SlideShare uma empresa Scribd logo
1 de 3
Baixar para ler offline
BeXar - Advanced Solutions Group, LLC
47 E. Crestwood Rd. # 1
P.O. Box 125
Kaysville, Utah 84037
BeXar
De Oppresso Liber
Phone (801) 444-0029
Fax (801) 444-0031
To Whom It May Concern:
Subject: Bill Mo’unga/Site Superintendent/Project Manager Letter of Commendation for
his role in Veteran’s Affairs Palo Alto Health Care Division’s Remodel of Mental Health
Projects.
The Mental Health Projects were located on Veteran’s Affairs property in Palo Alto and
Menlo Park. The projects consisted of the following:
Bldg. 2 1st
and 2nd
Floor Mental Health Wings. One wing housed a female population
and the second wing was a more long-term mental health ward on the VA Palo Alto
Campus.
Bldg. 5 3rd
Floor Mental Health Wing also on the VA Palo Alto Campus.
Bldg. 348 Mental Health Wing in Menlo Park Campus.
The Projects were structured into (5) separate contracts with separate contract numbers as
per the direction of the Contracting Officer. The project was not a design built and the
VA did not have drawings or specifications. The (5) projects were based on scopes of
works written on an 8X11 sheets of paper and included in the contract. Theses scope of
works were basically a list of items in each mental health floor noting mental deficiencies
that needed to be fixed and revised.
Bill Mo’unga was hired as the Site Superintendent for these (5) Mental Health Projects.
The following is a list of accomplishments that Bill Mo’unga was able to perform on
these projects:
• Research, create, and provide Mental Health Deficiencies Submittals. Submittals
included product information, specification requirements, pictures, etc. Bill took
the lead with the Chief of Engineering/Steve Elliott, the assigned Contracting
Officer Technical Representative/Russ Allgire, and the Contracting Officer/Susan
Battjer as they met and held weekly meetings together with the Nursing Staff in
order to come to a general consensus on all mental health material that were being
proposed to be installed. They were all successful due to Bill Mo’unga’s efforts.
The VA received their much needed mental health retrofits and revisions
accordingly.
BeXar - Advanced Solutions Group, LLC
47 E. Crestwood Rd. # 1
P.O. Box 125
Kaysville, Utah 84037
BeXar
De Oppresso Liber
Phone (801) 444-0029
Fax (801) 444-0031
• Project Coordination and Scheduling with the Engineering, Contracting, VA Palo
Alto and Menlo Park Electrical and Plumbin Shops, the various Nursing Staffs in
each building, and our Veterans whom are living in these areas receiving
treatment for various mental issues caused by their fight for our Freedoms. We
remodeled all of the various mental health wings when they were occupied.
There was a tremendous amount of pressure on Bill Mo’unga and our labor crews
in interacting and working around and near our veterans. We could not leave any
tools, screws, or any type of material that could be used as “contraband” against
themselves, the population, and the staff. Bill insured that all crews were
consistently and continually monitoring anything that was being brought in side
the mental health wings.
• It was decided that due to the variety of items listed on the scope of work, that we
would perform the majority of the scope of work “In House”. Bill Mo’unga lead
the various crews with various skills in the self performance of a majority of the
scope of work. Items included, demo, shower handle plumbing removal and
reinstallation, faucet and handle retrofit to tamper proof and institute type, door
removal and installed with a piano hinge. All door hardware in the mental
facilities were removed and replaced with tamper proof door hardware, all screws
in all patient rooms, hallways, bathrooms, etc, were replaced by our crews with
tamper proof. Bill Mo’unga was successful in leading the labor force to a timely
completion of the mental health projects on schedule and under budget.
• Each of the (5) projects scope of works included a list of a least 75 -150 different
work items that were deemed deficiencies in these various mental health wings.
• Bill Mo’unga worked tirelessly with the corporate office on various purchase
orders and billing rules and regulations. It is corporate office policy that every
purchase on a project have a purchase order. Amongst the (5) mental health
projects there was approximately 250 purchase orders all ordered and approved
by Bill Mo’unga.
• Bill provided daily reports, safety meeting reports, burn permits for each of the
(5) mental health projects daily throughout the life of the contracts.
• Upon completion of all (5) Mental health projects, Bill Mo’unga received letter
of commendations from Susan Battjer/Contracting Officer, and Russ
Allgire/Contracting Officer Technical Respresentative for his roles as Site
Superintendent on the Mental Health Projects located at the VAPAHCS.
I would like to personally thank and congratulate Bill Mo’unga for his successful and
tremendous effort in delivering the (5) Mental Health Deficiencies Repair Contracts on
time and under budget. You were able to overcome a variety of obstacles, including the
continual change of scope of work by the VA, and at the end of the day, the project was
BeXar - Advanced Solutions Group, LLC
47 E. Crestwood Rd. # 1
P.O. Box 125
Kaysville, Utah 84037
BeXar
De Oppresso Liber
Phone (801) 444-0029
Fax (801) 444-0031
constructed and completed and remodeled to a high quality of construction level that was
approved and complimented by both Staff and Engineering.
It was a pleasure working with you and best regards,
Tim Mo’unga
Bexar-ASG Program Manager

