WHAT ARE THE CITY’S INVESTMENTS?
1. Infrastructure, facilities and other improvements that
provide services to the public, usually with benefits to the
community at large as well as the direct user.
Examples: roads, bridges, right-of-way, public parks, police/fire
stations and recreation facilities.
2. Vehicles, equipment, technology and other assets that
allow for the efficient and safe delivery of public services.
Examples: police cruisers, lawn mowers, data servers and radios.
3. Economic and neighborhood development that supports
job creation, neighborhood revitalization and community
satisfaction.
2
INVESTMENT GOALS
1. Protect People (Safety & Environment)
2. Foster Economic Vitality and Quality of Life in the City
3. Promote Property Values
4. Support and Maintain Service Levels
5. Increase Efficiencies
6. Provide a High Level of Customer Service
7. Meet Legislative Mandates
3
FACTOID:
-The replacement costs for City-Owned infrastructure
(Governmental Activities) is over $2 billion.
Asset Category
Governmental
Activities
Business
Activities Total
Land 69.69 42.97 112.65
Building Improvements 68.47 131.95 200.42
Other Improvements 15.90 254.36 270.26
Infrastructure & ROW 236.47 0.00 236.47
Construction In Progress 12.31 42.89 55.20
Total $402.84 $472.16 $875.00
VALUE OF CITY-OWNED CAPITAL ASSETS
2013 (In Millions, Net of Depreciation)
4
0
2,500,000
5,000,000
7,500,000
10,000,000
12,500,000 2013 Actuals
2014 Actuals
2015 Plan
Sources
INVESTMENTS
2013 & 2014 ACTUALS AND 2015 PLAN
5
0
5,000,000
10,000,000
15,000,000
20,000,000
2013 Actuals
2014 Actuals
2015 Plan
Uses
INVESTMENTS
2013 & 2014 ACTUALS AND 2015 PLAN
6
INVESTMENTS
2013 & 2014 ACTUALS AND 2015 SOURCES OVERVIEW
Sources 2013 Actuals 2014 Actuals 2015 Plan
Cash 11,613,913 8,485,844 10,159,400
Debt/Loans 4,921,600 5,700,000 1,500,000
Federal Grants 6,679,745 4,784,766 10,250,000
HUD Funds 3,801,687 1,438,366 1,865,000
State Sources 8,355,234 4,978,376 4,592,000
Racino Payments 0 1,500,000 0
Other Sources 4,244,923 3,245,821 2,983,800
Total $39,617,102 $30,133,174 $31,350,200
7
Investments
2013 & 2014 Actuals and 2015 Uses Overview
Uses 2013 Actuals 2014 Actuals 2015 Plan
Infrastructure 12,852,464 9,919,425 19,626,300
Economic Development 9,186,757 8,995,447 4,130,800
Neighborhoods 2,164,395 990,870 690,000
Demolition 6,496,119 3,512,851 1,830,000
Facilities 1,072,027 2,084,472 1,510,000
Equipment/Technology 3,900,711 5,937,374 3,563,100
Total $35,672,472 $31,440,439 $31,350,200
8
2014 INVESTMENT HIGHLIGHTS
9
2014 INVESTMENT HIGHLIGHTS INFRASTRUCTURE
$20.1M PROGRAMMED AND $9.9M SPENT
1. Wayne Ave Trans. Enhancement
2. Smithville Reconstruction Phase 1
3. Smithville Reconstruction Phase 2
4. Smithville Reconstruction Phase 4
5. South Main Widening
6. Keowee St. Road Reconstruction
7. Bikeway Ramps at Fifth Street
8. Watervliet Trans. Enhancement
9. City-wide Bus Pad Replacement
10. Thoroughfare Resurfacing
11. Residential & Alley Resurfacing
12. eRoad Pavement Condition Analysis
13. LED Street Light Replacement
10
eRoad Info Pavement Management Software
2014 INVESTMENT HIGHLIGHTS
ROAD RESURFACING - $2.8M Programmed
11
2014 INVESTMENT HIGHLIGHTS
ECONOMIC DEVELOPMENT $9.0M
1. Development Projects
2. EDGE Projects
a. Creative Foam
b. idX Dayton
3. Goodwill Easter Seals
4. Northwest Rail Line
Improvement
12
2014 INVESTMENT HIGHLIGHTS
NEIGHBORHOODS $4.5M
1. Demolition
2. Fairview Family
Fitness Park
Construction
3. Real Estate Acquisition
Program (REAP) and
LotLinks
4. Tree Replacement
5. Mini Grants
13
PARK IMPROVEMENTS
HIGHLIGHTS
$1 million, 2 - year park
facility improvement plan.
Phase 1
1. Arlington
2. Belmont
3. Burkham
4. Burkhardt
5. Jane Newcom
6. Princeton
7. Residence Park
8. Stuart Patterson
14
1. One Stop – Boiler & Heater Coil
Replacements
2. Transportation Center Elevator Electric Upgrade
3. Perimeter Door Replacement Program – Various
City Buildings
4. Special Investigations Improvements
5. City Hall – Remodel of Purchasing
6. Lohrey Recreation Center Improvements
7. Sunrise Center – Brick and Lintel
Replacement
8. Cellular Monitoring Equipment Installations City
Wide
9. Waste Collection – Facility Brick/Tuck-Point
Repair
10.WPOD – Parking, Perimeter Fencing and
Gates
11. Building 7 (Central Garage) Roofs
12. GDRC Fitness Equipment
13.Pool Demolition and Spray Park
Improvements
2014 INVESTMENT HIGHLIGHTS
FACILITIES $2.1M
15
2014 INVESTMENT HIGHLIGHTS
EQUIPMENT & TECHNOLOGY $5.9M
Central Services
1. Aerial Two-Man/Scissor Lift
2. PCs and Thin Clients
3. VoIP System
4. Replacement of end of life hardware
and infrastructure
Police
1. Cruisers and Upfitting (10)
