Organization-wide defined process model

                   Questions answered by workshop key findings:
                   What’s the right depth and width of the process model?
                           - What’s the right number of levels?
                           - What’s the right level of detail?
                           - Which processes should be described?
                   How to implement operational information?
                   How to implement location-specific procedures?




Best Practice in Process Management
Organization-wide defined process model – Feb 2012, Page 2
Copyright© Lufthansa Technik AG. All rights reserved.
Subject to restrictions and disclaimer on last page.
What‘s the right depth and width of the process model?


                                                                      Width



                 Key Findings
                 Depth and width of the process model correlate
                 The root of the process model is a process map
                        - Core- / support- / management processes
                 The detailing ends with reference to
                 (manufacturer’s) manuals / operative documents
                 The right depth and width of the process model is
                 determined by the aims of the management
                 system and an individual decision

Depth

Best Practice in Process Management
Organization-wide defined process model – Feb 2012, Page 3
Copyright© Lufthansa Technik AG. All rights reserved.
Subject to restrictions and disclaimer on last page.
What‘s the right depth and width of the process model?


 The organization’s management system…                                                                                                     Width




                                                             De
                                                                  gre
                                                                        eo
                                                                             f in
                                                                                    teg
                                                                                          rat
                                                                                             i   on
                                                                                                      of
                                                                                                           ma
                                                                                                                na
                                                                                                                     ge
                                                                                                                          me
                                                                                                                             n   ts
                                                                                                                                   yst
                                                                                                                                      em




Depth

Best Practice in Process Management
Organization-wide defined process model – Feb 2012, Page 4
Copyright© Lufthansa Technik AG. All rights reserved.
Subject to restrictions and disclaimer on last page.
What‘s the right depth and width of the process model?


 The organization’s management system…                                                 Width

                                                             epicts higher level directives,




Depth

Best Practice in Process Management
Organization-wide defined process model – Feb 2012, Page 5
Copyright© Lufthansa Technik AG. All rights reserved.
Subject to restrictions and disclaimer on last page.
What‘s the right depth and width of the process model?


 The organization’s management system…                                                Width

                                                              integrates level directives,legislative
                                                             epicts higher normative and
                                                                requirements,




Depth

Best Practice in Process Management
Organization-wide defined process model – Feb 2012, Page 6
Copyright© Lufthansa Technik AG. All rights reserved.
Subject to restrictions and disclaimer on last page.
What‘s the right depth and width of the process model?


 The organization’s management system…                                                Width

                                                              integrates level directives,legislative
                                                             epicts higher normative and
                                                                requirements,

                                                             erves as basis for process improvement,




Depth

Best Practice in Process Management
Organization-wide defined process model – Feb 2012, Page 7
Copyright© Lufthansa Technik AG. All rights reserved.
Subject to restrictions and disclaimer on last page.
What‘s the right depth and width of the process model?


 The organization’s management system…                                                Width

                                                              integrates level directives,legislative
                                                             epicts higher normative and
                                                                requirements,

                                                             erves as basis for process improvement,
                                                             llows assignment of responsibilities,




Depth

Best Practice in Process Management
Organization-wide defined process model – Feb 2012, Page 8
Copyright© Lufthansa Technik AG. All rights reserved.
Subject to restrictions and disclaimer on last page.
What‘s the right depth and width of the process model?


 The organization’s management system…                                                Width

                                                              integrates level directives,legislative
                                                             epicts higher normative and
                                                                requirements,

                                                             erves as basis for process improvement,
                                                             llows assignment of responsibilities,




               ases training of employees,




Depth

Best Practice in Process Management
Organization-wide defined process model – Feb 2012, Page 9
Copyright© Lufthansa Technik AG. All rights reserved.
Subject to restrictions and disclaimer on last page.
What‘s the right depth and width of the process model?


 The organization’s management system…                                                 Width

                                                               integrates level directives,legislative
                                                              epicts higher normative and
                                                                 requirements,

                                                              erves as basis for process improvement,
                                                              llows assignment of responsibilities,




               ases training of employees,
               upports daily business,




Depth

Best Practice in Process Management
Organization-wide defined process model – Feb 2012, Page 10
Copyright© Lufthansa Technik AG. All rights reserved.
Subject to restrictions and disclaimer on last page.
What‘s the right depth and width of the process model?