Mais conteúdo relacionado

Destaque (11)

Best photos ΔΙΑΦΗΜΙΣΕΙΣ (reklamas)
Best photos ΔΙΑΦΗΜΙΣΕΙΣ (reklamas)Best photos ΔΙΑΦΗΜΙΣΕΙΣ (reklamas)
Best photos ΔΙΑΦΗΜΙΣΕΙΣ (reklamas)
 
Piano di studi
Piano di studiPiano di studi
Piano di studi
 
Present continuous
Present continuous Present continuous
Present continuous
 
Jorge, brian, bunny
Jorge, brian, bunnyJorge, brian, bunny
Jorge, brian, bunny
 
Hobbies interview
Hobbies interviewHobbies interview
Hobbies interview
 
Портфолио
Портфолио Портфолио
Портфолио
 
2016 Personal Annual Report
2016 Personal Annual Report2016 Personal Annual Report
2016 Personal Annual Report
 
число и цифра 0
число и цифра 0число и цифра 0
число и цифра 0
 
Diarios cte justo sierra
Diarios cte justo sierraDiarios cte justo sierra
Diarios cte justo sierra
 
Article for Dainik Pudhari - Kolhapur (Jan 2017)
Article for Dainik Pudhari - Kolhapur (Jan 2017)Article for Dainik Pudhari - Kolhapur (Jan 2017)
Article for Dainik Pudhari - Kolhapur (Jan 2017)
 
Sur America
Sur AmericaSur America
Sur America
 

Semelhante a ASG REF

2016 07 15 Resume Donna Costa Final
2016 07 15 Resume Donna Costa Final2016 07 15 Resume Donna Costa Final
2016 07 15 Resume Donna Costa Final
Donna Costa
 
JulieGulan_resume_Feb29_b
JulieGulan_resume_Feb29_bJulieGulan_resume_Feb29_b
JulieGulan_resume_Feb29_b
julia gulan
 
MattRieck.v1.ML
MattRieck.v1.MLMattRieck.v1.ML
MattRieck.v1.ML
Matt Rieck
 
Curriculum Vitae (GH)Revised2[2]
Curriculum Vitae (GH)Revised2[2]Curriculum Vitae (GH)Revised2[2]
Curriculum Vitae (GH)Revised2[2]
Vic Buccheri
 
Deborah Durand's Resume
Deborah Durand's ResumeDeborah Durand's Resume
Deborah Durand's Resume
Debroah Durand
 
newPOKresume-revised
newPOKresume-revisednewPOKresume-revised
newPOKresume-revised
Paula O'Keefe
 

Semelhante a ASG REF (20)

