Be Agile when implementing Agility
Be Wagile for a smooth Delivery
Agility : An Iron Fist in a Velvet Glove
www.sygit.ch
Authors
Marc BURLEREAUX, marc.burlereaux@pmi-france.org
(Swiss Private Bank) has more than 27 years of expertise in Project, Program and Portfolio
Management with a proven track record in the field of Swiss Private Banking. Marc is a
Senior Volunteer at PMI, Director of “Pôle des Pays de Savoie” (PMI France Chapter) and also
a member of the PgMP® & PMI-RMP® Credentials PRC (Panel Review Committee). Marc has
been applying agile technics for the past 10 years, and more recently has spent two years as
Head of European Release Management in a Swiss Private Bank.
Sylvain GAUTIER, sylvain@sygit.ch
(SYGIT) has more than 27 years of expertise in IT and started his career working as a
consultant, and then as an architect, within the Software Industry (Computer Associates,
Sybase). Sylvain focused mainly on data design, DBA, and project management
methodologies for major European projects before becoming Head of IT Operations for an
important private bank in Geneva. Sylvain is now a freelance consultant applying Agile,
ITIL, Archimate and Service Design best practice to companies within the Banking and
Insurance sector.
Christine RIEU, christine.rieu@univ-savoie.fr
(University of Savoie, France): works as an Associate Professor in the Listic laboratory and
has carried out research on Knowledge Management for the past 15 years. Christine teaches
Project Management at the IUT of Annecy where she also holds the position of Head of
International Relationships. . Christine is also a founding member of “PMI Pôle des Pays de
Savoie”, France Chapter.
www.sygit.ch
Foreword
Private Banking expertise,
Program &
Release
Manager,
Senior
Volunteer
at PMI France
Chapter
Associate Professor, Research in
the Knowledge Management
area, Senior Volunteer at PMI
France Chapter
Agile SME &
Coach,
ITIL, BPMN
www.sygit.ch
www.sygit.ch
Summary
Foreword
1. Agile Basics
2. Agile Projects
Best practices
Use Case
Key for success
Agile Process
3. Challenges for a smooth Delivery
Context
Pitfalls
Tips and Tricks
Governance
4. Focus on Human factor
Conclusion
www.sygit.ch
1. Agile Basics
 All kind of projects – Nevertheless Context dependent
 Could be combined with traditional method
 Iterative & incremental development process
 Collaborative work : Value the human factor
 Use case driven
 Early engagement of Architecture
 Risk driven
ProcessA
Event1Event2
TU1
Event3
TU2
Event4
ProcessB
Processus
Driven
SOA
Company
Repository
www.sygit.ch
1. Agile Basics
con’t
 Pragmatic Methodology based on the fact that « Requirements are
evolving »
 Value the Business / Users Feedback
 The CHANGE REQUEST is not anymore a problem : the project embrace it
 Permanent and on the spot feedback
 Stay simple: focus on essential – maximise the work not to be done
 Main Objective : Speed – Velocity and Continuous Improvement
www.sygit.ch
2. Agile Projects
Best Practices
 Foundations
• Backlog (Requirements)
• Use Cases
• Process Activity (business process)
 Business Risks Analysis
 Non fonctional Requirements early identification
• Repository
• Clear Requirement : short sentences
 Poker Planning : most strategic piece of work
• Project costing
• Agreement on deliverables
www.sygit.ch 2. Agile Projects
Use case
Use case are not only a requirements gathering technic
It also permit to link all activities
Analysis
Model
Conceptual
Model
Specified by Realised by Implemented by Distributed by Verified by
Deployment
Model
Testing Model
Implementation
Model
Use case y Use case z
<<fragment>>
Ivar
Jacobson
Project Heart !
www.sygit.ch
2 Agile Projects
Key for Success
 Iterative Process : SPRINT !
 incremental delivery
 2 to 4 weeks : time box
 Synchronous Iteration for all combined Projects / Deliverables
 Scrum Master = Iteration coordinator
 Product Owner : Iteration Pilot – Risk Driven
 Planning of 2 SPRINTs maximum
www.sygit.ch
Process : Agile Iteration
ProjectTeam
SCRUMMasterScribe
Daily Scrum
CeremonySprint Planning
Ceremony
Iteration
START
Iteration Backlog
written
Iteration Plan
Inputted
Daily Scrum
Done
Progress
Inputted
CPUCPI
Produce Analysis
Produce the IT models
Perform functional testing
Perform technical review
Produce conception
Développement
Perform IT testing
Enter Iteration
Backlog
Enter progress
Task
Realised
Adjust perimeter
Review the Backlog
9H00 Game Over
Action Plan
Written
Close the iteration
Iteration
END
Iteration End
– 4 Days
Project
Backlog
updated
Major Event
Backlog
updated
Iteration
closed
Update project
management
deliverables
Deliverables
Updated
Demo
done
Demonstration
Retrospective
Game
Over ?
Yes
No
Next of
pressentation
2 Agile Process
www.sygit.ch
Process : Agile Iteration
Process ID xxxxxxxxx
Process summary Manage your month so Agile
Process owner Agile
Version 0.1
Status Draft / to review/ validated / communicated
Reviwed by Sylvain Gautier
Status date 23/01/2013
Mission statement
An iteration is a period of 4 weeks during which the team built a functional product increment
Process Objectives
An iteration begins with a planning meeting and ends with a review of the product and a retrospective
The team is "protected" during the iteration, the processing of new requirements is postponed to the next iteration
To set the good rhythm in the project and to compare the iterations, all must have the same length for a given project
Best practices:
1. The commitments result in deliverables with a level of agreed quality , as an executable from unit testing, acceptable specifications for development, etc..
2. At the end of iteration, we formally analyse the results on the basis of facts and tangible deliverables.
3. The results of the iteration are summarized in a report with recommendations and corrective actions to prevent the same mistakes are not repeated.
4. The objectives of iterations remain stable during the iteration.
5. The objectives of the iteration are not reviewed during iteration, no additional objective is added.
6. The changes will be requested on the next iteration, except in truly exceptional events.
7. A change objectives can only disempower the teams on outstanding commitments.
8. The iterations are synchronized between all projects. The timing of iterations enable to manage consistency of the work on several projects, particularly in the central teams
managing common components.
9. The iteration regularly collects all project participants and to exchange on factual information about the project.
10. We must create a genuine spirit of "project" and a common goal in which everyone can participates from its point of view and from its area of responsibility.
11. Each goal / task is a personal commitment, not forced, from each contributor, which is fully committed to its ability to deliver.
12. The reliability of the commitment is even stronger than the contributor agrees only on the month ahead, so the near future.
13. The commitments reflect the availability of resources and people
14. The iteration ends at its end date, not when all objectives are met. We look at the iteration end date, if the objectives have been achieved and the precise causes of delays
or disruptions.
15. The Scrum Master is the coordinator of the iterations of the project. He ensures that each contributor involved in the project has the potential to work properly.
Links to reference documents
Link 1
Link 2
Link 3
Link 4
Home Next
www.sygit.ch
Process : Conduct an iteration
Process Objectives
Best practices on how to conduct Elaboration Phase
1. Manage iterations by the risks
2. The first iterations, design, implement and test the priority use cases
3. Design, implement and test the central and risky architecture, the architecture is built iteratively by implementing the use structuring case in terms of architecture
4. Adapt to each iteration based on test results, and feedback from users & developers
5. It has only two iterations planned ahead, beyond is unpredictable.
6. Not to produce too many specifications in advance: The User project manager should have time to assist the IT (the goal is to have 80% of the specifications at the end of
the elaboration phase).
7. The Scrum Master is the custodian of the method.
8. The first priority of the Scrum Master is to remove obstacles that stand in front of his team.
The term "Sprint" given to the conduct of an iteration is inappropriate:
1. We make in fact a long distance race.
2. One iteration = one lap.
3. Once an iteration is completed, we immediately begin another, there is no pause.
4. The Scrum Master household his team.
Facteurs de succès
1. The iteration objectives are confirmed by the demonstration
2. The project team is motivated
PreviousHome
www.sygit.ch
Activity: Sprint Planning Ceremony
Activity ID xxxxxxxxx
Activity Summary Build your work's "Cocoon"
Main used tool Manual
Risk impact on process Probability 10% Impact Strategic
Activity objectives
• "As a team, we plan the next iteration based on priorities and our capacity in order to commit ourselves to carry on the perimeter. "
• Planning for the next iteration immediately = detail the tasks to be performed.
• Select the features to perform, identify tasks, and their completion criteria for acceptance, and all that from the Product Backlog: features prioritized and estimated (points
Tasks / Procedure
Preparation
The Product owner shall review the Product Backlog, adds, deletes and edits stories, adjusts priorities as required.