2. Unmarked Vehicles (9)
3. Mobile Data Computers (MDCs),
Docks, and Misc. Equipment
4. Handheld and Mobile In-Car Radios
(40 each)
5. Various NetMotion Licenses
Fire
1. 100 Foot Ladder Truck
Public Works
1. Crane Truck: Tandem Axel/80
Foot Boom
2. Riding Mowers (6)
3. Rear Loading CNG Trash Truck
16
2015 RECOMMENDED INVESTMENTS
17
2015 INVESTMENT PLAN
CASH AND DEBT
Cash Investments -- $10.2M:
1. $7.6M Sourced from 2015 General Fund Budget
2. $1.6M from 2014 Year-End General Fund Transfers
3. $1.0M Prior Year Funds
G.O. Debt and OPWC Loans -- $1.5M:
1. Over Last 3-Years Shifted 0.5 Mills to Bond Retirement
2. $1M Issued in 2012 for Pool Renovations
3. $500,000 in 0% OPWC Loans
18
ANNUAL CASH/DEBT INVESTMENT NEEDS
(MAINTENANCE LEVEL, IN MILLIONS)
1. Asphalt Resurfacing $ 5.0
2. Local Matches for Transportation 2.0
3. City Facilities/Recreation 2.2
4. Fire Facilities 0.8
5. Other Departments 1.0
6. Demolition 2.0
7. Equipment 4.0
8. Technology 4.0
9. Development 3.0
Total $24.0M
Investments Sourced from 2015 Budget $7.6M
19
Cash Investments $10.2M
G.O. Debt and OPWC Loans $ 1.5M
Subtotal City Sources $11.6M
Other Sources $19.7M
Total Investments $31.4M
Leverage – Other to City Sources 1.7 : 1
Note: The City seeks to maximize its investments
by seeking grant funding wherever possible.
20
2015 INVESTMENT PLAN
INFRASTRUCTURE
1. Webster Street Bridge Replacement
2. Smithville Road Reconstruction Phase 3
3. Warren Street Reconstruction
4. Hillcrest Avenue Sidewalk Installation
(SRTS)
5. Bus Pad Replacement
6. Broadway Bikeway Ramp (SRTS)
7. Water Street Rebuild
8. Various Design Projects
9. Salem Avenue Bridge Transportation
Enhancements
10. LED Street Lights
11. Thoroughfare, Residential, & Alley Resurfacing
Sources For: 2015 Cash Debt
OPWC
Loan
Federal
Grant
State
Sources CDBG Other Total
Infrastructure $19,626,300 2,696,300 0 500,000 10,250,000 4,592,000 900,000 688,000 $19,626,300
21
2015 INVESTMENT PLAN
ECONOMIC DEVELOPMENT
1. Development Projects
2. EDGE Projects
a. PSA Airlines
b. Water Street
3. Kettering Center
4. Railroad Maintenance
Sources For: 2015 Cash Debt
OPWC
Loan
Federal
Grant
State
Sources CDBG Other Total
Economic
Development $4,130,800 2,540,000 0 0 0 0 0 1,590,800 $4,130,800
22
2015 INVESTMENT PLAN
NEIGHBORHOODS
Note: The City has been allocated an additional
$4 million for demolition that will be processed
through the County Landbank from TARP
funding.
1. Demolition
2. Park Facility Improvements
Phase 2
3. Tree Replacement
4. Mini Grants
Sources For: 2015 Cash Debt
OPWC
Loan
Federal
Grant
State
Sources CDBG Other Total
Neighborhoods $2,520,000 940,000 0 0 0 0 875,000 705,000 $2,520,000
23
2015 INVESTMENT PLAN
FACILITIES
1. Mechanical Fire Damper Survey
Repair Requirements
2. Entry Gate at EPODS
3. HVAC Replacements
4. Re-Lamping to LED Lighting
5. Howell Field Press Box and
Dugout Improvements
6. Fairview and Dabney Pool
Renovations
7. Fire Trailer
Sources For: 2015 Cash Debt
OPWC
Loan
Federal
Grant
State
Sources CDBG Other Total
Facilities $1,510,000 420,000 1,000,000 0 0 0 90,000 0 $1,510,000
24
2015 INVESTMENT PLAN
EQUIPMENT & TECHNOLOGY
Central Services
1. Pickup Truck
2. Enterprise Location-Based
Management System (ELMS)
Police
1. Cruisers and Upfitting (8)
2. Unmarked Vehicles (8)
3. Mobile Data Computers (MDCs),
Docks and Misc. equipment
(third and final phase)
4. Various NetMotion Licenses
Housing Inspection
1. Boarding Van
Fire
1. Command SUV
2. Training Center Utility Van
3. Medium Duty Lawn Tractors (2)
Public Works
1. Front Automated Loaders (2)
City Wide
1. P25 Digital Radio Upgrade
Sources For: 2015 Cash Debt
OPWC
Loan
Federal
Grant
State
Sources CDBG Other Total
Equipment &
Technology $3,563100 3,563,100 0 0 0 0 0 0 $3,563,100
Note: The total General Fund project cost is $2.1M, with $1.3M
funded now and $800K pre-committed from the 2016 plan.
25
TODAY’S SERVICES VS.
TOMORROW’S ASSETS
Operating
79% Non-
Operating
8%
General
Capital
5%
Enterprise
Capital
8%
2014 Actual Expenditures = $379M
26
Special Issues
1. Insufficient investment when compared to the
City’s asset base.
2. Aging infrastructure and facilities, some with
structural problems.
3. Aging equipment, some of which are at end of
useful life and are costly to maintain.
4. Inability to keep pace with resurfacing and
other routine maintenance resulting in the need
for complete reconstruction.
5. Ongoing need for disposal or sale of City
assets.
6. Need to identify resources for investments in
newer, greener and more high-tech
improvements to decrease operating costs and
enhance customer service and quality of life.
27
THANK YOU
28
Questions?

