This document contains certain forward-looking information. This forward-looking information includes, or may be based upon,
estimates, forecasts, and statements as to management’s expectations with respect to, among other things, the size and quality of
the Company’s mineral resources, progress in development of mineral properties, timing and cost for placing the Company’s
mineral projects into production, costs of production, amount and quality of metal products recoverable from the Company’s
mineral resources, demand and market outlook for metals and coal and future metal and coal prices. Forward-looking
information is based on the opinions and estimates of management at the date the information is given, and is subject to a variety
of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the
forward-looking information. These factors include the inherent risks involved in the exploration and development of mineral
properties, uncertainties with respect to the receipt or timing of required permits and regulatory approvals, the uncertainties
involved in interpreting drilling results and other geological data, fluctuating metal and coal prices, the possibility of project cost
overruns or unanticipated costs and expenses, uncertainties relating to the availability and costs of financing needed in the future,
uncertainties related to metal recoveries and other factors. Mineral resources that are not mineral reserves do not have
demonstrated economic viability. Inferred mineral resources are considered too speculative geologically to have economic
considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that mineral
resources will be converted into mineral reserves. Readers are cautioned to not place undue reliance on forward-looking
information because it is possible that predictions, forecasts, projections and other forms of forward-looking information will not
be achieved by the Company. The forward-looking information contained herein is made as of the date hereof and the Company
assumes no responsibility to update them or revise it to reflect new events or circumstances, except as required by law.
2
Corporate Information
Listings: TSX (Canada): FT
OTC QX (USA): FTMDF
Share Price $0.41
Shares Out – Basic 135.9
Shares Out – Fully Diluted 143.1
Market Cap – Basic $55.7
Working Capital (Q1 2013) $13.0
Total Assets (Q1 2013) $148.9
All amounts in M or CAD$M except per share amounts.
Share Performance
SharePrice(C$)
ShareVolume(M)
Analyst Coverage
Dealer Date Rating Target
Killian Charles
Industrial Alliance Securities
June 28, 2013 Spec Buy $3.30
David Davidson
Paradigm Capital
July 24, 2013 Spec Buy $1.00
Michael Fowler
Loewen Ondaatje McCutcheon
July 22, 2013 Spec Buy $2.65
Russell Stanley
Haywood Securities
July 19, 2013 Buy $0.60
Ownership
China Mining Resources Group Ltd. 11%
Procon Resources Inc. 11%
Insiders 30%
Strategic investment by Procon Resources Inc.:
- Oct. 1, 2013 14.625 M @ $0.40
As of July 30, 2013
3
-
200
400
600
800
1,000
1,200
1,400
$0.00
$0.10
$0.20
$0.30
$0.40
$0.50
$0.60
$0.70
Daily Volume
Closing Price
Fortune Minerals Limited
 Canadian mineraldevelopment company
 HeadquarteredinLondon,Ontario,Canada
 Canada Focus-operating inmining friendlyjurisdictions
Two late-stageprojects
 ArctosAnthracite Project,BC
 PositiveFeasibilityStudy
 Advancingtowardsproduction
 NICOGold-Cobalt-Bismuth-CopperProject,Northwest
Territories&Saskatchewan:
 PositiveFeasibility&FEEDStudies
 NearcompletionofPermitting Process
4
Summary Highlights
 Oneofthe world’spremiermetallurgical coaldevelopment projects
 Advancedprojectwith$100 millionofworkcompleted
 UpdatedFeasibilityStudy withrobusteconomics,completedOctober 2012
 Railwaydevelopment strategy toPortofPrince Rupert – allowsforscalable expansion
 World-classJV partner securedwithSouthKoreanPOSCO– one ofthe world’slargest steel producers
 Supplyshortagesofmetallurgicalcoalswithgrowingworldconsumption
 EnvironmentalAssessmentprocesswithjoint venture funding inplace.
5
Arctos is the largest & most advanced Canadianproject of high rank anthracitecoal
 Highestquality metallurgicalcoalwithveryhigh carbon&energy content
 Representsonly1%ofworldcoalreserves
Metallurgicalcoal with diverse applications
 MetallurgicalReductants / charge carbon
 Ultra-LowVol.PCI
 Sinter
 Otherproducts:
 Filtermedia
 Blendcoalwithcokingcoalformaking metallurgical coke
 Directcokereplacement
 Ureafertilizers,synthetic fuels&plastics
 Heating&cookingbriquettes
 Pelletizing
 Premiumthermal coal
 Cement
6
Insufficient supply of metallurgical
coalsto meet forecast global demand
 Increasingdemand foranthracite
due tonew steel technologies&
loweremissions
 Emergingeconomiesare driving
forcesforsteelproduction&future
metallurgicalcoaldemand
 China’sGDPgrowthperspective
 10-14%growthwasequivalentto
~$300BofGDPperyear
 Currentforecastedgrowthof7-8%
isequivalentto~$550BofGDP per
year
 Marginalcostofproduction
US$150-180/tlimits supply &
marketadjusting by shuttering high
costproducers
 Current metallurgicalcoal surplusis
short-term&willreverse with
economicrecovery
920
1,185
1,440
-
200
400
600
800
1,000
1,200
1,400
1,600
2010 2015 2020
Mt
Global Met Coal Demand
Source: Peabody Global Energy Analytics, Deloitte
7
 Steelmakers around the world are expanding
Pulverized Coal Injection (PCI) use to reduce
costs, improve margins
 PCIreduces the amount ofcoke(made from
cokingcoal)required
 SeabornePCImarket expected togrowat 8%
CAGRto2018
 Low-volPCItypically priced at 70% to80% of
highquality hardcokingcoal
 ArctosPCIwillachieve a higher pricegiven its
ultra-lowvolatilecontent
 Arctos coal also has diverse usage in other
metallurgicalprocesses
 Sinterfeed
 Canreplace15% -30%ofblast furnacecoke
withanthracite
 Newsteel technologies(Cokonyx/HiSmelt)
 Growthofelectricarcsteel manufacturing
 Ferroalloys&other metal processing
Source: Macarthur Coal, Peabody
8
China became a net coal importer of anthracite in 2004, coking coal in 2007, all coals in 2009
$47 $45
$58
$125
$115
$98
$300
$129
$215
$291
$209
-$150
-$100
-$50
$0
$50
$100
$150
$200
$250
$300
$350
-150
-50
50
150
250
350
450
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
HardCokingCoalPrice(US$/t)
NetImports(Mt)
Coal & Anthracite Net Imports by China
Coal Net Imports (Mt)
Anthracite Net Imports (Mt)
Hard Coking Coal Price (US$/t)
Source: China Coal Resource Website, Bloomberg
9
Supply constraints due to declining exports & lack of new supply
 China: 547 million tonnes – net importer since 2004
 Vietnam: 44.5 million tonnes – reducing exports to 5% of production by 2015 to utilize production
domestically
 Few new high-quality deposits in mining friendly jurisdictions
0
100
200
300
400
500
600
China Vietnam North Korea* Ukraine Russia Other
Mt
Supply of Anthracite - 2011
Production
Export
Production
Export
China Vietnam North Korea* Ukraine Russia
Export /
Production
0.8% 43.1% 13.2% 27.1% 48.5% 8.5%
Source: Company research, corporate presentations, Wood Mackenzie & U.S. Energy Information Administration
*Production statistics from 2010 data. “Other” includes Spain, South Africa, South Korea, Germany, USA, and United Kingdom.
10
 16,411 Ha license area in northwest BC
 Close proximity to deep water shipping ports
 Ridley Terminals in Prince Rupert (330 km)
 Mine site straddles railway right-of-way
 Track (CN) installed to 150 km south of mine
 Railway road bed largely complete to mine
 Road access from railway subgrade
 Support from CN Rail for railway extension
 BC Government extending electrical grid to area
 Project in Tahltan & Gitxsan Territories
 BC Government sharing revenues with Aboriginal groups
Railway sub-
grade links
mine site
with CN
mainline &
Ridley
Terminals
11
Secured world-classinvestor & strategic partner – one of the world’s largeststeel producers
 POSCOCanada has acquired 20%interest in Arctosforanticipated initial payments &cashcontributionsof $188
millionbasedoncurrent capital costestimates
 $30millionpaid toFortune,$20 millioncontributed directly tothe JV toadvance permitting
 20%oftotaldevelopment &capital costs– $158 millionunder current estimates
 20%ofoperatingcostsfor20% ofproductionin-kindfortheir ownuse
 Fortuneis ProjectManager &iscompensatedforprovidingsupport overlifeofmine
 ValidatesArctosas one ofworld’spremier metallurgical coaldevelopment projects-key future supplier toglobal
steelindustry
POSCO Gwanyang steel plant
12
 Recent upgrade & increase in resources & new reserves (October 15, 2012) – Small fraction of total resource
 Lost Fox deposit remains open for possible expansion & additional coal seams identified below 350 meters &
on adjacent lands
 Historical Resources include 2.2 billion tonnes in the Speculative class (1)
Area Measured Indicated M&I Inferred
Lost Fox 107.9 109.5 217.4 91.5
Hobbit-Broatch 13.5 13.5 258.4
Summit 9.6
Lost Fox Extension
Total 107.9 123.0 230.9 359.5
Coal Resources Run-of-Mine Coal Reserves 10% Ash Product Reserves
Measured Indicated Inferred Proven Probable Total Proven Probable
Total
Product
172.4 20.4 12.1 115.0 9.9 124.9 64.4 4.8 69.2
Historical Arctos Global Resources (million tonnes) (1)
Lost Fox Metallurgical Coal Reserves and Resources (million tonnes) (2)
(1) The Arctos Mineral Resource & Mineral Reserve estimates were prepared in 2002, 2005, & 2007, respectively, by Marston & Marston Inc. in compliance with NI 43-101.Richard Marston, P.E.
is the Qualified Person responsible for the estimates. Historical Resources include 2.2 billion tonnes in the Speculative class. The historical resource estimate was developed by Gulf in 1988 and
updated in 2002 by Marston-Golder to reflect changes in the estimation of Inferred Resources under Paper GSC 88-21. The Speculative portion of the resources is not compliant with current
reporting standards. A qualified person has not done the work necessary to classify the historical estimate of Speculative resources as current mineral resources under NI 43-101 and the estimate
should not be relied upon. Speculative Resources were developed based on estimated average coal thickness applied to the projected aerial extent of the coal. Further information regarding the
Arctos Coal Resource & Reserve estimates is available from the Company’s disclosures under the Company’s profile on the SEDAR website at www.sedar.com
(2) The 2012 DFS utilized updated Resource & Reserve estimates for the Lost Fox Deposit, which Edward Minnes, P.E. is the Qualified Person.
13
 Railway road bed largely constructed to mine site by BC Government – brownfield extension from Minaret
 Permitting of railway extension established with Federal & BC Governments to be similar to logging road
 Environmental Assessment underway as part of mine development
 Capital costs included in 2012 DFS
 CN collaborating on railway extension to Arctos
 Discussions initiated with potential operators, including CN
Existing railway right-of-way & road bed
14
Ridley Coal Terminal a world-class coal & bulk materials handling facility
 Ice-free, deep water port 30 hours closer to Asia than Port of Vancouver
 Capable of handling full Capesize vessels up to 250,000 dwt that reduces ocean freight
 16 Mtpa capacity under expansion to 25 Mtpa – permitting a future expansion up to 60 Mtpa
 Opportunities for shared cargos & blending of coals with other metallurgical coal producers
 Companies with committed capacity have contacted JV to sell their allocations
