SlideShare uma empresa Scribd logo
1 de 46
• Laura Dietrich: Maintenance Manger
• Antoinette Lockett: Plant Manger
• Waseem Manzoor: Quality Manger
• Xiaoyan Liu: Production Manger
Meeting Agenda
I. Understanding Downtime -Group
II. Major Losses of TPM -Antoinette Lockett
I. Planned Downtime Losses -Xiaoyan Liu
II. Unplanned Downtime Losses -Laura Dietrich
III. Reduce Speed Losses-
IV. Poor Quality Losses -Waseem Manzoor
III. Total Productive Maintenance
I. What is TPM -Antoinette Lockett
II. Breakdown of TPM -Laura Dietrich
III. TPM History -Laura Dietrich
IV. TPM Evolution
V. Goal of TPM -Antoinette Lockett
VI. Three Principles of Prevention
Meeting Agenda Cont.
I. TPM-8 Pillars-Laura Dietrich
II. Kick off TPM
I. Launching TPM- Preparatory Stage-Antoinette Lockett
II. Autonomous Maintenance- Xiaoyan Liu
III. Equipment Management Life Cycle- Xiaoyan Liu
IV. TPM Implementation-Waseem Manzoor
V. Launching TPM- Stabilization-Waseen Manzoor
VI. Eliminating Equipment Losses-Laura Dietrich
VII. Improvement Goals for Chronic Losses-Laura Dietrich
III. Overall Equipment Efficiency
I. What is OEE-Xiaoyan Liu
II. OEE Factors-Xiayon Liu
III. Calculating OEE-Waseem Manzoor
IV. TPM Benefits-Xiaoyan Liu
Understanding
Downtime
MAJOR LOSSES
Planned Downtime losses
• Start-ups
• shift changes
• coffee and lunch breaks
• planned maintenance shutdowns
Unplanned Downtime Losses
• Equipment breakdown
• Changeovers
• Lack of material
Reduced Speed Losses
• Idling and minor stoppages
• Slow-downs
Poor Quality Losses
• Process non-conformities
• Scrap
TPM
What is Total Productive
Maintenance?
• TPM is a plant improvement
methodology which enables continuous
and rapid improvement of the
manufacturing process through use of
employee involvement, employee
empowerment, and closed-loop
measurement of results
• TOTAL = All encompassing by
maintenance and production
individuals working together
• PRODUCTIVE = Production goods and
services that meet or exceed
customers’ expectations
• MAINTENANCE = Keeping equipment
and plant in as good as or better than
the original conditions at all times
Breakdown of TPM
TPM - History
• Productive maintenance (PM) originated in
the U.S. in late 1940’s & early 1950’s
• Japanese companies modified and enhanced
it to fit the Japanese industrial
environment
• The first use the term TPM was in 1961 by
Nippondenso, a Japanese auto components
manufacturer
• Seiichi Nakajima – head of JIPM, one of
the earliest proponents, known as the
Father of TPM
TPM - Evolution
• Breakdown maintenance
• Preventive maintenance (PM)
• Productive maintenance
• Total productive maintenance
Goals of TPM
1. Aims at getting the most effective use of
equipment
2. Builds a comprehensive PM system
3. Brings together people from all departments
concerned with equipment
4. Requires the support and cooperation of
everyone from top managers down
5. Promotes and implements PM activities based
on autonomous small group activities.
6. Maintaining Equipment for life
7. Encouraging input from all employees
8. Using teams for continuous improvement
Three Principles of Prevention
• Maintenance of normal conditions
• Early discovery of abnormalities
• Prompt response
TPM 8 PILLARS
PILLARS OF TPM
KobetsuKaizen
PlannedMaintenance
QualityMaintenance
Training
OfficeTPM