Mais conteúdo relacionado

Mais procurados

ADOPTED Supplement 16-17
ADOPTED Supplement 16-17ADOPTED Supplement 16-17
ADOPTED Supplement 16-17
Xenia Bradford
 
Downtown park tax district draws mixed reviews
Downtown park tax district draws mixed reviewsDowntown park tax district draws mixed reviews
Downtown park tax district draws mixed reviews
Brandis Hill
 
Where does our towns money go 3
Where does our towns money go 3Where does our towns money go 3
Where does our towns money go 3
Cllr. Mick Glynn
 
Last_Mile_Hines2017_Submission
Last_Mile_Hines2017_SubmissionLast_Mile_Hines2017_Submission
Last_Mile_Hines2017_Submission
Daniel Mihalov
 

Mais procurados (20)

International Cities and Towns Presentation - Gerard Carlyon 2017
International Cities and Towns Presentation - Gerard Carlyon 2017International Cities and Towns Presentation - Gerard Carlyon 2017
International Cities and Towns Presentation - Gerard Carlyon 2017
 
Piven hsc presentation final 3.18.13
Piven hsc presentation   final 3.18.13Piven hsc presentation   final 3.18.13
Piven hsc presentation final 3.18.13
 
City Plan Commission (CPC) 12.19.13 Agenda Item 9
City Plan Commission (CPC) 12.19.13 Agenda Item 9City Plan Commission (CPC) 12.19.13 Agenda Item 9
City Plan Commission (CPC) 12.19.13 Agenda Item 9
 
Zephyr brochure_ang
Zephyr brochure_angZephyr brochure_ang
Zephyr brochure_ang
 
ADOPTED Supplement 16-17
ADOPTED Supplement 16-17ADOPTED Supplement 16-17
ADOPTED Supplement 16-17
 
Sp4 2013 budget amendment 05.20.13
Sp4 2013 budget amendment 05.20.13Sp4 2013 budget amendment 05.20.13
Sp4 2013 budget amendment 05.20.13
 
Barron Road-Capstone Drive Realignment
Barron Road-Capstone Drive RealignmentBarron Road-Capstone Drive Realignment
Barron Road-Capstone Drive Realignment
 
City Council 02.18.2014 Agenda Item #5.1
City Council 02.18.2014 Agenda Item #5.1City Council 02.18.2014 Agenda Item #5.1
City Council 02.18.2014 Agenda Item #5.1
 
