INTRODUCTION
 A stress ribbon bridge is a tension structure (similar in
many ways to a simple suspension bridge).
 Stress Ribbon Bridge uses the theory of a catenary
transmitting loads via tension in the deck to abutments
which are anchored to the ground.
 Unlike the simple span the ribbon is stressed in
compression, which adds to the stiffness of the structure.
 Stress ribbon bridges are very economical, aesthetic and
almost maintenance free structure. They require minimal
quantity of materials.
HISTORY
 The first stress ribbon bridge was constructed in Switzerland in the 1960s.
This concept was first introduced by a German engineer Ulrich
Finsterwalder.
FORM OF A STRESS RIBBON BRIDGE
Superstructure:-
 A typical stress ribbon bridge deck consists of precast concrete planks with
bearing tendons to support them during construction and separate pre stressing
tendons which are tensioned to create the final designed geometric form.
 The pre stressing tendons transfer horizontal forces in to the abutments and
then to the ground most often using ground anchors.
 The tendons are encased in ducts which are generally grouted after tensioning in
order to lock in the stress and protect them from corrosion. Since the bending in
the deck is low, the depth can be minimized and results in reduction in dead
load and horizontal forces in abutments.
 The abutments are designed to transfer the horizontal forces from
the deck cables into the ground via ground anchors. Pedestrians,
wind and temperature loads can cause large changes in the bending
moments in the deck close to the abutments and accordingly crack
widths and fatigue in reinforcement must be considered.
 The ground anchors are normally tensioned in 2 stages, the first
step is tensioned before the deck is erected and the rest, after the
deck is complete. If stressed in one stage only, there will be a large
out of balance force to be resisted by the abutments in the
temporary case.
 The soil pressure, overturning and sliding has to be checked for
construction as well as permanent condition.
 Substructure:-
Ground Conditions:-
 The ideal ground condition for resisting large horizontal forces from the ribbon
is a rock base. This occurs rarely but suitable foundations can be devised even
if competent soils are only found at some depth below the abutments.
 In some cases where soil conditions do not permit the use of anchors, piles
can also be used. Horizontal deformations can be significant and are
considered in the design.
 It is also possible to use a combination of anchors and drilled shafts. Battered
micropilling is another alternative which can resist the load from the ribbon
because of its compression and tension capacity.
CONSTRUCTION TECHNIQUE
 The abutments and piers are built first. Next the bearing cables were stretched from
abutment to abutment and draped over steel saddles that rested atop the piers.
 The bearing tendons generally support the structure during construction, and only rarely
is additional false work used. Once the bearing cables were tensioned to the specified
design force, precast panels were suspended via support rods located at the four corners
of each panel. At this point the bridge sagged into its catenary shape.
 The next step was to place post tensioning ducts in the bridge. The ducts were placed
directly above the bearing cables and support rods, which are all located in two
longitudinal troughs that run the length of the bridge. After the ducts were in place, the
cast-in place concrete was placed in the longitudinal troughs in small transverse closure
joints.
STRUCTURAL SYSTEM
 The development of the self-anchored stress-ribbon structure supported by an arch.
 It is clear that the intermediate support of a multi-span stress-ribbon can also have the
shape of an arch.
 The arch serves as a saddle from which the stress-ribbon spans can rise during post-
tensioning and during temperature drop, and where the center "band" can rest during a
temperature rise.
 In the initial stage, the stress-ribbon behaves as a two-span cable supported by the
saddle that is fixed to the end abutments.
COMPARISION WITH SIMPLE SUSPENSION
BRIDGE
 A stress ribbon bridge is a tension
structure similar in many ways to a
simple suspension bridge. The
suspension cables are embedded in
the deck which follows a catenary
arc between the supports.
 Unlike the simple span the ribbon
is stressed in compression, which
adds to the stiffness of the
structure.
 As opposed to suspension bridges,
where the cables carry the load, in
stress ribbon, by tensioning the
cables and the deck between
abutments, the deck shares axial
tension forces.
 A simple suspension span tends to
sway and bounce. The supports in
turn support upward thrusting arcs
that allow the grade to be changed
between spans, where multiple
spans are used.
ADVANTAGES
 Stress ribbon pedestrian bridges are very economical, aesthetical and almost
maintenance free structures.
 They require minimal quantity of materials.
 They are erected independently from existing terrain and therefore they have
a minimum impact upon the environment during construction.
 They are quick and convenient to construct if given appropriate conditions,
without false work.
 A stress ribbon bridge allows for long spans with a minimum number of
piers and the piers can be shorter than those required for cable stayed or
suspension bridges.
APPLICATION & INSTANCE
 Eco duct:
 A tunnel which was built as part of a large network of motorways outside Brno.
The theory is the same as a self-anchored arch but the geometry is much more
complex. It is 50m wide and spans 70m a finite element program was used in
its design.
 Stuttgart trade fair hall roof: The suspended asymmetric roof comprises a
regular repetition of stressed trusses with individual I-beam ribbons of steel
between them. The trusses function as strut and tie A-frames based on
concrete strip foundations and are tied back to the ground with anchors. The
stresses in the ribbons and weight of its ‘green roof’ were used to resist wind
uplift.
CONCLUSION
 Stress ribbon bridges are a versatile form of bridge, the adaptable form of
structure is applicable to a variety of requirements.
 The slender decks are visually pleasing and have a visual impact on
surroundings giving a light aesthetic impression.
 Post tensioned concrete minimizes cracking and assures durability. Bearings
and expansion joints are rarely required minimizing maintenance and
inspections.
 Since erection using pre-cast segments does not depend on particular site
condition and permits labour saving erection and a short time to delivery.
Using bearing tendons can eliminate the need for site form work and large
plant, contributing to fast construction programmes and preservation of the
environments.
 Stressed ribbon bridge is a solution to the areas which require aesthetic yet
cost effective pedestrian bridges to be built .
THANK YOU

