SlideShare uma empresa Scribd logo
1 de 24
First Solutions Limited  Data Division
PPS Data Solutions History PPS Data Solutions Limited (PDSL), operates as a joint venture company originally formed in 2003 between John Cameron (PCTS Developer) and The PPS Group. The company holds all software rights to the PCTS application. The company was originally formed as a 50 / 50 partnership serving the Chinese Energy Industry and has since partnered in other regions with PPS Group companies.  PPS Group companies have supplied PCTS via distribution agreements where the PPS Group Companies issue the PCTS licences to respective clients since 2004. PPS Data solutions provide all support and maintenance to the PPS group companies relating to PCTS supply and servicing..
PPS Data Solutions Structure PPS Data Solutions (Software Owner) PPS Group (PCTS Distributor) FSL  (Software Licencee) PPS Nigeria Ltd (Software Licencee)
FSL Data Division History First Solutions Limited (FSL), operates as a joint venture company originally formed between China Offshore Oil Nanhai East Corp (subsidiary of CNOOC) and The PPS Group.  Serving the Chinese Energy Industry, the synergies between these companies brings together proven leading edge technology and expertise, with Chinese knowledge, market insight, and cost advantages. Initially developed in the North Sea by engineers, for engineers, FSL Data Division offers Contractors, Fabricators, and Operators  a range of low cost, project control and maintenance management information solutions, designed to deliver real commercial and operational benefits.
PCTS modules have previously been adopted by both ELF Exploration (Paris) and Total Fina (Paris) for use on their projects prior to their merger. The system was exclusively used on the Elf Elgin PUQ (UK 2000) and subsequent hook up, Girassol (Angola 2001), Total’s South Pars projects (Korea & Iraq 2001), Enel Power’s Jebil Ali Phase 3 (UAE 2002). 2003 - Devon Energy China Ltd, (Panyu 4-2 and Panyu 5-1), 2004 CNOOC China Ltd, and CCLS (CNOOC Shenzhen) for the HuiZhou Terminal.  2005 – Present: SPDC (Nigeria) for the Okoloma gas to power projects. Main contractors include Barmac/Halliburton/KBR (UK) , Hyundai (Korea)  TPG (Paris), Enel Projects, (Milan), Alcon (Nigeria). Engineering companies having utilized the software to satisfy project deliverables include: MacDermotts, (Wembley and Nigg Bay), TPG Engineering (Technip) (Paris & Nigg), Bougyues Offshore (Paris and Korea), Foster Wheeler (Paris), Impac Offshore (Hamburg), Saipem (Okoloma project, Nigeria). PCTS History
Areas of Operation - Modules -  Typical Users Vendor Document Control  - Europe Project Workscope Co-Ordination - Europe, Africa, Asia Job Carding / Task Management - UK and Caspian Region
Areas of Operation - Modules -  Typical Users QA/QC Systems Management & Tracking - UK, North Sea, & Norway Maintenance  Management -  CMMS Modules - UK, North Sea, & China
Quotes : ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Problem Definition   The following diagrams identify project stages and trace the ultimate root of common problems faced by project management teams during large-scale construction contracts involving plant and equipment.   Post Operations Pre - Operations Conceptual & Detailed Design Construction Commissioning Handover and Start Up Operations Project Phases
Major Problem Causes Primary Problem Roots   Typical Problems through the Phases “ Project overruns on initial cost objectives can attain as much as 100%” “ We underestimated the complexity and the technical challenge” “ It is evident that the risk of additional cost overruns has increased dramatically” FSL Data Division provide effective solutions to increase project control and minimise failure. Ultimate Problem Root Quality Control / Information Supply Failures   Vendor Equip. not Installed or inspected to spec.   Rotating Equipment not Installed or inspected to spec.   Vessels, Pipework not Installed or inspected to spec.   Instrument/ Electrical Equipment not installed/ tested to spec   Planning/ Engineering Difficulties   Lack of confidence in general information   Incorrect Maintenance Procedures and lack of Vendor manuals   Invalid Certification and Misinformed Indexes/ Schedules Poor Quality Installation Poor Quality Documentation Unplanned Plant Shut Downs Start up/ Energise Problems Project Completion Delayed   Mechanical Completion Unacceptable HSE Hazards Unexpected Labour and Material Requirements Surveys and Rework Handover / Acceptance Difficulties Who Does What? Test & Inspection Failures
Impact of Data Problems
Solutions   The PCTS solution is a combination of documentation, software, and services, designed to assist Engineering Management teams throughout the project lifecycle or specific phases of a complex contract.         By utilising our implementation experience to assist the delivery process we can ensure that introducing this technology becomes an operational advantage and not a commercial burden.   Conceptual & Detailed Design Construction Commissioning Handover and Start Up Operations PCTS PlanMS Project Phases Documentation – Training – Applications - Support
Solutions Through the Phases  * Solutions Supply or Review of Project Completions Management and Organisation Procedures Induction Training for Project Management Teams Implementation Support for Key Project personnel or Supply if necessary Post Operations Pre - Operations Conceptual & Detailed Design Construction Commissioning Handover and Start Up Operations Project Phases Unplanned Plant Shut Downs Start up/ Energise Problems Project Completion Delayed   Mechanical Completion Unacceptable HSE Hazards Unexpected Labour and Material Requirements Surveys and Rework Handover / Acceptance Difficulties Who Does What? Test & Inspection Failures Problems