Hr 3684 infrastructure_investment_and_jobs_act_summary
Hr 3684 infrastructure_investment_and_jobs_act_summaryHr 3684 infrastructure_investment_and_jobs_act_summary
Hr 3684 infrastructure_investment_and_jobs_act_summary
 
Roadway Impact Fees
Roadway Impact FeesRoadway Impact Fees
Roadway Impact Fees
 
Santa Monica Talks 2012
Santa Monica Talks 2012Santa Monica Talks 2012
Santa Monica Talks 2012
 
City of Asheville Draft Budget Numbers
City of Asheville Draft Budget NumbersCity of Asheville Draft Budget Numbers
City of Asheville Draft Budget Numbers
 
Transit And Transformation Ne Wire January 2009 (Final)
Transit And Transformation Ne Wire January 2009 (Final)Transit And Transformation Ne Wire January 2009 (Final)
Transit And Transformation Ne Wire January 2009 (Final)
 
Land Development Process - Orange County, Florida
Land Development Process - Orange County, FloridaLand Development Process - Orange County, Florida
Land Development Process - Orange County, Florida
 
Downtown park tax district draws mixed reviews
Downtown park tax district draws mixed reviewsDowntown park tax district draws mixed reviews
Downtown park tax district draws mixed reviews
 
Derbyshire Dales District Council FY2015/16 spending plans and priorities
Derbyshire Dales District Council FY2015/16 spending plans and prioritiesDerbyshire Dales District Council FY2015/16 spending plans and priorities
Derbyshire Dales District Council FY2015/16 spending plans and priorities
 
Where does our towns money go 3
Where does our towns money go 3Where does our towns money go 3
Where does our towns money go 3
 
Last_Mile_Hines2017_Submission
Last_Mile_Hines2017_SubmissionLast_Mile_Hines2017_Submission
Last_Mile_Hines2017_Submission
 
DOPWIC Program Year 2020 Applicant Workshop
DOPWIC Program Year 2020 Applicant WorkshopDOPWIC Program Year 2020 Applicant Workshop
DOPWIC Program Year 2020 Applicant Workshop
 
Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015
Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015
Briefing on MIG Expenditure for Select Committee on Appropriations 12 May 2015
 

Semelhante a City Manager's Recommended 2015 Investment Plan

2009 Budget Presentation
2009 Budget Presentation2009 Budget Presentation
2009 Budget Presentation
Brett Deaton
 
Capital Improvement Saratoga 03 31-2021 council agenda packet
Capital Improvement Saratoga 03 31-2021 council agenda packetCapital Improvement Saratoga 03 31-2021 council agenda packet
Capital Improvement Saratoga 03 31-2021 council agenda packet
Rishi Kumar
 
2021-2025 Financial Plan PowerPoint Presentation.pdf
2021-2025 Financial Plan PowerPoint Presentation.pdf2021-2025 Financial Plan PowerPoint Presentation.pdf
2021-2025 Financial Plan PowerPoint Presentation.pdf
MohammadZubair874462
 

Semelhante a City Manager's Recommended 2015 Investment Plan (20)

Infrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's FutureInfrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's Future
 
Infrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's FutureInfrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's Future
 
2015- 2016 Budget Workshop Presentation
2015- 2016 Budget Workshop Presentation 2015- 2016 Budget Workshop Presentation
2015- 2016 Budget Workshop Presentation
 
FY 21 Debt Issuance
FY 21 Debt IssuanceFY 21 Debt Issuance
FY 21 Debt Issuance
 
Final 12 01 community mtg phase ii presentation
Final 12 01 community mtg  phase ii presentationFinal 12 01 community mtg  phase ii presentation
Final 12 01 community mtg phase ii presentation
 
2009 Community Development Goals & Acomplishments
2009 Community Development Goals & Acomplishments2009 Community Development Goals & Acomplishments
2009 Community Development Goals & Acomplishments
 
2009 Budget Presentation
2009 Budget Presentation2009 Budget Presentation
2009 Budget Presentation
 
FY18 Budget Workshop Day 2
FY18 Budget Workshop Day 2FY18 Budget Workshop Day 2
FY18 Budget Workshop Day 2
 
City Council April 3, 2012 CIP Discussion
City Council April 3, 2012 CIP DiscussionCity Council April 3, 2012 CIP Discussion
City Council April 3, 2012 CIP Discussion
 
FY 2019 Proposed Budget
FY 2019 Proposed BudgetFY 2019 Proposed Budget
FY 2019 Proposed Budget
 
