmission and distribution system. In addition, NERC will need to
conduct analyses of each of the potential tie-in points to determine if the transmission or
distribution line can accommodate the addition of up to 6 MW of capacity on these lines from the
SPGP. At the completion of its study, NERC will provide the SPGP with tie-in and hook-up
requirements and fees, detailed interconnection requirements, and the hourly availability and cost
of reserving capacity on the line. It is recommended that the CRDenergy immediately proceed
with the NERC studies for each of the proposed site options as soon as the system design
parameters are finalized. A copy of the interconnection application form and interconnection
requirements is available from NERC.
It should also be noted that the system designs developed for this feasibility study utilized listed
components accepted by the Nigeria Electricity Regulatory Commission (NERC).
14. Additional Value Added Benefits
In additional value-added benefit is the voltage support distributed energy options such as
SPGP provide to the local transmission and distribution grid. While this has no monetary value
to the SPGP operators, NERC may accrue benefits on its stressed system through the
additional localized voltage support provided by SPGP. While this additional voltage support is
minimal from just one 6 MW SPGP, these benefits may become appreciable if additional
distributed generation plants are brought on line in the future. While a 6 MW SPGP is unlikely
to prevent a localized power black out, the proliferation of distributed energy options on the
localized grid may have an impact in the future. As SPGP and other distributed energy options
become valued on a more equal basis with conventional peaking power plants (such as natural
gas combustion turbines) the value added benefits of SPGP are more likely to be transferred to
tangible monetary benefits. The development of a SPGP at PH is an important first step in PH
towards moving the market for SPGP technologies from small-scale electricity power
applications to utility-scale power plant applications.
14.a. NERC Generation Tariff Methodology
NERC has determined that the price of electricity to be paid to generators will be at the level
required by an efficient new entrant to cover its life cycle costs (including its short run fuel and
operating costs and its long run return on capital invested). The Long Run Marginal Cost (LRMC)
Method is in use here. LRMC involves calculating the full life cycle cost of the lowest‐efficient-cost
new entrant generator, taking into account current costs of plant and equipment, return on capital,
operation and maintenance, fuel costs, etc.
LRMC is applied in Individual long run marginal cost for each generator: This sets prices for each
generator according to its plant and site specific costs. However, individual (site‐specific) LRMC
model requires each new entrant IPP that requires a tariff beyond the MYTO benchmark to apply
to the NERC for approval. The IPP will open its procurement process, accounts and financial
model to scrutiny by the NERC, which will then apply prudence and relevance tests to determine
whether such plant and site‐specific costs should be allowed in the tariff.
CRDenergy.
RC741304
Technical Analysis
The following sections detail the technical components of the proposed SPGP at PH and include
the system siting requirements, system optimization characteristics, and preliminary design
considerations.
15.Installation Site
Two factors will determine the viability of location siting of SPGP; first is the closeness to
national grid when projecting SPGP to be connected to national grid (but if SPGP operates off-
grid or on direct sales to retailer/consumers, then the closeness to national grid is no factor.
Secondly, closeness to gas pipeline, Open Cycle Gas Turbine Plants are fully gas powered and
gas consumption is subsequently high. Base on this, it is advise to situate SPGP close to gas
pipeline .
As part of government/NERC initiative to boost the industry , each SPGP will procure its gas
supply pursuant to a long-term gas supply agreement with the Gas Aggregation Company of
Nigeria Limited (GACN). And Gas transportation services will be provided by the state-owned
Nigerian Gas Company Limited. Fuel supply contract terms are relatively uniform across the
sector.
Technical data requirements for a new power station
1. Site Information of Power Station location map to scale showing roads, transmission
line and transmission stations, if any.
2. Fuel supply arrangement (contractual, gas and oil pipelines-where available)
3. On the site map show area required for the following:
• Fuel delivery point,
• fuel storage space,
• liquid waste disposal area,
Land Requirements for SPGP (6MW)
As part of the site assessment for a 6 MW SPGP at the industrial complex. CRDenergy
calculated the land requirements for the SPGP system under consideration. Based on the
system designs developed for this potential project, a 6 MW SPGP would require approximately
200 meter width) by 200 meters (length) of available land.
16.Preliminary System Design
As one of the first steps in conducting the feasibility study for the SPGP at the PH, CRDenergy
developed preliminary system designs for the system. SPGP type and size was designed to
optimize performance for annual energy output and to maximize reliability.
17.Plant Operations and Maintenance Cost
The O&M cost were spilt into two main categories, which are annual Variable and Fixed O&M
expenses. The Variable expenses include; repair and replacement cost, water, chemicals &
lubricants. The fixed costs include management expenses, training expenses and salaries. The
table below will list the annual variable and fixed expenses and the respective cost.
CRDenergy.
RC741304
18.Projectschedule
The time fram for procurement and installation of SPGP is six months. According to the project
schedule there is an intention to secure the supply of electric power by 2016. SPGP should start
their operation for the first time during 2016, and a half year later the remaining Gas turbine shall
be put into operation will start.
19.Environmental aspects
The SPGP as a fuel will use natural gas that will cause energy saving by an energy efficient
generation plant. The greatest effect is the CO2 reduction, and also reduction of acid rain
related substances, SOx and NOx. The gas turbine shall be equipped with dry low NOx
combustors in small amounts.
20. Electricity Generation License
A generation license authorizes the licensee to construct, own, operate and maintain a
generation station for purposes of generation and supply of electricity in accordance with the
Electric Power Sector Reform Act, 2005. Subject to this Act, the holder of a generation license
may sell power or ancillary services to any of the classes of persons specified in the license.
-Distribution Licence
• the connection of customers for the purpose of receiving a supply of electricity;
• the installation, maintenance and reading of meters, billing and collection; and
-Trading Licence
A trading license authorizes the license to engage in the purchasing, selling, and trading of
electricity.
20.1. Licensing Fees:
off-grid operationws: One year license
Application fee USD$50.00 & license fee USD$5,000.00
Grid-connected operations: 10 years license
Application fee USD$250.00 & license fee US$2,500.00
Annual Operating levies: 1.5% of license charges/kwh
Electrical installations/wiring: Five years license
Catagory a(330/132kv Application fee USD$500.OO/License USD$25,000.00
Annual operating levy USD$2,500.00
Catagory a(330/132kv Application fee USD$250.OO/License USD$2,500.00
Annual operating levy USD$250.00
Catagory a(330/132kv Application fee USD$10.OO/License USD50.00
CRDenergy.
www.crdenergy.com
21. Gas Consumption for SPGP
Gas consumption for power generation is computed for each hour and for each unit according to
the actual production of the single unit in that hour and to its heat rate at such a load.
Gas Comsumption Per hour = 2130m³cubic meter /75220.24ft³cubic foot/2130000litre
Multiply by 24 hours 25560m³ cubic meter /902642.88ft³ cubic foot /25560000litre per day
Muitiply by 356 days 9099360m³ cubic meter /317.832000404 ft³ cubic foot /9099360000litre per annual
on average plus/minus cost of gas per day will be
25560m³/902642ft³/25560000litre = USD$1,700.00
On Average Plus/Minus Cost Of Gas Per Annual Will Be
10 000 000m³/353 146 667ft³/10000000000L = USD$600,000.00
Fixed cost of gas in nigeria is USD$2.5 per 1000ft³ also same as 29m³ also same as 28316 litres
22. Gas Turbine Principle of Operation
A gas turbine is a type of internal combustion engine that uses gas as the working fluid. It is essentially
comprised of an upstream rotating compressor coupled to a downstream turbine, and a combustion
chamber in-between.
22.1. Classification of Gas turbines
Classification of Gas turbines can be done according to following criteria; path of working substance,
nature of cycle, process of heat absorption, mode of drive and function of rotational speed, pressure
drop in the gas turbine and physical location.
22.2.Types of Gas Turbines
There are two main types of Gas turbines; Aero-derivatives and Industrial Gas Turbines.
22.3. Chosen Gas Turbine
The least rated power requirement for the gas turbine is: 6MW/6000kw
The limit is based on establishing a SPGP with a rated power output which is at least 8000Kva. This is
based upon theoretical knowledge that the steam section will generate about 20% of the rated
capacity of the Gas turbine.
After going through the several options the best option was a setup of ELSIB Т-6-2U3 TURBO
GENERATOR.
The choice had several key Technical and economic attributes which included;
• Short starting period (10-20 minutes).
• High Thermal efficiency (42%) and low heat rates (low fuel consumption).
• Low emissions.
• Readily available on the market and available spare parts.
CRDenergy.
www.crdenergy.com
23. Turbine Control
In order to ensure high efficiency, high plant availability performance and high safety standards; the
steam turbine Must be equipped with a control system. ELSIB makes this a simple task by packing
the turbine control system with the actual steam turbine.
24. Balance of Plant Equipment
For the Plant to function efficiently it requires other equipment or auxiliaries in addition to the gas
turbine. These include; the turbine inlet cooling system, the condenser, the boiler feed pump, the
water treatment plant, the cooling tower, and the exhaust gas stack. Therefore this section analyses
those other useful components of the SPGP.
Condenser - The steam from the steam turbine exhausts into the condenser which is a pressure of
10kpa. Boiler feed pump - The boiler feed pump must be able to raise the water to a pressure of
30Bars from 10kpa. Water treatment plant - The raw water from river needs to be treated, so as to
avoid tube scaling and damage to Turbine blades and pump impellers.Thus the plant will have a
Demineralization plant to remove the minerals which can corrode plant components. In addition the
plant will have water treatment ponds to allow for sedimentation to take place. Exhaust Gas Stack -
Exhaust stack design is important in reducing emissions. The stack should have the ability to cope up