Solutions Through the Phases  * Solutions Basic Quality Induction for Inspectors, Supervision, and General Workforce. Preparation and Planning Induction for Project Management Teams Progress Control and Management Feedback via PCTS Post Operations Pre - Operations Conceptual & Detailed Design Construction Commissioning Handover and Start Up Operations Project Phases Unplanned Plant Shut Downs Start up/ Energise Problems Project Completion Delayed   Mechanical Completion Unacceptable HSE Hazards Unexpected Labour and Material Requirements Surveys and Rework Handover / Acceptance Difficulties Who Does What? Test & Inspection Failures Problems
Solutions Through the Phases  Solutions * Co Ordination and Implementation Induction for Project Management Teams Completions Activities Directed by Commissioning Needs via PCTS Scheduling. Outstanding Work (Punchlist) and Acceptance Control via PCTS Post Operations Pre - Operations Conceptual & Detailed Design Construction Commissioning Handover and Start Up Operations Project Phases Unplanned Plant Shut Downs Start up/ Energise Problems Project Completion Delayed   Mechanical Completion Unacceptable HSE Hazards Unexpected Labour and Material Requirements Surveys and Rework Handover / Acceptance Difficulties Who Does What? Test & Inspection Failures Problems
Solutions Through the Phases  Solutions * Acceptance and Handover Induction for Project Management Teams Completions Status Feedback and Start Up Work Front Control Via PCTS. Start Up Plan and Co Ordination Assisted Via PCTS Project Status Visibility Post Operations Pre - Operations Conceptual & Detailed Design Construction Commissioning Handover and Start Up Operations Project Phases Unplanned Plant Shut Downs Start up/ Energise Problems Project Completion Delayed   Mechanical Completion Unacceptable HSE Hazards Unexpected Labour and Material Requirements Surveys and Rework Handover / Acceptance Difficulties Who Does What? Test & Inspection Failures Problems
Solutions Through the Phases  Solutions * Close Out And administration Induction For Project Management Teams Outstanding Work Control and Completion Managed Via PCTS Data Handover / Transfer from PCTS to CMMS Post Operations Pre - Operations Conceptual & Detailed Design Construction Commissioning Handover and Start Up Operations Project Phases Unplanned Plant Shut Downs Start up/ Energise Problems Project Completion Delayed   Mechanical Completion Unacceptable HSE Hazards Unexpected Labour and Material Requirements Surveys and Rework Handover / Acceptance Difficulties Who Does What? Test & Inspection Failures Problems
PCTS Documentation  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],The PCTS system is backed up by established documentation covering organisation, methodology, and procedures for use during major projects.  These are offered to compliment existing procedures or can be tailored to structure activity management for specific situations.  The documents also detail and specify software use within a particular project environment.  By adopting the documentation a company can immediately standardise their pre-commissioning / commissioning operations both internally and externally covering :
Project Training  : Basic Project Management Induction ,[object Object],[object Object],[object Object],[object Object],[object Object],As well as system user training, we can provide training for Engineering Management covering the following activities during projects:
Project Training  : Basic Project Quality Induction This is offered to clients to avoid problems encountered during inspection/commissioning activities industry wide.  It is primarily aimed at the general workforce with a complimentary equivalent for inspection and supervision teams.  The aim is to attempt to get the quality of work improved on a “doing it right first time” approach.  Client project specification/procedures and materials to be used are reviewed and incorporated within the course.  The subjects covered have been identified as common problems throughout the world. These include: ,[object Object],[object Object],[object Object],[object Object]
PCTS (Project Completions Tracking System)  ,[object Object],[object Object],[object Object],[object Object],[object Object],The PCTS provides support for Engineering Management through any or all of the following activities during projects: By managing your knowledge base and delivering fully integrated knowledge flows, we ensure that data disconnects are bridged and sub-optimal information silos are replaced.
[object Object],[object Object],[object Object],[object Object],[object Object],PCTS (Project Completions Tracking System)  The overall function of the system shall be to monitor / control construction and commissioning status, progress and QA/QC handover / acceptance data. The system shall deliver cost and time savings to management teams through;
PCTS Contact Details FSL Data Division, 4K2 Times Plaza, No. 1 Taizi Road, Shekou, Shenzhen. Guangdon. People’s Republic of China [email_address] [email_address] [email_address] E-mail E-mail E-mail Nig. Mob. +234 (0) 805 827 6556 Ch Tel +86 (0)13410172172 Tel + 44 (0) 7880800220 Tel +234 (0)84 461587 FSL Data Division Systems Consultant PPS Data Solutions Ltd. Commercial Director PPS Nigeria Ltd. Managing Director John Cameron David Hemphill Sunday Omueti
4K2 Times Plaza, No. 1 Taizi Road, Shekou, Shenzhen. Guangdon People’s Republic of China First Solutions Limited