Roscoe mapd 6.7.12
Roscoe  mapd 6.7.12Roscoe  mapd 6.7.12
Roscoe mapd 6.7.12
 
Public Infrastructure in Massachusetts: Costs, Strategies, and Funding
Public Infrastructure in Massachusetts: Costs, Strategies, and FundingPublic Infrastructure in Massachusetts: Costs, Strategies, and Funding
Public Infrastructure in Massachusetts: Costs, Strategies, and Funding
 
A8 a10 chicago main intro of ordinances 2012 12/10
A8 a10 chicago main intro of ordinances 2012 12/10A8 a10 chicago main intro of ordinances 2012 12/10
A8 a10 chicago main intro of ordinances 2012 12/10
 
Fy 2013 proposed budget presentation 10-29-12 v3
Fy 2013 proposed budget presentation 10-29-12 v3Fy 2013 proposed budget presentation 10-29-12 v3
Fy 2013 proposed budget presentation 10-29-12 v3
 
Capital Improvement Saratoga 03 31-2021 council agenda packet
Capital Improvement Saratoga 03 31-2021 council agenda packetCapital Improvement Saratoga 03 31-2021 council agenda packet
Capital Improvement Saratoga 03 31-2021 council agenda packet
 
Amrut ppt
Amrut pptAmrut ppt
Amrut ppt
 
2011 District One Public Works Integrating Committee Applicant Workshop
2011 District One Public Works Integrating Committee Applicant Workshop2011 District One Public Works Integrating Committee Applicant Workshop
2011 District One Public Works Integrating Committee Applicant Workshop
 
WS3 Project Realities
WS3 Project Realities WS3 Project Realities
WS3 Project Realities
 
2021-2025 Financial Plan PowerPoint Presentation.pdf
2021-2025 Financial Plan PowerPoint Presentation.pdf2021-2025 Financial Plan PowerPoint Presentation.pdf
2021-2025 Financial Plan PowerPoint Presentation.pdf
 
Atl bond presentation council retreat 10-17-14
Atl bond presentation   council retreat 10-17-14Atl bond presentation   council retreat 10-17-14
Atl bond presentation council retreat 10-17-14
 

Mais de City of Dayton

Mais de City of Dayton (20)

Dwsg 2017 registration packet
Dwsg 2017 registration packetDwsg 2017 registration packet
Dwsg 2017 registration packet
 
Review of 2017 Crime Rates
Review of 2017 Crime RatesReview of 2017 Crime Rates
Review of 2017 Crime Rates
 
2016 Dayton World Soccer Games - RESULTS
2016 Dayton World Soccer Games - RESULTS2016 Dayton World Soccer Games - RESULTS
2016 Dayton World Soccer Games - RESULTS
 
Dayton World Soccer Games 2016 - Brackets
Dayton World Soccer Games 2016 - BracketsDayton World Soccer Games 2016 - Brackets
Dayton World Soccer Games 2016 - Brackets
 
How to Interact with Law Enforcement Officers
How to Interact with Law Enforcement OfficersHow to Interact with Law Enforcement Officers
How to Interact with Law Enforcement Officers
 
Welcome Belmont - Year One Report
Welcome Belmont - Year One ReportWelcome Belmont - Year One Report
Welcome Belmont - Year One Report
 
Dayton World Soccer Games 2016 - Registration Packet
Dayton World Soccer Games 2016 - Registration PacketDayton World Soccer Games 2016 - Registration Packet
Dayton World Soccer Games 2016 - Registration Packet
 
1889 Photo Tour of Dayton
1889 Photo Tour of Dayton1889 Photo Tour of Dayton
1889 Photo Tour of Dayton
 
Dayton Transportation Plan 2040 - Overview
Dayton Transportation Plan 2040 - OverviewDayton Transportation Plan 2040 - Overview
Dayton Transportation Plan 2040 - Overview
 
Dayton World Soccer Games 2015 Registration Packet
Dayton World Soccer Games 2015 Registration PacketDayton World Soccer Games 2015 Registration Packet
Dayton World Soccer Games 2015 Registration Packet
 
Dayton Kickball Tournament 2015 (Registration Packet)
Dayton Kickball Tournament 2015 (Registration Packet)Dayton Kickball Tournament 2015 (Registration Packet)
Dayton Kickball Tournament 2015 (Registration Packet)
 
2015 Adult Dodgeball Tournament - Registration Packet
2015 Adult Dodgeball Tournament - Registration Packet2015 Adult Dodgeball Tournament - Registration Packet
2015 Adult Dodgeball Tournament - Registration Packet
 
Youth Winter Soccer League
Youth Winter Soccer LeagueYouth Winter Soccer League
Youth Winter Soccer League
 
Greater West Dayton Corridor Strategy: A Framework for Investment
Greater West Dayton Corridor Strategy: A Framework for InvestmentGreater West Dayton Corridor Strategy: A Framework for Investment
Greater West Dayton Corridor Strategy: A Framework for Investment
 