Safety,healthand
Environment
5s
AutonomousMaintenance
Kick off TPM
Launching TPM- Preparatory Stage
• Announce top management’s decision
to introduce TPM
• Launch an educational campaign to
introduce TPM
• Create an organizational structure to
promote TPM
• Establish basic policies
• Form a master plan for implementing
TPM
Launching TPM- Preliminary
Implementation
• Improve the effectiveness of each critical
piece of equipment
• Set up and implement autonomous
maintenance
• Establish a planned maintenance system in
the maintenance department
• Provide training to improve operator and
maintenance skills
• Develop an early equipment management
program
Launching TPM- TPM Implementation
• Perfect TPM
implementation and raise
TPM levels
Launching TPM- Stabilization
Eliminating Equipment Losses
Improvement Goals for Chronic Losses
OEE
What is OEE
• OEE (overall equipment efficiency) is
a “best practices” way to monitor and
improve the efficiency of your
manufacturing processes
– machines
– manufacturing cells
– assembly lines
OEE Factors
• Plant Operating Time
• Planned production time
– planned downtime ie. breaks
• Availability
– downtime losses
• Performance
– Speed losses
• Quality
– Quality losses
World Class OEE
OEE Factor World Class
Availability 90.0%
Performance 95.0%
Quality 99.9 %
OEE 85.0%
Calculating OEE
• Availability = Operating time/planned
production
• Performance = Ideal Cycle Time / Total
Pieces or
(total pieces / Operating time)/Ideal Run time
• Quality = Good Pieces / Total Pieces
• OEE = Availability X Performance X
Quality
Example OEE Calculation
Item Data
Shift length 8 hrs = 480 min.
Short Breaks 2@ 15 min. = 30 min
Meal Break 1 @ 30 min = 30 min
Down Time 47 min
Ideal Run Time 60 pieces per min
Total Pieces 19,271 pieces
Reject Pieces 423 pieces
Availability =
Operating time
Planned production time
• = 373 minutes / 420 minutes
• = 0.8881 (88.81%)
Performance =
(Total pieces /Operating time)
Ideal Run Time
• = (19,271 pieces/373 minutes)/60
pieces per minute
• = 0.8611 (86.11%)
Quality =
Good Pieces
Total Pieces
• = 18,848 / 19,271 pieces
• = 0.9780 (97.80 %)
OEE =
Availability X Performance X Quality
• = 0.8881 X 0.8611 X 0.9780
• = 0.7479 (74.79%)
TPM BENIFITS
TPM - Benefits
• Improved equipment eliminates the root cause of
defects
• Defects are prevented through planned
maintenance
• Preventive maintenance costs are reduced as
equipment operators conduct autonomous
maintenance
• Improved equipment designs ensure that new
equipment naturally produces fewer defects
• Simplified products designs and a redesigned
process produce with few defects
• Engineers, technicians and managers are trained in
maintenance and quality
TPM - Benefits
(Japanese TPM Prize winners during 1982-
1984)
• Equipment failures reduced from
1,000/month to 20/month
• Quality defects reduced from 1.0% to 0.1%
• Warranty claims reduced by 25%
• Maintenance costs reduced by 30%
• WIP decreased by 50%
• Productivity improved by 50%. (Patterson &
Fredendall, 1995)
TPM – Success stories
• USPS Albany, New York: annual save of
$86,000; could save $4.5 million if applied
nationwide
• Yamato Kogyo Corp., Japan:
- productivity up by 130%,
- accidents cut by 90%,
- defects reduced by 95%,
- employee suggestion rate increased by
over 300%
Tpm new