 Government of Canada announced plans to sell the terminal again – no anticipated impact to project
15
 October2012 update to2005 &2010 FS
 Basedon railwaytransportofcoaltoRidley Coal TerminalinPrinceRupert
 Initial3 Mtpa productionfromLostFoxdeposit openpit mine, washplant &site infrastructure
 69.2Mt ofproduct coalreserves– 25+ yearsproduction(smallfractionoftotal resource)
 Premiumultra-lowvolatile PCIproduct
 Can diversifyproduct mix toproduce premiumproducts (charge carbon)&sinter
 Lifeofmine average FreeOnBoard(FOB)vessel cashcostC$127.61/tonne (US$121.22/tonne)
 C1operating cashcostC$119.85/tonne (US$113.86)FOB
 Connectiontothe electrical gridcouldsave C$7/tonne
BASE CASE
Ultra-Low Volatile PCI
US$175/tonne (C$1 = US$0.95)
PRE-TAX AFTER TAX
IRR 17.0% 14.7%
NPV (8%) C$615.9 million C$405.8 million
Capital (Years 1-3) C$788.6 million
(includes railway capital)
$0.6
$1.2
$1.9
$2.5
$3.2
$3.8
$-
$0.5
$1.0
$1.5
$2.0
$2.5
$3.0
$3.5
$4.0
$175/t $200/t $225/t $250/t $275/t $300/t
C$B
FOB Price (US$/t)
NPV - Pre-tax at 8%
The 2012 Feasibility Study was prepared by Golder-Marston in compliance with
NI 43-101. Mr. Edward (Ted) Minnes, P.E. is the Qualified Person responsible for the study.
16
17
 Arctosacceptedinto new EAsubstitution process&willbe reviewed by BC EAO
 Arctosproject identifiedonBC GovernmentMajorInvestment OfficeList
 Arctoson NaturalResourcesCanada (NRCan)Deputy Ministers’watchlistformajorprojects
 NRCan’sMajorProjectsManagement Officeassignedstafftohelp progressArctos
 ProjectDescriptionReportcompleted&submitted to EAagencies
 BaselineFieldWork
 Additionalfieldworkformine area, railbed &roadaccesscorridorinprogressby Stantec
 FieldworkcommencedAugust2012
 BCEAOApplication
 DraftApplicationInformationRequirements submitted tothe BC EAO
 Targeting ApplicationInformationRequirements approvalinQ42013
 PreparationofapplicationforEnvironmentalAssessmentCertificate (EAC)in 2014
 Workplans &documentsshared withAboriginalgroups
BC Government
 Federal & BC Government harmonized EA substitution process
 BC Government focus on Premier Clark’s Jobs Plan - 8 new mines & 9 mine expansions by 2015
 Establishment of Major Investment Office – Arctos identified as major project
 Pacific Gateway Policy of expanding trade with Asia – includes investments in rail, power & ports
 BC Government revenue sharing with Aboriginal groups
Tahltan Nation
 Environmental Assessment Process Funding, Traditional Knowledge & PEM Data Sharing agreements
 Community engagement in progress
 Tahltan Community Liaison hired
Gitxsan Nation
 MOU completed with Gitxsan Hereditary Chiefs
 Access Agreements completed
 Quarterly meetings with chiefs on subject of watersheds
 Annual presentations at Gitxsan Summit
 Gitxsan Community Liaisons hired
 Traditional Use & Knowledge Study to be completed
18
One of world’s largestundeveloped deposits – railway transportation solution provides scalable
expansion potential
 Railtransportationallowsforhigher annual productionthan 3 Mtpa &willlowersomecostforinbound freight
 FSreservesonlyrepresents smallfractionoftotal resource
 UpdatedreservesforLostFoxdeposit cansupport higher productionrates(4 Mtpa ramp-upsensitivity)
 Productioncanbe expanded fromadjacent Hobbit – Broatchdeposit
 Current resourceonlyidentifiedto 350 metres – Additional coalseamsidentified at depth (potential
undergroundmining)
 Budget inplace foradditional drilling
 3rd Party contributionto railwaycapital costsincreasesNPV
 BCGovernmentextending electricalgrid&connectionwouldlowerpower&mine operatingcosts&enable use of
loweroperating costelectrifiedmining equipment (preliminaryestimate isC$7/tonne reduction toOPEX)
 Lease-to-purchaseofmobileequipment fleet &contractmining wouldlowerupfrontcapital &increase IRR
19
 Nextsteps include:
 Completepermitting activities
 Continue Tahltan, Gitxsan &stakeholder engagement
 Advancerailengineering &permitting, &establishagreements withqualifiedoperator
 Secureportcapacity
 Securelowcostpowerforthe sitewithextensionofelectricalgrid
 Conduct additional drilling forexpansionofreserves&obtainsamplesforproduct testing &mix
 Secondstagestrategicpartner(s) &project financing
 Deloitteengaged toadvise onprojectfinancing &development options,targeting projectlevel jointventure,
potentiallyincluding:
• Equity investment
• Off-takerelationship
• Commitmentto arrangedebt financing forconstruction
20
Proposed Development Timeline
2013 2014 2015 2016
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Project Description submission
Baseline field work & document prep
Filing of EAC documents
EAO-CEAA review process
Ministerial decision process
Mine permitting
Construction
Commissioning & commercial
production
21
 Positive Front End Engineering & Design Study (FEED) in 2012
based on a vertically integrated mine & mill in the Northwest
Territories & refinery in Saskatchewan
 FEED - ~20% of detailed engineering complete for
procurement
 Attractive economics – FS generates NPV of $309 million* –
highly leveraged to increased cobalt & gold prices with low
downside risk
 Negative cash cost – cobalt cash cost (net of credits) of
negative US$0.81/lb at Base Case prices & negative
US$1.07/lb at recent prices
 High-grade deposit of combined gold, cobalt, and bismuth co-
products plus by-product copper
 Positioned to be one of the largest & lowest cost suppliers of
cobalt sulphate to the rapidly expanding battery sector
 Very advanced project with $110 million already invested –
including pilot plants, test mining & extensive permitting work –
resulting in planned production in 2016
 Strong management & board with experience in mine permitting,
development & operations Test mining 2006/2007
*Base case: pre-tax, 7% discount rate
22
 Gold price increased consistently in the past
decade
 While mine supply remains relatively flat, future
demand continues to grow:
 Growing physical demand from Asia &
central banks
 Growing investment demand based on
currency protection & safe haven status
 Provides a flexible financing opportunity
NICO contains 1.1 million ounces of gold
– provides significant counter-cyclical hedge
Source: Bloomberg; Energy & Metals Consensus Forecasts December 2012
23
$310
$363
$410 $445
$604
$697
$873 $873
$1,211
$1,574
$1,669
$1,504
$-
$200
$400
$600
$800
$1,000
$1,200
$1,400
$1,600
$1,800
Historical & Forecast Gold Price
 Wide chemical & metallurgical market
applications in batteries, high strength alloys,
cutting tools, catalysts, etc.
 Cobalt sulphate used in lithium ion & nickel
metal hydride batteries for electronic devices &
hybrid/electric vehicles
 High purity cobalt used in aerospace
applications
 Cobalt demand expected to grow at ~7% per
year next five years
 Over past decade, increase in demand resulted
mostly from increase in chemical applications,
particularly rechargeable batteries & catalysts
 Chemical applications accounted for ~55% of
worldwide cobalt demand in 2011 & expected
to dominate future cobalt consumption
27%
19%
13%
10%
9%
7%
6%
5%
4% Batteries (27%)
Superalloy (19%)
Hard Materials (13%)
Colours (10%)
Catalysts (9%)
Magnets (7%)
Hardfacing & Other Alloys (6%)
Tyre Adhesives, Soaps, Driers (5%)
Feedstuffs (4%)
Wide Application of Industrial Usage
24
 Cobaltcriticalformanufacturingbatteries usedinelectricvehicles*,computers,cell phones&other electronic
devices
 Nickelmetal hydridecar batteries containapproximately4 kg ofcobalt
 Lithium-ioncarbatteries contain2 to 6 kg ofcobalt
 Cobaltusage in batteries isexpected to growfrom25%ofdemand in2011 to 45%in2018 &projectionsas high as
100,000 tonnes inbattery applications alone by 2020
0
1
2
3
4
5
6
2008 2010f 2012f 2014f 2016f 2018f 2020f
MillionsofUnits
Global Electric Vehicle Battery Sales
* Electric vehicles include hybrid electric vehicles (HEV), plug-in hybrid electric vehicles (PHEV) & pure electric vehicles (EV)
Source: Roskill
Approx. 20% compound annual
growth forecast from 2011 to 2020
25
 Worldmarket ofrefinedcobalt production~82,000t, excluding somesecondaryprocessing&scrap
 Vastmajorityofcobalt sourcedfromregionsthat are politicallyunstable orprone toexport restrictions
 Congo(DRC)currently accounts for51%ofglobalsupply
 China has the largest refining capacity (~40%)but limitedmine supply
 Chemicalproductionis indeficitwhereas metalsinsurplus
 LMEinitiated futuresmarket trading forcobalt in2010, resulting in greater liquidity
 NICOwillbe a reliable NorthAmericanproducer
51%
12%
7% 7% 5% 5% 4% 3% 2% 2% 2%
0%
10%
20%
30%
40%
50%
60%
Congo Zambia China Russia Other Countries Australia Cuba Canada New Caledonia Brazil Morocco
Proportion of World Cobalt Production (%)
Source: USGS Industry Survey
26
 Traditionallyusedinfusible alloys,cosmetics,chemicalsetc.
 Newmarkets focusonsuper conductors,CDs&auto anti-corrosionmaterials
 Environmentallysafe replacement forleadinplumbing &electronicsolders,brass,ceramicglazes, freecutting
steel,hot dipgalvanizing &paint pigments
 Globalframeworkto eliminateleadexpected to driveincreasedbismuth consumption
 Europeanlegislationto eliminate leadinelectronics
Growing Number of Applications
Source: USGS Industry Survey
27
 Worldmarket between 15,000 &20,000 t per year
 China isthe principal sourceofbismuth(240 Kt reserve),accounting for80%ofworldreserves&73% ofworld
productionin2010
 China has closed20%ofitsproductiondue to environmentalconcerns&exportsreduced due torestrictions
 NICOcontainsover48 Kt ofbismuth, equivalent to 15%ofworldreserves&the world’slargestdeposit
240,000
11,000 10,000 10,000 5,000 5,000
39,000
48,661
-
50,000
100,000
150,000
200,000
250,000
300,000
China Peru Bolivia Mexico Canada Kazakhstan Other Countries NICO
Tonnes
World Bismuth Reserves
NICO is the world’s
largest deposit of
bismuth
*
*Excluding NICO
Source: USGS Industry Survey 2010
28
NICO Project
 Largescalegold-cobalt-bismuthdeposit
 160km fromCity ofYellowknife
 450km fromrailwayat Hay River
 Highconcentrationratiousing simple
flotation– 4,650 t ofore/day reduced
to180 t ofconcentrate
 Allowsshipping to Saskatchewanor
third-partylowercostprocessor
Saskatchewan Metals Processing
Plant (SMPP)
 Hydrometallurgical plant to process bulk
concentrate from NICO
 Plant will produce gold doré, cobalt sulphate
&/or cobalt cathode, bismuth ingot & copper
metal precipitate
 Low cost power (5.7 cents kWh), skilled labour
pool & 5 year tax holiday
29
 5,140 Halease in southern NWT
 Winteraccessroads
 All-weatherroadplanned by governments
tohighway (135 km)
 $1.5millionin place forbaseline
environmentalsurvey
 Engineering &environmental work
underway
 450kmfromrailwayat Hay Riverfor
transportofconcentratesto SMPP
 160kmfromCity ofYellowknife
 50kmfromTownofWhati
 22kmfromSnareHydro– potential lower
costpowersupply
 Settledland claimswith TlichoGovernment
30
Underground Mineral Reserves Tonnes Au (g/t) Co (%) Bi (%) Cu (%)
Proven 282,000 4.93 0.14 0.27 0.03
Probable 94,000 5.6 0.11 0.19 0.01
Total 376,000 5.09 0.13 0.25 0.02
Open Pit Mineral Reserves Tonnes Au (g/t) Co (%) Bi (%) Cu (%)
Proven 20,513,000 0.94 0.11 0.15 0.04
Probable 12,099,000 1.05 0.11 0.13 0.04
Total 32,612,000 0.98 0.11 0.14 0.04
Combined Mineral Reserves Tonnes Au (g/t) Co (%) Bi (%) Cu (%)
Proven 20,795,000 0.99 0.11 0.15 0.04
Probable 12,193,000 1.09 0.11 0.13 0.04
Total 32,988,000 1.02 0.11 0.14 0.04
Contained Metal
1,085,000
ounces
82,268,000
pounds
102,053,000
pounds
27,179,000
pounds