with the exhaust gas temperatures of 194.9 and ensure that they are exhausted into the atmosphere
at a safe and lower temperature.
Complete delivering Package of Turbo generator delivery
- Turbo generator with air cooler, support plate or foundation pins
- Mounting accessories and special tools
- Installation materials to the generator
- Hardware thermal control
- Cover sound proof
- The pumps supplying water to the cooling coil
- Excitation system
- Spare parts to the extent agreed with the customer
Turbo Generator Technical characterics
25.Characteristics Duty Long-permissible modes
Full Active Power Kva 6000
Active Power, Kva 7500
Power Factor 0.8
Voltage Stator 10500
Current A 412
Rotational Speed, Vol / Min 3000
Frequency, Hz 50
Efficiency,% 97.7
Connection Phases Of The Stator Winding "Star"
The Ratio of Short-Circuit 0.47
Transient Inductive Reactance 0.17
Rated Temperature of Cooling Water
Inlet Air Cooler, ° C 32
The Minimum Temperature of The Cooling Water
Inlet Air Cooler, ° C 15
CRDenergy.
www.crdenergy.com
Cooling water flow through coolers, m / h 42
In-let air temperature of 40 ° C in the generator, kW 6600
Temperature of the air entering the generator
40° C kW 7200
Operating Temperature, Co
Stator Winding 125
Winding Rotor 130
Stator Iron 120
Weight, Kg
General 18000
Stator 8800
Rotor 5300
25.1.Turbogenerator provides stable operation:
- at a frequency of 46.0 Hz - for at least 1 s;
- at a frequency of 47.0 Hz - for at least 40 seconds.
The Turbogenerator is manufactured for operation at an altitude upto 1000 m above the
sea level in the non-explosive environment at a temperature not lower than +5 C.
The turbo generator has a closed design. Cooling turbo generator performed air in a closed circuit under
the effect of the two axial fans mounted on the rotor shaft. The air is cooled by water in the air cooler that is
integrated into the housing located above the stator of the turbo generator.
The stator core is assembled from isolated segments of electrical steel. For cooling the windings and stator
core in the core provided with radial ventilation channels that share the core along its length into individual
packages. Outside diameter core made ducts for supplying air to the radial channels.
The stator winding is a two-layer reel. The stator winding insulation thermosetting "Monolith" heat
resistance class "F". Permissible temperature measured by the thermal resistance meter, laid in grooves
125C (heat resistance class "B").
The winding has six pins: 3 - linear, 3 zero. O are located at the bottom of the generator stator.
The rotor is made from solid stainless steel forging, which provides mechanical strength of the rotor at all
operating modes of the Turbo generator.
The rotor winding is made of cold-continuous copper conductors and fit into grooves milled in the barrel
rotor.
Rotor winding insulation heat resistance class "F". Allowable temperature of the rotor winding, measured by
resistance - 130 ° C (for temperature class "B").
On the console of the rotor shaft is set anchor brushless exciter with diode rectifiers. The voltage rectified
current displayed on the slip rings are designed to control the rotor winding insulation.
Stator end winding closed box-shaped shield. The panels are fixed bearings. On the side of the pathogen
bearings and labyrinth seals are isolated from the "land".
To monitor the thermal state of the Turbo generator is equipped with thermal resistance meters.
Control devices can be connected to the PCS station.
CRDenergy.
www.crdenergy.com
26.Turbine Generator Excitation System
Brushless excitation system powered by a rotating anchor of the auxiliary AC generator through the
rectifiers. The anchor of the auxiliary generator and the rectifiers are placed on the shaft of the Turbo
generator. System power is provided from the exciter transformer connects to the turbine generator.
TECHNICAL DIAGRAM OF ELSIB Т-6-2U3 TURBO GENERATOR
27.Quality and Warranty
Production and testing of turbine generators NPO "ELSIB" JSC carried out in accordance with the
requirements of ISO-9001-2008. The Turbo generator meets the standards of RF and IEC
recommendations. The company ensures compliance with the requirements of the Turbo generator
standards, subject to improper use, transport and storage, set specifications. Warranty period of operation
of the Turbo generator at least three years from the date of commissioning in the domestic supply or 1 year
CRDenergy.
www.crdenergy.com
from the date of commissioning, and no more than three years since testing the Turbo generator across the
state border of the Russian Federation in the supply of turbine generators for export.
28. Recommendations And Conclusion
In order for the full potential of the project to be realized a few but important factors have to be
noted in its implementation, and plant design and operation.
29.Technical Recommendations
A clear result that was obtained from the technical analysis is that the plant will have to operate in
a SPGP mode. This will result in high thermal efficiency and electrical power output. Furthermore,
another important design feature of the plant is the use of a ELSIB type heat recovery steam
generator in the steam section so as to reduce plant start-up time; this design is also much
cheaper as compared to the conventional steam drum type.
Furthermore, it is also recommended that the plant will have a turbine inlet cooling system (TIC)
which can use water as the coolant, as this will ensure uncompromised plant electrical output
during warm periods. It also recommended for the plant to use the latest ELSIB control system for
the gas turbine so as to ensure high plant thermal efficiency, low emissions, and overall securing
high plant availability performance. It is also recommended that the ELSIB T6-2 Gas turbine be the
gas turbine technology of choice due to its high thermal efficiency and low emission rates and from
the technical analysis it had the best specifications.
30. Environmental Recommendations
Although the above recommended technical factors ensure protection for the environment, it is
also recommended that several management technics must be adopted in the plant operation.
These include implementation of a Cleaner Production (CP) strategy at the plant and using
established international standards and overall using an Environmental Management System
(EMS) so as to ensure that the environmental goals are achieved.
31. Economical Recommendations
A lot of factors are putting into consideration in evaluating this assessment, general investment
opportunities and effective functioning of SPGP in Nigeria as a case study and Africa as a whole.
First, a favourable investment climate is characterized largely by the following: good repayment
record and investment grade rating; less (costly) risk mitigation techniques to be employed which
translates into lower cost of capital and hence lower project costs and more competitive prices;
potentially more than one investment opportunity.
The most critical areas in coherent power sector is planning linked to procurement and
contracting. Planning has built-in contingencies to avoid emergency power plants or blackouts;
responsibility for procurement is clearly allocated, plans are linked to procurement; technical and
environmental due-diligence on the proposed site is also essential, and the procurement process
is transparent and competition ultimately drives down prices. Finally, capacity is built to contract
and evaluate effectively.
CRDenergy.
www.crdenergy.com
A final area which may make or break the long-term sustainability of this projects is: abundant, low
cost fuel and secure contracts. We have chosen a fuel option that is cost-competitive with other
fuels and anticipate to secure contracts of fuel supply for the duration of the project.
There are other factors that will directly effect the project or may help to facilitate a more
balanced outcomes, namely:
1) favourable equity partners;
2) favourable debt arrangements;
3) a secure and adequate revenue stream;
4) credit enhancements and security arrangements;
5) positive technical performance and finally,
6) strategic management and relationship building.
Favourable equity partners is defined as follows: where possible, the involvement of local partners
and equity as well as firms with development origins; appetite for the actual project risk and a
return on equity that is generally perceived by parties as a reasonable and fair.
Favourable debt arrangements are paramount for the long-term sustainability of projects and may
be characterized as follows: competitively priced financing, local capital markets; some flexibility in
terms and conditions (including possible refinancing). Of utmost importance is a secure and
adequate revenue stream, which is generally made possible via the following conditions:
commercially sound metering, billing and collections by the utility (including the ability to
disconnect customers who default on payments, be they Government ministries/departments or
parastatals); it should be noted that investors/financiers prefer markets where the off-taker is not a
vertically integrated utility with own generation stations; the revenue stream should be
safeguarded in a robust PPA, which stipulates capacity and energy charges as well as dispatch,
fuel metering, interconnection, insurance, force majeure, transfer, termination, change of law
provisions, refinancing arrangements, dispute resolution, etc
Taking various forms, credit enhancements and security arrangements are part of the muscle that
attracts and sustains IPPs, specifically: partial risk guarantees; political risk insurance and cash,
namely escrow accounts, letters of credit and liquidity facilities--all of which should be made clear
at the time of implementation.
Positive technical performance is an area where most IPPs have a clear advantage, however, it
should not be taken for granted; this encompasses high technical performance, including
availability, and also that sponsors anticipate potential conflicts (especially related to O&M, and
budgeting) and mitigate them.
Strategic management and relationship building is grease for the wheels and an integral part of
the balancing of development and investment outcomes. Sponsors should work to create a
positive image through political relationships, development funds, and effective communications.
Ongoing, strategic management of their contracts, especially in the face of exogenous stresses, is
critical.
CRDenergy.
www.crdenergy.com
32. Policy Recommendations
The plant will use fuel from Nigeria; therefore it is recommended that the government sticks to its
energy policy measures especially its commitment in ensuring a solid bilateral business
relationship with Nigeria. This is also pointed out in the energy policy where it's stated that the
country is committed to regional power system integration through supporting initiatives on system
integration, joint cross-border generation projects.
Small Power Generating Plants
Technical and Economical assessment
is conducted by Craig & Rupert Denis Limited Nigeria,
on request of Brainstorm utilities limited.
Craig & Rupert Denis Limited
Regus Embankment Tower
123317 Moscow, Russia
10 Presnenskaya Naberezhnaya, Block C
Tel.: № +7 (495) 722 44 75
Fax.: № +7 (495) 967 76 00
Email: enquires@crdenergy.com
www.crdenergy.com

