DEFINITION OF SURVEYINGDEFINITION OF SURVEYING
1. SURVEYING is the art of determining the positions of points on or
near the earth’s surface by means of measurements in the three
elements of space; namely distance, direction, and elevation.
(Rayner and Schmidt)
2. SURVEYING is the art of measuring horizontal and vertical
distances between objects, of measuring angles between lines, of
determining the direction of lines, and of establishing points by
predetermined angular and linear measurements. (Davis, Foote,
Anderson and Mikhail)
3. SURVEYING is the art of making such measurements of the relative
positions of points on the surface of the earth that, on drawing them
to scale, natural and artificial features may be exhibited in their
correct horizontal or vertical relationship. (Clarke)
4. SURVEYING is that branch of applied mathematics which teaches
the art of determining the area of any portion of the earth’s surface,
the length and directions of the boundary lines, the contour of the
surfaces, and of accurately delineating the whole paper. (Webster)
5. SURVEYING is the science or art of making such
measurements as are necessary to determine the
relative position of points above, on, or beneath the
surface of the earth, or to establish such points. (Breed,
Hosmer, and Bone)
6. SURVEYING is the science and art of determining
relative positions of points above, on, or beneath the
surface of the earth, or establishing such points. (Brinker
and wolf)
7. SURVEYING the art and science of determining angular
and linear measurements to establish the form, extent,
and relative position of the points, lines, and areas on or
near the surface of the earth or on other extraterrestrial
bodies through applied mathematics and the use of
specialized equipment and techniques.(Juny Pilapil LA PUTT)
TWO GENERAL CLASSIFICATIONS OFTWO GENERAL CLASSIFICATIONS OF
SURVEYINGSURVEYING
• PLANE SURVEYING is that type of
surveying in which the earth is considered
to be a flat surface, and where distances
and areas involved are of limited extent
that the exact shape of the earth is
disregarded.
• GEODETIC SURVEYING are surveys of
wide extent which take into account the
spheroidal shape of the earth.
TYPES OF SURVEYSTYPES OF SURVEYS
1. CADASTRAL SURVEYS are usually closed
surveys which are undertaken in urban and
rural locations for the purpose of determining
and defining property lines and boundaries,
corners, and areas. These surveys are also
made to fix the boundaries of municipalities,
towns, and provincial jurisdictions.
2. CITY SURVEYS are surveys of the areas in
and near a city for the purpose of planning
expansions or improvements, locating property
lines, fixing reference monuments, determining
the physical features and configuration of the
land, and preparing maps.
3. CONSTRUCTION SURVEYS these are surveys which
are undertaken at a construction site to provide data
regarding grades, reference lines, dimensions, ground
configuration, and the location and elevation of
structures which are of concern to engineers, architects,
and builders.
4. FORESTRY SURVEYS a type of survey executed in
connection with forest management and mensuration,
and the production and conservation of forest lands.
5. HYDROGRAPHIC SURVEYS refer to surveying
streams, lakes, reservoirs, harbors, oceans, and other
bodies of water. These surveys are made to map shore
lines, chart the shape of areas underlying water
surfaces, and measure the flows of the stream.They are
of general importance in connection with navigation,
development of water supply and resources, flood
control, irrigation, production of hydro-electric power, sub
aqueous constructions, and recreations.
6. INDUSTRIAL SURVEY sometimes known as
optical tooling. It refers to the use of surveying
techniques in ship building, construction and
assembly of aircraft, layout and installation of
heavy and complex machinery, and in other
industries where very accurate dimensional
layouts are required.
7. MINE SURVEYS are surveys which are
performed to determine the position of all
underground excavations and surface mine
structures, to fix surfaces boundaries of mining
claims, determine geological formations, to
calculate excavated volumes, and establish lines
and grades for other related mining work.
8. PHOTOGRAMMETRIC SURVEYS a type of
survey which makes use of photographs taken
with specially designed cameras either from
airplanes or ground stations. Measurements are
obtained from the photographs which are used
in conjunction with limited ground surveys.
9. ROUTE SURVEYS involves the determination
of alignment, grades, earthwork quantities,
location of natural and artificial objects in
connection with the planning, design, and
construction of highways, railroads, pipelines,
canals, transmission lines, and other linear
projects.
10. TOPOGRAPHIC SURVEYS are those
surveys made for determining the shape
of the ground, and the location and
elevation of natural and artificial features
upon it. The features shown include such