Planning
The Product owner select the stories to be developed in the iteration, and propose this list the Scrum Master
The Scrum Master identifies additional stories (defects to be corrected, engineering, etc.).
Task dependencies from one iteration will not be evaluated here: this aspect will be dealt on the daily scrum meeting
Determine the level of quality expected for items developed during the iteration
The definition of "finished" is established, reviewed and validated jointly (look at: Good task)
The objectives of the iteration are specified
To determine the ability of the team
Calendar Capacity: CC = (effective duration of the iteration) - vacations - other commitments
Planned capacity: PC = CC * focusing factor (estimated), default = 6/8 = 0.75
Decomposition
For each Use Case or component, the team imagines the tasks (specification, design, coding, business, coding, data interface, GUI coding, unit testing, technical tests,
integration tests, documents and manuals, etc.).
Estimate
Each task is estimated by the "experts" of the team. A consensus value is used.
Note: the estimate of a task varies from 0.25 to 2 "ideal day". If a task requires two people, multiply by 2!
Audit the accounts
Make the sum of task estimates and compare with the calculated capacity. Check the feasibility depending on the nature of the tasks and needed skills on the period
Negotiate
The Scrum Master and the Product Owner negotiate a reduction (or increase!) of the iteration scope in case of under-or over-capacity.
Commit
Collectively, the team gives his opinion on the feasibility of the plan ...
Get commitment from each of the tasks assigned, including tasks carried over from the previous iteration.
Links to reference documents
Link 1
Link 2
Link 3
Good
Task
Good
Story
Product Backlog
Home
www.sygit.ch
Product Backlog
Use
Case
Variant 2
Variant 1
Nominal
Case
• No more than ½
iteration
• Can be demonstrated
Requirement
3
Requirement
2
Requirement
1
Story 2
Story 3
Task 1Story 1 Task 2 Task n
…
Non functional
Requirements
Task 1Story n Task 2 Task n
…
Previous
www.sygit.ch
Activity: Daily Scrum Ceremony
Activity objectives
Every day, a meeting allows the team and the Scrum Master to monitor progress on the tasks and challenges.
This meeting last for 15 minutes maximum: the Daily Scrum.
Are present: The Scrum Master, the coach, and the contributors.
Tasks / Procedure
1. Be sure to name the "scribe" at the beginning of the session.
2. Each member answers three questions:
1. What did I do yesterday?
2. What will I do today?
3. What are the challenges / difficulties I meet?
3. The turn of speech must be strictly observed to avoid drift.
4. Activities can be run in parallel: analysis, design, coding, integration, testing, etc..
5. The choice of dependencies between tasks is performed here (dependencies, skills, ...).
6. The choice of suspending a task blocked by technical difficulties is made at this meeting.
7. If a task is not feasible, it can be put back in the backlog.
Best practices:
1. If possible, the team works in the same room.
2. If the need arises, the discussion can then be made freely, after the Daily Scrum.
3. This meeting is a synchronization point for the team and should not be considered as a progress report.
Links to reference documents
Link 1
Link 2
Link 3
Home
Activity ID xxxxxxxxx
Activity Summary Team Coordination Meeting
Main used tool Manual
Risk impact on process Probability 10% Impact Sensible
www.sygit.ch
Activity: Demonstration
Activity objectives
1. The team describes and demonstrates the new features to stakeholders and gather feedback = product review (quality of design / defaults ....).
Tasks / Procedure
1. Perform the demonstration of the product increment produced during the iteration:
1. The increment product is verified, demonstrated and validated
2. The defects are noted to be entered as tasks of the story "bug fixes" for the next iteration
2. To review the tasks of the previous iteration:
1. Done / not done.
2. Number of defects found.
3. Defer not done tasks on the next iteration (new tasks).
4. Report faults on the next iteration (new tasks), with priority 1.
5. Calculate the project progress: Example: 70% of the points are shown (% of the status of the manufacturing process).
3. Write a summary of the iteration and improvement measures in the Flash Report.
Links to reference documents
Link 1
Link 2
Link 3
Home
Activity ID xxxxxxxxx
Activity Summary Demonstrate the product increment
Main used tool Manual
Risk impact on process Probability 10% Impact Critical
www.sygit.ch
Activity: Perform Retrospective Ceremony
Home
Links to reference documents
Link 1
Link 2
Link 3
Activity ID xxxxxxxxx
Activity Summary Analyse the process, search the causes, suggest improvements
Main used tool Manual
Risk impact on process Probability 10% Impact Critical
Tasks / Procedure
Initialization (15 ’)
1. A team member summarizes what has been delivered, the status of what remains to be done (planned and not done), and an update on the decisions taken at previous
retrospective.
Identification of positive and negative points (20 '- 30’)
1. Each member of the project list the positives and negatives of the iteration (alone or in pairs)
Analysis (60 '- 90’)
1. The team members present their ideas, and the team look for the causes of malfunctions or the factors that led to good results.
2. The team selects the most significant elements
Decisions (30 '- 60’)
1. The team decides on the action plan:
2. Improve practices
3. Renew the practices that have had positive effects
Closing
1. Team commitment
Note
1. Duration : from 1 to 3 hours
Activity objectives
1. As participants in the project, we regularly analyse our processes and our work procedures to improve efficiency.
2. The team has a look on methodology, tools and Human aspects on the iteration that ends = Process Review (effectiveness, efficiency).
3. Good practices and practices to be changed are identified
4. Decisions are made to optimize the process
www.sygit.ch
Activity: Adjust perimeter
Exceptions
Home
Links to reference documents
Link 1
Link 2
Link 3
Activity ID xxxxxxxxx
Activity Summary Change the iteration backlog, in cases of major event
Main used tool Manual
Risk impact on process Probability 10% Impact Critical
Tasks / Procedure
1. Remove a story from Iteration Backlog and replace it in the Project Backlog
2. Move a task of a story of the iteration to a story in the next iteration
3. Practice exchange for free
4. Trace the movements of story / task in the flash report of the current week
Activity objectives
1. Change the objectives of the iteration, the lower priority items are eventually excluded.
www.sygit.ch
Activity: Review the Backlog
Home
Links to reference documents
Link 1
Link 2
Link 3
Activity ID xxxxxxxxx
Activity Summary Prepare the next iteration
Main used tool Manual
Risk impact on process Probability 10% Impact Critical
Tasks / Procedure
Ensure Stories cover all needs
1. All Use cases and fragments are represented by Stories
2. Stories can be created for training activities, building development platform, etc..
Check estimates in points
1. All stories are estimated in points
2. The estimates are consistent (with the knowledge of the moment ...)
3. New stories are estimated
Review priorities
1. ≈ 20% of stories to achieve: high priority
2. ≈ 30% of stories to achieve: Medium priority.
3. ≈ 50% of stories to achieve: Low Priority
Decompose high priority Stories in Stories of appropriate size
1. Choose one or more axes of decomposition
2. Create the identified stories , describe them, plan them, estimate them in points
3. Remove obsolete stories
Notes:
1. Duration : 2 to 4 hours
2. This additional time in meetings is largely cushioned by the decline in the planning tasks and the time saved on the preparatory work for the next iteration.
3. The Backlog review is a team effort, led by the product owner, assisted by the project members if required. It is not necessary to involve the whole team (except for
re-estimation of stories)
Activity objectives
1. "As a team, we maintain the product backlog up to date in order to have a realistic view of the outstanding work and priorities and to plan the next iteration."
2. Consider what has changed in the Project Backlog
3. Preparing for the next iteration, facilitate planning, and to make the ceremony of the next iteration planning more efficient and less time consuming
4. Perform change for free : as the budget of the project must be kept unchanged, if new user cases or requirements are coming ask which other requirements have to return
to the product backlog and be realized within another release.
www.sygit.ch
Activity: Perform technical review
Home
Links to reference documents
Link 1
Link 2
Link 3
Activity ID xxxxxxxxx
Activity Summary Ensure compliance with quality standards throughout the project
Main used tool Manual
Risk impact on process Probability 10% Impact Critical
Tasks / Procedure
1. Perform code review between two team members
2. Review of "logs" of the tools (version control, DBMS, CMDB) list the items that were actually created, modified, deleted, by whom and when.
3. Verify the proper implementation of norms and standards of the used tools.
4. Create tasks for necessary adjustments in a story "Adjustment / quality standards" planed in the next iteration: Pay the technical debt.
5. If too much defects have been identified during preceding iterations, it can be a good idea to propose an iteration only dedicated to bug fixing and refractor.