Mais conteúdo relacionado

Mais procurados

Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteRajat Nainwal
 
suspension bridge ppt
suspension bridge pptsuspension bridge ppt
suspension bridge pptSAI KIRAN
 
Advantages and disadvantages of Prestressed concrete
Advantages and disadvantages of Prestressed concreteAdvantages and disadvantages of Prestressed concrete
Advantages and disadvantages of Prestressed concreteBaruti Balinda Jonathan
 
stress ribbon bridge.pptx
stress ribbon bridge.pptxstress ribbon bridge.pptx
stress ribbon bridge.pptxSauravShahane
 
“BACTERIAL CONCRETE” ppt
“BACTERIAL CONCRETE” ppt“BACTERIAL CONCRETE” ppt
“BACTERIAL CONCRETE” pptAjeetPanedakatti
 
High performance concrete ppt
High performance concrete pptHigh performance concrete ppt
High performance concrete pptGoogle
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteRajesh Burde
 
Pre-stressed concrete
Pre-stressed concrete Pre-stressed concrete
Pre-stressed concrete aishwaryasanap
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Rajesh Prasad
 
SEMINAR PRESENTATION ON BOX CULVERTS
SEMINAR PRESENTATION ON  BOX CULVERTSSEMINAR PRESENTATION ON  BOX CULVERTS
SEMINAR PRESENTATION ON BOX CULVERTSsrinivas cnu
 
CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls Manvinder Kingra
 
Suspension Bridges VS Cable-Stayed Bridges
Suspension Bridges VS Cable-Stayed BridgesSuspension Bridges VS Cable-Stayed Bridges
Suspension Bridges VS Cable-Stayed BridgesHussein Zidan
 
post tensioning slabs
post tensioning slabspost tensioning slabs
post tensioning slabsgopichand's
 
Ready mix concrete
Ready mix concreteReady mix concrete
Ready mix concreteBala murali
 
Post-tensioning in Prestressed Concrete
Post-tensioning in Prestressed ConcretePost-tensioning in Prestressed Concrete
Post-tensioning in Prestressed ConcreteDavinderpal Singh
 

Mais procurados (20)

Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
suspension bridge ppt
suspension bridge pptsuspension bridge ppt
suspension bridge ppt
 
