Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
My portfolio (2012)
1. Clifford Loh’s
Portfolio
d (2012)
ealan
ew Z
o, N
tag
n, O
rde
Ga
wn
to
ns
ee
Qu
Architecture
2. PROLOGUE
Education Intern Assistant Architect
Pursuing a multidisciplinary career in University of Tasmania LLA Architects Veritas Design Group
designing, construction, consultation and Master of Architecture (M.Arch.),
development. Architecture April 2009 - July 2009 (4 months) July 2010 - January 2011 (7 months)
2011 – 2012
Specialities: Interested in realising Worked full-time as part of a 3-month Worked 7 months as a full-time assistant
interesting spatial concepts; highly Universiti Putra Malaysia internship for the course. Job architect. Job responsibilities includes
enthusiastic; creative and innovative Bachelor of Design (Architecture), responsibilities: from drafting of building conducting simple feasibility studies
in problem solving; determine and Architecture plans, surveying construction site, for clients at early stages of the design
consistent. 2007 – 2010 providing design concepts to clients and proposal, building design at the design
even brainstorming ideas on ways to development stage, conducting site
Strong communication/public speaking Chung Ling High School improve the company’s image. inspections with fellow project managers,
skills- fluent in English, Mandarin, Bahasa Sciences attending architectural conferences
Malaysia and Hokkien. 2000 – 2006 Reference as well as participating in a couple of
Ar Laurence Loh architecture competitions.
22, Gerbang Midlands
Contact info Independent Coursework:
10250 Penang, Malaysia Building design, master planning, 3D
British Council English for School
Phone: +6042270076 modelling
Clifford Loh Jia Yang
42, Jalan Bintang, Seasoned user of modelling and graphics
softwares: Reference
Tanjung Bungah, Eric Tham
11200 Penang, Malaysia Rhino, SketchUp, AutoCAD, Illustrator,
Photoshop, InDesign, PowerPoint Level 5.04, Menara Boustead Penang
Phone: +60174666505 39, Jalan Sultan Ahmad Shah
Email: cliffordlohjiayang@gmail.com 10050 Penang, Malaysia
also:
Revit, 3ds Max, Ulead VideoStudio, After Phone: +6042278977
Bendigo Bank, Bendigo, Victoria, Australia (2012) Effects, Cinema 4D General Post Office, Bendigo, Victoria, Australia (2012)
with plugins:
Podium, VRay, Kerkythea, Artlantis,
Grasshopper
3. 01 SELF-DISCOVERY
Self-discovery, expressing myself with the aid of technology Expressed architecturally and digitally, ‘pixels’ made out of LED panels and
speakers
‘Cloud-based’ architecture
Exposition of the self
ARC 3010 Specialised Architectural Design 1
The project’s primary objective is as an
initiation to a more individualistic and
inspiration-based approach to design, in
contrast to more systematic or algorithmic
based design processes. The exercise
requires response to context and brief on
individual selected parameters for more
idiosyncratic solutions to the same design
brief.
Interior materialised out of thin air, with careful placement of ‘pixels’ ‘Pixel cloud’ ‘Pixels’ form part of the elevation ‘screens’
Project size: 150-200sqm, max height 20m
Project medium: SketchUp, AutoCAD,
Illustrator, Photoshop, PowerPoint
Project duration: 3 weeks (completed 13th
August 2009)
4. 02 ANALOGUE Kampung Boy Gallery
ARC 3003 Architectural Design Studio 4
The project is to propose the design of
a gallery meant for exhibiting the work
of Datuk Lat, who is internationally
known for the “The Kampung Boy”, a
cartoon novel depicting his experience
of growing up in the village. The
challenge for this project is to use
the ideas from the novel as the main
concept for the overall design.
Project size: 1900sqm
Project medium: ink, pencil, marker
Project duration: 6 weeks (completed
9th April 2009)
Archaeological gallery
ARC 3003 Architectural Design Studio 4
A team of archaeologists will be starting
the archaeological process soon and
we have been assigned to design an
archaeological gallery which will provide
temporary shelter and serve as a viewing
gallery.
Project size: 700sqm
Project medium: ink, pencil, marker
Project duration: 4 weeks (completed The entire structure is placed carefully above a historical fort The form and skin articulation of the building is inspired by the storyline of “The Kampung Boy” and the
12th February 2009) where archaeological activities are to take place environment
5. 03 FOLDING ARCHITECTURE
Urban Lung Urban Strip
ARC 3011 Specialised Architectural Design 2 ARC 3011 Specialised Architectural Design 2
The green building centre is a one-stop The objective is to facilitate the spaces
source of “green” information, products, within the Anti-Object (part one of the
resources, and expert support to help project) for the function of stripping down
members in the building industry and the for the enjoyment and pleasures of water.
public to create a healthy, environmentally The task is to add the function of cooling,
friendly, energy efficient and sustainable refreshing and reinvigorating to the Anti-
building through education and examples. object on site with the element of water in
the form of swimming baths.