Note: Sums of the combined mineral reserves may not exactly equal sums of the underground and open pit reserves due to rounding.
Reserve estimate by P&E Mining Consultants Inc., Eugene Puritch, P.Eng. & Fred Brown, CPG PrSciNat, Qualified Persons as defined by NI-43-101
31
Riskmitigation
 Testminingcompleted to confirmdeposit geometry
&grades
 ~$20 millionpre-productiondevelopment
completedby Proconforwith 2 kmofdecline ramp,
2mine levels &ventilation raisetosurface
 Largesamplescollectedforpilot plant testing
 Pilotingcompletedtoconfirmprocessflowsheets,
recoveries&productquality
 Front-EndEngineering &Design(“FEED”)completed
with~20%ofdetailed engineering formine
concentrator&SMPP
 Executionplaninplace forprojectdelivery
 3rd party due-diligence completed onall aspects of
project
32
 Continuousflotationtests toproduce separatecobalt &bismuthconcentrates
 Recoveryimprovementsforall metals
 Provedprocessflowsheet, productionofhighvalue products
 Cobaltpressure oxidation,precipitation&electrowinningtodemonstrateproductionof99.8%cobalt
cathodeorsolventextraction&crystallizationto 20.9%cobalt sulphate
 Bismuthferricchlorideleaching, productionof99.5%bismuth cathode as powder-Flux&smeltto
>99.9%bismuthingot
 Cyanidationforrecoveryofgold
 Abilitytoproduce thickened tailings frombulk tailings
Cobalt Sulphate
(heptahydrate)
Co 20.9%
Cobalt Cathode Metal
Co >99.95%
Bismuth Ingot
Bi >99.99%
33
Gold Doré
PositiveFEED Study demonstrating very low
costs& strong economics
 Verticallyintegratedproject consistingofopenpit
&undergroundmine, mill&hydrometallurgical
refinery
 Lowcapital costsof$441 million
 Negativecashcostnet ofcredits
 Significantdetailed engineering, reducing project
risk
 GoldenGiant Mine (Hemlo)equipment
purchased&dismantled forrelocation
 Metalrecoveriesverifiedfrompilot plants;
 Goldrecoveryrangesfrom56 to85%, with
anaverage of73.7%
 Cobaltrecoveryof84%
 Bismuthrecoveryof72%
 Copperrecoveryof41%
 Optimizationsbeing examined toimproveproject
economics
FEED Study Highlights – Base Case, Cobalt Sulphate
Mine type Open pit with underground in 2nd year
Mining method
Open pit: conventional truck & loader
Underground: blasthole open stoping
Strip Ratio Waste to ore 3.0 : 1
Processing rate 4,650 tonnes of ore/day
Mine life 19.8 years (potential for additional 3.2)
Processing Processed to high value metal products
Pre-tax NPV (7%) $308.5 million
Pre-tax IRR 14.0%
Capital costs $440.5 million
LOM average revenue/yr $194 million
LOM average operating cost/yr $97 million
Cobalt operating cost (net of
credits)
Negative US$0.81/lb at Base Case
Negative US$1.07/lb at Current Price
Case
34
NICO willbe a reliableCanadian-based producer of strategic metals:
 Golddoré, 99.8%cobalt cathode &/or20.9%cobalt sulphate, 99.99%bismuth ingot, &a coppermetal precipitate
$89
$61
$43
$1
$67
$69
$43
$2
0
10
20
30
40
50
60
70
80
90
100
Cobalt Sulphate Gold Bismuth Copper
C$M
Average Annual Revenue by Metal – Base Case (gold) & Recent Price (black)
Annual Production 3,473,600 lbs 40,000 oz 3,681,800 lbs 559,400 lbs
Base Case Price assumptions are US$1,450/troy ounce (“oz”) for gold, US$20/pound (“lb”) for cobalt, US$11/lb for bismuth and US$3.50/lb for copper at an exchange rate of US$ 0.95 = C$
1. Recent Price assumptions are US$1,650/oz for gold, US$15/lb for cobalt, US$11/lb for bismuth and US$3.50/lb for copper at an exchange rate of US$ 0.95 = C$ 1.
35
NICO has negative operating costs for all metalsnet of by-product credits
 Demonstratesthat aftercapital has been repaid, operationscanbe sustainedduring periodsoflowmetal prices&
volatility
-$0.81
-$1.07
-$1.20
-$1.00
-$0.80
-$0.60
-$0.40
-$0.20
$0.00
Base Case Current Price
CashCostNetofBy-Products($US/lb)
Cobalt
-$738.75
-$148.42
-$800
-$700
-$600
-$500
-$400
-$300
-$200
-$100
$0
Base Case Current Price
CashCostNetofBy-Products($US/oz)
Gold
-$12.78
-$7.99
-$14
-$12
-$10
-$8
-$6
-$4
-$2
$0
Base Case Current Price
CashCostNetofBy-Products($US/lb)
Bismuth
Note: Based on cobalt sulphate option. Base Case Price assumptions are US$1,450/troy ounce (“oz”) for gold, US$20/pound (“lb”) for cobalt, US$11/lb for bismuth and US$3.50/lb for
copper at an exchange rate of US$ 0.95 = C$ 1. . The Current Price Case uses prices as at May 31, 2012 and are US$1,558.00/oz for gold, US$15.23/lb for cobalt, US$10.55/lb for bismuth and
US$3.40/lb for copper and an exchange rate of US$ 0.97 = C$ 1. Mr. Alexander Duggan, P.Eng. and Mr. Graham Peter Holmes, P.Eng. of Jacobs are the Qualified Persons for Jacobs and Mr.
Eugene Puritch, P.Eng. is the Qualified Person responsible for the work by P&E under NI 43-101.
36
Significantopportunity existingto further strengthen project economics
 Customprocessingofconcentratestodefer SMPP
 Extendmine lifefor3+ yearswithstockpiledsubeconomicmaterial
 Alternativepowersupply tomine to lowercosts
 Moveforwardgoldproductionviaadditional undergroundmining to accesshighgrade material
 Generateadditional returns fromSMPP
 Customprocessingofconcentrates sourcedfromother minesglobally
 Expansionpotential already designed
 Significant commodity prices upside
 Cobalt supply disruptions in DRC & less than
expected production from laterites
 Gold forward sales & political uncertainty
 Bismuth supply decreases in China due to
export quotas & increased environmental
restrictions
37
Progressing through final stagesof permitting process
 EnvironmentalAssessmentswelladvanced formine &SMPPpermitting
 Mine&millapprovedby FederalMinister&TlichoGovernment
 ForSMPP,addendum toEnvironmental Impact Statementsubmitted forreview &public comment,
afterwhichgovernmentapprovalwillbe pending
Advanced relationships with Aboriginal groups
 Signed Co-operative Relationship Agreement with
Tlicho Government
 Initiated Tlicho Participation Agreement (PA)
Negotiations
Project Financing & Development Options
 Deloitte engaged to advise on project financing &
development options, targeting a project level joint
venture, potentially including:
 Minority equity investment
 Off-take relationship
 Commitment to arrange debt
financing for construction
38
Proposed Development Timeline – Assumes access to full financing
39
2012 2013 2014 2015 2016
Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1
SMPP EA
SMPP fully permitted
NICO environmental
review
NICO Minister’s
approval
NICO fully permitted
Financing
Engineering &
procurement
Construction
Commissioning
Commercial
operations
Procon Private Placement
 $11.7millionprivate placement toadvance NICOdevelopment &workingcapital
 14%premiumtoclosingprice
 29,250,000 Fortunesharesissued -Procon’sownership19.4%
 Righttoappoint nomineeto board
About Procon
 Full-service mining contractor based in Vancouver
 Majority owned by Beijing based China CAMC
Engineering, a leading provider of international EPC
services, contracting, trading, & international project
investment
 Procon & CAMC are subsidiaries of Sinomach – large
Chinese SOE (revenues of US$ 34.6 billion)
 Conducted 2006/2007 NICO underground test mining
Next Steps
 Fortune & Procon working to advance NICO project,
secure Project Financing & complete execution plan
for planned construction in 2014
40
 Two advanced Canadian development assets
 One of the world’s premier metallurgical coal developments,
1.1 million ozs. gold, 82 million lbs. cobalt & 15% of global
bismuth reserves
 $210 million combined expenditures
 Positive Feasibility Studies, test mined, pilot plant processed &
in permitting
 Low cost production
 Combined NPV’s approaching $1 billion
 Experienced board & management team
 Deloitte Corporate Finance engaged to secure
strategic partners to finance both projects with
minimal equity dilution
41
Directors
Mahendra Naik, B Comm, CA Chairman, Director CFO Fundeco - Founding director & former CFO, IAMGOLD
George Doumet, MSc, MBA Honorary Chairman, Director Chemical Engineer – President & CEO, Federal White Cement
Robin Goad, MSc, PGeo President & CEO, Director Geologist - 30 yrs mining & exploration experience
David Knight, BA, LLB Secretary, Director Partner, Norton Rose Fulbright specializing in securities & mining law
James Excell, BASc Director Metallurgical Engineer – 35 yrs mining experience BHP-Billiton
William Breukelman, BASc, MBA, PEng Director Chemical Engineer – Chairman, Gedex
James Currie, BSc (Hons), PEng Director Mining Engineer – COO, Elgin Mining
The Honorable Carl L. Clouter Director Commercial pilot - former owner of charter airline in NWT
Shou Wu (Grant) Chen, MSc, MBA Director Geologist – Deputy Chairman & CEO, China Mining Resources Group
Ed Yurkowski Director CEO Procon Mining & Tunneling
Management
Julian Kemp, BBA, CA, C.Dir VP Finance & CFO Chartered Accountant – 20+ yrs mining financial experience
Mike Romaniuk, BASc, PEng VP Operations & COO Geologist & Process Engineer – 25+ yrs engineering, mining & construction
experience primarily with Xstrata Nickel & Falconbridge
Bill Shepard Logistics Manager 15 yrs experience in procurement & logistics
Richard Schryer, PhD Director Regulatory &
Environmental Affairs
Aquatic Scientist –20+ yrs experience in mine permitting & environmental
assessments
Adam Jean, HBA, CA Controller Chartered Accountant previously with Ernst & Young
Mike Middaugh Project Controls Manager 20 yrs major construction & project management
Keith Lee, BSc Senior Process Engineer 25 yrs operations, engineering & mineral processing experience
Carl Kottmeier, MBA, PEng Project Manager Mining Engineer – 24 yrs engineering & operations experience
Seok Joon Kim, MASc, PEng Senior Mining Engineer Mining Engineer – 10+ years operations & engineering experience
42
Metal Price &
Exchange Rate Case
Cobalt Metal Option Cobalt Sulphate Option
Pre-Tax After Tax Pre-Tax After Tax
IRR
%
$M
NPV
(7%)
$M
NPV (5%)
IRR
%
$M
NPV
(7%)
$M
NPV
(5%)
IRR
%
$M
NPV
(7%)
$M
NPV
(5%)
IRR
%
$M
NPV
(7%)
$M
NPV
(5%)
Base Case Prices 10.8 164.5 293.2 9.6 101.0 207.1 14.0 308.5 466.0 12.4 212.6 338.7
3-yr Trailing
Average Prices
7.4 17.1 114.6 6.6 (15.3) 69.0 10.5 146.8 270.0 9.3 86.7 188.4
Current Prices 7.1 2.1 99.7 6.2 (30.6) 53.4 9.6 109.5 228.2 8.5 57.6 156.8
Escalated Prices 13.9 315.2 477.8 12.3 214.9 344.7 17.1 467.1 660.1 15.2 332.4 483.7
Optimistic Prices 18.3 539.5 749.8 16.3 387.5 551.3 21.6 707.0 951.1 19.3 514.5 702.3
Base Case Price assumptions are US$1,450/troy ounce (“oz”) for gold, US$20/pound (“lb”) for cobalt, US$11/lb for bismuth and US$3.50/lb for copper at an
exchange rate of US$ 0.95 = C$ 1. The 3-year Trailing Average Prices Case are as at May 31, 2012 and are US$1,359.94/oz for gold, US$18.53/lb for cobalt,
US$9.83/lb for bismuth and US$3.51/lb for copper and an exchange rate of US$ 0.98 = C$ 1. The Current Price Case uses prices as at May 31, 2012 and are
US$1,558.00/oz for gold, US$15.23/lb for cobalt, US$10.55/lb for bismuth and US$3.40/lb for copper and an exchange rate of US$ 0.97 = C$ 1. The Escalated
Price Case uses metal price assumptions of US$1,800.00/oz for gold, US$22.50/lb for cobalt, US$12.50/lb for bismuth and US$4.00/lb for copper and an exchange
rate of US$ 1 = C$ 1. For the Optimistic Price Case uses US$2,000.00/oz for gold, US$25.00/lb for cobalt, US$15.00/lb for bismuth and US$4.50/lb for copper at
an exchange rate of US$ 1 = C$ 1. Mr. Alexander Duggan, P.Eng. and Mr. Graham Peter Holmes, P.Eng. of Jacobs are the Qualified Persons for Jacobs and Mr.
Eugene Puritch, P.Eng. is the Qualified Person responsible for the work by P&E under NI 43-101.
43
44
45
46
47
Investor presentationjul2013