Mais conteúdo relacionado

Mais procurados

Lag 05 mgl k-electric 13-03-2019
Lag 05 mgl k-electric 13-03-2019Lag 05 mgl k-electric 13-03-2019
Lag 05 mgl k-electric 13-03-2019
abdul basit
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India
sanjeev jain
 
Dilligentia 2nd Annual Gas conference - (ICF) India Gas Market Assessment_27t...
Dilligentia 2nd Annual Gas conference - (ICF) India Gas Market Assessment_27t...Dilligentia 2nd Annual Gas conference - (ICF) India Gas Market Assessment_27t...
Dilligentia 2nd Annual Gas conference - (ICF) India Gas Market Assessment_27t...
Ashish Singla
 
Solar power projects under rec mechanism in india
Solar power projects under rec mechanism in indiaSolar power projects under rec mechanism in india
Solar power projects under rec mechanism in india
Bhargav Parmar
 

Mais procurados (20)

Introduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) MechanismIntroduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) Mechanism
 
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019
 
Renewable Energy Certificate
Renewable Energy CertificateRenewable Energy Certificate
Renewable Energy Certificate
 
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
 
Presentation by MNRE on Solar Parks
Presentation by MNRE on Solar ParksPresentation by MNRE on Solar Parks
Presentation by MNRE on Solar Parks
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
 
PV Project Development Economic Feasibility Financial Model Baseline Case
PV Project Development Economic Feasibility Financial Model Baseline CasePV Project Development Economic Feasibility Financial Model Baseline Case
PV Project Development Economic Feasibility Financial Model Baseline Case
 
URN 14D 328 - applying for a Contract for Difference this October 2014 under ...
URN 14D 328 - applying for a Contract for Difference this October 2014 under ...URN 14D 328 - applying for a Contract for Difference this October 2014 under ...
URN 14D 328 - applying for a Contract for Difference this October 2014 under ...
 
Lag 05 mgl k-electric 13-03-2019
Lag 05 mgl k-electric 13-03-2019Lag 05 mgl k-electric 13-03-2019
Lag 05 mgl k-electric 13-03-2019
 
National Solar Mission Status (July'17)
National Solar Mission Status (July'17)National Solar Mission Status (July'17)
National Solar Mission Status (July'17)
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
 
Investment Idea - KSK Energy Ventures Ltd - "HOLD"
Investment Idea - KSK Energy Ventures Ltd - "HOLD"Investment Idea - KSK Energy Ventures Ltd - "HOLD"
Investment Idea - KSK Energy Ventures Ltd - "HOLD"
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India
 
Dilligentia 2nd Annual Gas conference - (ICF) India Gas Market Assessment_27t...
Dilligentia 2nd Annual Gas conference - (ICF) India Gas Market Assessment_27t...Dilligentia 2nd Annual Gas conference - (ICF) India Gas Market Assessment_27t...
Dilligentia 2nd Annual Gas conference - (ICF) India Gas Market Assessment_27t...
 