VA LETTER
VA LETTERVA LETTER
VA LETTER
 
VA LETTER
VA LETTERVA LETTER
VA LETTER
 
Mark Koerber
Mark KoerberMark Koerber
Mark Koerber
 
Bertha Johnson Resume
Bertha Johnson ResumeBertha Johnson Resume
Bertha Johnson Resume
 
Michael Bencrowsky - Certified Peer Specialist
Michael Bencrowsky - Certified Peer SpecialistMichael Bencrowsky - Certified Peer Specialist
Michael Bencrowsky - Certified Peer Specialist
 
2016 07 15 Resume Donna Costa Final
2016 07 15 Resume Donna Costa Final2016 07 15 Resume Donna Costa Final
2016 07 15 Resume Donna Costa Final
 
Blue Pool Designs Summary 2009
Blue Pool Designs Summary 2009Blue Pool Designs Summary 2009
Blue Pool Designs Summary 2009
 
Garst Jim 2015-Update
Garst Jim 2015-UpdateGarst Jim 2015-Update
Garst Jim 2015-Update
 
JulieGulan_resume_Feb29_b
JulieGulan_resume_Feb29_bJulieGulan_resume_Feb29_b
JulieGulan_resume_Feb29_b
 
MattRieck.v1.ML
MattRieck.v1.MLMattRieck.v1.ML
MattRieck.v1.ML
 
LSorrResume2015
LSorrResume2015LSorrResume2015
LSorrResume2015
 
Curriculum Vitae (GH)Revised2[2]
Curriculum Vitae (GH)Revised2[2]Curriculum Vitae (GH)Revised2[2]
Curriculum Vitae (GH)Revised2[2]
 
LSorrResume2016
LSorrResume2016LSorrResume2016
LSorrResume2016
 
Deborah Durand's Resume
Deborah Durand's ResumeDeborah Durand's Resume
Deborah Durand's Resume
 
Resume 4-14-2015
Resume 4-14-2015Resume 4-14-2015
Resume 4-14-2015
 
Resume word
Resume wordResume word
Resume word
 
Assistant Resume
Assistant ResumeAssistant Resume
Assistant Resume
 
8-koi_CapabilityStatement_20240209.pdf
8-koi_CapabilityStatement_20240209.pdf8-koi_CapabilityStatement_20240209.pdf
8-koi_CapabilityStatement_20240209.pdf
 
Understanding Fundamentals of Behavioral Legal & Ethical Marketing
Understanding Fundamentals of Behavioral Legal & Ethical MarketingUnderstanding Fundamentals of Behavioral Legal & Ethical Marketing
Understanding Fundamentals of Behavioral Legal & Ethical Marketing
 
newPOKresume-revised
newPOKresume-revisednewPOKresume-revised
newPOKresume-revised
 

Mais de Bill Mounga

Ethics pay off for Orem contractor
Ethics pay off for Orem contractorEthics pay off for Orem contractor
Ethics pay off for Orem contractor
Bill Mounga
 
Prudential Reference - Steve
Prudential Reference - StevePrudential Reference - Steve
Prudential Reference - Steve
Bill Mounga
 
TELFORD Reference
TELFORD ReferenceTELFORD Reference
TELFORD Reference
Bill Mounga
 
Laufou Reference
Laufou ReferenceLaufou Reference
Laufou Reference
Bill Mounga
 
LJW 2930 Reference Letter
LJW 2930 Reference LetterLJW 2930 Reference Letter
LJW 2930 Reference Letter
Bill Mounga
 
Signature Underwriters Reference Letter
Signature Underwriters Reference LetterSignature Underwriters Reference Letter
Signature Underwriters Reference Letter
Bill Mounga
 
Bill Mounga PacificWest Recommendation Letter 101016 (1)
Bill Mounga PacificWest Recommendation Letter 101016 (1)Bill Mounga PacificWest Recommendation Letter 101016 (1)
Bill Mounga PacificWest Recommendation Letter 101016 (1)
Bill Mounga
 