Mais conteúdo relacionado

Mais procurados

2013, PRESENTATION, Shariin gol-A New Dawn, Graham Chapman
2013, PRESENTATION, Shariin gol-A New Dawn, Graham Chapman2013, PRESENTATION, Shariin gol-A New Dawn, Graham Chapman
2013, PRESENTATION, Shariin gol-A New Dawn, Graham ChapmanThe Business Council of Mongolia
 
Fission Uranium Corporate Presentation
Fission Uranium Corporate PresentationFission Uranium Corporate Presentation
Fission Uranium Corporate PresentationDev Randhawa
 
Copper North Mining - Corporate Presentation - October 22, 2015
Copper North Mining - Corporate Presentation - October 22, 2015Copper North Mining - Corporate Presentation - October 22, 2015
Copper North Mining - Corporate Presentation - October 22, 2015coppernorthmining
 
AAB Corporate Presentation January 2016
AAB Corporate Presentation January 2016AAB Corporate Presentation January 2016
AAB Corporate Presentation January 2016Aberdeen International
 
150928 corporate presentation
150928 corporate presentation150928 corporate presentation
150928 corporate presentationreservoirminerals
 
Company website presentation april 2014
Company website presentation   april 2014Company website presentation   april 2014
Company website presentation april 2014AnteroResources
 
Huguenot Project Presentation
Huguenot Project PresentationHuguenot Project Presentation
Huguenot Project PresentationColonialCoal
 
Investor Presentation September 2011
Investor Presentation September 2011Investor Presentation September 2011
Investor Presentation September 2011forbescoal
 
Mag One Products Inc. Investor Presentation
Mag One Products Inc. Investor PresentationMag One Products Inc. Investor Presentation
Mag One Products Inc. Investor PresentationRedChip Companies, Inc.
 
150918 corporate presentation
150918 corporate presentation150918 corporate presentation
150918 corporate presentationreservoirminerals
 
2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu
2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu
2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh BatkhuuThe Business Council of Mongolia
 
150825 corporate presentation
150825 corporate presentation150825 corporate presentation
150825 corporate presentationreservoirminerals
 
PVA BMO Investor Presentation a2013
PVA BMO Investor Presentation a2013PVA BMO Investor Presentation a2013
PVA BMO Investor Presentation a2013PennVirginiaCorp
 

Mais procurados (19)

30.10.2012 Sharyn Gol - A New Dawn, Batmunkh Batkhuu
30.10.2012 Sharyn Gol - A New Dawn, Batmunkh Batkhuu30.10.2012 Sharyn Gol - A New Dawn, Batmunkh Batkhuu
30.10.2012 Sharyn Gol - A New Dawn, Batmunkh Batkhuu
 
Alexco resource 2013
Alexco resource 2013Alexco resource 2013
Alexco resource 2013
 
2013, PRESENTATION, Shariin gol-A New Dawn, Graham Chapman
2013, PRESENTATION, Shariin gol-A New Dawn, Graham Chapman2013, PRESENTATION, Shariin gol-A New Dawn, Graham Chapman
2013, PRESENTATION, Shariin gol-A New Dawn, Graham Chapman
 
Fission Uranium Corporate Presentation
Fission Uranium Corporate PresentationFission Uranium Corporate Presentation
Fission Uranium Corporate Presentation
 
Rare earths: not so rare but sought after
Rare earths: not so rare but sought afterRare earths: not so rare but sought after
Rare earths: not so rare but sought after
 
Copper North Mining - Corporate Presentation - October 22, 2015
Copper North Mining - Corporate Presentation - October 22, 2015Copper North Mining - Corporate Presentation - October 22, 2015
Copper North Mining - Corporate Presentation - October 22, 2015
 
Nap investor presentation january 2014
Nap investor presentation january 2014Nap investor presentation january 2014
Nap investor presentation january 2014
 
AAB Corporate Presentation January 2016
AAB Corporate Presentation January 2016AAB Corporate Presentation January 2016
AAB Corporate Presentation January 2016
 
150928 corporate presentation
150928 corporate presentation150928 corporate presentation
150928 corporate presentation
 
Company website presentation april 2014
Company website presentation   april 2014Company website presentation   april 2014
Company website presentation april 2014
 
Huguenot Project Presentation
Huguenot Project PresentationHuguenot Project Presentation
Huguenot Project Presentation
 
Investor Presentation September 2011
Investor Presentation September 2011Investor Presentation September 2011
Investor Presentation September 2011
 
Mag One Products Inc. Investor Presentation
Mag One Products Inc. Investor PresentationMag One Products Inc. Investor Presentation
Mag One Products Inc. Investor Presentation
 
150918 corporate presentation
150918 corporate presentation150918 corporate presentation
150918 corporate presentation
 
NAP Investor Presentation August 2014
NAP Investor Presentation August 2014NAP Investor Presentation August 2014
NAP Investor Presentation August 2014
 
2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu
2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu
2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu
 
150825 corporate presentation
150825 corporate presentation150825 corporate presentation
150825 corporate presentation
 
Investor Presentation November 2014
Investor Presentation November 2014Investor Presentation November 2014
Investor Presentation November 2014
 
PVA BMO Investor Presentation a2013
PVA BMO Investor Presentation a2013PVA BMO Investor Presentation a2013
PVA BMO Investor Presentation a2013
 

Destaque

Graphite-is-black-gold-of-the-21st-century-industrial-alliance-securities
Graphite-is-black-gold-of-the-21st-century-industrial-alliance-securitiesGraphite-is-black-gold-of-the-21st-century-industrial-alliance-securities
Graphite-is-black-gold-of-the-21st-century-industrial-alliance-securitiesChristopher R Anderson
 
Birla sun life insurance
Birla sun life insuranceBirla sun life insurance
Birla sun life insuranceAmit Dazz
 
JL Gross Ad Valorem Tax Services
JL Gross Ad Valorem Tax ServicesJL Gross Ad Valorem Tax Services
JL Gross Ad Valorem Tax Serviceskhiggins481
 
Ecological Anthropology Course Fundamentals 1 29 08
Ecological Anthropology  Course Fundamentals 1 29 08Ecological Anthropology  Course Fundamentals 1 29 08
Ecological Anthropology Course Fundamentals 1 29 08Richard Currie Smith
 
Ecological Anthropology: Hunting& Gathering & Subsistence Food Production
Ecological Anthropology: Hunting& Gathering & Subsistence Food ProductionEcological Anthropology: Hunting& Gathering & Subsistence Food Production
Ecological Anthropology: Hunting& Gathering & Subsistence Food ProductionRichard Currie Smith
 
First 10 elements of the periodic table
First 10 elements of the periodic tableFirst 10 elements of the periodic table
First 10 elements of the periodic tablehazelizzyy
 
Alexco resource corp_2014-3-31_general
Alexco resource corp_2014-3-31_generalAlexco resource corp_2014-3-31_general
Alexco resource corp_2014-3-31_generalCompany Spotlight
 
Young-Davidson Mine Tour
Young-Davidson Mine TourYoung-Davidson Mine Tour
Young-Davidson Mine TourAuRico Gold
 
SFL 2012 Results Presentation
SFL 2012 Results PresentationSFL 2012 Results Presentation
SFL 2012 Results PresentationCompany Spotlight
 
Goldmine International
Goldmine InternationalGoldmine International
Goldmine InternationalSami Siddiqui
 
Global rare earths resources and scenarios of future rare earth industry
Global rare earths resources and scenarios of future rare earth industryGlobal rare earths resources and scenarios of future rare earth industry
Global rare earths resources and scenarios of future rare earth industryholythornbird
 

Destaque (19)

Graphite-is-black-gold-of-the-21st-century-industrial-alliance-securities
Graphite-is-black-gold-of-the-21st-century-industrial-alliance-securitiesGraphite-is-black-gold-of-the-21st-century-industrial-alliance-securities
Graphite-is-black-gold-of-the-21st-century-industrial-alliance-securities
 
Birla sun life insurance
Birla sun life insuranceBirla sun life insurance
Birla sun life insurance
 
JL Gross Ad Valorem Tax Services
JL Gross Ad Valorem Tax ServicesJL Gross Ad Valorem Tax Services
JL Gross Ad Valorem Tax Services
 
Ecological Anthropology Course Fundamentals 1 29 08
Ecological Anthropology  Course Fundamentals 1 29 08Ecological Anthropology  Course Fundamentals 1 29 08
Ecological Anthropology Course Fundamentals 1 29 08
 
Ecological Anthropology: Hunting& Gathering & Subsistence Food Production
Ecological Anthropology: Hunting& Gathering & Subsistence Food ProductionEcological Anthropology: Hunting& Gathering & Subsistence Food Production
Ecological Anthropology: Hunting& Gathering & Subsistence Food Production
 
Pembina apr13cp
Pembina apr13cpPembina apr13cp
Pembina apr13cp
 
11.05.2012, NEWSWIRE, Issue 221
11.05.2012, NEWSWIRE, Issue 22111.05.2012, NEWSWIRE, Issue 221
11.05.2012, NEWSWIRE, Issue 221
 
First 10 elements of the periodic table
First 10 elements of the periodic tableFirst 10 elements of the periodic table
First 10 elements of the periodic table
 
29.06.2012, NEWSWIRE, Issue 228
29.06.2012, NEWSWIRE, Issue 22829.06.2012, NEWSWIRE, Issue 228
29.06.2012, NEWSWIRE, Issue 228
 
17.06.2014, NEWSWIRE, Issue 172
17.06.2014, NEWSWIRE, Issue 17217.06.2014, NEWSWIRE, Issue 172
17.06.2014, NEWSWIRE, Issue 172
 
15.06.2012, NEWSWIRE, Issue 226
15.06.2012, NEWSWIRE, Issue 22615.06.2012, NEWSWIRE, Issue 226
15.06.2012, NEWSWIRE, Issue 226
 
Alexco resource corp_2014-3-31_general
Alexco resource corp_2014-3-31_generalAlexco resource corp_2014-3-31_general
Alexco resource corp_2014-3-31_general
 
Young-Davidson Mine Tour
Young-Davidson Mine TourYoung-Davidson Mine Tour
Young-Davidson Mine Tour
 
23.05.2014, NEWSWIRE, Issue326
23.05.2014, NEWSWIRE, Issue32623.05.2014, NEWSWIRE, Issue326
23.05.2014, NEWSWIRE, Issue326
 
SFL 2012 Results Presentation
SFL 2012 Results PresentationSFL 2012 Results Presentation
SFL 2012 Results Presentation
 
25.01.2013, NEWSWIRE, Issue 258
25.01.2013, NEWSWIRE, Issue 25825.01.2013, NEWSWIRE, Issue 258
25.01.2013, NEWSWIRE, Issue 258
 