Mais conteúdo relacionado

Mais procurados

Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and conceptsPaul Robere
 
TPM for lean manufacturing | lean tools
 TPM  for lean manufacturing |  lean tools	 TPM  for lean manufacturing |  lean tools
TPM for lean manufacturing | lean tools 博行 門眞
 
What is total productive maintenance?
What is total productive maintenance?What is total productive maintenance?
What is total productive maintenance?ThreadSol
 
Total productive maintenance assignment_Amitesh singh yadav
Total productive maintenance assignment_Amitesh singh yadavTotal productive maintenance assignment_Amitesh singh yadav
Total productive maintenance assignment_Amitesh singh yadavAmitesh Singh Yadav
 
05 Seminar Slide
05 Seminar Slide05 Seminar Slide
05 Seminar Slidepraful_m_n
 
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...ADD VALUE CONSULTING Inc
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and conceptsRohit Singh
 
Autonomous maintenance ppt
Autonomous maintenance pptAutonomous maintenance ppt
Autonomous maintenance pptSuraj1911
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Sanjeev Deshmukh
 
Total Productive Management
Total Productive ManagementTotal Productive Management
Total Productive ManagementBaibhav Agrawal
 
Powerful TPM-OEE implementation details
Powerful TPM-OEE  implementation details Powerful TPM-OEE  implementation details
Powerful TPM-OEE implementation details Tan Moses
 
Floyd's introduction to total productive maintenance
Floyd's introduction to total productive maintenanceFloyd's introduction to total productive maintenance
Floyd's introduction to total productive maintenanceFloyd Patterson
 

Mais procurados (20)

Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Tpm (group 8)
Tpm (group 8)Tpm (group 8)
Tpm (group 8)
 
TPM for lean manufacturing | lean tools
 TPM  for lean manufacturing |  lean tools	 TPM  for lean manufacturing |  lean tools
TPM for lean manufacturing | lean tools
 
What is total productive maintenance?
What is total productive maintenance?What is total productive maintenance?
What is total productive maintenance?
 
Tpm
TpmTpm
Tpm
 
TPM (en)
TPM (en)TPM (en)
TPM (en)
 
Total productive maintenance assignment_Amitesh singh yadav
Total productive maintenance assignment_Amitesh singh yadavTotal productive maintenance assignment_Amitesh singh yadav
Total productive maintenance assignment_Amitesh singh yadav
 
05 Seminar Slide
05 Seminar Slide05 Seminar Slide
05 Seminar Slide
 
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
 
Tpm new
Tpm newTpm new
Tpm new
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
Autonomous maintenance ppt
Autonomous maintenance pptAutonomous maintenance ppt
Autonomous maintenance ppt
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 
Total Productive Management
Total Productive ManagementTotal Productive Management
Total Productive Management
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
TPM_sample
TPM_sampleTPM_sample
TPM_sample
 
Tpm guide
Tpm guideTpm guide
Tpm guide
 
Powerful TPM-OEE implementation details
Powerful TPM-OEE  implementation details Powerful TPM-OEE  implementation details
Powerful TPM-OEE implementation details
 
Tpm
TpmTpm
Tpm
 
Floyd's introduction to total productive maintenance
Floyd's introduction to total productive maintenanceFloyd's introduction to total productive maintenance
Floyd's introduction to total productive maintenance
 

Semelhante a Tpm new

Total Productivity Maintenance - 60 pg PPT
Total Productivity Maintenance - 60 pg PPTTotal Productivity Maintenance - 60 pg PPT
Total Productivity Maintenance - 60 pg PPTmihirpatel306953
 
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMMMaintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMMsshoaib1
 
Tpm presentation by kaungnyunt
Tpm presentation by kaungnyuntTpm presentation by kaungnyunt
Tpm presentation by kaungnyuntKAUNG NYUNT WIN
 
tpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdftpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdfmihirpatel306953
 
Total Productive Maintenance_Magbatoc.pptx
Total Productive Maintenance_Magbatoc.pptxTotal Productive Maintenance_Magbatoc.pptx
Total Productive Maintenance_Magbatoc.pptxRichardMagbatoc1
 
totalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptxtotalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptxRichardMagbatoc1
 
Maintenance_6.pdf
Maintenance_6.pdfMaintenance_6.pdf
Maintenance_6.pdfIgorKuzle1
 
TPM presentation
TPM presentationTPM presentation
TPM presentationEr Preet
 
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCEMAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCElaxtwinsme
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and conceptsMarvin Norona
 
Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptxMargi Shah
 
Total productive maintainence
Total productive maintainenceTotal productive maintainence
Total productive maintainenceSandeep Chowdary
 

Semelhante a Tpm new (20)

Total productive maintanance
Total productive maintananceTotal productive maintanance
Total productive maintanance
 
Tpm basic
Tpm basicTpm basic
Tpm basic
 
Total Productivity Maintenance - 60 pg PPT
Total Productivity Maintenance - 60 pg PPTTotal Productivity Maintenance - 60 pg PPT
Total Productivity Maintenance - 60 pg PPT
 
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMMMaintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
Maintenance Total Productive TPMMMMMMMMMMMMMMMMMMM
 