Activity objectives
1. Conduct reviews on the deliverables of all used tools
www.sygit.ch
Activity: Perform IT testing
Home
Links to reference documents
Link 1
Link 2
Link 3
Activity ID xxxxxxxxx
Activity Summary Test the story
Main used tool Manual
Risk impact on process Probability 40% Impact Critical
Tasks / Procedure
1. Test what is produced, according to what was described in the design and modelling documents.
2. Correct immediately what can be.
3. Report defects not immediately corrected on the next iteration (new tasks), in a story of a priority 1.
Activity objectives
1. Ensure that stories are developed according to the validated design and modelling
Exceptions
None
www.sygit.ch
Activity: Perform functional testing
Home
Links to reference documents
Link 1
Link 2
Link 3
Activity ID xxxxxxxxx
Activity Summary Test the Use case, and its related requirements
Main used tool Manual
Risk impact on process Probability 40% Impact Critical
Tasks / Procedure
1. Test what is produced, according to the specifications (Use cases, fragments, variants, requirements, business rules), if possible as the development is produced and
deployed on the test environment.
1. Report bugs and the non-alignments of specifications with the code and / or design, at the Daily Scrum of the next day.
Activity objectives
1. Ensure that the increment is developed in line with the Use Case specifications (and the associated requirements and business rules).
Exceptions
None
www.sygit.ch
Activity: Produce the IT models
Home
Links to reference documents
Link 1
Link 2
Link 3
Activity ID xxxxxxxxx
Activity Summary A good model is better than 100 documentation pages
Main used tool Manual
Risk impact on process Probability 30% Impact Critical
Tasks / Procedure
1. Organize workshops
2. Realize the models (class diagrams, sequence diagrams, activity diagrams, data models, component architecture ....).
3. Reformulate the models
4. Forward models to architects
5. Correct the models according to the remarks made by the architects
Activity objectives
1. The IT and the architects perform the necessary design models, using the right tools.
Exceptions
None
www.sygit.ch
Activity: Produce conception
Home
Links to reference documents
Link 1
Link 2
Link 3
Activity ID xxxxxxxxx
Activity Summary Describe the "story" that exists between the models
Main used tool Manual
Risk impact on process Probability 20% Impact Sensible
Tasks / Procedure
1. Write technical specifications in addition to the models.
2. Describe how the models work together.
3. Describe the behaviour of IT components.
4. Establish the necessary explanatory diagram, by using the referenced tools, as far as possible.
Activity objectives
1. Write technical specifications, related explanatory diagrams showing the logical design of the solution.
Exceptions
None
www.sygit.ch
Activity: Produce Analysis
Home
Links to reference documents
Link 1
Link 2
Link 3
Activity ID xxxxxxxxx
Activity Summary Write the functional specifications
Main used tool Manual
Risk impact on process Probability 20% Impact Sensible
Tasks / Procedure
1. Accurately describe the Use Cases (nominal and variants)
2. Clearly describe the business rules associated with use cases
3. Describe the sequence of screens
4. Achieve the Models of the GUI
5. Coordinate and exchange with other product owners to avoid duplication of functions between the projects (Shared read access on tools for all projects is an
important aid to deal with this point).
1. Export specifications in a MS-WORD document within a shareable archive.
Activity objectives
1. Write functional specifications, within the enterprise repository tool.
2. Keep concise, unambiguous and clear.
Exceptions
None
www.sygit.ch
What is a “good task” ?
 This is a limited task whose realization is limited in time (2 days)
To remove the tunnel effect of early identification and overruns associated with
difficulties
The effort for a task is between 2 and 12 hours 'ideal' in general
Beware of scheduled tasks to be run by two people (we multiply the effort by two!)
 The expected result is described in an intelligible way, clear and can be
quantified
Examples: a document, source code, description of test cases, deployment of a tool, ...
We can say: "it's over"
 This is a task that contributes to the completion of the ongoing iteration
objectives
Development of a story (from specification to integration)
Technical tasks "to test the development environment," ...
Increase in skills: training, working in pairs senior / junior
 What's a "not good task"?
Recurring and mandatory tasks of the project are not planned (Scrum ceremonies,
demonstration, etc.).
Tasks such as "I keep 10 hours in case I have a problem, nobody knows"
Project management meetings
Previous
www.sygit.ch
What is a “good story” ?
 This is a business function understandable and usable by a user
(or a computer if it is a technical function of the architecture)
 This is necessary so that the progress of the project is based on the delivered
features
(with the expected level of finish)
 It's a Use Case, or a fragment or a part of UC / fragment where
The tasks from designing to demonstration can be performed during a single
iteration
The "right" time to complete the story is around 1/2 iteration:
To reduce the tunneling effect
To facilitate the scheduling of work
To maximize the number of stories completed by the end of iteration
 In a nutshell
A use case is strictly a functional or user view
A story is a function that takes into account the needs of engineering (cutting
the Use
Case into multiple stories that can be implemented in one iteration)
Previous
www.sygit.ch
 Global Private Banking
 Combined CHANGES delivered in same Release Cycles
– Weekly and Monthly Releases
– Change The Bank: « Projects or Minor Enhancements Deliverables »
– Monthly Fix pack for certain Products
 Delivery Figures
– 100 à 150 Projects deliverables per year
– 100 à 150 Minor Enhancements per year (small projects : less than 6 MM)
 Methodological context : MIX
– Risk based « classical » methodology (Waterfall)
– Tollgates Process
– Agile delivery for certain Products
– Trend to implement more Agility in all Software Delivery
– Trend to enhance the Release Process to be more Lean and Agile
 Out of scope
– Incidents fix (ITIL niveaux 1, 2 et 3)
– Infrastructure change without any business impact
3. Challenges for a smooth Delivery
Context
www.sygit.ch
 Too frequent delivery
– Stakeholders overloaded (including the business)
– Testing Teams
– Training Teams
– Implementation and Release Teams
– Change Delivery organisation
– Less « shared visibility »: challenge to identify, track & control the DEPENDENCIES
– Risk of production impact, SLA breach
 Lack of Architecture / Security / Testing early engagement
– Technical Debt
– Costly refactoring with business impact
 Lack of Integration / Infrastructure early engagement
 Lack of Deployment and Support early engagement
Results :
Production sometimes managed by Project Teams (or Third Party Vendor …)
Production instability
Technical Debt
Refactoring
Bad IT image , …
3. Challenges for a smooth Delivery
Pitfalls
www.sygit.ch
 Early Engagement of Key Stakeholders since first SPRINTs
– Architecture team
– Security team
– Integration, infrastructure & deployment teams
 Quality required : Early alignement of all key stakeholders to avoid
– Late rejection of deliverables
– Technical Debt
 Test Team Early Engagement – Test automation – Test Driven Development
 Support Team Early engagement
 Not too frequent deliveries in production
 Non Functional Requirements mandatory for a successful delivery
 ITIL concepts
3. Challenges for a smooth Delivery
Tips & Tricks
www.sygit.ch
 Tollgate Process :
FIRST : Project Set-up for success and aligned with business strategy
 Have Change Delivery « Project Managers »: Business Coordination
 Continuous Integration, a challenge if many Products impacted
 Strong Acceptance to ensure quality & compliance
– Business acceptance (Functional requirements)
– Technical acceptance (Non Functional requirements)
 « Wagile » implementation: Rigorous transition to Production
– Share the Change and the Rollout Roadmap
– Quality control
– Dependencies identification & Management
– Limiting Factors Management (internal and external, Human and Others)
– Risk management
3. Challenges for a Delivery
Governance
www.sygit.ch
4. Human Factor
 Project Manager Evolution
 Value Added generator
 Coach, « Protecting role»
 Team Self Management, Self Organized
 Have fun working together
 Pragmatic approach
 Quickly capitalise on Lessons learned – Continuous Improvement
 Long term performance
 Quality as common objective
 DO BETTER does not mean DO MORE OR TOO MUCH : STRESS proof
 Collective Intelligence should not prevent the Individual Creativity
Manager
Controller
Inspiring Leader
Facilitator
!
www.sygit.ch
Conclusion
 Agile Methods = Philisophy and Mindset – nor Dogm neither Toolbox
 Take into account the context / environment
 Best of Breed from both « Agile and Traditional / Waterfall Worlds »
 Be Agile (and open) when implementing Agile
 Change Delivery still needs Project Managers
 Be Wagile for a smooth transition to production
 Agility is too important to be left to the Techies 
 PMI (Project Management Institute) look for Agility
• New credential PMI-ACP (Agile Certification Practitioner)
• PMBOK 5th Edition : iterative planning

