1. POSITION TITLE AND NO. : ELECTRICAL ENGINEER
NAME OF FIRM : AECOM INDIA LTD.
NAME OF EXPERT : BHASKAR SARKAR
DATE OF BIRTH : 09/03/1946
CITIZENSHIP : Indian
EDUCATION : • Bachelor of Electrical Engineering from Jadavpur University in 1971
• Chartered Engineer, Institute of Engineers
EMPLOYMENT RECORD RELEVANT TO THE ASSIGNMENT:
Period Employing organization and
Your title / position Contact
information for references
Country Summary of activities performed relevant to
the assignment
15th May,
2013 – till
date
Employer: Independent Consultant
working for URS Scott Wilson India
Pvt. Ltd. (an AECOM Company)
Position held: Consultant – Electrical
Engineering
India. Assigned to perform the following jobs for Mega Surface Water
Based Water Supply Scheme for Kulpi & 9 adjoining blocks,
District-24 Parganas, W.B.”.:-
• Preparation of DPR, design, engineering & estimating for
Intake, Water Treatment Plant and GLR (Ground Level
Reservoir) at Kulpi & 9 other adjoining blocks. .
• Preparation of Tender Documents & detail specification for
Electrical, Instrumentation and PLC based SCADA system
• Technical evaluation of offer of Contractor for Electrical &
SCADA equipment and recommendation to PHED.
• Checking and review of Contractors’ drawings, documents
and technical details of SCADA and Electrical systems
taking corrective measures as required to the tune of Plant
requirement in consultation with PHED.
• Inspection of critical equipment and SCADA development at
Contractor’s / Manufacturer’s Works.
• Supervision during commissioning
Preparation of DPR for submission under NGRBA for
Integrated and comprehensive Pollution Abatement scheme for
5 (five) Municipal towns under Kolkata Metropolitan
Development Authority (World Bank funded):
Oct’ 2012 -
May 2013
Employer: Independent Consultant
working for Webstar Engineers (India)
Pvt. Ltd
Position held: Consultant
India The job involved detail design, selection of Transformer, 11 kV
switch gear, equipment layout and civil assignment drawing of
substation, PCC. APFC panel, Illumination System, Earthing
etc. Also preparing BOQ for tender purpose, selection of
Contractor etc. for Electrification of a New Workshop of MBE
Coal & Mining Engineering at Kharagpur
Jan’ 2000
-Sept’2012
Employer: Tecpro Systems Ltd., an
EPC Contractor
Position held: Advisor- Electrical on
Contract basis
India • HT & LT Electrical distribution system, illumination,
earthing, cable layout, cable schedule & PLC based
control system - design, engineering, estimation and
tender etc. of the bulk material handling projects of Steel
Plant, Coal Handling System of Captive Power
Generation Plant, Crushing & Screening Systems, Water
Treatment Plant etc. Job involved interaction with Client /
Client’s Consultant, like MECON, CET, DCPL, MND etc.
for approval of design, engineering, drawings etc.
• Project inspection during construction
March
2008 to
Feb 2010
Employer: Independent Consultant
working for Span Consultants India
Pvt. Limited.
Position held: Consultants
Engineering, preparing specification, scope of work of PLC
based SCADA system and also Instrumentation system & of
complete electrical system of the Water Treatment Plants
located at Arsenic Affected Area in Nadia District (Northern
Sector) & Water Treatment Plants Birbhum District viz. Block I
– Kaligunj, Block II - KRISHNANAGAR & Block III - Part of
NABADWIP etc., Vetting of tender documents, recommending
to PHED and Review of contractor’s proposal and drawings
and monitoring execution of the project as per specification.
March Employer: Fenner (India) Ltd. India Design, engineering, detailing of electrical power distribution
1
2. 1993 to
Dec. 1999
Position held: Senior Design Manager system and Control system of various Bulk Material handling
Projects. of Steel Plant etc.
December
1992 to
March
1993
Employer: United Nations Industrial
Development Organization, Vienna
Position held: UNIDO Consultant on
contract
For references
Client: General Tyre Industries in Hama.
Syria Study of electrical equipment & system for improvement of
quality and increased production by execution various
maintenance schedules as per UNIDO programme and furnish
a detail project report to UNIDO, Vienna.
March’92
to Dec.’92
Employer: Micromeg India Pvt. Ltd.