Advantages and disadvantages of Prestressed concrete
Advantages and disadvantages of Prestressed concreteAdvantages and disadvantages of Prestressed concrete
Advantages and disadvantages of Prestressed concrete
 
stress ribbon bridge.pptx
stress ribbon bridge.pptxstress ribbon bridge.pptx
stress ribbon bridge.pptx
 
Prestressed construction
Prestressed constructionPrestressed construction
Prestressed construction
 
“BACTERIAL CONCRETE” ppt
“BACTERIAL CONCRETE” ppt“BACTERIAL CONCRETE” ppt
“BACTERIAL CONCRETE” ppt
 
Bearings in bridges
Bearings in bridgesBearings in bridges
Bearings in bridges
 
High performance concrete ppt
High performance concrete pptHigh performance concrete ppt
High performance concrete ppt
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridge
 
Pre-stressed concrete
Pre-stressed concrete Pre-stressed concrete
Pre-stressed concrete
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...
 
SEMINAR PRESENTATION ON BOX CULVERTS
SEMINAR PRESENTATION ON  BOX CULVERTSSEMINAR PRESENTATION ON  BOX CULVERTS
SEMINAR PRESENTATION ON BOX CULVERTS
 
CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls
 
Suspension Bridges VS Cable-Stayed Bridges
Suspension Bridges VS Cable-Stayed BridgesSuspension Bridges VS Cable-Stayed Bridges
Suspension Bridges VS Cable-Stayed Bridges
 
ACE special structures
ACE special structuresACE special structures
ACE special structures
 
post tensioning slabs
post tensioning slabspost tensioning slabs
post tensioning slabs
 
Ready mix concrete
Ready mix concreteReady mix concrete
Ready mix concrete
 
Post-tensioning in Prestressed Concrete
Post-tensioning in Prestressed ConcretePost-tensioning in Prestressed Concrete
Post-tensioning in Prestressed Concrete
 
Bridge
BridgeBridge
Bridge
 

Semelhante a Stress ribbon bridge

PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETEghildiyal8811
 
PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETEghildiyal8811
 
Chapter 1 Basic Concepts (PART I) (1).ppt
Chapter 1 Basic Concepts (PART I) (1).pptChapter 1 Basic Concepts (PART I) (1).ppt
Chapter 1 Basic Concepts (PART I) (1).pptHuzaifaZafar15
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteParag Pal
 
What Is Post Tensioning
What Is Post TensioningWhat Is Post Tensioning
What Is Post TensioningAMSYSCO Inc.
 
stress ribbon bridge by kaiser malik
stress ribbon bridge by kaiser  malikstress ribbon bridge by kaiser  malik
stress ribbon bridge by kaiser malikjunaid bashir
 
STRESS_RIBBON_BRIDGE
STRESS_RIBBON_BRIDGESTRESS_RIBBON_BRIDGE
STRESS_RIBBON_BRIDGEFazalArif1
 
CT 3 +5 prestressing b+
CT 3 +5 prestressing b+CT 3 +5 prestressing b+
CT 3 +5 prestressing b+Est
 
Suspension-Bridge-dfsdfsfdsfsdppt sos.pptx
Suspension-Bridge-dfsdfsfdsfsdppt sos.pptxSuspension-Bridge-dfsdfsfdsfsdppt sos.pptx
Suspension-Bridge-dfsdfsfdsfsdppt sos.pptxsamratr1103
 
Advad.Ind.Const.Tech. Batch -3
Advad.Ind.Const.Tech. Batch -3Advad.Ind.Const.Tech. Batch -3
Advad.Ind.Const.Tech. Batch -3Prasanth Dasu
 
CTP.ppt
CTP.pptCTP.ppt
CTP.pptarun t
 
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdfRijuDasgupta
 
1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs632k18BilalAhmad
 
Explain any tube system and structural configuration of a building having tha...
Explain any tube system and structural configuration of a building having tha...Explain any tube system and structural configuration of a building having tha...
Explain any tube system and structural configuration of a building having tha...World Of Engineers Consultant.
 
Explain any tube system and structural configuration of a building having tha...
Explain any tube system and structural configuration of a building having tha...Explain any tube system and structural configuration of a building having tha...
Explain any tube system and structural configuration of a building having tha...World Of Engineers Consultant.
 