Mais conteúdo relacionado

Mais procurados

The real reason that projects fail and how to fix it - An introduction to Cri...
The real reason that projects fail and how to fix it - An introduction to Cri...The real reason that projects fail and how to fix it - An introduction to Cri...
The real reason that projects fail and how to fix it - An introduction to Cri...Association for Project Management
 
PMI-ACP: Agile Project Management v1.0
PMI-ACP: Agile Project Management v1.0PMI-ACP: Agile Project Management v1.0
PMI-ACP: Agile Project Management v1.0PhuocNT (Fresher.VN)
 
PMP Chapter 6 of 6 closing process group (1- Process) (Based on PMBOK 6th ed...
PMP Chapter 6 of 6  closing process group (1- Process) (Based on PMBOK 6th ed...PMP Chapter 6 of 6  closing process group (1- Process) (Based on PMBOK 6th ed...
PMP Chapter 6 of 6 closing process group (1- Process) (Based on PMBOK 6th ed...Shamil Habet
 
Successful Project Presentation
Successful Project PresentationSuccessful Project Presentation
Successful Project PresentationColin Sullivan
 
PMI-ACP Domain VII - Continuous Improvement v1.0
PMI-ACP Domain VII - Continuous Improvement v1.0PMI-ACP Domain VII - Continuous Improvement v1.0
PMI-ACP Domain VII - Continuous Improvement v1.0PhuocNT (Fresher.VN)
 
10 reasons why projects fail or common mistakes to avoid
10 reasons why projects fail or common mistakes to avoid10 reasons why projects fail or common mistakes to avoid
10 reasons why projects fail or common mistakes to avoidMarianna Semenova
 
Introduction to pmp
Introduction to pmpIntroduction to pmp
Introduction to pmpDuy Tan Geek
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project ManagementJoshua Pierce
 
Prince2 explained in 30mins
Prince2 explained in 30minsPrince2 explained in 30mins
Prince2 explained in 30minsILX Group
 
PRINCE2 Agile Guidance Preview
PRINCE2 Agile Guidance PreviewPRINCE2 Agile Guidance Preview
PRINCE2 Agile Guidance PreviewFrank Turley
 
Project management by example
Project management by exampleProject management by example
Project management by exampleSarah Eggleston
 
General Project Management 2003
General Project Management 2003General Project Management 2003
General Project Management 2003Sidewinder2011
 
PMP Chapter 2 of 6 Initiating Process Group (2- Processes) (Based on PMBOK 6...
PMP Chapter 2 of 6  Initiating Process Group (2- Processes) (Based on PMBOK 6...PMP Chapter 2 of 6  Initiating Process Group (2- Processes) (Based on PMBOK 6...
PMP Chapter 2 of 6 Initiating Process Group (2- Processes) (Based on PMBOK 6...Shamil Habet
 
PRINCE2 Foundation Workshops -- Organization
PRINCE2 Foundation Workshops -- OrganizationPRINCE2 Foundation Workshops -- Organization
PRINCE2 Foundation Workshops -- OrganizationFrank Turley
 
Using an Agile Inception to Kick Off a Project
Using an Agile Inception to Kick Off a ProjectUsing an Agile Inception to Kick Off a Project
Using an Agile Inception to Kick Off a ProjectVictor Bonacci
 
CMGT 410 NEW Life of the Mind/newtonhelp.com   
CMGT 410 NEW Life of the Mind/newtonhelp.com   CMGT 410 NEW Life of the Mind/newtonhelp.com   
CMGT 410 NEW Life of the Mind/newtonhelp.com   bellflower22
 
Essentials of Entry Level Project Management - Rev A
Essentials of Entry Level Project Management - Rev AEssentials of Entry Level Project Management - Rev A
Essentials of Entry Level Project Management - Rev ASteve Kiester
 
Software project scheduling
Software project schedulingSoftware project scheduling
Software project schedulingMuntha Ulfat
 

Mais procurados (20)

The real reason that projects fail and how to fix it - An introduction to Cri...
The real reason that projects fail and how to fix it - An introduction to Cri...The real reason that projects fail and how to fix it - An introduction to Cri...
The real reason that projects fail and how to fix it - An introduction to Cri...
 
P01 - Project Kick-Off
P01 - Project Kick-OffP01 - Project Kick-Off
P01 - Project Kick-Off
 
PMI-ACP: Agile Project Management v1.0
PMI-ACP: Agile Project Management v1.0PMI-ACP: Agile Project Management v1.0
PMI-ACP: Agile Project Management v1.0
 
Scrum Concepts
Scrum ConceptsScrum Concepts
Scrum Concepts
 
PMP Chapter 6 of 6 closing process group (1- Process) (Based on PMBOK 6th ed...
PMP Chapter 6 of 6  closing process group (1- Process) (Based on PMBOK 6th ed...PMP Chapter 6 of 6  closing process group (1- Process) (Based on PMBOK 6th ed...
PMP Chapter 6 of 6 closing process group (1- Process) (Based on PMBOK 6th ed...
 
Successful Project Presentation
Successful Project PresentationSuccessful Project Presentation
Successful Project Presentation
 
PMI-ACP Domain VII - Continuous Improvement v1.0
PMI-ACP Domain VII - Continuous Improvement v1.0PMI-ACP Domain VII - Continuous Improvement v1.0
PMI-ACP Domain VII - Continuous Improvement v1.0
 
10 reasons why projects fail or common mistakes to avoid
10 reasons why projects fail or common mistakes to avoid10 reasons why projects fail or common mistakes to avoid
10 reasons why projects fail or common mistakes to avoid
 
Introduction to pmp
Introduction to pmpIntroduction to pmp
Introduction to pmp
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
Prince2 explained in 30mins
Prince2 explained in 30minsPrince2 explained in 30mins
Prince2 explained in 30mins
 
PRINCE2 Agile Guidance Preview
PRINCE2 Agile Guidance PreviewPRINCE2 Agile Guidance Preview
PRINCE2 Agile Guidance Preview
 
Project management by example
Project management by exampleProject management by example
Project management by example
 
General Project Management 2003
General Project Management 2003General Project Management 2003
General Project Management 2003
 
PMP Chapter 2 of 6 Initiating Process Group (2- Processes) (Based on PMBOK 6...
PMP Chapter 2 of 6  Initiating Process Group (2- Processes) (Based on PMBOK 6...PMP Chapter 2 of 6  Initiating Process Group (2- Processes) (Based on PMBOK 6...
PMP Chapter 2 of 6 Initiating Process Group (2- Processes) (Based on PMBOK 6...
 
PRINCE2 Foundation Workshops -- Organization
PRINCE2 Foundation Workshops -- OrganizationPRINCE2 Foundation Workshops -- Organization
PRINCE2 Foundation Workshops -- Organization
 
Using an Agile Inception to Kick Off a Project
Using an Agile Inception to Kick Off a ProjectUsing an Agile Inception to Kick Off a Project
Using an Agile Inception to Kick Off a Project
 
CMGT 410 NEW Life of the Mind/newtonhelp.com   
CMGT 410 NEW Life of the Mind/newtonhelp.com   CMGT 410 NEW Life of the Mind/newtonhelp.com   
CMGT 410 NEW Life of the Mind/newtonhelp.com   
 
Essentials of Entry Level Project Management - Rev A
Essentials of Entry Level Project Management - Rev AEssentials of Entry Level Project Management - Rev A
Essentials of Entry Level Project Management - Rev A
 
Software project scheduling
Software project schedulingSoftware project scheduling
Software project scheduling
 

Semelhante a 20130821 agility an_iron_fist_in_a_velvet_glove

Presentation by saurabh chandra
Presentation by saurabh chandraPresentation by saurabh chandra
Presentation by saurabh chandraPMI_IREP_TP
 
PMI CH AMM2023 - Bye Bye Project Manager - SwissQ.pptx
PMI CH AMM2023 - Bye Bye Project Manager - SwissQ.pptxPMI CH AMM2023 - Bye Bye Project Manager - SwissQ.pptx
PMI CH AMM2023 - Bye Bye Project Manager - SwissQ.pptxChristoph Wolf
 
Business Analyst Role in Hybrid Agile Waterfall
Business Analyst Role in Hybrid Agile WaterfallBusiness Analyst Role in Hybrid Agile Waterfall
Business Analyst Role in Hybrid Agile WaterfallStephen Williamson
 
