Q: How do you ensure that the ventilation scheme in your factory will work effectively?
A: Consider the sources of inlet air
Whether your factory is relatively airtight or not, you have to consider the fact that nature doesn’t like a
vacuum. If you try to extract air from an enclosed space and no air comes in to replace what you are
trying to extract, nothing will move. So it’s not enough to install a ventilation system; you also need a
path for air inlet. This blog post demonstrates that this needs careful design.
For air to come out, air must come in
Think of emptying a bottle by upending it over the sink: to empty it as fast as possible, you need to tilt
it so that the incoming air takes a different path to the outgoing fluid. Similarly,
when designing a ventilation system, it becomes essential to include ways to let
the air in, not just means of extracting the air.
The potential negative consequences
If there is insufficient air inlet, this can lead to negative pressure within the
building. Various things can happen. Dirt can be sucked in. If a process of
combustion is taking place, carbon monoxide can build up. The lack of effective
ventilation means that temperatures can rise excessively.
In and out: ensuring air velocities are not excessive
There is more. It is necessary to design the size of the inlet openings optimally
so that air velocities are not excessive. Many industrial processes, such as
glass manufacture (see previous blog), can be adversely affected by excessive
draughts.
© 2013 Colt International Licensing Ltd.
This illustration shows you what can happen if, for instance, you have 2 adjacent
buildings both with natural ventilation in the roof, but one is higher. If there is a
connection between the buildings, the outlet in the lower building does not function
as an outlet but as an inlet. So you need to increase the inlets at low level
dramatically in order to lower the neutral line, so that this theoretical line is below the
roof level of the lower building.
The solutions
The air inlet must be provided at low level, below the neutral plane, so that the ventilation scheme
operates efficiently. This can be achieved with ventilators in other areas of the building, or by using
doors or windows that open automatically or, if these are not sufficient, air inlet ventilators.
Effective design – CFD
Computational Fluid Dynamics analysis is a valuable tool for designing effective ventilation systems. It
can also help to assess the required areas of exhaust ventilation and air inlet, which need not be
identical.
If you need help with your ventilation system design or CFD analysis support, why not contact us for a
free consultation?
© 2013 Colt International Licensing Ltd.

Mais conteúdo relacionado

Mais de Colt UK

Smoke and environmental ventilation of multi-storey buildings using shafts we...
Smoke and environmental ventilation of multi-storey buildings using shafts we...Smoke and environmental ventilation of multi-storey buildings using shafts we...
Smoke and environmental ventilation of multi-storey buildings using shafts we...Colt UK
 
Seven good practices for pressurisation systems
Seven good practices for pressurisation systemsSeven good practices for pressurisation systems
Seven good practices for pressurisation systemsColt UK
 
Can car park ventilation schemes be more energy efficient? Yes – and they sho...
Can car park ventilation schemes be more energy efficient? Yes – and they sho...Can car park ventilation schemes be more energy efficient? Yes – and they sho...
Can car park ventilation schemes be more energy efficient? Yes – and they sho...Colt UK
 
Q&A from Dr John H Klotes webinar on design fires for smoke control
Q&A from Dr John H Klotes webinar on design fires for smoke controlQ&A from Dr John H Klotes webinar on design fires for smoke control
Q&A from Dr John H Klotes webinar on design fires for smoke controlColt UK
 
CPD Presentation Evaporative cooling in data centres
CPD Presentation   Evaporative cooling in data centresCPD Presentation   Evaporative cooling in data centres
CPD Presentation Evaporative cooling in data centresColt UK
 
The top three considerations when specifying glass louvred ventilators
The top three considerations when specifying glass louvred ventilatorsThe top three considerations when specifying glass louvred ventilators
The top three considerations when specifying glass louvred ventilatorsColt UK
 
CPD Presentation - Smoke control and environmental ventilation in residential...
CPD Presentation - Smoke control and environmental ventilation in residential...CPD Presentation - Smoke control and environmental ventilation in residential...
CPD Presentation - Smoke control and environmental ventilation in residential...Colt UK
 
CPD Presentation: Smoke curtains and fire curtains
CPD Presentation: Smoke curtains and fire curtainsCPD Presentation: Smoke curtains and fire curtains
CPD Presentation: Smoke curtains and fire curtainsColt UK
 
CPD Presentation: Key considerations when specifying weather louvres
CPD Presentation: Key considerations when specifying weather louvresCPD Presentation: Key considerations when specifying weather louvres
CPD Presentation: Key considerations when specifying weather louvresColt UK
 