 The organization’s management system…                                                   Width

                                                                 integrates level directives,legislative
                                                                epicts higher normative and
                                                                   requirements,

                                                                erves as basis for process improvement,
                                                                llows assignment of responsibilities,




               ases training of employees,
               upports daily business,
                is used as bi-directional
                  communication platform,                                               ? ! ? !
               acilitates active process management,
               nfolds possibilities for informal discussions.
Depth

Best Practice in Process Management
Organization-wide defined process model – Feb 2012, Page 11
Copyright© Lufthansa Technik AG. All rights reserved.
Subject to restrictions and disclaimer on last page.
What‘s the right depth and width of the process model?


                                                      The organization’s management system…
low


         Degree of integration of management system
                                                      depicts higher level directives,
                                                      integrates normative and legislative requirements,
                                                      serves as basis for process improvement,
                                                      allows assignment of responsibilities,
                                                      eases training of employees,
                                                      supports daily business,
                                                      is used as bi-directional communication platform,
                                                                                                            ? ! ? !
                                                      facilitates active process management,
high
                                                      unfolds possibilities for informal discussions.


Best Practice in Process Management
Organization-wide defined process model – Feb 2012, Page 12
Copyright© Lufthansa Technik AG. All rights reserved.
Subject to restrictions and disclaimer on last page.
How to implement operational information:
Target group oriented placement


                   Placement of operational                   Placement of operational
                   information in process                     information only
                   descriptions and linked                    in linked documents
                   documents



 Criterium to decide where to place the necessary operational information:
 Who is my “customer” and how can process management support him?
         - Can the employee, who needs to be provided with the information, access
           the process management system within his flow of work?
         - Does the system help or handicap the employee in his routine?




Best Practice in Process Management
Organization-wide defined process model – Feb 2012, Page 13
Copyright© Lufthansa Technik AG. All rights reserved.
Subject to restrictions and disclaimer on last page.
How to implement location-specific procedures?


 Implementation of location-specific                          Mandatory Group Processes
      procedures only in operational                            complemented with location-
      documents linked within the process                       specific processes




                                                                       A         B
                            A               B

Best Practice in Process Management
Organization-wide defined process model – Feb 2012, Page 14
Copyright© Lufthansa Technik AG. All rights reserved.
Subject to restrictions and disclaimer on last page.
Overview



Organization-wide defined process model

                   Questions answered by workshop key findings:
                   What’s the right depth and width of the process model?
                           - What’s the right number of levels?
                           - What’s the right level of detail?
                           - Which processes should be described?
                   How to implement operational information?
                   How to implement location-specific procedures?




Best Practice in Process Management
Organization-wide defined process model – Feb 2012, Page 15
Copyright© Lufthansa Technik AG. All rights reserved.
Subject to restrictions and disclaimer on last page.
Follow our blog to receive updates:
                                                                          http://www.BPinPM.net

                                                                          For additional information, please contact:
                                                                          Mirko.Kloppenburg@BPinPM.net

                                                                          Lufthansa Technik AG, HAM TQ32/D
                                                                          Weg beim Jäger 193
                                                                          22335 Hamburg, Germany


  Thank you for your attention.
Copyright© Lufthansa Technik AG. All rights reserved.
The information contained in this presentation is proprietary to Lufthansa Technik AG and is disclosed in confidence. The presentation
and the information contained herein shall be kept strictly confidential and shall not be used, disclosed to others or reproduced without
the express written consent of Lufthansa Technik AG. Nothing contained in this publication shall constitute any warranty, guarantee or
liability for LufthansaManagement its subsidiaries and affiliates but is for information purposes only. Accordingly, Lufthansa Technik AG
Best Practice in Process Technik AG,
its subsidiaries and affiliates neither expresslyPage conclusively accept responsibility or liability for the actuality, accuracy and
Organization-wide defined process model – Feb 2012, nor 16
completeness of the statements rights information contained in this publication.
Copyright© Lufthansa Technik AG. All and reserved.
Subject to restrictions and disclaimer on last page.