Mais conteúdo relacionado

Mais procurados

CV, Henry Chapman, 12 Jul 16
CV, Henry Chapman, 12 Jul 16CV, Henry Chapman, 12 Jul 16
CV, Henry Chapman, 12 Jul 16
Henry Chapman
 
E1013201
E1013201E1013201
E1013201
nrb_6
 
Resume Of Ahmed H Al-Ahmedi5
Resume Of Ahmed H Al-Ahmedi5Resume Of Ahmed H Al-Ahmedi5
Resume Of Ahmed H Al-Ahmedi5
Ahmed AlAhmedi
 
Using HP Quality Center 10.0 workflow and customization interface to manage t...
Using HP Quality Center 10.0 workflow and customization interface to manage t...Using HP Quality Center 10.0 workflow and customization interface to manage t...
Using HP Quality Center 10.0 workflow and customization interface to manage t...
Michael Deady
 
Lascas Failure Learn A Big Lession From The Most Terrible Problems In The W...
Lascas Failure   Learn A Big Lession From The Most Terrible Problems In The W...Lascas Failure   Learn A Big Lession From The Most Terrible Problems In The W...
Lascas Failure Learn A Big Lession From The Most Terrible Problems In The W...
guestc990b6
 
Karel Mudde - Resume1
Karel Mudde - Resume1Karel Mudde - Resume1
Karel Mudde - Resume1
Mudde Karel
 
Using HP Quality Center 10.0 Premier to introduce processes and control into ...
Using HP Quality Center 10.0 Premier to introduce processes and control into ...Using HP Quality Center 10.0 Premier to introduce processes and control into ...
Using HP Quality Center 10.0 Premier to introduce processes and control into ...
Michael Deady
 
Accelerated reliability techniques in the 21st century
Accelerated reliability techniques in the 21st centuryAccelerated reliability techniques in the 21st century
Accelerated reliability techniques in the 21st century
ASQ Reliability Division
 

Mais procurados (19)

Building a comissioning guideline
Building a comissioning guidelineBuilding a comissioning guideline
Building a comissioning guideline
 
CV, Henry Chapman, 12 Jul 16
CV, Henry Chapman, 12 Jul 16CV, Henry Chapman, 12 Jul 16
CV, Henry Chapman, 12 Jul 16
 
commissioning guideline
commissioning guidelinecommissioning guideline
commissioning guideline
 
Value add: Single User Performance Testing (http://managingperformancetesting...
Value add: Single User Performance Testing (http://managingperformancetesting...Value add: Single User Performance Testing (http://managingperformancetesting...
Value add: Single User Performance Testing (http://managingperformancetesting...
 
