BRT LESSONS FROM DAR ES SALAAM
Presented at Workshop on BRT Innovation in Africa
29 JUNE 2018
PRESENTED BY ENG. RONALD LWAKATARE, CE DART
• One of the fastest growing cities in
the world. Average annual growth
from 2002 to 2012 was 7.7%.
• City’s population is currently nearly
5 million.
• Dar es Salaam metropolitan area
covers a large part of the city with
a total area of 1,391 square
kilometres and a population
density of 3,133 per square
kilometre.
• Economic growth in Dar es
Salaam is estimated at 10% per
annum, above the country
average.
• Average Annual Vehicular
Growth is around 19% per
annum (2002-2015).
Introduction: Dar es Salaam City Profile
3
• Public Transport in Dar es Salaam is
dated back in 1949 with Dar es
Salaam Motor Transport Company
(DMT).
• DMT nationalized and UDA
established in 1967.
• Private sector involved from 1983.
• Urban PT Challenges:
– Poor roads and Insufficient infrastructure
– Air quality and health issues.
– Low capacity buses and no schedule
services
– Congestion
Introduction: The history of Public Transport
in DSM
4
Current PT in DSM
4.MASS TRANSIT OPTIONS
Bus Rapid Transit Light Rail Transit
Underground metro Urban rail
$5-15 M/KM
$80-175 M/KM
$12-25 M/KM
Modernisation of the PT in DSM
Public Transport System Visualized
i. Metro System
o High Cost and Operational Challenges
o Too Big to Fail
ii. Improved Bus System
o Low Cost
o No Operational Risk
o Availability of Affordable Technology; and
o Encourages Participation of Locals
Selection of BRT for DSM
DART Agency: Established through Government Notice (GN) No. 120 of 25th May,
2007 under the Executive Agencies Act No. 30 of 1997. DART inaugurated on 16th
June 2008.
DART Mandate: To establish and operate a bus rapid transit system in Dar es
Salaam.
DART VISION: To have a modern public transport system at reasonable cost to
users and yet profitable to the operators using high capacity buses which meet
International Standards, environmentally friendly, operating on exclusive lanes, at less
travelling time.
DART MISSION: To provide quality, accessible and affordable mass transport
system for the residents of Dar es Salaam which will subsequently:
− enable poverty reduction,
− improve standard of living,
− lead to sustainable economic growth, and
− act as a pioneer of private and public investment partnership in the transport sector
DART Agency
DART Agency - Structure
8
BRT Characteristics
CHARACTERISTICSFully dedicated right of way (buses avoid traffic congestion)
Alignment in the center of the road (to avoid typical curb-side delays - turnings,
parking, slow moving vehicles)
Stations with off-board fare collection (to reduce boarding and alighting delay related
to paying the driver)
Station platforms level with the bus floor (to reduce boarding and alighting delay
caused by steps)
Redesigned intersections (to avoid intersection delays)
DART Project – Initialisation
• Year 2002 Dar es Salaam City Council initiated an idea of Bus
Rapid Transit (BRT). Supported by United Nations
Environment Programme (UNEP), Institute of Transport and
Development Policy (ITDP) and the then Prime Minister’s
Office Regional Administration and Local Government.
• Global Environmental Facility (GEF) National Focal Point
endorsed proposal to establish a BRT Project in Dar es Salaam
- Multistakeholder Working Group established.
• DCC endorsed project in April 2003 - Technical team and
Steering Committee established.
• Study tours conducted to cities with BRT around the world.
• Project Management Unit (PMU) established 2004 - World
Bank supported. 10
DART System Corridors
• Concept was Visualized in 2002 and 6 Corridors with 140.1 km were
Selected and Construction Proposed in 6 Phases
• Detailed Study was for Phase 1 was carried out in 2007 and
construction works started in 2010 to 2015.
• Detailed design for Phases 2 and 3 was completed in 2015.
• Phase 4 increased from 16.1 (Tanki bovu) to 25.9 km (Tegeta)
DART System Development - Phase-1
 Length of 20.9 km; dedicated
concrete road
 Infarstructures: 1 Depot, 27 BRT
Stations (4 Categories), 5
Terminals, 7 Feeder Stations and
connects 11 feeder Routes to
Main Corridors
 Station Spacing 500-600m with
dedicated pathways for
Pedestrians & NMV Users
 The cost of the Phase 1
infrastructure is about USD 170
million.
 The contract works – 7 Packages.
 Period of implementation –
between 2010 – 2016.
MoF & MoWCT PO-RALG
DCC
ISP (UDA-RT)
TANROADS
FUNDS MANAGER
(NMB)
SUMATRA
DART KEY IMPLEMENTING ACTORS
PUBLICSECTORPRIVATESECTOR
EGA
TR
DART AGENCY
Phase 1
Phase 2
Phase 3
Phase 4
No. of Buses
Length Daily
passengers
Articulated 18m Feeder
12m
Total buses
Phase 1 20.9 400,000 177 128 305
Phase 2 20.3 495,000 102 111 213
Phase 3 23.6 395,000 123 94 217
Phase 4 25.9 168,000 80 60 140
Phase 5 22.8 Design not done
Phase 6 27.6
TOTAL 141.1 1,458,000 875
DAILY PASSENGERS & NUMBER OF BUSES
Note: Figures for new projects ie. Phases 2-6 to be reviewed and updated.
Projections
Modern Transport System
DART AGENCY
Infrastructure (Public)
Corridor (roadways, bicycle
and pedestrian paths)
Stations/Terminals
Depot
Pedestrian bridges
Control room
Fare Collection (Private)
Fare collection system
Equipment (Turnstiles,
Ticket Office Machines)
Smart Cards, mobile top ups
Bar coded paper tickets
Bus Operations (Private)
Buses, articulated 18m,
standard 12m, hybrid 12m
Bus Operations
Cleaner fuel, Euro III
standard
Intelligent Transportation
System
DART System Phase 1- Implementation Arrangement
Interim Services (for 2 Years)
• Delay in Procurement Process for SP – UDART; Utilize
the already Constructed Corridor; Test the System; and
Relief to Congested Corridor
• Interim Services become Operational on 10 May, 2016
covering 20.9km Trunk Routes and One Feeder Route