Position held: Design Engineer
(Electrical)
India System electrical design, engineering, drawing for Bulk material
handling Projects
July’1986 -
Feb’1992
Employer: Cable Corporation Ltd.,
Uganda
Position held: Plant Manager
Status : Expatriate
Uganda Responsible for execution of rehabilitation project under
African Development Bank and a joint venture of
Government of Uganda and Mehta Group. Responsibility was -
Erection, commissioning and production run, quality control of
HT /LT PVC cables, OH line conductors and training of Fellow
Ugandans. etc.
Oct’1980 -
Jul’1986
Employer: Dunlop India Ltd., Sahaganj
Position held: Section Manager
India Complete electrical and electronic drive maintenance, 11 kV
substation of Giant Cover, Aero Tyre, Bag-O-Matic Press,
Creel Bead Sections, OTR sections.
Jan’1973 -
Oct’1980
Employer: Hindustan Cables Ltd.,
Rupnarainpur
Position held: Executive Engineer
He was responsible for execution of Project for electrical power
distribution and erection and commissioning of equipment for
Jelly Filled Cable Project. Also responsible for electrical
maintenance in Shops, Colony maintenance including its Water
Treatment Plant.
MEMBERSHIP IN PROFESSIONAL
ASSOCIATIONS AND PUBLICATIONS
: Chartered Engineer, Institute of Engineers
TRAININGS UNDERTAKEN: Underwent 2 weeks training at IIT Chennai (Formerly Madras) on Thyristor
Controlled Drives, sponsored by Dunlop India Ltd. during Dec’83
LANGUAGES SKILLS : Speak Read Write
English Excellent Excellent Excellent
Hindi Excellent Excellent Excellent
Bengali Excellent Excellent Excellent
ADEQUACY FOR THE ASSIGNMENT:
Detailed Tasks
Assigned on
Consultant’s Team of
Experts:
Reference to Prior Work/Assignments that Best Illustrates Capability to Handle the
Assigned Tasks
i) Carry out detail design,
engineering on electrical
power distribution,
Instrumentation &
SCADA system and
prepare technical
specifications.
ii) Assist the PMU to
develop a tender
document related to the
above for execution of
the Intake/ WTP and
water distribution
systems together with
1. Name of Project: Mega Surface Water Based Water Supply Scheme for
Kulpi (renamed as Falta-Mathurapur), District: South 24 Parganas, West
Bengal
Period worked: 15th May, 2013 – till date.
Location: South 24 Parganas, West Bengal, India.
Client: PHEDte Govt. of West Bengal.
Position Held: Consultant.
Main Project Features: :
A Mega Water Supply Project based on surface water under Public Health Engibneering Dte, Govt.
of West Bengal, for Kulpi and 9 others adjoining Blocks of South 24 Parganas District. Total Project
covered almost 1600 Sq. Km area and comprising of the following Units:
i) Intake : Intake well including RCC Pump House comprising of 2 W + 2 S Vertical Turbine
Pump to be constructed on top of Well.with approach Jetty at River Bhagirathi.
ii) Raw Water Rising Main: Twin 1422mm MS Pipe of 2.1Km long.
iii) Water Treatment Plant (52 MGD Output Capacity): 2 nos Inlet Well, 8 Nos. Flush Mixer, 8
Nos. Clariflocculator with rotating bridge scraper, Filter house containing Filter beds (Rapid
Sand Filter), Chemical House, Backwash Tank, Clear Water Reservoir, Clear Water Pump
2
3. other Experts/
Engineers of the
company..
iii) Assist the PMU to
evaluate the tenders of
Bidders.
iv) Assist the PMU to
assess the
appropriateness of the
implementation designs
produced by the
contractors.
v) Assist the PMU to
supervise the
implementation of
Electrical & SCADA
systems under the
project.
House, Sludge sump cum pump house, 2 nos. Sludge Ponds, Recycling of Water from Sludge
pond, necessary pipes and channels for interconnection of different units others
iv) Electrical Sub-station for Water treatment and Intake area
v) PLC based Instrumentation and controlling devices compatible with SCADA for operation of
Water Treatment Plant, Raw Water Pumping system, Clear water pumping system, Chemical
dosing etc.
vi) Fire safety arrangement for all buildings.
vii) Clear Water Rising Main :
• Primary Grid. : Approx. 110 Km of rising main of MS Pipe (dia varies from 1800 mm to
1200mm) rest are DI k9 pipes (dia varies 1000mm to 450mm) consisting of 10 nos. GLRs of
different capacity at each 10 nos. Blocks.