Professional Project Manager Should Be Proficient in Agile
Professional Project Manager Should Be Proficient in AgileProfessional Project Manager Should Be Proficient in Agile
Professional Project Manager Should Be Proficient in AgileNitor
 
#Project Management fundamentals - By SN Panigrahi
#Project Management fundamentals - By SN Panigrahi#Project Management fundamentals - By SN Panigrahi
#Project Management fundamentals - By SN PanigrahiSN Panigrahi, PMP
 
James dimas it infrastructure approach
James dimas it infrastructure approachJames dimas it infrastructure approach
James dimas it infrastructure approachJames (JD) Dimas
 
Agile Truths and Misconceptions
Agile Truths and MisconceptionsAgile Truths and Misconceptions
Agile Truths and MisconceptionsRichard Cheng
 
É possível medir se um gigante é ágil?
É possível medir se um gigante é ágil?É possível medir se um gigante é ágil?
É possível medir se um gigante é ágil?Alan Braz
 
Brief introduction to project management and project management tools
Brief introduction to project management and project management toolsBrief introduction to project management and project management tools
Brief introduction to project management and project management toolsNathan Petralia
 
Managing Projects for Digital Innovation Culture
Managing Projects for Digital Innovation CultureManaging Projects for Digital Innovation Culture
Managing Projects for Digital Innovation CultureHoward Jess Mijares II
 
Project Management Msc. 7Pjmn009W Project Management Project.
Project Management Msc. 7Pjmn009W Project Management Project.Project Management Msc. 7Pjmn009W Project Management Project.
Project Management Msc. 7Pjmn009W Project Management Project.Renee Jones
 
Kick+Off+Presentation.pptx
Kick+Off+Presentation.pptxKick+Off+Presentation.pptx
Kick+Off+Presentation.pptxAjinkya Vaze
 
"Why Agile " by Swaminathan Nagarajan
"Why Agile " by Swaminathan Nagarajan"Why Agile " by Swaminathan Nagarajan
"Why Agile " by Swaminathan NagarajanSwaminathan Nagarajan
 
20160512 predictive and adaptive approach
20160512   predictive and adaptive approach20160512   predictive and adaptive approach
20160512 predictive and adaptive approachSilvia Fragola
 
Introduction to Agile & scrum
Introduction to Agile & scrumIntroduction to Agile & scrum
Introduction to Agile & scrumElad Sofer
 
Agile Myths and Misconceptions
Agile Myths and MisconceptionsAgile Myths and Misconceptions
Agile Myths and MisconceptionsCalen Legaspi
 

Semelhante a 20130821 agility an_iron_fist_in_a_velvet_glove (20)

PMO Daily Operations using Scrum Methodology
PMO Daily Operations using Scrum MethodologyPMO Daily Operations using Scrum Methodology
PMO Daily Operations using Scrum Methodology
 
Presentation by saurabh chandra
Presentation by saurabh chandraPresentation by saurabh chandra
Presentation by saurabh chandra
 
PMI CH AMM2023 - Bye Bye Project Manager - SwissQ.pptx
PMI CH AMM2023 - Bye Bye Project Manager - SwissQ.pptxPMI CH AMM2023 - Bye Bye Project Manager - SwissQ.pptx
PMI CH AMM2023 - Bye Bye Project Manager - SwissQ.pptx
 
Business Analyst Role in Hybrid Agile Waterfall
Business Analyst Role in Hybrid Agile WaterfallBusiness Analyst Role in Hybrid Agile Waterfall
Business Analyst Role in Hybrid Agile Waterfall
 
Professional Project Manager Should Be Proficient in Agile
Professional Project Manager Should Be Proficient in AgileProfessional Project Manager Should Be Proficient in Agile
Professional Project Manager Should Be Proficient in Agile
 
#Project Management fundamentals - By SN Panigrahi
#Project Management fundamentals - By SN Panigrahi#Project Management fundamentals - By SN Panigrahi
#Project Management fundamentals - By SN Panigrahi
 
James dimas it infrastructure approach
James dimas it infrastructure approachJames dimas it infrastructure approach
James dimas it infrastructure approach
 
Agile Truths and Misconceptions
Agile Truths and MisconceptionsAgile Truths and Misconceptions
Agile Truths and Misconceptions
 
É possível medir se um gigante é ágil?
É possível medir se um gigante é ágil?É possível medir se um gigante é ágil?
É possível medir se um gigante é ágil?
 
Brief introduction to project management and project management tools
Brief introduction to project management and project management toolsBrief introduction to project management and project management tools
Brief introduction to project management and project management tools
 
Managing Projects for Digital Innovation Culture
Managing Projects for Digital Innovation CultureManaging Projects for Digital Innovation Culture
Managing Projects for Digital Innovation Culture
 
Project Management Msc. 7Pjmn009W Project Management Project.
Project Management Msc. 7Pjmn009W Project Management Project.Project Management Msc. 7Pjmn009W Project Management Project.
Project Management Msc. 7Pjmn009W Project Management Project.
 
Kick+Off+Presentation.pptx
Kick+Off+Presentation.pptxKick+Off+Presentation.pptx
Kick+Off+Presentation.pptx
 
Why agile by Swaminathan Nagarajan
Why agile by Swaminathan Nagarajan Why agile by Swaminathan Nagarajan
Why agile by Swaminathan Nagarajan
 
"Why Agile " by Swaminathan Nagarajan
"Why Agile " by Swaminathan Nagarajan"Why Agile " by Swaminathan Nagarajan
"Why Agile " by Swaminathan Nagarajan
 
Agile = scrum = no project managers
Agile =  scrum =  no project managersAgile =  scrum =  no project managers
Agile = scrum = no project managers
 
Agile Project LifeCycle
Agile Project LifeCycleAgile Project LifeCycle
Agile Project LifeCycle
 
20160512 predictive and adaptive approach
20160512   predictive and adaptive approach20160512   predictive and adaptive approach
20160512 predictive and adaptive approach
 
Introduction to Agile & scrum
Introduction to Agile & scrumIntroduction to Agile & scrum
Introduction to Agile & scrum
 
Agile Myths and Misconceptions
Agile Myths and MisconceptionsAgile Myths and Misconceptions
Agile Myths and Misconceptions
 

Mais de HSBC Private Bank

Contribution to PMI article "Attitude Adjustment"
Contribution to PMI article "Attitude Adjustment"Contribution to PMI article "Attitude Adjustment"
Contribution to PMI article "Attitude Adjustment"HSBC Private Bank
 
Sustainable project management a whole programme indeed
Sustainable project management a whole programme indeedSustainable project management a whole programme indeed
Sustainable project management a whole programme indeedHSBC Private Bank
 
Une gestion de projet durable : tout un programme ... !
Une gestion de projet durable : tout un programme ... !Une gestion de projet durable : tout un programme ... !
Une gestion de projet durable : tout un programme ... !HSBC Private Bank
 
Congrès PMI EMEA Avril 2013 - Istanbul - retour conférences par Mamane et Marc
Congrès PMI EMEA Avril 2013 - Istanbul - retour conférences par Mamane et Marc Congrès PMI EMEA Avril 2013 - Istanbul - retour conférences par Mamane et Marc
Congrès PMI EMEA Avril 2013 - Istanbul - retour conférences par Mamane et Marc HSBC Private Bank
 
Agilité : une main de fer dans un gant de velours
Agilité : une main de fer dans un gant de veloursAgilité : une main de fer dans un gant de velours
Agilité : une main de fer dans un gant de veloursHSBC Private Bank
 

Mais de HSBC Private Bank (7)

PMN1115 Org Agility
PMN1115 Org AgilityPMN1115 Org Agility
PMN1115 Org Agility
 
Contribution to PMI article
Contribution to PMI articleContribution to PMI article
Contribution to PMI article
 
Contribution to PMI article "Attitude Adjustment"
Contribution to PMI article "Attitude Adjustment"Contribution to PMI article "Attitude Adjustment"
Contribution to PMI article "Attitude Adjustment"
 
Sustainable project management a whole programme indeed
Sustainable project management a whole programme indeedSustainable project management a whole programme indeed
Sustainable project management a whole programme indeed
 
Une gestion de projet durable : tout un programme ... !
Une gestion de projet durable : tout un programme ... !Une gestion de projet durable : tout un programme ... !
Une gestion de projet durable : tout un programme ... !
 