Dayton World Soccer Games 2014 - Tournament Bracket
Dayton World Soccer Games 2014 - Tournament BracketDayton World Soccer Games 2014 - Tournament Bracket
Dayton World Soccer Games 2014 - Tournament Bracket
 
Dayton Day Tennis 2014
Dayton Day Tennis 2014Dayton Day Tennis 2014
Dayton Day Tennis 2014
 
Dayton World Soccer Games 2014 - REGISTRATION PACKET
Dayton World Soccer Games 2014 - REGISTRATION PACKETDayton World Soccer Games 2014 - REGISTRATION PACKET
Dayton World Soccer Games 2014 - REGISTRATION PACKET
 
Climate Change in the Dayton, Ohioian Mind
Climate Change in the Dayton, Ohioian MindClimate Change in the Dayton, Ohioian Mind
Climate Change in the Dayton, Ohioian Mind
 
Da Vinci Collaborative - Project Overview
Da Vinci Collaborative - Project OverviewDa Vinci Collaborative - Project Overview
Da Vinci Collaborative - Project Overview
 
Neighborhood Clean-Up Application
Neighborhood Clean-Up ApplicationNeighborhood Clean-Up Application
Neighborhood Clean-Up Application
 

Último

Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Call Girls In Delhi Whatsup 9873940964 Enjoy Unlimited Pleasure
 
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
sonatiwari757
 

Último (20)

Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related Topics
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
 
Climate change and safety and health at work
Climate change and safety and health at workClimate change and safety and health at work
Climate change and safety and health at work
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
 
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
 
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
 
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
 
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
 
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)
 