with 115 Trunk and 25 feeder Buses
• Average Daily Ridership, working Days, touched
200,000+
• Ticketing through AFCS
• Fund Manager: NMB ; Fare Collector: UDART(Maxcom)
DART System Phase 1 - Operations
With Full Operation Services:
 305 buses: - 177 Articulated (18M) and 128
Feeder (12M) Buses
 Estimated Peak Hour Load 18,000 Passengers
 Estimated Daily Ridership 450,000-500,000
per day
 Expected Annual Ridership 130 Millions
17
DART System Phase 1 - Operations
DART AGENCY
DART Buses - Technology
• DART Buses: General
Specification – Trunk (18 m)
and Feeder (12m)
 Emission Class Euro III
technology
 Real mountable engine
 Propulsion Fuel – diesel
 Automatic gearbox-
hydraulic retarder
 Total pneumatic suspension
 Pneumatic brake system
 Fuel reserve of 300ltres
 Minimum power of 260HP
• DART Buses Future
Technology
 Use of Gas
 Euro IV – VI technology
DART Technologies - ITS
One Single Software Platform
RTPI
AFCS
ITCS
ITS -Systems Capability
Real Time Visibility
and Tracking of
buses
1. automatic vehicle
location
2.Various view, selection
and search options
3. Monitoring of the
performed services
(status, deviations, etc.)
Daily Planning
1.Route Planning
2.Bus Scheduling
Operations
Optimization as and
when required
DART Technologies - ITCS
Operation and control centre:
• Real time visibility and tracking of buses.
• Daily Planning and bus scheduling.
• Operations optimization.
Ubungo
Gerezani
Morocco
Kivukoni Kimara Kimara
Flat Fare
Adult TShs 650
Student TShs 200
Trunk Service
Feeder Service
Flat Fare
Adult TShs 400
Student TShs 200
AFCS
Automatic Fare collection, clearing and settlement system
Integrated Fare : Adult TShs 800 and Student TShs 200
Current Products
Future Products
1. Intermodal Services i.e Use of one card for BRT and
Ferries
Ticketing Solution for Buses
 Barcode Tickets
 Contactless Cards
DART System - Pre-boarding Ticketing
DART AGENCY
Overwhelming public response
Savings in time & money-
2-3 hours down to 45 min.
More
comfortable and
larger
Environmentally friendly
engines – Euro III
Modern technology (ITS/AFCS)
Electronic Smart cards, Optic fibre
1,000+ employed
Business
opportunities -
parking
Consideration for
Disabled, pregnant
women, elderly
Students travel
comfortably
Attracts Financiers-
WB, AfDB, AFD
(France)
Security - Police
ACHIEVEMENTS
Impact evaluation –
improved mobility
& satisfaction
DART AGENCY
Invasion of infrastructure
-vehicles, motorcycles
-petty traders
Inadequate skills on
modern technologies
(ITS/AFCS
Accidents
New to Tanzania:
Peak hour congestion
Scheduling of buses
- delays
Delays due to traffic
Intersections
e.g. Ubungo
Resettlements -
daladalas
High expections-
Pilot vs. Full service
Delays during construction
Procurement (PPP) of Service Providers
CHALLENGES
24
Flooding at Jangwani
Accidents
Brt Invadors
Birth a station
Ubungo bus terminal
>200 buses 6-6.30 am
Procurement of
Service Providers
commence early
Public
Awareness:
- call centre
Build capacity
continuous training
Resettlements
be addressed
early – dala dala
Adjacent roads
& Feeder roads
be in good
condition
Have legislation
for BRT
Establish control
room
Maintain
cooperation
Increase
Revenue sources
-Transit Oriented Development
Provide Park &
Ride facilities
early
Use structure
that ensures
good quality of
service
Next phases
learn from
shortcomings of
pilot Ph I
LESSONS LEARNT
Demand Management Strategies
2
6
ResourceRequirement
With the distribution of traffic, the deployment of resources will be rationalized
at the operator level, compared to resource deployment as per peak hour
demand.
Time
Peak Hour Demand
Distributed Demand
Rationalize and Optimize Resources
Demand Management
Strategies
0
10
20
30
40
50
60
70
80
Transport Share - Developing Cities
Bus Walk/Cycle Metro Car
Source: Bus Rapid Transit Planning Guide, gTZ
High Bus Use and Walkable City > Less Congestion
DART AGENCY
Integrate all modes of Transport
in Dar es Salaam:
-establish an institution.
-Master Plan (JICA) shows need
for Metros from 2025/2030.
Have one smart card/system for
all modes- BRT, Ferry, Rail.
• Convenient for passengers
• Saves resources from having
several payment systems.
• Difficult to merge different
systems later
To provide full service for
Phase I
• Procurement of 2nd Operator
on going.
• Current operator to continue
subject to performance. Implementation of next phases 2 to 6
continuing
• Consultants finalising design review for Phase 2.
Adverts on 12 Feb 2018 (buildings), 03 May 2018 (road
works).
• Procurement of Consultants for design & supervision
of phases 3 (review) & 4 ongoing. Design of Phases 5 &
6 also to be done.
• Procurement of Transaction Advisors, Service
providers to commence before completion of
construction.
• Expect traffic disruptions during construction.
• Dart building with state of art
control room.
• More involvement of dala dala
operators.
• Evaluate Impacts – Baseline
before operations started.
NEXT STEPS
Institutional review of DART Agency
29
Stakeholders engagement
Public education
30
Accessibility for all
31
Enhanced Safety – Pedestrian
32
Convenient to users
33
Reliable
DART AGENCY
UNPAID AREA
PAID AREA
 DART Phase 1 interim operations are
continuing and winning the global
Sustainability Transport Award has been
great for Tanzania considering the efforts
put into this project.
 Good coordination amongst key
stakeholders is crucial for success of the
project.
 Cooperation with Development Partners
such as the World Bank, African
Development Bank and others is well
appreciated.
 Hopefully, public transport in Dar es
Salaam will be further improved to all
modes and be convenient to the majority
of all classes of the public and thus
reduce considerably use of private cars -
be No.1 choice of means of transport.
35
CONCLUSION
Thank You