Contracts for difference
Contracts for differenceContracts for difference
Contracts for difference
 
Ltbr
LtbrLtbr
Ltbr
 
Solar power projects under rec mechanism in india
Solar power projects under rec mechanism in indiaSolar power projects under rec mechanism in india
Solar power projects under rec mechanism in india
 
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
 
Engr. Asim Mahmood CV
Engr. Asim Mahmood CVEngr. Asim Mahmood CV
Engr. Asim Mahmood CV
 
Energy audit tata power solar
Energy audit   tata power solarEnergy audit   tata power solar
Energy audit tata power solar
 

Semelhante a Small Power Generation Plant

Sep 13 corporatepresentation
Sep 13 corporatepresentationSep 13 corporatepresentation
Sep 13 corporatepresentation
Company Spotlight
 
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.pptAPP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
somnathmahapatra6
 
Presentation by bhavesh thakkar
Presentation by bhavesh thakkarPresentation by bhavesh thakkar
Presentation by bhavesh thakkar
PMI_IREP_TP
 
Fuelcell Investor Presentation March 2014
Fuelcell Investor Presentation March 2014Fuelcell Investor Presentation March 2014
Fuelcell Investor Presentation March 2014
Company Spotlight
 
Fuelcell investor presentation_14
Fuelcell investor presentation_14Fuelcell investor presentation_14
Fuelcell investor presentation_14
Company Spotlight
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projects
Sanman Rajput
 

Semelhante a Small Power Generation Plant (20)

01 ltbr
01 ltbr01 ltbr
01 ltbr
 
LTBR Presentation April 2014
LTBR Presentation April 2014LTBR Presentation April 2014
LTBR Presentation April 2014
 
Sep 13 corporatepresentation
Sep 13 corporatepresentationSep 13 corporatepresentation
Sep 13 corporatepresentation
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Birendra Behuria ppt.pptx
Birendra Behuria ppt.pptxBirendra Behuria ppt.pptx
Birendra Behuria ppt.pptx
 
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.pptAPP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
APP_PEER_REV_Australia-INDIA PERSPECTIVE 23 June.ppt
 
REC status
REC statusREC status
REC status
 
Dss For Wind Power Plant
Dss For Wind Power PlantDss For Wind Power Plant
Dss For Wind Power Plant
 
Session 6 - Presentation by Georgian Industrial Group
Session 6 - Presentation by Georgian Industrial GroupSession 6 - Presentation by Georgian Industrial Group
Session 6 - Presentation by Georgian Industrial Group
 
Presentation by bhavesh thakkar
Presentation by bhavesh thakkarPresentation by bhavesh thakkar
Presentation by bhavesh thakkar
 
Fuelcell Investor Presentation March 2014
Fuelcell Investor Presentation March 2014Fuelcell Investor Presentation March 2014
Fuelcell Investor Presentation March 2014
 
Fuelcell investor presentation_14
Fuelcell investor presentation_14Fuelcell investor presentation_14
Fuelcell investor presentation_14
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projects
 
PSP & Guidelines MOP.pptx
PSP & Guidelines MOP.pptxPSP & Guidelines MOP.pptx
PSP & Guidelines MOP.pptx
 
CSP Today Solar Tower report 2014 - Infographic
CSP Today Solar Tower report 2014 - InfographicCSP Today Solar Tower report 2014 - Infographic
CSP Today Solar Tower report 2014 - Infographic
 
GS Economy
GS EconomyGS Economy
GS Economy
 
Renewable Energy - Recent Initiatives
Renewable Energy - Recent InitiativesRenewable Energy - Recent Initiatives
Renewable Energy - Recent Initiatives
 
Presensation For IARU Climate Change Congress
Presensation For IARU Climate Change CongressPresensation For IARU Climate Change Congress
Presensation For IARU Climate Change Congress
 
Thermal power sector
Thermal power sectorThermal power sector
Thermal power sector
 
Island Power Generation and Demand Side Purchasing and Selling
Island Power Generation and Demand Side Purchasing and SellingIsland Power Generation and Demand Side Purchasing and Selling
Island Power Generation and Demand Side Purchasing and Selling
 

Último

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Último (20)

Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 

Small Power Generation Plant

  • 1. CRDenergy. RC741304 PROTOTYPE FOR ю SPGP PROJECTS SmallPower Generation for Industrial Applications Economic andTechnicalFeasibilityAssessment SmallPowerGenerationPlant Small Power Generation Plant solution (SPGP) continues to be an important segment of Electrical Energy production. The increasing demand for energy has to be satisfied while considering the impact on the global environment. SPGP plays an important role in industrial applications. Small size cogeneration plants sited close to industrial energy consumption can deliver power with high fuel efficiency and low emissions, and with modest space requirements. CRDenergy can offer to its customers complete solutions from feasibility studies to the actual turnkey cogeneration plant construction, aftermarket services and customized financial solutions. We are using oil and gas industrial port city Port Harcourt city (PH) in Nigeria, African largest economy as a case study, with its complexity, it reflects the shortage of power or barriers and opportunity encountered in every growing economy . Avoiding the structural complexity of building large scale power plant; SPGP offers a flexible, realiable, close to consumer option that can be multipled in multiple units and easily transformed to negbourhood service station in industrial hubs.
  • 2. CRDenergy. RC741304 List of contents 1. The CRDenergy Initiative: An Overview 1.1. A small power generation plant Opportunities for PH 2. Energy Situation 3. Project Economic feasibility assessment 4. Project Capital requirement 5. Taxation 6. Financial Source 7. Actual Project cost 8. Annaul cost of runing installation 9. Cost of power generation 10. Revenue, pay back & subside 11. Power Sales Strategies 12. Alternative Power sales Strategies 13. Utility Grid Connection Proximity and Requirements 14. Additional Value Added Benefits 14.a. NERC Generation Tariff Methodology 15. Installation Site 16. Preliminary System Design 17. Plant Operations and Maintenance Cost 18. Project schedule 19. Environmental aspects 20. Electricity Generation License 20.1. Licensing Fees 21. Gas Consumption for SPGP 22. Gas Turbine Principle of Operation 22.1. Classification of Gas turbines 22.2. Types of Gas Turbines 22.3. Chosen Gas Turbine 23. Turbine Control 24. Balance of Plant Equipment 25. Characteristics Duty Long-permissible modes 25.1. Turbogenerator provides stable operation 26. Turbine Generator Excitation System 27. Quality and Warranty 28. Recommendations And Conclusion 29. Technical Recommendations 30. Environmental Recommendations 31. Economical Recommendations 32. Policy Recommendation 33. Diagram of Nigerian National Grid
  • 3. CRDenergy. RC741304 1.The CRDenergy Initiative: An Overview A SPGP is powered by gas turbine generator installed on an industrial site for the dual purpose of power generation and electricity reliability. A SPGP is most effective at producing electricity when industries in Port harcourt (PH) industrial hub need it most – for steady, continual productivity, 24hours-365 days. A SPGP can be installed quickly (3 - 6 months construction time), can generate immediate power that will not fluctuate in price, and can provide relief to the energy system during peak demand periods, such as those being experienced in Port harcourt(PH). A SPGP will provide Port harcourt(PH) industries with the opportunity to generate environmentally benign electricity and maintain local control over energy revenues (instead of exporting these funds to non-resident energy providers). CRDenergy has an opportunity to transform these innovative, environmentally benign, and economically viable power generating assets for the energy-stressed industries in Port harcourt(PH) industrial hub. 1.1. A SPGP Opportunities for Port harcourt. CRDenergy has taken the initiative to undertaken a detailed technology and economic feasibility study to determine the viability of developing up to a six megawatt (6+MW) SPGPs at different ports within the City. In addition, with expected continued shortfalls in electricity generation supplies likely, a SPGP could be a cost-effective means of enhancing electricity reliability and reducing electricity price volatility. This study has determined that a A SPGP can be an economically viable option for power production. It can be operate off-grid and runs as neighborhood power station or it can be easily integrated into national grid. 2. Energy Situation Energy prices hit new all time highs in January of 2015. Forecast of electricity demand is much higher than previously analyzied, as a result, retail energy prices are still well over 60% higher than the same period the previous year. In addition to rising energy costs, the scarcity of energy supplies throughout the state have resulted in an unprecedented number of power black out. There are a number of reasons that electricity consumers in PH may continue to experience black out and high energy prices, including: • Electricity demand is forecasted to continue to increase over the next five years in the Rivers state; • New power plants planned for construction are not expected to keep up with the rising demand for electricity in the PH marketplace; • The time lag for developing conventional power plants in PH is currently about 2-3 years; • Nationwide, commodity prices for natural gas continue to increase as demand outstrips supply; • There are few available generation sites located near national grid transmission lines within the state; The use of Open Cycle Gas Turbine Plant, such as SPGP, can provide a long term solution to these concerns.
  • 4. CRDenergy. RC741304 Economic Analysis 3. Project Economic feasibility assessment This assessment was done in a systematic way. This included defining or evaluating the financial requirements of the project or capital investment required, which will be classified into different categories, namely Engineering, Procurement and Construction costs (EPC). Furthermore, the operations and maintenance cost of the SPGP were also taken into consideration. As a measure of its viability several factors were evaluated, namely; the project internal rate of return (IRR), payback period and the overall project net present value (NPV) at the end of the expected Plant life. 4. Project Capital requirement In order to simplify the analysis and as well as to use the standard economic evaluation that is normally done for any power plant, the overall plant capital requirement was determined using the plant capacity first. Hence, the capital requirement for a SPGP as defined in the review, ranges between USD$0.16,1528.00/kW and typically is USD$ 0.18.00/kW from experience. Thus for a 6 MW SPGP the Capital requirement is: Thus the Project total capital requirement is: USD$1,270,000.00. The Capital Requirement will be spread over six construction months, assuming equal investment in both years. 5. Taxation Company tax of 32% and annual depreciation rate of 33.3% as recommended by NERC 6. Financial Source Amount (NGN)/ Million 1. Capital investment 310,798.00 . 2. Loan 952,500.00 Total cost USD$1,263,298.00 Term of payment & guarantee: Documentary letter of credit / Equity evaluation and Capital investment on agreement with bank A further economic evaluation will be undertaken by C&RD to elavuate long term economic proxies before the implementation of the project; 1. Short term cash flow projection 2. Medium term cash flow projection 3. Funding arrangements 4. Asset base 5. Risk Management Strategy 6. Management experience and dep
  • 5. CRDenergy. RC741304 7. Actual Project cost Amount (NGN)/ Million 1. Complete delivering set of Turbine generator T-6-2U3 air-cooled for coupling to a steam turbine consisting of Turbo generator with air cooler, support plate or foundation pins; Mounting accessories and special tools; Installation materials to the generator; Hardware thermal 395,250.00 control; Cover sound proof; The pumps supplying water to the cooling . coil; Excitation system 2. Logistic, Engineering and installation (ELSIB Russia experts on site) 34,448.00 3. Installation facility construction 52,000.00 4. Labour, transportation, miscelaneous, etc) 15,800.00 (The total number of employees in SPGP is 6. After the completion of the new plant, it will keep the same organization. It consists of 2 engineers . and 2 operators and 1 maintenance workers/transporter.) 5. O&M cost- water, chemicals, lubricants & training expenses 50,000.00 6. Insurance & Licencing 50,000.00 Total cost USD$550,698.00 This cost evaluation is approximated to six months of Engineering, Procurement and Construction operational period and six months of active service. The SPGP starts generating revenue for operational purpose after this period, revenue & pay backs and debit servicing will resume with 10 years to 20 years till 40 years service line of SPGP. 8. Annaul cost of runing installation Amount (NGN)/Million 1. Labour, transportation, miscelaneous, etc) 35,800.00 2. O&M cost- water, chemicals, lubricants & training expenses 30,000.00 3. On average plus/minus cost of gas per annual will be , 10 000 000m³/ 353 146 667ft³/10000000000L 600 000.00 Total cost USD$ 665,800.00 9. Cost of power generation Cost of power in nigeria can valued in different catagory depending on your operating license and distribution limits. On average USD$0.17per kwh x 100 000 kWh per day average = USD$ 15, 000.00 (OFF GRID/DIRECT BLOCK MONTHLY SALES FOR INDUSTRIAL CATEGORY D2) Muitply by 356 depends on annual consumption ratio = USD$5,340,000.00 per annual. This evaluation is made with most minimal 33% power output ratio of 4000 Kwh per hour, actual value may be valued at 4000 kWh power out/ per minute, depending electricity power comsumption.