TQM-Module 5.pptx
TQM-Module 5.pptxTQM-Module 5.pptx
TQM-Module 5.pptx
 
Tpm presentation by kaungnyunt
Tpm presentation by kaungnyuntTpm presentation by kaungnyunt
Tpm presentation by kaungnyunt
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
tpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdftpmprinciplesandconcepts-190103043928.pdf
tpmprinciplesandconcepts-190103043928.pdf
 
Total Productive Maintenance_Magbatoc.pptx
Total Productive Maintenance_Magbatoc.pptxTotal Productive Maintenance_Magbatoc.pptx
Total Productive Maintenance_Magbatoc.pptx
 
totalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptxtotalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptx
 
Maintenance_6.pdf
Maintenance_6.pdfMaintenance_6.pdf
Maintenance_6.pdf
 
TPM presentation
TPM presentationTPM presentation
TPM presentation
 
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCEMAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
MAINTENANCE POLICIES – PREVENTIVE MAINTENANCE
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
TPM & OEE
TPM & OEETPM & OEE
TPM & OEE
 
Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptx
 
Tpm
TpmTpm
Tpm
 
TPM.pptx
TPM.pptxTPM.pptx
TPM.pptx
 
Unit 1 mpa
Unit 1 mpaUnit 1 mpa
Unit 1 mpa
 
Total productive maintainence
Total productive maintainenceTotal productive maintainence
Total productive maintainence
 

Último

Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...
Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...
Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...lizamodels9
 
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111Sapana Sha
 
Majestic Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore Es...
Majestic Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore Es...Majestic Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore Es...
Majestic Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore Es...amitlee9823
 
What Does The Engine Malfunction Reduced Power Message Mean For Your BMW X5
What Does The Engine Malfunction Reduced Power Message Mean For Your BMW X5What Does The Engine Malfunction Reduced Power Message Mean For Your BMW X5
What Does The Engine Malfunction Reduced Power Message Mean For Your BMW X5Bavarian Workshop
 
➥🔝 7737669865 🔝▻ Bhiwandi Call-girls in Women Seeking Men 🔝Bhiwandi🔝 Escor...
➥🔝 7737669865 🔝▻ Bhiwandi Call-girls in Women Seeking Men  🔝Bhiwandi🔝   Escor...➥🔝 7737669865 🔝▻ Bhiwandi Call-girls in Women Seeking Men  🔝Bhiwandi🔝   Escor...
➥🔝 7737669865 🔝▻ Bhiwandi Call-girls in Women Seeking Men 🔝Bhiwandi🔝 Escor...amitlee9823
 
John Deere 335 375 385 435 Service Repair Manual
John Deere 335 375 385 435 Service Repair ManualJohn Deere 335 375 385 435 Service Repair Manual
John Deere 335 375 385 435 Service Repair ManualExcavator
 
John deere 425 445 455 Maitenance Manual
John deere 425 445 455 Maitenance ManualJohn deere 425 445 455 Maitenance Manual
John deere 425 445 455 Maitenance ManualExcavator
 
Lecture-20 Kleene’s Theorem-1.pptx best for understanding the automata
Lecture-20 Kleene’s Theorem-1.pptx best for understanding the automataLecture-20 Kleene’s Theorem-1.pptx best for understanding the automata
Lecture-20 Kleene’s Theorem-1.pptx best for understanding the automataHUSNAINAHMAD39
 
Is Your BMW PDC Malfunctioning Discover How to Easily Reset It
Is Your BMW PDC Malfunctioning Discover How to Easily Reset ItIs Your BMW PDC Malfunctioning Discover How to Easily Reset It
Is Your BMW PDC Malfunctioning Discover How to Easily Reset ItEuroService Automotive
 
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdfJohn Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdfExcavator
 
Call Girls Bangalore Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Bangalore Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...Call Girls Bangalore Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Bangalore Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...amitlee9823
 
Workplace-Hazards TLE EIM 10 QUARTER3 W2
Workplace-Hazards TLE EIM 10 QUARTER3 W2Workplace-Hazards TLE EIM 10 QUARTER3 W2
Workplace-Hazards TLE EIM 10 QUARTER3 W2johnreyloyola1
 