People feel better in colt conditions
People feel better in colt conditions People feel better in colt conditions
People feel better in colt conditions Colt UK
 
CPD Presentation: Pressurisation
CPD Presentation: PressurisationCPD Presentation: Pressurisation
CPD Presentation: PressurisationColt UK
 
CPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using ShaftsCPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using ShaftsColt UK
 
CPD Presentation: Car Park Ventilation
CPD Presentation: Car Park VentilationCPD Presentation: Car Park Ventilation
CPD Presentation: Car Park VentilationColt UK
 
CPD Presentation: General Principles of Smoke Control
CPD Presentation: General Principles of Smoke ControlCPD Presentation: General Principles of Smoke Control
CPD Presentation: General Principles of Smoke ControlColt UK
 
You want to improve your factory’s productivity: what’s next?
You want to improve your factory’s productivity: what’s next?You want to improve your factory’s productivity: what’s next?
You want to improve your factory’s productivity: what’s next?Colt UK
 
Can your factory be more productive?
Can your factory be more productive?Can your factory be more productive?
Can your factory be more productive?Colt UK
 
Are you sure your natural ventilation system is really energy efficient?
Are you sure your natural ventilation system is really energy efficient?Are you sure your natural ventilation system is really energy efficient?
Are you sure your natural ventilation system is really energy efficient?Colt UK
 
When is a U value real?
When is a U value real?When is a U value real?
When is a U value real?Colt UK
 
Questions and answers from Paul Compton's pressurisation webinar
Questions and answers from Paul Compton's pressurisation webinar Questions and answers from Paul Compton's pressurisation webinar
Questions and answers from Paul Compton's pressurisation webinar Colt UK
 
The Lakanal House inquest and Local Authority tower blocks
The Lakanal House inquest and Local Authority tower blocksThe Lakanal House inquest and Local Authority tower blocks
The Lakanal House inquest and Local Authority tower blocksColt UK
 

Mais de Colt UK (20)

Smoke and environmental ventilation of multi-storey buildings using shafts we...
Smoke and environmental ventilation of multi-storey buildings using shafts we...Smoke and environmental ventilation of multi-storey buildings using shafts we...
Smoke and environmental ventilation of multi-storey buildings using shafts we...
 
Seven good practices for pressurisation systems
Seven good practices for pressurisation systemsSeven good practices for pressurisation systems
Seven good practices for pressurisation systems
 
Can car park ventilation schemes be more energy efficient? Yes – and they sho...
Can car park ventilation schemes be more energy efficient? Yes – and they sho...Can car park ventilation schemes be more energy efficient? Yes – and they sho...
Can car park ventilation schemes be more energy efficient? Yes – and they sho...
 
Q&A from Dr John H Klotes webinar on design fires for smoke control
Q&A from Dr John H Klotes webinar on design fires for smoke controlQ&A from Dr John H Klotes webinar on design fires for smoke control
Q&A from Dr John H Klotes webinar on design fires for smoke control
 
CPD Presentation Evaporative cooling in data centres
CPD Presentation   Evaporative cooling in data centresCPD Presentation   Evaporative cooling in data centres
CPD Presentation Evaporative cooling in data centres
 
The top three considerations when specifying glass louvred ventilators
The top three considerations when specifying glass louvred ventilatorsThe top three considerations when specifying glass louvred ventilators
The top three considerations when specifying glass louvred ventilators
 
CPD Presentation - Smoke control and environmental ventilation in residential...
CPD Presentation - Smoke control and environmental ventilation in residential...CPD Presentation - Smoke control and environmental ventilation in residential...
CPD Presentation - Smoke control and environmental ventilation in residential...
 
CPD Presentation: Smoke curtains and fire curtains
CPD Presentation: Smoke curtains and fire curtainsCPD Presentation: Smoke curtains and fire curtains
CPD Presentation: Smoke curtains and fire curtains
 
CPD Presentation: Key considerations when specifying weather louvres
CPD Presentation: Key considerations when specifying weather louvresCPD Presentation: Key considerations when specifying weather louvres
CPD Presentation: Key considerations when specifying weather louvres
 
People feel better in colt conditions
People feel better in colt conditions People feel better in colt conditions
People feel better in colt conditions
 
CPD Presentation: Pressurisation
CPD Presentation: PressurisationCPD Presentation: Pressurisation
CPD Presentation: Pressurisation
 
CPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using ShaftsCPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using Shafts
 
CPD Presentation: Car Park Ventilation
CPD Presentation: Car Park VentilationCPD Presentation: Car Park Ventilation
CPD Presentation: Car Park Ventilation
 
CPD Presentation: General Principles of Smoke Control
CPD Presentation: General Principles of Smoke ControlCPD Presentation: General Principles of Smoke Control
CPD Presentation: General Principles of Smoke Control
 
You want to improve your factory’s productivity: what’s next?
You want to improve your factory’s productivity: what’s next?You want to improve your factory’s productivity: what’s next?
You want to improve your factory’s productivity: what’s next?
 