Mais conteúdo relacionado

Mais procurados

Universal architectural design
Universal architectural designUniversal architectural design
Universal architectural design
Nishita Mohta
 
Conservation terminologies for site and monuments
Conservation terminologies for site and monumentsConservation terminologies for site and monuments
Conservation terminologies for site and monuments
ALI HYDER GADHI
 

Mais procurados (20)

Types of urban design
Types of urban designTypes of urban design
Types of urban design
 
Introduction to IGBC Green Factory Rating System_January 2015
Introduction to IGBC Green Factory Rating System_January 2015Introduction to IGBC Green Factory Rating System_January 2015
Introduction to IGBC Green Factory Rating System_January 2015
 
Sustainable Cities
Sustainable CitiesSustainable Cities
Sustainable Cities
 
Green city
Green city Green city
Green city
 
Copenhagen
CopenhagenCopenhagen
Copenhagen
 
Universal architectural design
Universal architectural designUniversal architectural design
Universal architectural design
 
Landscape urbanism
Landscape urbanism Landscape urbanism
Landscape urbanism
 
Land Use and Legibility- Urban Design Terminology
Land Use and Legibility- Urban Design TerminologyLand Use and Legibility- Urban Design Terminology
Land Use and Legibility- Urban Design Terminology
 
Case study on Majid Sarani & various streets
Case study on Majid Sarani & various streetsCase study on Majid Sarani & various streets
Case study on Majid Sarani & various streets
 