• Secondary Grid: Approx 400 km of rising main length. (dia Varies from 700mm to 300 mm)
consisting 108 nos Over head Reservoir of different blocks.
viii) Distribution: Approx. 4000 km of pipe length of different diameter of pipes.
Activities Performed:
• Preparation of DPR for Intake, Water Treatment Plant, 10 nos. GLR (Ground Level Reservoir)
at 10 different Blocks/locations etc.
• Preparation of Tender Documents with detail specification, design & engineering of all items
including Transformers, Switchgear, cables, illumination earthing etc.; PLC based Supervisory
Control & Data Acquisition (SCADA) system for on-line monitoring & instrumentation etc.
covering design, testing, software, graphics development and on-line control and monitoring of
Intake water pumps, water treatment plant, Ground level reservoir status, water quality
parameters and control of chemical dosing using distributed PLC based SCADA system.
• Technical vetting of tenders, preparation of synopsis and recommendation for Intake Structure,
Water Treatment Plant, GLR Substations etc. .
• Engaged in Technical Vetting of Drawings, Calculations & Documents of the Contractors
submitted for Electrical, Instrumentation and SCADA/ PLC System etc, interaction with
Contractors and subsequent recommendation to PHED for final Approval.
Checking of design, drawings etc. of bought-out Equipment, General Arrangement Drawings,
Manufacturer’s specification etc. of PLC/SCADA, Instrumentation etc., Inspection and
supervision during Software Development and during installation and commissioning stage.
To discuss and finalize for vendors to carry out Electrical and PLC/ SCADA systems for Intake
Structure, Water Treatment Plant etc.
To visit manufacturer’s works for Inspection and to check test at their Workshop.
2. Name of Project: Preparation of Detailed Project Report under NGRBA Integrated and comprehensive
Pollution Abatement scheme for Hooghly Chinsura (GAP) Municipal Town funded by World Bank
Period worked: May- Dec 2013.
Location: Kolkata;
Client: Kolkata Metropolita Development Authority;
Position Held: Consultants
Activities Performed: Design, engineering of electrical items, Preparation of specification after design & engineering all items
including Transformers, Switchgear, cables, illumination earthing power distribution system, making BOQ for Preparation of detailed
Project Report for the Sewerage & Drainage projects.
3. Name of Project: Preparation of detailed Project Report under NGRBA Integrated and comprehensive
Pollution Abatement scheme for Baranagar (GAP) Municipal Town funded by World Bank
Period worked: May- Dec 2013.
Location: Kolkata;
Client: Kolkata Metropolita Development Authority;
Position Held: Consultants
Activities Performed: Design, engineering of electrical items, Preparation of specification after design & engineering all items
including Transformers, Switchgear, cables, illumination earthing power distribution system, making BOQ for Preparation of detailed
Project Report for the Sewerage & Drainage projects.
4. Preparation of detailed Project Report under NGRBA Integrated and comprehensive Pollution Abatement
scheme for Mahestala (GAP) Municipal Town funded by World Bank
Period worked: May- Dec 2013.
Location: Kolkata;
Client: Kolkata Metropolita Development Authority;
3
4. Position Held: Consultant
Activities Performed: Design, engineering of electrical items, Preparation of specification after design & engineering all items
including Transformers, Switchgear, cables, illumination earthing power distribution system, making BOQ for Preparation of detailed
Project Report for the Sewerage & Drainage projects.
5. Preparation of detailed Project Report under NGRBA Integrated and comprehensive Pollution Abatement
scheme for Panihati (GAP) Municipal Town funded by World Bank
Period worked: May- Dec 2013.
Location: Kolkata;
Client: Kolkata Metropolita Development Authority;
Position Held: Consultant
Activities Performed: Design, engineering of electrical items, Preparation of specification after design & engineering all items
including Transformers, Switchgear, cables, illumination earthing power distribution system, making BOQ for Preparation of detailed
Project Report for the Sewerage & Drainage projects.
6. Name of Project: Electrification of a New Workshop of MBE Coal & Mining Engineering at Kharagpur
Period worked: Oct’ 2012 - May 2013.
Location: Kharagpur, West Bengal;
Client: MBE Coal & Mining Engineering;
Position Held: Consultants for Electrification
Main Project Features: Design, engineering of electrical power distribution system of a Medium Sized Factory.
Activities Performed: Job involved detail design, selection of Transformer, 11 kV switch gear, equipment layout and civil
assignment drawing of substation, PCC. APFC panel, Illumination System, Earthing etc. Also making BOQ for tender Purpose,
selection of Contractor etc.