Project size: 5000sqm
Project medium: SketchUp, AutoCAD, Project size: 180sqm
Illustrator, Photoshop, Podium Project medium: SketchUp, AutoCAD,
Project duration: 12 weeks (completed 8th Illustrator, Photoshop, Podium
April 2010) Project duration: 3 weeks (completed 21st
Urban lung, a series of paper-folding-inspired spaces suspended in midair January 2010)
The project was designed to suit a capricious personality
before the function was added to rid of preconceived
Urban lung, sectional perspective Urban strip, perspectives of the pool Urban strip, section notion of how a public bath should be designed
6. 04 PARAMETRICS
The Ethological City (gp. proj.)
KDA 711 Design Studio 7 Using free form modelling software The final part of the project involves making
Project size: 9000sqm to ‘form find’ a building-sized object an urban and architectural proposition
Project medium: Rhino, Grasshopper, through ‘data visualisation’ of urban for the site that responds to selected
SketchUp,AutoCAD,Cinema4D, Illustrator, and architectural parameters. Develop a conceptual, environmental, social and
Photoshop, 3ds Max, VRay, laser cutter, method of working that moves from ‘form cultural parameters. Consider the building,
CNC router modelling’ to ‘performance-testing’ to and its relationship with this environment
Project duration: 12 weeks (completed 6th ‘form modification’ to ‘ fabrication until and context as a ‘whole system’ which
June 2011) the ‘final fabrication’ of the prototype. contributes positively to the environment. Parametric modelling using Rhino + Grasshopper Performance testing using Cinema 4D
7. 05 DESIGN RESEARCH From Realm to Realm
ARC 3010 Specialised Architectural Design 1
This task takes place during the practical
training period, whereby we are to record
and assess experiences of public spaces
and amenities encountered throughout
the period. Findings are presented upon
the start of the semester.
Project size: -
Project medium: ink, pencil, marker
Project duration: 12 weeks (completed
20th July 2009)
Three urban precincts within George Town, Penang were thoroughly observed and researched to provide relevant information in critiquing urban design, which includes street furniture and wayfinding The three districts researched are Campbell Street, Little India and Upper Penang Road
Launceston is an old city designed before
Design/research and ‘make’ the invention of the automobile, which has
shortened commutes and “shrunk” urban
project + exegesis landscapes. Since the invention of the
automobile, cities are being designed to
KDA 722 Design Research Methods
be noticed at speeds, while the historical
core is slowly being “retrofitted” to do so,
Project size: -
sometimes at the expense of people-scale
Project medium: After Effects, Photoshop
as defined by Jan Gehl.
Project duration: 15 weeks (completed
650m of York St.’s elevation is composed of frame-captured shots from a video recorded while driving at close to 50km/h. The parts in colour are most likely the only detail that is easily read at that speed,
11th October 2011)
while the rest in grey are just blurred away
8. 06 COMPETITIONS
Pedestrian Bridge (group project) Urban Renewal for Penang
A competition organised by the City Hall of
Rifle Range (group project)
Kuala Lumpur, the objective is to come up
The main objective of this competition is
with a pedestrian bridge that encapsulate
to get creative ideas and practical solution
what makes urban living in the city so
in redeveloping an existing housing area
unique. We envision our proposal to suit
in Rifle Range, Penang into a vibrant,
the heritage zones of the city, and at the
sustainable and well-planned residential
same time tell a story of the millions of
and commercial area.
people that actually cross path.
Project size: overall site area of 19 acres
Project size: -
Project medium: SketchUp, AutoCAD,
Project medium: SketchUp, AutoCAD,
Illustrator, Photoshop, 3ds Max, VRay, ink,
Illustrator, Photoshop, Podium
pencil, marker
Project duration: 2 weeks (completed
Project duration: 12 weeks (completed
September 2009)
15th September 2010)
9. The act of taking apart and reconstructing
the senses in public is, in itself, performative.
07 PROFESSIONAL PROJECT The product of the deconstruction is part
of the display, which interrogates the
The project seeks to open up the idea of composition of performing arts, leading to
performance to “performative space” to new interpretation of the work.
foster an appreciation of the arts amongst
the locals in the context of globalisation of
the performing arts and new media arts.
Traditional street performances, the kotai
(Chinese mobile stage) and wayang kulit
(Malay shadow play) both inspire the
project’s conceptualisation.
Through architecture in this project, the
TheGeorgeTown Performing urban public spectator is physically and
Arts & Media Centre The building as an instrument for the sensorially intertwined with audiences and
deconstruction of performing arts through the institutional spaces of performing arts
KDA 753 Professional Project 1 the senses, which are then reconstructed (institutional) spaces, leading to new forms
KDA 754 Professional Project 2 and projected back into the urban stage, of interactivity.