What Causes BMW Chassis Stabilization Malfunction Warning To Appear
What Causes BMW Chassis Stabilization Malfunction Warning To AppearWhat Causes BMW Chassis Stabilization Malfunction Warning To Appear
What Causes BMW Chassis Stabilization Malfunction Warning To AppearJCL Automotive
 
Vip Mumbai Call Girls Mira Road Call On 9920725232 With Body to body massage ...
Vip Mumbai Call Girls Mira Road Call On 9920725232 With Body to body massage ...Vip Mumbai Call Girls Mira Road Call On 9920725232 With Body to body massage ...
Vip Mumbai Call Girls Mira Road Call On 9920725232 With Body to body massage ...amitlee9823
 
Call Girls Kanakapura Road Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Kanakapura Road Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Kanakapura Road Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Kanakapura Road Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp NumberVip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Numberkumarajju5765
 
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verified
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verifiedConnaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verified
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verifiedDelhi Call girls
 
Escorts Service Rajajinagar ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Rajajinagar ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Rajajinagar ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Rajajinagar ☎ 7737669865☎ Book Your One night Stand (Bangalore)amitlee9823
 

Último (20)

Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...
Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...
Call Girls In Kotla Mubarakpur Delhi ❤️8448577510 ⊹Best Escorts Service In 24...
 
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
 
Majestic Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore Es...
Majestic Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore Es...Majestic Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore Es...
Majestic Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore Es...
 
What Does The Engine Malfunction Reduced Power Message Mean For Your BMW X5
What Does The Engine Malfunction Reduced Power Message Mean For Your BMW X5What Does The Engine Malfunction Reduced Power Message Mean For Your BMW X5
What Does The Engine Malfunction Reduced Power Message Mean For Your BMW X5
 
➥🔝 7737669865 🔝▻ Bhiwandi Call-girls in Women Seeking Men 🔝Bhiwandi🔝 Escor...
➥🔝 7737669865 🔝▻ Bhiwandi Call-girls in Women Seeking Men  🔝Bhiwandi🔝   Escor...➥🔝 7737669865 🔝▻ Bhiwandi Call-girls in Women Seeking Men  🔝Bhiwandi🔝   Escor...
➥🔝 7737669865 🔝▻ Bhiwandi Call-girls in Women Seeking Men 🔝Bhiwandi🔝 Escor...
 
John Deere 335 375 385 435 Service Repair Manual
John Deere 335 375 385 435 Service Repair ManualJohn Deere 335 375 385 435 Service Repair Manual
John Deere 335 375 385 435 Service Repair Manual
 
John deere 425 445 455 Maitenance Manual
John deere 425 445 455 Maitenance ManualJohn deere 425 445 455 Maitenance Manual
John deere 425 445 455 Maitenance Manual
 
Lecture-20 Kleene’s Theorem-1.pptx best for understanding the automata
Lecture-20 Kleene’s Theorem-1.pptx best for understanding the automataLecture-20 Kleene’s Theorem-1.pptx best for understanding the automata
Lecture-20 Kleene’s Theorem-1.pptx best for understanding the automata
 
(ISHITA) Call Girls Service Jammu Call Now 8617697112 Jammu Escorts 24x7
(ISHITA) Call Girls Service Jammu Call Now 8617697112 Jammu Escorts 24x7(ISHITA) Call Girls Service Jammu Call Now 8617697112 Jammu Escorts 24x7
(ISHITA) Call Girls Service Jammu Call Now 8617697112 Jammu Escorts 24x7
 
Is Your BMW PDC Malfunctioning Discover How to Easily Reset It
Is Your BMW PDC Malfunctioning Discover How to Easily Reset ItIs Your BMW PDC Malfunctioning Discover How to Easily Reset It
Is Your BMW PDC Malfunctioning Discover How to Easily Reset It
 
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdfJohn Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
John Deere 7430 7530 Tractors Diagnostic Service Manual W.pdf
 
Call Girls Bangalore Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Bangalore Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...Call Girls Bangalore Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
Call Girls Bangalore Just Call 👗 7737669865 👗 Top Class Call Girl Service Ban...
 