7. Name of Project: Water Supply Scheme for Arsenic Affected Area in Nadia District (Northern Sector) &
Water Treatment Plants Birbhum District, of PHED, Government of West bengal
Year: 2011
Location: West Bengal;
Client: PHED, Government of West Bengal;
Position Held: Senior Electrical Consultant on part-time basis with Span Consultants India Pvt. Ltd.
Project Done : Surface Water Based Water supply scheme for Arsenic affected area of Nadia District (Northern Sector) of PHED.
Activities Performed:
To provide detail specification, scope of work, etc of the complete electrical system, HT Substations of the plant, Vetting of
tender documents, recommending to PHED and approving drawings and monitoring execution of the project as per
specification and within estimated cost.
Engineering, making specification of PLC based SCADA system Instrumentation of the Water Treatment Plants and checking
drawings, documents, system Architecture Drawing of the SCADA etc.
Preparation of NIT and vetting of contractors’ documents
Checking of Contractor’s drawings, specification and provide corrective measures in accordance with Plant System requirement
8. Name of Project: Intake Well and Water Treatment Plant at Ramchandrapur, Balarampur, Balaramghati
and Mukutmanipu, West Bengal of PHED, Government of West bengal
Year: 2011
Location: West Bengal;
Client: PHED, Government of West Bengal.
Position held – Self-employed Consultant.
Task performed: Electrical & Relay Logic based control system of operation of Intake Structure, Treatment Plant. Design, detailing
and supervision during erection
9. Name of Projects: Bulk Material Handling Projects of Crushing, Screening Plant, Transportation BF
materials, Coal Handling system of Steel Plant and Captive Power Plant
Period worked: 2000 to Sept’2012.
Jobs done in the Projects of: West Bokaro, Tata Steel; SAIL, DSP; SAIL BSP, SAIL Bokaro Steel Plant; Engineers Projects
(India) Ltd.for UCT1 & UCT2; Dalli Mines, BSP etc.
Position Held: Advisor- Electrical on Contract basis with Tecpro Systems Ltd. Location: Kolkata.
Main Project Features: Design, engineering, procurement, erection, testing & commissioning on turnkey basis Bulk Material
Handling Projects.
Activities Performed:
• Electrical & PLC/ SCADA based Control system design, engineering, drawing, estimation and tender engineering etc. of bulk
material handling projects.
• Design, engineering of PLC /SCADA based control system, Automation system architecture, Control Philosophy, IO
4
5. assignment, related drawings and detailing, specifications of the system including process graphic displays of Plant activities,
interlocking and alarm system management etc., examining vendor specifications and other Inputs and to take corrective
measures as per system requirement. Also done design, calculation of Electrical HT & LT power distribution, Sizing of Power
and Distribution Transformers, Load calculation and design, SLD of HT & LT Switchgear, Plant Illumination, Cable selection,
Cable Schedule, Calculation and Layout of Earthing and Lightning Protection system
10. Name of Projects: Bulk Material Handling Projects
Period worked: 1993 to Dec. 1999
Client: Steel Plant at Bokaro, KISCO, SJK Steel at Hyderabad etc.
Position Held: Senior Design Manager of Fenner India Ltd.
Main Project Features: Material Handling Projects of Steel, Coal and process industries.
Activities Performed: Design, engineering, detailing of electrical power and PLC based control system of various Bulk Material
handling Projects
11. Name of Assignment: Electrical works in General Tyre Industries in Hama, Syria
Period worked: December 1992 to March 1993
Location: Hama, Syria;
Client: United Nations Industrial Development Organization, Vienna;
Position Held: Technical consultant
Main Project Features: Electrical equipment & System for improvement of quality and increased production by execution various
maintenance schedule.
Activities Performed: To identify the fault, technical consultation, power distribution of Ban Berry Mixer and some of machinery etc.
and to prepare a comprehensive report and technical solution and recommendation to Head Quarter of UNIDO, Viena.
12. Name of Assignement: Rehabilitation Project job and up gradation of production process in Cable
Corporation Ltd., Uganda.
Period of assignment: July’1986 - Feb’1992
Client: Cable Corporation Ltd., Uganda;
Position Held: Plant Manager
Main Project Features: Rehabilitation project job and up gradation of production process in Cable Corporation Ltd., Uganda, in the
joint Venture of Mehta Group and Government of Uganda under African Development Bank (ADB).