WSU Capstone
WSU CapstoneWSU Capstone
WSU Capstone
 
Wsmc outpatient flow lean project
Wsmc outpatient flow lean projectWsmc outpatient flow lean project
Wsmc outpatient flow lean project
 
E1013201
E1013201E1013201
E1013201
 
Production Performance Results Internet Sample
Production Performance Results   Internet SampleProduction Performance Results   Internet Sample
Production Performance Results Internet Sample
 
KL-MT3633 - event
KL-MT3633 - eventKL-MT3633 - event
KL-MT3633 - event
 
Resume Of Ahmed H Al-Ahmedi5
Resume Of Ahmed H Al-Ahmedi5Resume Of Ahmed H Al-Ahmedi5
Resume Of Ahmed H Al-Ahmedi5
 
Using HP Quality Center 10.0 workflow and customization interface to manage t...
Using HP Quality Center 10.0 workflow and customization interface to manage t...Using HP Quality Center 10.0 workflow and customization interface to manage t...
Using HP Quality Center 10.0 workflow and customization interface to manage t...
 
Lascas Failure Learn A Big Lession From The Most Terrible Problems In The W...
Lascas Failure   Learn A Big Lession From The Most Terrible Problems In The W...Lascas Failure   Learn A Big Lession From The Most Terrible Problems In The W...
Lascas Failure Learn A Big Lession From The Most Terrible Problems In The W...
 
Karel Mudde - Resume1
Karel Mudde - Resume1Karel Mudde - Resume1
Karel Mudde - Resume1
 
Shanahan Engineering Presentation
Shanahan Engineering PresentationShanahan Engineering Presentation
Shanahan Engineering Presentation
 
ROHIT JOSHI JI
ROHIT JOSHI JIROHIT JOSHI JI
ROHIT JOSHI JI
 
Andy cv
Andy   cvAndy   cv
Andy cv
 
Using HP Quality Center 10.0 Premier to introduce processes and control into ...
Using HP Quality Center 10.0 Premier to introduce processes and control into ...Using HP Quality Center 10.0 Premier to introduce processes and control into ...
Using HP Quality Center 10.0 Premier to introduce processes and control into ...
 
Accelerated reliability techniques in the 21st century
Accelerated reliability techniques in the 21st centuryAccelerated reliability techniques in the 21st century
Accelerated reliability techniques in the 21st century
 
DOUGLAS D 2
DOUGLAS D 2DOUGLAS D 2
DOUGLAS D 2
 

Semelhante a Pcts Proj Service

T Pearce CV PIPNG MANAGER ENGINEER 2015
T Pearce CV PIPNG MANAGER  ENGINEER 2015T Pearce CV PIPNG MANAGER  ENGINEER 2015
T Pearce CV PIPNG MANAGER ENGINEER 2015
Terry Pearce
 
ITP-1 – Project CharterGroup 3 - The Project Management Masters .docx
ITP-1 – Project CharterGroup 3 - The Project Management Masters .docxITP-1 – Project CharterGroup 3 - The Project Management Masters .docx
ITP-1 – Project CharterGroup 3 - The Project Management Masters .docx
priestmanmable
 
Wendell Spencer Resume Mar 2015
Wendell Spencer Resume Mar 2015Wendell Spencer Resume Mar 2015
Wendell Spencer Resume Mar 2015
wendell spencer
 
Team 4, Team PMP”IT Installation of the Adelphi V.docx
Team 4, Team PMP”IT Installation of the Adelphi V.docxTeam 4, Team PMP”IT Installation of the Adelphi V.docx
Team 4, Team PMP”IT Installation of the Adelphi V.docx
mattinsonjanel
 