Can your factory be more productive?
Can your factory be more productive?Can your factory be more productive?
Can your factory be more productive?
 
Are you sure your natural ventilation system is really energy efficient?
Are you sure your natural ventilation system is really energy efficient?Are you sure your natural ventilation system is really energy efficient?
Are you sure your natural ventilation system is really energy efficient?
 
When is a U value real?
When is a U value real?When is a U value real?
When is a U value real?
 
Questions and answers from Paul Compton's pressurisation webinar
Questions and answers from Paul Compton's pressurisation webinar Questions and answers from Paul Compton's pressurisation webinar
Questions and answers from Paul Compton's pressurisation webinar
 
The Lakanal House inquest and Local Authority tower blocks
The Lakanal House inquest and Local Authority tower blocksThe Lakanal House inquest and Local Authority tower blocks
The Lakanal House inquest and Local Authority tower blocks
 

Último

Abdulaziz Tariq Abdulaziz Mustafa CV 2024
Abdulaziz Tariq Abdulaziz Mustafa CV 2024Abdulaziz Tariq Abdulaziz Mustafa CV 2024
Abdulaziz Tariq Abdulaziz Mustafa CV 2024Abdulaziz Mustafa
 
一比一原版格林威治大学毕业证成绩单如何办理
一比一原版格林威治大学毕业证成绩单如何办理一比一原版格林威治大学毕业证成绩单如何办理
一比一原版格林威治大学毕业证成绩单如何办理cyebo
 
Heidi Livengood's Professional CADD Portfolio
Heidi Livengood's Professional CADD PortfolioHeidi Livengood's Professional CADD Portfolio
Heidi Livengood's Professional CADD PortfolioHeidiLivengood
 
Eric Parein CV. Parein in English is best pronounced as PARE-IN
Eric Parein CV. Parein in English is best pronounced as PARE-INEric Parein CV. Parein in English is best pronounced as PARE-IN
Eric Parein CV. Parein in English is best pronounced as PARE-INEric Parein
 
Claire's designing portfolio presentation
Claire's designing portfolio presentationClaire's designing portfolio presentation
Claire's designing portfolio presentationssuser8fae18
 
Heuristic Evaluation of System & Application
Heuristic Evaluation of System & ApplicationHeuristic Evaluation of System & Application
Heuristic Evaluation of System & ApplicationJaime Brown
 
Redefining Globalization, urbanisation and Localisation
Redefining Globalization, urbanisation and LocalisationRedefining Globalization, urbanisation and Localisation
Redefining Globalization, urbanisation and LocalisationJIT KUMAR GUPTA
 
Presentation on 3D Printing.pptx presentation
Presentation on 3D Printing.pptx presentationPresentation on 3D Printing.pptx presentation
Presentation on 3D Printing.pptx presentationajroy0196
 
Dos And Dont's Of Logo Design For 2024..
Dos And Dont's Of Logo Design For 2024..Dos And Dont's Of Logo Design For 2024..
Dos And Dont's Of Logo Design For 2024..GB Logo Design
 
The Impact of Artificial Intelligence on Modern Healthcare.pptx
The Impact of Artificial Intelligence on Modern Healthcare.pptxThe Impact of Artificial Intelligence on Modern Healthcare.pptx
The Impact of Artificial Intelligence on Modern Healthcare.pptxDoraemon495609
 
iF_Design_Trend_Report_twentytwenrythree
iF_Design_Trend_Report_twentytwenrythreeiF_Design_Trend_Report_twentytwenrythree
iF_Design_Trend_Report_twentytwenrythreeCarlgaming1
 
Art Nouveau Movement Presentation for Art History.
Art Nouveau Movement Presentation for Art History.Art Nouveau Movement Presentation for Art History.
Art Nouveau Movement Presentation for Art History.rrimika1
 