Mais conteúdo relacionado

Semelhante a BPinPM - Organization wide defined Process Model

Xamtrex consulting ems benefits document
Xamtrex consulting ems benefits documentXamtrex consulting ems benefits document
Xamtrex consulting ems benefits documentSHYAM DIXIT
 
Case Management and BPM
Case Management and BPMCase Management and BPM
Case Management and BPMSandy Kemsley
 
BPM - The Promise And Challenges
BPM  - The Promise And ChallengesBPM  - The Promise And Challenges
BPM - The Promise And ChallengesJerald Burget
 
Paper Dynamic Case Management by Capgemini ECM, Yvo Booisma
Paper Dynamic Case Management by Capgemini ECM, Yvo BooismaPaper Dynamic Case Management by Capgemini ECM, Yvo Booisma
Paper Dynamic Case Management by Capgemini ECM, Yvo BooismaYvo Booisma
 
A potential pitfalls_of_process_modeling_part_a-1
A potential pitfalls_of_process_modeling_part_a-1A potential pitfalls_of_process_modeling_part_a-1
A potential pitfalls_of_process_modeling_part_a-1Jean-François Périé
 
Thinking Beyond Traditional BPM
Thinking Beyond Traditional BPMThinking Beyond Traditional BPM
Thinking Beyond Traditional BPMSandy Kemsley
 
10%2 D04%20 Art%20 Bp%20 Maturity%20 Model%20%2 D%20 Fisher%2 Epdf
10%2 D04%20 Art%20 Bp%20 Maturity%20 Model%20%2 D%20 Fisher%2 Epdf10%2 D04%20 Art%20 Bp%20 Maturity%20 Model%20%2 D%20 Fisher%2 Epdf
10%2 D04%20 Art%20 Bp%20 Maturity%20 Model%20%2 D%20 Fisher%2 Epdfshinikju
 
It Project And Agile
It Project And AgileIt Project And Agile
It Project And AgileRoman Agaev
 
Vendor Management - An Overview (Project File)
Vendor Management - An Overview (Project File)Vendor Management - An Overview (Project File)
Vendor Management - An Overview (Project File)Jyoti Kumari
 
Business process modelling and e tom telecom
Business process modelling and e tom telecomBusiness process modelling and e tom telecom
Business process modelling and e tom telecomKate Koltunova
 
ChrisGarrisonProjectThesis
ChrisGarrisonProjectThesisChrisGarrisonProjectThesis
ChrisGarrisonProjectThesisChris Garrison
 
Bpm The promise
Bpm The promiseBpm The promise
Bpm The promisesaruman70
 

Semelhante a BPinPM - Organization wide defined Process Model (20)

Xamtrex consulting ems benefits document
Xamtrex consulting ems benefits documentXamtrex consulting ems benefits document
Xamtrex consulting ems benefits document
 
Case Management and BPM
Case Management and BPMCase Management and BPM
Case Management and BPM
 
4.pptx
4.pptx4.pptx
4.pptx
 
ap_casemgmt_whitepaper
ap_casemgmt_whitepaperap_casemgmt_whitepaper
ap_casemgmt_whitepaper
 
systems thinking by Fingar
systems thinking by Fingarsystems thinking by Fingar
systems thinking by Fingar
 
BPM - The Promise And Challenges
BPM  - The Promise And ChallengesBPM  - The Promise And Challenges
BPM - The Promise And Challenges
 
Business Process Management - topsoft 2010_03_24 13:00
Business Process Management - topsoft 2010_03_24 13:00Business Process Management - topsoft 2010_03_24 13:00
Business Process Management - topsoft 2010_03_24 13:00
 
Paper Dynamic Case Management by Capgemini ECM, Yvo Booisma
Paper Dynamic Case Management by Capgemini ECM, Yvo BooismaPaper Dynamic Case Management by Capgemini ECM, Yvo Booisma
Paper Dynamic Case Management by Capgemini ECM, Yvo Booisma
 
A potential pitfalls_of_process_modeling_part_a-1
A potential pitfalls_of_process_modeling_part_a-1A potential pitfalls_of_process_modeling_part_a-1
A potential pitfalls_of_process_modeling_part_a-1
 
四大移动操作系统企业应用安全性和可管理性横向评测
四大移动操作系统企业应用安全性和可管理性横向评测四大移动操作系统企业应用安全性和可管理性横向评测
四大移动操作系统企业应用安全性和可管理性横向评测
 
Usecase Presentation
Usecase PresentationUsecase Presentation
Usecase Presentation
 
Thinking Beyond Traditional BPM
Thinking Beyond Traditional BPMThinking Beyond Traditional BPM
Thinking Beyond Traditional BPM
 
Business process management
Business process managementBusiness process management
Business process management
 