Workplace-Hazards TLE EIM 10 QUARTER3 W2
Workplace-Hazards TLE EIM 10 QUARTER3 W2Workplace-Hazards TLE EIM 10 QUARTER3 W2
Workplace-Hazards TLE EIM 10 QUARTER3 W2
 
(INDIRA) Call Girl Surat Call Now 8250077686 Surat Escorts 24x7
(INDIRA) Call Girl Surat Call Now 8250077686 Surat Escorts 24x7(INDIRA) Call Girl Surat Call Now 8250077686 Surat Escorts 24x7
(INDIRA) Call Girl Surat Call Now 8250077686 Surat Escorts 24x7
 
What Causes BMW Chassis Stabilization Malfunction Warning To Appear
What Causes BMW Chassis Stabilization Malfunction Warning To AppearWhat Causes BMW Chassis Stabilization Malfunction Warning To Appear
What Causes BMW Chassis Stabilization Malfunction Warning To Appear
 
Vip Mumbai Call Girls Mira Road Call On 9920725232 With Body to body massage ...
Vip Mumbai Call Girls Mira Road Call On 9920725232 With Body to body massage ...Vip Mumbai Call Girls Mira Road Call On 9920725232 With Body to body massage ...
Vip Mumbai Call Girls Mira Road Call On 9920725232 With Body to body massage ...
 
Call Girls Kanakapura Road Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Kanakapura Road Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Kanakapura Road Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Kanakapura Road Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp NumberVip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫤 Mahipalpur ➡️ 9711199171 ➡️ Delhi 🫦 Whatsapp Number
 
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verified
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verifiedConnaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verified
Connaught Place, Delhi Call girls :8448380779 Model Escorts | 100% verified
 
Escorts Service Rajajinagar ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Rajajinagar ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Rajajinagar ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Rajajinagar ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 