Semelhante a Stress ribbon bridge (20)

Acm Unit 1
Acm Unit 1Acm Unit 1
Acm Unit 1
 
PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETE
 
PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETE
 
Chapter 1 Basic Concepts (PART I) (1).ppt
Chapter 1 Basic Concepts (PART I) (1).pptChapter 1 Basic Concepts (PART I) (1).ppt
Chapter 1 Basic Concepts (PART I) (1).ppt
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
What Is Post Tensioning
What Is Post TensioningWhat Is Post Tensioning
What Is Post Tensioning
 
stress ribbon bridge by kaiser malik
stress ribbon bridge by kaiser  malikstress ribbon bridge by kaiser  malik
stress ribbon bridge by kaiser malik
 
STRESS_RIBBON_BRIDGE
STRESS_RIBBON_BRIDGESTRESS_RIBBON_BRIDGE
STRESS_RIBBON_BRIDGE
 
CT 3 +5 prestressing b+
CT 3 +5 prestressing b+CT 3 +5 prestressing b+
CT 3 +5 prestressing b+
 
Suspension-Bridge-dfsdfsfdsfsdppt sos.pptx
Suspension-Bridge-dfsdfsfdsfsdppt sos.pptxSuspension-Bridge-dfsdfsfdsfsdppt sos.pptx
Suspension-Bridge-dfsdfsfdsfsdppt sos.pptx
 
Advad.Ind.Const.Tech. Batch -3
Advad.Ind.Const.Tech. Batch -3Advad.Ind.Const.Tech. Batch -3
Advad.Ind.Const.Tech. Batch -3
 
CTP.ppt
CTP.pptCTP.ppt
CTP.ppt
 
Presentation1
Presentation1Presentation1
Presentation1
 
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)702A.pdf
 
1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs
 
Explain any tube system and structural configuration of a building having tha...
Explain any tube system and structural configuration of a building having tha...Explain any tube system and structural configuration of a building having tha...
Explain any tube system and structural configuration of a building having tha...
 
Explain any tube system and structural configuration of a building having tha...
Explain any tube system and structural configuration of a building having tha...Explain any tube system and structural configuration of a building having tha...
Explain any tube system and structural configuration of a building having tha...
 
Ppt
PptPpt
Ppt
 
Long Span Structures
Long Span StructuresLong Span Structures
Long Span Structures
 
Post lintel structre
Post lintel structrePost lintel structre
Post lintel structre
 

Último

Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...jabtakhaidam7
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfsumitt6_25730773
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 

Último (20)

Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 

Stress ribbon bridge

  • 1.
  • 3. INTRODUCTION  A stress ribbon bridge is a tension structure (similar in many ways to a simple suspension bridge).  Stress Ribbon Bridge uses the theory of a catenary transmitting loads via tension in the deck to abutments which are anchored to the ground.  Unlike the simple span the ribbon is stressed in compression, which adds to the stiffness of the structure.  Stress ribbon bridges are very economical, aesthetic and almost maintenance free structure. They require minimal quantity of materials.
  • 4. HISTORY  The first stress ribbon bridge was constructed in Switzerland in the 1960s. This concept was first introduced by a German engineer Ulrich Finsterwalder.
  • 5. FORM OF A STRESS RIBBON BRIDGE Superstructure:-  A typical stress ribbon bridge deck consists of precast concrete planks with bearing tendons to support them during construction and separate pre stressing tendons which are tensioned to create the final designed geometric form.  The pre stressing tendons transfer horizontal forces in to the abutments and then to the ground most often using ground anchors.  The tendons are encased in ducts which are generally grouted after tensioning in order to lock in the stress and protect them from corrosion. Since the bending in the deck is low, the depth can be minimized and results in reduction in dead load and horizontal forces in abutments.
  • 6.  The abutments are designed to transfer the horizontal forces from the deck cables into the ground via ground anchors. Pedestrians, wind and temperature loads can cause large changes in the bending moments in the deck close to the abutments and accordingly crack widths and fatigue in reinforcement must be considered.  The ground anchors are normally tensioned in 2 stages, the first step is tensioned before the deck is erected and the rest, after the deck is complete. If stressed in one stage only, there will be a large out of balance force to be resisted by the abutments in the temporary case.  The soil pressure, overturning and sliding has to be checked for construction as well as permanent condition.  Substructure:-
  • 7. Ground Conditions:-  The ideal ground condition for resisting large horizontal forces from the ribbon is a rock base. This occurs rarely but suitable foundations can be devised even if competent soils are only found at some depth below the abutments.  In some cases where soil conditions do not permit the use of anchors, piles can also be used. Horizontal deformations can be significant and are considered in the design.  It is also possible to use a combination of anchors and drilled shafts. Battered micropilling is another alternative which can resist the load from the ribbon because of its compression and tension capacity.
  • 8. CONSTRUCTION TECHNIQUE  The abutments and piers are built first. Next the bearing cables were stretched from abutment to abutment and draped over steel saddles that rested atop the piers.  The bearing tendons generally support the structure during construction, and only rarely is additional false work used. Once the bearing cables were tensioned to the specified design force, precast panels were suspended via support rods located at the four corners of each panel. At this point the bridge sagged into its catenary shape.  The next step was to place post tensioning ducts in the bridge. The ducts were placed directly above the bearing cables and support rods, which are all located in two longitudinal troughs that run the length of the bridge. After the ducts were in place, the cast-in place concrete was placed in the longitudinal troughs in small transverse closure joints.
  • 9. STRUCTURAL SYSTEM  The development of the self-anchored stress-ribbon structure supported by an arch.  It is clear that the intermediate support of a multi-span stress-ribbon can also have the shape of an arch.  The arch serves as a saddle from which the stress-ribbon spans can rise during post- tensioning and during temperature drop, and where the center "band" can rest during a temperature rise.  In the initial stage, the stress-ribbon behaves as a two-span cable supported by the saddle that is fixed to the end abutments.
  • 10. COMPARISION WITH SIMPLE SUSPENSION BRIDGE  A stress ribbon bridge is a tension structure similar in many ways to a simple suspension bridge. The suspension cables are embedded in the deck which follows a catenary arc between the supports.  Unlike the simple span the ribbon is stressed in compression, which adds to the stiffness of the structure.  As opposed to suspension bridges, where the cables carry the load, in stress ribbon, by tensioning the cables and the deck between abutments, the deck shares axial tension forces.  A simple suspension span tends to sway and bounce. The supports in turn support upward thrusting arcs that allow the grade to be changed between spans, where multiple spans are used.
  • 11. ADVANTAGES  Stress ribbon pedestrian bridges are very economical, aesthetical and almost maintenance free structures.  They require minimal quantity of materials.  They are erected independently from existing terrain and therefore they have a minimum impact upon the environment during construction.  They are quick and convenient to construct if given appropriate conditions, without false work.  A stress ribbon bridge allows for long spans with a minimum number of piers and the piers can be shorter than those required for cable stayed or suspension bridges.
  • 12. APPLICATION & INSTANCE  Eco duct:  A tunnel which was built as part of a large network of motorways outside Brno. The theory is the same as a self-anchored arch but the geometry is much more complex. It is 50m wide and spans 70m a finite element program was used in its design.  Stuttgart trade fair hall roof: The suspended asymmetric roof comprises a regular repetition of stressed trusses with individual I-beam ribbons of steel between them. The trusses function as strut and tie A-frames based on concrete strip foundations and are tied back to the ground with anchors. The stresses in the ribbons and weight of its ‘green roof’ were used to resist wind uplift.
  • 13. CONCLUSION  Stress ribbon bridges are a versatile form of bridge, the adaptable form of structure is applicable to a variety of requirements.  The slender decks are visually pleasing and have a visual impact on surroundings giving a light aesthetic impression.  Post tensioned concrete minimizes cracking and assures durability. Bearings and expansion joints are rarely required minimizing maintenance and inspections.  Since erection using pre-cast segments does not depend on particular site condition and permits labour saving erection and a short time to delivery. Using bearing tendons can eliminate the need for site form work and large plant, contributing to fast construction programmes and preservation of the environments.  Stressed ribbon bridge is a solution to the areas which require aesthetic yet cost effective pedestrian bridges to be built .