natural objects as hills, mountains, rivers,
lakes, relief of the ground surface, etc; and
works of man, such as roads, building,
ports, towns, municipalities, and bridges.
Units of measurementsUnits of measurements
1. LINEAR measurements which includes
the length, width, thickness, depth and the
distance. The units are meter cm and mm
and kilometer
Other related definitionsOther related definitions
• Photogrammetry – is the science of
mapping out a big track of land and
consists in taking overlapping photographs
from an aeroplane flown at adequate
altitude and interpreting such photos on
stereoscopic machines for topography or
fixing land boundaries.
Control – is a framework or a skeleton of a
survey consisting of established station
whose relative positions have been
established accurately and from which the
details of the map are determined.
Triangulation – is the method of establishing
horizontal control by selecting stations
forming-well proportioned triangles. All the
angles of the triangles are measured by
repetition. Only one side, called base line,
is measured accurately, the other side are
computed.
• Trilateration – is that method of fixing the
horizontal control and consists in
measuring all sides with electronic
instruments, the angles are calculated.
DISTANCE MEASUREMENTSDISTANCE MEASUREMENTS
• Errors in Measuring distances
• 1. tape not standard length
• 2. imperfect alignment of tape
• 3. tape not horizontal
• 4. tape not stretch straight
• 5. imperfections of observation
• 6. variations in temperature
• 7. variations in tension
• 8. effect of sag
MISTAKES IN MEASURINGMISTAKES IN MEASURING
DISTANCESDISTANCES
• 1. Adding or dropping a full tape length
• 2. Adding a foot, usually in measuring the
fractional part of tape length at the end of
the line.
• 3. Reading numbers incorrectly
• 4. recording numbers incorrectly
• 5. Reading wrong meter mark.
TWO METHODS OF MEASURINGTWO METHODS OF MEASURING
DISTANCEDISTANCE
• 1. PACING – furnishes us a rapid means
of approximately checking more precise
measurements of distance. This principles
involves the determination of individuals
pace factor by dividing the average
number of paces to the distance of the
course using the tape.
• p.f. = average number of paces / dist using the tape
Then the determination of the unknown pace distance by
multiplying the average number of paces by the pace
factor.
Unknown distance = pace factor x average number of paces
Example:
A. Determination of individuals pace factor:
Trial Line No. of paces
1 A – B 68
2 B – A 69
3 A – B 70
4 B – A 67
Solution :
a) Total number of paces = 68 + 69 + 70 + 67 = 274
b) Average number of paces = total no. of paces / no. of trials
= 274 / 4 = 68.50
c) Pace factor (p.f.) = measured dist by tape / ave. no. of paces
= 50 m / 68.5 = 0.73
B. Determination of unknown distance:
Trial Line No. of Paces
1 B – C 38
2 C – B 39
3 B – C 38.50
Solution:
a) Total no. of paces = 38 + 39 + 38.5 = 115.50
b) Average no. of paces = 115 / 3 = 38.50
c) Unknown distance = p.f. x ave. no. of paces
= 0.73 x 38.50
= 28.105 m
Percent of Difference = Difference between the
true and computed value over the average
between the two values.
Unknown distance = 28.105 m (computed value)
Tape distance = 28.00 (true value)
% of Difference = .105 / 28.0525 x 100
= 3.74%
Percent of Error = Difference between the true
value and computed value over the true value
%of error = 0.105 / 28 x 100 = 3.75%
Exercises:
A. From the given field notes below:
Trial Line No. of paces
1 A – B 79.5
2 B – A 79.00
3 A – B 78.20
4 B – A 79.20
5 A – B 79.50
Compute:
a) Average no. of paces
b) pace factor if the measured distance is 70 m?
B. Given the ff. data below:
Trial Line No. of paces
1 B – C 55.00
2 C – B 58.00
3 B – C 57.00
4 C – B 55.00
5 B – C 56.00
Compute:
a) Average no. of paces
b) unknown distance use p.f. as computed in problem A
c) If the measured distance between B – C is
50m, find the % of difference and error.
2. Chaining or Taping :
is the operation of measuring horizontal or inclined
distance by the use of tape.
Factors affecting the Tape ( tape correction)
a. Temperature Correction
Ct = k ( T2 – T1)
where:
Ct = Correction for temperature
( added or subtracted )
k = temperature coefficient
( 0.0000116/0
C , 0.00000645/0
F)
T1 = temp during standardization of tape
T2 = temp during actual measurements
L = length of tape at temperature T1
b. Pull Correction
Cp = ( P2 – P1)L / AE
where:
Cp = Correction for pull (Added of subtraction)
E = modulus of elasticity
A = Cross-sectional area of tape
P2 = applied pull during actual measurements
P1 = applied pull during standardization of tape
L = length of tape at pull ( P1)
C. Sag Correction
Cs = w2
L3
/ 24 P2
where:
Cs = correction for sag ( subtract always)
w = weight of the tape per unit length(kg/m)
L = unsopported length of tape
P = applied pull during actual measurement
Slope Correction
Cs = h2
/ 2S
where
Cs = correction for slope ( always subtracted)
h = difference in elevation between tape ends
s = slope/ inclined distance