Sustainable Urban Development
Sustainable Urban DevelopmentSustainable Urban Development
Sustainable Urban Development
 
City Beautiful
City BeautifulCity Beautiful
City Beautiful
 
IGBC RATING SYSTEM
IGBC RATING SYSTEMIGBC RATING SYSTEM
IGBC RATING SYSTEM
 
Indian Green Building Council Green Schools Rating
Indian Green Building Council Green Schools RatingIndian Green Building Council Green Schools Rating
Indian Green Building Council Green Schools Rating
 
Green city
Green cityGreen city
Green city
 
Untold Story of Chandigarh Master Plan
Untold Story of Chandigarh Master PlanUntold Story of Chandigarh Master Plan
Untold Story of Chandigarh Master Plan
 
Tele aviv
Tele avivTele aviv
Tele aviv
 
Conservation terminologies for site and monuments
Conservation terminologies for site and monumentsConservation terminologies for site and monuments
Conservation terminologies for site and monuments
 
Asymptote architecture
Asymptote architectureAsymptote architecture
Asymptote architecture
 
wankhede stadium case study
wankhede stadium case studywankhede stadium case study
wankhede stadium case study
 
Marine park design
Marine park designMarine park design
Marine park design
 

Semelhante a Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwakatare

Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
BRTCoE
 
Theme 1 Technological improvements in BRT and BHLS
Theme 1 Technological improvements in BRT and BHLSTheme 1 Technological improvements in BRT and BHLS
Theme 1 Technological improvements in BRT and BHLS
BRTCoE
 
Technological improvements in BRT and BHLS Oxford sept 2013
Technological improvements in BRT and BHLS Oxford sept 2013Technological improvements in BRT and BHLS Oxford sept 2013
Technological improvements in BRT and BHLS Oxford sept 2013
BRTCoE
 
MyCiti presentation by Kylie Hatton
MyCiti presentation by Kylie HattonMyCiti presentation by Kylie Hatton
MyCiti presentation by Kylie Hatton
guylundy
 
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements   Sbs Transist Vs SmrtAfa Interpretation Of Financial Statements   Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
ruoting
 

Semelhante a Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwakatare (20)

Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
Webinar: Examples of BRT implementation in South Africa metropolitan and smal...
 
Modern Roads
Modern RoadsModern Roads
Modern Roads
 
What PRASA is doing to improve the passenger rail service in the Western Cape
What PRASA is doing to improve the passenger rail service in the Western CapeWhat PRASA is doing to improve the passenger rail service in the Western Cape
What PRASA is doing to improve the passenger rail service in the Western Cape
 
Tackling future urban mobility demand in singapore
Tackling future urban mobility demand in singaporeTackling future urban mobility demand in singapore
Tackling future urban mobility demand in singapore
 
Theme 1 Technological improvements in BRT and BHLS
Theme 1 Technological improvements in BRT and BHLSTheme 1 Technological improvements in BRT and BHLS
Theme 1 Technological improvements in BRT and BHLS
 
Technological improvements in BRT and BHLS Oxford sept 2013
Technological improvements in BRT and BHLS Oxford sept 2013Technological improvements in BRT and BHLS Oxford sept 2013
Technological improvements in BRT and BHLS Oxford sept 2013
 
Transforming Urban Mobility in Africa: A Strong Institution, a Prerequisite
Transforming Urban Mobility in Africa: A Strong Institution, a PrerequisiteTransforming Urban Mobility in Africa: A Strong Institution, a Prerequisite
Transforming Urban Mobility in Africa: A Strong Institution, a Prerequisite
 
monorail system implication in Sri Lanka
monorail system implication in Sri Lankamonorail system implication in Sri Lanka
monorail system implication in Sri Lanka
 
Capacity management in large projects
Capacity management in large projectsCapacity management in large projects
Capacity management in large projects
 
Lagos BRT "Lite" : A First for Africa
Lagos BRT "Lite":  A First for AfricaLagos BRT "Lite":  A First for Africa
Lagos BRT "Lite" : A First for Africa
 
Transantiago
TransantiagoTransantiago
Transantiago
 
Multimodal in rail development: popularity and reaping benefits
Multimodal in rail development: popularity and reaping benefitsMultimodal in rail development: popularity and reaping benefits
Multimodal in rail development: popularity and reaping benefits
 
Metro Rail final.pptx
Metro Rail final.pptxMetro Rail final.pptx
Metro Rail final.pptx
 
Public transport improvement
Public transport improvement Public transport improvement
Public transport improvement
 