Goldmine International
Goldmine InternationalGoldmine International
Goldmine International
 
27.07.2012, NEWSWIRE, Issue 232
27.07.2012, NEWSWIRE, Issue 23227.07.2012, NEWSWIRE, Issue 232
27.07.2012, NEWSWIRE, Issue 232
 
Global rare earths resources and scenarios of future rare earth industry
Global rare earths resources and scenarios of future rare earth industryGlobal rare earths resources and scenarios of future rare earth industry
Global rare earths resources and scenarios of future rare earth industry
 

Semelhante a Investor presentationjul2013

Fortune Minerals Investor Presentation - January 2014
Fortune Minerals Investor Presentation - January 2014Fortune Minerals Investor Presentation - January 2014
Fortune Minerals Investor Presentation - January 2014Company Spotlight
 
Fortune Minerals Investor Presentation November 2013
Fortune Minerals  Investor Presentation November 2013Fortune Minerals  Investor Presentation November 2013
Fortune Minerals Investor Presentation November 2013Company Spotlight
 
Fortune investor presentation2014
Fortune investor presentation2014Fortune investor presentation2014
Fortune investor presentation2014Company Spotlight
 
Fortune Minerals - Investor Presentation April 2014
Fortune Minerals - Investor Presentation April 2014Fortune Minerals - Investor Presentation April 2014
Fortune Minerals - Investor Presentation April 2014Company Spotlight
 
April 2012 Fortune Minerals Investor Presentation
April 2012 Fortune Minerals Investor PresentationApril 2012 Fortune Minerals Investor Presentation
April 2012 Fortune Minerals Investor PresentationCompany Spotlight
 
Fortune minerals march 2012 investor presentation
Fortune minerals march 2012 investor presentationFortune minerals march 2012 investor presentation
Fortune minerals march 2012 investor presentationCompany Spotlight
 
Nov. 2013 Champion Corporate Presentation - English
Nov. 2013 Champion Corporate Presentation - EnglishNov. 2013 Champion Corporate Presentation - English
Nov. 2013 Champion Corporate Presentation - EnglishChampionMines
 
Feb. 2013 Champion Corporate Presentation - English
Feb. 2013 Champion Corporate Presentation - EnglishFeb. 2013 Champion Corporate Presentation - English
Feb. 2013 Champion Corporate Presentation - EnglishChampionMines
 
Murchison Minerals Corporate Presentation - August 2022
Murchison Minerals Corporate Presentation - August 2022Murchison Minerals Corporate Presentation - August 2022
Murchison Minerals Corporate Presentation - August 2022CHF Investor Relations
 
April 2013 Champion Corporate Presentation - English
April 2013 Champion Corporate Presentation - EnglishApril 2013 Champion Corporate Presentation - English
April 2013 Champion Corporate Presentation - EnglishChampionMines
 
May 2013 Champion Corporate Presentation - English
May 2013 Champion Corporate Presentation - EnglishMay 2013 Champion Corporate Presentation - English
May 2013 Champion Corporate Presentation - EnglishChampionMines
 
150720 corporate presentation
150720 corporate presentation150720 corporate presentation
150720 corporate presentationreservoirminerals
 
Oct. 2013 Champion Corporate Presentation - English
Oct. 2013 Champion Corporate Presentation - EnglishOct. 2013 Champion Corporate Presentation - English
Oct. 2013 Champion Corporate Presentation - EnglishChampionMines
 
Corporate Presentation - June 2015
Corporate Presentation - June 2015Corporate Presentation - June 2015
Corporate Presentation - June 2015reservoirminerals
 
Corporate Presentation November 2012
Corporate Presentation November 2012Corporate Presentation November 2012
Corporate Presentation November 2012Crocodile Gold
 
Crocodile Gold Corporate Presentation December 2012
Crocodile Gold Corporate Presentation December 2012Crocodile Gold Corporate Presentation December 2012
Crocodile Gold Corporate Presentation December 2012Crocodile Gold
 
Corporate Presentation - April 2015
Corporate Presentation - April 2015Corporate Presentation - April 2015
Corporate Presentation - April 2015reservoirminerals
 
2023-07-11-Strategic-Resources.pdf
2023-07-11-Strategic-Resources.pdf2023-07-11-Strategic-Resources.pdf
2023-07-11-Strategic-Resources.pdfAdnet Communications
 
Aug. 2013 Champion Corporate Presentation - English
Aug. 2013 Champion Corporate Presentation - EnglishAug. 2013 Champion Corporate Presentation - English
Aug. 2013 Champion Corporate Presentation - EnglishChampionMines
 

Semelhante a Investor presentationjul2013 (20)

Fortune Minerals Investor Presentation - January 2014
Fortune Minerals Investor Presentation - January 2014Fortune Minerals Investor Presentation - January 2014
Fortune Minerals Investor Presentation - January 2014
 
Fortune Minerals Investor Presentation November 2013
Fortune Minerals  Investor Presentation November 2013Fortune Minerals  Investor Presentation November 2013
Fortune Minerals Investor Presentation November 2013
 
Fortune investor presentation2014
Fortune investor presentation2014Fortune investor presentation2014
Fortune investor presentation2014
 
Fortune Minerals - Investor Presentation April 2014
Fortune Minerals - Investor Presentation April 2014Fortune Minerals - Investor Presentation April 2014
Fortune Minerals - Investor Presentation April 2014
 
April 2012 Fortune Minerals Investor Presentation
April 2012 Fortune Minerals Investor PresentationApril 2012 Fortune Minerals Investor Presentation
April 2012 Fortune Minerals Investor Presentation
 
Fortune minerals march 2012 investor presentation
Fortune minerals march 2012 investor presentationFortune minerals march 2012 investor presentation
Fortune minerals march 2012 investor presentation
 
Nov. 2013 Champion Corporate Presentation - English
Nov. 2013 Champion Corporate Presentation - EnglishNov. 2013 Champion Corporate Presentation - English
Nov. 2013 Champion Corporate Presentation - English
 
Feb. 2013 Champion Corporate Presentation - English
Feb. 2013 Champion Corporate Presentation - EnglishFeb. 2013 Champion Corporate Presentation - English
Feb. 2013 Champion Corporate Presentation - English
 
Murchison Minerals Corporate Presentation - August 2022
Murchison Minerals Corporate Presentation - August 2022Murchison Minerals Corporate Presentation - August 2022
Murchison Minerals Corporate Presentation - August 2022
 
April 2013 Champion Corporate Presentation - English
April 2013 Champion Corporate Presentation - EnglishApril 2013 Champion Corporate Presentation - English
April 2013 Champion Corporate Presentation - English
 
May 2013 Champion Corporate Presentation - English
May 2013 Champion Corporate Presentation - EnglishMay 2013 Champion Corporate Presentation - English
May 2013 Champion Corporate Presentation - English
 
150720 corporate presentation
150720 corporate presentation150720 corporate presentation
150720 corporate presentation
 
Oct. 2013 Champion Corporate Presentation - English
Oct. 2013 Champion Corporate Presentation - EnglishOct. 2013 Champion Corporate Presentation - English
Oct. 2013 Champion Corporate Presentation - English
 
Reservoir Corporate PDAC
Reservoir Corporate PDACReservoir Corporate PDAC
Reservoir Corporate PDAC
 
Corporate Presentation - June 2015
Corporate Presentation - June 2015Corporate Presentation - June 2015
Corporate Presentation - June 2015
 
Corporate Presentation November 2012
Corporate Presentation November 2012Corporate Presentation November 2012
Corporate Presentation November 2012
 
Crocodile Gold Corporate Presentation December 2012
Crocodile Gold Corporate Presentation December 2012Crocodile Gold Corporate Presentation December 2012
Crocodile Gold Corporate Presentation December 2012
 
Corporate Presentation - April 2015
Corporate Presentation - April 2015Corporate Presentation - April 2015
Corporate Presentation - April 2015
 
2023-07-11-Strategic-Resources.pdf
2023-07-11-Strategic-Resources.pdf2023-07-11-Strategic-Resources.pdf
2023-07-11-Strategic-Resources.pdf
 
Aug. 2013 Champion Corporate Presentation - English
Aug. 2013 Champion Corporate Presentation - EnglishAug. 2013 Champion Corporate Presentation - English
Aug. 2013 Champion Corporate Presentation - English
 

Mais de Company Spotlight

Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 YearsPresentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 YearsCompany Spotlight
 
Cypress Development Corp. Investor Presentation
Cypress Development Corp. Investor PresentationCypress Development Corp. Investor Presentation
Cypress Development Corp. Investor PresentationCompany Spotlight
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationCompany Spotlight
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCompany Spotlight
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. PresentationCompany Spotlight
 
Aben Resources Ltd. Presentation
Aben Resources Ltd. PresentationAben Resources Ltd. Presentation
Aben Resources Ltd. PresentationCompany Spotlight
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationCompany Spotlight
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. PresentationCompany Spotlight
 
Aben Resources Ltd. Presentation
Aben Resources Ltd. PresentationAben Resources Ltd. Presentation
Aben Resources Ltd. PresentationCompany Spotlight
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCompany Spotlight
 
TerraX Minerals - Corporate Presentation
TerraX Minerals - Corporate PresentationTerraX Minerals - Corporate Presentation
TerraX Minerals - Corporate PresentationCompany Spotlight
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationCompany Spotlight
 
TerraX Minerals, Inc. Corporate Presentation
TerraX Minerals, Inc. Corporate PresentationTerraX Minerals, Inc. Corporate Presentation
TerraX Minerals, Inc. Corporate PresentationCompany Spotlight
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. PresentationCompany Spotlight
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCompany Spotlight
 

Mais de Company Spotlight (20)

Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 YearsPresentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
Presentation Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
 
Aben resources presentation
Aben resources presentationAben resources presentation
Aben resources presentation
 
Aben Resources Ltd.
Aben Resources Ltd.Aben Resources Ltd.
Aben Resources Ltd.
 
Cypress Development Corp. Investor Presentation
Cypress Development Corp. Investor PresentationCypress Development Corp. Investor Presentation
Cypress Development Corp. Investor Presentation
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate Presentation
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate Presentation
 
Aben Resources Ltd.
Aben Resources Ltd.Aben Resources Ltd.
Aben Resources Ltd.
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. Presentation
 
Aben Resources Ltd. Presentation
Aben Resources Ltd. PresentationAben Resources Ltd. Presentation
Aben Resources Ltd. Presentation
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate Presentation
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. Presentation
 
Aben Resources Ltd. Presentation
Aben Resources Ltd. PresentationAben Resources Ltd. Presentation
Aben Resources Ltd. Presentation
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate Presentation
 
TerraX Minerals - Corporate Presentation
TerraX Minerals - Corporate PresentationTerraX Minerals - Corporate Presentation
TerraX Minerals - Corporate Presentation
 
Aben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate PresentationAben Resources Ltd. Corporate Presentation
Aben Resources Ltd. Corporate Presentation
 
Cypress Development Corp
Cypress Development CorpCypress Development Corp
Cypress Development Corp
 
TerraX Minerals, Inc. Corporate Presentation
TerraX Minerals, Inc. Corporate PresentationTerraX Minerals, Inc. Corporate Presentation
TerraX Minerals, Inc. Corporate Presentation
 
Cypress Development Corp. Presentation
Cypress Development Corp. PresentationCypress Development Corp. Presentation
Cypress Development Corp. Presentation
 
Cypress Development Corp
Cypress Development CorpCypress Development Corp
Cypress Development Corp
 
Cypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate PresentationCypress Development Corp. Corporate Presentation
Cypress Development Corp. Corporate Presentation
 

Último

Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizharallensay1
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Falcon Invoice Discounting
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon investment
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...lizamodels9
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceDamini Dixit
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 

Último (20)

Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 

Investor presentationjul2013

  • 2. This document contains certain forward-looking information. This forward-looking information includes, or may be based upon, estimates, forecasts, and statements as to management’s expectations with respect to, among other things, the size and quality of the Company’s mineral resources, progress in development of mineral properties, timing and cost for placing the Company’s mineral projects into production, costs of production, amount and quality of metal products recoverable from the Company’s mineral resources, demand and market outlook for metals and coal and future metal and coal prices. Forward-looking information is based on the opinions and estimates of management at the date the information is given, and is subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information. These factors include the inherent risks involved in the exploration and development of mineral properties, uncertainties with respect to the receipt or timing of required permits and regulatory approvals, the uncertainties involved in interpreting drilling results and other geological data, fluctuating metal and coal prices, the possibility of project cost overruns or unanticipated costs and expenses, uncertainties relating to the availability and costs of financing needed in the future, uncertainties related to metal recoveries and other factors. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Inferred mineral resources are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that mineral resources will be converted into mineral reserves. Readers are cautioned to not place undue reliance on forward-looking information because it is possible that predictions, forecasts, projections and other forms of forward-looking information will not be achieved by the Company. The forward-looking information contained herein is made as of the date hereof and the Company assumes no responsibility to update them or revise it to reflect new events or circumstances, except as required by law. 2
  • 3. Corporate Information Listings: TSX (Canada): FT OTC QX (USA): FTMDF Share Price $0.41 Shares Out – Basic 135.9 Shares Out – Fully Diluted 143.1 Market Cap – Basic $55.7 Working Capital (Q1 2013) $13.0 Total Assets (Q1 2013) $148.9 All amounts in M or CAD$M except per share amounts. Share Performance SharePrice(C$) ShareVolume(M) Analyst Coverage Dealer Date Rating Target Killian Charles Industrial Alliance Securities June 28, 2013 Spec Buy $3.30 David Davidson Paradigm Capital July 24, 2013 Spec Buy $1.00 Michael Fowler Loewen Ondaatje McCutcheon July 22, 2013 Spec Buy $2.65 Russell Stanley Haywood Securities July 19, 2013 Buy $0.60 Ownership China Mining Resources Group Ltd. 11% Procon Resources Inc. 11% Insiders 30% Strategic investment by Procon Resources Inc.: - Oct. 1, 2013 14.625 M @ $0.40 As of July 30, 2013 3 - 200 400 600 800 1,000 1,200 1,400 $0.00 $0.10 $0.20 $0.30 $0.40 $0.50 $0.60 $0.70 Daily Volume Closing Price
  • 4. Fortune Minerals Limited  Canadian mineraldevelopment company  HeadquarteredinLondon,Ontario,Canada  Canada Focus-operating inmining friendlyjurisdictions Two late-stageprojects  ArctosAnthracite Project,BC  PositiveFeasibilityStudy  Advancingtowardsproduction  NICOGold-Cobalt-Bismuth-CopperProject,Northwest Territories&Saskatchewan:  PositiveFeasibility&FEEDStudies  NearcompletionofPermitting Process 4
  • 5. Summary Highlights  Oneofthe world’spremiermetallurgical coaldevelopment projects  Advancedprojectwith$100 millionofworkcompleted  UpdatedFeasibilityStudy withrobusteconomics,completedOctober 2012  Railwaydevelopment strategy toPortofPrince Rupert – allowsforscalable expansion  World-classJV partner securedwithSouthKoreanPOSCO– one ofthe world’slargest steel producers  Supplyshortagesofmetallurgicalcoalswithgrowingworldconsumption  EnvironmentalAssessmentprocesswithjoint venture funding inplace. 5
  • 6. Arctos is the largest & most advanced Canadianproject of high rank anthracitecoal  Highestquality metallurgicalcoalwithveryhigh carbon&energy content  Representsonly1%ofworldcoalreserves Metallurgicalcoal with diverse applications  MetallurgicalReductants / charge carbon  Ultra-LowVol.PCI  Sinter  Otherproducts:  Filtermedia  Blendcoalwithcokingcoalformaking metallurgical coke  Directcokereplacement  Ureafertilizers,synthetic fuels&plastics  Heating&cookingbriquettes  Pelletizing  Premiumthermal coal  Cement 6
  • 7. Insufficient supply of metallurgical coalsto meet forecast global demand  Increasingdemand foranthracite due tonew steel technologies& loweremissions  Emergingeconomiesare driving forcesforsteelproduction&future metallurgicalcoaldemand  China’sGDPgrowthperspective  10-14%growthwasequivalentto ~$300BofGDPperyear  Currentforecastedgrowthof7-8% isequivalentto~$550BofGDP per year  Marginalcostofproduction US$150-180/tlimits supply & marketadjusting by shuttering high costproducers  Current metallurgicalcoal surplusis short-term&willreverse with economicrecovery 920 1,185 1,440 - 200 400 600 800 1,000 1,200 1,400 1,600 2010 2015 2020 Mt Global Met Coal Demand Source: Peabody Global Energy Analytics, Deloitte 7
  • 8.  Steelmakers around the world are expanding Pulverized Coal Injection (PCI) use to reduce costs, improve margins  PCIreduces the amount ofcoke(made from cokingcoal)required  SeabornePCImarket expected togrowat 8% CAGRto2018  Low-volPCItypically priced at 70% to80% of highquality hardcokingcoal  ArctosPCIwillachieve a higher pricegiven its ultra-lowvolatilecontent  Arctos coal also has diverse usage in other metallurgicalprocesses  Sinterfeed  Canreplace15% -30%ofblast furnacecoke withanthracite  Newsteel technologies(Cokonyx/HiSmelt)  Growthofelectricarcsteel manufacturing  Ferroalloys&other metal processing Source: Macarthur Coal, Peabody 8
  • 9. China became a net coal importer of anthracite in 2004, coking coal in 2007, all coals in 2009 $47 $45 $58 $125 $115 $98 $300 $129 $215 $291 $209 -$150 -$100 -$50 $0 $50 $100 $150 $200 $250 $300 $350 -150 -50 50 150 250 350 450 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 HardCokingCoalPrice(US$/t) NetImports(Mt) Coal & Anthracite Net Imports by China Coal Net Imports (Mt) Anthracite Net Imports (Mt) Hard Coking Coal Price (US$/t) Source: China Coal Resource Website, Bloomberg 9
  • 10. Supply constraints due to declining exports & lack of new supply  China: 547 million tonnes – net importer since 2004  Vietnam: 44.5 million tonnes – reducing exports to 5% of production by 2015 to utilize production domestically  Few new high-quality deposits in mining friendly jurisdictions 0 100 200 300 400 500 600 China Vietnam North Korea* Ukraine Russia Other Mt Supply of Anthracite - 2011 Production Export Production Export China Vietnam North Korea* Ukraine Russia Export / Production 0.8% 43.1% 13.2% 27.1% 48.5% 8.5% Source: Company research, corporate presentations, Wood Mackenzie & U.S. Energy Information Administration *Production statistics from 2010 data. “Other” includes Spain, South Africa, South Korea, Germany, USA, and United Kingdom. 10
  • 11.  16,411 Ha license area in northwest BC  Close proximity to deep water shipping ports  Ridley Terminals in Prince Rupert (330 km)  Mine site straddles railway right-of-way  Track (CN) installed to 150 km south of mine  Railway road bed largely complete to mine  Road access from railway subgrade  Support from CN Rail for railway extension  BC Government extending electrical grid to area  Project in Tahltan & Gitxsan Territories  BC Government sharing revenues with Aboriginal groups Railway sub- grade links mine site with CN mainline & Ridley Terminals 11
  • 12. Secured world-classinvestor & strategic partner – one of the world’s largeststeel producers  POSCOCanada has acquired 20%interest in Arctosforanticipated initial payments &cashcontributionsof $188 millionbasedoncurrent capital costestimates  $30millionpaid toFortune,$20 millioncontributed directly tothe JV toadvance permitting  20%oftotaldevelopment &capital costs– $158 millionunder current estimates  20%ofoperatingcostsfor20% ofproductionin-kindfortheir ownuse  Fortuneis ProjectManager &iscompensatedforprovidingsupport overlifeofmine  ValidatesArctosas one ofworld’spremier metallurgical coaldevelopment projects-key future supplier toglobal steelindustry POSCO Gwanyang steel plant 12
  • 13.  Recent upgrade & increase in resources & new reserves (October 15, 2012) – Small fraction of total resource  Lost Fox deposit remains open for possible expansion & additional coal seams identified below 350 meters & on adjacent lands  Historical Resources include 2.2 billion tonnes in the Speculative class (1) Area Measured Indicated M&I Inferred Lost Fox 107.9 109.5 217.4 91.5 Hobbit-Broatch 13.5 13.5 258.4 Summit 9.6 Lost Fox Extension Total 107.9 123.0 230.9 359.5 Coal Resources Run-of-Mine Coal Reserves 10% Ash Product Reserves Measured Indicated Inferred Proven Probable Total Proven Probable Total Product 172.4 20.4 12.1 115.0 9.9 124.9 64.4 4.8 69.2 Historical Arctos Global Resources (million tonnes) (1) Lost Fox Metallurgical Coal Reserves and Resources (million tonnes) (2) (1) The Arctos Mineral Resource & Mineral Reserve estimates were prepared in 2002, 2005, & 2007, respectively, by Marston & Marston Inc. in compliance with NI 43-101.Richard Marston, P.E. is the Qualified Person responsible for the estimates. Historical Resources include 2.2 billion tonnes in the Speculative class. The historical resource estimate was developed by Gulf in 1988 and updated in 2002 by Marston-Golder to reflect changes in the estimation of Inferred Resources under Paper GSC 88-21. The Speculative portion of the resources is not compliant with current reporting standards. A qualified person has not done the work necessary to classify the historical estimate of Speculative resources as current mineral resources under NI 43-101 and the estimate should not be relied upon. Speculative Resources were developed based on estimated average coal thickness applied to the projected aerial extent of the coal. Further information regarding the Arctos Coal Resource & Reserve estimates is available from the Company’s disclosures under the Company’s profile on the SEDAR website at www.sedar.com (2) The 2012 DFS utilized updated Resource & Reserve estimates for the Lost Fox Deposit, which Edward Minnes, P.E. is the Qualified Person. 13
  • 14.  Railway road bed largely constructed to mine site by BC Government – brownfield extension from Minaret  Permitting of railway extension established with Federal & BC Governments to be similar to logging road  Environmental Assessment underway as part of mine development  Capital costs included in 2012 DFS  CN collaborating on railway extension to Arctos  Discussions initiated with potential operators, including CN Existing railway right-of-way & road bed 14
  • 15. Ridley Coal Terminal a world-class coal & bulk materials handling facility  Ice-free, deep water port 30 hours closer to Asia than Port of Vancouver  Capable of handling full Capesize vessels up to 250,000 dwt that reduces ocean freight  16 Mtpa capacity under expansion to 25 Mtpa – permitting a future expansion up to 60 Mtpa  Opportunities for shared cargos & blending of coals with other metallurgical coal producers  Companies with committed capacity have contacted JV to sell their allocations  Government of Canada announced plans to sell the terminal again – no anticipated impact to project 15