Pitch Presentation for Service Design in Technology
Pitch Presentation for Service Design in TechnologyPitch Presentation for Service Design in Technology
Pitch Presentation for Service Design in TechnologyJaime Brown
 
Design Portofolios - Licensed Architect / BIM Specialist
Design Portofolios - Licensed Architect / BIM SpecialistDesign Portofolios - Licensed Architect / BIM Specialist
Design Portofolios - Licensed Architect / BIM SpecialistYudistira
 
Extended Reality(XR) Development in immersive design
Extended Reality(XR) Development in immersive designExtended Reality(XR) Development in immersive design
Extended Reality(XR) Development in immersive designGOWSIKRAJA PALANISAMY
 
一比一原版谢菲尔德大学毕业证成绩单如何办理
一比一原版谢菲尔德大学毕业证成绩单如何办理一比一原版谢菲尔德大学毕业证成绩单如何办理
一比一原版谢菲尔德大学毕业证成绩单如何办理cyebo
 
Recycled Modular Low Cost Construction .pdf
Recycled Modular Low Cost Construction .pdfRecycled Modular Low Cost Construction .pdf
Recycled Modular Low Cost Construction .pdfjeffreycarroll14
 
FW25-26 Fashion Key Items Trend Book Peclers Paris
FW25-26 Fashion Key Items Trend Book Peclers ParisFW25-26 Fashion Key Items Trend Book Peclers Paris
FW25-26 Fashion Key Items Trend Book Peclers ParisPeclers Paris
 
Knowing, Understanding and Planning Cities- Role and Relevance Physical Plan...
Knowing, Understanding and Planning Cities- Role and Relevance  Physical Plan...Knowing, Understanding and Planning Cities- Role and Relevance  Physical Plan...
Knowing, Understanding and Planning Cities- Role and Relevance Physical Plan...JIT KUMAR GUPTA
 
Week of Action 2022_EIT Climate-KIC_Headers
Week of Action 2022_EIT Climate-KIC_HeadersWeek of Action 2022_EIT Climate-KIC_Headers
Week of Action 2022_EIT Climate-KIC_Headersekinlvnt
 

Último (20)

Abdulaziz Tariq Abdulaziz Mustafa CV 2024
Abdulaziz Tariq Abdulaziz Mustafa CV 2024Abdulaziz Tariq Abdulaziz Mustafa CV 2024
Abdulaziz Tariq Abdulaziz Mustafa CV 2024
 
一比一原版格林威治大学毕业证成绩单如何办理
一比一原版格林威治大学毕业证成绩单如何办理一比一原版格林威治大学毕业证成绩单如何办理
一比一原版格林威治大学毕业证成绩单如何办理
 
Heidi Livengood's Professional CADD Portfolio
Heidi Livengood's Professional CADD PortfolioHeidi Livengood's Professional CADD Portfolio
Heidi Livengood's Professional CADD Portfolio
 
Eric Parein CV. Parein in English is best pronounced as PARE-IN
Eric Parein CV. Parein in English is best pronounced as PARE-INEric Parein CV. Parein in English is best pronounced as PARE-IN
Eric Parein CV. Parein in English is best pronounced as PARE-IN
 
Claire's designing portfolio presentation
Claire's designing portfolio presentationClaire's designing portfolio presentation
Claire's designing portfolio presentation
 
Heuristic Evaluation of System & Application
Heuristic Evaluation of System & ApplicationHeuristic Evaluation of System & Application
Heuristic Evaluation of System & Application
 
Redefining Globalization, urbanisation and Localisation
Redefining Globalization, urbanisation and LocalisationRedefining Globalization, urbanisation and Localisation
Redefining Globalization, urbanisation and Localisation
 
Presentation on 3D Printing.pptx presentation
Presentation on 3D Printing.pptx presentationPresentation on 3D Printing.pptx presentation
Presentation on 3D Printing.pptx presentation
 
Dos And Dont's Of Logo Design For 2024..
Dos And Dont's Of Logo Design For 2024..Dos And Dont's Of Logo Design For 2024..
Dos And Dont's Of Logo Design For 2024..
 
The Impact of Artificial Intelligence on Modern Healthcare.pptx
The Impact of Artificial Intelligence on Modern Healthcare.pptxThe Impact of Artificial Intelligence on Modern Healthcare.pptx
The Impact of Artificial Intelligence on Modern Healthcare.pptx
 
iF_Design_Trend_Report_twentytwenrythree
iF_Design_Trend_Report_twentytwenrythreeiF_Design_Trend_Report_twentytwenrythree
iF_Design_Trend_Report_twentytwenrythree
 
Art Nouveau Movement Presentation for Art History.
Art Nouveau Movement Presentation for Art History.Art Nouveau Movement Presentation for Art History.
Art Nouveau Movement Presentation for Art History.
 