ULTIMO-overviewV2.2.pptx
ULTIMO-overviewV2.2.pptxULTIMO-overviewV2.2.pptx
ULTIMO-overviewV2.2.pptx
 
SEM 1 PRESENTATION
SEM 1 PRESENTATIONSEM 1 PRESENTATION
SEM 1 PRESENTATION
 
MyCiti presentation by Kylie Hatton
MyCiti presentation by Kylie HattonMyCiti presentation by Kylie Hatton
MyCiti presentation by Kylie Hatton
 
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements   Sbs Transist Vs SmrtAfa Interpretation Of Financial Statements   Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
 
16 projects
16 projects16 projects
16 projects
 
Feasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik CityFeasibility Study of Mass Transport in Nasik City
Feasibility Study of Mass Transport in Nasik City
 

Mais de BRTCoE

Gabriel Oliveira - BRT in Brazil: state of the practice as from the BRT Stand...
Gabriel Oliveira - BRT in Brazil: state of the practice as from the BRT Stand...Gabriel Oliveira - BRT in Brazil: state of the practice as from the BRT Stand...
Gabriel Oliveira - BRT in Brazil: state of the practice as from the BRT Stand...
BRTCoE
 
Heather Allen - Why do we need to consider how women move in urban transport ...
Heather Allen - Why do we need to consider how women move in urban transport ...Heather Allen - Why do we need to consider how women move in urban transport ...
Heather Allen - Why do we need to consider how women move in urban transport ...
BRTCoE
 

Mais de BRTCoE (20)

BRT+ Workshop
BRT+ WorkshopBRT+ Workshop
BRT+ Workshop
 
MaaS Trial in Sydney
MaaS Trial in SydneyMaaS Trial in Sydney
MaaS Trial in Sydney
 
Full cost reliability by Juan Carlos Muñoz
Full cost reliability by Juan Carlos MuñozFull cost reliability by Juan Carlos Muñoz
Full cost reliability by Juan Carlos Muñoz
 
Congreso nacional chileno 2019 DITL
Congreso nacional chileno 2019 DITLCongreso nacional chileno 2019 DITL
Congreso nacional chileno 2019 DITL
 
Gabriel Oliveira - BRT in Brazil: state of the practice as from the BRT Stand...
Gabriel Oliveira - BRT in Brazil: state of the practice as from the BRT Stand...Gabriel Oliveira - BRT in Brazil: state of the practice as from the BRT Stand...
Gabriel Oliveira - BRT in Brazil: state of the practice as from the BRT Stand...
 
Heather Allen - Why do we need to consider how women move in urban transport ...
Heather Allen - Why do we need to consider how women move in urban transport ...Heather Allen - Why do we need to consider how women move in urban transport ...
Heather Allen - Why do we need to consider how women move in urban transport ...
 
Workshop Innovation in Africa - Manifesto for BRT Lite
Workshop Innovation in Africa - Manifesto for BRT LiteWorkshop Innovation in Africa - Manifesto for BRT Lite
Workshop Innovation in Africa - Manifesto for BRT Lite
 
Workshop Innovation in Africa - BRT Lessons from Nigeria by Dr. Dayo Mobereola
Workshop Innovation in Africa - BRT Lessons from Nigeria by Dr. Dayo MobereolaWorkshop Innovation in Africa - BRT Lessons from Nigeria by Dr. Dayo Mobereola
Workshop Innovation in Africa - BRT Lessons from Nigeria by Dr. Dayo Mobereola
 
Workshop Innovation in Africa - Context, challenges & opportunities for urban...
Workshop Innovation in Africa - Context, challenges & opportunities for urban...Workshop Innovation in Africa - Context, challenges & opportunities for urban...
Workshop Innovation in Africa - Context, challenges & opportunities for urban...
 
Workshop Innovation in Africa - Mobilize
Workshop Innovation in Africa - MobilizeWorkshop Innovation in Africa - Mobilize
Workshop Innovation in Africa - Mobilize
 
Workshop Innovation in Africa - Day one of operations by Cristina Albuquerque
Workshop Innovation in Africa - Day one of operations by Cristina AlbuquerqueWorkshop Innovation in Africa - Day one of operations by Cristina Albuquerque
Workshop Innovation in Africa - Day one of operations by Cristina Albuquerque
 
Workshop Innovation in Africa - BRT, Minibus System and Innovation in African...
Workshop Innovation in Africa - BRT, Minibus System and Innovation in African...Workshop Innovation in Africa - BRT, Minibus System and Innovation in African...
Workshop Innovation in Africa - BRT, Minibus System and Innovation in African...
 