  • 16.  October2012 update to2005 &2010 FS  Basedon railwaytransportofcoaltoRidley Coal TerminalinPrinceRupert  Initial3 Mtpa productionfromLostFoxdeposit openpit mine, washplant &site infrastructure  69.2Mt ofproduct coalreserves– 25+ yearsproduction(smallfractionoftotal resource)  Premiumultra-lowvolatile PCIproduct  Can diversifyproduct mix toproduce premiumproducts (charge carbon)&sinter  Lifeofmine average FreeOnBoard(FOB)vessel cashcostC$127.61/tonne (US$121.22/tonne)  C1operating cashcostC$119.85/tonne (US$113.86)FOB  Connectiontothe electrical gridcouldsave C$7/tonne BASE CASE Ultra-Low Volatile PCI US$175/tonne (C$1 = US$0.95) PRE-TAX AFTER TAX IRR 17.0% 14.7% NPV (8%) C$615.9 million C$405.8 million Capital (Years 1-3) C$788.6 million (includes railway capital) $0.6 $1.2 $1.9 $2.5 $3.2 $3.8 $- $0.5 $1.0 $1.5 $2.0 $2.5 $3.0 $3.5 $4.0 $175/t $200/t $225/t $250/t $275/t $300/t C$B FOB Price (US$/t) NPV - Pre-tax at 8% The 2012 Feasibility Study was prepared by Golder-Marston in compliance with NI 43-101. Mr. Edward (Ted) Minnes, P.E. is the Qualified Person responsible for the study. 16
  • 17. 17  Arctosacceptedinto new EAsubstitution process&willbe reviewed by BC EAO  Arctosproject identifiedonBC GovernmentMajorInvestment OfficeList  Arctoson NaturalResourcesCanada (NRCan)Deputy Ministers’watchlistformajorprojects  NRCan’sMajorProjectsManagement Officeassignedstafftohelp progressArctos  ProjectDescriptionReportcompleted&submitted to EAagencies  BaselineFieldWork  Additionalfieldworkformine area, railbed &roadaccesscorridorinprogressby Stantec  FieldworkcommencedAugust2012  BCEAOApplication  DraftApplicationInformationRequirements submitted tothe BC EAO  Targeting ApplicationInformationRequirements approvalinQ42013  PreparationofapplicationforEnvironmentalAssessmentCertificate (EAC)in 2014  Workplans &documentsshared withAboriginalgroups
  • 18. BC Government  Federal & BC Government harmonized EA substitution process  BC Government focus on Premier Clark’s Jobs Plan - 8 new mines & 9 mine expansions by 2015  Establishment of Major Investment Office – Arctos identified as major project  Pacific Gateway Policy of expanding trade with Asia – includes investments in rail, power & ports  BC Government revenue sharing with Aboriginal groups Tahltan Nation  Environmental Assessment Process Funding, Traditional Knowledge & PEM Data Sharing agreements  Community engagement in progress  Tahltan Community Liaison hired Gitxsan Nation  MOU completed with Gitxsan Hereditary Chiefs  Access Agreements completed  Quarterly meetings with chiefs on subject of watersheds  Annual presentations at Gitxsan Summit  Gitxsan Community Liaisons hired  Traditional Use & Knowledge Study to be completed 18
  • 19. One of world’s largestundeveloped deposits – railway transportation solution provides scalable expansion potential  Railtransportationallowsforhigher annual productionthan 3 Mtpa &willlowersomecostforinbound freight  FSreservesonlyrepresents smallfractionoftotal resource  UpdatedreservesforLostFoxdeposit cansupport higher productionrates(4 Mtpa ramp-upsensitivity)  Productioncanbe expanded fromadjacent Hobbit – Broatchdeposit  Current resourceonlyidentifiedto 350 metres – Additional coalseamsidentified at depth (potential undergroundmining)  Budget inplace foradditional drilling  3rd Party contributionto railwaycapital costsincreasesNPV  BCGovernmentextending electricalgrid&connectionwouldlowerpower&mine operatingcosts&enable use of loweroperating costelectrifiedmining equipment (preliminaryestimate isC$7/tonne reduction toOPEX)  Lease-to-purchaseofmobileequipment fleet &contractmining wouldlowerupfrontcapital &increase IRR 19
  • 20.  Nextsteps include:  Completepermitting activities  Continue Tahltan, Gitxsan &stakeholder engagement  Advancerailengineering &permitting, &establishagreements withqualifiedoperator  Secureportcapacity  Securelowcostpowerforthe sitewithextensionofelectricalgrid  Conduct additional drilling forexpansionofreserves&obtainsamplesforproduct testing &mix  Secondstagestrategicpartner(s) &project financing  Deloitteengaged toadvise onprojectfinancing &development options,targeting projectlevel jointventure, potentiallyincluding: • Equity investment • Off-takerelationship • Commitmentto arrangedebt financing forconstruction 20
  • 21. Proposed Development Timeline 2013 2014 2015 2016 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Project Description submission Baseline field work & document prep Filing of EAC documents EAO-CEAA review process Ministerial decision process Mine permitting Construction Commissioning & commercial production 21
  • 22.  Positive Front End Engineering & Design Study (FEED) in 2012 based on a vertically integrated mine & mill in the Northwest Territories & refinery in Saskatchewan  FEED - ~20% of detailed engineering complete for procurement  Attractive economics – FS generates NPV of $309 million* – highly leveraged to increased cobalt & gold prices with low downside risk  Negative cash cost – cobalt cash cost (net of credits) of negative US$0.81/lb at Base Case prices & negative US$1.07/lb at recent prices  High-grade deposit of combined gold, cobalt, and bismuth co- products plus by-product copper  Positioned to be one of the largest & lowest cost suppliers of cobalt sulphate to the rapidly expanding battery sector  Very advanced project with $110 million already invested – including pilot plants, test mining & extensive permitting work – resulting in planned production in 2016  Strong management & board with experience in mine permitting, development & operations Test mining 2006/2007 *Base case: pre-tax, 7% discount rate 22
  • 23.  Gold price increased consistently in the past decade  While mine supply remains relatively flat, future demand continues to grow:  Growing physical demand from Asia & central banks  Growing investment demand based on currency protection & safe haven status  Provides a flexible financing opportunity NICO contains 1.1 million ounces of gold – provides significant counter-cyclical hedge Source: Bloomberg; Energy & Metals Consensus Forecasts December 2012 23 $310 $363 $410 $445 $604 $697 $873 $873 $1,211 $1,574 $1,669 $1,504 $- $200 $400 $600 $800 $1,000 $1,200 $1,400 $1,600 $1,800 Historical & Forecast Gold Price
  • 24.  Wide chemical & metallurgical market applications in batteries, high strength alloys, cutting tools, catalysts, etc.  Cobalt sulphate used in lithium ion & nickel metal hydride batteries for electronic devices & hybrid/electric vehicles  High purity cobalt used in aerospace applications  Cobalt demand expected to grow at ~7% per year next five years  Over past decade, increase in demand resulted mostly from increase in chemical applications, particularly rechargeable batteries & catalysts  Chemical applications accounted for ~55% of worldwide cobalt demand in 2011 & expected to dominate future cobalt consumption 27% 19% 13% 10% 9% 7% 6% 5% 4% Batteries (27%) Superalloy (19%) Hard Materials (13%) Colours (10%) Catalysts (9%) Magnets (7%) Hardfacing & Other Alloys (6%) Tyre Adhesives, Soaps, Driers (5%) Feedstuffs (4%) Wide Application of Industrial Usage 24
  • 25.  Cobaltcriticalformanufacturingbatteries usedinelectricvehicles*,computers,cell phones&other electronic devices  Nickelmetal hydridecar batteries containapproximately4 kg ofcobalt  Lithium-ioncarbatteries contain2 to 6 kg ofcobalt  Cobaltusage in batteries isexpected to growfrom25%ofdemand in2011 to 45%in2018 &projectionsas high as 100,000 tonnes inbattery applications alone by 2020 0 1 2 3 4 5 6 2008 2010f 2012f 2014f 2016f 2018f 2020f MillionsofUnits Global Electric Vehicle Battery Sales * Electric vehicles include hybrid electric vehicles (HEV), plug-in hybrid electric vehicles (PHEV) & pure electric vehicles (EV) Source: Roskill Approx. 20% compound annual growth forecast from 2011 to 2020 25
  • 26.  Worldmarket ofrefinedcobalt production~82,000t, excluding somesecondaryprocessing&scrap  Vastmajorityofcobalt sourcedfromregionsthat are politicallyunstable orprone toexport restrictions  Congo(DRC)currently accounts for51%ofglobalsupply  China has the largest refining capacity (~40%)but limitedmine supply  Chemicalproductionis indeficitwhereas metalsinsurplus  LMEinitiated futuresmarket trading forcobalt in2010, resulting in greater liquidity  NICOwillbe a reliable NorthAmericanproducer 51% 12% 7% 7% 5% 5% 4% 3% 2% 2% 2% 0% 10% 20% 30% 40% 50% 60% Congo Zambia China Russia Other Countries Australia Cuba Canada New Caledonia Brazil Morocco Proportion of World Cobalt Production (%) Source: USGS Industry Survey 26
  • 27.  Traditionallyusedinfusible alloys,cosmetics,chemicalsetc.  Newmarkets focusonsuper conductors,CDs&auto anti-corrosionmaterials  Environmentallysafe replacement forleadinplumbing &electronicsolders,brass,ceramicglazes, freecutting steel,hot dipgalvanizing &paint pigments  Globalframeworkto eliminateleadexpected to driveincreasedbismuth consumption  Europeanlegislationto eliminate leadinelectronics Growing Number of Applications Source: USGS Industry Survey 27
  • 28.  Worldmarket between 15,000 &20,000 t per year  China isthe principal sourceofbismuth(240 Kt reserve),accounting for80%ofworldreserves&73% ofworld productionin2010  China has closed20%ofitsproductiondue to environmentalconcerns&exportsreduced due torestrictions  NICOcontainsover48 Kt ofbismuth, equivalent to 15%ofworldreserves&the world’slargestdeposit 240,000 11,000 10,000 10,000 5,000 5,000 39,000 48,661 - 50,000 100,000 150,000 200,000 250,000 300,000 China Peru Bolivia Mexico Canada Kazakhstan Other Countries NICO Tonnes World Bismuth Reserves NICO is the world’s largest deposit of bismuth * *Excluding NICO Source: USGS Industry Survey 2010 28
  • 29. NICO Project  Largescalegold-cobalt-bismuthdeposit  160km fromCity ofYellowknife  450km fromrailwayat Hay River  Highconcentrationratiousing simple flotation– 4,650 t ofore/day reduced to180 t ofconcentrate  Allowsshipping to Saskatchewanor third-partylowercostprocessor Saskatchewan Metals Processing Plant (SMPP)  Hydrometallurgical plant to process bulk concentrate from NICO  Plant will produce gold doré, cobalt sulphate &/or cobalt cathode, bismuth ingot & copper metal precipitate  Low cost power (5.7 cents kWh), skilled labour pool & 5 year tax holiday 29
  • 30.  5,140 Halease in southern NWT  Winteraccessroads  All-weatherroadplanned by governments tohighway (135 km)  $1.5millionin place forbaseline environmentalsurvey  Engineering &environmental work underway  450kmfromrailwayat Hay Riverfor transportofconcentratesto SMPP  160kmfromCity ofYellowknife  50kmfromTownofWhati  22kmfromSnareHydro– potential lower costpowersupply  Settledland claimswith TlichoGovernment 30
  • 31. Underground Mineral Reserves Tonnes Au (g/t) Co (%) Bi (%) Cu (%) Proven 282,000 4.93 0.14 0.27 0.03 Probable 94,000 5.6 0.11 0.19 0.01 Total 376,000 5.09 0.13 0.25 0.02 Open Pit Mineral Reserves Tonnes Au (g/t) Co (%) Bi (%) Cu (%) Proven 20,513,000 0.94 0.11 0.15 0.04 Probable 12,099,000 1.05 0.11 0.13 0.04 Total 32,612,000 0.98 0.11 0.14 0.04 Combined Mineral Reserves Tonnes Au (g/t) Co (%) Bi (%) Cu (%) Proven 20,795,000 0.99 0.11 0.15 0.04 Probable 12,193,000 1.09 0.11 0.13 0.04 Total 32,988,000 1.02 0.11 0.14 0.04 Contained Metal 1,085,000 ounces 82,268,000 pounds 102,053,000 pounds 27,179,000 pounds Note: Sums of the combined mineral reserves may not exactly equal sums of the underground and open pit reserves due to rounding. Reserve estimate by P&E Mining Consultants Inc., Eugene Puritch, P.Eng. & Fred Brown, CPG PrSciNat, Qualified Persons as defined by NI-43-101 31