Mais conteúdo relacionado

Mais procurados

Lecture 02 distance corrections
Lecture 02 distance correctionsLecture 02 distance corrections
Lecture 02 distance corrections
Rehan Hanif
 
Levelling report-1
Levelling report-1Levelling report-1
Levelling report-1
tfkc1212
 
Triangulation and trilateration pdf...
Triangulation and trilateration pdf...Triangulation and trilateration pdf...
Triangulation and trilateration pdf...
Gokul Saud
 
Basics Of Surveying
Basics Of SurveyingBasics Of Surveying
Basics Of Surveying
stooty s
 

Mais procurados (20)

70148
70148 70148
70148
 
Ge 105 lecture 4 (TRIANGULATION ADJUSTMENT) by: Broddett B. Abatayo
Ge 105 lecture 4 (TRIANGULATION ADJUSTMENT) by: Broddett B. AbatayoGe 105 lecture 4 (TRIANGULATION ADJUSTMENT) by: Broddett B. Abatayo
Ge 105 lecture 4 (TRIANGULATION ADJUSTMENT) by: Broddett B. Abatayo
 
Conventional and modern surveying instruments
Conventional and modern surveying instrumentsConventional and modern surveying instruments
Conventional and modern surveying instruments
 
Surveying ch-two
Surveying ch-twoSurveying ch-two
Surveying ch-two
 
Lecture 02 distance corrections
Lecture 02 distance correctionsLecture 02 distance corrections
Lecture 02 distance corrections
 
Balancing of traverse
Balancing of traverseBalancing of traverse
Balancing of traverse
 
Traverse Survey Part 2/2
Traverse Survey Part 2/2Traverse Survey Part 2/2
Traverse Survey Part 2/2
 
Levelling report-1
Levelling report-1Levelling report-1
Levelling report-1
 
Triangulation survey
Triangulation surveyTriangulation survey
Triangulation survey
 
surveying- lecture notes for engineers
surveying- lecture notes for engineerssurveying- lecture notes for engineers
surveying- lecture notes for engineers
 
Triangulation
Triangulation Triangulation
Triangulation
 
Surveying
SurveyingSurveying
Surveying
 
Surveying instruments with their uses
Surveying instruments with their uses Surveying instruments with their uses
Surveying instruments with their uses
 
Lecture 03 theory of errors in observations
Lecture 03 theory of errors in observationsLecture 03 theory of errors in observations
Lecture 03 theory of errors in observations
 
Ge 122 lecture 3 (CADASTRAL AND PUBLIC LAND SUBDIVISION SURVEY) by: Broddett ...
Ge 122 lecture 3 (CADASTRAL AND PUBLIC LAND SUBDIVISION SURVEY) by: Broddett ...Ge 122 lecture 3 (CADASTRAL AND PUBLIC LAND SUBDIVISION SURVEY) by: Broddett ...
Ge 122 lecture 3 (CADASTRAL AND PUBLIC LAND SUBDIVISION SURVEY) by: Broddett ...
 
Triangulation and trilateration pdf...
Triangulation and trilateration pdf...Triangulation and trilateration pdf...
Triangulation and trilateration pdf...
 