BBB TORCH AWARD M-CONSTRUCTION
BBB TORCH AWARD M-CONSTRUCTIONBBB TORCH AWARD M-CONSTRUCTION
BBB TORCH AWARD M-CONSTRUCTION
Bill Mounga
 
Laufou Reference
Laufou ReferenceLaufou Reference
Laufou Reference
Bill Mounga
 
TELFORD Reference
TELFORD ReferenceTELFORD Reference
TELFORD Reference
Bill Mounga
 
Prudential Reference - Steve
Prudential Reference - StevePrudential Reference - Steve
Prudential Reference - Steve
Bill Mounga
 

Mais de Bill Mounga (20)

Ethics pay off for Orem contractor
Ethics pay off for Orem contractorEthics pay off for Orem contractor
Ethics pay off for Orem contractor
 
GSA LETTER
GSA LETTERGSA LETTER
GSA LETTER
 
Prudential Reference - Steve
Prudential Reference - StevePrudential Reference - Steve
Prudential Reference - Steve
 
TELFORD Reference
TELFORD ReferenceTELFORD Reference
TELFORD Reference
 
HAFB Reference
HAFB ReferenceHAFB Reference
HAFB Reference
 
Weilenman Ref
Weilenman RefWeilenman Ref
Weilenman Ref
 
Laufou Reference
Laufou ReferenceLaufou Reference
Laufou Reference
 
LJW 2930 Reference Letter
LJW 2930 Reference LetterLJW 2930 Reference Letter
LJW 2930 Reference Letter
 
BLUE SKY REF
BLUE SKY REFBLUE SKY REF
BLUE SKY REF
 
NIST Letter
NIST LetterNIST Letter
NIST Letter
 
Signature Underwriters Reference Letter
Signature Underwriters Reference LetterSignature Underwriters Reference Letter
Signature Underwriters Reference Letter
 
Bill Mounga PacificWest Recommendation Letter 101016 (1)
Bill Mounga PacificWest Recommendation Letter 101016 (1)Bill Mounga PacificWest Recommendation Letter 101016 (1)
Bill Mounga PacificWest Recommendation Letter 101016 (1)
 
BBB TORCH AWARD M-CONSTRUCTION
BBB TORCH AWARD M-CONSTRUCTIONBBB TORCH AWARD M-CONSTRUCTION
BBB TORCH AWARD M-CONSTRUCTION
 
Laufou Reference
Laufou ReferenceLaufou Reference
Laufou Reference
 
TELFORD Reference
TELFORD ReferenceTELFORD Reference
TELFORD Reference
 
Prudential Reference - Steve
Prudential Reference - StevePrudential Reference - Steve
Prudential Reference - Steve
 