  • 6. CRDenergy. RC741304 On average USD$0.17.00 per kw x 4000 kw = USD$ 560.00/consumption ratio 75% (GRID CONNECTED TCN SALE FOR INDUSTRIAL CATEGORY D2) Muitly by minute depends on minute consumption ratio x 60 minutes = USD$ 33,600.00 Muiltply by hour depends on hour consumption ratio x 24 hours = USD$ 6,720.00 Multiply by 356 depends on annual consumption ratio = USD$2,392,320.00 This cost evaluation of this report is base on net minimal of USD$875,000.00 /33% power output ratio per annual. If we reverse the value for residential category R2 assesment, the value will be half of the this cost. The Nigerian Electricity Regulatory Commission, NERC, has put into operation a Multi-Year Tariff Order, MYTO, for the determination of the cost of electricity sold by distribution/retail companies for the period 1 June 2012 to 31 May 2017. Consumers are charged in different categories, namely, residential, commercial, industrial, special and street lighting. Electricity consumption is measured in kilowatt-hour, kWh, and the energy charge is 2015, USD$0.17.54, USD$0.17.24 per kWh in 2015 – 2016 and USD$0.16.13 in 2016 – 2017. For PH Disco, the fixed monthly charge for industrial category D2 energy charge is USD$0.17 per kWh in 2015 – 2016 and USD$0.15.39 per kWh in 2016 – 2017. 10. Revenue, pay back & subside Total cost of investment USD$597,498.00 . . Annaul cost of runing installation USD$665,800.00. . Annual revenue generated USD$1,750,000.00 . Annual dividend USD$500,000.00 . Annual debt servicing/pay back USD$250,000.00 Economic Incentives The following sections detail the economic incentives available to increase the economic potential of the proposed SPGP system options. It should be noted that the availability and applicability of these incentives varies, and therefore a range of financial impacts is presented. 11.Power Sales Strategies This project is typically tailored for industrial customers that will purchases the output of the proposed SPGP, definitely the will experience an annual decrease in their utility bills, stability and non interrupted power flow. We evaluated different approach to transmitting electricity power to the industrial consumers.
  • 7. CRDenergy. RC741304 First approach, a direct sales strategy; with an NERC license to sale and NERC conditions met on transmission regulation, wiring, tec., SPGP operators will contract industries within her facility to deliver power utility directly to the industries. A uniform agreement should be drawn in line with NERC Multi-Year Tariff Order and tailored options will be considered in selling power blocks of 1000kWh per month (just under 15% of average industrial usage), the incremental cost on the consumers utility bill would be ~USD$100.00 per month. Further studies will be undertaken to evaluate procurement and installation of commercially sound metering, billing and collections by the utility (including the ability to disconnect customers who default on payments). Another alternative considered under the sales options was direct sales to industrial power marketers. While this scenario may warrant further evaluation, CRDenergy contacted several power marketers operating in Nigeria to determine their interest in purchasing electricity power resources from an independent SPGP. While all were interested in purchasing electricity power (since few industrial power marketers have any SPGP in their resource portfolios), none were willing to pay more than 10 cents/kWh. Selling directly into the industrial consumer or power marketers would be a high risk option, especially if future energy prices were to drop below the USD$0.34/kWh level; prices below this level would result in negative cash flow for the plant and would not accrue sufficient revenues to meet the finance payment requirement. In addition, selling into the market reduces one of the major benefits provided by electricity power - price stability. 12. Alternative Power sales Strategies SPGP operators may also want to consider the option of selling the output of the SPGP directly into the Power grid. While current market conditions indicate that selling the power directly into the Power grid may result in immediate profits and positive cash flow, the future of the PH electricity market is highly uncertain and extreme volatility in energy prices may continue to exist. The energy from a SPGP can be sold at fixed prices under long-term contracts. Fixed price long- term contracts are the lowest risk option since they guarantee a positive revenue stream from energy sales. This strategy also provides advantages to the customer by providing a long-term hedge against future price volatility - a value-added benefit in addition to any energy price savings resulting from the long- term fixed price contract. Under any of the direct sales strategies that require transmitting power through the grid, additional costs will be incurred for these sales including, but not limited to, power scheduling and transmission wheeling charges, administrative costs, and transaction costs. Discussions should be initiated with NERC to determine the amount of these additional costs if direct sales strategies are pursued. On the role of the Nigerian Bulk Electricity Trading Plc (NBET) established protocol in developing a model Power Purchase Agreement (PPA) for the IPP such that it is able to shore up credit enhancements provided through the Federal Ministry of Finance will ease investors’ consideration of the “project finance” option in investing in the sector. CRDenergy may pursuant to a 20-year power purchase agreement, sell the electric power generated at its power plant to NBET. NBET will make monthly capacity payments reflecting capital, equity return, and fixed operation and maintenance costs plus monthly energy payments reflecting a pass-through of fuel costs and variable operation and maintenance expenses in respect of energy delivered.
  • 8. CRDenergy. RC741304 13. Utility Grid Connection Proximity and Requirements An engineering feasibility study will be required by Transmission Company of Nigeria (TCN) & Nigerian Electricity Regulatory Commission (NERC) to determine interconnection requirements and line load capacity. SPGP facilities will be required to meet NERC standard interconnection requirements to tie-in to its transmission and distribution system. In addition, NERC will need to conduct analyses of each of the potential tie-in points to determine if the transmission or distribution line can accommodate the addition of up to 6 MW of capacity on these lines from the SPGP. At the completion of its study, NERC will provide the SPGP with tie-in and hook-up requirements and fees, detailed interconnection requirements, and the hourly availability and cost of reserving capacity on the line. It is recommended that the CRDenergy immediately proceed with the NERC studies for each of the proposed site options as soon as the system design parameters are finalized. A copy of the interconnection application form and interconnection requirements is available from NERC. It should also be noted that the system designs developed for this feasibility study utilized listed components accepted by the Nigeria Electricity Regulatory Commission (NERC). 14. Additional Value Added Benefits In additional value-added benefit is the voltage support distributed energy options such as SPGP provide to the local transmission and distribution grid. While this has no monetary value to the SPGP operators, NERC may accrue benefits on its stressed system through the additional localized voltage support provided by SPGP. While this additional voltage support is minimal from just one 6 MW SPGP, these benefits may become appreciable if additional distributed generation plants are brought on line in the future. While a 6 MW SPGP is unlikely to prevent a localized power black out, the proliferation of distributed energy options on the localized grid may have an impact in the future. As SPGP and other distributed energy options become valued on a more equal basis with conventional peaking power plants (such as natural gas combustion turbines) the value added benefits of SPGP are more likely to be transferred to tangible monetary benefits. The development of a SPGP at PH is an important first step in PH towards moving the market for SPGP technologies from small-scale electricity power applications to utility-scale power plant applications. 14.a. NERC Generation Tariff Methodology NERC has determined that the price of electricity to be paid to generators will be at the level required by an efficient new entrant to cover its life cycle costs (including its short run fuel and operating costs and its long run return on capital invested). The Long Run Marginal Cost (LRMC) Method is in use here. LRMC involves calculating the full life cycle cost of the lowest‐efficient-cost new entrant generator, taking into account current costs of plant and equipment, return on capital, operation and maintenance, fuel costs, etc. LRMC is applied in Individual long run marginal cost for each generator: This sets prices for each generator according to its plant and site specific costs. However, individual (site‐specific) LRMC model requires each new entrant IPP that requires a tariff beyond the MYTO benchmark to apply to the NERC for approval. The IPP will open its procurement process, accounts and financial model to scrutiny by the NERC, which will then apply prudence and relevance tests to determine whether such plant and site‐specific costs should be allowed in the tariff.