Workshop Innovation in Africa - BRT in South Africa by Christo Venter
Workshop Innovation in Africa - BRT in South Africa by Christo VenterWorkshop Innovation in Africa - BRT in South Africa by Christo Venter
Workshop Innovation in Africa - BRT in South Africa by Christo Venter
 
Workshop Innovation in Africa - BRT+ Centre of Excellence Presentation
Workshop Innovation in Africa - BRT+ Centre of Excellence PresentationWorkshop Innovation in Africa - BRT+ Centre of Excellence Presentation
Workshop Innovation in Africa - BRT+ Centre of Excellence Presentation
 
Camila Balbontin - Do preferences for BRT and LRT change as a voter, citizen,...
Camila Balbontin - Do preferences for BRT and LRT change as a voter, citizen,...Camila Balbontin - Do preferences for BRT and LRT change as a voter, citizen,...
Camila Balbontin - Do preferences for BRT and LRT change as a voter, citizen,...
 
Cristian Navas - Testing collaborative accessibility-based engagement tools: ...
Cristian Navas - Testing collaborative accessibility-based engagement tools: ...Cristian Navas - Testing collaborative accessibility-based engagement tools: ...
Cristian Navas - Testing collaborative accessibility-based engagement tools: ...
 
Juan Carlos Muñoz - Connected and automated buses. An opportunity to bring re...
Juan Carlos Muñoz - Connected and automated buses. An opportunity to bring re...Juan Carlos Muñoz - Connected and automated buses. An opportunity to bring re...
Juan Carlos Muñoz - Connected and automated buses. An opportunity to bring re...
 
BRT Station Design in the Urban Context
BRT Station Design in the Urban ContextBRT Station Design in the Urban Context
BRT Station Design in the Urban Context
 
Zhao emotional travel 20160920 p
Zhao emotional travel 20160920 pZhao emotional travel 20160920 p
Zhao emotional travel 20160920 p
 
Urban Road Congestion Management - Capacity Investments and Pricing Policies
Urban Road Congestion Management - Capacity Investments and Pricing PoliciesUrban Road Congestion Management - Capacity Investments and Pricing Policies
Urban Road Congestion Management - Capacity Investments and Pricing Policies
 

Último

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Último (20)