City Manager's Recommended 2015 Investment Plan

  • 1.
  • 2. WHAT ARE THE CITY’S INVESTMENTS? 1. Infrastructure, facilities and other improvements that provide services to the public, usually with benefits to the community at large as well as the direct user. Examples: roads, bridges, right-of-way, public parks, police/fire stations and recreation facilities. 2. Vehicles, equipment, technology and other assets that allow for the efficient and safe delivery of public services. Examples: police cruisers, lawn mowers, data servers and radios. 3. Economic and neighborhood development that supports job creation, neighborhood revitalization and community satisfaction. 2
  • 3. INVESTMENT GOALS 1. Protect People (Safety & Environment) 2. Foster Economic Vitality and Quality of Life in the City 3. Promote Property Values 4. Support and Maintain Service Levels 5. Increase Efficiencies 6. Provide a High Level of Customer Service 7. Meet Legislative Mandates 3
  • 4. FACTOID: -The replacement costs for City-Owned infrastructure (Governmental Activities) is over $2 billion. Asset Category Governmental Activities Business Activities Total Land 69.69 42.97 112.65 Building Improvements 68.47 131.95 200.42 Other Improvements 15.90 254.36 270.26 Infrastructure & ROW 236.47 0.00 236.47 Construction In Progress 12.31 42.89 55.20 Total $402.84 $472.16 $875.00 VALUE OF CITY-OWNED CAPITAL ASSETS 2013 (In Millions, Net of Depreciation) 4
  • 5. 0 2,500,000 5,000,000 7,500,000 10,000,000 12,500,000 2013 Actuals 2014 Actuals 2015 Plan Sources INVESTMENTS 2013 & 2014 ACTUALS AND 2015 PLAN 5
  • 6. 0 5,000,000 10,000,000 15,000,000 20,000,000 2013 Actuals 2014 Actuals 2015 Plan Uses INVESTMENTS 2013 & 2014 ACTUALS AND 2015 PLAN 6
  • 7. INVESTMENTS 2013 & 2014 ACTUALS AND 2015 SOURCES OVERVIEW Sources 2013 Actuals 2014 Actuals 2015 Plan Cash 11,613,913 8,485,844 10,159,400 Debt/Loans 4,921,600 5,700,000 1,500,000 Federal Grants 6,679,745 4,784,766 10,250,000 HUD Funds 3,801,687 1,438,366 1,865,000 State Sources 8,355,234 4,978,376 4,592,000 Racino Payments 0 1,500,000 0 Other Sources 4,244,923 3,245,821 2,983,800 Total $39,617,102 $30,133,174 $31,350,200 7
  • 8. Investments 2013 & 2014 Actuals and 2015 Uses Overview Uses 2013 Actuals 2014 Actuals 2015 Plan Infrastructure 12,852,464 9,919,425 19,626,300 Economic Development 9,186,757 8,995,447 4,130,800 Neighborhoods 2,164,395 990,870 690,000 Demolition 6,496,119 3,512,851 1,830,000 Facilities 1,072,027 2,084,472 1,510,000 Equipment/Technology 3,900,711 5,937,374 3,563,100 Total $35,672,472 $31,440,439 $31,350,200 8
  • 10. 2014 INVESTMENT HIGHLIGHTS INFRASTRUCTURE $20.1M PROGRAMMED AND $9.9M SPENT 1. Wayne Ave Trans. Enhancement 2. Smithville Reconstruction Phase 1 3. Smithville Reconstruction Phase 2 4. Smithville Reconstruction Phase 4 5. South Main Widening 6. Keowee St. Road Reconstruction 7. Bikeway Ramps at Fifth Street 8. Watervliet Trans. Enhancement 9. City-wide Bus Pad Replacement 10. Thoroughfare Resurfacing 11. Residential & Alley Resurfacing 12. eRoad Pavement Condition Analysis 13. LED Street Light Replacement 10
  • 11. eRoad Info Pavement Management Software 2014 INVESTMENT HIGHLIGHTS ROAD RESURFACING - $2.8M Programmed 11
  • 12. 2014 INVESTMENT HIGHLIGHTS ECONOMIC DEVELOPMENT $9.0M 1. Development Projects 2. EDGE Projects a. Creative Foam b. idX Dayton 3. Goodwill Easter Seals 4. Northwest Rail Line Improvement 12
  • 13. 2014 INVESTMENT HIGHLIGHTS NEIGHBORHOODS $4.5M 1. Demolition 2. Fairview Family Fitness Park Construction 3. Real Estate Acquisition Program (REAP) and LotLinks 4. Tree Replacement 5. Mini Grants 13
  • 14. PARK IMPROVEMENTS HIGHLIGHTS $1 million, 2 - year park facility improvement plan. Phase 1 1. Arlington 2. Belmont 3. Burkham 4. Burkhardt 5. Jane Newcom 6. Princeton 7. Residence Park 8. Stuart Patterson 14
  • 15. 1. One Stop – Boiler & Heater Coil Replacements 2. Transportation Center Elevator Electric Upgrade 3. Perimeter Door Replacement Program – Various City Buildings 4. Special Investigations Improvements 5. City Hall – Remodel of Purchasing 6. Lohrey Recreation Center Improvements 7. Sunrise Center – Brick and Lintel Replacement 8. Cellular Monitoring Equipment Installations City Wide 9. Waste Collection – Facility Brick/Tuck-Point Repair 10.WPOD – Parking, Perimeter Fencing and Gates 11. Building 7 (Central Garage) Roofs 12. GDRC Fitness Equipment 13.Pool Demolition and Spray Park Improvements 2014 INVESTMENT HIGHLIGHTS FACILITIES $2.1M 15
  • 16. 2014 INVESTMENT HIGHLIGHTS EQUIPMENT & TECHNOLOGY $5.9M Central Services 1. Aerial Two-Man/Scissor Lift 2. PCs and Thin Clients 3. VoIP System 4. Replacement of end of life hardware and infrastructure Police 1. Cruisers and Upfitting (10) 2. Unmarked Vehicles (9) 3. Mobile Data Computers (MDCs), Docks, and Misc. Equipment 4. Handheld and Mobile In-Car Radios (40 each) 5. Various NetMotion Licenses Fire 1. 100 Foot Ladder Truck Public Works 1. Crane Truck: Tandem Axel/80 Foot Boom 2. Riding Mowers (6) 3. Rear Loading CNG Trash Truck 16