  • 9. CRDenergy. RC741304 Technical Analysis The following sections detail the technical components of the proposed SPGP at PH and include the system siting requirements, system optimization characteristics, and preliminary design considerations. 15.Installation Site Two factors will determine the viability of location siting of SPGP; first is the closeness to national grid when projecting SPGP to be connected to national grid (but if SPGP operates off- grid or on direct sales to retailer/consumers, then the closeness to national grid is no factor. Secondly, closeness to gas pipeline, Open Cycle Gas Turbine Plants are fully gas powered and gas consumption is subsequently high. Base on this, it is advise to situate SPGP close to gas pipeline . As part of government/NERC initiative to boost the industry , each SPGP will procure its gas supply pursuant to a long-term gas supply agreement with the Gas Aggregation Company of Nigeria Limited (GACN). And Gas transportation services will be provided by the state-owned Nigerian Gas Company Limited. Fuel supply contract terms are relatively uniform across the sector. Technical data requirements for a new power station 1. Site Information of Power Station location map to scale showing roads, transmission line and transmission stations, if any. 2. Fuel supply arrangement (contractual, gas and oil pipelines-where available) 3. On the site map show area required for the following: • Fuel delivery point, • fuel storage space, • liquid waste disposal area, Land Requirements for SPGP (6MW) As part of the site assessment for a 6 MW SPGP at the industrial complex. CRDenergy calculated the land requirements for the SPGP system under consideration. Based on the system designs developed for this potential project, a 6 MW SPGP would require approximately 200 meter width) by 200 meters (length) of available land. 16.Preliminary System Design As one of the first steps in conducting the feasibility study for the SPGP at the PH, CRDenergy developed preliminary system designs for the system. SPGP type and size was designed to optimize performance for annual energy output and to maximize reliability. 17.Plant Operations and Maintenance Cost The O&M cost were spilt into two main categories, which are annual Variable and Fixed O&M expenses. The Variable expenses include; repair and replacement cost, water, chemicals & lubricants. The fixed costs include management expenses, training expenses and salaries. The table below will list the annual variable and fixed expenses and the respective cost.
  • 10. CRDenergy. RC741304 18.Projectschedule The time fram for procurement and installation of SPGP is six months. According to the project schedule there is an intention to secure the supply of electric power by 2016. SPGP should start their operation for the first time during 2016, and a half year later the remaining Gas turbine shall be put into operation will start. 19.Environmental aspects The SPGP as a fuel will use natural gas that will cause energy saving by an energy efficient generation plant. The greatest effect is the CO2 reduction, and also reduction of acid rain related substances, SOx and NOx. The gas turbine shall be equipped with dry low NOx combustors in small amounts. 20. Electricity Generation License A generation license authorizes the licensee to construct, own, operate and maintain a generation station for purposes of generation and supply of electricity in accordance with the Electric Power Sector Reform Act, 2005. Subject to this Act, the holder of a generation license may sell power or ancillary services to any of the classes of persons specified in the license. -Distribution Licence • the connection of customers for the purpose of receiving a supply of electricity; • the installation, maintenance and reading of meters, billing and collection; and -Trading Licence A trading license authorizes the license to engage in the purchasing, selling, and trading of electricity. 20.1. Licensing Fees: off-grid operationws: One year license Application fee USD$50.00 & license fee USD$5,000.00 Grid-connected operations: 10 years license Application fee USD$250.00 & license fee US$2,500.00 Annual Operating levies: 1.5% of license charges/kwh Electrical installations/wiring: Five years license Catagory a(330/132kv Application fee USD$500.OO/License USD$25,000.00 Annual operating levy USD$2,500.00 Catagory a(330/132kv Application fee USD$250.OO/License USD$2,500.00 Annual operating levy USD$250.00 Catagory a(330/132kv Application fee USD$10.OO/License USD50.00
  • 11. CRDenergy. www.crdenergy.com 21. Gas Consumption for SPGP Gas consumption for power generation is computed for each hour and for each unit according to the actual production of the single unit in that hour and to its heat rate at such a load. Gas Comsumption Per hour = 2130m³cubic meter /75220.24ft³cubic foot/2130000litre Multiply by 24 hours 25560m³ cubic meter /902642.88ft³ cubic foot /25560000litre per day Muitiply by 356 days 9099360m³ cubic meter /317.832000404 ft³ cubic foot /9099360000litre per annual on average plus/minus cost of gas per day will be 25560m³/902642ft³/25560000litre = USD$1,700.00 On Average Plus/Minus Cost Of Gas Per Annual Will Be 10 000 000m³/353 146 667ft³/10000000000L = USD$600,000.00 Fixed cost of gas in nigeria is USD$2.5 per 1000ft³ also same as 29m³ also same as 28316 litres 22. Gas Turbine Principle of Operation A gas turbine is a type of internal combustion engine that uses gas as the working fluid. It is essentially comprised of an upstream rotating compressor coupled to a downstream turbine, and a combustion chamber in-between. 22.1. Classification of Gas turbines Classification of Gas turbines can be done according to following criteria; path of working substance, nature of cycle, process of heat absorption, mode of drive and function of rotational speed, pressure drop in the gas turbine and physical location. 22.2.Types of Gas Turbines There are two main types of Gas turbines; Aero-derivatives and Industrial Gas Turbines. 22.3. Chosen Gas Turbine The least rated power requirement for the gas turbine is: 6MW/6000kw The limit is based on establishing a SPGP with a rated power output which is at least 8000Kva. This is based upon theoretical knowledge that the steam section will generate about 20% of the rated capacity of the Gas turbine. After going through the several options the best option was a setup of ELSIB Т-6-2U3 TURBO GENERATOR. The choice had several key Technical and economic attributes which included; • Short starting period (10-20 minutes). • High Thermal efficiency (42%) and low heat rates (low fuel consumption). • Low emissions. • Readily available on the market and available spare parts.
  • 12. CRDenergy. www.crdenergy.com 23. Turbine Control In order to ensure high efficiency, high plant availability performance and high safety standards; the steam turbine Must be equipped with a control system. ELSIB makes this a simple task by packing the turbine control system with the actual steam turbine. 24. Balance of Plant Equipment For the Plant to function efficiently it requires other equipment or auxiliaries in addition to the gas turbine. These include; the turbine inlet cooling system, the condenser, the boiler feed pump, the water treatment plant, the cooling tower, and the exhaust gas stack. Therefore this section analyses those other useful components of the SPGP. Condenser - The steam from the steam turbine exhausts into the condenser which is a pressure of 10kpa. Boiler feed pump - The boiler feed pump must be able to raise the water to a pressure of 30Bars from 10kpa. Water treatment plant - The raw water from river needs to be treated, so as to avoid tube scaling and damage to Turbine blades and pump impellers.Thus the plant will have a Demineralization plant to remove the minerals which can corrode plant components. In addition the plant will have water treatment ponds to allow for sedimentation to take place. Exhaust Gas Stack - Exhaust stack design is important in reducing emissions. The stack should have the ability to cope up with the exhaust gas temperatures of 194.9 and ensure that they are exhausted into the atmosphere at a safe and lower temperature. Complete delivering Package of Turbo generator delivery - Turbo generator with air cooler, support plate or foundation pins - Mounting accessories and special tools - Installation materials to the generator - Hardware thermal control - Cover sound proof - The pumps supplying water to the cooling coil - Excitation system - Spare parts to the extent agreed with the customer Turbo Generator Technical characterics 25.Characteristics Duty Long-permissible modes Full Active Power Kva 6000 Active Power, Kva 7500 Power Factor 0.8 Voltage Stator 10500 Current A 412 Rotational Speed, Vol / Min 3000 Frequency, Hz 50 Efficiency,% 97.7 Connection Phases Of The Stator Winding "Star" The Ratio of Short-Circuit 0.47 Transient Inductive Reactance 0.17 Rated Temperature of Cooling Water Inlet Air Cooler, ° C 32 The Minimum Temperature of The Cooling Water Inlet Air Cooler, ° C 15