10%2 D04%20 Art%20 Bp%20 Maturity%20 Model%20%2 D%20 Fisher%2 Epdf
10%2 D04%20 Art%20 Bp%20 Maturity%20 Model%20%2 D%20 Fisher%2 Epdf10%2 D04%20 Art%20 Bp%20 Maturity%20 Model%20%2 D%20 Fisher%2 Epdf
10%2 D04%20 Art%20 Bp%20 Maturity%20 Model%20%2 D%20 Fisher%2 Epdf
 
GEM-EMA Practitioner Guide
GEM-EMA Practitioner GuideGEM-EMA Practitioner Guide
GEM-EMA Practitioner Guide
 
It Project And Agile
It Project And AgileIt Project And Agile
It Project And Agile
 
Vendor Management - An Overview (Project File)
Vendor Management - An Overview (Project File)Vendor Management - An Overview (Project File)
Vendor Management - An Overview (Project File)
 
Business process modelling and e tom telecom
Business process modelling and e tom telecomBusiness process modelling and e tom telecom
Business process modelling and e tom telecom
 
ChrisGarrisonProjectThesis
ChrisGarrisonProjectThesisChrisGarrisonProjectThesis
ChrisGarrisonProjectThesis
 
Bpm The promise
Bpm The promiseBpm The promise
Bpm The promise
 

Último

Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 

Último (20)

Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 

BPinPM - Organization wide defined Process Model

  • 1. Thomas Jussen, Mirko Kloppenburg Best Practice in Process Management Lufthansa Technik AG Management System, HAM TQ32/D Organization-wide defined process model Weg beim Jäger 193 22335 Hamburg Hamburg, February 2012
  • 2. Overview Organization-wide defined process model Questions answered by workshop key findings: What’s the right depth and width of the process model? - What’s the right number of levels? - What’s the right level of detail? - Which processes should be described? How to implement operational information? How to implement location-specific procedures? Best Practice in Process Management Organization-wide defined process model – Feb 2012, Page 2 Copyright© Lufthansa Technik AG. All rights reserved. Subject to restrictions and disclaimer on last page.
  • 3. What‘s the right depth and width of the process model? Width Key Findings Depth and width of the process model correlate The root of the process model is a process map - Core- / support- / management processes The detailing ends with reference to (manufacturer’s) manuals / operative documents The right depth and width of the process model is determined by the aims of the management system and an individual decision Depth Best Practice in Process Management Organization-wide defined process model – Feb 2012, Page 3 Copyright© Lufthansa Technik AG. All rights reserved. Subject to restrictions and disclaimer on last page.
  • 4. What‘s the right depth and width of the process model? The organization’s management system… Width De gre eo f in teg rat i on of ma na ge me n ts yst em Depth Best Practice in Process Management Organization-wide defined process model – Feb 2012, Page 4 Copyright© Lufthansa Technik AG. All rights reserved. Subject to restrictions and disclaimer on last page.
  • 5. What‘s the right depth and width of the process model? The organization’s management system… Width epicts higher level directives, Depth Best Practice in Process Management Organization-wide defined process model – Feb 2012, Page 5 Copyright© Lufthansa Technik AG. All rights reserved. Subject to restrictions and disclaimer on last page.
  • 6. What‘s the right depth and width of the process model? The organization’s management system… Width  integrates level directives,legislative epicts higher normative and requirements, Depth Best Practice in Process Management Organization-wide defined process model – Feb 2012, Page 6 Copyright© Lufthansa Technik AG. All rights reserved. Subject to restrictions and disclaimer on last page.
  • 7. What‘s the right depth and width of the process model? The organization’s management system… Width  integrates level directives,legislative epicts higher normative and requirements, erves as basis for process improvement, Depth Best Practice in Process Management Organization-wide defined process model – Feb 2012, Page 7 Copyright© Lufthansa Technik AG. All rights reserved. Subject to restrictions and disclaimer on last page.
  • 8. What‘s the right depth and width of the process model? The organization’s management system… Width  integrates level directives,legislative epicts higher normative and requirements, erves as basis for process improvement, llows assignment of responsibilities, Depth Best Practice in Process Management Organization-wide defined process model – Feb 2012, Page 8 Copyright© Lufthansa Technik AG. All rights reserved. Subject to restrictions and disclaimer on last page.
  • 9. What‘s the right depth and width of the process model? The organization’s management system… Width  integrates level directives,legislative epicts higher normative and requirements, erves as basis for process improvement, llows assignment of responsibilities, ases training of employees, Depth Best Practice in Process Management Organization-wide defined process model – Feb 2012, Page 9 Copyright© Lufthansa Technik AG. All rights reserved. Subject to restrictions and disclaimer on last page.
  • 10. What‘s the right depth and width of the process model? The organization’s management system… Width  integrates level directives,legislative epicts higher normative and requirements, erves as basis for process improvement, llows assignment of responsibilities, ases training of employees, upports daily business, Depth Best Practice in Process Management Organization-wide defined process model – Feb 2012, Page 10 Copyright© Lufthansa Technik AG. All rights reserved. Subject to restrictions and disclaimer on last page.
  • 11. What‘s the right depth and width of the process model? The organization’s management system… Width  integrates level directives,legislative epicts higher normative and requirements, erves as basis for process improvement, llows assignment of responsibilities, ases training of employees, upports daily business,  is used as bi-directional communication platform, ? ! ? ! acilitates active process management, nfolds possibilities for informal discussions. Depth Best Practice in Process Management Organization-wide defined process model – Feb 2012, Page 11 Copyright© Lufthansa Technik AG. All rights reserved. Subject to restrictions and disclaimer on last page.
  • 12. What‘s the right depth and width of the process model? The organization’s management system… low Degree of integration of management system depicts higher level directives, integrates normative and legislative requirements, serves as basis for process improvement, allows assignment of responsibilities, eases training of employees, supports daily business, is used as bi-directional communication platform, ? ! ? ! facilitates active process management, high unfolds possibilities for informal discussions. Best Practice in Process Management Organization-wide defined process model – Feb 2012, Page 12 Copyright© Lufthansa Technik AG. All rights reserved. Subject to restrictions and disclaimer on last page.
  • 13. How to implement operational information: Target group oriented placement Placement of operational Placement of operational information in process information only descriptions and linked in linked documents documents Criterium to decide where to place the necessary operational information: Who is my “customer” and how can process management support him? - Can the employee, who needs to be provided with the information, access the process management system within his flow of work? - Does the system help or handicap the employee in his routine? Best Practice in Process Management Organization-wide defined process model – Feb 2012, Page 13 Copyright© Lufthansa Technik AG. All rights reserved. Subject to restrictions and disclaimer on last page.
  • 14. How to implement location-specific procedures?  Implementation of location-specific  Mandatory Group Processes procedures only in operational complemented with location- documents linked within the process specific processes A B A B Best Practice in Process Management Organization-wide defined process model – Feb 2012, Page 14 Copyright© Lufthansa Technik AG. All rights reserved. Subject to restrictions and disclaimer on last page.
  • 15. Overview Organization-wide defined process model Questions answered by workshop key findings: What’s the right depth and width of the process model? - What’s the right number of levels? - What’s the right level of detail? - Which processes should be described? How to implement operational information? How to implement location-specific procedures? Best Practice in Process Management Organization-wide defined process model – Feb 2012, Page 15 Copyright© Lufthansa Technik AG. All rights reserved. Subject to restrictions and disclaimer on last page.
  • 16. Follow our blog to receive updates: http://www.BPinPM.net For additional information, please contact: Mirko.Kloppenburg@BPinPM.net Lufthansa Technik AG, HAM TQ32/D Weg beim Jäger 193 22335 Hamburg, Germany Thank you for your attention. Copyright© Lufthansa Technik AG. All rights reserved. The information contained in this presentation is proprietary to Lufthansa Technik AG and is disclosed in confidence. The presentation and the information contained herein shall be kept strictly confidential and shall not be used, disclosed to others or reproduced without the express written consent of Lufthansa Technik AG. Nothing contained in this publication shall constitute any warranty, guarantee or liability for LufthansaManagement its subsidiaries and affiliates but is for information purposes only. Accordingly, Lufthansa Technik AG Best Practice in Process Technik AG, its subsidiaries and affiliates neither expresslyPage conclusively accept responsibility or liability for the actuality, accuracy and Organization-wide defined process model – Feb 2012, nor 16 completeness of the statements rights information contained in this publication. Copyright© Lufthansa Technik AG. All and reserved. Subject to restrictions and disclaimer on last page.

Notas do Editor

  1. End of Detailing: Avoid duplicate information!
  2. Promising Practice: WIKI (Pre-BMS) can provide input and help finding the right level of detail
  3. Provide a specific example