Congrès PMI EMEA Avril 2013 - Istanbul - retour conférences par Mamane et Marc
Congrès PMI EMEA Avril 2013 - Istanbul - retour conférences par Mamane et Marc Congrès PMI EMEA Avril 2013 - Istanbul - retour conférences par Mamane et Marc
Congrès PMI EMEA Avril 2013 - Istanbul - retour conférences par Mamane et Marc
 
Agilité : une main de fer dans un gant de velours
Agilité : une main de fer dans un gant de veloursAgilité : une main de fer dans un gant de velours
Agilité : une main de fer dans un gant de velours
 

Último

A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusZilliz
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWERMadyBayot
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...apidays
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbuapidays
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelDeepika Singh
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 

Último (20)

A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 

20130821 agility an_iron_fist_in_a_velvet_glove

  • 1. www.sygit.ch Be Agile when implementing Agility Be Wagile for a smooth Delivery Agility : An Iron Fist in a Velvet Glove
  • 2. www.sygit.ch Authors Marc BURLEREAUX, marc.burlereaux@pmi-france.org (Swiss Private Bank) has more than 27 years of expertise in Project, Program and Portfolio Management with a proven track record in the field of Swiss Private Banking. Marc is a Senior Volunteer at PMI, Director of “Pôle des Pays de Savoie” (PMI France Chapter) and also a member of the PgMP® & PMI-RMP® Credentials PRC (Panel Review Committee). Marc has been applying agile technics for the past 10 years, and more recently has spent two years as Head of European Release Management in a Swiss Private Bank. Sylvain GAUTIER, sylvain@sygit.ch (SYGIT) has more than 27 years of expertise in IT and started his career working as a consultant, and then as an architect, within the Software Industry (Computer Associates, Sybase). Sylvain focused mainly on data design, DBA, and project management methodologies for major European projects before becoming Head of IT Operations for an important private bank in Geneva. Sylvain is now a freelance consultant applying Agile, ITIL, Archimate and Service Design best practice to companies within the Banking and Insurance sector. Christine RIEU, christine.rieu@univ-savoie.fr (University of Savoie, France): works as an Associate Professor in the Listic laboratory and has carried out research on Knowledge Management for the past 15 years. Christine teaches Project Management at the IUT of Annecy where she also holds the position of Head of International Relationships. . Christine is also a founding member of “PMI Pôle des Pays de Savoie”, France Chapter.
  • 3. www.sygit.ch Foreword Private Banking expertise, Program & Release Manager, Senior Volunteer at PMI France Chapter Associate Professor, Research in the Knowledge Management area, Senior Volunteer at PMI France Chapter Agile SME & Coach, ITIL, BPMN www.sygit.ch
  • 4. www.sygit.ch Summary Foreword 1. Agile Basics 2. Agile Projects Best practices Use Case Key for success Agile Process 3. Challenges for a smooth Delivery Context Pitfalls Tips and Tricks Governance 4. Focus on Human factor Conclusion
  • 5. www.sygit.ch 1. Agile Basics  All kind of projects – Nevertheless Context dependent  Could be combined with traditional method  Iterative & incremental development process  Collaborative work : Value the human factor  Use case driven  Early engagement of Architecture  Risk driven ProcessA Event1Event2 TU1 Event3 TU2 Event4 ProcessB Processus Driven SOA Company Repository
  • 6. www.sygit.ch 1. Agile Basics con’t  Pragmatic Methodology based on the fact that « Requirements are evolving »  Value the Business / Users Feedback  The CHANGE REQUEST is not anymore a problem : the project embrace it  Permanent and on the spot feedback  Stay simple: focus on essential – maximise the work not to be done  Main Objective : Speed – Velocity and Continuous Improvement
  • 7. www.sygit.ch 2. Agile Projects Best Practices  Foundations • Backlog (Requirements) • Use Cases • Process Activity (business process)  Business Risks Analysis  Non fonctional Requirements early identification • Repository • Clear Requirement : short sentences  Poker Planning : most strategic piece of work • Project costing • Agreement on deliverables
  • 8. www.sygit.ch 2. Agile Projects Use case Use case are not only a requirements gathering technic It also permit to link all activities Analysis Model Conceptual Model Specified by Realised by Implemented by Distributed by Verified by Deployment Model Testing Model Implementation Model Use case y Use case z <<fragment>> Ivar Jacobson Project Heart !
  • 9. www.sygit.ch 2 Agile Projects Key for Success  Iterative Process : SPRINT !  incremental delivery  2 to 4 weeks : time box  Synchronous Iteration for all combined Projects / Deliverables  Scrum Master = Iteration coordinator  Product Owner : Iteration Pilot – Risk Driven  Planning of 2 SPRINTs maximum
  • 10. www.sygit.ch Process : Agile Iteration ProjectTeam SCRUMMasterScribe Daily Scrum CeremonySprint Planning Ceremony Iteration START Iteration Backlog written Iteration Plan Inputted Daily Scrum Done Progress Inputted CPUCPI Produce Analysis Produce the IT models Perform functional testing Perform technical review Produce conception Développement Perform IT testing Enter Iteration Backlog Enter progress Task Realised Adjust perimeter Review the Backlog 9H00 Game Over Action Plan Written Close the iteration Iteration END Iteration End – 4 Days Project Backlog updated Major Event Backlog updated Iteration closed Update project management deliverables Deliverables Updated Demo done Demonstration Retrospective Game Over ? Yes No Next of pressentation 2 Agile Process
  • 11. www.sygit.ch Process : Agile Iteration Process ID xxxxxxxxx Process summary Manage your month so Agile Process owner Agile Version 0.1 Status Draft / to review/ validated / communicated Reviwed by Sylvain Gautier Status date 23/01/2013 Mission statement An iteration is a period of 4 weeks during which the team built a functional product increment Process Objectives An iteration begins with a planning meeting and ends with a review of the product and a retrospective The team is "protected" during the iteration, the processing of new requirements is postponed to the next iteration To set the good rhythm in the project and to compare the iterations, all must have the same length for a given project Best practices: 1. The commitments result in deliverables with a level of agreed quality , as an executable from unit testing, acceptable specifications for development, etc.. 2. At the end of iteration, we formally analyse the results on the basis of facts and tangible deliverables. 3. The results of the iteration are summarized in a report with recommendations and corrective actions to prevent the same mistakes are not repeated. 4. The objectives of iterations remain stable during the iteration. 5. The objectives of the iteration are not reviewed during iteration, no additional objective is added. 6. The changes will be requested on the next iteration, except in truly exceptional events. 7. A change objectives can only disempower the teams on outstanding commitments. 8. The iterations are synchronized between all projects. The timing of iterations enable to manage consistency of the work on several projects, particularly in the central teams managing common components. 9. The iteration regularly collects all project participants and to exchange on factual information about the project. 10. We must create a genuine spirit of "project" and a common goal in which everyone can participates from its point of view and from its area of responsibility. 11. Each goal / task is a personal commitment, not forced, from each contributor, which is fully committed to its ability to deliver. 12. The reliability of the commitment is even stronger than the contributor agrees only on the month ahead, so the near future. 13. The commitments reflect the availability of resources and people 14. The iteration ends at its end date, not when all objectives are met. We look at the iteration end date, if the objectives have been achieved and the precise causes of delays or disruptions. 15. The Scrum Master is the coordinator of the iterations of the project. He ensures that each contributor involved in the project has the potential to work properly. Links to reference documents Link 1 Link 2 Link 3 Link 4 Home Next
  • 12. www.sygit.ch Process : Conduct an iteration Process Objectives Best practices on how to conduct Elaboration Phase 1. Manage iterations by the risks 2. The first iterations, design, implement and test the priority use cases 3. Design, implement and test the central and risky architecture, the architecture is built iteratively by implementing the use structuring case in terms of architecture 4. Adapt to each iteration based on test results, and feedback from users & developers 5. It has only two iterations planned ahead, beyond is unpredictable. 6. Not to produce too many specifications in advance: The User project manager should have time to assist the IT (the goal is to have 80% of the specifications at the end of the elaboration phase). 7. The Scrum Master is the custodian of the method. 8. The first priority of the Scrum Master is to remove obstacles that stand in front of his team. The term "Sprint" given to the conduct of an iteration is inappropriate: 1. We make in fact a long distance race. 2. One iteration = one lap. 3. Once an iteration is completed, we immediately begin another, there is no pause. 4. The Scrum Master household his team. Facteurs de succès 1. The iteration objectives are confirmed by the demonstration 2. The project team is motivated PreviousHome