Total systems engineering_development_management_course_sampler
Total systems engineering_development_management_course_samplerTotal systems engineering_development_management_course_sampler
Total systems engineering_development_management_course_sampler
Jim Jenkins
 

Semelhante a Pcts Proj Service (20)

T Pearce CV PIPNG MANAGER ENGINEER 2015
T Pearce CV PIPNG MANAGER  ENGINEER 2015T Pearce CV PIPNG MANAGER  ENGINEER 2015
T Pearce CV PIPNG MANAGER ENGINEER 2015
 
SPEC Process Engineering&Construction
SPEC Process Engineering&ConstructionSPEC Process Engineering&Construction
SPEC Process Engineering&Construction
 
ITP-1 – Project CharterGroup 3 - The Project Management Masters .docx
ITP-1 – Project CharterGroup 3 - The Project Management Masters .docxITP-1 – Project CharterGroup 3 - The Project Management Masters .docx
ITP-1 – Project CharterGroup 3 - The Project Management Masters .docx
 
Stretton CV-f
Stretton CV-fStretton CV-f
Stretton CV-f
 
Pangan_Jefferson_CV
Pangan_Jefferson_CVPangan_Jefferson_CV
Pangan_Jefferson_CV
 
Pangan_Jefferson_CV
Pangan_Jefferson_CVPangan_Jefferson_CV
Pangan_Jefferson_CV
 
MonaliPhatak_Resume
MonaliPhatak_ResumeMonaliPhatak_Resume
MonaliPhatak_Resume
 
Wendell Spencer Resume Mar 2015
Wendell Spencer Resume Mar 2015Wendell Spencer Resume Mar 2015
Wendell Spencer Resume Mar 2015
 
Resume rahul iyer jan 2014 international
Resume rahul iyer jan 2014 internationalResume rahul iyer jan 2014 international
Resume rahul iyer jan 2014 international
 
Pes profile
Pes profilePes profile
Pes profile
 
Eng Delsaer Corporate 2009 New
Eng   Delsaer Corporate 2009 NewEng   Delsaer Corporate 2009 New
Eng Delsaer Corporate 2009 New
 
Team 4, Team PMP”IT Installation of the Adelphi V.docx
Team 4, Team PMP”IT Installation of the Adelphi V.docxTeam 4, Team PMP”IT Installation of the Adelphi V.docx
Team 4, Team PMP”IT Installation of the Adelphi V.docx
 
PAC Fast Track Implementation Program
PAC Fast Track Implementation ProgramPAC Fast Track Implementation Program
PAC Fast Track Implementation Program
 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summary
 
Good IT Project Management
Good IT Project Management Good IT Project Management
Good IT Project Management
 
Anih Resume v16.01
Anih Resume v16.01Anih Resume v16.01
Anih Resume v16.01
 
ATI's Total Systems Engineering Development & Management technical training c...
ATI's Total Systems Engineering Development & Management technical training c...ATI's Total Systems Engineering Development & Management technical training c...
ATI's Total Systems Engineering Development & Management technical training c...
 
Total systems engineering_development_management_course_sampler
Total systems engineering_development_management_course_samplerTotal systems engineering_development_management_course_sampler
Total systems engineering_development_management_course_sampler
 
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
 
Ray-Goodfellow.ppt
Ray-Goodfellow.pptRay-Goodfellow.ppt
Ray-Goodfellow.ppt
 

Último

Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 

Último (20)

Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial Wings
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance management
 
Rice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna ExportsRice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna Exports
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
BeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfBeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdf
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' Slideshare
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 