PROBLEMS ON BEARINGS
PROBLEMS ON BEARINGSPROBLEMS ON BEARINGS
PROBLEMS ON BEARINGS
 
Basics Of Surveying
Basics Of SurveyingBasics Of Surveying
Basics Of Surveying
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
Triangulation and Trilateration
Triangulation and TrilaterationTriangulation and Trilateration
Triangulation and Trilateration
 

Semelhante a Introduction to surveying

S2 1 introduction of basic surveying
S2 1 introduction of basic surveyingS2 1 introduction of basic surveying
S2 1 introduction of basic surveying
Est
 
Distance Measurement & Chain Surveying
Distance Measurement & Chain SurveyingDistance Measurement & Chain Surveying
Distance Measurement & Chain Surveying
Bahzad5
 

Semelhante a Introduction to surveying (20)

Engineering survey
Engineering surveyEngineering survey
Engineering survey
 
Surveying
Surveying Surveying
Surveying
 
Fundamentals of surveying
Fundamentals of surveyingFundamentals of surveying
Fundamentals of surveying
 
Surveying presentation and its objectives in detail including principles,hist...
Surveying presentation and its objectives in detail including principles,hist...Surveying presentation and its objectives in detail including principles,hist...
Surveying presentation and its objectives in detail including principles,hist...
 
Surveying (introduction)
Surveying (introduction)Surveying (introduction)
Surveying (introduction)
 
Introduction to survey
Introduction to surveyIntroduction to survey
Introduction to survey
 
Basics of surveying
Basics of surveyingBasics of surveying
Basics of surveying
 
INTRODUCTION TO SURVEYING
INTRODUCTION TO SURVEYINGINTRODUCTION TO SURVEYING
INTRODUCTION TO SURVEYING
 
S2 1 introduction of basic surveying
S2 1 introduction of basic surveyingS2 1 introduction of basic surveying
S2 1 introduction of basic surveying
 
fundamentals_of_surveying (2).pdf
fundamentals_of_surveying (2).pdffundamentals_of_surveying (2).pdf
fundamentals_of_surveying (2).pdf
 
Distance Measurement & Chain Surveying
Distance Measurement & Chain SurveyingDistance Measurement & Chain Surveying
Distance Measurement & Chain Surveying
 
30838893 chain-survey
30838893 chain-survey30838893 chain-survey
30838893 chain-survey
 
Traversing Notes |surveying II | Sudip khadka
Traversing Notes |surveying II | Sudip khadka Traversing Notes |surveying II | Sudip khadka
Traversing Notes |surveying II | Sudip khadka
 
surveying.ppt
surveying.pptsurveying.ppt
surveying.ppt
 
surveying.ppt
surveying.pptsurveying.ppt
surveying.ppt
 
Surveying
SurveyingSurveying
Surveying
 
Application of surveying
Application of surveyingApplication of surveying
Application of surveying
 
TYPES OF SURVEYING.docx
TYPES OF SURVEYING.docxTYPES OF SURVEYING.docx
TYPES OF SURVEYING.docx
 
Module 4 Introduction to Surveying and Levelling.pptx
Module 4 Introduction to Surveying and Levelling.pptxModule 4 Introduction to Surveying and Levelling.pptx
Module 4 Introduction to Surveying and Levelling.pptx
 
79338922 survey-report
79338922 survey-report79338922 survey-report
79338922 survey-report
 

Último

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Último (20)

HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 

Introduction to surveying

  • 2. DEFINITION OF SURVEYINGDEFINITION OF SURVEYING 1. SURVEYING is the art of determining the positions of points on or near the earth’s surface by means of measurements in the three elements of space; namely distance, direction, and elevation. (Rayner and Schmidt) 2. SURVEYING is the art of measuring horizontal and vertical distances between objects, of measuring angles between lines, of determining the direction of lines, and of establishing points by predetermined angular and linear measurements. (Davis, Foote, Anderson and Mikhail) 3. SURVEYING is the art of making such measurements of the relative positions of points on the surface of the earth that, on drawing them to scale, natural and artificial features may be exhibited in their correct horizontal or vertical relationship. (Clarke) 4. SURVEYING is that branch of applied mathematics which teaches the art of determining the area of any portion of the earth’s surface, the length and directions of the boundary lines, the contour of the surfaces, and of accurately delineating the whole paper. (Webster)
  • 3. 5. SURVEYING is the science or art of making such measurements as are necessary to determine the relative position of points above, on, or beneath the surface of the earth, or to establish such points. (Breed, Hosmer, and Bone) 6. SURVEYING is the science and art of determining relative positions of points above, on, or beneath the surface of the earth, or establishing such points. (Brinker and wolf) 7. SURVEYING the art and science of determining angular and linear measurements to establish the form, extent, and relative position of the points, lines, and areas on or near the surface of the earth or on other extraterrestrial bodies through applied mathematics and the use of specialized equipment and techniques.(Juny Pilapil LA PUTT)
  • 4. TWO GENERAL CLASSIFICATIONS OFTWO GENERAL CLASSIFICATIONS OF SURVEYINGSURVEYING • PLANE SURVEYING is that type of surveying in which the earth is considered to be a flat surface, and where distances and areas involved are of limited extent that the exact shape of the earth is disregarded. • GEODETIC SURVEYING are surveys of wide extent which take into account the spheroidal shape of the earth.
  • 5. TYPES OF SURVEYSTYPES OF SURVEYS 1. CADASTRAL SURVEYS are usually closed surveys which are undertaken in urban and rural locations for the purpose of determining and defining property lines and boundaries, corners, and areas. These surveys are also made to fix the boundaries of municipalities, towns, and provincial jurisdictions. 2. CITY SURVEYS are surveys of the areas in and near a city for the purpose of planning expansions or improvements, locating property lines, fixing reference monuments, determining the physical features and configuration of the land, and preparing maps.
  • 6. 3. CONSTRUCTION SURVEYS these are surveys which are undertaken at a construction site to provide data regarding grades, reference lines, dimensions, ground configuration, and the location and elevation of structures which are of concern to engineers, architects, and builders. 4. FORESTRY SURVEYS a type of survey executed in connection with forest management and mensuration, and the production and conservation of forest lands. 5. HYDROGRAPHIC SURVEYS refer to surveying streams, lakes, reservoirs, harbors, oceans, and other bodies of water. These surveys are made to map shore lines, chart the shape of areas underlying water surfaces, and measure the flows of the stream.They are of general importance in connection with navigation, development of water supply and resources, flood control, irrigation, production of hydro-electric power, sub aqueous constructions, and recreations.
  • 7. 6. INDUSTRIAL SURVEY sometimes known as optical tooling. It refers to the use of surveying techniques in ship building, construction and assembly of aircraft, layout and installation of heavy and complex machinery, and in other industries where very accurate dimensional layouts are required. 7. MINE SURVEYS are surveys which are performed to determine the position of all underground excavations and surface mine structures, to fix surfaces boundaries of mining claims, determine geological formations, to calculate excavated volumes, and establish lines and grades for other related mining work.
  • 8. 8. PHOTOGRAMMETRIC SURVEYS a type of survey which makes use of photographs taken with specially designed cameras either from airplanes or ground stations. Measurements are obtained from the photographs which are used in conjunction with limited ground surveys. 9. ROUTE SURVEYS involves the determination of alignment, grades, earthwork quantities, location of natural and artificial objects in connection with the planning, design, and construction of highways, railroads, pipelines, canals, transmission lines, and other linear projects.
  • 9. 10. TOPOGRAPHIC SURVEYS are those surveys made for determining the shape of the ground, and the location and elevation of natural and artificial features upon it. The features shown include such natural objects as hills, mountains, rivers, lakes, relief of the ground surface, etc; and works of man, such as roads, building, ports, towns, municipalities, and bridges.