  • 13. www.sygit.ch Activity: Sprint Planning Ceremony Activity ID xxxxxxxxx Activity Summary Build your work's "Cocoon" Main used tool Manual Risk impact on process Probability 10% Impact Strategic Activity objectives • "As a team, we plan the next iteration based on priorities and our capacity in order to commit ourselves to carry on the perimeter. " • Planning for the next iteration immediately = detail the tasks to be performed. • Select the features to perform, identify tasks, and their completion criteria for acceptance, and all that from the Product Backlog: features prioritized and estimated (points Tasks / Procedure Preparation The Product owner shall review the Product Backlog, adds, deletes and edits stories, adjusts priorities as required. Planning The Product owner select the stories to be developed in the iteration, and propose this list the Scrum Master The Scrum Master identifies additional stories (defects to be corrected, engineering, etc.). Task dependencies from one iteration will not be evaluated here: this aspect will be dealt on the daily scrum meeting Determine the level of quality expected for items developed during the iteration The definition of "finished" is established, reviewed and validated jointly (look at: Good task) The objectives of the iteration are specified To determine the ability of the team Calendar Capacity: CC = (effective duration of the iteration) - vacations - other commitments Planned capacity: PC = CC * focusing factor (estimated), default = 6/8 = 0.75 Decomposition For each Use Case or component, the team imagines the tasks (specification, design, coding, business, coding, data interface, GUI coding, unit testing, technical tests, integration tests, documents and manuals, etc.). Estimate Each task is estimated by the "experts" of the team. A consensus value is used. Note: the estimate of a task varies from 0.25 to 2 "ideal day". If a task requires two people, multiply by 2! Audit the accounts Make the sum of task estimates and compare with the calculated capacity. Check the feasibility depending on the nature of the tasks and needed skills on the period Negotiate The Scrum Master and the Product Owner negotiate a reduction (or increase!) of the iteration scope in case of under-or over-capacity. Commit Collectively, the team gives his opinion on the feasibility of the plan ... Get commitment from each of the tasks assigned, including tasks carried over from the previous iteration. Links to reference documents Link 1 Link 2 Link 3 Good Task Good Story Product Backlog Home
  • 14. www.sygit.ch Product Backlog Use Case Variant 2 Variant 1 Nominal Case • No more than ½ iteration • Can be demonstrated Requirement 3 Requirement 2 Requirement 1 Story 2 Story 3 Task 1Story 1 Task 2 Task n … Non functional Requirements Task 1Story n Task 2 Task n … Previous
  • 15. www.sygit.ch Activity: Daily Scrum Ceremony Activity objectives Every day, a meeting allows the team and the Scrum Master to monitor progress on the tasks and challenges. This meeting last for 15 minutes maximum: the Daily Scrum. Are present: The Scrum Master, the coach, and the contributors. Tasks / Procedure 1. Be sure to name the "scribe" at the beginning of the session. 2. Each member answers three questions: 1. What did I do yesterday? 2. What will I do today? 3. What are the challenges / difficulties I meet? 3. The turn of speech must be strictly observed to avoid drift. 4. Activities can be run in parallel: analysis, design, coding, integration, testing, etc.. 5. The choice of dependencies between tasks is performed here (dependencies, skills, ...). 6. The choice of suspending a task blocked by technical difficulties is made at this meeting. 7. If a task is not feasible, it can be put back in the backlog. Best practices: 1. If possible, the team works in the same room. 2. If the need arises, the discussion can then be made freely, after the Daily Scrum. 3. This meeting is a synchronization point for the team and should not be considered as a progress report. Links to reference documents Link 1 Link 2 Link 3 Home Activity ID xxxxxxxxx Activity Summary Team Coordination Meeting Main used tool Manual Risk impact on process Probability 10% Impact Sensible
  • 16. www.sygit.ch Activity: Demonstration Activity objectives 1. The team describes and demonstrates the new features to stakeholders and gather feedback = product review (quality of design / defaults ....). Tasks / Procedure 1. Perform the demonstration of the product increment produced during the iteration: 1. The increment product is verified, demonstrated and validated 2. The defects are noted to be entered as tasks of the story "bug fixes" for the next iteration 2. To review the tasks of the previous iteration: 1. Done / not done. 2. Number of defects found. 3. Defer not done tasks on the next iteration (new tasks). 4. Report faults on the next iteration (new tasks), with priority 1. 5. Calculate the project progress: Example: 70% of the points are shown (% of the status of the manufacturing process). 3. Write a summary of the iteration and improvement measures in the Flash Report. Links to reference documents Link 1 Link 2 Link 3 Home Activity ID xxxxxxxxx Activity Summary Demonstrate the product increment Main used tool Manual Risk impact on process Probability 10% Impact Critical
  • 17. www.sygit.ch Activity: Perform Retrospective Ceremony Home Links to reference documents Link 1 Link 2 Link 3 Activity ID xxxxxxxxx Activity Summary Analyse the process, search the causes, suggest improvements Main used tool Manual Risk impact on process Probability 10% Impact Critical Tasks / Procedure Initialization (15 ’) 1. A team member summarizes what has been delivered, the status of what remains to be done (planned and not done), and an update on the decisions taken at previous retrospective. Identification of positive and negative points (20 '- 30’) 1. Each member of the project list the positives and negatives of the iteration (alone or in pairs) Analysis (60 '- 90’) 1. The team members present their ideas, and the team look for the causes of malfunctions or the factors that led to good results. 2. The team selects the most significant elements Decisions (30 '- 60’) 1. The team decides on the action plan: 2. Improve practices 3. Renew the practices that have had positive effects Closing 1. Team commitment Note 1. Duration : from 1 to 3 hours Activity objectives 1. As participants in the project, we regularly analyse our processes and our work procedures to improve efficiency. 2. The team has a look on methodology, tools and Human aspects on the iteration that ends = Process Review (effectiveness, efficiency). 3. Good practices and practices to be changed are identified 4. Decisions are made to optimize the process
  • 18. www.sygit.ch Activity: Adjust perimeter Exceptions Home Links to reference documents Link 1 Link 2 Link 3 Activity ID xxxxxxxxx Activity Summary Change the iteration backlog, in cases of major event Main used tool Manual Risk impact on process Probability 10% Impact Critical Tasks / Procedure 1. Remove a story from Iteration Backlog and replace it in the Project Backlog 2. Move a task of a story of the iteration to a story in the next iteration 3. Practice exchange for free 4. Trace the movements of story / task in the flash report of the current week Activity objectives 1. Change the objectives of the iteration, the lower priority items are eventually excluded.
  • 19. www.sygit.ch Activity: Review the Backlog Home Links to reference documents Link 1 Link 2 Link 3 Activity ID xxxxxxxxx Activity Summary Prepare the next iteration Main used tool Manual Risk impact on process Probability 10% Impact Critical Tasks / Procedure Ensure Stories cover all needs 1. All Use cases and fragments are represented by Stories 2. Stories can be created for training activities, building development platform, etc.. Check estimates in points 1. All stories are estimated in points 2. The estimates are consistent (with the knowledge of the moment ...) 3. New stories are estimated Review priorities 1. ≈ 20% of stories to achieve: high priority 2. ≈ 30% of stories to achieve: Medium priority. 3. ≈ 50% of stories to achieve: Low Priority Decompose high priority Stories in Stories of appropriate size 1. Choose one or more axes of decomposition 2. Create the identified stories , describe them, plan them, estimate them in points 3. Remove obsolete stories Notes: 1. Duration : 2 to 4 hours 2. This additional time in meetings is largely cushioned by the decline in the planning tasks and the time saved on the preparatory work for the next iteration. 3. The Backlog review is a team effort, led by the product owner, assisted by the project members if required. It is not necessary to involve the whole team (except for re-estimation of stories) Activity objectives 1. "As a team, we maintain the product backlog up to date in order to have a realistic view of the outstanding work and priorities and to plan the next iteration." 2. Consider what has changed in the Project Backlog 3. Preparing for the next iteration, facilitate planning, and to make the ceremony of the next iteration planning more efficient and less time consuming 4. Perform change for free : as the budget of the project must be kept unchanged, if new user cases or requirements are coming ask which other requirements have to return to the product backlog and be realized within another release.
  • 20. www.sygit.ch Activity: Perform technical review Home Links to reference documents Link 1 Link 2 Link 3 Activity ID xxxxxxxxx Activity Summary Ensure compliance with quality standards throughout the project Main used tool Manual Risk impact on process Probability 10% Impact Critical Tasks / Procedure 1. Perform code review between two team members 2. Review of "logs" of the tools (version control, DBMS, CMDB) list the items that were actually created, modified, deleted, by whom and when. 3. Verify the proper implementation of norms and standards of the used tools. 4. Create tasks for necessary adjustments in a story "Adjustment / quality standards" planed in the next iteration: Pay the technical debt. 5. If too much defects have been identified during preceding iterations, it can be a good idea to propose an iteration only dedicated to bug fixing and refractor. Activity objectives 1. Conduct reviews on the deliverables of all used tools