  • 32. Riskmitigation  Testminingcompleted to confirmdeposit geometry &grades  ~$20 millionpre-productiondevelopment completedby Proconforwith 2 kmofdecline ramp, 2mine levels &ventilation raisetosurface  Largesamplescollectedforpilot plant testing  Pilotingcompletedtoconfirmprocessflowsheets, recoveries&productquality  Front-EndEngineering &Design(“FEED”)completed with~20%ofdetailed engineering formine concentrator&SMPP  Executionplaninplace forprojectdelivery  3rd party due-diligence completed onall aspects of project 32
  • 33.  Continuousflotationtests toproduce separatecobalt &bismuthconcentrates  Recoveryimprovementsforall metals  Provedprocessflowsheet, productionofhighvalue products  Cobaltpressure oxidation,precipitation&electrowinningtodemonstrateproductionof99.8%cobalt cathodeorsolventextraction&crystallizationto 20.9%cobalt sulphate  Bismuthferricchlorideleaching, productionof99.5%bismuth cathode as powder-Flux&smeltto >99.9%bismuthingot  Cyanidationforrecoveryofgold  Abilitytoproduce thickened tailings frombulk tailings Cobalt Sulphate (heptahydrate) Co 20.9% Cobalt Cathode Metal Co >99.95% Bismuth Ingot Bi >99.99% 33 Gold Doré
  • 34. PositiveFEED Study demonstrating very low costs& strong economics  Verticallyintegratedproject consistingofopenpit &undergroundmine, mill&hydrometallurgical refinery  Lowcapital costsof$441 million  Negativecashcostnet ofcredits  Significantdetailed engineering, reducing project risk  GoldenGiant Mine (Hemlo)equipment purchased&dismantled forrelocation  Metalrecoveriesverifiedfrompilot plants;  Goldrecoveryrangesfrom56 to85%, with anaverage of73.7%  Cobaltrecoveryof84%  Bismuthrecoveryof72%  Copperrecoveryof41%  Optimizationsbeing examined toimproveproject economics FEED Study Highlights – Base Case, Cobalt Sulphate Mine type Open pit with underground in 2nd year Mining method Open pit: conventional truck & loader Underground: blasthole open stoping Strip Ratio Waste to ore 3.0 : 1 Processing rate 4,650 tonnes of ore/day Mine life 19.8 years (potential for additional 3.2) Processing Processed to high value metal products Pre-tax NPV (7%) $308.5 million Pre-tax IRR 14.0% Capital costs $440.5 million LOM average revenue/yr $194 million LOM average operating cost/yr $97 million Cobalt operating cost (net of credits) Negative US$0.81/lb at Base Case Negative US$1.07/lb at Current Price Case 34
  • 35. NICO willbe a reliableCanadian-based producer of strategic metals:  Golddoré, 99.8%cobalt cathode &/or20.9%cobalt sulphate, 99.99%bismuth ingot, &a coppermetal precipitate $89 $61 $43 $1 $67 $69 $43 $2 0 10 20 30 40 50 60 70 80 90 100 Cobalt Sulphate Gold Bismuth Copper C$M Average Annual Revenue by Metal – Base Case (gold) & Recent Price (black) Annual Production 3,473,600 lbs 40,000 oz 3,681,800 lbs 559,400 lbs Base Case Price assumptions are US$1,450/troy ounce (“oz”) for gold, US$20/pound (“lb”) for cobalt, US$11/lb for bismuth and US$3.50/lb for copper at an exchange rate of US$ 0.95 = C$ 1. Recent Price assumptions are US$1,650/oz for gold, US$15/lb for cobalt, US$11/lb for bismuth and US$3.50/lb for copper at an exchange rate of US$ 0.95 = C$ 1. 35
  • 36. NICO has negative operating costs for all metalsnet of by-product credits  Demonstratesthat aftercapital has been repaid, operationscanbe sustainedduring periodsoflowmetal prices& volatility -$0.81 -$1.07 -$1.20 -$1.00 -$0.80 -$0.60 -$0.40 -$0.20 $0.00 Base Case Current Price CashCostNetofBy-Products($US/lb) Cobalt -$738.75 -$148.42 -$800 -$700 -$600 -$500 -$400 -$300 -$200 -$100 $0 Base Case Current Price CashCostNetofBy-Products($US/oz) Gold -$12.78 -$7.99 -$14 -$12 -$10 -$8 -$6 -$4 -$2 $0 Base Case Current Price CashCostNetofBy-Products($US/lb) Bismuth Note: Based on cobalt sulphate option. Base Case Price assumptions are US$1,450/troy ounce (“oz”) for gold, US$20/pound (“lb”) for cobalt, US$11/lb for bismuth and US$3.50/lb for copper at an exchange rate of US$ 0.95 = C$ 1. . The Current Price Case uses prices as at May 31, 2012 and are US$1,558.00/oz for gold, US$15.23/lb for cobalt, US$10.55/lb for bismuth and US$3.40/lb for copper and an exchange rate of US$ 0.97 = C$ 1. Mr. Alexander Duggan, P.Eng. and Mr. Graham Peter Holmes, P.Eng. of Jacobs are the Qualified Persons for Jacobs and Mr. Eugene Puritch, P.Eng. is the Qualified Person responsible for the work by P&E under NI 43-101. 36
  • 37. Significantopportunity existingto further strengthen project economics  Customprocessingofconcentratestodefer SMPP  Extendmine lifefor3+ yearswithstockpiledsubeconomicmaterial  Alternativepowersupply tomine to lowercosts  Moveforwardgoldproductionviaadditional undergroundmining to accesshighgrade material  Generateadditional returns fromSMPP  Customprocessingofconcentrates sourcedfromother minesglobally  Expansionpotential already designed  Significant commodity prices upside  Cobalt supply disruptions in DRC & less than expected production from laterites  Gold forward sales & political uncertainty  Bismuth supply decreases in China due to export quotas & increased environmental restrictions 37
  • 38. Progressing through final stagesof permitting process  EnvironmentalAssessmentswelladvanced formine &SMPPpermitting  Mine&millapprovedby FederalMinister&TlichoGovernment  ForSMPP,addendum toEnvironmental Impact Statementsubmitted forreview &public comment, afterwhichgovernmentapprovalwillbe pending Advanced relationships with Aboriginal groups  Signed Co-operative Relationship Agreement with Tlicho Government  Initiated Tlicho Participation Agreement (PA) Negotiations Project Financing & Development Options  Deloitte engaged to advise on project financing & development options, targeting a project level joint venture, potentially including:  Minority equity investment  Off-take relationship  Commitment to arrange debt financing for construction 38
  • 39. Proposed Development Timeline – Assumes access to full financing 39 2012 2013 2014 2015 2016 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 SMPP EA SMPP fully permitted NICO environmental review NICO Minister’s approval NICO fully permitted Financing Engineering & procurement Construction Commissioning Commercial operations
  • 40. Procon Private Placement  $11.7millionprivate placement toadvance NICOdevelopment &workingcapital  14%premiumtoclosingprice  29,250,000 Fortunesharesissued -Procon’sownership19.4%  Righttoappoint nomineeto board About Procon  Full-service mining contractor based in Vancouver  Majority owned by Beijing based China CAMC Engineering, a leading provider of international EPC services, contracting, trading, & international project investment  Procon & CAMC are subsidiaries of Sinomach – large Chinese SOE (revenues of US$ 34.6 billion)  Conducted 2006/2007 NICO underground test mining Next Steps  Fortune & Procon working to advance NICO project, secure Project Financing & complete execution plan for planned construction in 2014 40
  • 41.  Two advanced Canadian development assets  One of the world’s premier metallurgical coal developments, 1.1 million ozs. gold, 82 million lbs. cobalt & 15% of global bismuth reserves  $210 million combined expenditures  Positive Feasibility Studies, test mined, pilot plant processed & in permitting  Low cost production  Combined NPV’s approaching $1 billion  Experienced board & management team  Deloitte Corporate Finance engaged to secure strategic partners to finance both projects with minimal equity dilution 41
  • 42. Directors Mahendra Naik, B Comm, CA Chairman, Director CFO Fundeco - Founding director & former CFO, IAMGOLD George Doumet, MSc, MBA Honorary Chairman, Director Chemical Engineer – President & CEO, Federal White Cement Robin Goad, MSc, PGeo President & CEO, Director Geologist - 30 yrs mining & exploration experience David Knight, BA, LLB Secretary, Director Partner, Norton Rose Fulbright specializing in securities & mining law James Excell, BASc Director Metallurgical Engineer – 35 yrs mining experience BHP-Billiton William Breukelman, BASc, MBA, PEng Director Chemical Engineer – Chairman, Gedex James Currie, BSc (Hons), PEng Director Mining Engineer – COO, Elgin Mining The Honorable Carl L. Clouter Director Commercial pilot - former owner of charter airline in NWT Shou Wu (Grant) Chen, MSc, MBA Director Geologist – Deputy Chairman & CEO, China Mining Resources Group Ed Yurkowski Director CEO Procon Mining & Tunneling Management Julian Kemp, BBA, CA, C.Dir VP Finance & CFO Chartered Accountant – 20+ yrs mining financial experience Mike Romaniuk, BASc, PEng VP Operations & COO Geologist & Process Engineer – 25+ yrs engineering, mining & construction experience primarily with Xstrata Nickel & Falconbridge Bill Shepard Logistics Manager 15 yrs experience in procurement & logistics Richard Schryer, PhD Director Regulatory & Environmental Affairs Aquatic Scientist –20+ yrs experience in mine permitting & environmental assessments Adam Jean, HBA, CA Controller Chartered Accountant previously with Ernst & Young Mike Middaugh Project Controls Manager 20 yrs major construction & project management Keith Lee, BSc Senior Process Engineer 25 yrs operations, engineering & mineral processing experience Carl Kottmeier, MBA, PEng Project Manager Mining Engineer – 24 yrs engineering & operations experience Seok Joon Kim, MASc, PEng Senior Mining Engineer Mining Engineer – 10+ years operations & engineering experience 42
  • 43. Metal Price & Exchange Rate Case Cobalt Metal Option Cobalt Sulphate Option Pre-Tax After Tax Pre-Tax After Tax IRR % $M NPV (7%) $M NPV (5%) IRR % $M NPV (7%) $M NPV (5%) IRR % $M NPV (7%) $M NPV (5%) IRR % $M NPV (7%) $M NPV (5%) Base Case Prices 10.8 164.5 293.2 9.6 101.0 207.1 14.0 308.5 466.0 12.4 212.6 338.7 3-yr Trailing Average Prices 7.4 17.1 114.6 6.6 (15.3) 69.0 10.5 146.8 270.0 9.3 86.7 188.4 Current Prices 7.1 2.1 99.7 6.2 (30.6) 53.4 9.6 109.5 228.2 8.5 57.6 156.8 Escalated Prices 13.9 315.2 477.8 12.3 214.9 344.7 17.1 467.1 660.1 15.2 332.4 483.7 Optimistic Prices 18.3 539.5 749.8 16.3 387.5 551.3 21.6 707.0 951.1 19.3 514.5 702.3 Base Case Price assumptions are US$1,450/troy ounce (“oz”) for gold, US$20/pound (“lb”) for cobalt, US$11/lb for bismuth and US$3.50/lb for copper at an exchange rate of US$ 0.95 = C$ 1. The 3-year Trailing Average Prices Case are as at May 31, 2012 and are US$1,359.94/oz for gold, US$18.53/lb for cobalt, US$9.83/lb for bismuth and US$3.51/lb for copper and an exchange rate of US$ 0.98 = C$ 1. The Current Price Case uses prices as at May 31, 2012 and are US$1,558.00/oz for gold, US$15.23/lb for cobalt, US$10.55/lb for bismuth and US$3.40/lb for copper and an exchange rate of US$ 0.97 = C$ 1. The Escalated Price Case uses metal price assumptions of US$1,800.00/oz for gold, US$22.50/lb for cobalt, US$12.50/lb for bismuth and US$4.00/lb for copper and an exchange rate of US$ 1 = C$ 1. For the Optimistic Price Case uses US$2,000.00/oz for gold, US$25.00/lb for cobalt, US$15.00/lb for bismuth and US$4.50/lb for copper at an exchange rate of US$ 1 = C$ 1. Mr. Alexander Duggan, P.Eng. and Mr. Graham Peter Holmes, P.Eng. of Jacobs are the Qualified Persons for Jacobs and Mr. Eugene Puritch, P.Eng. is the Qualified Person responsible for the work by P&E under NI 43-101. 43
  • 44. 44
  • 45. 45
  • 46. 46
  • 47. 47