Pcts Proj Service

  • 1. First Solutions Limited Data Division
  • 2. PPS Data Solutions History PPS Data Solutions Limited (PDSL), operates as a joint venture company originally formed in 2003 between John Cameron (PCTS Developer) and The PPS Group. The company holds all software rights to the PCTS application. The company was originally formed as a 50 / 50 partnership serving the Chinese Energy Industry and has since partnered in other regions with PPS Group companies. PPS Group companies have supplied PCTS via distribution agreements where the PPS Group Companies issue the PCTS licences to respective clients since 2004. PPS Data solutions provide all support and maintenance to the PPS group companies relating to PCTS supply and servicing..
  • 3. PPS Data Solutions Structure PPS Data Solutions (Software Owner) PPS Group (PCTS Distributor) FSL (Software Licencee) PPS Nigeria Ltd (Software Licencee)
  • 4. FSL Data Division History First Solutions Limited (FSL), operates as a joint venture company originally formed between China Offshore Oil Nanhai East Corp (subsidiary of CNOOC) and The PPS Group. Serving the Chinese Energy Industry, the synergies between these companies brings together proven leading edge technology and expertise, with Chinese knowledge, market insight, and cost advantages. Initially developed in the North Sea by engineers, for engineers, FSL Data Division offers Contractors, Fabricators, and Operators a range of low cost, project control and maintenance management information solutions, designed to deliver real commercial and operational benefits.
  • 5. PCTS modules have previously been adopted by both ELF Exploration (Paris) and Total Fina (Paris) for use on their projects prior to their merger. The system was exclusively used on the Elf Elgin PUQ (UK 2000) and subsequent hook up, Girassol (Angola 2001), Total’s South Pars projects (Korea & Iraq 2001), Enel Power’s Jebil Ali Phase 3 (UAE 2002). 2003 - Devon Energy China Ltd, (Panyu 4-2 and Panyu 5-1), 2004 CNOOC China Ltd, and CCLS (CNOOC Shenzhen) for the HuiZhou Terminal. 2005 – Present: SPDC (Nigeria) for the Okoloma gas to power projects. Main contractors include Barmac/Halliburton/KBR (UK) , Hyundai (Korea)  TPG (Paris), Enel Projects, (Milan), Alcon (Nigeria). Engineering companies having utilized the software to satisfy project deliverables include: MacDermotts, (Wembley and Nigg Bay), TPG Engineering (Technip) (Paris & Nigg), Bougyues Offshore (Paris and Korea), Foster Wheeler (Paris), Impac Offshore (Hamburg), Saipem (Okoloma project, Nigeria). PCTS History
  • 6. Areas of Operation - Modules - Typical Users Vendor Document Control - Europe Project Workscope Co-Ordination - Europe, Africa, Asia Job Carding / Task Management - UK and Caspian Region
  • 7. Areas of Operation - Modules - Typical Users QA/QC Systems Management & Tracking - UK, North Sea, & Norway Maintenance Management - CMMS Modules - UK, North Sea, & China
  • 8.
  • 9. Problem Definition   The following diagrams identify project stages and trace the ultimate root of common problems faced by project management teams during large-scale construction contracts involving plant and equipment.   Post Operations Pre - Operations Conceptual & Detailed Design Construction Commissioning Handover and Start Up Operations Project Phases
  • 10. Major Problem Causes Primary Problem Roots   Typical Problems through the Phases “ Project overruns on initial cost objectives can attain as much as 100%” “ We underestimated the complexity and the technical challenge” “ It is evident that the risk of additional cost overruns has increased dramatically” FSL Data Division provide effective solutions to increase project control and minimise failure. Ultimate Problem Root Quality Control / Information Supply Failures   Vendor Equip. not Installed or inspected to spec.   Rotating Equipment not Installed or inspected to spec.   Vessels, Pipework not Installed or inspected to spec.   Instrument/ Electrical Equipment not installed/ tested to spec   Planning/ Engineering Difficulties   Lack of confidence in general information   Incorrect Maintenance Procedures and lack of Vendor manuals   Invalid Certification and Misinformed Indexes/ Schedules Poor Quality Installation Poor Quality Documentation Unplanned Plant Shut Downs Start up/ Energise Problems Project Completion Delayed   Mechanical Completion Unacceptable HSE Hazards Unexpected Labour and Material Requirements Surveys and Rework Handover / Acceptance Difficulties Who Does What? Test & Inspection Failures