  • 21. www.sygit.ch Activity: Perform IT testing Home Links to reference documents Link 1 Link 2 Link 3 Activity ID xxxxxxxxx Activity Summary Test the story Main used tool Manual Risk impact on process Probability 40% Impact Critical Tasks / Procedure 1. Test what is produced, according to what was described in the design and modelling documents. 2. Correct immediately what can be. 3. Report defects not immediately corrected on the next iteration (new tasks), in a story of a priority 1. Activity objectives 1. Ensure that stories are developed according to the validated design and modelling Exceptions None
  • 22. www.sygit.ch Activity: Perform functional testing Home Links to reference documents Link 1 Link 2 Link 3 Activity ID xxxxxxxxx Activity Summary Test the Use case, and its related requirements Main used tool Manual Risk impact on process Probability 40% Impact Critical Tasks / Procedure 1. Test what is produced, according to the specifications (Use cases, fragments, variants, requirements, business rules), if possible as the development is produced and deployed on the test environment. 1. Report bugs and the non-alignments of specifications with the code and / or design, at the Daily Scrum of the next day. Activity objectives 1. Ensure that the increment is developed in line with the Use Case specifications (and the associated requirements and business rules). Exceptions None
  • 23. www.sygit.ch Activity: Produce the IT models Home Links to reference documents Link 1 Link 2 Link 3 Activity ID xxxxxxxxx Activity Summary A good model is better than 100 documentation pages Main used tool Manual Risk impact on process Probability 30% Impact Critical Tasks / Procedure 1. Organize workshops 2. Realize the models (class diagrams, sequence diagrams, activity diagrams, data models, component architecture ....). 3. Reformulate the models 4. Forward models to architects 5. Correct the models according to the remarks made by the architects Activity objectives 1. The IT and the architects perform the necessary design models, using the right tools. Exceptions None
  • 24. www.sygit.ch Activity: Produce conception Home Links to reference documents Link 1 Link 2 Link 3 Activity ID xxxxxxxxx Activity Summary Describe the "story" that exists between the models Main used tool Manual Risk impact on process Probability 20% Impact Sensible Tasks / Procedure 1. Write technical specifications in addition to the models. 2. Describe how the models work together. 3. Describe the behaviour of IT components. 4. Establish the necessary explanatory diagram, by using the referenced tools, as far as possible. Activity objectives 1. Write technical specifications, related explanatory diagrams showing the logical design of the solution. Exceptions None
  • 25. www.sygit.ch Activity: Produce Analysis Home Links to reference documents Link 1 Link 2 Link 3 Activity ID xxxxxxxxx Activity Summary Write the functional specifications Main used tool Manual Risk impact on process Probability 20% Impact Sensible Tasks / Procedure 1. Accurately describe the Use Cases (nominal and variants) 2. Clearly describe the business rules associated with use cases 3. Describe the sequence of screens 4. Achieve the Models of the GUI 5. Coordinate and exchange with other product owners to avoid duplication of functions between the projects (Shared read access on tools for all projects is an important aid to deal with this point). 1. Export specifications in a MS-WORD document within a shareable archive. Activity objectives 1. Write functional specifications, within the enterprise repository tool. 2. Keep concise, unambiguous and clear. Exceptions None
  • 26. www.sygit.ch What is a “good task” ?  This is a limited task whose realization is limited in time (2 days) To remove the tunnel effect of early identification and overruns associated with difficulties The effort for a task is between 2 and 12 hours 'ideal' in general Beware of scheduled tasks to be run by two people (we multiply the effort by two!)  The expected result is described in an intelligible way, clear and can be quantified Examples: a document, source code, description of test cases, deployment of a tool, ... We can say: "it's over"  This is a task that contributes to the completion of the ongoing iteration objectives Development of a story (from specification to integration) Technical tasks "to test the development environment," ... Increase in skills: training, working in pairs senior / junior  What's a "not good task"? Recurring and mandatory tasks of the project are not planned (Scrum ceremonies, demonstration, etc.). Tasks such as "I keep 10 hours in case I have a problem, nobody knows" Project management meetings Previous
  • 27. www.sygit.ch What is a “good story” ?  This is a business function understandable and usable by a user (or a computer if it is a technical function of the architecture)  This is necessary so that the progress of the project is based on the delivered features (with the expected level of finish)  It's a Use Case, or a fragment or a part of UC / fragment where The tasks from designing to demonstration can be performed during a single iteration The "right" time to complete the story is around 1/2 iteration: To reduce the tunneling effect To facilitate the scheduling of work To maximize the number of stories completed by the end of iteration  In a nutshell A use case is strictly a functional or user view A story is a function that takes into account the needs of engineering (cutting the Use Case into multiple stories that can be implemented in one iteration) Previous
  • 28. www.sygit.ch  Global Private Banking  Combined CHANGES delivered in same Release Cycles – Weekly and Monthly Releases – Change The Bank: « Projects or Minor Enhancements Deliverables » – Monthly Fix pack for certain Products  Delivery Figures – 100 à 150 Projects deliverables per year – 100 à 150 Minor Enhancements per year (small projects : less than 6 MM)  Methodological context : MIX – Risk based « classical » methodology (Waterfall) – Tollgates Process – Agile delivery for certain Products – Trend to implement more Agility in all Software Delivery – Trend to enhance the Release Process to be more Lean and Agile  Out of scope – Incidents fix (ITIL niveaux 1, 2 et 3) – Infrastructure change without any business impact 3. Challenges for a smooth Delivery Context
  • 29. www.sygit.ch  Too frequent delivery – Stakeholders overloaded (including the business) – Testing Teams – Training Teams – Implementation and Release Teams – Change Delivery organisation – Less « shared visibility »: challenge to identify, track & control the DEPENDENCIES – Risk of production impact, SLA breach  Lack of Architecture / Security / Testing early engagement – Technical Debt – Costly refactoring with business impact  Lack of Integration / Infrastructure early engagement  Lack of Deployment and Support early engagement Results : Production sometimes managed by Project Teams (or Third Party Vendor …) Production instability Technical Debt Refactoring Bad IT image , … 3. Challenges for a smooth Delivery Pitfalls
  • 30. www.sygit.ch  Early Engagement of Key Stakeholders since first SPRINTs – Architecture team – Security team – Integration, infrastructure & deployment teams  Quality required : Early alignement of all key stakeholders to avoid – Late rejection of deliverables – Technical Debt  Test Team Early Engagement – Test automation – Test Driven Development  Support Team Early engagement  Not too frequent deliveries in production  Non Functional Requirements mandatory for a successful delivery  ITIL concepts 3. Challenges for a smooth Delivery Tips & Tricks
  • 31. www.sygit.ch  Tollgate Process : FIRST : Project Set-up for success and aligned with business strategy  Have Change Delivery « Project Managers »: Business Coordination  Continuous Integration, a challenge if many Products impacted  Strong Acceptance to ensure quality & compliance – Business acceptance (Functional requirements) – Technical acceptance (Non Functional requirements)  « Wagile » implementation: Rigorous transition to Production – Share the Change and the Rollout Roadmap – Quality control – Dependencies identification & Management – Limiting Factors Management (internal and external, Human and Others) – Risk management 3. Challenges for a Delivery Governance
  • 32. www.sygit.ch 4. Human Factor  Project Manager Evolution  Value Added generator  Coach, « Protecting role»  Team Self Management, Self Organized  Have fun working together  Pragmatic approach  Quickly capitalise on Lessons learned – Continuous Improvement  Long term performance  Quality as common objective  DO BETTER does not mean DO MORE OR TOO MUCH : STRESS proof  Collective Intelligence should not prevent the Individual Creativity Manager Controller Inspiring Leader Facilitator !
  • 33. www.sygit.ch Conclusion  Agile Methods = Philisophy and Mindset – nor Dogm neither Toolbox  Take into account the context / environment  Best of Breed from both « Agile and Traditional / Waterfall Worlds »  Be Agile (and open) when implementing Agile  Change Delivery still needs Project Managers  Be Wagile for a smooth transition to production  Agility is too important to be left to the Techies   PMI (Project Management Institute) look for Agility • New credential PMI-ACP (Agile Certification Practitioner) • PMBOK 5th Edition : iterative planning