Activities Performed: Responsible for execution of rehabilitation project under African Development Bank and Government of
Uganda. Erection, commissioning and production run quality control of HT /LT PVC cables, OH line conductors etc.
13. Name of Assignment: Dunlop India Ltd., Sahaganj
Period worked: Oct’1980 - Jul’1986
Location: Sahaganj;
Client: Dunlop India Ltd.
Position Held: Section Manager;
Activities Performed: Assigned for complete electrical and electronic drive maintenance, 11 kV substation of Giant Cover, Aero
Tyre, Bag-O-Matic Press, Creel Bead Sections, OTR sections
14. Name of Assignment: Jelly Filled Cable Project and other related Project
Period worked: Jan’1973 - Oct’1980
Location: Rupnarainpur;
Client: Hindustan Cables Ltd;
Position Held: Executive Engineer
Activities Performed: Responsible for execution of Project for electrical substations, power distribution and erection and
commissioning of equipment for Jelly Filled Cable Project. Also responsible for electrical maintenance in Shops, Colony including
Water Treatment Plant.
Expert’s Contact Information: E-mail: sinetech2k6@gmail.com Phone: +91 9433082139
------------------------------------------------------------------------------- Dated 17/06/2015
[Signature of the Candidate] Day/Month/Year
1
5
6. assignment, related drawings and detailing, specifications of the system including process graphic displays of Plant activities,
interlocking and alarm system management etc., examining vendor specifications and other Inputs and to take corrective
measures as per system requirement. Also done design, calculation of Electrical HT & LT power distribution, Sizing of Power
and Distribution Transformers, Load calculation and design, SLD of HT & LT Switchgear, Plant Illumination, Cable selection,
Cable Schedule, Calculation and Layout of Earthing and Lightning Protection system
10. Name of Projects: Bulk Material Handling Projects
Period worked: 1993 to Dec. 1999
Client: Steel Plant at Bokaro, KISCO, SJK Steel at Hyderabad etc.
Position Held: Senior Design Manager of Fenner India Ltd.
Main Project Features: Material Handling Projects of Steel, Coal and process industries.
Activities Performed: Design, engineering, detailing of electrical power and PLC based control system of various Bulk Material
handling Projects
11. Name of Assignment: Electrical works in General Tyre Industries in Hama, Syria
Period worked: December 1992 to March 1993
Location: Hama, Syria;
Client: United Nations Industrial Development Organization, Vienna;
Position Held: Technical consultant
Main Project Features: Electrical equipment & System for improvement of quality and increased production by execution various
maintenance schedule.
Activities Performed: To identify the fault, technical consultation, power distribution of Ban Berry Mixer and some of machinery etc.
and to prepare a comprehensive report and technical solution and recommendation to Head Quarter of UNIDO, Viena.
12. Name of Assignement: Rehabilitation Project job and up gradation of production process in Cable
Corporation Ltd., Uganda.
Period of assignment: July’1986 - Feb’1992
Client: Cable Corporation Ltd., Uganda;
Position Held: Plant Manager
Main Project Features: Rehabilitation project job and up gradation of production process in Cable Corporation Ltd., Uganda, in the
joint Venture of Mehta Group and Government of Uganda under African Development Bank (ADB).
Activities Performed: Responsible for execution of rehabilitation project under African Development Bank and Government of
Uganda. Erection, commissioning and production run quality control of HT /LT PVC cables, OH line conductors etc.
13. Name of Assignment: Dunlop India Ltd., Sahaganj
Period worked: Oct’1980 - Jul’1986
Location: Sahaganj;
Client: Dunlop India Ltd.
Position Held: Section Manager;
Activities Performed: Assigned for complete electrical and electronic drive maintenance, 11 kV substation of Giant Cover, Aero
Tyre, Bag-O-Matic Press, Creel Bead Sections, OTR sections
14. Name of Assignment: Jelly Filled Cable Project and other related Project
Period worked: Jan’1973 - Oct’1980
Location: Rupnarainpur;
Client: Hindustan Cables Ltd;
Position Held: Executive Engineer
Activities Performed: Responsible for execution of Project for electrical substations, power distribution and erection and
commissioning of equipment for Jelly Filled Cable Project. Also responsible for electrical maintenance in Shops, Colony including
Water Treatment Plant.
Expert’s Contact Information: E-mail: sinetech2k6@gmail.com Phone: +91 9433082139
------------------------------------------------------------------------------- Dated 17/06/2015
[Signature of the Candidate] Day/Month/Year
1
5