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 

Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwakatare

  • 1. BRT LESSONS FROM DAR ES SALAAM Presented at Workshop on BRT Innovation in Africa 29 JUNE 2018 PRESENTED BY ENG. RONALD LWAKATARE, CE DART
  • 2. • One of the fastest growing cities in the world. Average annual growth from 2002 to 2012 was 7.7%. • City’s population is currently nearly 5 million. • Dar es Salaam metropolitan area covers a large part of the city with a total area of 1,391 square kilometres and a population density of 3,133 per square kilometre. • Economic growth in Dar es Salaam is estimated at 10% per annum, above the country average. • Average Annual Vehicular Growth is around 19% per annum (2002-2015). Introduction: Dar es Salaam City Profile
  • 3. 3 • Public Transport in Dar es Salaam is dated back in 1949 with Dar es Salaam Motor Transport Company (DMT). • DMT nationalized and UDA established in 1967. • Private sector involved from 1983. • Urban PT Challenges: – Poor roads and Insufficient infrastructure – Air quality and health issues. – Low capacity buses and no schedule services – Congestion Introduction: The history of Public Transport in DSM
  • 5. 4.MASS TRANSIT OPTIONS Bus Rapid Transit Light Rail Transit Underground metro Urban rail $5-15 M/KM $80-175 M/KM $12-25 M/KM Modernisation of the PT in DSM
  • 6. Public Transport System Visualized i. Metro System o High Cost and Operational Challenges o Too Big to Fail ii. Improved Bus System o Low Cost o No Operational Risk o Availability of Affordable Technology; and o Encourages Participation of Locals Selection of BRT for DSM
  • 7. DART Agency: Established through Government Notice (GN) No. 120 of 25th May, 2007 under the Executive Agencies Act No. 30 of 1997. DART inaugurated on 16th June 2008. DART Mandate: To establish and operate a bus rapid transit system in Dar es Salaam. DART VISION: To have a modern public transport system at reasonable cost to users and yet profitable to the operators using high capacity buses which meet International Standards, environmentally friendly, operating on exclusive lanes, at less travelling time. DART MISSION: To provide quality, accessible and affordable mass transport system for the residents of Dar es Salaam which will subsequently: − enable poverty reduction, − improve standard of living, − lead to sustainable economic growth, and − act as a pioneer of private and public investment partnership in the transport sector DART Agency
  • 8. DART Agency - Structure 8
  • 9. BRT Characteristics CHARACTERISTICSFully dedicated right of way (buses avoid traffic congestion) Alignment in the center of the road (to avoid typical curb-side delays - turnings, parking, slow moving vehicles) Stations with off-board fare collection (to reduce boarding and alighting delay related to paying the driver) Station platforms level with the bus floor (to reduce boarding and alighting delay caused by steps) Redesigned intersections (to avoid intersection delays)
  • 10. DART Project – Initialisation • Year 2002 Dar es Salaam City Council initiated an idea of Bus Rapid Transit (BRT). Supported by United Nations Environment Programme (UNEP), Institute of Transport and Development Policy (ITDP) and the then Prime Minister’s Office Regional Administration and Local Government. • Global Environmental Facility (GEF) National Focal Point endorsed proposal to establish a BRT Project in Dar es Salaam - Multistakeholder Working Group established. • DCC endorsed project in April 2003 - Technical team and Steering Committee established. • Study tours conducted to cities with BRT around the world. • Project Management Unit (PMU) established 2004 - World Bank supported. 10
  • 11. DART System Corridors • Concept was Visualized in 2002 and 6 Corridors with 140.1 km were Selected and Construction Proposed in 6 Phases • Detailed Study was for Phase 1 was carried out in 2007 and construction works started in 2010 to 2015. • Detailed design for Phases 2 and 3 was completed in 2015. • Phase 4 increased from 16.1 (Tanki bovu) to 25.9 km (Tegeta)
  • 12. DART System Development - Phase-1  Length of 20.9 km; dedicated concrete road  Infarstructures: 1 Depot, 27 BRT Stations (4 Categories), 5 Terminals, 7 Feeder Stations and connects 11 feeder Routes to Main Corridors  Station Spacing 500-600m with dedicated pathways for Pedestrians & NMV Users  The cost of the Phase 1 infrastructure is about USD 170 million.  The contract works – 7 Packages.  Period of implementation – between 2010 – 2016.
  • 13. MoF & MoWCT PO-RALG DCC ISP (UDA-RT) TANROADS FUNDS MANAGER (NMB) SUMATRA DART KEY IMPLEMENTING ACTORS PUBLICSECTORPRIVATESECTOR EGA TR
  • 14. DART AGENCY Phase 1 Phase 2 Phase 3 Phase 4 No. of Buses Length Daily passengers Articulated 18m Feeder 12m Total buses Phase 1 20.9 400,000 177 128 305 Phase 2 20.3 495,000 102 111 213 Phase 3 23.6 395,000 123 94 217 Phase 4 25.9 168,000 80 60 140 Phase 5 22.8 Design not done Phase 6 27.6 TOTAL 141.1 1,458,000 875 DAILY PASSENGERS & NUMBER OF BUSES Note: Figures for new projects ie. Phases 2-6 to be reviewed and updated. Projections
  • 15. Modern Transport System DART AGENCY Infrastructure (Public) Corridor (roadways, bicycle and pedestrian paths) Stations/Terminals Depot Pedestrian bridges Control room Fare Collection (Private) Fare collection system Equipment (Turnstiles, Ticket Office Machines) Smart Cards, mobile top ups Bar coded paper tickets Bus Operations (Private) Buses, articulated 18m, standard 12m, hybrid 12m Bus Operations Cleaner fuel, Euro III standard Intelligent Transportation System DART System Phase 1- Implementation Arrangement