  • 10. Units of measurementsUnits of measurements 1. LINEAR measurements which includes the length, width, thickness, depth and the distance. The units are meter cm and mm and kilometer
  • 11. Other related definitionsOther related definitions • Photogrammetry – is the science of mapping out a big track of land and consists in taking overlapping photographs from an aeroplane flown at adequate altitude and interpreting such photos on stereoscopic machines for topography or fixing land boundaries.
  • 12. Control – is a framework or a skeleton of a survey consisting of established station whose relative positions have been established accurately and from which the details of the map are determined. Triangulation – is the method of establishing horizontal control by selecting stations forming-well proportioned triangles. All the angles of the triangles are measured by repetition. Only one side, called base line, is measured accurately, the other side are computed.
  • 13. • Trilateration – is that method of fixing the horizontal control and consists in measuring all sides with electronic instruments, the angles are calculated.
  • 14. DISTANCE MEASUREMENTSDISTANCE MEASUREMENTS • Errors in Measuring distances • 1. tape not standard length • 2. imperfect alignment of tape • 3. tape not horizontal • 4. tape not stretch straight • 5. imperfections of observation • 6. variations in temperature • 7. variations in tension • 8. effect of sag
  • 15. MISTAKES IN MEASURINGMISTAKES IN MEASURING DISTANCESDISTANCES • 1. Adding or dropping a full tape length • 2. Adding a foot, usually in measuring the fractional part of tape length at the end of the line. • 3. Reading numbers incorrectly • 4. recording numbers incorrectly • 5. Reading wrong meter mark.
  • 16. TWO METHODS OF MEASURINGTWO METHODS OF MEASURING DISTANCEDISTANCE • 1. PACING – furnishes us a rapid means of approximately checking more precise measurements of distance. This principles involves the determination of individuals pace factor by dividing the average number of paces to the distance of the course using the tape. • p.f. = average number of paces / dist using the tape
  • 17. Then the determination of the unknown pace distance by multiplying the average number of paces by the pace factor. Unknown distance = pace factor x average number of paces Example: A. Determination of individuals pace factor: Trial Line No. of paces 1 A – B 68 2 B – A 69 3 A – B 70 4 B – A 67 Solution : a) Total number of paces = 68 + 69 + 70 + 67 = 274 b) Average number of paces = total no. of paces / no. of trials = 274 / 4 = 68.50 c) Pace factor (p.f.) = measured dist by tape / ave. no. of paces = 50 m / 68.5 = 0.73
  • 18. B. Determination of unknown distance: Trial Line No. of Paces 1 B – C 38 2 C – B 39 3 B – C 38.50 Solution: a) Total no. of paces = 38 + 39 + 38.5 = 115.50 b) Average no. of paces = 115 / 3 = 38.50 c) Unknown distance = p.f. x ave. no. of paces = 0.73 x 38.50 = 28.105 m
  • 19. Percent of Difference = Difference between the true and computed value over the average between the two values. Unknown distance = 28.105 m (computed value) Tape distance = 28.00 (true value) % of Difference = .105 / 28.0525 x 100 = 3.74% Percent of Error = Difference between the true value and computed value over the true value %of error = 0.105 / 28 x 100 = 3.75%
  • 20. Exercises: A. From the given field notes below: Trial Line No. of paces 1 A – B 79.5 2 B – A 79.00 3 A – B 78.20 4 B – A 79.20 5 A – B 79.50 Compute: a) Average no. of paces b) pace factor if the measured distance is 70 m?
  • 21. B. Given the ff. data below: Trial Line No. of paces 1 B – C 55.00 2 C – B 58.00 3 B – C 57.00 4 C – B 55.00 5 B – C 56.00 Compute: a) Average no. of paces b) unknown distance use p.f. as computed in problem A c) If the measured distance between B – C is 50m, find the % of difference and error.
  • 22. 2. Chaining or Taping : is the operation of measuring horizontal or inclined distance by the use of tape. Factors affecting the Tape ( tape correction) a. Temperature Correction Ct = k ( T2 – T1) where: Ct = Correction for temperature ( added or subtracted ) k = temperature coefficient ( 0.0000116/0 C , 0.00000645/0 F) T1 = temp during standardization of tape T2 = temp during actual measurements L = length of tape at temperature T1
  • 23. b. Pull Correction Cp = ( P2 – P1)L / AE where: Cp = Correction for pull (Added of subtraction) E = modulus of elasticity A = Cross-sectional area of tape P2 = applied pull during actual measurements P1 = applied pull during standardization of tape L = length of tape at pull ( P1)
  • 24. C. Sag Correction Cs = w2 L3 / 24 P2 where: Cs = correction for sag ( subtract always) w = weight of the tape per unit length(kg/m) L = unsopported length of tape P = applied pull during actual measurement
  • 25. Slope Correction Cs = h2 / 2S where Cs = correction for slope ( always subtracted) h = difference in elevation between tape ends s = slope/ inclined distance