  • 18. 2015 INVESTMENT PLAN CASH AND DEBT Cash Investments -- $10.2M: 1. $7.6M Sourced from 2015 General Fund Budget 2. $1.6M from 2014 Year-End General Fund Transfers 3. $1.0M Prior Year Funds G.O. Debt and OPWC Loans -- $1.5M: 1. Over Last 3-Years Shifted 0.5 Mills to Bond Retirement 2. $1M Issued in 2012 for Pool Renovations 3. $500,000 in 0% OPWC Loans 18
  • 19. ANNUAL CASH/DEBT INVESTMENT NEEDS (MAINTENANCE LEVEL, IN MILLIONS) 1. Asphalt Resurfacing $ 5.0 2. Local Matches for Transportation 2.0 3. City Facilities/Recreation 2.2 4. Fire Facilities 0.8 5. Other Departments 1.0 6. Demolition 2.0 7. Equipment 4.0 8. Technology 4.0 9. Development 3.0 Total $24.0M Investments Sourced from 2015 Budget $7.6M 19
  • 20. Cash Investments $10.2M G.O. Debt and OPWC Loans $ 1.5M Subtotal City Sources $11.6M Other Sources $19.7M Total Investments $31.4M Leverage – Other to City Sources 1.7 : 1 Note: The City seeks to maximize its investments by seeking grant funding wherever possible. 20
  • 21. 2015 INVESTMENT PLAN INFRASTRUCTURE 1. Webster Street Bridge Replacement 2. Smithville Road Reconstruction Phase 3 3. Warren Street Reconstruction 4. Hillcrest Avenue Sidewalk Installation (SRTS) 5. Bus Pad Replacement 6. Broadway Bikeway Ramp (SRTS) 7. Water Street Rebuild 8. Various Design Projects 9. Salem Avenue Bridge Transportation Enhancements 10. LED Street Lights 11. Thoroughfare, Residential, & Alley Resurfacing Sources For: 2015 Cash Debt OPWC Loan Federal Grant State Sources CDBG Other Total Infrastructure $19,626,300 2,696,300 0 500,000 10,250,000 4,592,000 900,000 688,000 $19,626,300 21
  • 22. 2015 INVESTMENT PLAN ECONOMIC DEVELOPMENT 1. Development Projects 2. EDGE Projects a. PSA Airlines b. Water Street 3. Kettering Center 4. Railroad Maintenance Sources For: 2015 Cash Debt OPWC Loan Federal Grant State Sources CDBG Other Total Economic Development $4,130,800 2,540,000 0 0 0 0 0 1,590,800 $4,130,800 22
  • 23. 2015 INVESTMENT PLAN NEIGHBORHOODS Note: The City has been allocated an additional $4 million for demolition that will be processed through the County Landbank from TARP funding. 1. Demolition 2. Park Facility Improvements Phase 2 3. Tree Replacement 4. Mini Grants Sources For: 2015 Cash Debt OPWC Loan Federal Grant State Sources CDBG Other Total Neighborhoods $2,520,000 940,000 0 0 0 0 875,000 705,000 $2,520,000 23
  • 24. 2015 INVESTMENT PLAN FACILITIES 1. Mechanical Fire Damper Survey Repair Requirements 2. Entry Gate at EPODS 3. HVAC Replacements 4. Re-Lamping to LED Lighting 5. Howell Field Press Box and Dugout Improvements 6. Fairview and Dabney Pool Renovations 7. Fire Trailer Sources For: 2015 Cash Debt OPWC Loan Federal Grant State Sources CDBG Other Total Facilities $1,510,000 420,000 1,000,000 0 0 0 90,000 0 $1,510,000 24
  • 25. 2015 INVESTMENT PLAN EQUIPMENT & TECHNOLOGY Central Services 1. Pickup Truck 2. Enterprise Location-Based Management System (ELMS) Police 1. Cruisers and Upfitting (8) 2. Unmarked Vehicles (8) 3. Mobile Data Computers (MDCs), Docks and Misc. equipment (third and final phase) 4. Various NetMotion Licenses Housing Inspection 1. Boarding Van Fire 1. Command SUV 2. Training Center Utility Van 3. Medium Duty Lawn Tractors (2) Public Works 1. Front Automated Loaders (2) City Wide 1. P25 Digital Radio Upgrade Sources For: 2015 Cash Debt OPWC Loan Federal Grant State Sources CDBG Other Total Equipment & Technology $3,563100 3,563,100 0 0 0 0 0 0 $3,563,100 Note: The total General Fund project cost is $2.1M, with $1.3M funded now and $800K pre-committed from the 2016 plan. 25
  • 26. TODAY’S SERVICES VS. TOMORROW’S ASSETS Operating 79% Non- Operating 8% General Capital 5% Enterprise Capital 8% 2014 Actual Expenditures = $379M 26
  • 27. Special Issues 1. Insufficient investment when compared to the City’s asset base. 2. Aging infrastructure and facilities, some with structural problems. 3. Aging equipment, some of which are at end of useful life and are costly to maintain. 4. Inability to keep pace with resurfacing and other routine maintenance resulting in the need for complete reconstruction. 5. Ongoing need for disposal or sale of City assets. 6. Need to identify resources for investments in newer, greener and more high-tech improvements to decrease operating costs and enhance customer service and quality of life. 27

Notas do Editor

  1. Development Projects EDGE Projects (Awarded in 2014) PSA Airlines $1.8M project $500K EDGE, $300K DF, $100K JobsOhio, $900K Airport Retain 446 jobs, 42 additional pledge Water Street $45M project $500K EDGE, $500K DF public funds for infrastructure and public amenities Wright State University Kettering Center Clean Ohio fund application sponsored by City $1.2M project - $900K State and $300K WSU Asbestos abatement throughout building prior to renovation and reoccupancy Design and bid completed in 2014, abatement to begin 1st quarter 2015 and take approximately 12 months Railroad Maintenance $40K in 2015 CIP funds Typically spend about $75K a year in insurance, inspections, maintenance and repair – we have carryover from 2014 to cover balance Working with Trotwood to market Syncreon building - 375,000 square foot building