  • 16. Interim Services (for 2 Years) • Delay in Procurement Process for SP – UDART; Utilize the already Constructed Corridor; Test the System; and Relief to Congested Corridor • Interim Services become Operational on 10 May, 2016 covering 20.9km Trunk Routes and One Feeder Route with 115 Trunk and 25 feeder Buses • Average Daily Ridership, working Days, touched 200,000+ • Ticketing through AFCS • Fund Manager: NMB ; Fare Collector: UDART(Maxcom) DART System Phase 1 - Operations
  • 17. With Full Operation Services:  305 buses: - 177 Articulated (18M) and 128 Feeder (12M) Buses  Estimated Peak Hour Load 18,000 Passengers  Estimated Daily Ridership 450,000-500,000 per day  Expected Annual Ridership 130 Millions 17 DART System Phase 1 - Operations
  • 18. DART AGENCY DART Buses - Technology • DART Buses: General Specification – Trunk (18 m) and Feeder (12m)  Emission Class Euro III technology  Real mountable engine  Propulsion Fuel – diesel  Automatic gearbox- hydraulic retarder  Total pneumatic suspension  Pneumatic brake system  Fuel reserve of 300ltres  Minimum power of 260HP • DART Buses Future Technology  Use of Gas  Euro IV – VI technology
  • 19. DART Technologies - ITS One Single Software Platform RTPI AFCS ITCS ITS -Systems Capability Real Time Visibility and Tracking of buses 1. automatic vehicle location 2.Various view, selection and search options 3. Monitoring of the performed services (status, deviations, etc.) Daily Planning 1.Route Planning 2.Bus Scheduling Operations Optimization as and when required
  • 20. DART Technologies - ITCS Operation and control centre: • Real time visibility and tracking of buses. • Daily Planning and bus scheduling. • Operations optimization.
  • 21. Ubungo Gerezani Morocco Kivukoni Kimara Kimara Flat Fare Adult TShs 650 Student TShs 200 Trunk Service Feeder Service Flat Fare Adult TShs 400 Student TShs 200 AFCS Automatic Fare collection, clearing and settlement system Integrated Fare : Adult TShs 800 and Student TShs 200 Current Products Future Products 1. Intermodal Services i.e Use of one card for BRT and Ferries Ticketing Solution for Buses  Barcode Tickets  Contactless Cards DART System - Pre-boarding Ticketing
  • 22. DART AGENCY Overwhelming public response Savings in time & money- 2-3 hours down to 45 min. More comfortable and larger Environmentally friendly engines – Euro III Modern technology (ITS/AFCS) Electronic Smart cards, Optic fibre 1,000+ employed Business opportunities - parking Consideration for Disabled, pregnant women, elderly Students travel comfortably Attracts Financiers- WB, AfDB, AFD (France) Security - Police ACHIEVEMENTS Impact evaluation – improved mobility & satisfaction
  • 23. DART AGENCY Invasion of infrastructure -vehicles, motorcycles -petty traders Inadequate skills on modern technologies (ITS/AFCS Accidents New to Tanzania: Peak hour congestion Scheduling of buses - delays Delays due to traffic Intersections e.g. Ubungo Resettlements - daladalas High expections- Pilot vs. Full service Delays during construction Procurement (PPP) of Service Providers CHALLENGES
  • 24. 24 Flooding at Jangwani Accidents Brt Invadors Birth a station Ubungo bus terminal >200 buses 6-6.30 am
  • 25. Procurement of Service Providers commence early Public Awareness: - call centre Build capacity continuous training Resettlements be addressed early – dala dala Adjacent roads & Feeder roads be in good condition Have legislation for BRT Establish control room Maintain cooperation Increase Revenue sources -Transit Oriented Development Provide Park & Ride facilities early Use structure that ensures good quality of service Next phases learn from shortcomings of pilot Ph I LESSONS LEARNT
  • 26. Demand Management Strategies 2 6 ResourceRequirement With the distribution of traffic, the deployment of resources will be rationalized at the operator level, compared to resource deployment as per peak hour demand. Time Peak Hour Demand Distributed Demand Rationalize and Optimize Resources
  • 27. Demand Management Strategies 0 10 20 30 40 50 60 70 80 Transport Share - Developing Cities Bus Walk/Cycle Metro Car Source: Bus Rapid Transit Planning Guide, gTZ High Bus Use and Walkable City > Less Congestion
  • 28. DART AGENCY Integrate all modes of Transport in Dar es Salaam: -establish an institution. -Master Plan (JICA) shows need for Metros from 2025/2030. Have one smart card/system for all modes- BRT, Ferry, Rail. • Convenient for passengers • Saves resources from having several payment systems. • Difficult to merge different systems later To provide full service for Phase I • Procurement of 2nd Operator on going. • Current operator to continue subject to performance. Implementation of next phases 2 to 6 continuing • Consultants finalising design review for Phase 2. Adverts on 12 Feb 2018 (buildings), 03 May 2018 (road works). • Procurement of Consultants for design & supervision of phases 3 (review) & 4 ongoing. Design of Phases 5 & 6 also to be done. • Procurement of Transaction Advisors, Service providers to commence before completion of construction. • Expect traffic disruptions during construction. • Dart building with state of art control room. • More involvement of dala dala operators. • Evaluate Impacts – Baseline before operations started. NEXT STEPS Institutional review of DART Agency
  • 35.  DART Phase 1 interim operations are continuing and winning the global Sustainability Transport Award has been great for Tanzania considering the efforts put into this project.  Good coordination amongst key stakeholders is crucial for success of the project.  Cooperation with Development Partners such as the World Bank, African Development Bank and others is well appreciated.  Hopefully, public transport in Dar es Salaam will be further improved to all modes and be convenient to the majority of all classes of the public and thus reduce considerably use of private cars - be No.1 choice of means of transport. 35 CONCLUSION