Street performances bring together whereby stages occupy the streets and
Project size: 6750sqm the senses into a holistic art form. The building facades act as backdrops and
Project medium: SketchUp, AutoCAD, importance in the absence of any senses screens. This opens up the possibilities
Rhino, Illustrator, Photoshop, InDesign heightens the perceived awareness of for the public to interrogate the
Project duration: 7 months (completed the others, making tangible what is composition of the art forms, creating new proscenium configuration concert hall configuration playhouse + amphitheatre
29th October 2012) intangible. interpretations.
10. EPILOGUE
Awards and recognitions Studio projects Subjects
Third Year First Semester (2009/10-1)
Penang Rifle Range Competition, 4th place Architectural Design Studio 1: First Year First Semester (2007/08-1) 1.ARC 3010 Specialised Architectural Design 1
DBKL Pedestrian Bridge Design (Heritage Zone), 1.2d Exploration 1.ARC 3000 Architectural Design Studio 1 2.ARC 3402 Structure 3
category winner, 2009 2.3d Exploration 2.ARC 3100 Graphics 1 3.ARC 3510 Building Services 3
Venice Biennale exhibition, shortlisted, 2009 3.Exploration Of Light, Sound And Movement 3.ARC 3111Technical Drawing 4.ARC 3801 Practical Training
Architectural Design Excellence Award, 2008 4.ARC 3210 History Of Southeast Asian Architecture 5.ARC 4120 Cad Application
Academic Excellence (GPA 4.0), 2009 Architectural Design Studio 2 5.ARC 3400 Structure 1 6.ARC 4611 Socio-Cultural Environment 2
Academic Excellence, 2010 1.Floating Object (Exploration) 6.ARC 3800 Architectural Practice 7.ARC 4700 Theory Of Town And Regional Planning
2.Sitting Area (Reading Corner) 7.SKP 2010 Malaysia Nationhood
3.Fisherman’s Wharf Third Year Second Semester (2009/10-2)
First Year Second Semester (2007/08-2)
Websites Architectural Design Studio 3 1.ARC 3001 Architectural Design Studio 2
1.ARC 3011 Specialised Architectural Design 2
2.ARC 3302 Material And Construction Technology
1.Mini Eco-Resort (Habitable Sculpture) 2.ARC 3101 Graphics 2 3.ARC 3511 Building Services 4
2.Mini Eco-Resort (Residential Unit Prototype) 3.ARC 3110 Architectural Communications 4.ARC 4612 Environmental Behaviour Study
LinkedIn: http://my.linkedin.com/in/cliffordloh/ 3.Mini Eco-Resort (Main Facilities) 4.ARC 3200 History And Theory Of Architecture 1
Flickr: http://www.flickr.com/photos/cliffloh/ 5.ARC 4710 Project Management
5.ARC 3300 Material And Construction Technology 1
Instagram: http://instagram.com/cliffordloh/ Khoo Kongsi, Penang, Malaysia (2010) In studio, School of Architecture CUHK, Hong Kong (2010)
Architectural Design Studio 4 6.ARC 3600 Environmental Physics 1 Forth Year First Semester (2011-1)
Pinterest: http://pinterest.com/cliffordloh/ 1.Archaeological Gallery 7.SKP 2204 Ethnic Relationship 1.KDA 711 Design Studio 7
2.Kampung Boy Gallery 2.KDA 712 Professional Studies
Second Year First Semester (2008/09-1) 3.KDA 713 Building Technology & Design 7
Specialised Architectural Design 1 1.ARC 3002 Architectural Design Studio 3
1.From Realm To Realm 2.ARC 3120 Computer Graphic Forth Year Second Semester (2011-2)
2.Exposition Of The Self 3.ARC 3201 History And Theory Of Architecture 2 1.KDA 721 Design Studio 8
3.Amphibious [Boatel] 4.ARC 3310 Site Development 2.KDA 722 Design Research Methods
5.ARC 3401 Structure 2 3.KDA 723 Building Technology in Design 8
Specialised Architectural Design 2 6.ARC 3500 Building Services 1
1.Urban Strip 7.ARC 3601 Environmental Physics 2 Fifth Year First Semester (2012-1)
2.Inhabiting The Urban Lung 8.SKP 2203 Islamic Civilisation And Asian Civilisation 1.KDA 751 Design Studio 9
2.KDA 752 Advanced Design Research
Design Studio 7 Second Year Second Semester (2008/09-2) 3.KDA 753 Professional Project 1
1.The Ethological City 1.ARC 3003 Architectural Design Studio 4
2.ARC 3220 History Of Islamic Architecture Fifth Year Second Semester (2012-2)
Design Studio 8 3.ARC 3301 Material & Construction Technology 2 1.KDA 754 Professional Project 2
1.Informal Urbanism 4.ARC 3501 Building Services 2
5.ARC 4113 Construction Drawing
Millennium Plaza, Penang, Malaysia (2010) Professional Project 6.ARC 4610 Socio-Cultural Environment 1 Royal Botanical Gardens, Hobart, Australia (2011)
1.George Town Performing Arts and Media Centre 7.PRT 2008 Agriculture And Man