Tpm new

  • 1.
  • 2. • Laura Dietrich: Maintenance Manger • Antoinette Lockett: Plant Manger • Waseem Manzoor: Quality Manger • Xiaoyan Liu: Production Manger
  • 3. Meeting Agenda I. Understanding Downtime -Group II. Major Losses of TPM -Antoinette Lockett I. Planned Downtime Losses -Xiaoyan Liu II. Unplanned Downtime Losses -Laura Dietrich III. Reduce Speed Losses- IV. Poor Quality Losses -Waseem Manzoor III. Total Productive Maintenance I. What is TPM -Antoinette Lockett II. Breakdown of TPM -Laura Dietrich III. TPM History -Laura Dietrich IV. TPM Evolution V. Goal of TPM -Antoinette Lockett VI. Three Principles of Prevention
  • 4. Meeting Agenda Cont. I. TPM-8 Pillars-Laura Dietrich II. Kick off TPM I. Launching TPM- Preparatory Stage-Antoinette Lockett II. Autonomous Maintenance- Xiaoyan Liu III. Equipment Management Life Cycle- Xiaoyan Liu IV. TPM Implementation-Waseem Manzoor V. Launching TPM- Stabilization-Waseen Manzoor VI. Eliminating Equipment Losses-Laura Dietrich VII. Improvement Goals for Chronic Losses-Laura Dietrich III. Overall Equipment Efficiency I. What is OEE-Xiaoyan Liu II. OEE Factors-Xiayon Liu III. Calculating OEE-Waseem Manzoor IV. TPM Benefits-Xiaoyan Liu
  • 7. Planned Downtime losses • Start-ups • shift changes • coffee and lunch breaks • planned maintenance shutdowns
  • 8. Unplanned Downtime Losses • Equipment breakdown • Changeovers • Lack of material
  • 9. Reduced Speed Losses • Idling and minor stoppages • Slow-downs
  • 10. Poor Quality Losses • Process non-conformities • Scrap
  • 11. TPM
  • 12. What is Total Productive Maintenance? • TPM is a plant improvement methodology which enables continuous and rapid improvement of the manufacturing process through use of employee involvement, employee empowerment, and closed-loop measurement of results
  • 13. • TOTAL = All encompassing by maintenance and production individuals working together • PRODUCTIVE = Production goods and services that meet or exceed customers’ expectations • MAINTENANCE = Keeping equipment and plant in as good as or better than the original conditions at all times Breakdown of TPM
  • 14. TPM - History • Productive maintenance (PM) originated in the U.S. in late 1940’s & early 1950’s • Japanese companies modified and enhanced it to fit the Japanese industrial environment • The first use the term TPM was in 1961 by Nippondenso, a Japanese auto components manufacturer • Seiichi Nakajima – head of JIPM, one of the earliest proponents, known as the Father of TPM
  • 15. TPM - Evolution • Breakdown maintenance • Preventive maintenance (PM) • Productive maintenance • Total productive maintenance
  • 16.
  • 17. Goals of TPM 1. Aims at getting the most effective use of equipment 2. Builds a comprehensive PM system 3. Brings together people from all departments concerned with equipment 4. Requires the support and cooperation of everyone from top managers down 5. Promotes and implements PM activities based on autonomous small group activities. 6. Maintaining Equipment for life 7. Encouraging input from all employees 8. Using teams for continuous improvement
  • 18. Three Principles of Prevention • Maintenance of normal conditions • Early discovery of abnormalities • Prompt response
  • 22. Launching TPM- Preparatory Stage • Announce top management’s decision to introduce TPM • Launch an educational campaign to introduce TPM • Create an organizational structure to promote TPM • Establish basic policies • Form a master plan for implementing TPM
  • 23.
  • 24.
  • 25.
  • 26.
  • 28. • Improve the effectiveness of each critical piece of equipment • Set up and implement autonomous maintenance • Establish a planned maintenance system in the maintenance department • Provide training to improve operator and maintenance skills • Develop an early equipment management program Launching TPM- TPM Implementation
  • 29. • Perfect TPM implementation and raise TPM levels Launching TPM- Stabilization
  • 31. Improvement Goals for Chronic Losses
  • 32. OEE
  • 33. What is OEE • OEE (overall equipment efficiency) is a “best practices” way to monitor and improve the efficiency of your manufacturing processes – machines – manufacturing cells – assembly lines
  • 34. OEE Factors • Plant Operating Time • Planned production time – planned downtime ie. breaks • Availability – downtime losses • Performance – Speed losses • Quality – Quality losses
  • 35. World Class OEE OEE Factor World Class Availability 90.0% Performance 95.0% Quality 99.9 % OEE 85.0%
  • 36. Calculating OEE • Availability = Operating time/planned production • Performance = Ideal Cycle Time / Total Pieces or (total pieces / Operating time)/Ideal Run time • Quality = Good Pieces / Total Pieces • OEE = Availability X Performance X Quality
  • 37. Example OEE Calculation Item Data Shift length 8 hrs = 480 min. Short Breaks 2@ 15 min. = 30 min Meal Break 1 @ 30 min = 30 min Down Time 47 min Ideal Run Time 60 pieces per min Total Pieces 19,271 pieces Reject Pieces 423 pieces
  • 38. Availability = Operating time Planned production time • = 373 minutes / 420 minutes • = 0.8881 (88.81%)
  • 39. Performance = (Total pieces /Operating time) Ideal Run Time • = (19,271 pieces/373 minutes)/60 pieces per minute • = 0.8611 (86.11%)
  • 40. Quality = Good Pieces Total Pieces • = 18,848 / 19,271 pieces • = 0.9780 (97.80 %)
  • 41. OEE = Availability X Performance X Quality • = 0.8881 X 0.8611 X 0.9780 • = 0.7479 (74.79%)
  • 43. TPM - Benefits • Improved equipment eliminates the root cause of defects • Defects are prevented through planned maintenance • Preventive maintenance costs are reduced as equipment operators conduct autonomous maintenance • Improved equipment designs ensure that new equipment naturally produces fewer defects • Simplified products designs and a redesigned process produce with few defects • Engineers, technicians and managers are trained in maintenance and quality
  • 44. TPM - Benefits (Japanese TPM Prize winners during 1982- 1984) • Equipment failures reduced from 1,000/month to 20/month • Quality defects reduced from 1.0% to 0.1% • Warranty claims reduced by 25% • Maintenance costs reduced by 30% • WIP decreased by 50% • Productivity improved by 50%. (Patterson & Fredendall, 1995)
  • 45. TPM – Success stories • USPS Albany, New York: annual save of $86,000; could save $4.5 million if applied nationwide • Yamato Kogyo Corp., Japan: - productivity up by 130%, - accidents cut by 90%, - defects reduced by 95%, - employee suggestion rate increased by over 300%