Pitch Presentation for Service Design in Technology
Pitch Presentation for Service Design in TechnologyPitch Presentation for Service Design in Technology
Pitch Presentation for Service Design in Technology
 
Design Portofolios - Licensed Architect / BIM Specialist
Design Portofolios - Licensed Architect / BIM SpecialistDesign Portofolios - Licensed Architect / BIM Specialist
Design Portofolios - Licensed Architect / BIM Specialist
 
Extended Reality(XR) Development in immersive design
Extended Reality(XR) Development in immersive designExtended Reality(XR) Development in immersive design
Extended Reality(XR) Development in immersive design
 
一比一原版谢菲尔德大学毕业证成绩单如何办理
一比一原版谢菲尔德大学毕业证成绩单如何办理一比一原版谢菲尔德大学毕业证成绩单如何办理
一比一原版谢菲尔德大学毕业证成绩单如何办理
 
Recycled Modular Low Cost Construction .pdf
Recycled Modular Low Cost Construction .pdfRecycled Modular Low Cost Construction .pdf
Recycled Modular Low Cost Construction .pdf
 
FW25-26 Fashion Key Items Trend Book Peclers Paris
FW25-26 Fashion Key Items Trend Book Peclers ParisFW25-26 Fashion Key Items Trend Book Peclers Paris
FW25-26 Fashion Key Items Trend Book Peclers Paris
 
Knowing, Understanding and Planning Cities- Role and Relevance Physical Plan...
Knowing, Understanding and Planning Cities- Role and Relevance  Physical Plan...Knowing, Understanding and Planning Cities- Role and Relevance  Physical Plan...
Knowing, Understanding and Planning Cities- Role and Relevance Physical Plan...
 
Week of Action 2022_EIT Climate-KIC_Headers
Week of Action 2022_EIT Climate-KIC_HeadersWeek of Action 2022_EIT Climate-KIC_Headers
Week of Action 2022_EIT Climate-KIC_Headers
 

Considering the sources of inlet air to ensure effective ventilation in your factory

  • 1. Considering the sources of inlet air to ensure effective ventilation in your factory Q: How do you ensure that the ventilation scheme in your factory will work effectively? A: Consider the sources of inlet air Whether your factory is relatively airtight or not, you have to consider the fact that nature doesn’t like a vacuum. If you try to extract air from an enclosed space and no air comes in to replace what you are trying to extract, nothing will move. So it’s not enough to install a ventilation system; you also need a path for air inlet. This blog post demonstrates that this needs careful design. For air to come out, air must come in Think of emptying a bottle by upending it over the sink: to empty it as fast as possible, you need to tilt it so that the incoming air takes a different path to the outgoing fluid. Similarly, when designing a ventilation system, it becomes essential to include ways to let the air in, not just means of extracting the air. The potential negative consequences If there is insufficient air inlet, this can lead to negative pressure within the building. Various things can happen. Dirt can be sucked in. If a process of combustion is taking place, carbon monoxide can build up. The lack of effective ventilation means that temperatures can rise excessively. In and out: ensuring air velocities are not excessive There is more. It is necessary to design the size of the inlet openings optimally so that air velocities are not excessive. Many industrial processes, such as glass manufacture (see previous blog), can be adversely affected by excessive draughts. © 2013 Colt International Licensing Ltd.
  • 2. This illustration shows you what can happen if, for instance, you have 2 adjacent buildings both with natural ventilation in the roof, but one is higher. If there is a connection between the buildings, the outlet in the lower building does not function as an outlet but as an inlet. So you need to increase the inlets at low level dramatically in order to lower the neutral line, so that this theoretical line is below the roof level of the lower building. The solutions The air inlet must be provided at low level, below the neutral plane, so that the ventilation scheme operates efficiently. This can be achieved with ventilators in other areas of the building, or by using doors or windows that open automatically or, if these are not sufficient, air inlet ventilators. Effective design – CFD Computational Fluid Dynamics analysis is a valuable tool for designing effective ventilation systems. It can also help to assess the required areas of exhaust ventilation and air inlet, which need not be identical. If you need help with your ventilation system design or CFD analysis support, why not contact us for a free consultation? © 2013 Colt International Licensing Ltd.