BLUE SKY REF
BLUE SKY REFBLUE SKY REF
BLUE SKY REF
 
Weilenman Ref
Weilenman RefWeilenman Ref
Weilenman Ref
 
LJW REF
LJW REFLJW REF
LJW REF
 
VA ENG REF
VA ENG REFVA ENG REF
VA ENG REF
 

ASG REF

  • 1. BeXar - Advanced Solutions Group, LLC 47 E. Crestwood Rd. # 1 P.O. Box 125 Kaysville, Utah 84037 BeXar De Oppresso Liber Phone (801) 444-0029 Fax (801) 444-0031 To Whom It May Concern: Subject: Bill Mo’unga/Site Superintendent/Project Manager Letter of Commendation for his role in Veteran’s Affairs Palo Alto Health Care Division’s Remodel of Mental Health Projects. The Mental Health Projects were located on Veteran’s Affairs property in Palo Alto and Menlo Park. The projects consisted of the following: Bldg. 2 1st and 2nd Floor Mental Health Wings. One wing housed a female population and the second wing was a more long-term mental health ward on the VA Palo Alto Campus. Bldg. 5 3rd Floor Mental Health Wing also on the VA Palo Alto Campus. Bldg. 348 Mental Health Wing in Menlo Park Campus. The Projects were structured into (5) separate contracts with separate contract numbers as per the direction of the Contracting Officer. The project was not a design built and the VA did not have drawings or specifications. The (5) projects were based on scopes of works written on an 8X11 sheets of paper and included in the contract. Theses scope of works were basically a list of items in each mental health floor noting mental deficiencies that needed to be fixed and revised. Bill Mo’unga was hired as the Site Superintendent for these (5) Mental Health Projects. The following is a list of accomplishments that Bill Mo’unga was able to perform on these projects: • Research, create, and provide Mental Health Deficiencies Submittals. Submittals included product information, specification requirements, pictures, etc. Bill took the lead with the Chief of Engineering/Steve Elliott, the assigned Contracting Officer Technical Representative/Russ Allgire, and the Contracting Officer/Susan Battjer as they met and held weekly meetings together with the Nursing Staff in order to come to a general consensus on all mental health material that were being proposed to be installed. They were all successful due to Bill Mo’unga’s efforts. The VA received their much needed mental health retrofits and revisions accordingly.
  • 2. BeXar - Advanced Solutions Group, LLC 47 E. Crestwood Rd. # 1 P.O. Box 125 Kaysville, Utah 84037 BeXar De Oppresso Liber Phone (801) 444-0029 Fax (801) 444-0031 • Project Coordination and Scheduling with the Engineering, Contracting, VA Palo Alto and Menlo Park Electrical and Plumbin Shops, the various Nursing Staffs in each building, and our Veterans whom are living in these areas receiving treatment for various mental issues caused by their fight for our Freedoms. We remodeled all of the various mental health wings when they were occupied. There was a tremendous amount of pressure on Bill Mo’unga and our labor crews in interacting and working around and near our veterans. We could not leave any tools, screws, or any type of material that could be used as “contraband” against themselves, the population, and the staff. Bill insured that all crews were consistently and continually monitoring anything that was being brought in side the mental health wings. • It was decided that due to the variety of items listed on the scope of work, that we would perform the majority of the scope of work “In House”. Bill Mo’unga lead the various crews with various skills in the self performance of a majority of the scope of work. Items included, demo, shower handle plumbing removal and reinstallation, faucet and handle retrofit to tamper proof and institute type, door removal and installed with a piano hinge. All door hardware in the mental facilities were removed and replaced with tamper proof door hardware, all screws in all patient rooms, hallways, bathrooms, etc, were replaced by our crews with tamper proof. Bill Mo’unga was successful in leading the labor force to a timely completion of the mental health projects on schedule and under budget. • Each of the (5) projects scope of works included a list of a least 75 -150 different work items that were deemed deficiencies in these various mental health wings. • Bill Mo’unga worked tirelessly with the corporate office on various purchase orders and billing rules and regulations. It is corporate office policy that every purchase on a project have a purchase order. Amongst the (5) mental health projects there was approximately 250 purchase orders all ordered and approved by Bill Mo’unga. • Bill provided daily reports, safety meeting reports, burn permits for each of the (5) mental health projects daily throughout the life of the contracts. • Upon completion of all (5) Mental health projects, Bill Mo’unga received letter of commendations from Susan Battjer/Contracting Officer, and Russ Allgire/Contracting Officer Technical Respresentative for his roles as Site Superintendent on the Mental Health Projects located at the VAPAHCS. I would like to personally thank and congratulate Bill Mo’unga for his successful and tremendous effort in delivering the (5) Mental Health Deficiencies Repair Contracts on time and under budget. You were able to overcome a variety of obstacles, including the continual change of scope of work by the VA, and at the end of the day, the project was
  • 3. BeXar - Advanced Solutions Group, LLC 47 E. Crestwood Rd. # 1 P.O. Box 125 Kaysville, Utah 84037 BeXar De Oppresso Liber Phone (801) 444-0029 Fax (801) 444-0031 constructed and completed and remodeled to a high quality of construction level that was approved and complimented by both Staff and Engineering. It was a pleasure working with you and best regards, Tim Mo’unga Bexar-ASG Program Manager