  • 11. Impact of Data Problems
  • 12. Solutions   The PCTS solution is a combination of documentation, software, and services, designed to assist Engineering Management teams throughout the project lifecycle or specific phases of a complex contract.         By utilising our implementation experience to assist the delivery process we can ensure that introducing this technology becomes an operational advantage and not a commercial burden. Conceptual & Detailed Design Construction Commissioning Handover and Start Up Operations PCTS PlanMS Project Phases Documentation – Training – Applications - Support
  • 13. Solutions Through the Phases * Solutions Supply or Review of Project Completions Management and Organisation Procedures Induction Training for Project Management Teams Implementation Support for Key Project personnel or Supply if necessary Post Operations Pre - Operations Conceptual & Detailed Design Construction Commissioning Handover and Start Up Operations Project Phases Unplanned Plant Shut Downs Start up/ Energise Problems Project Completion Delayed   Mechanical Completion Unacceptable HSE Hazards Unexpected Labour and Material Requirements Surveys and Rework Handover / Acceptance Difficulties Who Does What? Test & Inspection Failures Problems
  • 14. Solutions Through the Phases * Solutions Basic Quality Induction for Inspectors, Supervision, and General Workforce. Preparation and Planning Induction for Project Management Teams Progress Control and Management Feedback via PCTS Post Operations Pre - Operations Conceptual & Detailed Design Construction Commissioning Handover and Start Up Operations Project Phases Unplanned Plant Shut Downs Start up/ Energise Problems Project Completion Delayed   Mechanical Completion Unacceptable HSE Hazards Unexpected Labour and Material Requirements Surveys and Rework Handover / Acceptance Difficulties Who Does What? Test & Inspection Failures Problems
  • 15. Solutions Through the Phases Solutions * Co Ordination and Implementation Induction for Project Management Teams Completions Activities Directed by Commissioning Needs via PCTS Scheduling. Outstanding Work (Punchlist) and Acceptance Control via PCTS Post Operations Pre - Operations Conceptual & Detailed Design Construction Commissioning Handover and Start Up Operations Project Phases Unplanned Plant Shut Downs Start up/ Energise Problems Project Completion Delayed   Mechanical Completion Unacceptable HSE Hazards Unexpected Labour and Material Requirements Surveys and Rework Handover / Acceptance Difficulties Who Does What? Test & Inspection Failures Problems
  • 16. Solutions Through the Phases Solutions * Acceptance and Handover Induction for Project Management Teams Completions Status Feedback and Start Up Work Front Control Via PCTS. Start Up Plan and Co Ordination Assisted Via PCTS Project Status Visibility Post Operations Pre - Operations Conceptual & Detailed Design Construction Commissioning Handover and Start Up Operations Project Phases Unplanned Plant Shut Downs Start up/ Energise Problems Project Completion Delayed   Mechanical Completion Unacceptable HSE Hazards Unexpected Labour and Material Requirements Surveys and Rework Handover / Acceptance Difficulties Who Does What? Test & Inspection Failures Problems
  • 17. Solutions Through the Phases Solutions * Close Out And administration Induction For Project Management Teams Outstanding Work Control and Completion Managed Via PCTS Data Handover / Transfer from PCTS to CMMS Post Operations Pre - Operations Conceptual & Detailed Design Construction Commissioning Handover and Start Up Operations Project Phases Unplanned Plant Shut Downs Start up/ Energise Problems Project Completion Delayed   Mechanical Completion Unacceptable HSE Hazards Unexpected Labour and Material Requirements Surveys and Rework Handover / Acceptance Difficulties Who Does What? Test & Inspection Failures Problems
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23. PCTS Contact Details FSL Data Division, 4K2 Times Plaza, No. 1 Taizi Road, Shekou, Shenzhen. Guangdon. People’s Republic of China [email_address] [email_address] [email_address] E-mail E-mail E-mail Nig. Mob. +234 (0) 805 827 6556 Ch Tel +86 (0)13410172172 Tel + 44 (0) 7880800220 Tel +234 (0)84 461587 FSL Data Division Systems Consultant PPS Data Solutions Ltd. Commercial Director PPS Nigeria Ltd. Managing Director John Cameron David Hemphill Sunday Omueti
  • 24. 4K2 Times Plaza, No. 1 Taizi Road, Shekou, Shenzhen. Guangdon People’s Republic of China First Solutions Limited