  • 13. CRDenergy. www.crdenergy.com Cooling water flow through coolers, m / h 42 In-let air temperature of 40 ° C in the generator, kW 6600 Temperature of the air entering the generator 40° C kW 7200 Operating Temperature, Co Stator Winding 125 Winding Rotor 130 Stator Iron 120 Weight, Kg General 18000 Stator 8800 Rotor 5300 25.1.Turbogenerator provides stable operation: - at a frequency of 46.0 Hz - for at least 1 s; - at a frequency of 47.0 Hz - for at least 40 seconds. The Turbogenerator is manufactured for operation at an altitude upto 1000 m above the sea level in the non-explosive environment at a temperature not lower than +5 C. The turbo generator has a closed design. Cooling turbo generator performed air in a closed circuit under the effect of the two axial fans mounted on the rotor shaft. The air is cooled by water in the air cooler that is integrated into the housing located above the stator of the turbo generator. The stator core is assembled from isolated segments of electrical steel. For cooling the windings and stator core in the core provided with radial ventilation channels that share the core along its length into individual packages. Outside diameter core made ducts for supplying air to the radial channels. The stator winding is a two-layer reel. The stator winding insulation thermosetting "Monolith" heat resistance class "F". Permissible temperature measured by the thermal resistance meter, laid in grooves 125C (heat resistance class "B"). The winding has six pins: 3 - linear, 3 zero. O are located at the bottom of the generator stator. The rotor is made from solid stainless steel forging, which provides mechanical strength of the rotor at all operating modes of the Turbo generator. The rotor winding is made of cold-continuous copper conductors and fit into grooves milled in the barrel rotor. Rotor winding insulation heat resistance class "F". Allowable temperature of the rotor winding, measured by resistance - 130 ° C (for temperature class "B"). On the console of the rotor shaft is set anchor brushless exciter with diode rectifiers. The voltage rectified current displayed on the slip rings are designed to control the rotor winding insulation. Stator end winding closed box-shaped shield. The panels are fixed bearings. On the side of the pathogen bearings and labyrinth seals are isolated from the "land". To monitor the thermal state of the Turbo generator is equipped with thermal resistance meters. Control devices can be connected to the PCS station.
  • 14. CRDenergy. www.crdenergy.com 26.Turbine Generator Excitation System Brushless excitation system powered by a rotating anchor of the auxiliary AC generator through the rectifiers. The anchor of the auxiliary generator and the rectifiers are placed on the shaft of the Turbo generator. System power is provided from the exciter transformer connects to the turbine generator. TECHNICAL DIAGRAM OF ELSIB Т-6-2U3 TURBO GENERATOR 27.Quality and Warranty Production and testing of turbine generators NPO "ELSIB" JSC carried out in accordance with the requirements of ISO-9001-2008. The Turbo generator meets the standards of RF and IEC recommendations. The company ensures compliance with the requirements of the Turbo generator standards, subject to improper use, transport and storage, set specifications. Warranty period of operation of the Turbo generator at least three years from the date of commissioning in the domestic supply or 1 year
  • 15. CRDenergy. www.crdenergy.com from the date of commissioning, and no more than three years since testing the Turbo generator across the state border of the Russian Federation in the supply of turbine generators for export. 28. Recommendations And Conclusion In order for the full potential of the project to be realized a few but important factors have to be noted in its implementation, and plant design and operation. 29.Technical Recommendations A clear result that was obtained from the technical analysis is that the plant will have to operate in a SPGP mode. This will result in high thermal efficiency and electrical power output. Furthermore, another important design feature of the plant is the use of a ELSIB type heat recovery steam generator in the steam section so as to reduce plant start-up time; this design is also much cheaper as compared to the conventional steam drum type. Furthermore, it is also recommended that the plant will have a turbine inlet cooling system (TIC) which can use water as the coolant, as this will ensure uncompromised plant electrical output during warm periods. It also recommended for the plant to use the latest ELSIB control system for the gas turbine so as to ensure high plant thermal efficiency, low emissions, and overall securing high plant availability performance. It is also recommended that the ELSIB T6-2 Gas turbine be the gas turbine technology of choice due to its high thermal efficiency and low emission rates and from the technical analysis it had the best specifications. 30. Environmental Recommendations Although the above recommended technical factors ensure protection for the environment, it is also recommended that several management technics must be adopted in the plant operation. These include implementation of a Cleaner Production (CP) strategy at the plant and using established international standards and overall using an Environmental Management System (EMS) so as to ensure that the environmental goals are achieved. 31. Economical Recommendations A lot of factors are putting into consideration in evaluating this assessment, general investment opportunities and effective functioning of SPGP in Nigeria as a case study and Africa as a whole. First, a favourable investment climate is characterized largely by the following: good repayment record and investment grade rating; less (costly) risk mitigation techniques to be employed which translates into lower cost of capital and hence lower project costs and more competitive prices; potentially more than one investment opportunity. The most critical areas in coherent power sector is planning linked to procurement and contracting. Planning has built-in contingencies to avoid emergency power plants or blackouts; responsibility for procurement is clearly allocated, plans are linked to procurement; technical and environmental due-diligence on the proposed site is also essential, and the procurement process is transparent and competition ultimately drives down prices. Finally, capacity is built to contract and evaluate effectively.
  • 16. CRDenergy. www.crdenergy.com A final area which may make or break the long-term sustainability of this projects is: abundant, low cost fuel and secure contracts. We have chosen a fuel option that is cost-competitive with other fuels and anticipate to secure contracts of fuel supply for the duration of the project. There are other factors that will directly effect the project or may help to facilitate a more balanced outcomes, namely: 1) favourable equity partners; 2) favourable debt arrangements; 3) a secure and adequate revenue stream; 4) credit enhancements and security arrangements; 5) positive technical performance and finally, 6) strategic management and relationship building. Favourable equity partners is defined as follows: where possible, the involvement of local partners and equity as well as firms with development origins; appetite for the actual project risk and a return on equity that is generally perceived by parties as a reasonable and fair. Favourable debt arrangements are paramount for the long-term sustainability of projects and may be characterized as follows: competitively priced financing, local capital markets; some flexibility in terms and conditions (including possible refinancing). Of utmost importance is a secure and adequate revenue stream, which is generally made possible via the following conditions: commercially sound metering, billing and collections by the utility (including the ability to disconnect customers who default on payments, be they Government ministries/departments or parastatals); it should be noted that investors/financiers prefer markets where the off-taker is not a vertically integrated utility with own generation stations; the revenue stream should be safeguarded in a robust PPA, which stipulates capacity and energy charges as well as dispatch, fuel metering, interconnection, insurance, force majeure, transfer, termination, change of law provisions, refinancing arrangements, dispute resolution, etc Taking various forms, credit enhancements and security arrangements are part of the muscle that attracts and sustains IPPs, specifically: partial risk guarantees; political risk insurance and cash, namely escrow accounts, letters of credit and liquidity facilities--all of which should be made clear at the time of implementation. Positive technical performance is an area where most IPPs have a clear advantage, however, it should not be taken for granted; this encompasses high technical performance, including availability, and also that sponsors anticipate potential conflicts (especially related to O&M, and budgeting) and mitigate them. Strategic management and relationship building is grease for the wheels and an integral part of the balancing of development and investment outcomes. Sponsors should work to create a positive image through political relationships, development funds, and effective communications. Ongoing, strategic management of their contracts, especially in the face of exogenous stresses, is critical.
  • 17. CRDenergy. www.crdenergy.com 32. Policy Recommendations The plant will use fuel from Nigeria; therefore it is recommended that the government sticks to its energy policy measures especially its commitment in ensuring a solid bilateral business relationship with Nigeria. This is also pointed out in the energy policy where it's stated that the country is committed to regional power system integration through supporting initiatives on system integration, joint cross-border generation projects. Small Power Generating Plants Technical and Economical assessment is conducted by Craig & Rupert Denis Limited Nigeria, on request of Brainstorm utilities limited. Craig & Rupert Denis Limited Regus Embankment Tower 123317 Moscow, Russia 10 Presnenskaya Naberezhnaya, Block C Tel.: № +7 (495) 722 44 75 Fax.: № +7 (495) 967 76 00 Email: enquires@crdenergy.com www.crdenergy.com